Loading...
HomeMy WebLinkAboutStaff Report 5.A 10/21/2013 - Attachment 11 - Part 1 ATTACHMENT 11 CITY OF PETALUMA STAFF REPORT Community.Development Department,Planning Division,.11 English Street,,Petaluma, CA 94952 (707).778-4301 Fax 7784498 E-mail:petaluraplanning @ci:petaluma-ea.us DA l E: August 13, 2013 AGENDA ITEM NO. 7 TO: Planning Commission FROM: Alicia Giudice, Senior Planner REVIEWED BY: Heather Hines;Planning Manager SUBJECT: Maria Driveapaitalents 35 Maria Drive-General Plan Amendment,Zoning Map Amendment and Site Plan and Architectural Review RECOMMENDATION Staff recommends that the.PlanningCommission conduct the,required public hearing and take the following actions: • .Adopt by Resolution,a;recommendation to the City Council to Adopt a Mitigated Negative Declaration and Mitigation Monitoring Program; • Adopt by Resolution a"recommendation to the City Council to Approve a General Plan Amendment to amend the General Plan land use designation.from Mixed Use to High Density Residential (18.1 —30.0'hii/ac); and • Adopt by Resolution a recommendation to the City Council to Approve a Zoning Map Amendment-to rezone the property located at 35 Maria Drive from PUD-Medical and Office to R-5. Staff also recommends that the,Planning Commission provide initial comments on the Site Plan and Architectural Reviewof the;proposed.apartment project. ;'. ._ : . .. PROJECT SUMMARY k Project: Maria Drive.Apaitiients, 35 Maria Drive APN: 007'=280?078:& 077 Maria Drive Apartments 35 MariaDrive`12-GPA-0582 Page 1 11-1 Project File: 12-GPA-O 5 82 Project Planner: AliciaGiudice, Senior Planner Project Applicant: JDA West,LLC Property Owner: Jack Yanoff Nearest Cross Street: McDowell Boulevard South Property Size: 5.85 acres (255,000 square feet) Site Characteristics: The site is level and is currently developed with a medical/office complex (constructed in the mid 70''s) and associated landscaping and parking lot improvements. Thereiare two access points at Maria Drive. Surrounding uses (Figure 1) include the following North-Directly to the north is 'a.'public path, which runs along Washington Creek. North of the path/creek is a single family residential neighborhood which has a General Plan land use designation of Low,Density residential allowing a density of 2.6-8.0 hu/ac. and is zoned,R2. South-South of the subject property is an existing little league baseball field and elementary school (McDowell'Elementary School). East-Across the street and to the;ea"stis a 9.76 acres site developed with. a 224-unit apartment complex'known as the Addison Ranch (a.k.a., Greenbriar Apartments) which is developed at a density of 22.9 units per acre. The.General Plan land use designation for this site is Medium Density Residential which allows a density of 8.1-18.0hu/ac. and the property is zoned PUD-Greenbriar Multi-family. This PUD is different than the PUD for the project site, which was adopted separately and only allows office on the project site. West-To the west and southwest is the Washington Square Shopping Center, which is located within the Community Commercial General Plan'land use designation and is zoned C2. Maria Drive Apartments - 35 Maria Drive 12-GPA-0582 Page 11-2 o II r • I Proj'_ct Site J ,, r it •� 1 J1•� �4 � Nigure 1:Zoning Diagram Existing Use: Existing medical and office complex. Proposed Use: 'Multifamily Residential- 144 Units (24.6 hu/ac) Current Zoning: Planned Unit District(Greenbriar Medical.&Office PUD) Proposed Zoning: R-5 Current GP'Iand Use: Mixed Use(densities up to 30 Hu/ac as part of a mixed use project Proposed GP Land Use: High Density Residential (densities 18- 30 hu/ac) Subsequent Actions: O City Council:Review of Mitigated Negative Declaration, General Plan Amendment and Zoning Map Amendment, • Planning Commission Review of Site.Plan and.Architecture Review • Administrative review of -Lot Line Adjustment to combine the two.lots. Maria Drive,Apartments - 3S'Maria'Drive 12-GPA-0582 PggI3 3 pR®JECT 1DIE,S,CSIP.P.ON„ s s . I Project Entitlements The applicant;is proposing<a General Plan Amendment, Zoning Map Amendment, and Site Plan and Architectural Review to develop the,property located at 35 Maria Drive. The applicant has applied to the.Gity of Petaluma for the following: General Plan Amendment The applicant is requesting a General Plan Amendment to change the current land use designation of Mixed Use which allows a residential density of up to 30 housing-Units per acre (as part of a mixed use project) to High Density Residential which allows densities thattrange from -18.1 hu/ac to 30.0 hulac. The High Density Residential classification would permit a full of housing types, but is intended for multi-family housing ihispecifc areas where higherdensity'is:;considered appropriate. Zoning Map Amendment The applicant is requesting a.Zoning'.Map Amendment to change the current zoning of the property from Planned Unit District (Greenbriar Medical & Office PUD) to R5;_, The R-5 zone is consistent with and implements the proposed High Density Residential land use designation. The R5 zoning district is applied to areas intended for the most urban housing;types at,densities ranging from 18.1 to 30:0 units per:acre, but where lower density housing is considered conforming. Site Plan &Architectural Review The applicant is requesting approval of Site Plan and Architectural Review for the proposed 144-unit apattalent complex and associated parking, landscaping and.common:recreational facilities. The site is currently developed with an existing medicalloffice complex and associated landscape, parking, and access improvements, which would be demolished to accommodate the proposed development. The proposed 144-units would be comprised,of 54, one-bedroom units,(approximately 800.sq. ft), 72, two-bedroom units (approximately 1,075 sq, ft) and 18, 3 bedroom units (approximately 1,275 sq. ft.)nin 6 apartment buildings on the site A total of 8 units would be ADA-accessible units, 37 units would be'adaptable units,and'3 would be designed for sensory impaired. The development will consist of,two building types: building;type - A (3keach) and,building type B (3 each) for a total of six(6) buildings. Both building types are proposed as three-stories imheight with a building:height 38' feet. An approximately 3,517 square foot community building is proposed within the center of the complex. Architecture. There are,two building types_ building type- A (3 each),and-building€ype - B (3 each) for atotal of six (6) buildings. These building types are different in the roof design and length of building and minor variations to the exterior, including window and balcony placement.and color selection. A variety of colors and materials are proposed (see Sheet A3:4,:A4.4, and A5.3. These include a mix of stucco, horizontal lap siding, and board & batten siding.. Siding colors range in shades of tans, browns, greens and grays. Inaddition,stone-veneer is proposed for the entry columns and at various locations on the lower level of the"buildings. Maria Drive Apartments ::=.35 Maria Drive 12-GPA-05$2 Pi 44 The Community building is ,similar in design to the, residential buildings. This is a single story building that incorporates the same mix of materials- including stucco, horizontal lap siding, and board&batten siding; and the same-mix of colors. Site Design. The project entails a zealignment of the existing driveways that exist for the office complex. Three of the buildings would be grouped along Maria Drive and oriented toward street with the driveways located:to the north and south of this group. The-restof the buildings would be sited such that they wrap around a central common community area A mix of,garages, carports, and uncovered parking would be located along rear and side property boundaries. To the north would be a new wrought iron fence. Oyerah the residential.buildings would have•the:following setbacks: More than 64 feet from the northerly-side property Line More than 80 feet from the westerly rear property line More than 60 feet from the southerly side property line. More than 17 feet from the easterly'front property line Access and Parkine. The project would entail realigning the two existing driveways onMaria Drive. The project includes 252 on-situ parking spaces including 15 garage spaces and 134 carports spaces and the remaining are-standard;parking spaces. A total of eleven (I1) spaces will be reserved as ADA accessible spaces throughout the[site. A total of 144 covered and uncovered bicycle spaces are proposed within 18 racks.located throughout the site, adjacent to the residential units, and near the community building and common'areas. Details of the proposed garage and carport buildings have not:been`provided and would'be:required as part of final Site Plan and,Architectural Review. Cominon Areas. Proposed' common areas within the development include a 3,517 square foot community-building, swimming pool/hot tub, picnic area, and playground area all located within the center of the complex. Maria Drive Apartments - 35 Maria Drive 12=GPA=0582 P It - k pa tx,. 1 s;^ d -1 t s'u i'5'; ;.,, s7 �-R''�1' +{1 ;'fit \ ' k°E A.fk , Y :K. YA s P f T� t ktl y a _.. v I j f.,_:Ci. ,_,<I✓z-. 1`"r.ly_.`,11 M Figure2. Site Plan Lighting: Lighting cut sheets have been provided which illustrate shielded lighting type of fixtures for the residential buildings and rectangular fixtures on 15:to-20 foot'poles for the parking areas and around the pool and'commony areas. A photometric plan was also provided (Plan Sheets El.0, E1.1 . and E1.2): trash enclosures is provided in the plans submittal but Trash Enclosures. The locations for-proposed the details for tra trash enclosures enclosures have ares sha ll een provided and will be required as part of the final design be,designed to be in conformance with the Site Plan and Architectural"Review Guidelines. Fence. An existing 6-foot high masonry wall located along the westerly and southwesterly property line will remain. A new 6-foot high wrought ironfence is proposed along Maria Drive and along the north side oft the property adjacent to the existing pedestrian path. Fence+details are provided on Plan. Sheet A1.1. Monument Sign. A 6.6-foot high,monument sign is proposed at each of the (see Sheet Al lA). The sign would be constructed with;a natural stone base;and,weathered cedar sign face (approximately 16 square feet) that includes project'name,owner name and contact.information. Maria Drive Apartments .35Maria"Drive 12-GPA-0582 Pagr1E6 Tree removal. There are 62 Eucalyptus trees and some ornamental trees that be removed as part of the proposed development:. According the a tree report prepared'by Robert W. Propos, a Board Certified Master Arborist, all trees are all-Tess than 30 inches in diameter and-appear to be in fair to• poor overall health and are',infested with an insect known as Lerp Psyllids. The trees also show drought symptoms with premature leaf,drop and yellowing of the leaves. These trees are not protected trees or required to be preserved under Chapter 17. However,the applicant has submitted a landscape plan that proposes a mix of trees, shrubs, and ground cover along the property frontage, along the perimeter of the&site and within the interior of the property. Lot Line Adjustment • Thesite consists of two lots'that will need to be combined into one lot prior to development. The lot merger of the two separate parcels (007:280-078 & 077).into one will`be required as a condition of project approval. More,detailssare-provided in the Staff Analysis-section below. STA EANAIXSIS '1 GENERAL PLAN AMENDMENT The applicant is requesting an amendment'to the General Plan=fromcthe current land use designation of Mixed Use (maximum density allowed`30 hu/ac) to High°Density Residential (18.1 — 30.0 hu/ac). The High Density Residential classification would permit a full range of housing types, but is intended for multi-family housing in.specific areas where higher density is considered appropriate. The site is currently developed' with a medical/office complex (constructed in the mid 70's) and associated isite. improvements such as landscaping and parking lot improvements,, which will be demolished/reinoved. The..office complex has had.a:high vacancy rate for several years, currently at about 50 percent compared to^the City's overall office vacancy rate'of approximately 25 percent. Absorbing the high-vacancy-rate for this site will be difficult',given•the.;condition of the,buildings and vacancy rates for the City",in' general'. According the Economic, Development Manager and documentation (submitted by the applicant (Attachment H); 'vacancy rates for rental housing is currently at approximately 2 percent. In;addition,,the applicant has submitted a memo prepared by BAE Urban Economics, dated July 25, 2013 (see Attachment I) and EFA dated July26, 2013 (see Attachment J), that provides reasons retail and office spacenwouldhe difficult,to:tenant at this location._ The primary reason-is that the site.does not have direct access to major corridors and is not visible from existing shopping,centers. The Economic Development Manager relayed.asirnilar.conclusion during;past discussion about the site. Because the requested General Plan Amendment wouldallow a density range that is currently permitted`under the Mixed Use Designation„impacts associated:with this amendment are similar to what has+already beeir•.evaluated in the General Plan EIR. The project is located across the street from an existing apartment complex,,which is developed at a density of 22 units per acre; similar to the permitted density range under the current and proposed land use designation, which allows,a density range between 18.1 to`30'units per acre. To the north Maria Drive Apartments - 35 Maria Drive 12-GPA 0582 -77 across Washington\Creek is an existing residential development which has a Low Density land use designation,which is:develope&ata density of approximately 7 units per acre. The proposed General Plan amendment would facilitate development of'the site with residential development that would supportthe nearby shopping centers. For exaniple,to the west and southwest and within a 500-foot walking distance of the project site, is an.existing shopping center known as Washington Square with frontage on N.. McDowell Boulevard., This shopping.center contains more than 220,000 square feet of retail uses serving the surrounding^area. Additionally, on the other side of Washington are the -Plain South and.Plain North, which include over 300:000 square feet of additional retail usesin thewicinity+of the project. Also within walking distance is McDowell Elementary Schooland McDowell Park. The East Side Transit Center is located within 500 feet of the project site on N. McDowell Boulevard and Maria Drive,providing(access to four existing bus routes"within the City. Relevant General P1an.Policies The proposed amendment would not cause internal inconsistencies in'the General.Plan, The proposed residential densities are similar to what is permitted under the existing residential densities. General Plan policies that support the proposed amendment include the following: 1-P-1: Promote a range of land:uses at densities and intensities to serve the community needs within the Urban Growth Boundary (UGB). 1-P-2: Use land efficiently by promoting infill development, at equal or higher density and intensity than surroundinguses. The site is surrounded by.a mix of densities including a multifamily development across,the street, which has been developed at a density of approxinately 22 units`per acre and a single family • residential development,to the,north, which is developed at a density of approximately 7 units per acre. The proposed density of'18.1 to 30 units per acre is similar to the existing multi-family development across the street would provide a mix of densities..in the immediate area and is consistent wiihtthe densities allowed under the existing Mixed`,Use land:use designation. The proposed General Plan amendment would promote development of an underutilized infill site with high density residential; which,is similar to or higher than densities surrounding the site and intensif/residential uses near existing retail development. One example of how this is accomplished is through the applicant's proposed development for a 144 unit residential development on 5.85-acre parcel, which results,in`a density of 25 units per acre and is within the density.range allowed under the current and'proposed land use designation. The physical separation and proposed site'layout provides a transition from single-family development on the other side of Washington Creek thereby inininiizing potential privacy impacts as is demonstrated by the proposed development (see' Attachment K). This land use pattern also concentrates niutli family development (Addison Ranch and Maria Drive Apartments) near retail shopping and transit services and transitions into single-family development east ofWashington Creek. Maria Drive Apartments 35 Maria Drive 12-GPA-0582 PI 143 11 P-1: Promote residential development within the Urban Growth Boundary. 11-P-1: Encourage.thedevelopment of housing on underutilized land. The site is currentlydeveloped with an office development that has an ongoing high vacancy rate. The proposed amendment would allow development of this site with multi family housing. The proposed High Density Residential Land Use designation would allow densities of 18:1-30.0 units per acre; which is equal to the residentialadensities,allowed under the existing Mixed,Use land use and is similar to the densities that exist-acrosathe street within the Addison;Ranh/Greei brtar apartment complex (22 units per acre). General Plan Consistency • In addition to the above policies that are relevant to the General:Plan Amendment, the.following ;demonstrates how development of the proposed project wouldbe consistency with General Plan Policies: 1-P-3 Preserve the overall scale]and;character of established residential neighborhoods. The General Plan amendment Would'.allow development of this site with high density residential housing at a density:iange similar to what is across"the'street. 'The'project has been designed with a minimum 1.7 foot font,yardisetback from.the front property,line alongMat is Drive. This front yard area would<be landscaped'With a combination of groundcover,. shrubs, and trees. Buildings are oriented toward the street with parking located along the interior property boundaries and within the interior of the development The common areas and community room are also located within the interior of the lot with the siz tesi`den tiaLbuildings-surrounding-this area. 4-P-6 Improve air quality through required:planting'of trees,along,streets. Trees are proposed`along the,Maria Drive street frontage and within the interior of the lot. Parking lot trees are proposed within:landscape fingers 6-8 spaces apart as well as within the common area surrounding the-community building andpool area ld-P-1.1' Promote.residefidal develop-bent within the Urban Growth Boundary The proposed project would:provide•high-density residentialidevelopment on land within the Urban Growth_Boundary. 11-P-1 2 Encourage the development of housing'on underutilized.land. The existing site isrdeveloped-with officeibuildings that have a high-vacancyrate (approximately 50%). The project will provide additional-housing on underutilized'land within the Urban Growth Boundary 11-P-2-1 Encourage a mix of,housing design:types. Maria Drive Apartments 35„Maria,Drive'12-GPA 0582 • The proposedprojectconsists of 1'44,residential units consisting'of a mix of 1, 2irand 3 bedroom units contained within six buildings. .There;would be two budding;types that provide variety within the development while maintaining a unified design. In addition; the community building provides a variation of the residential units while: minimizing height. The project is laid out to maximize accessibility-by each of the units.. A total'of 8 units would.be-accessible,;while,37-would be adaptable units: In addition. 3 of the units; would be designed to accommodate persons with sensory impairments. - - 11-P-10.1 .Promote,the.use of energy conservation-features in the design"of residential development. The applicant has submitted a one page "Green Inztati e' the demonstrates the green building elements that will be incorporated into the project (see Attachment'L). These measures include recycling, use of low•water use plants;low energy and low'water use'appliances, exceeding Title 24 by 15 percent, etc. In,addition, the,proposed-project will be rrequired:to demonstrate compliance with Calgreen Tier One requirements`atbuilding permit submittal. Consistency with Government:Code Section 65358 Government Code Section 65358 allows General Plan amendments when it is deemed in the public interest to do so. The proposed General Plan amendment would allow for development of the property at a density ranging'from 118'to 30 units per acre, which is consistent with the density allowed under the existing .land use :designation. Residential development at this density would support=the existing nearby shopping centers due to proximity of the.site to these ,centers. Office vacancy rates within,the city areacurrently at approximately 25 percent By comparison vacancy rates for rental units are at approximately`2'percent. Furthermore;the applicant reports a vacancy rate of over 50% for this office complex. The.proposed amendment will facilitate the conversion of.highly vacant office complex intoa high density residential development within proximity to retail shopping centers,park and educational:facilities, and transitroutes. The applidant has submitted a development proposal which•provides an example of how this would be accomplished. The-applicant is seeking Site Plan and Architectur'al;Review for a 144-unit market rate apartment complex. The development would incorporate 8 ADA-accessible units, 37 adaptable units "and.3' units designed for the sensory impaired., In addition, the applicant is proposing to pay affordable housing fees, in,lieu'of:constructing-on-Site affordable housing, consistent with Program 4:4 of the Housing Element. Payment,of in-lieu'fees will allow the city to continue to fund affordable housing'through land, acquisition and assistance to non-profit developers and other mechanisms, includingsthe"silent second mortgage",program. SB18 Consultation SB 18 established responsibilities for local governments to+contact,provide notice to, refer plans to and consult with local tribes prior to amending a general plan. The purpose of consultation is to ensure mitigation of culturalfresource sites, Consultation is',expected'to be ongoing and can continue through City Conned deliberation on the,subject:general plan amendment: In compliance with SBlS, the city made,contact with the Federated Indians of Graton Rancheria and provided plans and relevant documents: In response to concerns raised by'the tribe representative, Maria Drive Apartments - 35Maria Drive 12-GPA-0582 131650 mitigation measures were included m:the 'initial study to address accidental discoyery of cultural resources and human remains. The City provided a list of these measures to the tribe representative. No additional request-for on going•consultation has been received at this time. ZONING MAP AMENDMENT The applicant is requesting a zoning map,amendment to rezone the subject property from•PUD- Planned Unit.District(Greenbriar Medical & Office :HID) to R5. The proposed R-5 District is coriSistent with the proposed High Density General Plan land use designation. The proposed project is consistent with the;developmentsstandards for the R,5 zoning district including setbacks, parking requirements,land building•height;,as Outlined in the Implementing.Zoning Ordinance (Table 4.9). The requested.zoning `map amendment complies with IZO Section.25.050.B., which requires the Planning Commission to makeaatfindingithat the public necessity, convenience and general welfare clearly permit and will be furthered byrthe proposed amendment. This finding can be made for the following+reaSOns: 1. .The'.amended-zoning,designation will result in uses that are appropriate and compatible with surrounding uses A mix of high density and low density residential development.surrounds the project site. Existing community services in the immediate vicinity include the Washington Square Shopping center, the little league,ball field, and McDowell Elementary School and support„high idenSity density residential development at this location: Existing transit facilities along:-Maria Drive and N:McDowell Boulevard allow opportunities for alternate modes oftraverto/from`theprojectsite. 2. The project site has a`high office vacancy rate of,50 percent, which is 'higher than the Citywide officervacancy rate ofapproxiniately 25 percent.; Allowable uses under the current PUD zoning is limited*. office: The zoning map amendment'would allow'development of this site with rental housing.. 3. The.project requires Site;Plan and Architectural Review, a,fnding,of'consistency with SPAR guidelines, and final discretionary approval by the Planning Commission. Conipliance,with IZO Proposed development would be required to ;comply with, applicable development standards contained fallowing is a list:Of those standards and how the project,satisfies zoning. 'requirements: Parking' Table 11.1 of the IZO outlines',the minimum on-ssite>parking requirements for specific use types. For multi-family dwelling;the ,1ZO requires :1 covered or uncovered parking space for each bedroom, studio, or efficiency unit. Ib-no case shall a project-provide;an overall parking;ratio of less than 1.5 spaces per unit The proposed'1'44 unitdevelopmentwould'contain a total of 252 bedrooms therefore requiring:a total of'2521 parking, spaces (1 per bedroom). The applicant proposed a total of 252 parking spaces and therefore, 'complies with the minimum parking space requirement. In:addition, Maria.Driye Apartments 3S Maria l)rive12-GPA-0582. 14e the applicant would"provide a parkingiratio of 1:75 spaces per unit thereby exceeding the minimum parking space<per unitlratio requirement.. The;applicant.is proposing to accommodate.the 252 parking:spaces as follows: 104'uncovered spaces (including 5 ADA accessible spaces) 15 garage spaces 134 covered:carport spaces(includes 6 ADA accessible spaces) 252 Totalspaeds Parking is:distributed throughout-the site to provide ADA parking;: guest;parking, and covered spaces withina reasonable distance to each ofthe:Units. Chapter 11.090 of the IZO states that the number of bicycle parking"spaces required shall be a minimum of 10% of the automobile spaces required. A rrifai of 252 automobile parking spaces are required„therefore requiring a total of 25.bicycle parkingispaces. The applicant proposes a total of 144 coveredd`and uncovered,'bicycle;parking spaces. These spaces will be provided within 18 racks located adjacent t to each of the buildings_,and near the community budding. Building Height The maximum building,heights allowed within the R-5 district>is 45 feet for primary buildings and 25 - feet for. structures., ,_Height=is measured`as the vertical distance between-the average finished grade and the midpoint between the eaves and,the ridge. The proposed residential buildings would reach a height of approximately:38 feet in compliance with the maximum height allowed for primary structures. The proposed community building would reachan average height,of approximately 20 feet in.compliance withemaximum height allowed,forraccessory structures. Building elevations have not been submitted for the proposed garages and carports. However, compliance with the maximum building,height for accessory buildings will-be 'verified prior to bringing the project back for final;SPAR review.. Building;Setbacks There are no minimum setbacks required for a primary building within the R-5 zoning district. However, the+site>plan demonstrates a;'17-foot setback from the frontproperty iSeibacks from the rear?and'<side property lines are at least 60 feet for the,primary buildings. Accessory buildmgs:'are: a required to respect' 4-foot :side yard setback and a 5-foot. rear ':yard setback. The site plan. demonstrates garage and-carport setbacks. that comply with the minimum setback required for accessory, buildings. Petaluma,Bicycle and Pedestrian Plan The Petaluma Pedestrian and Bicycle Advisory Committee (PBAC) reviewedthe proposed project on November 7„2012'and provide finabcomments,on November 1`4, 2012.. The PBAC comments'have been incorporated as 'draft conditions of approval for SPAR The following is a list of the committee's comments Maria Drive Apartments 35 Maria_Drive 12-GPA-0582' 1 ' • PBAC recommends safe, convenient, and secure bicycle parking; bicycle rack styles and locations. Racks should be conveniently located near entrances. Applicant to ensure adequate access to each rack,from all sides and avoid placing racks too close to any wall or structure. According to the site plan(plan°sheet A1.1) the applicant'has provided 18 bike racks on-site for a total of 144 bicycle parking space. • There shall be no direct glare into'bicyclists' and pedestrians'eyes. Lighting shall be directed downward to minimize light pollution. • The section of Maria Drive'that this project fronts is part_of a proposed class III bikeway. We would suggest the developer help with signage on this portion of the path. • Project to include 1) signage along Maria Frontage alerting:motorists to bikes/pedestrians traveling along Class III in front of project along Maria, 2) wayfinding signage within the development directing pedestrians to access through the northerly fence to the class I path that connects E Washingtonsapd Ely Blvd. • Signage and one way or keyed gate access through the Wall/gate on the northerly side of the site to Class I path that connects Washingtomand Ely Blvd. The Petalurna,Police further recommends that should a gate be provided at this location, that the gate shall be self-closing, one-way and keyed. This has-been included as condition of approval • PBAC recommends. more crosswalks at "corners" within the complex and beyond solely measures within the complex like`speed bumps' or;simi they also suggest traffic calming handicap crossings: As the development will have Children, ar feature. • Encouraging pedestrian access within the project and to the local shopping center so that vehicular,use is encouraged to be'minimalized. Given the project site's proximity to McDowell Elementary School, parks and shopping it is reasonable to assume that some of the development's;residents and guests will walk, bicycle, and/or utilize;transit`to reachltheir destinations. Sidewalks currently exist along.both sides of Maria Drive near the project frontage. The driveways would be modified to align with the intersection of Park Lane and Maria Drive;on the southerly access point and to align with the accesstdriveway for the Addison.Ranch apartment complex on the northerly access point In addition, conditions of project approval would require that all portions of broken, cracked, displaced Sidewalk.along the Maria Drive frontage be removed and replaced with City standard sidewalk. Marked pedestrian crossings`are on Maria,Drive at the Washington Creek Trail crossing Oust north of the project site) and at the Maria Drive/Park Lane intersection(1'ust south of the project site): These crossing are appropriate given the surrounding pedestrian network, and Maria Drive Apartments -35 MariaDrive 12-GPA-0582 1113 • are located on straightsegments of aria'Drive`whei e the sight distance is good The project will be conditioned as per the Traffic Study prepared by• A'-Trans that additional marked crosswalks be added so that all three legs of this intersections will have pedestrian crosswalks. In addition, existing.par king restrictions along Maria shall remain in effect and red curb shall be noted on the improvenrentplans as determined by the City Engineer. LOT LINE ADJUSTMENT The project site consists:of two lots that would be developed gas one single-development site. In some cases, proposed buildings would 'cut' across the property line, which would require more strict application of certain bnildirig/fire code. To address this, conditions of project approval require the applicant to combine the two lots into one single lot through,submittal of.a Lot Line Adjustment prior to issuance of grading/building permitsfor the site. SITE PLAN'&ARC1iIlECTi7RAL REVIEW Staff recommends that the Planning Commission review the=site, landscaping and architectural plans for the Maria Drive Apartment Complex, consider any comments from the public and provide initial feedback. The Planning Commission cannot take fmal action on the Site Plan and Architectural Review until the City Council acts on the other associated entitlements for the project which include the Adoption of a Mitigated Negative Declaration, a General plan Amendment and an Zoning Map Amendment. Upon approval By the City Council the project will be brought back to the Commission for final approval of Site Plan and Architectural Review. Staff has provided for consideration by the Commission draft findings and conditions of approval. The City of Petaluma's Site Plan &Architectural Review Procedures and Guidelines,provide general standards to achieve a satisfactory quality of design in the individual building and its site, appropriateness of the buildingto its'intended use, and the harmony of the development within its surroundings. Prior to SPAR approval the Planning Commission must make the following findings as outlined in Section 24.01'0 of theIZO. Initial staff analysis!.isshown in italics. 1. The appropriate use of quality materials and harmony and proportion'of the overall design. The proposed'architectural design:uses a variety of colors and materials to break up:the building mass in a harmonious way. Materials,include a°°mix of stucco.horizontal lap siding, and.board`& batten. In addition, stone veneer is proposed for the entry columns and at various locations on the lower portion of the buildings. (seeP,roject Plans;Sheets A14,A4.4,-and A5.3). 2. The architectural style:,which should be appropriate for the project in question, and compatible with the overall character of the neighborhood. The roof design is similar`to hip roof design of the Addison Apartments and the hip roof that is prominent in the single-family development north of the project.site The architectural style is appropriate for the site and uses:colors, materials and design features that make the proposed development compatible with existing multi family development across the street and existing single family residential along Maria Drive to the north The buildings proposed along Maria Maria Drive Apartments -35 Maria Drive 12-GPA-0582 neiz Drive are oriented toward the street, I:waddition'the project.proposes setbacks,of at least 64 feet from the north property line:at the Washington Creek/path boundary line and at least 4 feet single family residential developnient to the north, at least 80 feet from the westerly line where it borders the retail`shopping center and 15 feet along`the easterly property line along Maria Drive. The proposed'architectural style:combinedwith building orientation and setback from property lines create continuity along Maria as a residential corridor maintains privacy for existing development 'and'.minimizes'potential conflicts between commercial and residential development: 3. The siting of the structure on the property as compared to the siting of other structures in the immediate neighborhood. The project proposes setbacks of at least 64 feet from the north property line at the Washington Creek/path boundarylineand at least 140 feet f-om single family residential development to the north; at least'80 feet from the westerly property line where it borders the retail shopping center and 15 feet along the easte'r'ly property line along Maria. Drive. The structures along Maria Drive are oriented toward The street with parking access, and community building, and pool located within the center of the lot This siting is consistent with existing multi family development across the street and also consistent with'single family residential development, which are sited to face thegstreet with private areas toward the rear of the property. In addition, 'conditions of approval would require a keyed/gated access to the pedestrian path along Washington Creek. 4. The bulk, height, and color-of the proposed structures as compared to the bulk, height, and color of other'structures in,the•amihe'diate neighborhood. The proposed colors and materials are compatible with existing development: Materials include a nnix of stucco, horizontal lap 'siding and board & batten. The mix of colors include neutral tones (tan, beige, taupe)„which are similar to existing multi,family.developnnent across the street. The proposed height would be within the maximum-allowed:under the R-5 designation and would create a transition from the commercial developmerntto,the south to the single-family residential development to the north. In addition, the'variety created^by, roof pitqheS, balconies, and use of colors and mater,ials`serve,to further break up the bulk-and mass of the building. 5. Landscaping to approved City standards shall be required:on the site and shall be in keeping with the character or design of the site Existing trees shall be preserved-wherever possible, and shall not be removed unless approved by the Planning Commission. The, applicant is proposing'renaoyal of 62 Eucalyptus Trees and some ornamental trees due to poor health. None of'these trees are protected trees. The applicant has submitted a landscape plan 'thatp•oposes a mix of native California and horticultural appropriate trees, shrubs and groundcover. Lawn: area is minimal and is only within courtyard area of the picnic area playground and community center for the residents. Conditions of project approval require the applicant to comply with landscape water use efficiency standards of the City's water conservation ordinance. Maria Drive Apartments 35'Maria Drive 12-GPA-0582 11515 • 6. Ingress, egress, internal circulation for bicycles and automobiles, off-street automobiles and bicycle parking facilities' and pedestrian ways shall be so designed -as to promote safety and convenience, and shall conform to approved City standards. Any plans pertaining to pedestrian, bicycle, or automobile circulation shall be routed to the'PBAC, for review and approval or recommendation. The access driveways would be modified,to align with existing intersections of Maria Drive and Park Lane at the southerly side of the project site and access driveway of the Addison Ranch apartments at Maria Drive on the northerly side of the project site The•applicant is proposing interior pedestrian and bicycle facilities, such as bike racks, walkways; way-finding signs. The applicant is proposing a,6foot high wrought iron fence along the front property line with no proposed gate. The only pedestrian; access to and from Maria Drive would be at the access driveway on the northerly and southerly portions of the site In addition, Section 13.020 of the IZO limits front yard fence'he'ights to no-more than 42 inches from grade. Therefore, conditions of app-oval,would require that the proposed fence height'be Modified to comply with the IZO, that the fence contain breaks'consistent with the breaks between buildings.to allow pedestrian access, and that pathways, be extended through the project site to ease pedestrian and bicycle access between the three frontage.buildings: r, I��mo, ; .- sy b�PUBLf1C�COIVIMEflI �-a�kst• r '' % ,„.a@. �„ "� 'fin .#,+`,.,�:�srosm^�a p.:� mrra+wvm�n�.z.,> , Ym.b.�x.a' w`E9, � Upon receipt of the proposed projeet/application (October 24; 2012) staff sent a notice of application (November 11, 2012)to all property owners and occupants"within 500 feet of the subject property to inform them that the'project'proposal had been submitted and wasavailable for.review. On February 6, 2013, the projectfapplicant held a neighborhood meeting at the McDowell Elementary School,_approximately:twelve (12) people attended the neighborhood meeting as well the planning staff.. A.number of:'questions°were asked about the development pertainingto if the land had been purchased, whether or not the idevelopment would be sold off, how many people the project would, generate and,the;Income levels associated with theproject. Concerns were.raised regarding privacy from Etheiupper units looking-into the backyards and windows of the adjacent existing single-family homes, traffic, and parking over flow into the existing 'neighborhoods. Neighbors suggested'. additional' landscaping along-the property boundary of the subject property and the pedestrian path. Residents,were ualso concerned about access to the`pedestrian path and expressed concerns with allowing access. The residents also suggested the complex have gated driveways. Concern regarding a potential loss of3property value was also expressed. Concerns'were raised regarding the height of the project and how dense the project appeared and that it appeared very tight and squeezed in and that more open space or openness to the site might be appropriate. A Notice of Intent to Adopt a Mitigated Negative Declaration and a Notice of Public Hearing was published in.the Argun Courier on June.27, 2013 (with a corrected:notice posted on July 11, 2013) and mailed'to all property owners and occupants within 500 feet-of the subject property. Maria Drive Apartments -?35 Maria.Dcive 12-GPA-0582 T Igg16 In response tothe notice the City has received both written and verbal comments from neighbors related to potential increase in traffic, traffic related noise, increased use of the creek path for inappropriate and illegal activity, and a general opposition to multi-family development near existing single-family development. Written.00mments received to date are attached and summarized below: 1. A concern that the proposed project will cause traffic congestion at"the intersection of Maria Drive and Washington and at the intersection of Maria Drive and N. McDowell Boulevard . and at the intersection of Washington Street:and N.McDowell Blvd. RESPONSE TO COMMENT A'traffic study was preparred.by W-trans on June 14, 2013, and submitted to the City_. This-traffic study evaluated the Level of Service at,the intersections noted . above. The report concluded that under baseline plus project conditions (which includes all . recently approved but not yet constructed projects) the intersection of E Washington and McDowell Boulevard would operate i at LOS E. However under Future plus Project conditions (which assumes construction of the Rainer Avenue interchange and a protected left turn phasing on the E. Washington approaches:'atMaria Drive) LOS`.at all ,the noted intersections would continue to operate at acceptable levels. The traffic report,also states that while the intersection of E Washington and -McDowell Boulevard would operate at LOS E the project would only contribute a 1 second delay;at this intersection. Intersection Existing Baseline Baseline plus Future plus LOS project project Maria Drive/E. C C C D 'Washington St. B Maria Drive/ B B B McDowell Blvd - D `E.Washington/4 - D E E McDowell Blvd - 2. When combined with other-'projectssin the area such,as the new shopping centers, and other proposed housing residential.projects traffic congestion world be even worse. RESPONSE TO COMMENT Baseline conditions included projects that had been approved but hadnotbeen constructed. These projects include: • East Washington Place-approximately.377,951 square feet of retail/office on near Sonoma . Marin fairgrounds • Deer Creek Village -approximately 345,000,square feet of commercial on N. McDowell Blvd • The Birches- a 21-lot single family subdivision on Wood Sorrel'Drive near N.McDowell Blvd • Vintage Chateau II-a 68-unit senior apartment complex on N McDowell Blvd near Lynch Creek Way • Kelgren Senior Housing- a 50 unit senior'housing project at 855 Wood Sorrell Drive • OilStop-located at 1004 Lakeville Street • • Lindberg Circle-Nine+r esidentiahunits docated:at890'Iakevilte Street Maria Drive Apartments 35'Maria Drive`12-GPA 0582' lilgel7 • Park Square-Approximately 26 000 square`foot'commercial,project at Ldkeviile and Casa. Grande • North•RiverLanding-a mix of'apartnients retail office and assisted'livingfacility at 414 Petaluma Boulevard North ▪ Quarry Heights- 274 unit residential development on Petaluma Boulevard:South just west of US 101 • Sunnyslope II- a 22-lotsubdivision on Sunnyslope Road: • Logan Place:- a 66 unit affordablehousing developmentat 1200 Petaluma Boulevard North • Addison-Ranch -100 unit increase in,apartment units on Maria Drive Therefore, Level of Service shown under Response to Comment 1 above reflect future approved projects. 3. That the project's increase in vehicle trips will require increased traffic controls. RESPONSE TO COMMENT: According to the traffc'analysis, the proposed project would be expected'to generate 'a total-of 958, trips per day. However, the existing office use currently generates.a total of 565 tripsapeffr day. Therefore, the total_increase in trips would be 393. 4. Increased vehicle trips will increase pollution and result:in health'risks: RESPONSE TO COMMENT The applicant has submitted'Health Risk Analysis and Greenhouse Gas Emissions Assessment; using. the CalEEMod model, along :with the project vehicle trip generation rates to predict annual emissions associated with:operation.of the fully-developed site under the proposed project. In 2015, net annual emissions„resulting from the,proposed project are predicted to be 639 MT of CO2e: These emissions would be below,the BAAQMD threshold of 1,100 MT of CO2e/yr: Also the Initial Study concluded that incorporating Mitigation Measures A0-1 through AQ-4 will minimize exposure or sensitive receptors to potentially substantial fugitive dust and exhaust emissions, and' assures that temporary construction emissions do not exceed the BAAQMD significance thresholds for community.risk and hazard=impacts: 'These measures include Basic Construction Mitigation Measures'established by the Bay Area An Quality Management District, utilization of constructionrfleet that meets US EPA standards for reducing particulate matter and the-installation:of electrical power to facilitate use of electric poweredequipment. 5. Parking will a problem along the Maria Drive>in front of the projecttand continue to the single-family residential neighborhood to-the north. RESPONSE TO COMMENT: The project includes 252 on-site parking spaces including 15 garage:spaces;and 134 carports spaces and the remaining are standard parking spaces. A total of eleven (11)'spaces will be reserved.as ADA accessible spaces throughout the site In addition a totals of 144 covered and uncovered bicycle spaces are proposed This parking proposal results in a,parking ration of 1.75 parking-spaces per unit which exceeds the City of Petaluma automobile parking requirement of 1.5 spaces per unit. It also exceeds the and the minimum bicycle parking Maria Drive Apartments, -,35:Maria Drive 12-GPA-0582 11-18 obligation which sha'lt be,a niinimuin of 10% of the automobile.spaces required. A total of 252 automobile parking spac`es:are required, therefore requiring a total of 25 bicycle parking spaces. The applicant proposes a total of 144 covered and uncovered Lbicycle parking spaces. Therefore, parking related impacts are not expected. 6. That the proposed project would-impact rear yard privacy for existing residents to the north. RESPONSE TO COMMENT: The applicant proposes "six 3-story buildings. Due to site configuration, some windows would be directed to the north. However, an-approximately 64 foot setba'ck'fi•om the northerly property line to nearest residential building: is proposed. In addition, the northerly site property line is at'least 80 feet from the nearest property line across the creek to the north. This would create at least a 140 foot combined separation front the property lines of existing development to the'nearest residential structure on the/proposed project (see Attachment K). In addition, the applicant,is.proposing to install a 19 treesnalong this property boundary (see Attachment 0- Sheet LI); creating>an additional visual,buffer between the proposed and existing development. Therefore,privacy impacts are not expected Additional comments that are not related to the environmental document include a concern about crime, illegal activity along the creak, low income housing, and'request that Me project be reduced to fewer units with more green spaces:. ENVIRONMENTAL REVIEW' ` . i Pursuant to.the requirements,of.the'California Environmental;Quality Act(CEQA), an Initial Study of potential environmental impacts was+prepared for this project The potential for significant impacts were identified in the following eleven categories:, Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology& Soils, Hydrology,Noise, and Traffic. Mitigation measures have been,;proposed and agreed to by the applicant that will reduce potential impacts to less than significant levels: and are incorporated- into the Mitigation Monitoring and Reporting Program. There is'no:substantial evidence jn light,of the whole record that the project, as :mitigated, would have a significanteffect.on the environment., It-is therefore recommended that the Planning Commission recommend adoption of the Mitigated Negative Declaration and Mitigation;Monrtoring-and Reporting Program by the City Council: The Initial Study,Mitigated Negative Declaration and.Mitigation:Monitoring and Reporting Program, are included as Attachments. The mitigation measures are summarized below (please see,Attachment E for a'full description of the measures). Environmental impacts considered to be "Less than significant with mitigation measures" were identified in eleven,categories in the Initial Study. The following mitigation measures summarized below (for :full text please see Attachment E) will reduce all project impacts to a "Less than significantlevel." Maria Drive Apartments 35 Maria Drive 12-GPA-0582 IaIe.ice • VISA and VIS-2: Requires low-intensity lights for all exterior lighting to be directed onto the project site and access ways, and shielded to prevent glare and intrusion onto adjacent.properties.. AQ-1 thru AQ.=3c Implement BAAQMD Basic Construction Mitigation Measures and mitigation measures that require vehicle and equipment that meets US EPA particulate matter emissions.standards, that minimizes hours that equipment will operate and requiresinstallation of electrical power at the,site early in the construction process to allow use of such power for construction equipment • BIO-1: Conduct vegetation removal through cutting and/or grubbing between February l and August 31 outside of the general breeding bird season. - Otherwise, require;preparation of pre-construction nesting,bird surveys within 14 days, prior to such activities to determine the presence and location of nesting birds. CUL-1 thru CUL-3`. Require preconstruction test drilling for any grading proposed at depths of 5 feet or greater and establishes steps!',to follow in the event of accidental discovery'of cultural resources and/or human remains. GEO-1 thru GEO-8; Requires ,submittal of updated site specific geotechnical report that addresses week or expansive soils, foundation design, cuts and fills and requires conformance With applicable building'codes'and engineering standards. HYDRO-1 thru HYDRO-6: Requires preparation of Stormwater Pollution Prevention Plan, compliance with City of Petaluma.Phase II Stem Water Management Plan, requires stencils at inlets and catch basins■ ("NO DUMPING-DRAINS TO OCEAN"), and provide drainage plans that demonstrate compliance with General ePlan Policy 8-P-36 which requires an on-site storm water detention system to limit post construction storm water peak flows leaving the site to not exceed pre-project peak flows by detaining peak storm water runoff from the 100-year,`24 hour storm event. In addition, payment of Storm Drainage Impact'Fees`.are required. NOI-1 andNOI-2: Establishes construction hours of 7:00-am to 6:00pm Monday through Friday and interior-only work may be conducted on Saturdays from 9:00 a.m. to 5:00 pm. 'Prohibits construction activities on Sundays and all federal, state, and local holidays. Requires a detailed acoustical analysis identifying which units, will require an alternative ventilation;system.because the windows need to be in the closed.position to meet the indoor noisetstandard per the State of California Maria Drive Apartments - 3 S Maria Drive 12-GPA-0582 fate and the City'of;P-etaluma-requirement'thatinterior noise levels be reducedoto a CNEL..of45 dBA or less in habitable rooms 10-foot signage setback to ensure sufficient line of sight, requires CIRC-1 through CIRC traffic calming and pedestrian access measures such as cross walks, colored . pavement, and speed bumps and signage within the project and crosswalks and signage on Maria Drive. CA 1 EGORIES OF Pb IENTIAL IMPACT Aesthetics The Initial Study identified ,light and glare as a potentially significant impact. To mitigate this impact, the Initial Study incorporates Mitigation Measures MIS-1 and VIS-2 which limits exterior lighting to areas within the project` site in such a way that there is no intrusion onto adjacent properties. In addition, lighting is required to be low intensity with the Use of floodlights not allowed. Air Quality The project would result in emissions from construction activities including; grading and vehicle/equipment use. Major :'Sources of emissions during"grading and site preparation include exhaust from construction vehicles fugitive dust generated by construction vehicles and equipment traveling over exposed.'surfaces; and soil disturbances from grading and backfilling. The Initial Study concluded that Incorporating,Mitigation Measures AQ-1 through,AQ-4 will minimize exposure of sensitive receptors to potentially substantial fugitive dust and exhaust emissions, and assures that temporary construction emissions do not exceed the BAAQMD significance, thresholds for community risk and hazard 'impacts. These measures include Basic Construction Mitigation Measures established by'-the Bay Area Air Quality Management District, utilization of construction fleet that meets US EPA standards-for reducing particulate,;matter and the installation of electrical power to facilitate use of electric powered equipment. Biology Due to the developed nature of the-site, impacts on biological resources were not expected. However, compliance with the Migratory Bird Treaty Mitigation Measures'BIO-1 requires preconstruction surveys if tree.rernoval is to occur during the nesting period. Cultural Resources Although cultural resources were not "evident;on the site the initial study concluded that there is always a chance for accidental;discovery: The'initial study y;incorporated Mitigation Measures CULT- 1 through.CULT-3 that address the potential for accidental discovery of cultural(resources andhuman remains: The list of mitigati6n measures was done in consultation with representative from the Federated Indians'of Craton Rancheria=under=SB18 Consultation. Geotech The Initial study concluded that the potential for geologic related impacts related to liquefaction, erosion, and expansive soils would exist from the proposed project Implementation of GEO-1 through GEO 8 which=require submittal of detailed geotechnical report and an erosion and sediment control plan would reduce impacts'to less than significant.levels. 2 Maria Drive Apartments - 35 Maria ftf2i.Drive 12-GPA-0582 Hydrology The initial study concluded that;Hydrology. related impacts'would be reduced to less than significant levels through implementation of Mitigation Measures HYDRO-1 through HYDRO-6 by requiring submittal of Storm program, construction of an on=site detention system, and compliance with the City water e II Stormwater Management Plan. Noise The California Building Code+,requires that future noise conditions be,considered when determining a building's sound•attenuation requirements. The Petaluma General plan EIR shows existing and future (year 2025) noise levels for US 101: According to this data, itis calculated that noise levels at the site could incre`ase'byup to 2 dBA due to increased noise from distant traffic. • Based on the,noise Measurement program:and consideration of.little league noise the project site is exposed a CNEL of 60 to 62 dBA. With future increases in traffic volumes the CNEL could increase to 62 to 64 dBA. This increase'would not exceed applicable exterior noise standards. The State of California and the City of Petaluma;require that interior noise;levels;be reduced to a CNEL of 45 dBA or less'inhabitable rooms, Since the exterior CNEL is up`to i54 dBA, the required exterior-to-interior noise reduction is up to 19 dBA. • This can normally be accomplished`with conventional construction. The Initial Study concluded that that implementation of Mitigation MeasureNOI-1, which requires submittal of a detailed.acoustical study that demonstrates interior;noise levels would meet,that standards?of 45 dBA would reduce noise impacts to.less than signifcant: The Initial Study also concluded that noise impacts related to construction activity would be reduced to less than significant levels through implementation of Mitigation Measure.NOI-2, which restricts construction hours. Traffic The Initial Study ;identified potential, impacts related to sight visibility and internal circulation. Implementation of Mitigation,Measures,CIRC-1, which requires that an appropriate,sight distance be maintained and CIRC-2 through CIRC-4, which require bicycle and pedestrian signage and traffic calming measures;.would duce-impacts to less than,significant. The initial.study did.not identify impacts associated with Level of Service or trip;generation, A Traffic. Impact;Study was prepared.by W-Trans on June 14, 2013. The traffic study evaluated the following intersections: East Washington;StreettUS 101 Southbound ramps East-Washington Street/US 101 Northbound ramps East Washington/McDowell Boulevard East Washington/MariaDrive Marin Project Driveway/Maria Drive South McDowell;Boulevard/Maria Drive The Initial Study'concluded the following: Maria Drive Apartments - 35 Maria Drive.12'-GPA-0582 14e- • All study intersections currently operate at acceptably at LOS'D or better and are.expected to continue to do so under near-term baseline'and cumulative conditions. • Four of the study intersections have experienced a rate of collisions that is higher than the statewide average for similar facilities. The majority of these collisions are attributed to congestion along East Washington Street, which is expected to be alleviated by the implementation of several planned City improvements: • The proposed project is,expected;to generate an average of 958 daily trips, of which 73 would occur during the morning peak hour and 89 would occur during the evening peak hour. • Under near-term conditions,the project is expected to generate a total of 393 net new daily trips after accounting for demolition of existing office buildings on the,site, including 51 trips during the.a.m.peak hour, and63 during:the p.m.peak hour. • When compared to the land use assumptions applied in the City's traffic model, the project would generate 782 net new daily trips. This results in an average of 48 net new trips during the am. peak hour,and 65 trips during the pm. peak hour. • Existing pedestrian, bicycle and transit access to the site is expected to adequately serve the project's residents and guest. • The project is likely to generate additional school-age-pedestrian traffic to the intersection of Maria Drive/Park Lane. • Clear sight lines exist on°Maria,Drive at both proposed‘driveways: • Neither a right-turn nor left-turn lane is warranted at either Of the project driveways To improve site area circulation,the Initial Study includes the following as Mitigation Measures CIRC- 1 through CIRC-4 recommendsithefollowing • Maintaining an adequate line;of sight • Yellow striped:crosswalks_'should be added to the intersection of Maria Drive and Park lane. • Traffic cahming measures within the interior of the site • Installation of bicycle;and.pedestrian signage. • The existing parking restrictions along Maria Drive at the project driveway should remain in place,and the existing-red',curbs repainted to clearly depict the parking restrictions: • So the presence of landscaping does not impede upon a driver's ability to clearly see approaching traffic at the project's'driveway, any landscaping immediately adjacent to the driveways should be no more than one foot in height Site Access Access to the proposed apartment'complexwould be provided via a,primary driveway constructed as a new north leg to the Maria Drive/Park lane intersection, which.is stop-controlled on all approaches, as well as a secondary driveway,at the northeast corner of the project. Both,driveways would provide access to all parts of the project site Internal'circulation would include an outer drive aisle surrounding the residential buildings. This driveway-would provide access to,the.parking that borders the property along the northerly and westerly property boundaries. Additionally, an internal drive aisle behind the buildings along Maria Drive, facilitate direct access to all parts, of the site by emergency response vehicles. Conditions of approval require the applicant to demonstrate that the project can adequately accommodate:emergency vehicle access. Sight Distance Maria Drive Apartments - 35 Maria Drive 12'-GPA-0582 iage33 Sight distance along Maria Drive atthe two project driveways"was evaluated based on sight distance criteria in the Highway Design Manuel published by Caltrans. The recommended sight distance for minor street approaches that are either a private road or,a driveway are based on stopping sight distance, using the approach travel speeds as the basis for determining the:recommended sight distance. For the 25 mile per hour posted speed limit, a stopping sight distance of 150 feet is recommended. The available sight distance exceeds 200 feet in either direction at-both project driveways, so it is considered to be acceptable. However;the all monument signs for the proposed complex would need to be placed such as inc of sight is not impacted. In addition, landscape within the linePf sight area would need to be limited to low growing shrubs and.groundcover. Parking is currently prohibited on the west side of Maria Drive along the project frontage. This restriction helps to ensure clear sightlines for westbound drivers on the corridor. Therefore conditions of project approval require thatthe•parking restriction remain in:place and that plans demonstrate red curbing,at this location. Turn Lane Warrants The need for left-turn lanes on Maria'Drive was evaluated based-orr criteria contained in the Intersection Channelization Design Guide. Future peak hour volumes, including project-generated traffic, as well as safety criteria were reviewed in evaluating the need for turn lanes at the project driveway on Maria Drive. To ensure a conservative°analysis, the warrant calculations assume that all project-generated traffic would obtain access via a single driveway. Under these Future conditions, which represent a worst-case scenario, a left turn:lane is not warranted on Maria Drive at either driveway during either of the peak periods evaluated. Likewise, a right-turn lane is notwarranted . Intersection LOS calculations also indicate efficient operation at the Maria Drive/Park Lane-intersection upon the addition of the new project driveway, and no need to construct additional lanes. As discussed in the IS/MVD, thecproject site is already generating vehicle>trips: The project will result in a modest,net increase in trips: With the addition of project-generated traffic, all study intersections would continue to operate acceptably under existing, near=term baseline and future cumulative conditions. • RECOMMENDATION Staff recommends;that the Planning Commission conduct the•requiredpublic hearing and take;the following aetions: • Adopt by Resolution a recommendation to the City Council to,Adopt a Mitigated Negative Declaration and Mitigation Monitoring Program; • Adopt by Resolution a recommendation to the City Council to Approve a General Plan . Amendment to,amend the.General Plan land use designation from Mixed Use to High Density Residential (1'8.1`—30.0 hu/ac); and • Maria Drive Apartments °=35 Maria Drive 12-GPA-0582 Pig l-224 • Adopt by Resolution a recommendation 'to the City Council to Approve a Zoning Map Amendment to rezone the property located a t 35 Maria Drive from PUD-Medical and Office to R-5. ATTACHMENTS Attachment A:Resolution recommending to the City Council adoption of a Mitigated Negative Declaration, a Mitigation Monitoring Program Exhibit 1 Maria-Drive Apartment Complex Mitigation_Monitoring Program Attachment B:Resolution recommending to the City Council approval of a General Plan Amendment from Mixed Use to High.Density Residential (18.1-30.0 huiac) Attachment C:Resolution recommending<to:the City Council,approval'of;a Zoning Map Amendment from Planned Unit District-(Greenbriar Medical & Office) (APN No's. 007-280-078 &077)to R-5 Attachment D:"Draft"Findings for,Site Plan &Architectural Review to the Planning Commission Exhibit A `"Draft"'Site'Plan &Architectural Review Conditions of Approval Attachment E:InitiahStudy/MND'dated June 27, 2013 Attachment F: Project Narrative Attachment G: Public Comments Attachment H:Concord Group Memo, dated July 2013 Attachment I:BAE Memo, dated July 25, 2013 Attachment J: EFA Memo, dated.July 26, 2013 Attachment K: Diagrammatic Sections Attachment L: Green Initiative Attachment M:Rental:Rolls for,35 Maria Drive Attachment N: City of Petaluma Business Newsletter, dated April 2013,Page 3 Attachment 0: Plans 21171911 Maria Drive•Apartments - 3S:Maria'Drive'12-GPA-0582 IT 225 ATTACHMENT A RESOLUTION OF THE CITY OF'PETALUMA PLANNING COMMISSION RECOMMENDING TO THE CITY COUNCIL ADOPTION OF A MITIGATED NEGATIVE DECLARATION.AND MITIGATION MONITORING PROGRAM FOR THE MARIA DRIVE APARTMENT COMPLEX LOCATED,AT 35 MARJA DRIVE APN,007-280-078 & 077 FILE"1NO. 12-GPA-0582 WHEREAS, JDA West LLC, submitted applications for a General Plan Amendment, Zoning Map Amendment, and Site Plan and Architectural Review for the Maria Drive Apartments located at Maria.Drive((APN 007-280-078.&`077) ("the Project" or the "proposed Project").; and WHEREAS,the subject,to'the.Petaluma General Plan 2025; adopted by the City on May 19, 2008; and WHEREAS;in evaluating;certain potential environmental. effects of the Project in the Initial Study, the City relied on tbe'program EIR for the City of Petaluma General Plan 2025, certified on April 7, 2008 (General''Plan EIR) by the adoption or Resolution No 2008-058 N.C.S., which is incorporatedhereinbyrreference; and WHEREAS, the 'General Plan EIR identified potentially significant environmental impacts and related mitigation measures and the City also adopted a Statement of Overriding Considerations,for significant.impacts,that.could not be avoided; and WHEREAS, the City prepared an Initial Study dated June 27, 2013 for the proposed Project consistent with CEQA Guidelines sections 15162 and '15163' and determined that a Mitigated Negative Declaration(MND)'°was required in order toeanalyze the potential for new or additional significant environmental impacts of the Project beyond those identified in the General Plan EIR; and WHEREAS, on or before June 27, 2013, the city's Notice of.intent.to Adopt a Mitigated Negative Declaration based on the Initial Study, providing or a twenty(all day public comment peribd commencing g, y , and a Notice of Public Hearing to June bed field maile o August 1 residents 3 abef ro the owners O planning Commission, was published p p rty 500 feet of the Project, as well as all persons having requested special notice of said proceedings; and WHEREAS, on or before July 11, 2013,the City issued a corrected Notice of intent to • Adopt.a.Mitigated Negative Declaration basedon the Initial Study, providing a corrected public comment period commencing,July 11; 2013 and ending July 31, 2013, and a Notice of Public Hearing to be held.,on August:13'2013, before the City of Petaluma,Planning Commission, was published and mailed to all residents and property owners within 500 feet of the Project, as well as all persons having-requested'special notice of said proceedins; and Maria Drive Apartment-Complex-.Project-35 Maria Drive 12 GPA:0582- 11-26 Page 1 ATTACHMENT A WHEREAS',pursuant to the analysis sin the Initial Study/MND; the Project. does not make a-considerable contribution to the significant and unavoidable cumulative traffic and/or noiseimpacts identified in the general Plan 2025 EIRbecause of its small size; and WHEREAS, pursuant to further analysis in the Initial,Study/MND,including evaluation using the Bay Area Air Quality Management District(BAAQMD) ,CEQA,Guidelines and 2010 Clean Air Plan, the Project does not make'a considerable contribution to a significant cumulative air quality or greenhouse gas emissions'impacts found to be significant and unavoidable in the General Plan 2025 EIR, because of the Project's small.size and lack of significant stationary sources of emissions; and • • WHEREAS, the Planning Commission held a public hearing on August 13, 2013, during which the Commission considered the Project, the Initial Study/MND •pand supporting documentation referenced in the InitialStudy, and received and considered all written and oral public comments on environmental effects of the Project which were submitted up to and at the time of the public hearing; and WHEREAS, the Initial Study/MND and related project;and,environmental documents, including the General Plan 2025 EIR and all documents incorporated herein by reference, are available for review in the City of Petaluma Community Development Department at Petaluma City Hall, during normal business hours. The custodian of the documents and other materials which constitute.the record of proceedings for the proposed project, file No 12-GPA-0582, is the City of Petaluma Community Development Department, 11,Eng lish Street,Petaluma, CA 94952, attn: Alicia Giudice,,Senior Planner. NOW THEREFORE BEIT RESOLVED THAT: 1. The foregoing recitals are.true and correct and incorporated-herein,by reference. 2. Based on its review of the entire record herein, including• the Initial Study/MND, all supporting, referenced and;incorporated documents and all;comments received, the Planning Commission fords that potential impacts could be avoided or reduced to a level of insignificance by mitigation measures to be attached as conditions of approval. There is no substantial evidence that the Project as mitigated will have a significant effect on the environment, that the MND reflects the City's independent judgment and analysis, arid that the Initial Study/MND and supporting documents provide an adequate description of the impacts of the,Project and comply with CEQA, the State'CEQA Guidelines-and the City of Petaluma Environmental Guidelines. 3. The Petaluma Planning Commission recommends to the Petaluma City Council adoption of the MitigatedNegative Declaration 4. The Petaluma Planning Commission further recommends that the City of Petaluma City Council adopt the Mitigation Monitoring and Reporting Program attached as Exhibit 1 hereto and incorporated'herein by reference. Maria Drive Apartment Complex Project 35 Maria Drive 12-GPA. 0582 Page 2 11-27 ATTACHMENT B A RESOLUTION OF'THE.CITY OF PETALUMA PLANNING COMMISSION RECOMMENDING THECITY COUNCIL APPROVE;A GENERAL PLAN AMENDMENT TO,CHANGE THEiLAND USE,DESIGNATION FROM MIXED USE TO HIGH DENISTY RESIDENTIAL.FOR THE MARIA DRIVE APARTMENT PROJECT (144 UNITS)LOCATED AT 35 MARIA DRI VE,APN'S 007-280-078 & 077 FTGE NO. 12-GPA-0582 WHEREAS, JDA West submitted an application for a General Plan Amendment to change the land use designation of the project site located at 35 Maria Drive,(APN 007-280-078 &077) from Mixed Use to High Density Residential; and WHEREAS,the City's Planning Commission held a duly noticed public hearing to consider the proposed General Planamendment on August 13,;2013. A copy of the notice was published in the-Argus Courier,provided to residents and occupants-within 500 feet of the site in compliance with state and.local.law and routed to appropriate agencies listed under Government Code Section 65352;and WHEREAS, on August 13, 2013, the Planning Commission reviewed the CEQA documents prepared"for the project and approved Resolution. , incorporated herein by reference, recommending the City Council adopt a Mitigated Negative Declaration and Mitigation Monitoring Program, in accordance with the California-Environmental Quality Act, the state CEQA Guidelines and the:Cityof Petaluma Environmental Guidelines. NOW THEREFORE BE IT RESOLVED that the Planning Commission hereby recommends that the City Council approve a General Plan.Amendment changing the General Plan Land Use designation ofthe subject parcel (MN 007=280-078 & 077) from Mixed Use to High Density Residential based on the following findings: 1. :Modification of the laud use designation to.High,Density Residential is consistent with General Plan policies which promote a range ofland uses at densities and intensities to serve the community needs.within the Urban.Growth Boundary(UGB) and to use land efficiently' by promoting infill development, at equal or higher density<andintensitythan surrounding uses. 2. The change;in General Plan land-use designation"is compatible with the neighboring Medium Density Residential and Low Density Residential and would.provide a mix of densities within proximity to each other. The project is also in proximity to shopping, park and educational facilities, and transit-routes and stops, thereby promoting development.in areas that facilitate alternate modes of travel. 3. The General Plank amendment to change the land use designation to High Density residential will not contributeasignificant increase in vehicle trips compared to what has been evaluated Maria Drive Apai talent Complez-Project-35 Maria Drive 12-GPA-0582 11-28 Page;1- ATTACHMENT B in the General P1an,E1R, as maximnin density under theMixed Use designation and under the High Density Residential designation are both130'units per kit. 4. The City continues to face a high vacancy rate of approximately 25%•for office space. The project site is currently developed as an office complex and.has'a vacancy rateof about 50%. 5. The change of the land use designation to High Density Residential is consistent with policies of the.Petaluma General Plan 2025, which promote residential development within the Urban Growth Boundar3n and encourage the development of housing on underutilized land. 6. The public interest,publicnecessity, convenience and general welfare clearly permit and will be'fiirthered by the proposed' amendment because the^proposed' amendment will allow the conversion of highly vacant•office complex into a high density residential development within proximity to shopping, park,,and educational facilities, and transit routes. The site is currently developed with Ja.- medicalloffice complex (constructed in the mid 70's) and associated site improvements such;as landscaping and parking lot-improvements, which will be demolishedheinoved:. The office complex has had a high vacancy rate for several years, currently at about '50 percent compared to the City's overall office vacancy rate of approximately 25 percent. Absorbing the high vacancy rate for this site will be difficult given the condition of the.buildingsand vacancy rates for the City in general. According the Economic Development Manager and documentation submitted by the applicant, vacancy rates for rental_housing is currently at approximately 2 percent. In;addition,'memos prepared by BAE Urban Economics, dated July 25, 2013, and EFA.;dated July 26, 2013, demonstrate that because the site,does41ot:have direct access to major,corridors and is not visible from existing shopping centers occupy this'site with retail.or office rises is.difficult. 7. Government Code Section.65358 allows General Plan amendments when ibis deemed in the public interest to do so:. The proposed General Plan amendment would allow for development of the property at a density ranging from. 18 to 30 units per acre, which is consistent with the density., allowed under the existing'land use designation. Residential development at this density would support the existing nearby shopping centers due to proximity of the site to these centers. Office vacancy rates within the city are currently at. approximately 25 percent and,over '50% for this office.complex. By comparison vacancy rates for rental;units are at approximately 2 percent. The proposed amendment will facilitate the conversion of highly vacant office complex into a high,density residential development within proximity'to retail shopping centers,park and educational facilities, and°transit-routes. 8. State law limits the number of times a local agency can amend its general plan to no more than four times-per year. No ether General Plan Amendments have'been approved for 2013 Maria Drive Apartment Complex Project-35 Maria drive 12-GPA-0582 11_29 Page2 7 • ATTACHMENT C A-RESOLUTION;OF.THE CITY OF PETALUMA PLANNING COMIVIISSION RECOMMENDING I'HEr.CITY COUNCIL APPROVE AZONING MAP.AMENDMENT TO REZONE FROM PLANNED UNIT DISTRICT TO R-5 FOR THE MARIA DRIVE APARTMENT COMPLEX (144.UNITS) LOCATED AT 35 MARIA DRIVE,APN'S 007- 280-078 & 077 FILE NO. 12-GPA-0582 WHEREAS, JDA West, LLC':, submitted'an application-for Zoning Map Amendment to re-zone the project site located at 35 Maria Drive, from Planned Unit District to R-5 for the purpose of constructing 144 apartments;and associated common areas including a community room,picnicBBQ area playground, swimming pool; on=site parking, carports,and garages, WHEREAS,,the City's Planning;Commission held a duly noticed public hearing to consider the proposed Zoning Map amendment on August l3, 2013; and WHEREAS, on August 13, 2013, the Planning Commission by Resolution , incorporated herein by reference, recommendecr to,the City Council adoption of a Mitigated Negative Declaration and Mitigation Monitoring Program, in accordance with the California Environmental Quality Act, the state CEQA Guidelines and the City of Petaluma Environmental Guidelines;:and WHEREAS, on August 13, '2013, the Planning Commission approved Resolution , incorporated herein by reference, recommending the City Council adopt the related General Plan amendment and NOW 'THEREFORE BE :IT RESOLVED that the Planning Commission hereby recommends the City Council approve a zoning map amendment to„rezone the subject parcels (APN's'007-280=078'& 077)'from Planned Unit District to R5 for the Project for the following reasons : 1. The proposed zoning map amendment to Rezone.the'subjectparcels from PUD= Planned Unit District (APN's 007-280-078 & 077) to,R-5 is consistent with and implements the proposed High Density Residential land use classification of the General pan., 2. The proposed rezoning to R-5 is consistent with the, Petaluma General plan Housing Element policies which promote residential development within the. Urban Growth' Boundary'(Policy 1'1-P-1.1) and encourage the development of housing on underutilized land(Policy 11-P-1.2). 3. The public°necessity, convenience and general welfare clearly permit,and will be furthered by the proposed amendment because the proposed amendment will allow the conversion of highly vacant office complex into a high density residential development within proximity to shopping,. park and educational Maria?Drive Apartment Complex Project— 35 Maria Drive'12-GPA-0582 11-30 Page ATTACHMENT C • facilities, and`transit rotates. The,proposed projectAvould also require,Site'P1an & Architectural Review approval by the Planning Commission for the proposed residential development. • Maria.Drive Apartment Complex Project- 35 Maria Drive 12-GPA-0582 11-31 Page ATTACHMENT t ®6t1lFnPLANNINGG;SITE kCAP1 & ARCH ,7'ECTURA1. REVIEW .$r . 'ri RE89LUTlOin! usiSt lt4Ni * ,, w.' ..,,,s .: Maria Drive ApartmenYCompiex 35 Maria Drive APN'.s.007-280-078 &,077 City,File Number: 12-GPA-0582 1. The Project as conditioned,will-conform to the intent, ,goals'and policies of the Petaluma General 2025. The, City' Council in Resolution No approved the related GeneraPPlan amendment for the Project. Neither the:modifications made to the Project in the course of the Site Design and Architectural Review nor the conditions of approval set forth in Exhibit A have :modified the Project in any fashion which would create inconsistencies with the General Plan. The project complies with the:following General Plan policies: 1-P-3 Preserve the'overall scale and'character of established residential neighborhoods. The General.Plan amendment would allow development'of this site with high density residential housing at a density range similar to what is across the street: The project has been designed with a minimum 117 foot front yard setback from the front property line along Maria Drive This font yai c/area would be landscaped with a'combination of groundcover, shrubs, andarees. Buildings areoriiented toward the street with pai:king located along the •interior property boundaries.and within the interior of the;development.- The common areas and community room are also,lo'cated within the interior'of the,lotwith the six residential buildings:surrounding thu area: 4-P-6,Improve'air'quality through required planting;of trees;along•streets: Trees areproposed.along the Maria.Drive street frontage:and within the interior of the lot: Parking lot'trees are proposed within landscape fingers'6-8'spaces'apart as'well as within the common area surrounding the community building and area. 11-P-1.1 Promote residential development within the Urban Growth Boundary: The proposedd project would providehigh-density residential development.on land within the Urban Growth Boundary. 11=P-1.2.Encourage the development of housing on underutilized land. Maria Drive Apartment Complex Project- 35 Math Drive 12-GPA-0582 11-32 Page ATTACHMENT 1D The existing site is developed with'officetbuildings'that"have a high vacancy rate (approximately 50%). The project will provide additional housing on:'underutilized land within the Urban GrowthBoundaiy' 11-P-2-1 Encourage a mix of housing-design types. The proposed project consists of 144 residential units consisting of amix of 1, 2 and 3 bedroom units contained within six buildings. There would'be two building" types that provide variety within the development while maintainingauntfied.design. In addition, the community building provides a variation of the residentialiunits while+minimizing height The project is laid out to maximize accessibility by each of the units. A total of 8 units would be accessible, while 37 would be adaptable units. In additiona3 of the units would be designed to accommodate persons with sensory impairments. 11-P-10.1 Promote the use of energy conservation featureskin'the,design of residential development. The applicant has submitted a one page "Green Initiative" the demonstrates the green building elements that will''be incorporated into the project (see Attachment L). These measures include recycling,, use of low water use plants; low energy and low water use appliances; exceeding Title:24 by 15 percent etc. In,addition, the*proposed project will be required to demonstrate compliance with Calgreen Tier One requirements at building permit submittal. 2. The Project as conditioned, will not constitute a nuisance or be detrimental to the public welfare of the community because it conforms to the Petaluma Implementing Zoning Ordinance.(IZO). The Project'is zoned R-5 which allows 'a density'of18-30 units per acre. The City Council in Ordinance No determined that the uses proposed for the Project were consistent with the:High Density Residential, R-5 Zoning for the site Neither the project in the course of this Site.Plan and Architectural Review nor the conditions of approval set forth in Exhibit A have,modified the'Project=in any fashion that would create inconsistencies with the IZO. 3. The proposed architecture^and site plan, as conditioned, conform to the requirements of Site Plan and Architectural Review provision of Chapter 24.010 of the Implementing Zoning Ordinance as follows: a. The appropriate use of quality materials and harmony and proportion of the overall design. The,proposed architectural design uses a variety of colors and materials to break up the building mass in a harmonious way. Materials'include a mix of stucco, horizontal lap siding, and.board & batten. Im addition, stone veneer is proposed for the entry colunsns and at various.locations on the lower'portion of the buildings.. (see Project Plans Sheets A3.4, A4.4, and A5.3) Maria Drive Apartment Complex Project.- 35'Maria';Drive 12-GPA-0582 11-33 Page ATTACHMENT D b. The architectural style which;Should be appropnate,for.the project.in question, and compatible with the overall character of the neighborhood. Th.e.roof designris similar to hip roof design of the Addison,Apartments and the hip roof that is prominent in the single familysdevelopment north of the project.site The architectural style is appropriate for the site and'`uses,colons, materials and design features that make the proposed development compatible with existing multi family development across; the street and existing single family residential along Maria Drive to the north. The buildings proposed along Maria_Drive are oriented toward the street. In addition the project proposes setbacks of at-least 64 feet from the north property line at.the Washington Creek/path boundary line and at=least 140 feet from single family residential^development to the north; at,least 80 feet from the westerly property' line where it borders the retail shopping iicenter and 15 feet along the easterly property line along Maria Drive- The proposed architectural style combined with building orientation and setback from property lines create continuity along Maria as a residential" con-idor, maintains privacy,for, existing -development and minimizes potential conflicts',between commercial.andresidentiandevelopment. c. The siting of the structure on the property as compared to the siting of other structures in the immediate.neighborhood. The project proposes setbacks iof at least 64 feet from the north property line at the Washington Creek/path boundary line and at least 140 feet from single family residential development to the north; at least 80'feet from the westerly property line where it borders the.retail'•shopping center and 15 feet along the easterly property line along Maria Drive. Therrstructures along Maria Drive are oriented toward the street with,parking,, access, and community building and pool located within the center of the lot. This siting,is consistent with existing multi:family development across the street, and also consistent with single family residential development, which,are sited to face‘the'street with private-arreas,toward the rear,of the property. In addition, conditions of approval would require. a keyed/gated access to the pedestrian path along Washington Creek. d. The bulk,-;height,and color'of other structures in the immediate neighborh copared to the bulk, height, and;color,of the proposed structures as rri ood. The proposed' colors and materials are -compatible with existing development. Materials include a mix of stucco, horizontal lap siding and board & batten. The Mix,of colors include`neutral tones (tan, beige, taupe), which are similar to existing multifamilydevelopmenttacross the street: The`proposedheight would be within the maximum allowed under the R-5 designation and would create a.transition from the commercial development to;the.south to the single family residential development to the north. In addition, the variety created by roof pitches, balconies; and use of colors and materials serve, further break up the bulk and mass of the building. Maria Drive Apartment Complex Project-35 Maria Drive 12-GPA-0582 Page 11-34 ATTXPENIENT D e. Landscaping to approved City ards1shalLbe required onthe, site,and shall.be in keeping with the character or :design of the site Existing trees shall be preserved wherever possible, and shall not be removed' unless approved by the Planning Commission. The applicant is-proposing 'removal of 62 Eucalyptus Trees and some ornamental trees due to poor health. None of these trees areprotected trees. The applicant has submitted a landscape plan thatproposes a mix of native California and horticultural appropriate°.trees, shrubs and groundcover. Lawn area:is minimal:and is"only within courtyard area of the picnic area playground and community- center for the residents. Conditions of project approval require the applicant to comply with landscape water use efficiency standards of the City's water obnsei=vation,ordinance. f Ingress, egress, _internal circulation for bicycles and automobiles, off-street automobiles,and-bicycle parking facilities and pedestrian wayssshall be so designed as to promote safety and convenience, and shall conform'to approved City standards. Any plans.pertaining to pedestrian, bicycle, or'iautomobile'circulation shall be routed to the PBAC for revieW and approval or recommendation. The access driveways would be modified to:align with existingintersections of Maria Drive;and Park Lane at the southerly side of the project site and.access driveway of • ' the Addison Ranch apartments;at Maria Drive on the northerly side of the project site The applicant,is proposing interior pedestrian and facilities, such as bike5racks; walkways, wbay-'finding signs. The applicant is proposing a 0-foot high wrought iron fence,along the front property line:with no proposed gate. The only pedestrian access to and'fr`om Maria Drive`would,,be at the access driveway on the northerly and southerlybportions of the site. In addition, section 18.020 of the IZO limits front,yard fence heights to no more than 42 "inches from grade. Therefore, conditions of approval would require that the proposed fence height be modified to comply with theIZO, that the fence,contain breakcconsistentwith,thebreaks between buildings to allow pedestrian' access, and thatpdthways be extended through the project site to ease pedestrian and bicycle access between. the three f-ontage buildings. Maria Drive Apartment Complex Project 35"Maria-Drive 124GPA4)582 11-35 Page ATTAGEIMENT D EXHIBIT A. Maria Drive;ApartmentComplex 35Maria.Drive APN's 007- 280-078 & 077 City File Number: 12-GPA-0582 Planning: 1. All Mitigation Measures adopted by the City Council in conjunction with the Lynch Creek Plaza -Initial. Study/Mitigated Negative Declaration for the project are herein incorporated byreference;as conditions of project approval (see>Resolution ). 2. Before issuance of any development permit, the applicant shall revise the site plan or • other first sheet,of the office and'job site copies oftlie.BuildingPermit plans to list these Conditions of Approval and the Mitigation Measures from the Lynch Creek Plaza Mitigation MonitoringProgrammas notes. 3. The plans submitted for:building permit review shall be in substantial compliance with the plan-set date;"stamped January 15, 2013, except as modified'below: 4. .Prior to building permit approval, the plans shall note the installation of high efficiency heating equipment(90% or higher heating/furnaces).and'low NOx water heaters (40 NOx or less) in compliance with policy4-P-15D (reducing emissions). 5. Prior to building,or grading permit issuance, the applicant shall provide a Construction Phase ;Recycling Plan that would address the reuse and recycling of major waste materials (soil, vegetation; concrete, lumber, metal scraps, cardboard, packing, etc., generated by any demolition activities and construction of the project,'m compliance with General Plan Policy 2-P-122 for review by the planning.staff. 6. Prior to•returniug to the Planning Commission for Final,SPAR the applicant shall revise site plans; floor plans and architectural drawings that demonstrate elimination of the drive-through window. 7. Piiorto returning'to the.Planning'Commission-for TinaVSPAR the applicant shall submit the following: a_. Elevation drawings for the proposed garage and carport buildings. Said .elevations shall comply witfrminimum setback and height requirements. b, plans• to show front yard fence heights of no more than:42 inches as required by Section 13.020 of the>Implementing Zoning Ordinance, c: Revise plans that demonstrate breaks in the front yard fence•to allow access between the three frontage buildings. d. Revise ,plans to reflect pedestrian and bicycle pathways between the three -frontage buildings to facilitate access}at thesepoi'nts. 8. Prior to Building-Permit issuance, the.applicant shall submit a CalGreen'Tier 1 checklist that shows compliance with California Green Building Standards as adoptedby the City of Petaluma. 9. The applicant shall be subject to the following development fees: Sewer and Water Connection, Community Facilities, Storm Drain, Public Art Ordinance(Ordinance No 2202 N:C.S., School Facilities;and Traffic Mitigation-fees. Said fees are due at time of Maria Drive ApartmentComplex'Project- 35 Maria Drive 12=GPA-0582 11-36 Page ATTACHMENT'D issuance(of building:permit'at which time, other pertinent fees thatmay`be applicable to the proposed project-may be required: 10. The applicant;shall:comply General Plan Policy 4-P-16 by incorporating the following during,project construction: a. Maintain construction equipment engines intgood,condition and in proper tune per manufacturer's specification'for the duration of construction; b. Minimi7e idling time of construction related equipment, including heavy-duty equipment,motor vehicles,.and portable equipment c. Use alternative fuel construction equipment(i.e., compressed natural gas,liquid petroleum gas, and unleaded gasoline); d. Use add-on control devices such as diesel oxidation catalysts or particulate filters; e. Use diesel,equipment that meets the ARB's 2000 or newer certification standard for offroad:heavy-duty diesel engines; f. Phase construction of the project; g. Limit the hours,of operation of heavy duty equipment, 11. Prior to receiving grading/building:permits for the project, the applicant shall merge the two existing parcels(A'PN 007=280-078 & 077 )through the lot line adjustment process. Pedestrian and Bicvcle Advisorv,Committee: 12. PBAC recommends,safe, convenient,:and secure bicycle parkmg, bicycle rack styles and locations. Racks should'be,conveniently located near entrances. Applicant,shall ensure adequate access to each'rack,from.all sides and avoid placing racks too close to any wall or structure. 13: There shall':be no direct:glare into bicyclists' and,pedestrians' eyes. Lighting shall be directed'downward to minimizelight pollution. 14. The section of Maria Drive that this project fronts is:pai±of a proposed class III.bikeway. We,would.suggesfthe'developerhelp with signage;onthi's'portion otitfie path. 15. Project shall include: (1) signage along Maria Frontage alerting motorists to bikes/pedestrians traveling along P Class III in-front of project along Maria,,(2) wayfinding signage within the development directing pedestrians to access through the wall to the class'path-that connects E"Washington and Ely Blvd. 16: Signage.andone:way or keyed gate access;through:the wall/gate on the southerly side of the site to'Class I path that connects E'Washington and Ely Blvd. 17._PBAC recommends.more crosswalks at "corners'''within the complex and beyond solely handicap'crossings. 18. The project shall mcötporate traffic calming measures "speed bumps" or similar feature within the complex. Maria Drive Apartment'Complex Project- 35 Maria Drive 12 GPA-0582 11-37 Page ATTACHMENT D 19. Encouraging pedestrian access within the project and to the docaL shopping center sothat vehicular use is`minimized. Public'Works &Utilities (Engineering): 20, So the presence; of the landing does not impede upon a driver's ability to clearly see approaching traffic at the-project's driveway, any landscaping immediately adjacent to the driveways should be no,more than one foot in height. 21. All portions of broken, cracked;displaced sidewalk along the-Maria Drive frontage shall be removed and replaced with City standard sidewalk. 22. 10-foot wide, continental yellow thermoplastic::crosswalks shall'be installed at the east and south legs at themtersection of Maria Drive andPark Lane.,Accessible curb ramps shall be installed at the intersection in accordance with City and Caltrans standards. 23. Existing parking restrictions along Maria shall remain in effect and red curb shall be noted on the improvement,plans as determined by the City-Engineer. 24.:Landscaping shalt be limited to low lying shrubs and ground cover at-intersections and along curves of Maria Drive:The applicant's engineer shall provide the-necessary sight distance calculations with construction drawings, and sliall,be subject to the^approval of the City Engineer. 25. Any on-site:public utility easements proposed.to be:abandoned shall be vacated,through the streets and highway code process,prior to issuance of any building permits. An application fora right of way abandonment shall be submitted by the developer.. 26. The new southerly and northerlydnvewayapproaches on-Maria Drive shall be accessible. The entrance;shall be designed to meet City of Petaluma Fire Department requirements for ingress/egress. An emergency vehicleaccess easement, dedicated to the City of Petaluma, is required prior to fnalinspection,,subjectto Fire-Department requirements. 27. A lot line adjustment_or;merger is+required to be submitted by the applicant to either existing s=to accommodate the proposed development ors merge all properties into ne pa cel This shall be approved by the City.of Petaluma and recorded with the County Recorder's Office prior to issuance of;any building permits. 28..An 8 inch water,service connection shall be provided at the southern!connection location to Maria Drive for the combination fire and domestic water services. The existing 6 inch connection can be removed at the-main on Maria or used for-the.4 inch domestic service. Additional irrigation meters may be required based on,the irrigation plan provided during improvement plan submittal. 29. proposed on site water, sewer and storm dram utilities shall beprivately owned and maintained. 30. All water meters shall be located outside;of sidewalk_areas: 31.;The proposed storm dram system'shall be designed in accordance with flood control design criteriafrom the Sonoma County'Water Agency and'City of Petaluma Standards. 32. Prior.:to,issuance of:any construction permits; final hydraulic and'hydrology calculations shall be approved by:the Sonoma'County'Water Agency and City of Petaluma. 33. Improvement plan submittal shall,include.final drainage plans'and stormwater management report that demonstrate how runoff from the apai lucent buildings and 'interior.hardscape.gets to the proposed bio-filters along the perimeter, confirm whether 11-3 Maria'Dzive Aparfinent,Gomplex Project— 35 Maria Drive 12-GPA-0582 11-38 Page ATTACHMENT.D vegetative-swale'eredits will:be used a letter-from KriStar or authorized-professional approving the sizing of the units. . 34. The a pp licant shall demonstrate that Emergency vehicle access can be accommodated at both access'drivewa y s as re q uired•b y the Petaluma Fire,Department. Emergency Vehicle Access shall be provided through the entire site 35. The note on Li regarding the irrigation plan shall be removed. Irrigation plans shall be submitted at the time of improvement plan submittal;and shall comply with all City of Petaluma Ordinances.and Water'use Efficiency Standards 36: An encroachment permit is required prior to any construction-in-the public right of way or public easements The.applicant's Civil Engineer:shall submit grading,-drainage and utility drawings with the building permit an encroachment permit application. 37. All design and construction shall be in accordance with City bf Petaluma'design criteria and,construction standards. Fire Marshal: 38. Access: All roads/entrance/egress-within this.development Will need to accommodate the Petaluma Fire Department ladder truck turning radius. 39. Fire Hydrants`. Fire-l hydrant spacing shall-not-exceed.300 feet and/or 150 feet from the furthest stricture. Hydrant location is subject to the approval of the Fire Marshal's office and will require verification and coordination with the Fire Marshal's Office prior to submittal ofthe improvement;plans. 40. Sprinklers: All commercial building(s) (or portions thereof): shall be protected by an automatic fire sprinkler system as required'by the City of Petaluma Municipal Code:and shall !conform to NFPA 13 requirements. The fire sprinkler system shall be provided with.central station alarm system designed m:accordance With NFPA 72. A local alarm shall be on the exterior of the building AND a normally occupied location in the Ulterior of the building. All systems require 3 sets:of plans to be submitted to;the Fire Marshal's,Officefor review and approval. 41:Apartment or multifamily buildings !shall be fully sprinklered in accordance with Petaluma',s'Municipal Code and NFPA 13 R dwelling requirements. The system shall be calculated for a four-head;activation'at the most remote location. A local alarm shall be provided on the exterior and a normally occupied location AND in the interior of the building. All systems require,3^sets of plans'to be submitted to the Fire.Marshal's Office for review and approval. While NFPA 13 R systems are allowed please consider an NFPA 13' "-Four Head/dwelling Rule" fire sprinkler system. NFPA 13 R systems are Maria Drive.Apartment Goinplex Project-35 Maria,Drive 12-GPA-0582 Page . 11-39 • ATTACHMENT D limited "life safety" system, aren't designed:to protect property, and don't have attic protection. In an apartment setting, with multiple tenants, we believe the additional cost is worth the protection afforded and there may be benefits from an insurance standpoint as well Contact the Petaluma Fire Department.Plans Examiner, for more information regarding theNFPA 13 "Four Head/Dwelling Rule"fire sprinkler system. 42. General: To streamline,the approval process at building permit,.application, be sure to show or note all Fire Department requirements,on plans:submitted for building permit. 43. Provide smoke detectors for each dwelling unit. Smoke detectors shall be installed in all sleeping rooms, in hallways or areas giving access to sleeping rooms and at each level of the house. Detectors shall-be hardwired. (110v)with•battery backup, beanterconnected to one another, and located on dedicated circuit per the Califomia,Building Code. 44. The site.shall be provided:with an approved fire alarm.systenr as follow: 45. The Community Center Building contains an assembly occupancy and shall,be protected with.a fire alarm system for that occupancy type per the California Building Code and must comply with NFPA 72. 46.The other buildings shall be protected by a central station alarm to monitor all tamper switches and water flow. Additionally, this system must:provide a local alarm on the exterior of the building. and in a normally occupied location in the interior of the buildings. 47. The fire alarm contractor must obtain approved plans,and permit from the Fire Prevention Bureau prior to commencement of work. The fire alarm submittal shall include a permit application with three ,(3) sets of plans, cut sheets, and calculations for review. This system shall comply with NFPA 72. 48. Know boxes at each building;will be required for fire department access. Location of the Know boxes will be determined by the fire Marshal and/or fire inspector during inspections. 49. Building Height.( from' Section_905.3.1 PMC): ,Class`I standpipes Shall'be installed in buildings three stories or over in height and/r if in'the opinion of the Fire Chief, a hazard. or condition.exists in which the installation of standpipes would improve firefighting' operations. :Standpipes will be provided with approved outlets provided on each floor level, including the roof when roof access is provided. 50. Per Petaluma Mumcipal Code and.Title 17 of the California Administrative Code, a fire service underground to a building of three (3) or more floors shall have a double detector checklbackflow preventer installedperCity of Petaluma Water Installation Standards. 51. Fire service„underground to this elevelbpmenf shall be a"looped” system and all planning and.installation aspects;must,be coordinated-with'the'City Engineer"and the Fire Marshal. The fire underground plans must be submitted separately from the sprinkler plans. Three sets of plans and,pemuffrom the FMP are required. Maria Drive Apartment Corn"plek Project- 35 Maria Drive I2-CPA=0582 11-40 Page ATTACHMENT D • From Publie:Works&.Utilities(Water Conservation.Program Coordinator) 52. Final:landscaping plans shall be submitted at time of building;:permit:review and shall include an irrigation,plan;for review and approval. Said:landscaping and irrigation plan shall be compliance with the city of Petaluma's, Water Conservation Regulations Ordinance and shall be reviewed and approved by the City's. Water Conservation Program Coordinator: 53. Plans submitted for building'permit shall include all interior water using .fixtures for review and approval with the City's Water Conservation Program Coordinator for conformance withythe Petaluma'.5 Water Conservation Regulations Ordinance. 54. The applicant shall defend, indemnify and hold harmless:the City and its officials, boards, commissions, agents, officers and employees ("Indemnitees") from any claim, action or proceeding against Indemnitees to attack, set aside, void or annul any of the approvals of the project. The applicant's duty:to defend, indemnify, and held'harmless in accordance with this condition sh'all'. apply to any and all claims, actions or proceedings brought concerning the project,;not`just.such claims, actions or proceedings brought within the time period provided for in applicable State and/or local statutes. The City shall promptly notify the applicant of any such claim, action or proceeding concerning the project. The City shall cooperate fully in the defense. Nothing contained in this condition shall prohibit the City from participating in the defense of any;claim, action, or proceeding, and if the Citychooses`to do so, applicant shall reimburse,City for attorneys' fees and costs incurred by the City. Maria Drive Apartment Complex Project-35 Maria Drive 12 GP.A-0582 11-41 Page ATTACHMENT E U City of Petaluma A Itt f MITIGATEO NEGATIVE DECLARATION 35 Maria.Drive 1259' The Cityof Petaluma has prepared a•Mitigated Negative Declaration for the following described project: Project Name:Maria Drive Apartments Project'Location:35 Maria Drive Project.Applicant: JDA West, INC- Project Description: The applicant is proposing a General. Plan Amendment; Zoning Map Amendment, and Site Plan and Architectural Review to developthe property located at 35 Maria Drive. The proposed project is for 144-units which would be comprised of 54, one-bedroom units (approximately 800 sq: ft:), 72, two-bedroom units (approximately 1,075 sq. ft.) and 1B, 3 bedroom units (approximately 1275isq..ft.) in 6 apartment buildings'on the site A total of 8 units would be ADA-accessible units, 37 units would be adaptable units and 3 would be designed for sensory impaired. The development will consist of two building types: building type - A (3 each) and building type - B (3 each) for a total of six (6) buildings. Both building types are proposed as three stones 'in height with a building height 38 feet An approximately 3,517 square foot community building is proposed within the center of'the complex. A total of 252 automobile and 144 bicycle-parking spaces are proposed. FINDING: The City has conducted an Initial Study of the,projectandfound that=the project will not.have a significant effect'on the environment. Potential environmental impacts-associated with this project are determined to be minor and/or can mitigated to a less-than-significant level. Mitigation measures identifiedlin;th'e project Initial Study are as follows: • VIS-1'. In order to avoid light intrusion onto adjacent properties, alt exterior lighting shall be directed onto the project site and access ways, and shielded to prevent glare and intrusion onto adjacent propeties. VIS-2: Only low-intensity light standards and/or wall mounted lights shall be used (no flood lights),and lights attached to buildings shall provide.a "soft wash" of light against the wall and shall generate no direct glare. AQ-1. In order to assure that potential impact to existing near by sensitive receptors are reduced to levels below significance, The applicant shall incorporate the Best Management Practices for construction into the construction and:improvement plans and clearly indicate these provisions in the specifications. In addition an erosion control program'shall be'prepared and submitted to the City of Petaluma prior to any 11-42 • .Mitigated Negative Declaration- 35 Maria Drive Page 2 of 6 construction activity. BMPs shall include but not be limited to the BAAQMD Basic Construction Mitigation Measures as modified below: 1. All exposed surfaces '(e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered twotimes'per day. 2. All haul trucks transporting soil, sand, or other loose material off-site shall be covered. 3. All visible mud or dirt track-out onto adjacent public:roads shall be removed using wet power vacuum `street sweepers at least once per day. The use of dry power sweeping is prohibited. 4: All vehicle speeds on unpaved roads shall be limitedito 15 mph. 5. All roadways, driveways, and sidewalks shall;be completed as soon as possible. Building pads shall be laid as soon as possible iafter grading unless seeding or soil binders are,used. 6. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne tonics control measure Title 13, Section 2485 of California Code of Regulations). Clear signage shall be provided for construction workers at all access points. 7. All construction equipment shall be maintained and properly tuned in accordance with manufacturer's. ;specifications. All equipment shall be checked by a certified mechanic'and determined to be running in proper condition prior to operation. 8. Equipment staging shall occur as far as possible from existing sensitive receptors. 9. Post a publicly'visible sign with the telephone number and person to contact at the Lead Agency regarding dust complaints;, This ;person shall respond and take corrective action within 48 hours. The Air District's phone number shall also be visible tarensure compliance with applicable regulations. 10. The Developer shall designate aperson wittv authority to requireincreased watering to monitor,the`dust and.erosion:coritrol program and provide name and.phonenurriber to the City prior to issuance of'grading permits. Post a publicly visible;sign with the telephone number of person and person to;;contactat the,Lead Agency regarding dust complaints. This person shall respond and take corrective action within 48 hours: The Air Districts phone number shall also be visible to ensure compliance with applicable regulations. AQ-2. Diesel-powered off-road equipment larger than 50 horsepower and operating aPthe site more than-two days that are used for demolition and mass grading/excavation shall meet U.S'. EPA particulate matter emissions'standards for Tier 4 engines or an equivalent measure-;such asthe use of alternate powered equipment,alternate fuels, and added exhaust devices: The applicant shall provide the City with a list of measures to be used along with an updated Health' Risk Study that demonstrates effectiveness of such measures to reduce predicted cancer below thresholds of significance. AQ-3. The contractor shall.prepare,a project schedule that minimizes the number of hours that equipment will operate and'includesthe.provision of idling restrictions. 11-43 Mitigated Negative Declaration— 35 Maria Drive Page 3 of 6 AQ-4. Line power shall be installed at the site as soon as possible:after construction start and shall be used to power,equipment to avoid use of diesel-powered generator engines. BIO-1. To prevent impact§ to nesting birds covered by •State,and federal law (California Department of Fish and Game Code and the META), the applicant shall avoid the removal of trees, shrubs;,or weedy vegetation between February 1 and August 31, during the bird nesting,'period. If no vegetation ortree:removal°is proposed during the nesting period, no surveys are required. If it is not feasible to avoid the nesting period, a pre-construction survey for nesting birds'shall be conducted by a qualified wildlife biologist no earlier than seven days prior`to the removal of trees. Survey results shall be valid for the tree removals for 21 days.following the survey. If the trees are not removed within the 21-day period, then a new survey shall be conducted. In the, event. that an active nest for a protected species of bird is discovered in the areas;to, be cleared, clearing and construction shall be postponed for at least two weeks or until the biologist has determined that, the young have fledged (left the nest), the nest is vacated, and there is no evidence of second nesting attempts, whichever'is later. CUL-1 Prior to excavationfor'the swimming pool, the applicant shall;conduct test drilling to the depths expected for the pool. A City-approved archaeologist shall be present during test drilling,and excavation for the swimming pool or for any work involving depths of more then 5 feet. CUL-2 In the eventthat any cultural resources are uncovered during earthmoving activities,. all construction excavation activities shall bei suspended for a period to be determined by a City-approved archaeologist to allow for adequate inspection, recommendation and retrieval, if appropriate. CUL-1. In the event that human .remains are uncovered during earthmoving activities, all construction excavation activities shall be suspended and the following measures shall be undertaken: 1. The Sonoma County,Coroner shall be contacted. 2. If the coroner determines the remains to be Native American the coroner shall contact the Native American Heritage Commission-within 24 hours. 3. The project sponsor shall retain a City-approved qualified archaeologist to p recommendations and retrieval, if appropriate. rovide adequate inspection, recommendati 4. The Native American:Heritage Commission shall;identifytheperson or persons it believes to be the most likely descended from the deceased Native.American, and shall contact such descendant in accordance with state law. 5. The project sponsor shall be responsible for ensuring that human remains and associated grave goods are reburied with appropriate dignity at a place and process suitable'to the most.likely'descendent. GEO-1. Prior to Submittal of improvement Plans, the applicant shall .submit an updated geotechnical report that identifies performance of supplemental`exploration, defines the amount of expansive or w ak soils to be removed from the amount and make up of engineered fill to be replaced, and specific recommendations for private and public improvements. 11-44 Mitigated Negative Declaration^- 35 Maria Drive Page 4 of 6 GEO-2. The design, of all :earthwork, cuts and fills;, drainage, pavements, utilities, foundations, and structural components shall conform-,with the specifications, and criteria contained'in+the geotechnical,report (as updated to comply with GEO-1), as approved by the City Engineer and/or Chief Building Official. Foundation and structural design for buildings shall meet the Uniform Building Code regulations for seismic safety (Le., reinforcing perimeter and/or load bearing walls, bracing parapets, etc.). - GEO-3. The applicant shall obtain a geotechnical engineer to review the final project plans and specifications to determine if they are consistent with the recommendations as outlined in the report and'observe grading,,compaction and foundation excavations to verify that conditions are as anticipated and to Modify recommendations if warranted. A qualified geotechnical engineer shall sign the;improvement plans and certify the design as conforming to geotechnical report specifications. A qualified geotechnical,engineer shall inspect the construction work and shall certify to the City, prior to acceptance of the improvements or issuance of a certificaterofoccupancy that the improvements have been constructed in accordance with geotechnical report specifications. GEO-4. Construction and improvement plans shall be reviewed for conformance with the geotechnical report,specifications (as updated byGEO-1 above) by the Public Works Department and the-Chief Building Official prior to issuance of grading or building permits: Additional soils information may be required by Chief'Building Inspector during the plan check of b'uilding plans in accordance withthe Code. GEO-5. All earthwork, grading, trenching, backfilling, and compaction operations shall be conducted:in accordance;with the City of Petaluma s)Subdivision Ordinance (#1046, Title 20, Chapter-20 04 ofsthe Petaluma Municipal Code) and Grading and Erosion Control Ordinance#1576, Title 17, Chapter 1T31 of:the:Petaluma Municipal Code). GEO-6. The applicant shall submit an Erosion and Sediment Control Plan prepared by a registered professional engineer as an integral part of the.grading plan. The Erosion and Sediment Control Plan,shall be subject,to review and approval:of the Planning Division and Public.Works Department, prior to issuance,of a grading permit. The Plan shall include:temporary erosion control measures to be used during excavation for foundations, and,Other 'grading operations at the, to prevent discharge of sediment and contaminants,into the drainage system. The Erosion and Sediment Control Plan shall include that the material' and equipment for implementation; of erosion control measuresshall be on-site by October 1st. GEO-7. All construction activities;shall ,meet the Uniform` Building Code, regulations for seismic safety. Foundation,and structural:design for buildings shall conform to the requirements of the Uniform Building Code, as well as state and local laws/ordinances. Construction,plans shall.be subject to review and approval by the Building Division.prior to the issuance of a building permit.. All work shall be subject to inspection by the Building Division and must conform to all applicable code requirements and approved improvement plans prior to issuance of a Certificate of Occupancy. GEO-8. All public and .private improvements shall be subject:to inspection by City staff for compliance with the approved improvement plans, prior to their acceptance by the City. 11-45 `Mitigated Negative Declaration— 35 Maria.Drive Page:5 of 6 HYDRO-1.The project.shall prepare a SWPPP prior to the issuance of grading permits. The SWPPP shall be prepared pursuant to the requirements set by the State Water Resources Control Board (SWRCB), and implemented throughout project construction and operation The Applicant shall complete and submit a Notice of Intent (NOI) and appropriate .filing fee to the SWRCB. The applicant shall file a Notice of Termination (NOT)with the SWRCBiupon project completion. The SWPPP shall be submitted for review and approval by Public Works prior to approval of improvement plans or issuancerof grading or building permits. City inspectors shall inspect the improvements and verify compliance prior to acceptance of improvements. The SWPPP shall comply with Sari Francisco Bay Area Regional Water Quality Control Board;requirements. • HYDRO-2.In accordance^with City of Petaluma General. Plan 2025 Policy B-P=36, the project shall include an on;site`storm water detention system to limit post-construction storm water peak,flows leaving the;site to not exceed pre-project peak flows by detaining peak storm,water runoff from the 100-year, 24 hour storm event Final storm water calculations shall be designed in accordance. with City of Petaluma and Sonoma County Water Agency requirements and shall be provided with the project construction drav`'ings,subjeot to the review and,approval'bythe City Engineer. HYDRO-3. The developer shall be responsible for funding, through The project cost recovery account, all City 'required storm water quality,inspections: The project conditions, covenants and restrictions shall establish and fund a mechanism to ensure long term maintenance;, inspection.and repair as,needed of the storm water detention system and post construction storm water treatment measures and best management practices: The systems shall be inspected at least annually, prior to the onset of tharainyseason, bya Civil Engineer licensed to practice in the State of California, to ensure the drainage systems are performing as designed and required in project approvals. The'Civil Engineer shall prepare asignedE and sealed report of the inspection including findings regarding The condition of the storm water detention. and treatment;systems, photo documentation, ;any necessary proposed modifications and a'statement indicating that thersystem'is operating' ,as designed and required by projectiapprovals. The annual report°shall be submitted to the City of Petaluma Planning Department and Department of Public Works and Utilities no later than October 15t of each year. HYDRO-4:,The. project shall comply with the City of Petaluma Phase II Storm Water Management Plan.requirerents. HYDRO-5.AII storm drain inlets catch basins will be stenciled with prohibitive language (such. as: "NO DUMPING-DRAINS TO OCEAN) and/or graphical icons to discourage illegal dumping. HYDRO-6.The!applicant shall pay the applicable City's Storm Drainage Impact Fees calculated atithe"time:,of building permit issuance and a fair portion shall be paid for each residential unit prior to final inspection of issuance of a Certificate of Occupancy. NOI-1. Due .to the surrounding residential development and potentially intrusive noise generated by construction activities, construction hours°shall be restricted the hours of '7:00 am to 6:00pm Monday through Friday and interior-only work may be 11-46 • • Mitigated Negative Declaration— '35 Nana Drive Page.6 of 6 conducted on Saturdays from 9:00 a m. to 5.00 p.m., Construction activities shall be prohibited on Sundaysand all federal,'state, and local holidays. NOI-2. The project:shall comply with 'interior noise, standards of 45 'd BA. To assure that interior noise.standards are achieved plans submitted for development permit shall include a detailed acoustical analysis that identifies required window sound ratings, if any. The analysis shall also identify which units-will require.an alternative ventilation system because the windows need to be in the closed position to meet the indoor noise standard per the State of California and the.City of Petaluma requirement that interior noise,levels be'reduced`to a CNEL of 45 dBA or less in habitable rooms. CRC-1. The proposed.monumentsign at;tne extension of°Park,`Lane and Maria Drive shall be set back from the:access driveway approximately 10 feetP'to assure sufficient line of sight. -- CIRC-2. Traffic calming measures shall be employed to encourage low traveling vehicles on internal circulation including; crosswalks at corners; speed bumps, and colored pavement to visually identify'pedestrian crossings. CIRC-3. The intersection ofMariaLDrive and Park Lane shall be improved with yellow stripping crosswalks to further enhance pedestrian safety at the project access driveway and assure safe crossing to the McDowell Elementary School'to'the southeast. CIRC-4. The project applicant°;shall be responsible for the cost associated'with the installation of signage along the frontage of the property at Maria Drive;noting,that Maria Drive is a Class III Bike route. Date: Alicia Giudice; Senior'Planner Community Development Department 11-47 ATTACHMENT F Mada'Drive Apartments Petaluma, CA • ARECFNED An Architectural Descr,.iptio December 19, 201.2 t DEC n . 5 U7 Locatedlto the northeast of an"existing neighborhood shopping center and colziAnfef I cart orla or Morth McDowell Boulevard and.East Washington;Street the`Maria Drive Apartments are planned as a:high density, multifamily development..within an existing, under-utilized professional"business;park..Buffering the commercial uses at the. recently revitalized and upgraded shoppinglcenter known as Washington Square, the proposed re-development as planned, will create a neighborhood transition:between the more intensive,commercial uses to the south, and the already established neighborhood ofisingletfamilyhornes within the Creekside Drive:neighborhood to the north. Contiguous to the site and to the.southeastand easterly portion of the property, Maria Drive is a local residential collector street connecting North McDowell to East Washington. The arc of the road at Marla'Drive is addressed by the three proposed structures which run roughlyparallelto the right-of-way and are varied in type in an effort to create a more Urban'rhythm of massing and materials, defining the limits of the project and focusing the main structure's entry facade and detailing toward the central courtyard of the project, near the centrally located community building. The two primary entries into.the'site have been strategically located to facilitate'ease,`of circulation within the site's main drive aisles and to address the existing curb cut and existing traffic loads(fromrthe historic apartment development to the east of the proposed site. The:northern,property line of the site runs parallel to the Lynch Creek Trail,System which has an'existing painted crossing strip along Maria Drive. Lynch Creek Trail;at this portion of the system is an unimproved, unpaved pedestrian and mountain bike accessible path utilized.by both recreational users and local commuters. Currently, the existing property is separated from this public amenity'by a six foot tall galvanized cyclone fence with numerous perforations and:damaged sections which no longer effectively restrict unauthorized pedestrian access, resulting in secondary vandalism, loitering and'potentially nefarious activities. The development as proposed, intends to,limit any connectivity between'-the site,and this public trail system by limiting,access to the northern most intersection of the site and Maria Drive adjacent to the existing crosswalk. Residents wishing to use this trail system would enter it from the:Mana Drive right-,of-way. A continuous six foot tall, black wrought iron fence along this northerly property line will provide additional security for residents and visual connectivity due to the transparent nature of the fence system. Utilizing parking as a:buffer between the development and the existing,residential neighborhood to the north, covered parking stalls will provide security lighting for residents and ambient levels adjacent to the existing walking path along the Lynch.Creek Trail. Both the westerly property line and southwesterly property line of the proposed development are adjacent to the rear :loading dock,areas`of;the existing Wasiiington,Square neighborhood shopping center. Where the proposed multi-family ±structures;areclosest to the acoustical source'of=energy at the grocery.store's loading dock, the design team has placed three,separate garage structures which will have security fencing adjacent to the CMU wall..In addition to 'mitigating,direct line-of sightiransmissionof acoustic energy, these garages will,be-adjacentto an enhanced,. acoustical wall that,is proposed.to be constructed to.an approximate height of twelve feet above:adjacent grade. This split-fluted,,fully reinforced concrete masonry unit wall, will be provided with acoustic chambers, facing the loading- dock area of thestiopping center, designed and°engineered to:trap high energy noise frequencies at the property line. For those'third floor units of the proposed structure having a direct line-of-sight to the shopping center loading docks, enhanced STC rating, double glazed vinyl windows and door assemblies will be specified°and installed. The design focus for the entire.project is;the:centrally located amenity:courtyard. Directly'adjacent to the single story community building,the courtyard has been designed residents off,all ages, with a multi-age playground and tot lot assembly,,fully-fenced pooland sunbathing patio area and trellised picnicking and BBQ'arealinking these two spaces. In addition, the:landscape plan has been configured'to provide the largestiamount of open,,;grassed sod areas adjacent to these uses so children can wander and explore this park-like setting, securely nestled in this interior courtyard, several hundred feet from Maria.Drive.and neighboring properties. Creating "eyeson the street" defensible public spaces, this'amenity will be visible:from almost half-of the unit's balconies and the on-site manager within the c"orrimunitybuilding. Public benches for;parents:and grandparents will be placed for ease of supervision and neighborly interactions. Additional site amenities for residents and invited guests include a'significantinumber of locking bike storage areas, a USPS approved postal`delivery facility adjacent to the community building, and recycfl._to48ers adjacent-to the conveniently:located refuse enclosures. Landscaping design throughout the-site has been'integrated into thebuilding,edvironment and is.intended to produce an appropriate mix of public, semi-public and`.private spaces,for residents. These landscape buffers are designed to soften the massing of the,substantially proportioned;residential units and provide forappropnately scaled and placed landscaping'in;compliance with California low water use-statutes:and local jurisdictional'standards. The incorporation of flowering shrubs and ornamental trees is intended'to complement both.the architectural style of the development but.also the subtle changing of the seasons and sublime passage of time The thoughtful placement of canopy shade trees adjacent to all parking areas, drive aisles andopen recreational areas,.is intended to portray a sense of'place and permanence. Where possible, existing mature trees retained and protected on site, will be incorporated into the design of the development. Finally, along Maria Driveandin response to the;ever change,-arc of the right-of-way,the landscape architect has created landscape buffers ebbing and flowing with the interplay between orthogonal structure and the arc of the roadway. Breaking up the mass of these transitory spaces,,as intended,the landscape buffer at Maria Drive will present a changing.plane of colors and shapes that wilt mature with,the project, and ground it within the community. Centrally located and designed with a more pedestrian scale is the development's community building. At approximately 3,500 square feet this development amenity has been designed as a single,story structure with a cruciform footprint. The,main entry area and activities room are contained within a vaulted ceiling area that contains clerestory windows at the upperro'of. Contained within-this facilityare an on site manager's office, lobby reception area, non-commercial community kitchen; fully/equipped exercise room, restrooms,and on-site laundry facility for residents. Interior finishes and decor treatment at the community building are proposed to be of the highest commercial quality, of contemporary Napa styling-and durable, long-lasting;finishes. Directly adjacent to and 'contained with designed nooks and covered areasfare,apublic U.S.Postal Service mail pickup and delivery station, exterior pool shower and drinking fountain. Exterior access to the laundry roormand`restrooms have been planned into the structure to allow for ease of after-hours use by'residents and guests.. inkeeping with the overall design theme ofthe;proposed development, the exterior elevations of the community building are a blend of residential'.iscaled"California Craftsmen architectural styles, complete with batt and board siding, shiplap siding and manufactured wood out riggers. These design features are complemented by the cultured stone columns and-base treatment of a cobblefield stone texture application. The,main entry element is continuous through the building'and is intendedto actas a focal point within the site,,directingiguests and new residents to this centrally located facility and its uses. Visible from either of the site'stwo entry•drives this.enhanced feature has clerestory windows running at the soffit,line and within the gable ended overbuilds'there are top lights to introduce as much natural lighting as possible into.the:main community room. The community.building utilizes a similar color pallet As Building Type A, with the exception that the accent wood features, trim and such assemblies as the,farm house shutters will be€painted in a more robust Country Lane Red color: Roofing for the community building will also match the:roofing color and style of Building Types A.and B, along with the three residential,garages to the southerly property line,;and is intended to match a Pewter Gray color by Pabco Roofing Company; or equal. Both of the residential.structures,.Building TypessA and B, have similar design features which were specifically crafted to create both a "front" door and a "back,of house",compositionwhichlalthbugh similar in execution, remain distinctive enough so,either facade can be appreciated on its,own merits. The consistent design element feature at the entry for both building types vs al:gabled portico that have a baseofacultured stone in the;cobblefied texture and terminate4in-vertical banding'of`the batt and board style siding.Supporting the fascia of the:gabled roof will be Craftsmen styled"outriggers, in an'off-white or cream.color. These portico:elements will be provided with Building-and UnitSignage-in conformance with municipal fire code and are conceived!as a central feature of both the massing and pedestrian linkage for these building types.:finally, at,both the left and right side of these stone covered pylons, decorative craftsmen style lighting fixtures areproposed`for both aesthetics,and security. Utilizing three primary sidingmaterials for both Building Types A and B, the design team has selected a contemporary pallet of historic cotorsthat are consistent with product lines offered°by the James Hardie Plank Siding Company. There are three.primary siding types composed of this'cementitioussiding materials;':the batt.and board siding, and two different heights of ship lap.or horizontal siding in the three inch•and six inch,sized Select Cedarmill or Rustic Cedar lines. Where large areas of the structure require,siding, the:larger scale,horizontal siding is utilized, however,. where smaller scale elements are.proposed or the materials are directly above the::proposed stucco system, the smaller exposure,profile is designated. In addition to establishing a sense of scale and proportion, the visual interplay of shadow lines for these two different profiles will create visual interest and will.aid in reducing the scale and mass;of these structures..At areas of logical vertical thrust or a more narrow massing;element„the introduction of batt and board siding'is proposed. Theseelements would be primarily limited to either end of the structure and are consistent with the open stairway design at-either end of the building. 11-49 Thethird and final exterior mai ialintroduced is.a.three-coat cement stucc., system,;,in either a Heavy Dash texture or Light Lace textures As proposed the use of stucco will:be limited to the corners,of each building,type and will be ,vertical in composition'to,allow for a brief visual respite.-from the regularity-and texture of the ship lap siding. These stucco areas will be continued at exterior balcony half;walls and vertical,column,elements supporting'these patios and w ll`be separated from the ship lap siding by a classical Craftsman",beUybane,,of composite in either off-white or similar color. At the ends of each building type where the stucco supportsthersmaller gabled;building elements,the intent is to'high light the scale arid massing,of these domestically scaledtgabled ends,even including such features as'a tapered'Craftsman column at the third floor balcony. Grout colors s,for the proposed cobblefield stone..features will be selected,to be complementary to the.color selections.noted for the cement stucco system, reinforcing and celebrating the material dialogue between these grounding elements. Additional design components at the building exteriors include such architectural elements as painted wood plank shutters, painted wood outriggers at soffit;lines and gable ends, and powder coated metal railing at patio and deck half walls, in colors consistent with"-the accent features or fascia bands of each building. Colors of such accent features as the shutters will be utilized'to differentiate each structure type and will complement the overall design aesthetics of the development by integrating numerous design features into one, cohesive whole.: • Another design feature that will provide continuity throughout the site will be theiscale and massing-of the vinyl windows and patio doors. These energy efficient, double paned assemblies will be manufactured in either an off-white color or ecru color, similar to,almond,'that will complement the siding color selection and fascia trim and accessories. The massing of these windows, their location and rhythm have all been researched by;the design team to provide for the greatest amount of natural lighting within'eachvnit and their respectivebedroom areas. Due to the configuration of the site'and the location,ofthe central courtyard anddrive"aisles, the three structures that run parallel to the Maria Drive frontage will only show fleeting glimpses of vertical circulation elements at the end stair towers. None of the main entry,gable elements for these three buildings face:Maria Drive by design. Based upon the location of the footprintsto the..°proposed'.sidewalk and wrought iron fencing at,the Maria Drive right-of-way, thearticulation'of these three,buildings will provide a uniquely urban facade to;this.suburban street. The massing, scale and material articulation for these elevations are consistent With the front facad es, and are intended to create a dynamic,series of vistas for either pedestrians or vehicular traffic'along Maria Drive. Each of the individual,unit types will be provided with secure exterior locking storage, a private balcony or patio and private entry contained within a weather protected, interior corridor. Exterior patios will be provided with individual house:lights for,convenience and security, aswilt the primary entryway. As,proposed,'the unit interiors will offer full, contemporary kitchen layouts andlcabinet/countertop finishes, a dining;area, expansive living room connected directly to the exterior patio, and internal circulation,to separate bathrooms,and bedroom,areas. In addition, all units are ;provided,with interior coat or linenistorage closets'and,a separate closet for resident,washer and dryer. Material finishes will include low'VOCpaints and stains; residential carpeting and linoleum with recycled content, high efficiency windows and doors. Other energy savingSfeatures'for residentsare.proposed to include Energy Star lighting packages, low flow water fixtures for sinks,.Lavatories, showers'and water closets. All ranges exhaust vents and restroom exhaust assemblies-will be specified and installed to be in compliance with the 2010 California Green Building Codes and applicable local Tier adoptions. - All ground floor units throughout the site will be ADA,adaptable,and the development will provide the requisite transportation and ro'ect-amemtres. Such ADA amenities within accessible paths lue d travel-to both public number of ADA accessible unit types;on+ground floor areas, p p � within the units include'glue down'tarpeting, lowered cabinet heights, front control range and dishwasher, wider doorways,and frames,-accessible turn around areas, specified approach limits and where noted, either audible or•acoustic upgrades for sensory units. Within the development, public-amenities will be fully,ADA compliant in conformance with both state and federal civil statutes for universal accessibility. • 11-50