HomeMy WebLinkAboutResolution 2014-103 N.C.S. 7/7/2014Resolution No. 2014-103 N.C.S.
of the City of Petaluma, California
REJECTING ALL BIDS FOR THE
EAST WASHINGTON STREET AND EDITH STREET
LIGHTED CROSSWALKS PROJECT
WHEREAS, city staff has prepared construction bid documents and advertised for
construction of the East Washington and Edith Street Lighted Crosswalks, Project Number
C16101308; and,
WHEREAS, in accordance with the City of Petaluma Charter and Municipal Code,
California Public Contract Code Section 20162 and other applicable law, City staff solicited bids
for the Project; and,
WHEREAS, the project was bid on April 21, 2014, and two (2) bids were received and
opened on May 28, 2014 in accordance with applicable law; and,
WHEREAS, All bids received for the project exceeded the budgeted amounts; and
WHEREAS, staff has detennined that cost for asphalt, site concrete and ADA ramps
exceeds current market costs for construction; and.
WHEREAS, staff believes that by reclassifying the required contractors' license and
reducing trait quantity allowances for concrete, construction bid costs will be reduced.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City hereby:
1. Rejects all bids for the East Washington and Edith Lighted Crosswalks Project.
2. Directs staff to modify the plans and specifications, and rebid the project.
Under the power and authority conferred upon this Council by the Charter of said City
REFERENCE: I hereby certify the foregoing Resolution was introduced and adopted by the Ap roved as to
Council of the City of Petaluma at a Regular meeting on the 7°i day of July, 2014, form:
by the following vote: r
City Attorney
AYES: Albertson, Barrett, Mayor Glass, Harris, Healy, Vice Mayor Kearney, Miller
NOES: None
ABSENT: None
ABSTAIN: None
ATTEST:
City Clerk Mayor
Resolution No. 2014-103 N.C.S. Page I