resolution No. s6-211 N.~.s.
of the City of Petaluma, California
RESOLUTION AUTHORIZING THE CITY CLERK TO EXECUTE
AND RECORD NOTICE OF SUBSTANTIAL COMPLETION
OF THE KELLER STREET PARKING STRUCTURE,
WHEREAS, Trent Construction Company, the general contractor for the
Keller Street Parking Structure, has substantially completed the contract
work required for the construction of said project; and,
WHEREAS, DeLeuw Cather & Company, the project engineer, has filed
a Certification of Completion with the City of Petaluma, subject to certain
incompleted items attached as a "Punch List" to the Engineer's letter of July
18, 1986,. which is attached hereto as Exhibit A and incorporated herein by
reference; and,
WHEREAS, said Engineer has recommended that the City of Petaluma
file a Notice of Completion on said project as soon as possible;
NOW, THEREFORE, BE IT RESOLVED that the City Clerk be, and she.
' is, hereby authorized to forthwith execute and record a Notice of
Substantial Completion for the Keller Street Parking Structure.
Under the power and authority conferred upon this Council by the Charter of said City.
REFERENCE:
AYES
NOES:
I hereby certify the foregoing Resolution was introduced and adopted by the
Council of the City of Petaluma at a (Regular) *~}jeurire~~-(fipeeialj meeting
on the .-------21St..... day of ...---------`71z.1.Y ..................................... 1986.., by the
following vote: ....
DAVIS, SOBEL, WOOLSEY, CAVANAGH, BALSHAW, VICE-MAYOR
TENCER, MAYOR MATTEI ~~
None
ABSENT: None
ATTEST : ... ......... ............................................. .................................
City Clerk Mayor
Council Fil ..............
CFl 10-85 Res. No..... ~ ~ ~ 11 N.C S.
App
'fi'
,` ~ V
De Leuw, Cath'er~& Company
Engineers and Planners:
Our Ref.:
120 Howard.Street
P:O. Box 3821:: ~.
San FrancisCb; .California 94119
(415) 495=6060
July 18, 1986
~?ECEIVEp
JUL 1 F31986
Mr. William A. Lebel
Redevelopment Services Administrator TRANSIT/REDEV. SE~~; gp~iN.
City of Petaluma
P'. 0. Box_ 61
Petaluma, California 94953
Subject: Keller Street'Parking,Garage
ENGINEER''S CERTIFICATION OF COMPLETION
Dear Bill:
In response t'o :the G;ty Attorney's letter of .16'July 1986
reque"sting the Eng'ineer's certification of completion, we hereby
submit the following certification'of completion.
We estimate the potential value of the work remaining on the
Punch,Lst (;see~le'tter dated 30 June 1986) .fo be approximately
$'71,500. As. you can see, there is very little actual retention
to cover the remaining Punch List work. ',
The project is for~all practical purposes complete and the City
should fil'e.a:not~ice of completion as soon. as possible. The City
should consider this letter and the attachment the Engineer's
eertificatori of` completion per spar-ag~raph 2D'. of the General
Frov"sians;con:tained 'in the-Construction Project Manual.
Very t°ruly yours, '
DE LEIJW;, GATHER' &. COy~'AidY .
Richard E: Raschke
'• - - Resid'ent' '•&rigincer
~. By: Wlli'zm J. Brsslirn
_ ~ Pr..ojest' ,Manager ~ .
,. ..
RER yc~ Y .. ..
. Attachment '
- ~ __ , . .
_ :..
~,.
PROVIDING,DE LEUW:.CATHERTM
- - .ENGINEERING;'SERVICES ~ .. 1 - - ~,. _ - ~ - .
.: - _
-_~~• .. .
' ~~ ':
De Leuw, Cather 'Company ~ Our F3eL:
Engineers and Planners d
-, ~: ~`
120 towara~Street
P.O: Box .3821
San Francisco, California. 94119
(415) 495-6060
June 30, 1986
Mr. Wil am A~. Lebel
Program Administrator
City of Petaluma
P. O. ..Box 61
Petaluma, CA 94953
Subject: Keller S'.treet Parking. Garage
Field Lnspeeton -Punch List Work
Dear Bill:
Qn Friday, June 27, -1986, Phil' Olmstead' of Trent Construction,
Bill Lebel of The City of Petaluma, and Dick Raschke of De Leuw,
Cather'& Company met at the .subject site to ,review the status of
`the punch lis,t_'work to be performed. The following items are
noted as not finished: ~ '
1., Landscape Work
a. Trees (4 :out. of 6 on punch list). appear not to have been
relocated~bo the center of the. :grade .opening.. It was
suggested the Subcontractor 'meet directly with the
Landscape Mchi.tect to resolve: Trent to contact
Subeontractbr and advise.
b: Irrigation .controller conduit no.t secured to wall.
Replace cL;amp with proper anchor.
;c. Vine nursery stakes not removed and .replaced with stick
and tie; ;per punch list.
Z. Fire Protection Sxstem
a~.'~ Ieak:somewhere around check valve in sidewalk valve pit.
b. Flexh a conduit to sprinkler .control valve tamper switch
in valve pi=t not connected to swtiich,,requires a 45
~.'. degree elbow.
' c. Cap:on'f<<re hose valve ,piping at;seeond floor at Western
Avenue stars aeakng. ~~~°~' .
Mr. Willi~am~~.'A"A . Lebel
June 30., 186
Page Two ,
d.` Doors not ,latching -stair tower No. 3, door at level 3;
stair `tower No. 1, south door, level 1.
e. Fire hose valve. pipng_at,:center of third level.not~:~~
protected from:.traffic.. ..Subcontractor cairns mov-ing pipe
is extra ($39Q). Contractor estimates cost of patching.
hole, to: be $20Q. ,, De Leuw,, '.Gather `does not :agree., shop
drawings were: clearly marked to,ndicafe riser was in
way of tra_ff~c. This item is not :worth. the effort to
resolve and DCGO recommends City .issue a, Change Order for
$60Q~~compete to -rciocate riser as close tai r~nli on Line
B as,poss;bl~e. Verify distance from. wall with
Subcontractor 'before issuing Change,Order.
3. Decorative Grillwork
Misaligned bars not repa-fired. Subcontractor has offered
refund- of $1, 600:; D`e Leuw; Cater- .does. not `,recommend
acceptance. Repair work worth far more than that offered.
4. St=ructure - tGeneral:
a. Joints in slabs not.caulked.Subcontractor's offer of
providing<$2,772:worth of panting~,app,ears to be Tow.
Caul"king estimated; tq be worth, .$5,:000:. fix:tra paint-ing
_ has already been removed from this contract at.the
- , Contractor's! request, :C:ity should 'issue a, Change or."der ~,,.
to reduce contract by-~$S,OOU for consideration by the°,
Contractor..`
b:... I:oose-.wheel stops,. all level's; have. not been. repaired. -
c; No~so ution yet.. on uneneased landscaping sprinkler- piping
. ~ below first' ;floor slab on grade. ~ _
. ~ ;
_ .,
.. ~ ~
L
Mr. William., .. ~Liebel _ ~ '
June 30,
Page Three '
d. Repair of :craeks..n first floor slab on grade on east
side not determined.€o be.adequate.~ Suggest city core
(at their. own expense) several cracks to determineif.;
epoxy patch is working. * ~~;.~
e. Stair runners with improper slopes. in stair tower No. 1
have not been fixed. These stairs .may represent a
trippng~hazard; something should be done to correct
prob lem.,?~ '
5. Fsxtercr SitE Work,
a.. Piece of polycast trench drain aer.oss entry driveway
which was cracked during installation and not corrected
per in§tructions given at that time has now worked loose
and•should be repaired or reglaced.#
b. Several•expans~on .joints in sidewalk require additional
caulking compound to fill voids.
c. Tree: ;grates are very uneven and, present a tripping hazard`
to pedes'trans. ,Grates to be leveled t`o provide smooth
transition with sidewalk.
very truly yours;
DS. I.BUW, , CA--TABR &. COi~AP1Y ~ ~~
R. fi'. Raschke
. Resident`fingneer
cc:: Winfeld-Smt
h - '
' ,.
Y
_. .. .. .
. - .. ~ ~ ..
#Items.were not.:.discussed at jobs.te, tiut were .found to be on
' ' ~ original'' punch`lst..or on daily reports .reviewed, in preparing
this' fist. ~ . -. ~ -