DATE: February 25, 2013 •
TO: Honorable Mayor and Mem bserof the City•Council through City Manager
?11.
•
FROM Dan St.:John 4►. =t , u lic Works &Utilities
Larry Zimm- ' _ .41.% ger, Capital Projects Division
SUBJECT: . Resolution Authori2ing,Award of Contraci for the HSIP Lighted Crosswalks
Project
RECOMMENDATION
Staff recommends that theeCity'Council approve the resolution:authorizing award of contract for
the HSIP Lighted.Crosswalks Project.
BACKGROUND
On April 4,; 011, City Council accepted a federal Highway:Safetylmprovement Program
(HSIP);grant to fund 90% the HSIP'Lighted Crosswalks project. The funding is for crosswalk
improvementsralongtwo main,walking;and bicycling routes�to'Casa Grande High School. The
two existing'pedestrian crossings:selected for the planned improvements are,located on Ely
Boulevard South,at Spoonbill Avenue, and Casa Grande Road at CrinellaDrive. Both roads are
approximately80 feet wide with,a posted vehicular speed of 35 miles per hour and require
.students tocross four travel lanes and a two-direction`left-turn lane. The project scope was
developed.by City public works and police staff to"address incidents involving pedestrians at
these locations. Council gave;verbal,direction in the fall of 2009 for the project scope after a
staff-presentation,-and the project is included in the current CIP.
The proposed action meets Council;Goal "Plan for and implement priority capital projects as
fnding-permits".
DISCUSSION
The Notice Inviting Bids was issued on December 12, 2012: On January16, 2013, 8 bids were.
received as follows: -
Name of Bidder Business Location Total'.Bid
DC Electric Cotati $131,670 Lowest Responsible Bidder
Siemens Industry,,Inc. Novato $147,000
Ray's Electric Oakland ! $148;400
Agehda'Rev`iew^: 1 •
City Attorney, "^ Finance Di +a for • City Manager 1
•
Mike Brown Electric Co. Cotati , .$161,380,
W. Bradley.Electric; Inc. Novato "$161;600
Steiny and Company, Inc. Vallejo $1169,194
Cal Electro,Inc. Redding "$182,000
Tennyson Electric, Inc. Livermore $237,843
Engineer's estimate N/A $130;000
The.lowestresponsible.bidder, DC Electric; has;performed similar.projects for the City of Napa,
the City of Pittsburg and the Town of Windsor: Staff verified that DC Electric possesses both a
valid Class A and C-10 California Contractor's License, license number 949934, which expires
on July 31, 2014, that qualifies_DC'E-leetricto perform the work.
Construction is scheduled to begin in May of 2013 and to be completed by July 2013. It is
anticipated that construction managementand inspection will be conducted by staff.
FINANCIAL IMPACTS
The Cycle 4 Federal Highway Safety Improvement Program (I-ISIP).will fund 90% of design,
environmental review, construction, and construction management not to exceed $173,200. The •
required 10% match and the City's overhead,and administration will come from Street
' Maintenance Funds along with public donations collected for the project.
•
CIP,Budgets TCurrent, Estimated:Graut
Uses', - - _ FY 12213 Estimate 'Reiuit ursement'
Design/Environmental _ $ 31,250' $ 20,200 $ 18,180
Construction Contracts $ 125,000 $ 131,670 $ 118,503
Construction Management '$ 18,750 $ 18,750 $ 16,875
CIP Overhead @ 2.4%. $ 4,739 $ ,4;531 $ -
Administration $ 5,000 $ 5,000
Project Contingency $ 17,444 $ 13,167 '$ 11,850
TOTAL '$ 302,183' ' $ 193,318 $ 165,408
Funding Sources
Street Maint Operating Budget $ 9,739 $ 9,531
(2.4% Overheadand-Admin)'
Street Maint Operating Budget $ 15,433 $ 14;568
(10% Local,Match)
Donations (10% Local Match) $ 3,811 $ 3,811
Federal HSIP' $ 173,206 $ 165,408 $ 165,408
TOTAL $ 202,183 $ 193,318
ATTACHMENTS
I. Resolution
2. VicinityMap
2
Attachment 1
RESOLUTION AUTHORIZING TH1 AWARD?OF CONTRACTFOR
THE'HSIP`LIGHTED CROSSWALKS PROJECT
WHEREAS, city staff has prepared construction bid documents and advertised for
construction of this project; and
WHEREAS, in accordance with,the City of Petaluma Charterand Municipal Code,
California Public Contract Code Section 20162 and other applicable law, City staff solicited bids
for the Project; and
WHEREAS,the project was;bidon December 12, 2013,and 8 bids were received and
opened on,January 16, 2013 in accordance with applicable:l'aw; and
WHEREAS,the lowest responsible bidkor the Project wasasubmitted by DC Electric
from Cotati, CA for $131,670; and
WHEREAS, staff has determined that the Contractor's bid satisfies the bidding
requirements for the Project; and
WHEREAS, staff has verified that DC Electric possesses a'valid California Contractor's
License, Class A and C-10, number 949934 that qualifies DC Electric;tdperform the Project; and
WHEREAS,the Project is categorically exempt pursuant to California.Environmental
Quality Act ("CEQA"):and Title 14, the California Code of Regulations ("CEQA Guidelines"),
Section 15301, because the project:consists of adding safety devices to existing public streets;
and
NOW,THEREFORE, BE IT RESOLVED that the City Council of the City hereby:
1 Approves a constructiomcontingency of:-$13,167.
2: In accordance with the City of Petaluma:Charter'and Municipal Code, California Public
Contract Code Section 20162 and other applicable:law, waives any and all non-
conformance>in'the bid of DC Electric for the HSTP Lighted Crosswalks Project, Project .
No C16101103, finds The bid of$131,670 to be the lowest, responsivebid and further
finds that DC Electric is the lowest responsible bidder.
3. Awards the contract tor'HSIP Lighted Crosswalks Project, Project No. C16101103 to DC
Electric in the amount of$131,670,the amount,of the lowestsresponsive bid, conditioned
on DC-Electric's,tin ely executing the project:contract and submitting all required
documents, includingi;but not limited to, executed bonds, certificates'of insurance, and
endorsements;.in accordance with the project bid documents.
' 4. Directs:staff to issue a notice of award to DC Electric.
3
•
•
•
5. ,Authorizes and direct§the,City Managertol,ezecute;the•project contract on behalf of the
'City.ofPetaluma upon timely submission by,DC Electric:ofthe signed project contract
and'alllother rrequireddocument, including but not limited to,executed bonds, certificates
of insurance, and endorsements, in accordance with the project bid documents.
•
4
•
•
Attachment 2
Cn Ii ^ NI alp- sea Int
C. ' iii ` 1�►�in mii
a gi%I glIM 111 `1®9101 „ ® 0
is r 111 ��� : 111111MNB n ii a•
1
o �aa S.iai: .11111m -4 r
up .
sail ia111111r ',? . 'El
e ,; i 7
O ,.. .�
� 'Cj ��1«:a �. ' - Cr X1111
0 `rr .® :11111
x !mu • NI .111
C� 11101 . . 11111
Z, � 111PII• r . . all
W tai :1 -� . ' ' , .6 4r
.. , i
criii c4 Q �1 C1 � •►�1111�
< Z •® tip' a 1111/1111
p , < li11 III IN �i�1I111111
Z ®i ■ _ ® 11111111
Fri n 0�yQ''wrf _ Si 1! as/ �'1111111111111111x1 1!C.,��1
p.i Mum ::'011111111111111111 :_. ft I:i
U ar 111111Wii111111' ;: .�n1
I■ iVi/111111i1111/111a11.0111111
r_ ,,,,� no�1■ 1111111111Witul'��®t111/11
H E •i dir liiiiliiiu►t l.$Ii1111111
Z4 ��11/11 ': 1111111 is11`/1®1111 U N
Rag : man= a: 11111® : :t ■11111 la y;S. -. e1111 111 - l• .m fly,
,� 111111 111112 : : : MS a#1 I u
i �Ie !J i -�.Ma WE k
5