HomeMy WebLinkAboutStaff Report 3.E 1/6/2014 1,
1g 'vidcvitww#3 .E
�,SA U�
4 vat t
I85$
•
DATE: January 6, 2014
TO: Honorable Mayor and Mernbersofthe City Council'through City Manager
FROM Dan �� ` • CE:.=Director,Public Works & Utilities
Larry Zimmer, P.E. — Capital Projects Manager
SUBJECT: Resolution Authorizing;Award-of Contracffor the 2013 Sewer Manhole
Rehabilitation.Project
RECOMMENDATION.
It is recommended that the-.City Council approve the attached.resolution authorizing the award of
contract for the'2013 Sewer;Manlible,Rehabilitation Project.
BACKGROUND
To maintain.and improve the;condition:ofthe City's wastewater+system; the Public Works &
Utilities Department annually replaces or•rehabilitates deteriorating;sanitary sewer facilities
throughout the,City. Many ofthe1City's'older manholes were constructed with brick'and:mortar.
The City currently has approximately 140 manholes in need of rehabilitation or replacement.
These bric(.manholes are a•significant cause of infiltration;and inflows;,(1&I) to the sanitary
sewer system due to the deterioration of interior surfaces and,eroding mortar allowing ground
water to enter the sewer system 'This project will rehabilitate sewer manholes in various
locations of Petaluma using;a specialized:mortar and epoxy lining:system that is being
successfully utilized in neighboring,jurisdictions and throughout San Francisco Bay Area
This-project involves lining 60 iiiard oles and in-stalling covers on 4 manholes. The manhole
locations are-shown on Attachment 2.
The proposed: action meets Council Goal: "Planrfo'r and implement priority.capit'al projects as
funding permits.
DISCUSS" ION
TheNotice Inviting Bids was issued.on October 22, 2013. Oh November 13, 2013, one bid was
received as follows:
Agenda Review:
City Attorne}���C' / Finance Director 'City,Mane' 1
Name of Bidder, Bid Total
H&R Plumbing and'Drain Cleaning, Inc. $171,019.20"Lowest Responsible Bidder .
Engineer's Estimate $389,000
Due to the"specialty lining techniques and certification to perform the work, only one bid was
received for the project. Some plan holders, located outside the Bay.Area, indicated issues with
bonding and City'contract language,and:did not prepare a bid: The-lowestaresponsible bidder,
H&R Plumbing,and Drain Cleaning, Inc., has performed similar projects for the City of Santa
Rosa, Las'GallinasiValley Sanita tion District, and the City-of Richmond, City.of Berkeley, and
the City of Belmont. Staff verifie
d that H&R Plumbing and DrainiCleaning, lno. possesses a
valid Class C36-and.C42,California Contractor's License, license number 878364, which expires
on April 30, 2014,-that qualifieskH&R Plumbing and Drain Cleaning; Inc. to perform the work.
Construction is,scheduled to begin in February of 2014 and to be completed in May of 2014. It is
anticipated that construction management and overall inspection,will be conducted by City staff
with some specialized inspection services being performed by outside consultant.
FINANCIAL IMPACTS
The total project budget for the2013.,Sewer Manhole Rehabilitation Project (C66501003) is
$750;000 and approximately $1'5,000;has been expended to date-for planning, assessments and
design. H&R Plumbing-and Drain Cleaning, Inc. bid of$171019.20 is within the approved CIP
budgeted amount of$450,000 for construction contract phase The actual construction costs are
less than originally budgeted due'to advances in lining teohnologyandefficiency. At project
closeout, all remaining fundslwill returned to the Wastewater CIP ProjectNumber 066501003 to
be used on future manhole1rehabilitationprojects.
ATTACHMENTS.
1. Resolution
2. Location Map
2
Attachment I
RESOLUTION AUTHORIZING THE:AWARDIOFCONTRACT FOR
THE 2013 SEWER MANHOLE°REHABILITATION'PROJECT
WHEREAS, City staff has prepared:construction bid documents and advertised for construction
this project; and
WHEREAS, in accordance with the cityy of Petaluma.Charter.and Municipal Code, California
Public Contract Code Section 20162 and other applicable aaw, Cit y staff solicited bids for the
Project; and
WHEREAS, the project was bid on October 22, 2013, and one (1) bid was received and opened
on November 13, 2013 in accordance with applicable law; and
WHEREAS, the lowest responsive bid,for the Project was submittedby H&R Plumbing and
Drain Cleaning,Inc. from El SOI)rante, CA for $171,019.20 and
WHEREAS, staff has determined that the Contractor's bid satisfies the bidding requirements for
the Project; and
WHEREAS, staff has verified;that H&R Plumbing and Drain Cleaning, Inc. possesses a valid
California Contractor's License; Class C36 and C42, number,878364 that qualifies H&R
Plumbing and Drain Cleaning, Inc.,t'o perform the Project; and
WHEREAS, the Project is categorically exempt pursuant:to California.Environmental Quality
Act ("CEQA") and Title 14, the�California Code of Regulations("CEQA Guidelines"), Section
15302,because the project consists of replacement and reconstruction of existing utility systems
and/or facilities involving negligible or no expansion of capacity.
WHEREAS, the funds made available are in the 2013/2014 wastewaterCIP budget; and
NOW, THEREFORE, BELT RESOLVED that the City Council:of the,City hereby:
1. In accordance with the Cityof Petaluma Charter and Municipal Code,California Public
Contract Code Section 20162 and other applicable law, waives any and.all non-
conformance in the bid of H&R Plumbing and Drain:Cleaning, Inc. for'the 2013 Sewer
manhole Rehabilitation-Project, Project No C66501003, finds the bid of$171,019.20 to
be the lowest, responsive;bid and further finds that H&R Plumbing and Drain Cleaning,
Inc. is the lowest responsible'bdder.
2. Awards the contract the<2013 Sewer manhole Rehabilitation Project, Project No
• 066501003 to H&R:Plumbing,and.Drain.Cleaning, Inc.:in the amount of$171,019.20,
The afnount of the lowest responsive bid, conditioned on H&R Plumbing and Drain
Cleaning, Inc.timely executing the-project,contract and submitting all required
documents, including but not limited to;;executed,bonds, certificates of insurance, and
endorsements,:in accordance with the project bid documents.
3. Directs staff to issue notice of award to H&R Plumbing and Drain Cleaning, Inc..
3
4. Authorizes,arid,directs the City Manager to'execute the project contract on behalf of the
City of.Petaluma upon timely,submission,by H&R Plumbing and Drain:Cleaning, Inc. of
the signed,project contract and all other required document, including but not limited to,
executed bonds, certificates of insurance, and endorsements, in accordance with the
project bid documents.
4
•
2013 SEWER MANHOLE REHABILITATION. Attachment 2
VARIOUS LOCATIONS
PROJECT NO. 666501003
LOCATION MAP
_
0 t ‘ af, 2 ) a --ts`
R,,D0,,,---____
IP b •
ii
111
f [
C ' Dila I=
cC
ELY RD 444 a ' SONOMA MOUNTAIN PK,/ — a ELYBLVD
—:z I I
cr0 MI 1 1
c II ewlipass
1
c
lia Se i _ P. SUTTER 4.C'
— tnz I I
) _L...4. --/
i
MARIA VIR , 1 in r
m o CRINELLA DR
(14± I , es p • <
e, z
I,,,--—
0
0,, ap—PARK LNI--W, —
--- 1 i ¢-LarQ1 •
0 r
.17: 0 '
wool]SORREL DR w
= 1 6----DANIEL DR--
N MCDOWELL-BLVD T VV
S MCDOELL LVD
lip, cs
z
-7 N 0
_,
0
,,,,
Z Ill A —i 1
z 7;)
¢
01 --0_<31 —0
H 2 As A
0 i
HWY_101 HVVY N Hwy s I kl.
-ly N,
•,__ ST FRANCIS OR
_i_ i0. III
cI
H —
I ( I 4 P LI _
7 z PAYRANST
IN
L,
9 lk useo,
j Ill 6.(It Po m
2 i___
ST VALLEJO lEn
z
Qt 4 c 0
• , . 2 u)
IT— c t
\ MI 'F- ± .?'
4 .. ......_ 5
Manhole Location
■-- EAKEVILLE-ST Typical
*/65 irs4, 4, Wag ---fir
„--- -tal ,„("04}
iik. V Ar€49- 0 o
0
irc' 4e0, 41k c,w ... at Om, BLVD
nalli•••RETR‘ 1
c< 7p
O‘r / 466‘PAIPSAIP-ia: 111011111012111. r..----- .,,‘ e
e
o
0 0
co*S71, / illar44111111111 1111111Wall
P A\ ' 'P-777
i \,
\ HOWARD S1 la
.Psil ., s 6
v 1 pc) T IA GI SS
1 ,<.‘lz,
V A--
411111%.1k
en 11
0-c 1 4 allialtast co \ ‘'.
\ \---
1 -
0 y 2 OAK
7a7„..,a 111 a24— ,, <<, 0,2, \ 40
0:11,,,,,,t 4
\ 4 49
41,64i i- en PAIR st oq
9( TER
0 , ,‘'
wEesTER (-0,
_ .
.
■
SUNNYSLOPE RD%
8°DROA AVE i 5 j \<
'\
../.
j{j
2
ct
w
.7, \7g
WINDSOR-.,
0 -1 -100 2 200 Ft
,z__ $\ /b. '1A - ' ■
5