Loading...
HomeMy WebLinkAboutResolution 2010-071 N.C.S. 05/17/2010Resolution No. 2010-071 N.C.S. of the City of Petaluma, California PROVIDING FOR CONDITIONAL ACCEPTANCE OF AND RELEASE OF RETENTION FROM PROJECT NO.8299.C500402.54151 ELLIS CREEK WATER RECYCLING FACILITY WHEREAS, in accordance with Section 68 of Article X of the City of Petaluma Charter, Section 20162 of the California Public Contract Code and other applicable law, the City of Petaluma solicited bids for the Ellis Creek Water Recycling Facility project ("Project"); and, WHEREAS, bids for the Project were opened on July 14, 2005 in accordance with California Public Contract Code Section 4104.5 and other applicable law; and, WHEREAS, the apparent low bid for the Project was the bid of Kiewit Pacific Co. in the amount of $110,329,000.00; and, WHEREAS, by Resolution No. 2005-131 N.C.S. adopted August 1, 2005 the City Council of the City of Petaluma found the bid of $110,329,000.00 for the Project to be the lowest responsive bid and awarded the Project to Kiewit Pacific Co. in the amount of $110,329,000.00 conditioned on the City of Petaluma obtaining a required U.S. Army Corps of Engineers' permit and timely execution and delivery by Kiewit Pacific to the City of Petaluma of the Project Agreement and all required documents, including, but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the Project bid documents; and, WHEREAS, Resolution No. 2005-1.31 N.C.S. authorized and directed City Staff to issue a notice of award and notice to proceed upon satisfaction of the conditions specified in the resolution; and, WHEREAS, Resolution No. 2005-131 N.C.S. authorized the City Manager to sign the Project Agreement on behalf of the City upon satisfaction of the conditions contained in the resolution and subject to available funds for the project; and, Resolution No. 2010-071 N.C.S. Page 1 WHEREAS, Resolution No. 2005-131 N.C.S. delegated authority to execute Project change orders on behalf of the City as follows: to the Project Engineering Manager for change orders that increase or decrease the Project contract amount by up to $100,000 and/or that increase or decrease the number of Project working days by up to 30 days; to the Water Resources and Conservation Director for change orders that increase or decrease the Project contract amount by up to $250,000 and/or that increase or decrease the number of Project working days by up to 60 days; and to the City Manager for change orders that increase or decrease the Project contract amount by up to $500,000 and/or that increase or decrease the number of Project working days by up to 90 days and for other amendments to the Project contract that are necessary to effectively complete the project and/or to realize Project and/or cost benefits for the City so long as such change orders or amendments do not result in an increase in excess of 7.5% ($8,275,000.00) of the total Project amount; and, WHEREAS, in accordance with Resolution No. 2005-131 N.C.S., the Project contract and applicable law, the change orders listed in Attachment A to this Resolution cumulatively increasing the Project contract amount by an additional 5.01 % ($5,528,215.00) have been approved by the City; and, WHEREAS, the final Project contract amount as amended including all City approved change orders is $115,857,215.00; and, WHEREAS, City staff have inspected the Project and determined that it has been completed in accordance with the contract requirements subject to the Contractor's continuing warranty and other obligations pursuant to the contract, including contract close out requirements; and, WHEREAS, based on the foregoing, staff recommends acceptance of the Project on behalf of the City in accordance with this Resolution, the Project contract and applicable law. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Petaluma as follows: Resolution No. 2010-071 N.C.S. Page 2 The above recitals are true and correct and hereby declared to be findings of the City Council of the City of Petaluma. 2. The contract entitled Agreement for the Construction of Project No, 8299.C500402.54151 Ellis Creek Water Recycling Facility, with a final contract amount of $115,857,215.00 is accepted as complete, subject to the following conditions precedent. First Condition: The City of Petaluma must obtain Kiewit Pacific Company's final release and notice of any disputed amounts and any other required contract close out deliverable items in accordance with the Project contract and applicable law. Second Condition: The Covello Group, Construction Manager for the Project, must provide to the City of Petaluma a written statement that the Project construction and performance of the Project contract, including all contract closeout requirements, is complete and recommend acceptance to the City of Petaluma. Upon satisfaction of the specified conditions precedent and in accordance with applicable law, the City Manager is hereby authorized and directed to release all undisputed Project retention. 4. Upon satisfaction of the specified conditions precedent, the City Clerk is hereby authorized and directed to file a Notice of Completion concerning the Project with the Sonoma County Clerk's Office. Under the power and authority conferred upon this Council by the Charter of said City. REFERENCE: 1 hereby certify the foregoing Resolution was introduced and adopted by the pprov d to Council of the City of Petaluma at a Regular meeting on the 17`h day of May, 2010, fo by the following vote: ti City AYES: Barrett, Vice Mayor Glass, Harris, Healy, Rabbitt, Ren6e, Mayor Torliatt NOES: None ABSENT: None ABSTAIN: None ATTEST: 0 LQL� City Clerk Resolution No. 2010-071 N.C.S. . Page 3 "Exhibit A" Ellis Creek Water Recycling Facility CONTRACT CHANGE ORDER TRACKING SHEET CCO # Description Amount ime (Days) 1 Time extension for additional soil sampling 0.00 8 2 Lime treatment at Ox Ditch & Secondary Clarifiers 125,000.00 3 Board up Farmhouse 3,385.00 4 Hay Stacker Relocation 493.00 5 Terrorism Insurance and Increased Earthwork 0.00 6 Meter in Temporary Recycled Water Pipeline 3,023.00 7 Temporary Power for Pond 1 Aerators 1,270.00 8 Pavement Repair on Cypress and McDowell 419,681.00 9 Conduit. Encasement Coloring Agent (47,000.00) 10 Delayed Caltrans Encroachment Permit 16,723.00 11 Trench Cut -Off Walls (18,600.00) 12 Horizontal Aerators Extended Warranty Testing 0.00 13 Deletion of Prime Coat under AC Pavement (29,700.00) 14 Replace PVC Sched. 40 with EB 20 Conduit in DB (21,774.00) 15 Delete Lakeville Highway Access 40,000.00 16 Contract Time Extension for Weather Days 03-04/06 0.00 38 17 Change Valve Types 0.00 18 Replace EMT conduits by MC cable @ O&M Bldg (14,777.00) 19 Inverter Duty Motors at Oxidation Ditch Aerators 16,466.00 20 Aerated Lagoon and Pond 1 Modifications Milestone 0.00 21 Additional Striping and Loops on McDowell 13,747.00 22 Catch Basins Invert Changes (9,997.00) 23 Oxidation Ditch Sump Modifications (7,750.00) 24 Change Buried Conduits PVC GRS to PVC Sch. 40 (213,038.00) 25 Temporary Power to Existing Aerators 4 and 7 7,956.00 26 O&M Bldg: Ceiling & Wall Heights Rms 4,287.00 27 Provide Portable Generator Pads at Ponds 2,554.00 28 FS Bldg: Extend Conduit Stub -ups Beyond Ductbank 9,190.00 29 Headworks: Handrail Extension to Complete Deck 1,254.00 30 Pond 4 Aerator Temp Power 883.00 31 Aerated Lagoon: Reconnecting of Aerator No. 2 537.00 32 Unknown Utility at Pond 1 North Side 855.00 33 Ductbank Encasement with Reinforcing 24,884.00 34 Gun Safe for Storage of Bid Documents 2,410.00 35 S&C Pad Mounted Switch Additions 75,200.00 36 Permanent Power Supply for Pond 1 Aerators 98,000.00 37 Temporary Fire Hose 851.00 38 Change material for Temporary Debris Collector (36,150.00) 39 IChemical Tank Pads @ Filter Support Bldg 4,425.00 Resolution No. 2010-071 N.C.S. Page 4 Ellis Creek Water Recycling Facility CONTRACT CHANGE ORDER TRACKING SHEET cc0 # Description Amount Time (Days) 40 Disconnect Aerator No. 2 & reconnect Pond 4 Aerators 607.00 41 Delete Steel Steps in Manholes (19,012.00) 42 Add 4" Butterfly Valve in Acid Digester 1,189.00 43 Delete Pre -Action Fire System @ Main Elect. Bldg (19,242.00) 44 Headworks Influent Box Modifications 3,000.00 45 Transformer Pad at Restroom 9,498.00 46 Addition of Construction Joint at Oxidation Ditch Slabs 23,505.00 47 Change Conduits from PVC Rigid Steel to PVC Sch. 40 (21,912.00 48 Reader Board & Geogrid placement @ Cypress/McDowell 6,000.00 49 Plant Control System PLC Architecture (6,118.00 50 Grit Pump Room Sump Pump Modification 1,326.00 51 PLC Enclosure Size for PLCs 2, 3 and 8 5,446.00 52 Additional Time Switches at O&M Bldg. 2,722.00 53 Extension for Pond 1 Aerators Milestone Date 0.00 54 Levee Repair at Berm Existing Ponds 8 & 9 289,279.00 55 Operations Bldg. Maintenance Window 1,022.00 56 In -Plant Pump Station Wall Penetration Details 2,807.00 57 Alignment of 42" RSG line to Headworks 4,208.00 58 Revision of Structural Joints at Headworks Facility 5,628.00 59 Pond 9 & 10 Levee Pothole 1,400.00 60 Add pipe for Future Pump Can @ RWPS 6,316.00 61 Home Inspection of Farm House 746.00 62 Alignment of 42" PWE line to Cell D Transfer Structure 8,171.00 63 Delete Locks on Motor Operated Overhead Coiling Doors (383.00) 64 Dewatering of Pond 8 and Mitigated Wetland 3,488.00 65 UV System Programming 2,777.00 66 Septic Tank Removal at Farm House 739.00 67 Changes to Slide and Sluice Gates 11,177.00 68 PLC System Material for C Street Pump Station 14,915.00 69 PLC - 10 Analog Input Module 1,873.00 70 Change Storm Drain Pipe from RCP to CHDPE (72,398.00) 71 Deletion of CMU Coating on non -occupied structures (2,538.00) 72 Existing Utilities at West Access Road Entrance 8,543.00 73 Change Handrail for Polishing Wetlands Structures 6,965.00 74 Change SDR for HDPE Pipe Lines (52,415.00) 75 Addition of waterstop in wall @ Filter Support Bldg. 1,330.00 76 Delete waterstop & starter walls @ HW, RAS PS, UV (4,206.00) 77 Re -Power Pond Aerators, Reconnect Aerated Lagoon 3,718.00 78 Contract Time extension for Weather Days 10/2006 0.00 1 79 Deletion of waterstop and starter walls at Tertiary Filters (1,384.00) Resolution No. 2010-071 N.C.S. Page 5 Ellis Creek Water Recycling Facility CONTRACT CHANGE ORDER TRACKING SHEET cc0 # 80 Description Add waterstop at Grit Pump Area of Headworks Structure Amount 6,167.00 ime (Days) 81 Fuel Tank Removal at Farmhouse 2,972.00 82 Revised Anchorage for Oxidation Ditch Aerators 40,941.00 83 Deletion of Integrated System Shop Testing (1SST) 0.00 84 Additional Dowels at Maintenance Bldg. 914.00 85 Replace Fuses at MCC 3A after PG&E power spike 1,706.00 86 Remove and replace disconnect switch @ Aerated Lagoon 2,919.00 87 Lower Invert Elevation for 42" RSG Line 18,726.00 88 Addition of Roof Hatch @ Main Electrical Bldg. 3,195.00 89 Filter Support Bldg: NG Connections and Valving 1,361.00 90 Chain Link Fence addition @ Farmhouse 725.00 91 Repair Irrigation Lines @ Kaiser 1,186.00 92 Demo of Spillway at Pond 10 12,109.00 93 Curb and Grading @ Filter Support Bldg 0.00 94 Irrigation System: Concrete Valve Boxes 2,393.00 95 Contract time extension for Weather Days 11/06 0.00 5 96 Mitigation Wetlands Drain 4,370.00 97 Additional vinyl sheets for Levee Repair @ berm Pond 8 & 9 5,498.00 98 Shoring @ Naval Trail 21,271.00 99 Extra excavation @ W Access Rd. for 12" 1 W line 8,008.00 100 Replace SBS line @ Chlorine Contact Basin 5,936.00 101 Brush clearing @ Farm House 5,209.00 102 Relocate standby Generator @ CCB 2,005.00 103 Drywall Furring @ Elect Rm #2 in O&M Bldg. 1,630.00 104 Equipment for MCC-3 retrofit 25,360.00 105 Perimeter lighting switching @ Main Elec. Bldg. 1,795.00 106 Wiring for Time -Off Relay @ Wetlands Elec Bldg. 2,282.00 107 Changes to SCADA interface Boiler & PLC 3 3,549.00 108 Disposal of existing MCC 3 transformer 2,141.00 109 Contract time extension for Weather Days 12/06 0.00 7 110 Tree removal @ W Access Rd. 1,419.00 111 Deepening Pull Boxes @ Ox Ditch MCC Bldg. 11,540.00 112 Rebar modification @ Wetlands Pump St Deck Beam 2,187.00 113 Electrical Equipment Pads 9,018.00 114 Delete Catch Basins at W Access Rd. 1,746.00 115 Naval Bldg Lookout Area 3,000.00 116 Changes to TWE and PWE lines 0.00 117 Polishing Wetlands FSS: Add Hand Switch 3,444.00 118 Engineering of Anchorage @ Oxidation Ditch Aerators (20,089.00) 119 Replace Oxygen Probes @ Aerated Lagoon/Pond 1 13,411.00 Resolution No. 2010-071 N.C.S. Page 6 Ellis Creek Water Recycling Facility CONTRACT CHANGE ORDER TRACKING SHEET cc0 # Description Amount Time (Days) 120 Change Piping Material for Deionized Water Service 0.00 121 Filter Support Bldg: Relocation of 1W Line 4,568.00 122 Security Lighting at Farmhouse 1,200.00 123 Disposal of Asbestos Containing Pipe 2,087.00 124 Investigation and Disposal of FAA Building 20,512.00 125 Conduit addition @ Boiler Bldg. 15,780.00 126 O&M Bldg: Exhaust fans power supply & controls 34,440.00 127 Addition of Disconnect Switches @ Headworks 25,143.00 128 Level Transmitter addition @ Headworks 23,058.00 129 Contract Time extension Weather Days 0 1 -02/07 7 130 Subgrade Improve & Pipe Encasement @ W Access Rd. 12,128.00 131 Additional Conduit for Fuel Leak Detection 2,714.00 132 HVAC Enclosure Modifications @ Ops Bldg. 8,014.00 133 Wiring of Spare I/Os 45,713.00 134 PLC Enclosure Size for PLC 5 7,823.00 135 Partial Payment for PLC Enclosures 0.00 136 Trench Backfill with Native Material 72,000.00 137 UV Bldg Top Slab Modifications 14,000.00 138 Ops Bldg: HVAC Electrical & Mechanical Modifications 2,854.00 139 24" Pumped Storm Drain Line Coverage 30,000.00 140 Metal Siding @ Main Electrical Bldg. 5,071.00 141 Contract Time Extension for Weather Days April 2007 1 142 Ops: Relocate HVAC duct transition @ Locker Rm Ceiling 878.00 143 Use of Native Material for backfill @ North & Middle Cluster (80,000.00) 144 Recycled Water Storage Basin Size Increase 220,867.00 145 Outlet conduit replacement @ Existing CCB 1,260.00 146 Modify Rebar Expansion Joints @ Thickener Bldg 1,610.00 147 Modify Grating Seat @ Headworks Beam B-13 1,737.00 148 Added Space Heater for PLC 8 - RIO 1 1,803.00 149 Additional G2 Light Fixture @ Ops Bldg Lobby 2,013.00 150 Connection Grounding Bldg rebar @ MCC HW Bldg. 974.00 151 Relocate supply line fire riser @ maintenance Bldg. 3,027.00 152 Pipe material for 36" mixed liquor line @ 2ndary Clarifiers 14,271.00 153 Modifications HVAC Pads 9,562.00 154 Mod per PG&E Requiremnts to Main Power Supply 19,886.00 155 Addition of Wall Sleeves at Thickener Building 847.00 156 Reduce Deck Slab Openings @ Wetlands Pump Station 782.00 157 Wall Supports for Pony Wall at Laboratory 2,162.00 158 Concrete Encase HCS pipeline @ Headworks Structure 2,393.00 159 lConvert Conference Rm into 2 Offices @ Ops Bldg. 8,351.00 Resolution No. 2010-071 N.C.S. Page 7 Ellis Creek Water Recycling Facility CONTRACT CHANGE ORDER TRACKING SHEET CCO # 160 Description Concrete Backfill around Screw Press Equipment Trench Amount 1,588.00 ime (Days) 161 Expansion Joint Rebar @ Headworks Grid Line 10 1,151.00 162 Standby Generator Connection @ Wetlands PS 13,527.00 163 Deletion of Rotameters @ Tertiary Filters (1,074.00) 164 Blockouts for Ox Ditch Aerator Anchorage 1,022.00 165 Concrete Encase SD pipe under HWE pipeline @ HW 1,657.00 166 Temporary Power for Transformer @ Aerated Lagoon 28,343.00 167 Rebar @ Headworks Manual Bar Screen Embed 756.00 168 Subgrade Improvement for Wetlands PS Apron Slab 11,799.00 169 Screw Press Bldg Skylight Size Change 3,465.00 170 Additional 1/0 from Power Panel to PLC-9 2,887.00 171 Standby pump @ existing CCB during work @ Pond 10 44,000.00 172 Billing for Potable Water Usage on site through 4/4/07 1,552.00 173 Upgrade starters for Ox Ditch Aerator Motors 78,373.00 174 Blind flanges for future effluent line @ Aerated Lagoon 11,709.00 175 Remove rebar @ Ox Ditch Aerator Motor Block -outs 3,000.00 176 Modification of controls for Tertiary Effluent Bypass Valves (3,075.00) 177 Communication between PLC-8 & Thickener PLC 2,032.00 178 Automated 1 W Valve @ Recycled Water Storage Basin 46,267.00 179 Modification to HW Bar Screen Channels 6,130.00 180 Relocate Fire Pump Can @ RWPS 4,613.00 181 Add Effluent Conductivity Probe @ JB No. 2 9,680.00 182 Revise DB Routing @ Ferrous Chloride Area 2,463.00 183 Ventilation Alarms @ Boiler Bldg & Thickener Bldg 20,526.00 184 Anti Graffiti Coating @ O&M Bldg and Sound Wall 28,736.00 185 Deletion of Louvers @ HW Bar Screen Enclosures (1,374.00) 186 Deletion of Combination Smoke Fire Dampers (18,005.00) 187 Fire Rating Janitor Closet Door @ Ops 1,841.00 188 Brush clearing @ Farm House fire season 2007 3,186.00 189 Ops: CMU alignment & wall cap @ HVAC enclosure 1,826.00 190 Ops: addition acoustical ceiling @ electrical rm #1 3,125.00 191 Ops: framing details for Lobby 2,163.00 192 RWPS:.modified floor drainage 15,107.00 193 Ops: beam seats in CMU wall pockets 10,067.00 194 Recycled Water Storage Basin Berm Modifications (2,595.00) 195 Double Containment System Modifications 90,172.00 196 Site Security Lighting Estimation Cost 10,364.00 197 Grading @ Mitigation Wetlands & RWSB 27,012.00 198 PG&E power connection @ W Access Rd. 55,335.00 199 UV Disinfection Light Pole Mounting Detail 7,027.00 Resolution No. 2010-071 N.C.S. Page 8 Ellis Creek Water Recycling Facility CONTRACT CHANGE ORDER TRACKING SHEET CCO # 200 Description Ox Ditch Light Pole Mounting Detail Amount 8,852.00 ime (Days) 201 Existing CCB: power to New Chemical Metering Pump 8,588.00 202 Screw Press grating @ Flocculation Tank Opening 1,969.00 203 Anchorage of Diffuser Pipe Ponds 9 & 10 32,659.00 204 Acid Digester changed detail wall penetrations 4,286.00 205 Existing LPN panel in chemical bldg. 2,576.00 206 Revised Details @ RWSB 20,881.00 207 Ops: Deletion of Closet in Control Room (932.00) 208 Ultrasonic level sensor mount @ Headworks 1,208.00 209 Mitigation Wetlands Drain — Permanent Installation 75,048.00 210 Ops Bldg: Plumbing Dw s 29,571.00 211 Ops: Deletion of decking @ Mechanical Chases 1,719.00 212 Headworks: channel floor rebar modification 1,696.00 213 Ops: Furring Men's Restroom Urinal Wall 740.00 214 Informational Kiosks: Addition of 2" PVC 40 Pipe Sleeve 2,560.00 215 Screw Press: Modifications to Underslab Piping 2,607.00 216 Below Grading Coatings 72,507.00 217 Aerated Lagoon: Unknow utility @ 20" URW Alignment 5,225.00 218 Ops Bldg: Additional Window Clips 3,194.00 219 Silt Fence Repair 1,209.00 220 Ops Bldg: control rm. Backing & wood blocking 2,185.00 221 Ops Bldg: Modifying Welding Studs to 1/8" Tubing 5,293.00 222 Pond 10 Apron Slab: Over Ex, Fabric, and Rock 3,870.00 223 Addition of Solenoid Valve @ Recycled Water Surge Tank 5,095.00 224 Thickening Walls @ Ox Ditch Aerator Shafts 11,286.00 225 Relocate Receptacles @ Biofilter Mechanical Pad 3,286.00 226 Equipment Pad Modifications @ Screw Press 5,130.00 227 Footing Elevation @ Filter Support Bldg. Tank Farm 2,098.00 228 Relocation of Cell D Transfer Structure 5,162.00 229 Pipe Elevations & Drainage Swale @ Polishing Wetlands 1,938.00 230 Farm House: Plywood Cover @ Back Entry 756.00 231 Methane Digester construction joint location & piping 1,057.00 232 Ops Bldg: Icemaker Les 893.00 233 Acid Digester: Overflow Piping Modifications 1,727.00 234 West Cluster: Sitework & Grading Change 277.00 235 Ops Bldg: Future access control conduit stub -outs 1,720.00 236 Ops Bldg: Interior lights & furring strips 2,292.00 237 Potholing & Excavation existing utilities @ CCB 42,606.00 238 Replace Farmhouse Roof 34,194.00 239 SCADA: TWAS sump level set points 1,682.00 Resolution No. 2010-071 N.C.S. Page 9 Ellis Creek Water Recycling Facility CONTRACT CHANGE ORDER TRACKING SHEET CCO # 240 Description CCB: Relocation of Ammonia Tank Amount 17,176.00 ime (Days) 241 Add wire way in PLC 6 @ Existing Chemical Storage Bldg. 1,775.00 _[ 242 Replace Landscaping on Kaiser Property 2,690.00 243 Electrical Modifications @ UV Bldg. 47,188.00 244 Headworks: Rebar Detail @ Channel Wall Ends 1,625.00 245 Rebar @ Screw Press Bldg. Slab Extension 1,625.00 246 Tertiary Filter: 12 Inch Inlet Line 17,248.00 247 Ops: Modifications to Fume Hoods (490.00) 248 Ops: Addition of Compressed Air @ Laboratory 22,641.00 249 Ops: Training Room Modifications 8,494.00 250 Emergency Repair Kit Deletion (567.00) 251 Increase Cover Over 14 inch Foul Air Line 1,972.00 252 Headworks: Epoxy Coat Rebar @ Block -outs 20,579.00 253 Relocation of Mezzanine Column @ Screw Press 3,225.00 254 Additional Rebar @ Oxidation Ditch 1,348.00 255 Pipe Class Acid Gas & Methane Gas Pie (5,089.00) 256 Modifications to the Potable Water System 105,856.00 257 Thickening Bldg piping modifications 764.00 258 Catch Basin grating modification @ W Access Rd. culvert 4,950.00 259 Headworks FRP grating support @ Gate location 2,219.00 260 Digested Sludge Storage Tank: Piping Modifications 4,828.00 261 Modifications to Analyzer Enclosures 9,315.00 262 Additional Conduits & Wires Miscellaneous Areas 41,620.00 263 Planting modification @ West Access Rd. 2,328.00 264 Install Clapper Rail Trail Gate 2,687.00 265 Amphitheater seating next to Polishing Wetland Cell D 29,577.00 266 Ferrous Chloride- revised electrical & pump pad 24,552.00 267 Chip Down Top of Wall @ Filter Support 3,411.00 268 Conduits for Future Mixer @ CCB 11,320.00 269 Modifications for Interfacing between PLC 6 and PLC 11 5,800.00 270 Headworks Deck Slab Falsework 26,026.00 271 Dewatering of Pond 8 20,157.00 272 Pressure Gauges @ Wetlands Pump Station 4,110.00 273 Irri ation Changes @ Point of Connection 24,050.00 274 Filter Support: 4" chemical drain elevation 872.00 275 Unknown Utilities @ Site Entrance 4,205.00 276 Mitiqlated Wetland Planting (31,309.00) 277 Changes & Additions to 3W System @ Ox Ditches 34,716.00 278 Garbage Bin Structure 25,644.00 279 Relocate Veolia Materials @ CCB 788.00 Resolution No. 2010-071 N.C.S. Page 10 Ellis Creek Water Recycling Facility CONTRACT CHANGE ORDER TRACKING SHEET cc0 # 280 Description Wetlands PS Portable Eyewash Station Amount 5,217.00 ime (Days) 281 Temporary Irrigation Connection to Schollenber er 2,255.00 282 Partial Deletion of Planting @ Polishing Wetlands (18,900,00) 283 Change NEMA Rating for Pull Boxes @ Ox Ditches (10,726.00) 284 Delete Trail Material W Polishing Wetland Cell D (27,165.00) 285 Equipment Pad Modifications @ CCB Bldg. 26,412.00 286 Parapet Detail @ Ops Bldg Lobby 18,746.00 287 Relocate Potable Water Riser @ 1W Pump Station 3,299.00 288 Dewatering Pond 7 for TWIS 14,419.00 289 Additional work for Farmhouse Roof Replacement 41,819.00 290 Material for Clay Liner in RWSB 13,820.00 291 Ops Bldg 1 hr Fire Rating 40,885.00 292 Maintenance Bldg: 2hr Fire Rating 1,282.00 293 Relocate Tie -In to Potable Water Sys @ Cypress Dr. 8,042.00 294 Changes to Gates & Operators @ W Access Rd. (8,884.00 295 Ellis Creek Clean Up 8,395.00 296 Analog Input Module for PLC 11 2,766.00 297 Addition of the Polishing Wetlands Pump Station 415,000.00 298 Natural Gas Connection & Metering Pad 18,435.00 299 Additional Digital Input Points PLC 9 2,335.00 300 Weather Monitoring Station 24,976.00 301 Modifications for future Polishing Wetlands Pump Station 16,899.00 302 Addition of Geofabric @ East Access Rd. Ponds 8,740.00 303 Outlet Cutouts in Backsplash @ Ops Laboratory 1,908.00 304 Ops Bldg: Exhaust Fan Drainlines 7,662.00 305 PVC pipe for Plant Drain Piping (4,357.00) 306 Drainage Swale @ W Access Rd. (1,500.00) 307 UV Stair Grating Changes (3,111.00) 308 UV Channel Blockouts for Wirewa s (6,849.00) 309 CCB: Welding of 42" Pipe Connections 27,142.00 310 Trail Connection @ Schollenber er Park 13,167.00 311 Waste Gas Flare Pedestal 2,366.00 312 Relocation of cabinets in Ops Bldg. 753.00 313 Support for folding Partition in Ops Bldg. 830.00 314 Deepen Fuel Sump @ Generator 3,855.00 315 Operation Bldg: Fire Sprinkler Riser 25,728.00 316 Glass Lined Ductile Iron Pipe 97,613.00 317 Wetlands PS Mixer Mounting Bracket 1,798.00 318 Uninterru tible Power Supply @ Ops Bldg. 24,754.00 319 Clarifier 1 & 2 Light Post Mounting 3,060.00 Resolution No. 2010-071 N.C.S. Page 11 Ellis Creek Water Recycling Facility CONTRACT CHANGE ORDER TRACKING SHEET CCO # 320 Description Transformer Relocation @ Existing CCB Amount 6,187.00 ime (Days) 321 Ops Bldg: Mudroom Skylight Framing 5,192.00 322 Wetlands Pump Station Interim Milestone 0.00 323 Analyzer Enclosure @ Outfall Structure 11,080.00 324 Additional Grating @ Biofilter Damper Boxes 2,747.00 325 Additional Valves for H dronic System 762.00 326 Modifications @ Flow Control Structure C-2 (2,591.00) 327 Change Manhole & Catch Basin Elevation @ South Cluster 1,923.00 328 Modifications to the Existing Outfall Structure 12,254.00 329 Anti Graffiti Coating @ Garbage Bin Structure 2,389.00 330 Instrumentation and Control Modifications @ Existing Plant 58,658.00 331 Miscellaneous Extra Work @ Junction Box No. 2 49,264.00 332 Miscellaneous Extra Work @ Existing CCB 12,655.00 333 Paint Flashin s and install Spark Arrestor @ Farmhouse 2,860.00 334 Temperature Detection for Recycled Water Pumps 19,598.00 335 Raise Top of Electrical Pull Box @ Headworks 3,391.00 336 Modifications to Biosolids Load -out @ Screw Press Bldg. 266,077.00 337 Rerouting of Electrical Conduits @ Headworks Deck 46,510.00 338 Miscellaneous Instrumentation Modifications 5,366.00 339 Reverse Service Generator Plug 4,699,00 340 Submersible Sump Pump Control Panels 2,445.00 341 Flow Meter Transmitters @ WPS 1,597.00 342 Additional Fence & Gate @ Existing Farmhouse 5,299.00 343 Install pressure gauge @ Tertiary Filter Hypochlorite panel 1,684.00 344 Widen Sidewalk @ Filter Support Bldg. 821.00 345 Anti Graffiti Coating @ W Access Rd. Public Restroom 3,920.00 346 Screw Press Parapet Wall Height 2,658.00 347 Handrail Installation @ Ox Ditch Weir Gates 7,798.00 348 Bond and Insurance Over -Billing 66,172.00) 349 Drains for AC Unit & Backflow Preventers @ Ops Bldg 2,185.00 350 Delete wires @ Headworks & add wires @ PWFSS 0.00 351 Added Sample & Drain Lines @ JB 2 4,127,00 352 Additional Blackout Shades @ Ops Bldg. 885.00 353 Relocation of Drain Lines @ Biosolids Load -out Slab 10,201.00 354 Deletetion of Vinyl Coating- chemical pump pad @ CCB (3,481.00) 355 Ferrous Chloride Line Encasement under Equip Pad 2,608.00 356 Power Supply to Current Tranducers @ Ox Ditches 3,999.00 357 Level Switches @ RWPS 5,081.00 358 Contract Milestones O&M Bldg Occupancy / SCADA Readiness 0.00 359 22" Foul Air Pipe Encasement 11,291.00 Resolution No. 2010-071 N.C.S. Page 12 Ellis Creek Water Recycling Facility CONTRACT CHANGE ORDER TRACKING SHEET cC0 # Description Amount Time (Days) 360 Shoring @ JB 2 48,500.00 361 Dewaterin @ JB 2 28,000.00 362 Analyzer Changes & Minor Changes to Instrument Index 23,495.00 363 Sprinkler Repair at West Entrance Road 1,585.00 364 Modification of Light Pole Bases @ Tertiary Filters 693.00 365 Stair Landing @ Tertiary Pump Station 1,001.00 366 Acid Equipment Pad: Ferroud Chloride Line 1,207.00 367 RWPS H dropneumatic Tank Mechanical 1,543.00 368 Change Diffuser Pipe Supports @ UV 2,448.00 369 Fire Alram System Modifications (2,905.00) 370 Site Keying of Permanent Cores 2,745.00 371 Sediment Trap Modifications 12,478.00 372 Additional supports for 24" Mixed Liquor Return Pipes 7,876.00 373 Modification of 1W Fill Line @ RWSB 2,357.00 374 Deletion of Safety Ropes and Floaters @ Ox Ditches (5,500.00) 375 Changed Material for Sludge Pressure Relief Lines (1,473.00) 376 Electrical and SCADA changes @ Digester Area 7,716.00 377 Addition of Bases for Bollard Lights @ O&M Bldg. 9,176.00 378 Sidewalk Elevation Changes @ MCC 9 3,518.00 379 Reroute conduits @ Filter Support Tank Farm 2,870.00 380 Repair Pipe between Ponds 2 & 3 4,542.00 381 Reroute conduits/wires for Gas Heater Thermostats 4,436.00 382 Changes to Concrete Drain Ditches @ WAR 7,286.00 383 Conduit addition @ TWIS 3,053.00 384 Extend slab @ Polishing Wetland Flow Split Structure 2,661.00 385 Change Transformer Pad @ W Access Rd. Restroom 2,096.00 386 San itary Sewer Manhole Elevation @ WAR 6,593.00 387 HCS Injection Mounting Plate at the RWPS 998.00 388 MEB Exterior Fixture Mounting 5,301.00 389 RWPS Truck Fill Station 11,231.00 390 House Keeping Pads in Filter Support Building 5,812.00 391 West Access Road Sidewalk Removal 11,051.00 392 Water Meter Box Modifications - Location and Valves 11,349.00 393 Tertiary Filter HCS Diffusers 9,168.00 394 Conduit for Future Alum Tank at Filter Support Building 1,295.00 395 2008 Brush Clearing at Farm House and Hay Stacker Disposal 3,887.00 396 Raise Pull Box Lid @ Filter Support 3,694.00 397 Fire Pump Instrumentation Modifications 9,534.00 398 Pipe Elevations @ Sludge Storage Tank Equipment Pad 979.00 399 jAdditional Pressure Regulator & Gauge @ Outfall Bldg. 2,185.00 Resolution No. 2010-071 N.C.S. Page 13 Ellis Creek Water Recycling Facility CONTRACT CHANGE ORDER TRACKING SHEET CCO # 400 Description Raise Pull Box Lid @ Storm Water Pump Station Amount 3,301.00 1me (Days) 401 Modifications to FBA Piping @ Filter Support Bldg. 2,232.00 402 Modified Handrail Anchorage @ Headworks Structure 10,012.00 403 Biosolids Loadout Slab Modifications @ Screw Press 28,218.00 404 Raise Valve Box Lid @ Existing CCB 2,790.00 405 HCS Panel Modifications 4,632.00 406 Addition of Natural Gas Regulators @ Process Bldg. 4,050.00 407 Project Completion Time Extension 0.00 15 408 Revised Amphitheater Grading 16,231.00 409 Ops Bldg Electrical Room Heating and Cooling 6,439.00 410 Sand Trap Addition @ Tertiary Filters 1,762.00 411 Overflow Weir Modifications @ Headworks Structure 9,038.00 412 Air Gap Tank Coating @ 1 W/2W Pump Station 9,970.00 413 Modify Strainer Drains & Check Valve @ RWPS 2,995.00 414 Exit Routing Si na e @ Ops & Maintnce Bldg 1,861.00 415 Irrigation Connection at Existing Ponds 10,764.00 416 Methane Gas Pipe change @ Digested Sludge Storage Tank 3,724.00 417 Piping modifications in Analyzer Enclosures 6,916.00 418 Pressure Relief Vent change @ Wetlands Pump Station 4,320.00 419 Additional Drain Groove @ the Ferrous Chloride Area 1,607.00 420 Screw Press FRP Ducts and Crane Rail Conflict 2,852.00 421 Gravity Belt Thickener Reprogramming 4,705.00 422 Gate Modifications at Junction Box No. 2 10,345.00 423 Purchase of Trees for West Access Road 10,307.00 424 Change Level Ball Floats in Chemical Containment Areas 3,348.00 425 Modifications to Influent Sampling at the Headworks 2,883.00 426 Power Supply for Local Control Panel in Screw Press Building 1,357.00 427 Change Light Pole Height at UV Structure Bridge Crane 657.00 428 Reroute 3W Line at Boiler Building 2,426.00 429 Rewire and Retag Valves at the Tertiary Effluent Meter Vault 616.00 430 Life Ring Cabinets 11,444.00 431 Concrete Conduit Protection at the West Access Road Entrance 10,050.00 432 Pipe Modifications at Recycled Water Pump Station 3,462.00 433 Gravity Belt Thickener Spray Water Source Modification 769.00 434 Sidewalk Modifications at the Ferrous Chloride Area 752.00 435 Install Check Valve at Fire Pump Enclosure 1,483.00 436 Grit Classifer Speed Switch Power 3,679.00 437 Maintenance Bldg: Fire Rating for Door #1951 4,235.00 438 Installation of Thermal Mass Flow Meters 10,013.00 439 RWPS 3W Supply Modifications 11,477.00 440 Power to Rollup Door @ the MEB Bldg. 5,973.00 Resolution No. 2010-071 N.C.S. Page 14 Ellis Creek Water Recycling Facility CONTRACT CHANGE ORDER TRACKING SHEET cc0 # Description Amount ime (Days) 441 Ops & Maintenance Bldg. Green Roof Irrigation 5,537.00 442 Ops Bldg. Server Rack Size Change 8,045.00 443 Clarifier Scum Pump Wire Sizing 5,078.00 444 UV Disinfection UPS Enclosure Location Change 3,127.00 445 Cypress Drive Sidewalk and Landscape Modifications 14,093.00 446 Reduction in Spare Filter Sand (932.00) 447 Screw Press Bldg. Two Speed Fan Conductors 2,684.00 448 Barscreen Programming Change 7,943.00 449 Ops Bldg. Lab Epoxy Countertop Modifications 2,749.00 450 RWPS Control Schematic Modifications 1,374.00 451 Thickener Bldg.- sink supports & additional duplex outlets 2,239.00 452 Ops Bldg.- EC Purlin Shims/Spacers @ Standing Roof 14,150.00 453 Concrete Collars Around PVC Risers in Pavement 5,078.00 454 Headworks Parshall Flumes Level Sensor Mods 5,400.00 455 Acid Digester Overflow Elevation Change 8,699.00 456 H pochlorite Feed & Sample Pump Modifications 1,649.00 457 CCB Ammonia Tank Foundation and Anchorage 5,039.00 458 Ops Bldg. Knox Box Installation 2,034.00 459 Waste Gas Flare Modifications 17,809.00 460 East Flood Berm & Raise MH/Cathodic Protection 54,500.00 461 Filter Support & Thickener Bldg HVAC Modifications 2,853.00 462 Added Concrete Pull Boxes @ W Access Rd Light Poles 5,000.00 463 Sample Feed Modifications for Turbidimeters 12,533.00 464 Modifications for Acid Digester Level Alarm (2,276.00) 465 Motor Control Wiring Modifications 5,034.00 466 Motor MLR Suction Pressure Switch Location 3,488.00 467 Boiler Pressure Regulator Vents 3,653.00 468 Ops Bldg: Fire Alarm Annuncitator Panal Modifications 3,155.00 469 Oxidation Ditch MLR Equipment Pads 2,984.00 470 24" Cleanout on 42" PWE Piping 17,358.00 471 Pond 10 Level Element 11-LE-1102 Re -Location 7,752.00 472 CCB Paving & Grading Modifications 91,321.00 473 Pressure Gauge Revisions @ Thickener Bldg 1,676.00 474 Miscellaneous Instrumentation Modifications 468.00 475 Ops Bldg: Lab Vacuum Pump and Controls 3,786.00 476 Motor Operated Slide Gates Design Cost 6,140.00 477 Addition of PRV's @ the AHU's Incoming Water Supply 4,562.00 478 Agricultural Re -Use Flow Signal to MCC 2,443.00 479 Ops Bldg: HVAC Mods to AHU in Electrical Room 10,541.00 480 Natural & Methane Gas Risers 22,003.00 Resolution No. 2010-071 N.C.S. Page 15 Ellis Creek Water Recycling Facility CONTRACT CHANGE ORDER TRACKING SHEET cc0 # Description Amount Time (Days) 481 Entry Road Sidewalks 51,102.00 482 PLC 9 additional discrete input 4,548.00 483 Cake Pump Dry Run Protection Controls at Screw Press 2,572.00 484 Addition of Smoke/Heat detectors @ Maintenance Bldg 18,705.00 485 Motor Operated Fence Gates 1 and 2 23,597.00 486 Screw Press Bldg.- Hot Water Heater Upgrade 5,666.00 487 Transformer Rack @ Filter Support Bldg 1,968.00 488 Septa a Receiving Pump Oil Resevoir Monitor 3,583.00 489 Exterior Information Signs and Lettering (11,453.00) 490 Ops Bldg.- Canopy Hood Single Speed Motors 14,141.00 491 Replace Rotameters due to Freezing Conditions 15,040.00 492 Digesters Start-up Seeding and Gas Pure 46,749.00 493 Ops Bldg. AV & Electrical Room addition Door Louver 2,282,00 494 HVAC Modifications- Flex connectors on FRP Ductwork 5,500.00 495 Headworks- Barscreen Enclosure Gas Monitoring 19,823.00 496 Aeration Equipment Performance Testing (7,159.00) 497 UV Disinfection E eshields @ Openings in Channels 1,250.00 498 Biosolids Loadout Piping Alignment Change 1,770.00 499 Removal of Struvite Build-up @ Screw Press 1,415.00 500 Methane Digester Mixing Pumps Add Tee and ARV 8,578.00 501 Methane and Acid Digester Heating Pump Modifications 11,973.00 502 Ops Bldg- Control Room Wiremold Circuitry 16,198.00 503 Ops Bldg- Laboratory Deionized Water System 10,781.00 504 Polishing Wetlands FSS and PS Chainlink Enclosure 11,092.00 505 Pond 10 TWIS Structure Relocation 35,854.00 506 Curb Repair g West Access Road 5,047.00 507 Temp Power to Gate @ JB2 / Safe -off Pump CCB 4,651.00 508 Miscellaneous Electrical Issues @ CCB 10,753.00 509 Modifications to Pressure Gauge Schedule 60,594.00 510 CCB Subgrade Stabilization 18,875.00 511 Biosolids Loadout Electric Actuator Change 23,656.00 512 Polishing Wetlands Berm Leak Repair 136,621.00 513 Cell "A" Walking Path Trails 13,085.00 514 Deletion of Starter Walls & Watersto s @ Ox Ditches (16,000.00 515 Monolithic Pour of Secondary Clarifiers Slab 8,000.00) 516 Monolithic Pour of Methane Digester Slab on Grade (3,000.00) 517 Ponds 9 & 10 Trench Backfill Material (37,590.00) 518 Chlorine Contact Basin Washdown Pump 62,971.00 519 Chlorine Contact Basin Washdown Piping 44,411.00 520 Filter Support Bldg Air Compressor Service 4,437.00 Resolution No. 2010-071 N.C.S. Page 16 Ellis Creek Water Recycling Facility CONTRACT CHANGE ORDER TRACKING SHEET CCO # 521 Description CCB Drain Vault Float & Heat Trace Controller Amount 9,292.00 lme (Days) 522 Light Pole and Enclosure Grounding 15,751.00 523 CCB Existing Piping Modifications 53,364.00 524 Canal C Driveway Repair (6,000.00) 525 Hot Tap T&M 42,523.00 526 Additional Grading RWSB Petals 19,526.00 527 UV Disinfection Commissioning Testing 40,160.00 528 Bid Item Allowance Balancing (197,249.00) 529 Boiler Flame Detector Replacement 1,774.00 530 Additional Screw Press Site Visit 4,775.00 531 UV Re -Test KPC & IDI Costs 14,060.00 532 JCCB Washdown Pipe Painting 2,694.00 CHANGE ORDER TOTAL: 5,528,215.00 82 Contract Amount: 110,329,000.00 1278 Percent Change Orders: 5.010/0 Totals: 115, 857, 215.00 1360 Resolution No. 2010-071 N.C.S. Page 17