Loading...
HomeMy WebLinkAboutAgenda Bill 3EPart2 06/21/2010 ATTACHMENT 4 •~~.` Additional Development Capacity (Residential Units) A'DDITiONAL ANNEXATION AREAS LD. Number .(See Table 4) Additional Development Capacity (Residential Units) Figure 9 '~ Project Additional . ®eveloprr~ent Areas Sunny 5iope pssessmenr o~stnct tk wnnexauon city of r~etawma; Final EIR IV.A. Land Use Page 56 Sunnyslope Assessm'ent' District City oY Petaluma March 17, 1.989 Table 3 ASSUMED ADD1TIONAI_ RESIDENTIAL DEVELOPMENT CAPACITIES: PROPOSED ~-SSESSnAEBVT DISTRICT r Assessment Assumed Assumed r Dlstrlct Existing Additional Total Future r Ownerships° Acres Dwellings Capacltvb Dwelling Units G ~~ ~ - - - . <-f . r 41 2.0 1 3 4 r 44, 45, 64, 71 6.5 1 3-7 4-8 r 52 1.0 1 1 2 r 69 - 1.8 1 2 3 r 72, 73 5.5 1 9 10 r 93 1.4 1 1 2 r 92, 95 1.3 1 2 3 r 122 1.6 1 2 3 r 125, 136 5.2 2 8 10 r 126, 127, 128, 131 3.5 1 4 5 r 132 3.4 1 5 6 r 133, 134 2.3 1 3 4 r .135 1.1 1 1 2 r 137 6.0 1 9-10 10-11 r 138 5.7 2 5-7 7-9 r 141 10.4 1 8-11 9-12 r 142 1.0.0 1 9-11 10-12 r 143 8.6 1 12 13 r TOTALS 78.6 21 88-100 109-121 SOURCE: Wagstaff and Associates, October 1988 a See Figure 9. r ° Current assignment by city staff based on evaluation of site development suitabilities. r Range given for parcels 44, 45, 64, 71, 137, 1.38, 141, and 142 reflects the difference r between: the latest city evaluation (1989) and the September 17, 1986 correspondence r from the county to property owners. See explanation 'in EIR text. a a ,~ f~ 302 a a r r ~; r r r?. Sunnyslope Assessment District City -of' Petaluma March 17, 1.989 Table 4 F-SSUMED ADDITIONAL RESIDENTIAL DEVELOPM POSSIBLE ADDITIONAL ANNEXATION AREAS Additional Annexation Existing Area' Acres Dwellings Area 1 A B D G Subtotals Area 2 None Area 3 ~~ . U Subtotals TOTALS final; EIR IV.A. Land Use Page 57 ENT CAPACITIES: Maximum Allowable Capacity Assumed Assumed Additional Total Plan Capacityb Dwelling Units 2.4 2 2 4 2.1 2 2 4 0.6 0 1 1 0_2 0 .1 1 5.3 4 6 10 1..1 1 1 2 , 7.4 2 6 8 19.5 0 14 14 28.0 3 21 24 33.3 7 ~27 34 SOURCE: Wagstaff and .Associates, October 1.988 a See Figure 9. b Assumed development capacity determined by EIR .consultant and city staff based upon parcel configurations, slope conditions, creek alignments, and access. 302 . 3 ATTACH IVi ENT 5 Pa~kef: Nest I~~lls ~e~e PETAI.UIVIA GEIVERAI~ PLAN 2025 TOPIC DISCUSSION/P®SITI011I PAPER Location/Topic: Lands of Asbell, Irwin/Neuwboer,. Foley, and Mills. -216 Sunnyslope Avenue, 1309 D Street, 13.11 D Street and 1315 D Street. APNs 019-130-011, 019-130-046, 01-9-130-047, and 019-130-041. Staff may recommend the addition of APN 0'19-130-043 (Lands of Fraley) which currently has two homes on less than one acre, thereby identifying. the property as non- conforming. The attached map exhibit .indicates the five parcels; lands of Fraley is identified with an asterisk (~). If this request had been received before conclusion of the public process of reviewi-ng the. Land Use and Mobility Alternatives Report, it would have been incorporated in the Draft Map. Request: The property owners of the four properties first listed above have requested a land use designation of Low Density Residential- (2.1 - 8.0 units per acre) to allow a minimal amount of infill development to possibly occur, consistent with the size of the surrounding lots (see attached correspondence). Existing. General Plan; Suburban (,6 to 2.0 dwellings per acre). 'These parcels are included in the Sunnyslope PUD but were excluded from the assessment process as they do benefit from the public improvements undertaken by that implementation of the. Sunnyslope Assessment District. Draft hand Use 1lRa Ve Low Residential (:6 to 2.0 dwellings per acre) P~ rY Background: The Draft General Plan 2025 land use map recommended a change in .designation to Low Density Residential. (2.1- 8.0 dwellings per acre) for all parcels to the north, east and west of these parcels. The two parcels fronting on Sunnyslope Avenue are the only two with a lower density designation than .the remainder of the street frontage. These five parcels were originally recommended for Very Low Residential (:6 to 2.0 dwelling. per acre) based solely on the existing General Plan designation. Given their shape: and. deep dimensions they lend themselves well to a possible parcel map for small infill development. Alternatives: a. Direct staff to amend land use designation of four, or five, parcels to Low Density Residential. (2.1 to 8.0 dwellings per acre). b. Direct staff to retain the existing Very Low Residential designation. Recommendation: Direct staff to amend land use designation of five (including Lands of Fraley), parcel's to Low Density Residential (2.1. to 8.0 dwellings per acre), Staff will. contact the Fraley property representatives to ascertain their support. Attachments: Letter from property owners with exhibit Location exhibit ~ 1 ATTACHMENT 6 ~s~at Storm Caen t ~rati®~a and ai~nt~nac r®ra for Sunny ®eve~p~nt at 1311 "D" Street and 216 Sunny Slope Avenue Petaluma, California APN's 019-130-048, 019-048-049 and 019-130-011 Prepared for: Sunny® ®eve6opment, LLC By: Steven J. Lafranchi and Associates, Inc. 140 Second Street, Suite 312 Petaluma, California 95952 (707) 762-3122 System Overview..: The lands covered by #his private storm drain operation and. maintenance plan include Parcel 1 of Parcel Map 364, fronting on D Street; the SunnyD Development, a 4 parcel subdivision of a portion of .Parcel 2 of Parcel Map 364 and 'the designated remainder of said Parcel 2 of Parcel Map 364 that fronts on Sunny Slope Avenue; all within the City of Petaluma; California. The private storm drain system consists of individual lot drainage swales, storm drain inlets with filter inserts. to capture and treat the storm water runoff, an underground piping system with on-site detention capacity and connection to the existing curb inlet and the pub is storm drain system in Sunny Slope Avenue. Each of the on-site drain inlets will be equipped with a "Fossil-.Filter -Silt Basin" as manufactured. by KriStar Enterprises, Inc., storm water filter insert.. The filter will trap debris, sediment and treat runoff for the removal of petroleum hydrocarbons as it passes through the `filter''media. Each of the four new parcels created by the, SunnyD Development subdivision slopes in a northeasterly direction. Drainage swales near to and paralleling the easterly parcel lines of each parcel capture surface runoff and convey'tlie storm water to a drain inlet with filter inserts. The captured and treated storm water is then piped northerly in an underground piping system that connects to the existing curb inlet in Sunny Slope Avenue. The northerly portion of the underground piping across the `designated remained' parcel is~`oversized' (approximately 110-feet of 36-inch diameter pipe). The additional capacity of this section of pipe is used for on-site storm water detention. The release rate of the detained .runoff is controlled by a structure at the end of the on-site piping. Inspection Program: The inspection program shail:entail a field observation of the function and performance of all storm drain facilities. The storm .drain facilities .shall be reviewed on a quarterly basis for the first year and semi-annually (on April 1 S' and October'1 St) thereafter. Inspection of the storm drain system shall include preparation of an Inspection Report. An Inspection Report shall 6e prepared for each field .inspection. 1. The Inspection Report shall include, but not limited to, the following: a. Observation of the site for evidence of erosion. b. Inspection of the drainage swales with regards to erosion; slope stability, debris and vegetation. c. Inspection ofthe drain inlets. (e.g., condition, operation, siltation., debris, blockages, etc.) d. Inspection of the drain inlet filter inserts. (e.g., condition, siltation; debris., condition offilter media, etc.) e. Inspection of the underground piping. (e.g., condition, operation, siltation, debris, blockages, etc.) 33 f. Inspection of the.. connection and outlet into the existing curb inlet on the south side of Sunny Slope Avenue. (e.g., condition, siltation, debris, blockages, etc.) g. Inspection and observation of on-site detention piping (`oversized' storm drain piping) and the 'outlet flow rate regulating' structure. (e.g., condition, operation, siltation, debris, blockages, etc.) h. Identify storm drain system deficiencies. i. List maintenance operation required to eliminate system deficiencies. j. List maintenance .performed to restore system functionality. k. Evaluation of corrective measures effected. 2. Upon completion of the field observation, inspection, maintenance functions and preparation of the Inspection Report, a copy of the report shall be submitted to the City Engineer for the City of Petaluma. Sediment and Pollution Management. and Control: 1. The drain inlet filter`inserts shall be inspected and maintained in accordance with the manufacturer's recommendations. a. Debris and sediment will be removed as part of each inspection cycle. b. Filter media shall be removed and replaced per the manufacturer's recommendations. c. Disposal of exposed filter media shall be in accordance with local regulatory agency requirements to ensure compliance with all local, state and federal environment laws, rules and regulations. 2. Removal of accumulated sediment in the 'detention pipe' portion of the underground piping system within the `remained parcel' shall occur when the depth of the sediment is equal to or greater than 1" (0.083') in depth. a. All sediment shall be trapped on-site during the removal process. No sediment shall. be allowed to `wash' downstream. b. Storm drain facility cleaning and/or sediment removal shall be by self- , contained `vacuum truck', hydro-flushed to a vacuum or pumper truck or other method approved by the City Engineer. 3. If removed sediment is to be stored or dispersed (spread) on-site it shall be in accordance with City, State and' Federal best management practices and in a manner that will inhibit erosion in the future. 4. If sediment is to be disposed of off-site said disposal shall be coordinated with the City Engineer prior to the material. leaving the project site. The party performing the sediment removal operation shall .obtain all necessary permits and pay all required fees to all governing agencies having jurisdiction. 5. All significant site erosion shall be noted and corrected. Erosion repairs shall include all work .necessary to prevent or inhibif erosion in the future. 6. Sediment_ shall be removed from storm drain inlets when the depth of sediment reaches 1-inch (0'.08'). 3y Insect Control: 1. The Marin-Sonoma Mosquito and Vector Control District shall be notified of the existence of the onsite detention facilities. All requirements and recommendation. of said district shall be incorporated into the development and maintenance of the detention piping. Marin-Sonoma Mosquito and Vector Control District guidelines and requirements (latest edition) shall be considered part of the plan. 2. The detention piping shall be maintained in a manner#o eliminate standing water that is not part of the detention function during the `rainy' season. _ 3. Application of mosquito iarviccides (Bacillus Thurengensis or Altoside®, or approved equal commercially ,available products) shall only occur when absolutely necessary. Application of larvicides or pesticides shall only be done by persons or contractors licensed by the State, of California to perform such services. Site Access: 1. Ingress and egress to and from the site shall be maintained at all times. 2. A safe and. accessible route to all storm drain facilities covered by this plan shall be maintained at all times. Safet 1. Only trained and certified personnel shall be allowed to enter and work in confined spaces. 2. Only licensed personnel shall be retained to apply pesticides or larvicides. 3. Ingress, egress and access routes shall be maintained at all times. Aesthetics: 1. The site is to be regularly inspected for accumulated., trash and debris, quality and viability of landscaping with regard to erosion control. 2. Debris and trash shall be removed as part of the inspection. process. 3. All. landscaping used as erosion control measures shall be maintained and as necessary, refurbished or replaced in-kind. Steven J. Lafranchi, P.E., L.S. Steven J. Lafranchi .& Associates, Inc. 140 Second Street, Suite 312 Petaluma, California 94952 (707) 762-3122 ~5 ATTACHMENT 7 - ~. n ~" f ~- ~~ ~ t ~~ ~ 'ate .~. _, f: ti~=~~~~' a 4 ~' rn z ~ ~' h ~= I ~~ 6 ~ in ~ ~' ar C...~ >f ~~ is r ~j ~ ~ ~ ~ ~~ G~ r t~ ~' _ r t ? ~' r r ! ,t 4 ~. ~' k ~A ~} ~. ~. ~ ~~..~hlr ,r''f ~' f ~ L a~ ~ ~~ti ti 1 ~ ~, ~ F~ v '.?! - i III +,, ~ /~ ~3-:~` ~- I .' t,} s4~~ ~' `~~'~ _ . <= i 4, 4 -J. Z r,t ~ ~ ~~~ drY ` ~ jh_,J>>~. .,, a`4 Vc ~f t ~. a i _ S z ~} }{,K i'FA yy 4J"~_ [aP f 1 h' fj 'v"!i ~. F ~' r ~v.x f 1 F` ' ~ 1 I~' 1 F ~ ~ ~` ~ f' ~ >« r5 J ~,~ .n ~iµ~=yY ~` SAn yf}~~ i A ~ ~'~.'"ry t ,~._. ..~ ,A{J `W -a' f I "~ ~ ~. f ! ~ .. 2- ~ 7^~3'r.~'~ A i P t N Y"k7` ;> ~F q,_ f ~ r r ~ V ,-r,~ ~ T [ _~ >; 1 vf~ ~'__ t r~ ' ~ ~t~ t . xa'. ~ r ~ ~ 'r fs ~` ~~ 1 '. h r - S` v ~ ~, ~~'. - .1 ~`' m, ~'` t $ r ~ 'i '~ Y `='tP ~~T ~t~1 nT ~~ ~ '1 ~ ~v Jyf ~~ ~ 3 r ~~ i '• ~ r t ~ ' ~L,f ~ is f tt v t 1d2~f L x~ ~ ~ r ~~ ,~ ~.., ~~ ~ ~ ~~' ~ r ti >a,~C ~, o-5 k.' L:".,~ ~, } ~ ''"».~ ~~ ~rr'!~ rE '"'if c Y~,~zP T;~ 4~ ~ ~ . ~~ a 4~ ~~~ ~ ~ ej ~ th a SL ''t~tt A 6 ~r r ~~! ~ .r ' , ~ v ~ E ~ P".', v yr ~ ~ o-!' r~ ,~,~ ~,~ f ~,~ - t .:f ~ - ~ 4 ~_-. ~ x ~ ,: i a ~ ~ d a ~ b .. ~~ ~ - ~ "~ ~h ~~~ +~k..,' a f 4 -~c~ ~y~'~ 1. - ~ t".~t4 "F~+ ,~ ~ y a 4~'_ - ~ ' ~! 1-t '+~" ~ 8 r' R Y ~ i ~ V L: ~ 'yy ,~ ~ ~`I ~ °~. s.: y{, ~ ~ !a f I ~ I x-.*`~ ~ ~ ~ ~ fr~C-~ trq fi s ~ .~ ~rr~~l .ct _ ~ _ a ;~r ~ 1 S L ~ nr ti, ~ ~w'~+~` k•"~ - T ~+ ' ~d `1 ~ ~ ~k r ~. ~ ~'} ~ .4 1 F t ~ ,~ h S ar 3d M a d~ 444{ ~'' ~( ~f t Cy ~ :` f r't* v.," a 'N - s-. ~I Leo x~g ;. ~. ;tit ~ ~~ - lY ~ r d ~~ ~' ` a n ~r``.a'd r _ ~ Its ~ ~ tz ~ f~' 2 ~ l ~ ~~~ i t ~a ` ~. ~ axarb ra '~' '~ '., ~'1^T1.G ~'st ,, ~ ~ .rLr ~' ` ~.xx. ~ ~ ,, ~ ~~ >F ~ n- 7f ~`~~ ai1.r < k ,~ ~' tr ~ f• ~"~~ti~ L ^ r~ 7:[ e~ ...as'~ ~d. ~dti 1 .,,f~ ..a ~'- ~' ?. t„ ~x ~~r~ .J-,~~.. ~M'l,yft f ,`~'`wFS~~h ~ t~'`,~. ° -L ~~'S ~~ ~~ 'C C ~} ~ S ~ FT" ~ ,~. b T ~. i S r~, ~ {b ~ ~ r r ~~. 'fj, 1'~°~! ~ f ~' i '`i s ~ht 1 5 {~ti.~ "fly 1~. a~' i' _ .. k r , ~ ~ NNN S. ~ .. Ir ~ .r9 ~' / 1 ~ " 3 ~,~ r ~ `~~.-.,~.,.yG c'r, ~ ~ ,,, ~,r- ~~~w~ o ~~ r.~ ' y, }~. 0 ,~ €.~ r. ~~ {a Y+ ~y~~'a., I s ~ ~.' ~,' , r hr '"" ~„ ~ ~ ~ ~> :-:~ .. g~z:' ~ F' - ~ r lx ag n 3 _ ~ y C h7_ ~~ 1 ~~ A ~~9~i~ € ~ ® SIGHT LINE EXHIBIT ~ s1~r+ ~ L.nFwwcw a nssocuTes, mc. a avc encw~as-wm wmerais-unoaunn~o LANDS OF SUNNYD.DEYEIOPMENT LLC, ET AL $ aon~. w,c ~,~ 1311 "D" STREET 8 216 SUNNY SLOPEAYENUE APN'.019-130-049 8 APN 019-130-011 ~,n "" CA1IImn~ ~ PETALUMA CALIFORNIA. •' J AT~'ACHNIENT 8 Borba, Irene From: Alan Fulkerson [alan@sjla:com] Sent: Tuesday, May 25, 2010 3:06 PM To: 'Steve' Cc: Borba, Irene; Bates, Curtis Subject: Sianny'D' Attachments: Impermeable Lot Coverage Hydrographs:pdf There are three (3) attached multi-hydrog~aph plots. The 10 and 400 year storm frequency plots are based on a Run-Off Coefficient (G} of 0.90, equating the completed subdivision (Parcels 1-4} as being covered completely by asphalt paving. The attached multi-hydrograph plot of the 50Q year storm event has an associated 'C' of 0.75, which in this case happens to coincide with site coverage being approximately 75% asphalt (`C'=0.90) and 25%° permeable surface with a `C'=0.50 ('C'=0.75 is a composite value based on the two surface areas). The 110 lineal feet of 36-inch diameter'pipe as proposed (both previously and currently} for this project as a storm-water detention basin., has more than adequate storage volume to detain and meter out the post construction storm-water.run- off (based on the entire development. being covered by asphalt) to less than the peak discharge rate of an equivalent preconstruction storm event. The post-construction 500-year storm event (`C'=.0.75) exceeds the equivalent pre- construction storm event peak discharge .rate by only 20 gallons per minute (0.04 cubic feet per second) with a few cubic feet of required detention storage to spare. The metering device consists of a drop inlet or manhole with a baffle separating the 36" inlet pipe from the outlet pipe (15" or 18" per City Standard). The baffle will have a 5-inch high by 3-inch wide orifice. (opening) at the bottom which will nicely regulate the discharge to pre-construction levels. A 45 degree v-notch weir`, with an invert elevation 2.75-feet above the bottom of the orifice, will serve as a secondary metering device for discharge rates exceeding 0.82 cubic feet per second, and as an overflow should the orifice at the ,bottom of the structure become obstructed. Alan D. Fulkerson, P.E. Steven J. Lafranchi & Associates, Inc. 140 Second Street, Suite 312 Petaluma, GA 94952 (707) 762-3 122 37 iu~ti-~rog~aph P9®t . _. _.: __ , __ _. Hydraflow Hydrographs Extension for AutoCAD®Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 Flyd. No. 3 Ex. Hydrograph Outlet Structure Hydrograph type" =Rational Hydrograph type =Reservoir Peak discharge = 0.726 cfs Peak discharge = 0.68 cfs Time to peak = 15 min Time to peak = 16 min Hyd. Volume = 653 cult HY~• Volume 967 cuff Ex. Hydrograph thlrough Outlet- Structure 10-yr frequency Q (cfs) Q (cfsp 2:00 1 A0 0 aQ ?.oo 1.00 0.00 0 5 10 15 20 25 30'; 35` 4U, 4~ au Time (min) Hyd No. 1 ®Hyd No. 3 ~~ Multi@Hydrograph PI®f _. _ Hydraflow Hydrographs Extension for AutoCAD®Civif 3D® 2009 by Autodesk, Inc. vfi.Dfi6! ~y~Aa ~®• ~ ~y~• ~®. Ex. Hydrograph Outlet Structure Hydrograph type =Rational Hydrograph type Peak discharge =Reservoir = 0.94 cfs 'Peak discharge = 1.027 cfs Time to peak = 15 min Time to peak = 16 min ~ Hyd. Volume 924 cult ~ Hyd Volume ~ 1,371 cufit ~ (cfs) 3.00 2.00 1..00 0.00 0 5 Hyd No. i 1'0 15 20 25 30 35 4U `-~ ® Hyd No. 3 Q (cfs) 3.00 2.00 1.00 0.00 ov Time (min) h'/ Ex. Hydrograph through Outlet Structure 100-yr frequency ; ~It®ydro:raph PI®t _.. ~ . '° _. _ _ . . .... ..:..:. Hydraflow Hydrographs Extension for AutoCAD® Civi13D® 2009 by Autodes , nc: Hyd. N®. 1 {iyd. N®., 3 Ex. Hydrograph Outlet Structure Hydrograph type =Rational Hydrograph type Peak discharge =Reservoir = 1.34 cfs Peak discharge = 1.298 cfs Time to peak = 15 min Time to peak = 15 min Hyd. Volume = 1,168 cult ~:Hyd. Volume /"'/i~'1'~"`~9oXi4~' = 1,445 cufit~ ~ ~7~GJ~" p (cfs) 3.00 2.00 Ex. Hydirograph through Outlet Structure ~ ,yr frequency Q (cfs) 1.00 0 5 Hyd No. 1 3.00 2.00 1.00 I ~ ~ I ~.~®~, i t. .~ ~~ 0;00 .,. ~~ 50 ,..:. ... --- 000:. -- 10 15 20 ® Hyd No. 3 25 :3U ors tv ~~ Time {min) ~~ Pond Report _ _, ..........:: _. _~ .._ .. . _ _. -° - Tuesday, May 25, 2010 Hydraflow liydrographs Extension for AutoCAD®Civil 3l~ 2009 by Autodesk, Inc. v6.D66 Pond iVo. y -Detention.. Pond Pond Data UG Chambers -Invert elev. = 100.00 ft, Rise x Span= 3.00 x 3.00 ft, Barrel Len = 17 0:00 ft; No. l3arrels =1, Slope = 0.50%, Headers = No Stage /Storage Table Stage (ft) Elevation (ft) Contour area. (sgft) Incr. Storage {tuft) Total storage (cuff) ' 0.00 100.00 Na 0 12 0 12 0.36 100.36 n/a 60 73 0.71 100.71 . Na 93 1 ~ 1.07 101.07 n/a n/a 108 274 1.42 101.42 Na 115 389 1..78 101.78 Na 115 504 2.13 102.13 N 108 613 2.49 84 2 102.49 102.84 a n!a 93 705 . 3_P0 103:20 n/a 60 765 778 3.55 %, 103:55 Na " 12 Culvert /Orifice Structures Weir Structures [Al [Bl [CI [PrfRsr] [A] IBl [~] [D] Rise (in) = 5.00 Inactive 0.00 Inactive Crest'Len (ft) = 0.00 Inactive 0:00 0.00 0 Span (in) = 3.00 6.00 0.00 1.00 Crest EI. (ft) = 102.75 100:50 . 0.00 0.0 33 3 Barrels No = 1 1 0 16 Weir Coeff. = 1.05 3:33 - 3.33 . Invert EL (ft) = 100:00 100.00 0.00 100.00 Weir Type = 45 degV Rect -- -- N Length (ff) = 0.50 0.50 0.00 1.00 Multi-Stage = No Yes o No Slope (%) = 0.50 0.00 0.00 Na N-Value = .014 .013 .013 60 0 Na 60 0 Exfii.(inlhr) = 0.000 (by Wet area) Orifice Coeff. = 0.60 _ : 0.60 . Multi-Stage = Na No No No TW Elev. (ft) = 0.00 _ ._ J Note: CulverUOrifice ouHlows are analyzed under inlet (ic) and ou[lel(oc) control. Wetr risers checked for orifice conditions (ic) and submergence s _. Stage /'Storage /Discharge Table Stage Storage Elevation Civ A Civ B Clv C PrfRsr WrA WrB Wr C f Wr D Exfil User cfs cfs cfs Total cfs ft tuft ft cfs cfs cfs cfs cfs s cfs c 00 0 0 100.00 0.00 0.00 --- 0.00 _ 0.00 .__ --- - - a.ooo 0.028 . 0:36 12 100.36 0.03 oc 0.00 --- - 0.00 - ' 000 --- --- 0:00 ... ~ --- _ 0.355 0.71 73 100.71 .0.36 is 0.00 --- 0.00 --_ 00 0 - ;,,;. - - - 0.464 1,07 165 101.07 0:46 is 0.00 -- 0.00 -- . : 0 00 -- _ _ ~ - " 0.552 1.42 274 101.42 0.55 is 0.00 -- 0:00 . 0 00 -- _ - _~ --- 0.628 1,7g 389 101.78 0.63 is 0.00 --- 0.00 --- 0 00 . 0.00 -- -- 0.695 2.13 504 102.13 Or70 is 0.00 - : 0 00 -- - --- 0.757 2.49 613 102.49 0.76 is 0.00 -- 0.00 --- 00 00' 0 0 . 0.00 -- ~ --- -- 0.816 2..84 705 102.84 0.87 is 0.00 --- . . 14 00 0 0 0 00 --- _ --- 1.006 3.20 765 103.20 0.87 is 0.00 --- - . . 60' 00 0 0 . 0.00 -- _ -- 1.519 3.55 778 103.55 0.92 is 0.00 -- . . ~i ATTACHMENT 9 The task is to find a mechanism in which short term and long. term maintenance can be funded without. creating an entity such as a homeowner's association (HOA). The project is a minor subdivision without any commonly owned parcels which precludes the creation of an HOA. The maintenance agreement will include language that will. create an account that will be initially funded by fhe owners of the property (SunnyD.LLC). The initial seed money will be determined by estimating costs for yearly maintenance requirements (storm drain .related inspections, cleaning and pollution control inserts for treatment and.. detention) along with future private infrastructure repair and/or replacement: (sanitary sewer, water services, storm drains, driveway) that would run with the land via a deed restriction. The established account will be controlled by SunnyD, LLC as long as they have any ownership in the development. Ownership would include Parcel 1 of PM No. 361 the four parcels in this project and the designated 'remainder. All required yearly inspections shall.. be reported to the City of Petaluma Building Department. SunnyD, LLC shall be responsible for this yearly reporting as long as they retain ownership. As lots are sold, each new owner will be required to contribute funds into the maintenance fund. Contributions to this fund will be collected from each owner on an annual or semi-annual basis to maintain yearly maintenance and fund future replacement or until, such time that the account becomes sufficiently funded to sustain the yearly maintenance and long term replacement. At such time when-SunnyD no longer has an interest in any of the properties, the remaining owners will appoint, on a yearly basis, one of .the group to be responsible for the operational duties that SunnyD previously managed. The agreement will also contain provisions on what to do in the event that a shared facility is not properly maintained and fails or adversely affects neighboring properties or the public right of.way. Typically, failure to comply with terms of a private maintenance agFeement'is a private matter between private parties. In the case of illicit discharges or other Cityenforced violations, the terms of the agreement could be enforced by the City's Code Enforcement Program. A draft operation and maintenance manual has been prepared by SJLA, Inc as the guiding document for yearly maintenance requirements and direction for future inspections'to address long term replacement or repairs. The O&M manual will be recorded will each parcel. ~~- A~TACHMEIVT 10 PARCEL NET PARCEL SIZE MAX. IMPERVIOUS` EXAMPI;E COVERAGE No. 1 8,052 SF 4,831 SF 3,000 SF single story house 500 SF for garage 500 SF for driveway 500 SF for concrete patio 331 SF for other misc. items such as accessory building, walkways, etc No. 2 10,504 SF 6,302 SF 3,500 SF single family house 500 SF for garage 500 SF for driveway 500 SF for concrete patio 1,301 SF for other misc. items such as accessory building, walkways, etc No.3 8,888 SF - 5,332 SF 3,200 SF single story house 500 SF for garage 500 SF for driveway 500 SF for concrete patio 632 SF for other misc. items such as accessory - buildin ,walkways, etc No.4 9,692 SF 5,815 SF 3,500 SF single family house 500 SF for garage 500 SF for driveway 500 SF for concrete patio 815 SF for other misc. items such as accessory building, walkways, etc s:/planning/misc/sunny d impervious iot coverage cnari ~}