HomeMy WebLinkAboutResolutions 84-320 N.C.S. 12/17/1984DEC 171984 1 ~.
I~esolut:on 1~I0.8 4 - 3 2 o N. C. ~.
of the City of Petaluma, California
LAKEVILLE SQUARE. APARTMENTS
(Prates Road at El'y Blvd:. )
APPROVING CONDITIONAL OCCUPANCY OF THE
APARTMENTS IN BUILDINGS 28, 29a,, 29b .and 54, through 62
INCLUSIVE ;PRIOR TO CQMPLETION ~ OF ENTIRE PROJECT
WHEREAS, the Duffel .Company has requested occupancy of 86
apartment units Phase III,.' contained in .Buildings, 28., 29a, 29b and 54-62; and
WHEREAS, the Engi'neeririg; Fire and Planning Departments have-reviewed
the request and find that occupancy is feasible. if certain conditions are
.satisfied; and,
WHEREAS, the Gity 'Council has reviewed the request and recommended
conditions .
NOW, THEREFORE, BE IT RESOLVED that t_ke City Council hereby grants
occupancy of said units subject to approval of the dwelling units and all other
structures and the swimming pool. and associated equipment by the Chief
Building Inspector and fulfillment of the conditions recommended by the
Engineering, Fire and Plannin°g~ Departments as follows:
1. The streets and sidewalks in the occupied area shall be
maintained in a clean, debris-free condition during
.construction of the remainder of the apartment units.
2. All fire hydrants in the occupied area shall. be in complete
service.
3. Fire alarm systems in occupied units shall be in complete
service.
4. Access must be maintained to the. entire development.
5. All paving, curbs .and .storm drain plea most be in and
completed.
6. All acoustic, patio and pool security' 'fences must be
completed.
7. A temporary security fence must be erected so a s to
completely .separate. area to be occupied from areas yet
under construction..
8. All on-site improvements., e. g. irrigation system, yard
lighting, sidewalks, decks and patios in occupied .area must
Reno No 84-320 N.C.S.
be complete to a .point that finish grading and partial
landscaping is installed, partial landscaping means all trees
and shrubs. Bonds . may be posted for incomplete
landscaping .
9. Special bussing arrangements for .school. .children must be
expanded to include Phase III.
1Q. Developer shall meet all conditions of Resolution for
occupancy of Phase II and complete work noted in attached
Engineering Letter:.
LakeYille~&~3~.authority conferred' upon this Council!by -the Charter of said City.
- ,. _ _ -
~' I Whereby cetify the foregoing Resolution wag introduced and. adopted 'by the Approved s to
Council of the City 'of Petaluma at a (Regular). (~A~o~~d3 ~(~~ec~i~l~ meeting
on the ..., 17th .:..... day of .......December ..... .....:.. •--.., 19.8 4., by .the
following vote:
ity Attorney
AYES: Tencer, Cavanagh, Balshaw, Mayor Mattei
NOES: None
ABSENT: err a gla, V..M. Bond
..
ATTEST:: .. :.:._.. ........ .................................
ityfCler .. Mayor
Council File ........................:...........
'Eori4,CA;2"7/81 Ite~. No......5.4..-.~2.(1... N . C . S . -
DEC 1'71984 1 1
City of Retaluma
Memorandum ~ ~ December 12, 1.984
T0: John. Scharer, Gity Manager
FROM: Thomas S. ,Hargis, Di'~r. of Pubaic Works/City Engineer
SUBJECT: Status; of ,La;kev,i"l l e Square Apar: tments, 'P-hase 3
Occapancy. Request
. 1. These is one fire hydrant in the middle of the c,l.us,ter of units.
where the value stem _hase been damaged by the contractors utilizing
pipe wrenches to get construction water... That valve stem should be
replaced prior to occupancy o:f any, units ..
2. The. off-site storm drain under La;ke.vlle Hwy. has not been com-
pleted.
3. The bridge_o.ver Adobe Greek i>s completed.. The contractor is
install=ing the water man on the bridge„ Once that°wor.k is completed,
then there will bye two sources!o.f feed..of'wa;ter. to 'the. Lakeville.
. Square Apartments'. ..
4. The con ractor ha ;not completed Ely Bled. So., There. is still rock
compaction work, plus pa_'ving to be dome;.
5. We are mee~ti ng with .RG&E on Friday to discuss .street 1 ghti'ng on
Frates 'Road a'nd Ely- B1 ud,., So.
` 6. There is one storm drain trench within Phase 3 that has not been
..
repa;yed after line replacement.
7. General clean up is required; on al;l streets., sidewalks and parking
areas.
. )
Thomas $. Hargi;~s
Di:rector~ .o,f Pu~bl~c Works/
City Engi=veer
TSH/ pf
cc: DPW/CE, ACf
Planning O~r:
CB'I ~
F~il '
,, ,
~-
I
i.
itr
I
~...
r
t
r
j',
~.
'M
,1
-- -
/~