HomeMy WebLinkAboutStaff Report 4.A 3/17/2014 esb'L Lv:>r
W9
R
lase
DATE: March 17, 2014
TO: Honorable Mayor'and,Members of the City Council through City Manager
FROM: Dan.St.John, : rector, Public Works and Utilities
Larry Zimmer, P:E. —Manager, Capital Projects
SUBJECT: Resolution Approving the Project Budget and Authorizing Award of Contract for
the Wiseman Park Restroom Project
RECOMMENDATION
•
Staff recommends that the.City.Councilapprove the project budget and authorize the award of
contract for the Wiseman Park Restroom Project.
BACKGROUND
This project consists of building a restroom in an undeveloped area located betweeri.the soccer
fields-and softball diamonds near the south end of Wiseman Park facing St. Augustine Circle.
The,project has been long identified:by the youth sports,advocates.and City staff as a necessary
improvement to enhance the park and provide adequate sanitary,facilities to the many soccer and
softball�players and spectatorsthat regularly use the park. The.existing "port-a-potty" is not
adequate. Work will include site;;grading, demolition, constructing curb ramps, striping, bollards,
water service:connection sewer`lateral connection, excavation, erosion control, installation of
new facilities including.a City furnished pre-manufactured huilding'with accessories, building
slab, plumbing, equipment, and maintenance road which will also serve as an ADA compliant
pathway.
Basedsninputreceived:at:public meetings held in March and April 2013, staff changed the
project design and setthe building back from the street than originally planned. Other
changes`requested at public meeting include adding exterior lighting forsecurityaand
landscaping to help,the building blend into,the park setting. These two:items:will be completed
by Parks staffwhenfundingbecomes available rather than`under this contract'because it can be
done more cost effectively::Representatives of various sports'leagues strongly supported the need
for a restroom`because of the;many hundreds of participants and spectators using the sports
fields, including therPetaluma Girls Softball League, Petaluma Youth Soccer League, Lacrosse
and various;adiilt soccer teams.
Agenda Review:
City Attorney Finance Director City Manage — 1
At a.noticedand regular:meetingthe>Recreation,'Music•and',Parks Commission.on March 20,
2013`, the Commission considered,the°item,and,took;actionrecommending'CityCouncil approval
to-move forward:withthe project. On;May6, 2012', Council authorized staff to prepare plans and
speeificationsiand`to advertise for construction of the project
The proposedaction meets Council Goal'"Plan for and implement priority capital projects as
finding permits".
DISCUSSION
Staff issued a Notice Inviting Bids on January 9, 2014. Eleven bids received on February 12,
2014 compare reasonably to;the'Engineer's estimate, as shown`below:
Name of Bidder Business Location Total Bid
Cats 4 U,,Inc. Healdsburg $ 73,950
Coastside Construction Santa Rosa • $ 75,000
C. Hardy Petaluma $. 96,000
WR FordesAssociates . Richmond $100,000
CWS Construction Novato $119,900
Team Ghilotti, Inc. Petaluma $129,849
Fieldstone Construction Co. Santa Rosa $129,916
Murray Building,Inc: Sonoma $147,000
Maloney Construction, Inc. Novato $152,152
AE Nelson Construction' Rohnert Park $161,200
Wildcat Engineering. Petaluma $167,265
Engineer's estimate N/A $ 75,000
•
Council:previously approved•,a;total project budget of$100,000, comprising $80,000 of Park
Land'ImpactFees and $10,000 in donations each from the Petaluma Youth Soccer League
(PYSL) and_Petaluma Girls Softball•Association (PGSA).
Staff recommendsCity Council authorize the City Manager to enter-into contract for the
Wiseman Park Restroom Project with the apparent low bidder,.Cats 4 U, Inc. Construction is
tentatively scheduled,to begin in April 2014, and is expected to last approximately thirty working
days.
FINANCIAL'IMPACTS
The proposed action will'.requ„ire,an additional$40,000 funding from the Park Land Impact Fee
account. The change will have no impact on the General Fund. The project budget as
summarized in the table below exceedsthe May 6, 2013 staff estimate by $40,000 for the
following reasons:
•
2
1. Additional costs for thelbuilding purchase due to required building code revisions.
2. Design changes and additions based on.public inpui and Parks Commission
recommendations including moving the restroom further from the street.
Staff considered several aliernatives to bring the project back into`the approved budget. Moving
the building further from the street addsan estimated $15,000 to $20,000 to the installation
contract, however, the local re sidents''adamantly requested the change and therefore staff is not
recommending a further.redesign. The pre-engineered, manufactured restroom building was
reviewed, however the design is already at a bare bones level and therefore'staff does not
recommend downsizing the current selected model.
Staff recommends an increase in•the amount of Park Land Impact Fees used for the project by
$40,000 and an increase in'the'totafproject budget to $140,000.
The following is the proposed project budget:
` evised: •
• . 1344,-.CIP Project
iJses • Budget :Midge f,
Design/EnvironthentaVPerniits $ 8,000 $ 14,000
Legal Services $ 1,000 .$ 1,000
Construction Installation^Contract $ 48,000 $ 74,000
City purchased.resfrooni $ 25,000 $ 30,000
Construction,Management/Testing $ 8,000 $ 7,500
CIP Overhead n 2.4% $ '2,000 $ 3,500
Project"Cohtingency. $ 8,000 $ 10,000
TOTAL $ 100,000 $ 140,000
Funding;Sources
Cash Donations $ 20,000. $ 20,000
Park Land Impact Fees $ 80,000 $ 120,000
TOTAL .$ 100,000 $' 140,000
ATTACHMENTS
1. Resolution
2. Vicinity Map
• 3
Attachment 1
'RESOLUTIONAPPROVING THE PROJECT'BUDGET AND
AUTHORIZINGTHEAWARD OF CONTRACT"FOR THE WISEMAN PARK
RESTROOM PROJECI-TO CATS4U, INC.
WHEREAS, City staff has,prepared construction bid documents and advertised for
construction of this Project and
WHEREAS,in accordance with the City of Petaluma Charter and Municipal Code,
California Public Contract Code'Section 20162 and other applicable law, City staff solicited bids
for the Project; and
WHEREAS;,the-PiojectWwas bid on February 12, 2014, and eleven (11) bids were
received and opened in accordance with applicable law; and
WHEREAS, the lowest bid for the Project was from Cats-4 U, Inc. for $73,950; and
WHEREAS,,staffhasdetermined that Cats 4 U, Inc.'sbid+satisfies the bidding
requirements for the Project; and
WHEREAS, staff has verified that Cats 4 U, Inc. possesses.a;valid California
Contractor's License, Class'A,,number 465781 that qualifies Cats 4 U, Inc. to perform the
Project; and
WHEREAS, the Project.has a Categorical Exemptionpursuant to the California
Environmental Quality Act (-"CEQA"),.pursuant to Article 19, Section 15303, of Title 14 of the
California Code of Regulations("CEQA Guidelines").
NOW, THEREFORE,'BE IT RESOLVED that the City Council of the City of
Petaluma hereby:
1. Approves the Project.BudgeVin1the amount of$140,000 including a contingency of
$10,000, and -
2. Authorizes the transfer of funds from Parks Land Development Impact Fee Funds up to
$120;000 into•the Wiseman Park Restroom CIP Project.account,,and
2. Inraccordancerwith=the City of Petaluma Charter and Municipal Code, California Public
ContractCode:Section 20162 and other applicable law, waives any and all non-
conformance in the bid:of Cats:4 U, Inc. for the Wiseman Park[Restroom Project, and
finds the bid of$73,950 to be the;lowest responsive bid, and further finds that Cats 4 U,
Inc. is the lowest responsible,bidder, and
3. Awards the contract for.the Wiseman Park-Restroom Project to Cats 4 U, Inc. in the
amount of$73,950, conditioned:on:Cats 4 U, Inc:,timely executing;the project:contract
and submitting all required documents, including-but not limited to, executed bonds,
certificates of insurance,..and endorsements, in accordance with the project bid
documents,and
4. Directs staff to issue a notice of award to Cats 4 U, Inc., and
4
•
5. Authorizes and directs the:CityManagerfo;ezecute;the;project contract ion behalf of the
City of Petaluma upon timely submission by Cats'4•U,,Inc. of the signed project contract
and all other required'documents.including-but not limifed to; executed bonds,
certificates of insurance, and endorsements, in accordance•with the project bid
documents.
5
Attachment 2
•
,WISEMAN PARK RESTROOM.> " . ', U, PARKS AND RECREATION„
v
j ✓ ✓ % 1\ Project,Location
0
,<(-)„, _t_._- _
/� S
SOCERFIELDS ✓
/\
/
��/ i ( SNF SOFTBALL FIELDS
it - > --f Q N
N,N- N.- ,- „_•)-X---,
, cci,, „
-,„ N., cy-- , N\ ),,,,_,:o„ ,,,N() / ii(r- , 1(
2Y2P \.
6