Loading...
HomeMy WebLinkAboutPCDC Resolution 2010-03 02/22/2010RES®LUTi®IV IVO. 2010-03 PETALUMA COMMUNITV DEVELOPMENT COMMISSIOiV ACCEPTING COMPLETION OF THE CONSTRUCTION CONTRACT FOR THE WASHINGTON STREET AND SIXTH STREET PAVEMENT REHABILITATION PROJECT NO. C500207 WHEREAS, in accordance with Section 68 of Article X of the City of Petaluma Charter, Section 20162 of the California Public Contract Code and other applicable law, the City of Petaluma solicited bids for the Washington Street and Sixth Street Pavement Rehabilitation Project ("Project"); and, WHEREAS, bids for the Project were opened on February 4, 2009, in accordance with California Public Contract Code Section 4104.5 and other applicable law; and, WHEREAS, the apparent low bid for the Project was the bid of North Bay Construction, Inc. in the amount of $1,126,425; and, WHEREAS, by Resolution No. 2009-04 adopted on April 6, 2009 the City Council of the City of Petaluma and the Petaluma Community Development Commission ("PCDC") found the bid of $1,126,425 for the Project fo be the lowest responsive bid and awarded the Project to North Bay in the amount of $1,126,425, conditioned on North Bay's timely executing the Project contract and submitting all required documents, and authorized and directed the Executive Director to sign the Project contract on behalf of the PCDC upon such timely submission and to execute on behalf of the PCDC any change orders and other amendments to the Project contract that are necessary to effectively complete the project and/or to realize the Project and/or cost benefits for the PCDC so long as such change orders or amendments do not result in an increase in excess of $281,000, or 80% of project contingency; and, WHEREAS, the following change orders (CCO) affecting the Project amount have been approved: CCO Description Amount CCO# 1 Installed additional traffic loops on Howard @ Washington CCO#2 Saturday paving work in lieu of night work CCO#3 Potholing water main on 6'" Street @ E Street CCO#4 Salvaged cobblestones on 6'" Street CCO#5 Removal and replacement of broken gutter CCO#6 Repaired collapsed storm drain tubes on 6'" St. @ G & H CCO#7 Installed concrete cap to protect existing water main CCO#8 Replaced broken manhole frames and covers CCO#9 Replaced four traffic loops @6'"/D St. intersection CCO# 10 Reconfigured crosswalk layout on Washington Street CCO# 1 1 Repaired sink hole on Washington @ Howard CCO# 12 Installed stabilization fabric on 6'" Street CCO# 13 Repaired water and sewer services, and replaced traffic boxes CCO# 14 Replaced traffic signal pole on Washington @ Howard CCO# 15 Time extension CCO# 16 Installed conduit and wiring for advance traffic loops $2,250.00 $37,586.08 $3,959.80 $8, 736.43 $16,000.00 $29,574.00 $16,275.00 $4,275.00 $1,800.00 $2,541.00 $2,481.81 $6,027.50 $4,444.70 $3,678.25 $0.00 $7,129.58 PCDC Resolution No. 2010-03 Page 1 CCO#17 Installed foundation for back-up battery CCO#18 Extra sidewalk replacement and driveway preparation in advance of paving Total Change Orders: and, $1,393.71 $8,61 1.26 $156,764.12 WHEREAS, the final contract amount as amended, including all change orders, is $1,283,189.12; and, WHEREAS, PCDC staff have inspected the Project and determined that it has been completed in accordance with the contract requirements, subject to the Contractor's continuing warranty and other obligations pursuant to the contract; and, WHEREAS, based on the foregoing, staff recommends acceptance of the Project on behalf of the City, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Petaluma and the PCDC as follows: The contract entitled "Washington Street and Sixth. Street Rehabilitation Project," Project No. C500207, with the final contract amount of $1,283,189.12, is accepted as complete, subject to the Contractor's completing all punch list work, continuing warranty and other obligations pursuant to the contract. The City Clerk/Recording Secretary is hereby authorized and directed to file a Notice of Completion concerning the Project with the Sonoma County Clerk's Office within ten (10) days of the date of this Resolution. 3. Staff are hereby authorized and directed to release all undisputed retention not subject to pending change orders within sixty (60) days of the date of this Resolution and in accordance with the terms of the Project contract, California Public Contract Code Section 7107 and applicable law. ADOPTED this 22^d day of February, 2010, by the following vote: Commissioner Aye No Absent Abstain Barrett X Vice Chair Glass X Harris X Healy X Rabbitt X Renee X Chair Torliatt X ~, ~~ Pamela Chair PCDC Resolution No. 2010-03 Page 2 ATTEST: Claire C oper, CMC, Recording Secret APPROVE~'AS T~.EORM: Eric Danly, GenerayCounsel PCDC Resolution No. 2010-03 Page 3