HomeMy WebLinkAboutResolution 2013-131 N.C.S. 9/16/2013 Resolution No. 2013-131 N.C.S. of the City of Petaluma, California ACCEPTING COMPLETION OF THE CONSTRUCTION CONTRACT FOR THE PETALUMA RIVER TRAIL ENHANCEMENT PROJECT PROJECT NO. C03200503 WHEREAS, in accordance with Section 68 of Article X of the City of Petaluma Charter, Section 20162 of the California Public Contract Code and other applicable law, the City of Petaluma solicited bids for the Petaluma River Trail Enhancement Project ("Project"), and, WHEREAS, bids for the Project were opened on March 8, 2012, in accordance with California Public Contract Code Section 4104.5 and other applicable law; and, WHEREAS, the apparent low bid for the Project was Ghilotti Construction Company ("GCC") in the amount of$953,657; and, WHEREAS, by Resolution No. 2012-054, adopted on May 7, 2012, the City Council found the bid of$953,657 for the Project to be the lowest responsive bid, awarded the Project to GCC in the amount of$953,657, conditioned on GCC's timely executing the Project contract and submitting all required documents and authorized and directed the City Manager to sign the Project contract on behalf of the City, upon such timely submission and to execute on behalf of the City any amendments to the Project contract that are necessary to effectively complete the project and/or to realize the Project and/or cost benefits for the City; and, WHEREAS, the following contract change orders (CCO) affecting the Project amount have been approved: Change Description Amount Order# CCO #1 Environmental perimeter fence required per the Department of Fish and $3,692.00 Game Permit CCO#2 Fabrication for an steel plate needed for Abutment I $400.00 CCO#3 Modification to the railroad foundation due to utility conflict $10,928.24 CCO #4 Addition of geofoam behind Abutment 1 instead of Engineering fill to meet $41,469.60 seismic requirements CCO #5 Installation of gravel access road $14,000.00 Resolution No. 2013-131 N.C.S. Page I Change Description Amount Order# CCO #6 Utility conflicts and design modifications at Abutment I $7,329.86 CCO#7 Off-haul of Class III soil with a reduction of Class I and Class II soil unit $0.00 cost items, resulting in a no-cost change order CCO#8 Delays to contractor caused by utility conflicts at the railroad crossing on $5,512.85 Lakeville Street CCO #9 Additional tree and brush removal in order to build the Trail retaining $2,810.00 wall CCO #10 Soil stabilization for the trail along the Petaluma River edge $7,639.36 CCO #11 Replace fence damaged by tree and brush removal on CCO #9 $11,392.50 CCO#12 Stockpile of gravel $1,500.00 CCO #13 Various utility conflicts, storm drainage modifications, additional $19,902.84 surveying, and minor concrete work. Some work eliminated the need for unit items that resulted in contract under runs CCO #14 Relocation of pedestrian push button pole on Lakeville Street to meet $4,839.45 ADA requirement Total change orders: 5131,416.70 Over-runs included 2-3' retaining walls, asphalt, and geo-fabric. Under-runs included aggregate base, 0-2' and 4'-10' retaining walls, bridge approach concrete work, sidewalk, trail header boards, chain link fence, storm drain modifications, and pedestrian metal railings. Sum of over over-runs/under-runs: 5(48,600.05) and, WHEREAS, the final contract amount, as amended, including all change orders, is $1,036,473.65; and WHEREAS, the estimated total cost of the Project is $1,748,974, within the approved Project budget; and WHEREAS, City staff have inspected the Project and determined that it has been completed in accordance with the contract requirements, subject to completion of the punch list work, and the Contractor's continuing warranty and other obligations pursuant to the contract; and Resolution No. 2013-131 N.C.S. Page 2 WHEREAS, based on the foregoing, staff recommends acceptance of the Project on behalf of the City. NOW, THEREFORE, BE IT RESOLVED by the City Council as follows: 1. The contract entitled Petaluma River Trail Enhancement Project, Project No. C03200503, with the final contract amount of$1,036,473.65, is accepted as complete, subject to the Contractor completing the punch list work prior to the release of the retention, and the Contractor's continuing warranty and other obligations pursuant to the contract. 2. The City Clerk is hereby authorized and directed to file a Notice of Completion concerning the Project with the Sonoma County Clerk's Office within ten (10) days of the date of this Resolution. 3. Staff are hereby authorized and directed to release all undisputed retention not subject to pending change orders within sixty (60) days of the date of this Resolution and in accordance with the terms of the Project contract, California Public Contract Code Section 7107 and applicable law. Under the power and authority conferred upon this Council by the Charter of said City. REFERENCE: I hereby certify the foregoing Resolution was introduced and adopted by the Approve o Council of the City of Petaluma aka Regular meeting on the l6'"day of September, /� 2013,by the following vote: ��/\�� City Attorney AYES: Vice Mayor Albertson, Barrett, Harris,Healy, Kearney, Miller NOES: None ABSENT: Mayor Glass ABSTAIN: None • ATTEST: taailaa City Clerk Vice Mayor Resolution No. 2013-131 N.C.S. Page 3