HomeMy WebLinkAboutStaff Report 4.E 6/17/2013 A e'vLda'Ite w#4 E
, :za>
285a
DATE: June 17,2013
TO: Honorable Mayor and Members of the City Council through City Manager
FROM: Dan S .ASCE-Director, Public Works:& Utilities
Larry Zimmer, P.E. - Capital Projects Manager
SUBJECT: Resolution Authorizing Award of Contract for the.East Washington.Street 18"
Water Main Replacement (Petaluma River to Edith Street) Project
RECOMMENDATION
It is recommended that the;City Council approve the attached resolution authorizing the award of
contract for the,East Washington Street 18" Water Main Replacement (Petaluma River to Edith
Street)project to Team Ghilotti, Inc.
BACKGROUND
This project involves replacing approximately 2,300 feet of old deteriorated 6, 8 and 10-inch
cast iron and steel water mains with a new 18-inch water transmission maim on East Washington
Street between the Petaluma'River and Edith Street. Die project also involves installation of new
water services and fire hydrants. This is the third phase of replacing the existing water mains in
East Washington Street. The phase 2 project was completed last fall. Recent failures in these
lines have made water main replacement a top priority: This project will improve service and
will reduce repair and maintenance costs due to failure; The project location is shown on
Attachment 2.
DISCUSSION
The Notice Inviting Bids was issued on May 2, 2013. On May 29, 2013, seven bids were
received as follows:
Name of Bidder Bid Total
Team.Ghilotti,,Inc. $ 1,595 895 Lowest Responsible Bidder
Bay Pacific Pipelines, Inc. $ 1,647,970
Ghilotti Construction Company $ 1,822,765
Argonaut Constructors $ 1,859,306
Sierra Mountain Construction, Inc. $ '2,121,375
W.R. Forde;_Inc. $ ;2,266,559
Ranger Pipelines,;Ine. $.2,292,700
Agenda Revie -47 City Attorney(((((('y/\t Finance Di actor 'ty Manager 1
Engineer's Estimate $ 1;750;1'25
The lowest responsible bidder, Team Ghilotti, Inc. (TGI), has•performed'similar projects for the
City of Petaluma, the City of San Rafael, and the Marin Municipal Water District. Staff verified
that TGI;possesses a valid Class.A California Contractor's License, license number'895384,
which expires on April 30, 2015, that qualifies,TGI`to perform the work.
Construction is scheduled to begirt in'July of 2013 and`to be.completed in November of 2013. It
is anticipated that construction'management and inspection services-will conducted by City
staff.
•
The proposed action meets Council Goal: "Plan for and implement priority capital projects as
funding permits".
FINANCIAL IMPACTS
The total project budget for the,-East'Washington Street 18"`Water-Main-Replacement (Petaluma
River to Edith Street) (C67401002) ise$2,680,000. $110,000,has:been_expended to date for
engineering, assessments and design. Team Ghilotti, Inc.'.s bid of$1,595,895 is within the
approved CIP budgeted amount of$1,800,000 for the construction contract phase. Construction
contingency will remain at the budgeted,amount of$275,000. Any unused hinds will remain in
the project account until project closeout; at which time balance will be returned to the Water
Capital Fund.
ATTACHMENTS
1. Resolution
2. Location Map
•
•
'! 2
Attachment-1
RESOLUTION AUTHORIZING THE AWARD'OF CONTRACT FOR
THE EAST WASHINGTON STREET 18" WATER MAIN REPLACEMENT
(PETALUMA.RIVER'TO EDITH`STREET)
CITY PROJECT NUMBER C67401062
•
WHEREAS, city staff has prepared construction bid documents and advertised for construction
this project; and
WHEREAS, in accordance with the City of Petaluma.Charter and Municipal Code, California
Public Contract Code,Section.20162 and other applicable law, City staff solicited bids for the
Project; and •
WHEREAS,the project was bid on May 2, 201, and seven (7) bids were received and opened on
May 29, 2013 in accordance with applicable law; and
WHEREAS, the lowest responsive bid for the'Project.:was submitted by Team Ghilotti, Inca
(TGI) from Petaluma, CA for $1,595,895; and •
WHEREAS, staff has determined that the Contractor's bid satisfies the bidding requirements for
the Project; and
WHEREAS, staff has verifiecFthat TGI possesses a valid California Contractor's License, Class
A. number 895384 that qualifies TGI to perform the Project; and
WHEREAS, the Project is categorically exempt pursuant to California Environmental Quality
Act ("CEQA") and Title 14, the.California Code of Regulations ("CEQA Guidelines"), Section
15302, because the project consists of replacement and reconstruction of existing utility systems
and/or facilities involving negligible or no expansion of capacity.
WHEREAS, the funds made available are in the water capital budget; and
NOW, THEREFORE, BE IT RESOLVED that the City Council ofthe City hereby:.
1. In accordance with'the'-City of Petaluma Charter and Municipal Code, California Public
Contract Code Section 20162 and other applicable law, waives:anyand all non-
conformance?imihe bid'of Team Ghilotti, Inc. for the East Washington Street 18" Water
Main,Replacement (Petaluma River to Edith Street) Project, Project No C67401002,
finds the bid of$1,595895'to be the lowest, responsive bid and further finds that TGI is
the lowest>responsible bidder.
2. Awards the contract for the East Washington Street 18" Water.Main;Replacement
(Petaluma River to Edith Street) Project,Project No. C67401002 to TGI in,the:amount of
$1,595,895,the amount of the lowest responsive bid, conditioned on TGI's timely
executing the project contract and submitting all required documents, including but not
limited to, executed bonds, certificates of insurance, and endorsements, in accordance
with the project bid documents.
3
3. Directs staff to issue a notice of'award,to TGI.
4. Authorizes and directs the City Manager to execute the project contract on behalf of the
City of Petaluma upon timely submission by TGI of signed project contract and all
other required document, including but,not limited to, executed bonds, certificates of
insurance, and endorsements; in accordance with the project bid documents.
•
4 .
Attachment2
EAST WASHINGTON STREET
WATER MAIN.,REPLACEMENT PROJECT
•
PETALUMA RIVER TO EDITH STREET
PROJECT NO. C67401002
LOCATION MAP
AI I a .PiP 1, c �OO��C 4014.'
oDo
_ oa o0 00 q
IL0 O OD
Project..✓�o,, i, , �'� s' C
P Aso D
go. �: : ®� . ��
f ',\�\�\\\\\\\\ O�: ♦. z, _ ,LAKEVILLE,SREET
at \
' ------YN `I°4‘) Q$Pe}q' - ' 1441 1 1, r 7- _ \ i .
,,,,......„„), '---:„_44,„,-, , ,, 4,4,, -.._.:-. ] z N\
I
• ic,.. oo•oii,yo c.0 \o' \ \., \„ NI
o e R �\
, _,./.: Atito.N 1/ Ait /, on,
410P
�,\ � \
�� U
N
N' E
S
05/20/2013
i'