Loading...
HomeMy WebLinkAboutPlanning Commission Resolution 2013-01 1/8/2013 RESOLUTION NO. 2013-01 CITY OF PETALUMA PLANNING COMMISSION APPROVING SITE PLAN AND ARCHITECTURAL REVIEW FOR THE 360 CHURCH LOCATED AT 879 & 901 LINDBERG LANE APN 005-010-036 & 034 Project File No: 12-SPC-0335 WHEREAS, Pastor Colton Irving and Gene Feickert, submitted an application for Site Plan and Architectural Review for modifications to the existing building and site located at 879 and 901 Lindberg Lane for the purpose of relocating the 360 Church (the "project"); and, WHEREAS, the project has been reviewed in compliance with CEQA guidelines and has been determined to be categorically exempt. The project is categorically exempt from CEQA pursuant to Section 15301 (e.1) of the CEQA Guidelines because it involves modifications to existing structure resulting in no increase of floor area of the structure and pursuant to Section 15311 because it consists of construction or small parking lots accessory to an existing commercial, industrial, or institutional facilities; and, WHEREAS, on December 27, 2012, a Notice of Public Hearing was published in the Argus- Courier and mailed to all residents and property owners within 500 feet of the project;and, WHEREAS, the Planning Commission held a properly noticed public hearing on January 8, 2013 in accordance with the City of Petaluma's Implementing Zoning Ordinance, Section 24.010F. NOW THEREFORE, BE IT RESOLVED that the Planning Commission hereby approves the Site Plan and Architecture Review for the project, authorizes construction of site improvements for the project contained in said plans based on the findings made below and subject to the conditions of approval attached as Exhibit A hereto and incorporated herein by reference: 1. The proposed project, as conditioned, will not constitute a nuisance or be detrimental to the public welfare of the community because it will be operated in conformance with performance standards specified in the Uniform Building Code, the Petaluma Implementing Zoning Ordinance, and the City of Petaluma General Plan 2025. 2. The project is consistent with the General Plan 2025 Industrial land use designation of the subject property. It is the Implementing Zoning Ordinance that contains the full list of uses allowed within Industrial designations and the IZO specifically allows clubs, lodges, and private meeting halls as permitted uses here. Section 2(b)(1) of the Religious Land Use and Institutionalized Persons Act, specifies that a local jurisdiction has an obligation to process an application for a religious assembly on equal terms as nonreligious assemblies and institutions; thus a church facility is a permitted use. The project is consistent with the following goals, policies, and programs of the 2025 General Plan: 1-P-7: Encourage flexibility in building form and in the nature of activities to allow for innovation and the ability to change over time. The existing simple and flexible building was one of the attractors for the 360 Church. While the proposal includes a number of new entries most of the roll up doors will either remain (covered with drywall on the inside) or be filled with a storefront .system, maintaining the Planning Commission Resolution No. 2013-01 Page 1 building's adaptability into the future and making conversion back to an industrial use relatively simple to do. 1-P-28 - Encourage innovative site and building design to address parking solutions such as shared, structured, and/or underground facilities. The use of the improved gravel overflow parking lot will accommodate parking during peak demand (Sunday mornings and special events), while maintaining the existing permeability of the area. The addition of landscaping further improves the lot aesthetically and improves rainwater absorption and slows flows. Excessive dust would be avoided by use of a non- toxic spray that maintains a low level of moisture in the gravel (see condition 10). By allowing phased parking as part of the project, parking can be provided as it is needed, which is responsive to the nature of the use and to a congregation which is now about 300 people, but expecting to grow at the new site. 2-P-5 - Strengthen the visual and aesthetic character of major arterial corridors through intensification via in filling, orientation of facades toward the street, appropriate building height, and interior parking lot configuration on the parcel. While not on a major arterial corridor, the project addresses the objectives of this policy by improving the site appearance when viewed from Lindberg Lane, creating a front façade on the former North Bay Construction building, significantly landscaping a vacant lot, and designing a parking lot with good parking lot circulation. 8-P-39 - Consider, to the extent practicable, requiring sustainable site design practices such as: • Reduce imperviousness by using permeable paving, • Use canopy trees to absorb rainwater and slow water flow, • Design vegetated areas that are in close proximity to parking areas and impervious expanses in order to slow runoff, filter out pollutants, and facilitate infiltration, and • Use devices such as bio-retention cells, vegetate swales, and infiltration trenches, and dry wells to increase storage volume and facilitate infiltration. The large gravel overflow parking lot is proposed to remain a permeable pavement area. Landscape improvements are proposed to this lot, including planting of the red maple canopy tree (see Sheet L-1). The main parking lot between the existing building and Lindberg Lane will be paved because use will be high; it has been designed with bio- retention areas to facilitate infiltration as well as to slow runoff and filter out pollutants (see green areas of Sheet C-3, with detail at lower left corner). 3. The proposed project is consistent with the Implementing Zoning Ordinance ("IZO") as interpreted by the city to comply with federal law. As indicated in Table 4.4 (Allowed Land Uses and Permit Requirements for Industrial Zones), clubs, lodges, and private meeting halls are permitted uses in this zoning district. Although Table 4.4 of the IZO requires a CUP for religious facilities, pursuant to Section 2(b)(1) of the federal Religious Land Use and Institutionalized Persons Act ("RLUIPA"), a local jurisdiction may not impose or implement a land use regulation in a manner that treats a religious assembly or institution on less than equal terms with a nonreligious assembly or institution. Therefore, a CUP may not be required for this project. The proposed architectural changes to the former North Bay Construction building, the proposed accessory playground equipment, and proposed on-site fencing adhere to the development standards of the Industrial Zoning District. 4. The proposed project is consistent with the IZO Parking Requirements. Consistent with Table 11.1, the proposed 199 parking spaces at build out are adequate to provide for a maximum Planning Commission Resolution No.2013-01 Page 2 of 784 sanctuary seats (one parking space for every four seats) and 900 square feet of the office/general area staffed during church service. A phase one alternative is also consistent; the 144 Phase 1 spaces are adequate to provide for a maximum of 568 sanctuary seats. The 20 required bicycle parking spaces 110% of the required parking spaces) are also provided by the proposal. Continued use of the existing gravel parking lot (901 Lindberg Lane), with improvements and condition 10, is appropriate because the zoning and area is industrial in nature, because a gravel lot has historically been used here, because the General Plan encourages use of pervious parking lot surfaces, and because the lot will be unused most of the week. While observation indicates that the existing gravel surface generates very little dust during the dry season and an undetectable amount during the rainy season, to ensure that significant dust is not created on days that the parking lot is used, condition 10 specifies use of a non-toxic spray that will provide a continuous level of dust control for that limited use parking lot, in conformance with IZO section 11.070.F. 5. The proposed project, as conditioned, is consistent with the standards for Site Plan and Architectural Review outlined in Section 24.010 of the IZO in the following ways: a. The materials the project intends to incorporate into the existing simple pre-engineered building include wood, steel, and glass which are in harmony and compatible with the surrounding buildings. These materials will add texture and a softening to the existing strictly utilitarian building, while remaining straightforward as is appropriate in the industrial neighborhood. For example, the staircase enclosure will use the same metal roof as the existing building and the painted wood facade and fence to conceal the gas meters will serve to give texture to and soften the industrial appearance of the property. The timbers used to designate the parking spaces of the overflow parking lot are appropriate because they are a natural materials contributing to the rustic feel of the overflow lot. b. The architectural style is appropriate for the project and compatible with the overall character of the neighborhood. The changes to the existing structure are designed to soften and improve the existing industrial/warehouse appearance of the structure to accommodate the Meeting Hall/Religious Facility use. The proposed improvements to the existing building are simple, consistent with the existing architecture, and utilize industrial materials and utilitarian detailing in a manner compatible with the neighborhood, but with an increased focus on aesthetics than the purely utilitarian style of the existing building. Elements such as two-story entry feature sided with offset wooden slats, double store front doors surrounded by a natural wood entry trellis with canopy, and two symmetrically set second story windows are added to the Lindberg facing elevation to create a needed sense of entry at the front elevation. A new storefront entrance with cantilevered wood awnings and glass transoms would be added serve to create a sense of entry at the sanctuary entrances on each side of the building. c. The siting of the former North Bay Construction building will remain unchanged. The front elevation improvements of the two-story entry feature/staircase enclosure and awning projections will improve the buildings relationship to the Lindberg Lane. New accessory features like the playground and half basketball court are recessed from the public realm and compliant with the setbacks specified by the Industrial development standards. d. The proposed architectural changes to the existing warehouse building and surrounding grounds are appropriate for the site and are consistent with the bulk, height, and color of buildings in the surrounding area. There is little modification to the bulk of the existing building, just the addition of awnings.and the two-story entry feature/staircase enclosure Planning Commission Resolution No:2013-01 Page 3 to create a sense of entry and a softening of the building. The building height remains unchanged. The body color will remain beige and the new building components will brighten the building with natural wood details, burgundy red painted wood slats on the front elevation, and additional glazing. The modifications are designed to make the building more attractive, while remaining simple and appropriate in the industrial neighborhood. e. The project maintains the existing street trees and adds thoughtful landscaping through the site, especially in the two parking lot areas, near the building, and west of the building were a lawn area bordered by trees is created.. In total, six varieties of trees and groundcover, as well as five different kinds of shrubs are proposed. This amount of landscaping is extensive compared with the surrounding neighborhood, but is not expected to pose any nuisance to the neighborhood, but rather benefit the greater neighborhood by introducing increased screening and greening. f. Ingress, egress, and off-street parking, are adequate for the proposed Meeting Hall/Religious Facility use and conform to City standards. A full Traffic Impact Study was prepared to review whether, at build out, the church would have any significant traffic impact. Because the peak church facility attendance occurs outside of peak travel times (not during the morning or evening week day commute), no significant impact is projected to any intersection. The City's traffic engineer has reviewed and accepted the Study. The project proposes 199 parking spaces (and 20 bicycle parking spaces) for the Meeting Hall/Religious Facility build out condition; thus accommodating a 784 seat sanctuary. An asphalt parking lot in front of the building would consist of 51 spaces, including six accessible parking spaces, and is intended to accommodate the parking needs of the daily administrative activities and subgroup gatherings. A gravel overflow parking lot to the east of the building (901 Lindberg Lane) would consist of 148 spaces, and is intended to accommodate the large church services and special events. To increase usability of the gravel overflow lot, each standard parking space is 9.5 feet wide, rather than the standard 9 feet, and each space will be identifiable by an 8 toot timbers set at its top. Any issue with summertime dust will be controlled with a non-toxic dust suppressant spray. Use of the existing gravel lot, with improvements, is appropriate because the zoning and area is industrial in nature, because a gravel lot has historically been used here, because the General Plan encourage use of pervious parking lot surfaces, and because the lot will be unused most of the week. ADOPTED this 8th day of January, 2013, by the following vote: 'Commissioner Aye , ' No Absent Abstain Abercrombie X Elias X Herries X Johnson X Miller X Chair Pierre X Wolpert X Planning Commission Resolution No.2013-01 Page 4 Jenni /fifer Pierre,t►ir ATTEST: APPROVED AS TO FORM: H••ther Hines, Ca' mission Secretary Leslie Thomsen, Assistant City Attorney Planning Commission Resolution No.2013-01 Page 5 Attachment A CONDITIONS OF APPROVAL 360 CHURCH OF PETALUMA SPAR 879 & 901 LINDBERG LANE APN 005-010-036 & 034 Project File No: 12-SPC-0335 Planning Division: 1. This Site Plan and Architectural Review approval authorizes exterior changes to the former North Bay Construction building and grounds as shown on plans dated stamped December 18, 2012, at 879 and 901 Lindberg Lane, APN 005-010-036 and 034. 2. Plans submitted for building permit review shall be in substantial conformance with the Site Plan and Architectural Review request and those plans on file in the Planning Division date stamped December 18, 2012 and the color board submitted December 6, 2012, except as modified by the following conditions. 3. Prior to the issuance of any development permit, the applicant shall revise the site plan or other first sheet of the office and job site copies of the Building Permit plans to list these Conditions of Approval as notes. 4. Plans submitted for building permit shall include a detail of the exterior light fixtures, the new grid windows (which shall be simulated-divided, surface mount), the play structure, and the bicycle rack for staff review and approval. 5. Prior to building permit final, proof that the shared parking agreement between 879 and 901 Lindberg Lane (005-010-036 & 034) has been recorded shall be submitted to the Planning Division. 6. Prior to building permit final, fencing along Lindberg Lane shall be removed and a fence permit shall be filed and issued to install any new fencing such as the 4 foot metal fence separating the grounds from the main parking lot and the fence along the Gustafsson access drive. 7. Prior to building permit final, barbed wire topping existing fencing shall be removed, unless the abutting site qualifies for barbed wire under Implementing Zoning Ordinance section 13.040C. 8. Maximum occupancy of the sanctuary shall not exceed 568 occupants until such time that Phase 2 parking lot is completed and operational. 9. At project completion (total of 199 parking spaces) the maximum occupancy of the sanctuary shall not exceed 784. Additionally, not more than 900 square feet of accessory office use shall be in operation concurrently with services. 10. An environmentally friendly additive shall be sprayed on the gravel overflow lot at the completion of the rainy season and once during the middle of the dry season, to provide a continuous level of dust control for the limited use parking lot. The spray shall be calcium chloride or a magnesium chloride-based product or a similar environmentally friendly dust suppressant that absorbs air moisture. The applicant shall be responsible for keeping an Planning Commission Resolution No. 2013-01 Page 6 inventory of the application dates, and providing this to the City upon request. The applicant shall be responsible for additional applications should conditions warrant or at the request of the City. Should use of the overflow lot increase at some future point to exceed the scope (be used more than three times per average week), the applicant shall be responsible to immediately restudy the lot to determine the best solution, such as use of permeable pavement at all or the most used portion of the lot, and to rectify the situation, subject to review and approval of City staff. 11. There shall be no regularly scheduled use of the outdoor amenities such as the playground and half basketball court during the business hours typical of industrial users, weekdays 5am to 4pm, in order to ensure that the health effect for a sensitive population in an industrial zone is less than significant. 12. Construction activities shall comply with performance standards specified Implementing Zoning Ordinance Chapter 21 and the Petaluma Municipal Code Sections (noise, dust, odor, etc.). 13. The project shall be subject to all applicable development impact and other City fees, specifically sewer capacity fees. 14. The applicant shall defend, indemnify and hold harmless the City and its officials, boards, commissions, agents, officers and employees ("Indemnitees") from any claim, action or proceeding against Indemnitees to attack, set aside, void or annul any of the approvals of the project. The applicant's duty to defend, indemnify and hold harmless in accordance with this condition shall apply to any and all claims, actions or proceedings brought concerning the project, not just such claims, actions or proceedings brought within the time period provided for in applicable State and/or local statutes. The City shall promptly notify the applicant/developers of any such claim, action or proceeding. The City shall cooperate fully in the defense. Nothing contained in this condition shall prohibit the City from participating in the defense of any claim, action, or proceeding, and if the City chooses to do so, applicant shall reimburse City for attorneys' fees and costs incurred by the City. Building Division: 15. Prior to building permit issuance, the plans shall conform to accessibility requirement 1104B.6, Religious Facilities. Department of Public Works (Engineering Division): 16. Prior issuance of a building permit issuance, the applicant shall provide grading, drainage, and utility plans, prepared by a registered Civil Engineer in the State of California for review and approval by the City Engineer. 17. Prior to final inspection, the proposed storm water detention system shall be installed as noted in the preliminary detention analysis dated October 8, 2012, prepared by Steven J. Lafranchi and Associates and as proposed on the site plan received by the City on October 23, 2012. 18. Prior to building permit issuance, the fire service connection from Lindberg Lane to the old North Bay Construction yard at 471 Payran (APN 005-020-071) shall be shown in a private easement or a new-fire service connection and assembly shall be installed on 431 Payran to serve the existing fire protection system. Planning Commission Resolution No. 2013-01 Page 7 19. A grease trap is required for the church kitchen. Prior to building permit issuance, the grease trap shall be shown on the building permit drawings and shall meet City requirements. 20. Prior to building permit issuance, a separate irrigation meter is required per City standards and shall be shown on the building permit drawings. 21. Prior to building permit issuance, record and submit the proposed 10-foot wide private sewer and waterline easement as well as the 14-foot wide access easement. 22. Prior to final inspection, record and submit the proposed quitclaim of the existing 12-foot wide private right of way easement (212, O.R. 236 SCR) as well as the proposed 14-foot replacement access easement. Construction of the proposed driveway, curb cut and fencing for the new access shall be completed prior to final inspection. 23. If/when the proposed Lot Line Adjustment occurs between the project site and the Lace House Linen property, record and submit the proposed 10-foot wide private storm drain easement site as part of this project. 24. An encroachment permit from the Department of Public Works and Utilities is required for any work within the public right of way. Department of Public Works (Water Division): 25. Prior to building permit issuance, the plans shall note the use of water efficient equipment in the kitchen areas to qualify for the reduced sewer capacity fee. Fire Marshal: 26. Prior to building permit issuance and final, coordinate with the Are Marshal Office which may require either some red-curbing and/or No Parking signs along the south parkway near the Chicano property. Fire Department access as depicted on C-4 (Fire Apparatus Accessibility Exhibit) is acceptable. 27. Prior to building permit issuance, if extension of alteration of the sprinkler system to protect all areas of the tenant space alterations is needed, be advised, fire sprinkler additions or alterations involving more than six heads require a minimum of three sets of plans with calculation to be submitted for review and approval from the Fire Marshal's office. 28. Prior to building permit final, if the Fire alarm system shall be evaluated to determine compliance with NFPA 72 and the California Fire Code, depending on the allowable occupancy of the church, and any needed improvements completed. This may include adding occupant notifications appliances. 29. Prior to building permit issuance, the plans shall include the calculated allowable occupancy for the assembly area and other rooms. All assembly areas must be posted. 30. Prior to building permit final, all exiting, emergency lighting, and egress doors shall comply with applicable sections of both the 2010 California Fire Code and the 2010 California Building Code. 31. Prior to building permit final, one 2A1OBC-rated fire extinguisher shall be provided for each 3,000 square feet. There shall be no more than 75—feet travel distance from any location to a fire extinguisher. Planning Commission Resolution No.2013-01 Page 8 • Standard Site Plan and Architectural Review Conditions: 32. In the event that archaeological remains are encountered during grading, work shall be halted temporarily and a qualified archaeologist shall be, consulted for evaluation of the artifacts and to recommend future action. The local Native American community shall also be notified and consulted in the event any archaeological remains are uncovered. 33. All exterior lighting shall provide a "soft wash" of light against the wall and shall be hooded and directed downward with no direct glare into bicyclists' or pedestrians' eyes, and shall conform to City Performance Standards. 34. The site shall be kept clear at all times of all garbage and debris. No outdoor storage shall be permitted. 35. All planting shall be maintained in good growing condition. Such maintenance shall include, where appropriate, pruning, mowing, weeding, cleaning of debris and trash, fertilizing and regular watering. Whenever necessary, planting shall be replaced with other plant materials to insure continued compliance with applicable landscaping requirements. Required irrigation systems shall be fully maintained in sound operating condition with heads periodically cleaned and replaced when missing to insure continued regular watering of landscape areas, and health and vitality of landscape materials. Planning Commission Resolution No.2013-01 Page 9