HomeMy WebLinkAboutAgenda Bill 3.F 08/02/2010~~.A L ~~
a '~
185a.
DATE:
TO:
FROM:
SUBJECT:
August 2, 2010
~l ~~u~cv Itenv #3:
Honorable Mayor and Members of the City Council through City Manager
Vincent Marengo, Director of Public Works
Resolution Approving the Project Budget and Authorizing Award of Contract for
the 2010 Slurry Seal Project to American Asphalt Repair & Resurfacing Co.
RECOMMENDATION:
It is recommended that the City Council adopt the attached resolution approving the project
budget and authorizing award of contract for the 2010 Slurry Seal Project to American Asphalt
Repair & Resurfacing Co.
BACKGROUND:
The 2010 Slurry Seal Project involves placing slurry seal on various residential streets in-the City
as preventive maintenance to protect and prolong the lives of those roadways. Public Works
staff prepared the bid documents, and a Notice Inviting Bids was issued on July 1, 2010. Four
bids were received on July 14, 2010, as follows:
Name of Bider Base Bid Additive Bid Alternate
American Asphalt Repair & Resurfacing Co., Inc. $213,070.47* $85,194.65
Graham Contractors $227,896.96 $92,896.20
Bond Blacktop, Inc. $232,232.00 $'103,347.10
Valley Slurry Seal $299,623.60 $112,349.00
*The original base bid was $193,070.47. However, after staff review, the base bid amount was
revised upward, due to a calculation error. American Asphalt remained low bidder.
The engineer's estimates for construction are $271,000 for the base bid and $.113,000 for the
additive bid alternate. The base bid involves slurry sealing nineteen streets and the additive bid
alternate covers another ten streets.
Agenda Review ~,' ~
Dept. Director City Attorney Finance Director_=~!~ City Manager
DISCUSSION:
On June 21, 2010 City Council authorized a project budget of $330;752, including the use of
$292,046 of Proposition 1 B funds. As part of preparation of the bid documents; a field
investigation revealed numerous locations of pavement within the proposed project limits that
have degraded from the overall street condition rating. Since a slurry seal will only function
properly on pavement that 'is in relatively good condition, the solution employed by the Public
Works Department is to repair the localized failed areas of pavement prior to application of the
sealcoat. To allow for the pavement repair, the contract documents included a base bid for the
maximum number of street segments that could be included within the approved budget; and an
alternate bid, which included the remainder of the street. segments originally approved,. The low
base bid is within the approved budget and the base bid, plus alternate, is $60,688 over the
approved budget. Performing preventative maintenance is an economical option because it is
applied quickly, few to no: adjustments must be made to~ existing street features, and paint
striping is easily applied to the new surface. Adequate funds are available within the Street
Maintenance operating budget to snake up the budget shortfall, which allows full implementation
of the original scope of work.
Staff recommends authorizing the City Manager to enter into a contract with the low bidder,
American Asphalt Repair & Resurfacing Co., Inc, for both~the base bid and additive bid
alternate, to provide slurry seal on the proposed streets.
FINANCIAL IMPACTS:
Total Cost of Proposal or Project:
Amount Budgeted:
Amount Required to Complete Alternate Bid:
Source of Additional Funding
$391,440
$330,752
$ 60,688
Street Maintenance (2411-24110-54150 )
2411-24110-54150 Budget $375,000
Project Number 01.6101008
Project Funding Sources State Proposition 1B & Street Maintenance
The following is a breakdown of the construction budget:
Construction. Contract (low bid)
Design
Constructiori'Management & Inspection
Contingency
CIP Overhead
ATTACHMENTS
TOTAL:
$298,265.12
$10,000.00
$30,000.00
$44,000.00
$9,175.00
$391,440.12
1. Resolution
2. Location Maps
A~~A~~91~IE6+9~' '~
RESOLUTION APPROVING THE PROJECT BUDGET AND
AUTHORIZING THE AWARD OF CONTRACT FOR THE
2010 SLURRY.SEAL PROJECT 'I'O AMERICAN ASPHALT REPAIR &
RESURFACING CO.
WHEREAS, City staff has prepared construction bid documents and advertised for
construction of this Project; and
WHEREAS, in accordance with the City of Petaluma Charter and Municipal Code,
California Public Contract Code Section 20162 and other applicable law, City staff solicited bids
for the Project; and
WHEREAS, the Project was bid on July 14, 2010, and four (4) bids were received and
opened in accordance with applicable law; and
WHEREAS, the lowest bid for the Project was from American Asphalt Repair &
Resurfacing Co., Inc. for $298,265.12; and
WHEREAS, staff has determined that American Asphalt's bid satisfies the bidding
requirements for the Project; and..
WHEREAS, staff has verified that American, Asphalt possesses a valid. California
Contractor's License, Class A, number 439591 that qualifies American Asphalt to perform the
Project; and
WHEREAS, the Project is exempt pursuant to `Californi'a Environmental' Quality Act
("CEQA") and Title 14, the California Code of Regulations ("CEQA Guidelines"), Section
15301.
NOW,. THEREFORE, BE IT RESOLVED that the City Council of the City hereby:
3
Approves the Project Budget in the amount of $391,440.
2. In accordance with the City of Petaluma Charter and Municipal Code, California Public
Contract Code Section 20162 and other applicable law, waives any and all non-
conformance in the bid of American Asphalt Repair & Resurfacing Co., Inc.for the 2010
Slurry Seal Project, finds the bid. of $298,265.12 to be the lowest, responsive bid and
further finds that American Asphalt is the lowest responsible bidder.
3. Awards the contract'for the;2010 Slurry Seal Project to American Asphalt Repair &
Resurfacing Co., Inc:, in the amount of $298,265.12, the amount of the lowest responsive
bid, conditioned on American Asphalt timely executing the project contract and
submitting all required documents, including but'not limited to, executed bonds,
certificates of 'insurance, and endorsements, in accordance with the project bid
documents.
4. Directs staff to .issue a notice of award to American Asphalt Repair & Resurfacing Co.,
Inc.
Authorizes and directs the City Manager to execute the project contract on behalf of the
City of Petaluma upon timely submission by American Asphalt Repair & Resurfacing
Co., Inc. of the signed project contract and all other required documents, including but
not limited to, executed bonds, certificates of insurance, and endorsements, in accordance
with the project bid documents.
4
~o ~ o-- ~ PAVEMENT ~EALC~_A~ PROJECT
GRAPHIC SCALE:
2~a
O
0 500
D
D _•
PROJECT LIMITS n
2`
,~
m __
z - -"
-~,
N
PRINTING DATE; JUNE 16, 801'0 -, -= -
~Q 10-11~ PAVEMENT ~EALC®.A.T PROJECT
PROJECT LIMTPS
PRINTING DATE: JUNE 18, 2010
~o ~ 0-1 ~ ~AV~N~ s~~~~oA ~oJc~
GRAPHIC SCALE:
250
0
~' 0 .500
PROJRCT LIDdITS
PRINTING BATE: JUNE 18, 2010
GRAPffiC SCALE:
250
0
°° a soo
PROJECT LID{ITS
PRINTING DATE: JUNE 18, 2010
~o ~ o- i 1 ~v~~N~ s~A~~c~~.~ ~oJc
GRAPHIC SCALE:
250
o
C° 0 500
PROJECT LIDiTTS
PRINTING DATE: JUNE 18, 2010
~~~0-11 PAVEMENT SALC~AT PROJECT - --
PROTi;CT .LIMITS
PRINTING DATE: JUNE 18, 20f0
20 0-11~ PAVEMENT SEAI~C(~AT P®JECT
GRAPHIC SCALE:
250
O
N o 5oa
PROJECT LIMIT'S
PRIN'T'ING DATE: JUNE 18, 2010: -
GRAPffiC SCALE:
250
O
`'' 0 5:04
s
PROJECT
PROJECT LIMITS
PRINTING DATE: JUNE 18, 201:0
_ ~,
GRAPffiC SCALE:
250
O
~' 0 500
PROJECT LIMITS
PRINTING DATE: JUNE 18, 2010
GRAPHIC SCALE:
250
~' 0 500
PROJECT LIMITS
PRINTING DATE: JUNE iB, 2010
_ =- ~ O 10--11 AVEIVINT SEALC OAT ~JJE CT