Loading...
HomeMy WebLinkAboutAgenda Bill 3.E 07/12/2010w~AL U a '~ zs5$ DATE: TO FROM July 12, 20,10 ~l ~ev~.dcv I t~wv # 3 . ~ Honorable Mayor and'Mernbers of the City Council through City Manager Vincent.Marengo, Director of Public Works SUBJECT.: Resolution Approving a Planned Use of Expending 2008-2009 Allocation of Proposition 1 B Local Streets and, Roads Funds forthe Auto Center Dr. Extension to .Petaluma Blvd. North Project C53101'002 RECOIVIMENDA'1'lON: It is recommended that the City Council adopt the attached resolution approving a planned use of expending 2008-2009 allocation.. of Proposition 1 B local streets and roads .funds for the Auto Center Dr. Extension to Petaluma Blvd. North Project 0531 OI:002. BACKGROUND: Proposition 1 B (Prop 1 B) provided $1.9.925 billion in bond funds for a variety of transportation priorities, including $2 billionfor cities,and counties to fund=the. maintenance and improvement of local transportation facilities, The City-has recei~ued two shares of the Prop 1B allocations: $916,741:85 in FY 2007-08 and $847,322,03 in FY 2008-09. In order to utilize Prop 1 B funds, the .City must first approve a planned use and submit it to the State Department of Finance during: the annual update (October 2010). Initially, both allocations were planned for the Grinella Drive Reconstruction Project, However, the construction contract came in much lower than was originally estimated, leaving additional funds available for new projects. The 2007-08 allocation.of Prop 1 B funds will. be ..fully expended with the' completion of the Crinella Drive Reconstructon:Project and approximately $644,658.15 of the 2008-09 Prop 1B funds have been allocated :for the .following-projects: Crinella Drive Reconstruction, Petaluma Boulevard South Road Diet,, and 20:10-1 IPavement Sealcoat Project. There is enough funding remaining ofthe 2008-Q9 -Prop 1B funds to complete the Auto. Ceriter Drive Extension to Petaluma Blvd. North Project, Agenda Revew.l Dept. Director City Attorney Finance Director CityManag DISCUSSION: To improve vehicular access and circulation to the Auto Mall, Public Works staff has been working with the owner of the Victory Chevrolet dealership to .extend Auto Center Dr. to its connection with Petaluma Blvd. North: The original project budget was based on a preliminary project scope. The preliminary project design was initiated subsequent to acquisition of the necessary roadway improvement easement: The current project budget is based on the revised assessment of the project needs. The design and construction management will be funded.by PCDC funds and construction will be a combination of PCDC and Prop. l B funds. . The work, in general, consists of the following improvements: installation of new asphalt concrete pavement, concrete curb and gutter, valley gutter, sidewalk, driveway, curb ramps; guardrails, storm drain system,, water and sewer mains, lighting;,planting and irrigation. systems, signing, striping, pavement markings and advertising sign relocation. Project construction is anticipated to begin in late summer with completion in December 20.10. FINANCIAL IMPACTS: The State Department of Finance previously approved. the City's planned use of both 07-08 and 08-09 Prop 1B funds for the Crinella Drive Reconstruction Project and deposited a total of $1,764,064 directly into aCity-designated account: In addition to the initial deposits, .the Prop 1 B account has been earning interest that must be utilized in the same manner as the original funds. There is an estimated $141.,046.11 in Prop 1 B funding available for other road projects, which includes interest earned through June 30, 2009 ($26,382.23). ,Uses CIP Budgef IO%11 Desi $ 236 000 Le al Counsel $ 24 000 Plannin Environmental $ 30 000 Land & Easements $ 10.000 Construction Contracts $ 870 000 Desi er Construction Su ort $ 36 000 Staff sal/bens $ 114 000, CIP Overhead $ 33.000 Project Contin enc $ 132 000 Estimated Total Project Cost $ 1 485'000 Fundin Sources PCDC $ 1 346 000 Pro 1B Allocation $ 139 000 TOTAL $ 1 485 000 The design cosy shown above is a much larger percentage of the construction contract than typically seen: The additional charges are primarily due to right of way acquisition (legal descriptions and plats), but also include additional hazardous material. investigation, and a complex. issue .regarding a large .sign relocation. Staff charges are primarily for Construction Management, which are estimated at approximately 10 % of the construction contract, but.also include design reviews, traffic engineer reviews, and design contract management. Total Cost of Proposal or Project: Amount Budgeted: Project Number: ATTACHMIJNTS 1. Resolution $1,485,000 (includes $139,000 - 08-09 Prop 1B allocation being requested for use) $1,485,000 ($1,346,000 PCDC and $139,000 Prop 1B) 053101002 3 RESOLUTION APPROVING A PLANNED USE OF EXPENDING 2008-09 ALLOCATION OF PROPOSITION 1B LOCAL STREETS AND ROADS FUNDS, FOR THE AUTO CENTER DRIVE EXTENSION TO PETALUMA BLVD. NORTH PROJECT 053101002. WHEREAS, 2008-09 Proposition 1 B Local Streets and Roads Improvement Funds have been appropriated to the City of Petaluma for the purpose of local streets and roads projects in ,the amount of $847,322.03; and WHEREAS., approximately $795,658.15 of Proposition 1B Local Streets and Roads Improvement Funds have been. planned for other projects; and WHEREAS, any interest accrued by the City from Proposition 1B Local Streets and Roads Improvement Funds shall be made part of the original allocations and utilized following the same- requirements; the approximate interest earned through June 30, 2009 is $26,382.23, leaving an approximate $141,046.11 available for other projects; and WHEREAS, $141,046.11 of available Proposition 1 B Local Streets and Roads Improvement Funds including interest earned through June 30, 2009; and WHEREAS, to utilize Proposition 1 B Local Streets and Roads Funds, City Council must approve a planned use of the funds, as determined by the State Controller's Office, and submit to the State Department of Finance during the annual update; and WHEREAS, the planned use for the Proposition 1 B Local Street and Roads Funds must be included in the City of Petaluma 2010-11 budget; and WHEREAS, City Staff has derived a plan for the use of the Proposition 1 B Local Streets and Roads Funds allocation through the Auto Center Drive Extension to Petaluma Blvd. North; and WHEREAS; the overhead of 2.4% and project design will be paid for out of PCDC; and WHEREAS, project construction will be funded with a combination of PCDC and Proposition 1 B funds; and. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Petaluma hereby: N 1. Approves the proposed use of Proposition 1$ Local Streets and Roads Improvement Funds; and 2. Resolves that a certified copy of this resolution and its attachments,. and any accompanying supporting materials shall be made available to the .State Department of Finance; and 3. Authorizes the transfer of $139,000 from project 000501108 Crinella Drive Rehabilitation to C5310I001 Auto Center Dr. Extension Project. 5