Loading...
HomeMy WebLinkAboutStaff Report Item 8 04/03/20001�ILUo1—U�; CTI'Y OF PETALUMA, CALIFORNIA Agenda Title: Resolution to authorize the City Manager to enter into the Agreement for Funding of the Petaluma Industrial Water Survey and Incentive Demonstration Program with the Sonoma County Water Agency and Resolution to Approve the Professional Services Agreement for the Industrial Water Survey and Incentive Demonstration Project with Pacific Technology Associates. Deuartment: Director: Contact Person: Water Resources & Thom Hargis Steve Simmons/ Conservation Lynn Hulme Cost of Proposal: S60,000- 1) City's share of Sonoma County Water Agency Amendment 910 Funds - $25,000 2) Sonoma County Water Agency Funds - $35,000 Meeting Date: April 3, 2000 Phone Number: 778-4560/ 778-4507 Amount Budgeted: $60,000 Account Number: 601-400-9931- 7104 Attachments to Agenda Packet Item: 1) Petaluma Resolution No. 98-238 N.C.S. of the City of Petaluma California, 2) Cooperative agreement between the City of Petaluma and the Sonoma County Water Agency including Petaluma CIP budget, 3) Resolution of the City of Petaluma to authorize Agreement for Funding of the Petaluma Industrial Water Survey and Incentive Demonstration Program" with the Sonoma County Water Agency (Agreement attached), 4) Resolution to approve Professional Services Agreement for the Industrial Water Survey and Incentive Demonstration Project with Pacific Technology Associates (Agreement attached), 5) Industrial Water Efficiency Program proposed for the City of Petaluma and the Sonoma County Water Agency, April 26, 1999 (on file in City Clerk's Office). Summary Statement: The Pacific Technology team, working with Sola Optical USA, Inc., senior technology staff, has developed a plan to determine cost-effective water saving strategies for this high-tech facility. Implementation will require a $60,000 investment which is shared with the Sonoma County Water Agency: $25,000 for professional services (City funds subject to Council approval) and $35,000 for instrumentation/metering equipment (Agency funds subject to Board approval). The $25,000 City funds for professional services are available in the City of Petaluma's share of the funding provided via Amendment #10 to the Agreement for Water Supply and Construction of the Russian River-Cotati Intertie Project, approved by the Agency's Board of Directors. Council Priority: THIS AGENDA ITEM IS CONSIDERED TO BE PART OF, OR NECESSARY TO, ONE OR MORE OF TBE 1999-2000 PRIORITIES ESTABLISHED BY THE CITY COUNCIL ON JANUARY 30, 1999. Priority(s): N/A Recommended City Council Action/Suggested Motion: Approve Resolutions. Reviewed by Finance Director: Reviewed bvt _i, .Akornev: Date: ate: `�PoAj4-m 0-�11�11._ a -/ate Today's Date: It # and Date Revised 2/8/00 # AnoreveA by City Manager: � Date: 14il ode: S\SB\WATER CONSERVATION\Funding With SCWA & Pacific Technology Agreement CITY OF PETALUMA5 CALIFORNIA APRIL 3, 2000 AGENDA REPORT FOR RESOLUTION TO AUTHORIZE THE CITY MANAGER TO ENTER INTO THE AGREEMENT FOR FUNDING OF THE PETALUMA INDUSTRIAL WATER SURVEY AND INCENTIVE DEMONSTRATION PROGRAM WITH TBT; SONOMA COUNTY WATER AGENCY AND RESOLUTION TO APPROVE THE PROFESSIONAL SERVICES AGREEMENT FOR THE INDUSTRIAL WATER SURVEY AND INCENTIVE DEMONSTRATION PROJECT WITH PACIFIC TECHNOLOGY ASSOCIATES EXECUTIVE SUMMARY: The Pacific Technology team, working with Sola Optical USA, Inc., senior technology staff, has developed a plan to determine cost-effective water saving strategies for this high-tech facility. Implementation will require a $60,000 investment which is shared with the Sonoma County Water Agency: $25,000 for professional services (City funds subject to Council approval) and $35,000 for instrumentation/metering equipment (Agency funds subject to Board approval). The $25,000 City funds for professional services are available in the City of Petaluma's share of the funding provided via Amendment #10 to the Agreement for Water Supply and Construction of the Russian River-Cotati Intertie Project, approved by the Agency's Board of Directors. 2. BACKGROUND: The City of Petaluma's Water Conservation Program includes development and implementation of various water conservation measures that will reduce the amount of water used by the customers of Petaluma's Water Utility System, as well as reduce the amount of water discharged to Petaluma's Wastewater Treatment and Disposal System. An estimated $2,780,083 of funding will be available over the next 10 years to the City for water conservation measures and water reuse programs. These funds are identified in City's portion of the Sonoma County Water Agency Draft Water Conservation Plan with the goal to reduce water demands on the transmission system. In 1997, the City of Petaluma initiated a 10 -year Commercial/Industrial Water Survey and Incentive Program with the goal to obtain 10% participation with 10 acre-feet per year (AFY) estimated water savings. During the first two program years a customized commercial/industrial water survey and incentive program was developed for Mishi Apparel. The pilot study determined the magnitude of potential water and wastewater savings. The Bay Institute of San Francisco worked on Petaluma's programs from grant funds awarded from the Rose Foundation for Communities and Environment. Mishi Apparel is implementing the water efficiency recommendations in phases. They are currently in the first phase which includes replacing existing washing machines with front -loading, horizontal axis machines. The second demonstration site will be Sola Optical USA, Inc., headquartered in Petaluma, manufacturers of approximately 1/3 of all ophthalmic lenses worn in the United States. The Pacific Technology team will purchase instrumentation equipment (clamp -on flow meters, associated data loggers, and related data integration services) and perform an extensive water efficiency evaluation including: • Develop a dynamic water balance for the plant, including indoor and outdoor uses. There is currently a single City water meter for all uses. • Evaluate the water use in cast cleaning, coating and edging processes. • Evaluate potential water efficiency improvements. The Pacific Technology team estimates that these two demonstration projects (M'ishi Apparel and Sola Optical USA, Inc.) will together save as much water as was predicted for the entire first -generation CommerciaUIndustrial Survey and Incentive program proposed for Petaluma by the Montgomery Watson Report in 1995. 3. ALTERNATIVES • Defer the program. 4. FINANCIAL IMPACTS $25,000 - City funded services are available in the City of Petaluma's share of the funding provided via Amendment 910 to the Agreement for Water Supply and Construction of the Russian River-Cotati Intertie Project, approved by the Agency's Board of Directors. $35,000 - Sonoma County Water Agency Funds. 5. CONCLUSION The City should implement this second demonstration project; it is a stepping -stone to expanding this Commercial Industrial Survey and Incentive Program to Petaluma's remaining 850+ commercial, industrial and institutional customers. The City of Petaluma should continue to expand water conservation programs in order to preserve and protect existing water resources, to improve the likelihood that additional water resources will be available in the future and to help defer capital cost for expansion of City water and wastewater facilities. b. RE, COlVfMENDATION It is recommended that the City Council adopt the resolution authorizing the City Manager to enter into an Agreement for Funding of The Petaluma Industrial Water Survey and Incentive Demonstration Program with the Sonoma County Water Agency, and the Professional Services Agreement for the Industrial Water Survey and Incentive Demonstration Project with Pacific Technology Associates. Resolution No. 98-238 N.C.S. of the City of Petaluma, California RESOLUTION OF THE CITY OF PETALUMA TO AUTHORIZE THE CITY MANAGER TO ENTER INTO A COOPERATIVE AGREEMENT WITH THE SONOMA COUNTY WATER AGENCY TO FUND AND ADNIINISTER THE CITY OF PETALUNIA'S FY 98-99 WATER CIP PROJECT 9931 FOR WATER CONSERVATION WHEREAS, the City of Petaluma recognizes that water is an essential and limited resource; and WHEREAS, the City of Petaluma has a 5 year Capital Improvement Plan (CIP) for Water System Improvements which includes Project 9931 for water conservation; and WHEREAS, the City of Petaluma is a prime contractor of the Sonoma County Water Agency (SCWA) and wishes to cooperate with the SCWA to implement programs designed to conserve water; NOW, THEREFORE, BE IT RESOLVED the Petaluma City Council authorizes the Citv ivlanager to enter into a cooperative agreement with the SCWA to fund and administer programs included in the FY 98-99 Water CIP Project 49931 for Water Conservation and as might be amended by the City Council. s:\my fi les\reso98.doc - Under the power and authority conferred upon this Council by the _Charter of said Citv. REFERENCE: I hereby certify the foregoing Resolution was introduced and adopted by the Approved as to Council of the City of Petalumn at a (Regular)meeting form on the ... 1$th_.---....... day of .......... N.Q.V.e.tflbe.r........ ---......- •, 1998._, by the following vote; �p AYES. Lity ttorfie Torliatt, Read, Vice Mayor \Maguire, Mayor Hilligoss NOES: None ABSENT: Keller, Hamilton (one seV vacant by resignation of Stompe) f ATTEST : ............._.....---• lr�•- .. _.. /' .. City Clerkf..._...._ ...-...apor....._....:.! =l. . .5................. .... N"' itoa. Yu ..... .... '...... . NCS % TCO ^l5.{vCxav:.iluYaCawgramnuWervrc c q.n hky_^A'v . 1fl l;a, _aJ t ill/ 98/9G-10 Cooperative Agreement for Funding And Administration of the Petaluma Water Con=_erration Program for 1999 This 2creement is between the Sonoma County 'Nater Agency, a boot/ corporate ano colitic of :he Sick df California(heretnaifer `n"cency j, and City of Peta{Lima 1,here7 efier'Ctty.}. RECITALS A.. The Ciiv and A.Cenci share the goal of promoting Inc: 235207 en(C:2nC/ of WaLEr Use In orcer to reduce oceradna costs. avoid or defer canital imorovement cOsis associated with expansion Of :Vater SLICOIV and '.Vasi2'Nat2r dtsCCsat systems. minimize assCC:ai2d 2nVlronrnentat imgaC:S, anc meet cmerla anc s:andares of state and fecerai reculatory acenc:es. S. Amenarnent No. 0 to the Agreement for Water SuooiY and Constructon of the Russian River-Ccr2d Interne Prcleg'_ accrcvec by the Acenc's Eoard of Oirecmrs Resolution 97-1128 on August 2E. 1997, authorizes the Acency to implement and fund water ccns2Nailgn me3SUre5 that are Cost e Eq ve ano will regL'C2 'Nater cemanrs on the transrmissmn system. C The C:t/ has imolemented a {Nater Conser/adcri Prccram Which consists of speclnc programs :O im Crove water emC:enC'y. The City desires the Agency's assisianCS in deveioCmg and/or implem2nLing52`f2n SpeC:itC prcc; 2ms within Cirt s t1l/aier Conservation Program as descnged in Attachment E. rJ. The City is requesting a total of 51,17,000 for program fundlnc. E. Funding for this program is available Rom ailccauCn in the Acenc'J'S czzecory of Nater COns2rriicn Procan;' Sub-zbiec:'r2,17, (Acgaunt No. 975108) wit -in the Agency's 1998199 buecat. A.CenC'/ and Cib/ d0 mULU31IV desire to cCCCE ata in the Impiemen[2von anC ilnanCng Of said Prcm.m. AGRE=—MENT The Cat/ and ?.cent/ acree as follows: 1. RECITALS All Cf e aCCVe .recaals are true ano cgrrEC: _. OEF:NITIONS r'.f ai2 CUrccses Cf phis aCf^ement :fie 'Cllcwinc [erm5 ano cETIn;Ccns Sn27I Ce oseq CCnu,2c-cr -Cc nirac-cr hlr2'c cv C f! :C CE.,'1r—m ICS a1iat1Cr1 c. =_CU1Cm2Ct 7Cr P`:C:Cants cf aCC;ICc C:E .'C tC r ram' CrcCrams 'unC twist,nc ac:vtaC es (:i ai^{G_ _ -. .aC:Caids - Cxr =f Peta Iuma'9a:er 7r 1V a?:2:vaiEf C:;SiCmcrs :✓nC CUa:" 7nCsrms an.0 CC.^.C:::C'c ,.� E_.... 'nCf:ICCai grccr_cm as _=Zc7c2_ 1r. -..— 5se .:e. rucoecna _ a gee. ^ea :user Ce+aer,ancr. �•-c�n'a •^v Proaram - For the purposes of this aaraement'Prcarm' snail refer cC1Iec:tve^/ :e the `Naier Conservation pracrms de_cnbea in Attacnment 8 and re!2MC acdvibes the City anc Acency have acreec to cerforrn in c^operation. Proaram A.dmmisiatpr - Aeenc; stzi= ass!ane^ to im.ofement Program and pertcfm ACE Cy s respon=sibilities. i. COORDINATION City shall cCorcinate all WOM With ACEnCy s PrCorm Administrator, Lynn Hulrre.'Nater Con_ser/aticn Saecia!ist (Phone: 707-_c,,17-1918: Fax: 707-�2­ 3782) or assioneg oerscnnei. City ccnmc; Is i nomas Hargis. Direc;or of Enaineenna (Phone: 707-778-304; Fax: 70i-778=-37) gr assicnEa cEr=_cnnE!. 4, CITY'S RESPONSiEIL1TIES C,b/ snail ccmalete the City's `Nater Conservation P-GCrm at its cz:st anc 2xrense. EXcsct to the E:Qent of ACencl services provided for In Secton 5 and AcencJ minding provideo for in SEcdon o be!aw. In so doing: A. City shall provide Acencl's Prccram AdminisTtcr with requested polio/ and/or direction during Proaram. E. City snail provide a work spaca for us_a as a Program ofnca by the Procan A.dminisrator, inc!udina desk, dedlcsted telephone "Hotline' at 707-778-1507 with cscabiii-Les fcr four me_saaE•announcement mailboxes_• and chair for a minimum of 10 hours 0er'NEek. C. Ciry shall provide meedna i ;Hbes for any necassarl meetings , elating to Prccrm. D. C,tV Shall provide Prcarm Adnini_water With a current mailing list. inc!ueinc names and addresses. ror ccmmerctal and institutional Water CUS:omErS. .. E. Cib/ shall s_e!ec: and hire Contractors requ!rad by Progran• bases on Fmcram Acminisuaz&s reccmmendaadons. F. City shall pay invoices submitted by Contrg:crs and approved by Prccrm Aeninistrator. C. City shall require Its Contractors to Insure and indemnify the AAenc7 using the language idendned in Atachmem A as the language for Agency insurance and !ndemnincaadcri requirements in the bid paC<aae and snail provide evidence et such insurance anc indemnification to AaEnc? in a fcm satisfactory to A.gencl. H. City shall selec . based on Acency reccmmencadcns, all nxtur_ ;nc: ed in Ptncram. I. City snail maintain CcmciEte and accurate records of all trnsaczons in compliance with _generally 22Ccaoted acccundna princibles for Enterpnse ecccu'nting as promulgated '.^,v the AmEn[an Institute of Ceri!riEd Public ACgaunrcnts and the Covemmenral Accounting Stancaras Sc2rd. Suc records shall be a11GH21ble to the Aaency at all reasonable times i0r inspecacn aro anaivs;s. J. C:bl shall pay all applicable rebates to Freerrn P2mC;.02 ts. as Cu22ilfled 22,10 sucmited by AcencJ. K. Cin/ shall provide at least are (1) staff With kncWlEdce of C:Tv 'Naier acCcunts t0 Work ScEC:a! Event Fund Ralsina far zwo a nourweekeno 02'/s. L. C;11 snail meet with Proaram .`.omnis iratcr anc Agency sta:i :o c;scJss C.:/ s ::ca;s arc Cciec"ves .`Cr toe fcdc:viva programs: Irncadcri Incentive P=r=im. Lca/ `Nater Use Lancscace CrcirancE dJl C-17.1 sraa a_sss Pmcrn .=.cm;n!s_ira>[r :G :[[sic = c: a rrcE a .. a.n;nc s..e 'Gra ;.vc cav '-anc_da_E i/1/a72r AUCit traininc class arc ^_ne a%'J�/a:cf �L'Cy Ei C:ass -Cr l:o :C _r: ca':..,._a'.= I fie s;ic snail oc Eq rCeq 'yJiih IEiLI_cmcatiblE COMW=-FE aVcii2C:E rCr tt1E :al i:C:Ca-L aE ':J2:! __ a �c3i CV RnC_aiEC Turf are_ fcr insiniCaon ora CEmcnsi,22ticn [L'rCcsc. __eeeru• A,,,, ,=, Z,n, n. Pill. N.:vr::n...Zm=-4_m_..-_ N. CitV shall work with Acencv, to create 'Nater Conservation Web paGe WO snail Dost InfrrMation sueolied by Acenc/ ano update web pace as necessary. =crees to defeno. indemnity, hold harmless. and release Acencl, Its cf c re, acentsarIo EmPioyees, from and against any and all ac i E. Aeency will provide the following =services For the Lands=cape Water Audit Pfbcrem. cesc'bec In AGacnment 8: • Purc^ase audit equipment, incivaing ie!d e?ulomE it and portable cdmbuter SUch equwcmant snail become property of City upon burcna<_a. • Coordinate a two-day training class In accordance with $talc of Cd<ifgmia L2n csracc iNater Manaaement Program far up to 20 pa, ic;cants. • Pertarm landscarte water audits at Sa!ecten_ City owned parks. F, Agency will provide the followine services for the Imgat!an Incentive Progrrn, descnbe^_ In Attachment 8: • Ibleet wn ith City slam and based on those me9onas Will deve!eo guide!ines For runninc the prca_ram. • Prepare program forms and determine rebate amounts. C. bendy will provide the tollowina services for the Landscape Water Conserraan Ordinance. eescnbed In Attachment 8: • Meet With City staff and based on those meetings will review and dc,.e!aa options far a re` isec Landscape Water Conservation Ordinance. • Coordinate a one -day training class for Water Budget Training for up to 20 pardCioant_. H. Ardency will provide program deve!aament assistance for the City's Cammercia-I/lndusinal Water Survey and Incentives Program to City consultant, Bay Institute of San Francisca. I. Agent/ aarees to defend, indemnity, hold harmless, and release City, its pricer=acents. and emoloyees, from andagainstany and ail acdcns. claims. damages. lia Ciiides. or excenses that me be asserted by any person or entity, inc!udinc A.genc;, arising out of or InCCMec:ion with th2 perfomance of Acenc/ hereunder, excduding liability due to the sale active negligence ar willful misconduct Of City. I nis indemnification ablic2ricn Is not limited In any way by any limitation on tt.e amount or 'type of damages or compensation payable by Agency or its agents under `Crura, compensation acs, disability berefiLacts, or other employee benefit 2C2. In addition, Agency snail be liacie to City for any lass or damage to City praoery arising 7Cm Cr m ccfinection with AcenC/'s Performance hereunder. 6. FUNDING A. Upon executian of this aareement, reca!ot of an invoice thereof and rece!ct of evidence of insurance and indemnincatien fram the City's Conrrctor=_, Acenc/ will deposit with City s=n.-00, whicrt is to inance 2 porion or the following costs: • DIrect-in2C2I1 contractor Tabor and materials for Residential T aIle: Re-_12c.=.men( 7-rCa_r am. • SCeC:21 Event contractor for Residential Toilet Replacement Prccram. • Telephone charges for Yater Conseri2don 'Nadine' inc!udine fcUr messace/announcerneni mailboxes. • IMC2don Incentive Prceram rebates. B. Agency will also provide uo to S07.900 far Program adminiSu 2t!On ccnsi5r;na of Agency stmt me =,-,a material Costs. C. A.cenc7 s maximum Obligation under this acree 7lent Shall nct sXceeC S I a 7 .Ho. 7. ADDITIONAL REQUIREMENTS A. AcenC7 Mil nonN C;ry in %vniino when PMCram m2n2Cefncni CCSZS re2d' Z ,1FG. w.Vnlc' '.s d. Agenc'v s oucrer far PrCCram manaCefnc.^.0 as Crcvidec 'cr In Sec;:cn a..,em z r= .CEng'/ `,VIII also ❑Coli! Cir/ :n w.vntinc '.urian costsfcr C;q'e Ccnfrac:= nc:ucirc �Ired;-'rs:aa 2... Sced:21 Eve.^.t ,=-inc R21SSirO Cantrac;cr<-=nc'Ne:er �Ltanacemer.t r.s. �c:Cr_. nave -eaC e- -c„ -_- :rC.1 Of .CnCl s :CE' . ;Cr ccsi2 as Ceschb c anc ,.CvtC C 70' n se'=cn 4. [Em. A. C Cnce .bendy notincaticn :s civen. C.r/ ail ac"ISE Ace^CY In vmfing_ %-;i.,-.in G ac cof Ccjs _. desire to e!iher eno the ,CC_z P'Ccr2im, %vnen iG'G°'a Cf Acen Cv funding 's ceclete0 dr 100`.S of acdipcnat Prccram tossto ccnmue win :,heiS== L_ceerm.v �q; csren,'er :we:rq env ,:c .n,maan at ;-v reui,.n,v :'rxs Ccr:erva.en 2-.;. an tr'SS TERM OF AGREEMENT The tern Of this acreemenL snali he rrcm j2nu2ri It. iCCC to Decemcer ,7 i 7nfes5 Ierminaic^_ e=riier ;n accorcanca with the :erms herein. TERMINATION OF AGREEMENT This acreement may he canCZiec ucon thirty ','u) eays wr ten nonce cy ether cavi :ero,wn >c=-:rrer. _, =._renq = e _.,.-�ins.rauen _. Tn Peu��ra aamr __r:e^,:v^n P�=Sr=n wr •c33 IN WITNESS'NHERECF. the paries_ hereto have executec this acreement as set forh oe!ow. Fevle`.ve7 a5 :G SU CSianCe ov Aeencv, 7 CIrl OF FE AILU`ALUrceOVA!"S D�arrnent Heac AcoroveG as tc :unc cv=c_ncv: / 1141 Z�1_ A.cmtnis_tran�e Services 0`icer A Reviewed as tc rcrm Gy Ccunry C�aunse!: Ccun',v Counse ✓, City Clerk ATTORNEYCITY U OFFICER City o -!uma rel ytiOUC Er, Cii1G�+cna_er Date: v / ' Scnom- Cowr7 Wat n"a ncy Chas. Eca.0 of ur :ors Ari Ac},;MENT A WORDING FOR DIRECT-;NSTALL CONTRACTOR INDE ANIFiCATION Conti actor Parses to accadt all rsoonsibliity far loss or damage to any person or entity, and to de end. incamnity, hold harmless and re'.Ease the Ccty of Pewiuma and the Sonoma County Water Agency, the!r acents and =.mployees. from and against any and all aeons, c:aims, dam'ac-z . or dizabiiides, that may be aSseREd bV any person or enpty, inc:udinc Cantrac:ur, arls'na cut of or ,n c.^.nnecCcn ,.vith the pe:'cri Hance of Contractor hereunder, whetner Or clot there is concurrent neclicence on uiE pan OL C,ty di PECatuma cf Sonoma County Water Acenci, but esc:,:ding liability due to the scie active necticenca or ssole willful miscCrcuC. Of Citv of Petaluma or Sonoma County Water AQErlcy. 1 HIS tndEmntiiC3'ucn Oal1a2GCn is not limited in any way. by any limitation on the amount or type are damages or compensation payable to or for Conim-c:or or Its acents under Wceee`5' COmpettsation ac--. disabti€tv benefit ac".s, or other employee benism acs. INSURANCE The CcnLactcr shall obtain insuranca acCapt'abie to the City of Petaluma and the Sonoma County Water ACency Tom a company or companies cccEpt-able :o the City and Agency. The re-quired dccumentadcn of Such insurance shall be tumisned to the Cat ai the lime Contractor re?.hms the Executed czmr.cl fMe prover insurance shall be provided within ten (10) calendar pays after tie concac:cr has rece!vEd the notice *.hat the contract has been awarded and pncr is the City executing ute contraC the Contrad:.^.0 snail not commence work nor =_hail he allow his Employees or succcntrc cr= or anyone td commerce svcr< until all Insurance required hereunder has been submitted and approved. With respect id perfici—mance of worfi under :his controC Contractor shall maintain and =_hall rEauire ail of its subccntracrors to maintain insurance as de_cdbed below: Workers' Compensation Insurance With st2 utcry limits as rEcuirEti by the Labor Coca of :hE A. - State of Califdmia. Said peiicf snail be EncctSed with the milowing spec:.c laicu'cce: This pofic'J shall not vE CancEied or msrart'ai'l}y c°7anaed wiftut Iry mvirg thirry (>;G) days prior wriften node-- to rhe City of rsraluma and Sonoma County Ir/atEr,sCEnG,I. B Commercial General Liabilihy Insurance covering bcdiiy injury and prcper7/ damace utiiizma an GccuiTEnce policy farm, in an amount no less than 51,000.000 combined sincie limit fcr Ea'cn occurrence. Laid commercial aenercl liability insurance pcllCi shall E!tthcr be sndorsec with u,e tcllcwing scecIT)c lancuace or contain a^ylliVaient IanGuaoe :n the pCIICJ: i ne C,tv of ,z7eraturna anc Scncrna County Water Agency, tha!r g GE ono errcicycez. M ail:: as additional insurap for all fia`OrfitY ahsrnC CUC Of "'a CCE �f:ons ,CV Cf Gn CEn a!r cf fhe name-- insured in the peri CTance of'uhis contract. The inruvcn of more ten one insured snail not CCE aft :e xrca!r the nCniZ C ::nE Insurcc acains: anamer !nsurEd. dna ft -le c.verace a rrc.=C u7c'fl apolY c5 :i"•GL'_",i SECErECE dcrices ,7aC :.eon iSsuEp .d a.Ecn lnsurEd, our me ;nc;usiGn Cf =5 rnsurec &7all not CCE mE 'c lrc:,asa :he iirtrs cf :he CC,^CcG;{ _ .jaG71 I nrf CvErrca _.atuma anC : crC-;a nE hs"ance ^mIfCEra'� peCY C-unry /Va:er�ca.`7C/ 'virn r_esCec: to 2nY Insurance Cr ainfamec by the r".tl Of ^=C-iurna anc rtie -'Crlcra 'C�L'nr: 4tJc tEr=y'Er:C': 7i �,,.-.�M-,.tryy �C^'_.^.Ot':'� "'-.CTG i(IC nG.. �M1S'ly:.CR Ct'^Y i^ISM1:n3 It31Yt'�J"SC/'rot.Y:t �-tjt+R'V •�La This policy shad nor be cz:inca:ed or merenaily chanced Nithcur rirsr giving thirty (30) days priorwriren notice ro the C.ty or?eraiuma anc the Sonoma Caunty'NaEr„cancy C Automobile Liability Insurnca covenne hoeily inlury.anc prcoEti.v camace n an amount no le=_, :han 5-00.000 conoinEa s;ngle limit 'cr E_cn cccurranc_e. Sala nsuranca snail Inc:uce cCvE cc_e for owner, hirer, alio non-cwnea vEnces, Sala Polk/ snail he ancor_Er with the fedowinc ancusca: This pciicy snail ncr be c rc Eg or marenally c,,angec ',vithcut .Irs: giving ,hlrry (30) gays prior wn,rzen notice :o rhe C-ry or Peraiuma ana Sonoma County 'Narer Ace.4cy City of Petaluma Water Conservation Program The City of Petaluma's (City) Water Conservation Program includes development and implementation of various water conservation measures that will reduce the amount of water use by the customers of Petaluma's Water Utility System, as well as reduce the amount of water discharged to Petaluma's Wastewater Treatment and Disposal System. An estimated $2,780,083 of funding will be available over the next 10 years to the City for water conservation measures and water reuse programs. These funds are identified in City's portion of the Sonoma County Water Agency (Agency) Draft Water Conservation Plan with the goal to reduce water demands on the Transmission System. The program costs and water savings estimates are based on the Agency -funded Montgomery Watson Study, Water and Wastewater Efficiency/Avoided Costs Study, September 1995 (MW Study) and John Olaf Nelson Water Resources Management City of Petaluma's 1997 CII Toilet Replacement Program. Agency staff will work closely With City staff to administer the water conservation program. City of Petaluma FY 98-03 Capital Improvement Plan (CIP) Cin thousands of dollars) SOURCES Current IE.Y.98.99^5FY99.00,_?E'1f 40-0t,t .:FY,01-0Y FY02-03_, ._6 -YR CiP_ Year FY 1 Water Operations (City) 0 WPC Operating Fund 74 (city) - WPC Capital Fund (City) 171 Special Assessment 65 (Agency) 95 1 Other (Rose Foundation) 0 1 TOTAL 310 Water Conservation Program — FY 98-99 Budget Year Water Conservation Programs 1. Commercial Toilet Replacement 2. Residential Toilet Replacement 3. Local Weather Station 4. Landscape Water Audit 5. Irrigation Incentive G. Landscape Nater Conservation Ordinance 7. Commercial/industrial Water Survey & Incentives TOTAL PROJECT 01 386 1 1828 Agency WPC Operating Fund —ate - -.:311- _,• = _ ;:�� :..- - - 141 56511 i 50 95 1861 o 3311 20 31 78 a 1291 7 0 0 0 it236'r=:o':r236 40 Water Conservation Program — FY 98-99 Budget Year Water Conservation Programs 1. Commercial Toilet Replacement 2. Residential Toilet Replacement 3. Local Weather Station 4. Landscape Water Audit 5. Irrigation Incentive G. Landscape Nater Conservation Ordinance 7. Commercial/industrial Water Survey & Incentives TOTAL PROJECT 01 386 1 1828 Agency WPC Operating Fund WPC Capital Funds Other Total Amendment X10 141 56511 i 50 95 1861 o 3311 20 31 78 a 1291 7 0 0 0 71 40 a 01 0 40 10 0 01 0 10 18 0 a 01 18 N ....-.....Total 147 5 9 141 1 30 131 — 273 141 56511 i Ccaperauve Agreement for Funding and Admimsdaacn ct the ped uma Water Cordidmaan Pnagmm fdr 1299 A-1 PROGRAM 1. COMMEtRCIA.L AND INS i ITU T ZONAL TOILET RL?LACEMEN T PROGRAM Eackarouna in %. iiiE CioJ of PEiaiuma IClfiaiEC a--;iEa" icdeE raCiacc 50% C. 1,92_ f11C_n-W'cicC u=3. Jtic:- calci. �.E:v ':J'c iEr--: ns=.nJlfic Pix:2ras In 4nC::s,,7a1..._.,.TE.'=:ci. inst;tuticnaal 'aCaliies To data 47% (or 9C i tCtielZl of :,,e TGa feC!aCEmani _Cal '..•ere lEGcx_ c. 2 ==si c. SZ�11.1137, or $RC1 per tctie: To G^.mCiesa tree :Irccrsm _C21, =gL - :^GCE iciiets ':ml nEE :c Za.EC:c=EC rcf 2.1 C ,-=G= =n -n C =StinaiEd CCSi or S2 1.000 Cr �?G' t,cr tCdet I nE anncai 'NaiEr _aVtnC_ ci ii,_.._ r,, la�cmEn�s I_ __. ac. rEEt ger year (AFY), ,acc Administration in CCcer i0 Ctiam the maximum OCs-'i:.lE 11ciuni7r J :attic:::anon, •u`a �`_'tsiuf'c C.'.mfi+E.'::ai wa: r Cz r.ser'Ja:ic n C.ani gives aPPIC'rits two ootions: 1) Dire—c 2ristall o.cdcn where +7EE nXiUres are '_uCuliEC anc insiailEd CV a CTCV-1hirEd Ccnzac:Cr and 2) Rebate Codon :or c's'wmEr: Who preier to buy ccicrEd dr cnCJ-Si/iE ECUICnErli �7cn trte!r own succlier and/or want to use their cwn CC riu aC:Cf of CuailnEd In-❑oUSE malnC2no:^,CE yEfSCn"' rtEtates would Its S1,00 for a Cr-viiy-iush lane: and s iw,0 ,Cr a c--nnerctai-type power flus`, toilet Ac-encJ Va-will Ncrkwith Cirf staff to devsiCo a'Nater wnsErJE:len wet Ca_e to rurther adVerase this rCCC2n to C::SiLnmerS. 1999 PROGRAM COST- COMMERCIAL AND INSTITUTIONAL tutu_i r<cr ?Cc:41E?ai Remaining Toilets to riepiacs to meet °t796 gaol ' S a Esunated Direct -install and Rebate "Budget Adminizzmadon including City Inspections Agency Prccr<m Administration' 5:95, -aa 9a,15G Ss5.450 Commercial & Institutional Toilet Replacement'Neo Page I Commerc9ai 3 institudonai Toilet Repiacement Sudo-et i 5331, 00.70 r=•c:ual taiai P'cc_r<n adminisurticn ccSis for 1°` year less 100,c or Acen.C,.' actual casts. cue to =-Xce_tEc eii=enC'J C81ned i-1 am 1°' year excenence. and IesS CUE to fedUCEC CCnsuliani EX:: E.^sc Sii�C? ,-�S ,act PCr =rcccsoi and C=Edtac'.{ Redori wlil nci be re'_t:ira- PROGRAM 2. RESIDENTIAL TOILET R;=PL6,CE1MEN T PROGRAM Sackaraund ne G-jeSr IP.-.stcenilai Toilet Rep!sca i;Ert,C'"r.0 =+�1 CCc IS :C fECI'cC_ 2_ a :.r ' 0,;= _fa''Jiif- Csn t=ae:s .i. -es:cEn ai C:VE`.116Cs, i 1s waiEt saVinCs s Esus 2i =.t 1 1E°9 Administration ScEc:al c, a." =_nc =as=.- wr'I k;c:;cc i; e .ir--i year _._. auGE: 2.._,_.- - c:v _ - . ,va:-r ____ - - _ c =7':: -Ig -. ..�..iic. ... C .....:i 7,Cn-1rti, li cc=;z; 11.'..- _I.c. EIv icr�: uu.. .. .. -.-_ ._ .... ._r.. ..__ .. .. .. - �... T hEse_Ci^C lhroUCn ie -ch lea Crri `N i Zne rrccmIII C -2r NcGiC:CciliS c!;hEr a CECcic C_, ...^. .c'C(Cr =nC:ner SCECcai^EVEnc Tuna Ralsar to re_Ieca hien `Nater Uslnc =Bets with i.c c2dan Oar'USM !CIIE:= ReCa:ES of Si00 .. -=r Tolle:'NIII Ce clic to pal —=2 -12 wria 'NF_ ; :C sE!eC: ar1,. CUrCn'cSE ;h E!f own lXNfc_ 129C PRCGRAM C_ -ST - RESMENTIAL TGlL_T RE =L_4CE'AE:V I First Year miiet replacement acal Estimated Saeciai Event Contractor Ccs: Summary Reaor, Acency Proomm Admini_ adon Prepare draft RFP & samaie Cont,octor acreement Eta", the Sae --.;al Event Fund Raising weekend days Program administration Residential Toiiet'Neb Pace Re=sidential Toile: Replacement Eudget FROGrR AIIM 1. LOCAL WE4THFtR STA. i ION Ea Oka raur.d 1,000 i Z°.000 5-,000 S1 29.000.00 .=. Coil,crnla unapt:cn IVIarlacen;a' ln'C1-:aucn .C.YS:cC1 (Cil�Jll.�.j '.V Ec:i ler S:2dcn Wlil �E Ins-= Iec at iha =ac=:cr L'n Golf Course uncer separGtE acrEEmenc '.Pith''U"E A.CEnC: Curing :,`=- ills: VE -i. (r".CEnc., Funcinc Acreefnenc C=:e.ccWe A.Cra=_MEni With Ca/ of Petaluma :Cr Ca;ifcrnla irncaucn IblcncC=rrEnt Information SJStE^ Sudan as par cr Wa =r Ccnsen/adcn Precram hoc-_".) L ancscace mar,acera. homeowners. C;ii reC;aimea 'Nater usera. e:c., can use CilbtlS :n,crlmaticn aS a tori to ImCaiE Ly rEClaCina Cr11V thE'Naier :hat is last :hfCUCn EvapCCralns CifailCn (1-7). : `— Is c m.ESSUfEmerli lin ;nCnES) of i1`iE amount of `Na:Er uiai Is ICsi SV CraSS tlfoUCn ironsClra tion a1nC ovapCfaiiCn. This imCauan :e 1=11 ICUE c.-C'.Vs "cr'E21ihV ;Uri crass without w2Sunc '.Yater. 1999 Administration Acenc'/ Will: ResEaicn IncEmei remeval me:ncds ana anncunCE C::rr_=M E Caic from the Y=_'2'um2 C;PoIlS C;,^/ '.facer conscNaucn reccrcea teEECnone messace .macnlne. 'Nor;( with CItV ata' to deve'co a ,vGEEr C'nsErva::Cn `NEC C'__ ro Iunher Save^se t �L orccram. `JGnCJ_ c_C:tlCnai TE:CCCs :0 CIS_cminail C In iCfmaiiCn :C C__._...Es = C_n'J E.^.IE.^.::•Jc O. ;ne ca cc: -cin a c'.._e :he :r, rofma::cr,E..es. •isi_C _e. -•,v _-.E _E_, me: -.,c oI ..._sa-hira:ir.c :rcC.:. _<:_ ___ ._nes •n :-_ = Es _E ,.car_-: `;e::r_acEr Zrc=E._.cma - c _ e==- iaaa Pc 0Gi-..>,M C0ST—LOCAL WEATHERS AMN C:r{s teieonone cast to move and expand the aNaz2r canserraticri S,,MG teieonone to » message boxes_ i 1 Agency Proaram Administration Set uc retrieval method ror CINIIS data on Incernec I Maintain and ucdace weekly cl announcement I f Research and test dissemination methods � i Summary Repdr, I iLocai Weather Station Web Pace i GCO.GG : � LocaiWeather Station Eudget i FIFOGFAM 4. LANDSCAPE WATER, AUDIT PROGRA-M Eac:<around ^.e i0-ye=r ^yCci °Gr he 'NaierAuclt Prc:cr2M Is to aud1C K peCCEnt oft= i - y; G<a' c, 2cs •.vithln a ie (",,,C{ sertice 2i e= that are J ==-E cr li�grc :n size. The `s'Ce'= Wccr sHVfnC iC.' cllCiic': sties tS i �'? �=.r ! ct:C ci _-- e_t::, 2tev Ccs; to the City of _�C0.000. Lancsca.,_ 'f(/c.=r e=.tid'.t procrcm mil be ce`:G'-C--`-� in -""-rCs'rc2 ` lin the Sic,_ Of CailiCmic I__-lCsca_c `.Nater :Vlciio_erne.^,i P.':,Crcm. Pamidparas Will: Learn 'u`:=ir sky's ci., ent irgadcn e: da.,iC! 2nd •pr=e::--ltadcn pct= m ..c cdviseC of avciiacie IOW- est h^crcware ImCrcVe^rents Y Learn new to 2CCess carrentwea:therdaic thrcur,-i the ne\'J CINIIS siai:c:l :ccateC in c�a:ai L'ma O i-ecsiv=_ caseiine ir^cadcn sghedule_ ->++L'!es Casec on the crances in :he Wearner 2nC ET �ec_aivE inG_cuc::ens mediryine the irrc2den SC..__ + neceiv=_ .rater savings inrormadcri C":nr,c thG Inr.;al Cn-siiE tTlEe^ne `Nidi the Cfi{ 5 12, CSCaPe manaCSf, ii,E fCCrciTi CVerjle.v 'NIII C C15C s2C. mcudino: o prrcram, CC2!s and coieC::ves a hc:J the Irnc_ecn .s Current'y beinc GC�ec"Icc rrl� �mr ccCnc-= crr .gGticn re=rc .keeling C�u Ll. C:G SiIG .•� a d Ge'�'...idn�.. r..-.. a. aal G i J.G: •:JIII Ja a�gitac • .. .I , ^=_ --••.•C], = _- The site s ictalIrn�,^'iec area and Iccai Cara'.Vlil be CCmCare^ `.Viih cnelr g7ISE water use:.: E_.+-aiE :+�E site Sa p-.cn + I WIII be_:n u+_ audit .b.V VisUail `.aiUaiinc eaC:1 - r a occential 'Macer Savincs. A Iranec City Ci cenc: aLC!CCr Y - _ !rnConon SJsiB^ s Ossign, oee vino ccnciticn, ane c_rcr.: overa-" =?lC:sn C7 Sire5 iavinc Imcailcn sVs:=­_ , 5e ac^iCE'NCU!C re !Ve no rner untii wn7Care CCnV CEsionrr Cf�a!ntainEC :"CE^Et VCUIC E:IDicleC17C serVlCc Iie tie cy_iC;^s are ucCaCant m&incen:nErs -uff.:mdCC!e^.. i irrice,icn auditor would proceed with a CEi=:IEC IrilCH7Cn audit iC CEic:^!ne ,'.i Cita:—_n rate, Cs:nCL'CCn oaf? would uICE ` c ld used ,.. `/E;cC a ta— .mcazi:Cn uri0crmirJ. Gass iJCE, root CECL1, and soli :./pe. (-.CC .'. ^•^ stn EC+� a Sno. _ >w < c C-Ilc'. jO wound ee Cone :C a.s5=3 mmemizdiction I_. Ving weeKiv %sienna 5me_ or c'len( Cnonu` a;.0 sails+aC':Gn. drier assistance. 'cuff anS VEr CUES`uC::=. Sn C CC »1L'si SC i�'C!ES a: ..e____. vats s:ie tan CSCa CE +mnai:aCer(s) `NCUIC be rESCenS!bic .'Cr ImpleMCn•enC audit nnncL9Cs and c:c'Jlnc IC" mmncr .f`_a`cni sysiams fe Calrs (raplac:nC broken hews. re_ainnc leaFs. =_=A 999 Adrninisiiaticin ACenc:'s proc2m implementation Wiil beach 'Mich C+i!-:'Nnac. panKS Cunnc the nisi tircC c+Ti 'f Ear and '.v"ic inciuce :he fcilc tnc: _ +_ .o • Ot3iatn matEr;als and yu'tpmE'tt necessary IC prCVECE Cn-Siic nfiiscaca LYa:Er ai:Clts. • CCCrdinate a iwe day Landscape ImcauCn Auditor u ainino C: Ursa for CirJ lancsc2ne scud anc ICCni :Mcai+.::: manacers. Utilizing a Pemiuma lgcdon it Posa-lbs. • vesign and rrccuC_ a sicn to be pInca_ =t u+e at:Cli site that rEaCs. 'C';tV :.f='e:c!urna ! anCSCcCE Wa: Audit Procan'. • .tech innoiemenring the La^,ds `pe ImcaCCn Audit ' cm at C:CV CWnEC s; =M. • Wcri<:vlth Cav si:aT :o de`leico a water CCnse^/ailcl 'Nee C'ace to -,Qrn=r Educs:= City CsiCmErs. • CCcrcinaiE a t'=c:',nIG-i Final Recon tnai Inc:Uces cstr ic'tc= 'Macer sa`!e^_ f7Cm i'==rccran;, avcicec CcErs. prccrar . aenends and re-'mnendEC Crccrami mCeli=G :Cris. 71 -le P=rarii Viii 5e eacanced In the second VEar to cher audits for Imcaiors of Ccir ccuraes, mui::falmly hcuslr+c landso2=es. sc.`.cdis, c-e?neisnes. ar+c public pails :rwclvir:c three cr more aC: es of ianCSC-, ric, tc99 PROGRAM COST- LANDSCAPE INA ER AUDIT =FOGRA' I j Landscsoe Water tManacement Training OV Cal Pcly j S7,000i II I t. 00 , rtarketinc materials, training room and i7e?d Sign + P•urdas2 audit equipment inc:udinp a por-:3,S00abie comdu'�r 4 � Acencr Praeram Administration j 529.000 Coordinate training class and dratt. agree nen,:d hire instiuC:ors. i I Ferom the pre -audit and audit calCnlat_ cant -r savings potential and irrication schedules and prepare report for about 7 Ci^^ gwred sizes I Prepare end or the procrrn summar/ report i ec^nicsl =inai Report inc:udino estimated water saved. avciced costs and prgrarn benefits, recommended procr-M - odiricaticns Landscsce Water Audit Rmc am Wed p=Ce _=nese-^e Water Aucit ;�rccram uuccet GM. FROGRA.M S. IRRIGATION INCENTIVE PROGRAM Eac4a_round ne is=(Ear':JeEr saving CCaI fora :he !mCaucn Inc=n.. Procram I<- :C gcCain :C°u _a:TiC:cai:C.'• :. E_..-a:ct water savings :s 10 ane t,'le program cost is est;<<.atec at S C0.004. 1u= Incenuve . d.'am, a companon to the LancsCace Water Au`dlC Y."CC:- C .cr9 .r"oa7cr, 9'JS(,-.t-: ace. In Com..^.CPJea. flip U"'CfaGeS Ccllld be �C-.'1Lr�cC w ale Irrlcc:;an audit or tv ,,.e cad:c:Cc'I's cv: r C S:4nILEd "cCcmSV'7Jt1I be gGe a to hE C tC ner for env cevicE C( teCanivne :haF s CCs: =-e_.: water savings' Saarc:ai bene5r<curwe:cn the cCst--1- 1999 Administraticn Acenc; ',veil: 4 .rescarc" oiler IrmcauCn IncenGVec. ctT�.<. ci�C Ptcc-:,I andincs at a ne3znc '.wt'i "",:.t '•'Jeer grad ',ai{c SlGll , • deve!cp Imcadan Incentive Procran guidelines. marketing Plan, and crocran forms • ,York'AICh City sial, to develop a Mer =nsafvadcn wed pace to funner cdVer:ise *"his prccrmm 4 begin program lmClernen:sdon at C:tV CwneC sites lm.caCicn Incentives;Recaies will either be a P=_rCentage av the crcccsc sCUICnEnC CCs: 'Cr a set al„Cl.nt cC. 'X ure. Item's that will be considered for rebates ;nc:uce: drip imc2don Svsiems. sprit Sler heaps, arlc rnu!ti- crCc, car-,m,acie Impar:cit ccnuciler5, Che-:: '12iVeScode.^. VaiVes to inpfCve C`tEr_li sVs:E^ U.^,t:C.^iiV a!"C rc_1:C2 CVersorav, rain snuto�i cevices, moiswre sanscr5, presSUre ,-Zo UrMC VaIVEs 'circ C6'IEr '12rC 21'e ta-MS necess2rf to inCrCVe the Imcadon SVsten will also ce ccn5icerec. 5cc PROGRAM COST - IF.FIGA-MON INCENTIVE PROGRAM Agency Program Administration i .0,000 Research other Irrigation Incentive Prcarams and presentI findings to City water and park sail. Develop auidellnes for I irrigation incentive program. 1 Pre?are orcorm marketing plan. Develop program forms. Prepare end or the program summary reper, Irrigation Incentive Proarm Web P'age Irrigation Incentive Proarm 3udaet _ 10'000'00 FFIOGI=AM o. L.—'NDSCAPE WA.1EFc CONSERV"-.PION ORDINANCE caci<araund --- -------- arC 'rCla at. a4..4n.diC ..E._._c .-,c c. t,dE Gag E o s •• ^, - _ ".<V� _ • - CE.E.»_ .,.. -.._cyv.a=4".`rnm G ='1 :'-a ]nC. TC:..mw�^.Imn c: � e =m:uN :qte• :.� :ma [ "- - .Sv -'. _ leS9 Adminis Gtion r^CE'c'j s:aG wtil meet with C;ty Era- is C:ECCc_ G; SE('JICe arca. anc CfCVtC Es c iEasiCiliC✓ _a,; `or are Irc..S:—:al CE^':GnSiration prol=_G:. `t = ':Jilt reC :mi7:c.^.0 a nnancai incentive Sy5[Em that nCCES:G siimutate erolec:s:C SiCnliiC'ant2V reCUCa the JCIUmc Cf ':J`cCE.. i.=•JaivatE .�vcicEe CosiS innGvaiive wa°Er er-c:enq; Crccra—ms CrVjIdE unarC:ai fiCEri:`JES ;•,Si arE CCC CC+iiCr.ai :C 'Jlaiar 5_CC{v CCSis li`E :T�arGlr'al CCS:si ihaC are aVCICEC, i nE i".ce.^.C7, wntc:: SucCSiEE^i.Er :n 4E Ncic.` _`C:En CJ plarlN(iC by 'cisC CCnSGE!VO :hE 'i`IaiCinel CCSi C( i"cnaGMc 7e_iEC 'NcSiEYJai$.` i ni5 C: CIEC: W10acC a ihICC pCicnC al bE E C i ai aCCllee ac cr;gllY to C: CUS.cmers. the mar='nai cCSi ci iE. C'JIiiC pciluipi fr m SE ti+reE Vaiues. marginal 'Nai2r silo Civ. W25-:c:Si. Vaier CIC9al, anc WasiEWaiE inE C'mosnauCn of thE 'NasteWaier treats Tlanz CC5i5• Provides a `jarCSi= w1th wnlc:: :C mE39urc theEVE:.^. Puck tn'JESGT�E4C iilct :5 fusilnEd for re— lc=',icn ie Cl Efic:enCt prGlec:s. 2. Char aC: =nae CiCJ CCr'imErC.ci)inCt4Sii3atjrf'.CtIC `:eC:CC 11��a:ef USc ze s;lil ce e5umc _f_: this In VCIVeS fE:^•E:v�^C C.Ci reczrc5 to trE .>__ anc Crat aC:Erfiaz)on of the ClCI tnariE. ce[e:'nlr,E: • Nictu(ne and timmG or water use (indoor and cutcccr) • Numoer cf u=sers by cat eacry • Pcilumnt elscnaice ch2rac:enS'ucz • Detailed InfGrTiadcn about farce user= aevievJ E^_.".isunc Conmeraai E.x:eneJ {nCenCivE rrcc`�r^s r.'cc.am inicrnat:cn from tither C•C.es anC aCcnc:e5 "Viii Ce CJ1leC:ec anc reiiv'vec. Key irfG.f^aCCA scum: InC:uCEs: • Scures --f rtnancxc • ciiciGiiiriJ racuirements • r;nancnc feasoifity Stucies • raze -paver equity issues • t=inanc;al incucanent mecnanisms • Perfcrnar,Ce eValuaticn • ln.erac`cr, with pre:,-eaulient prccra-i • crccrem adnini5i,dive cCsiS c c aC c ;CC :ie CCrGCSe '•'+i C9'JE'.0 C'nC i=nC;. E`11c9^CE of the maCnit.:CE 4 Sae fea_iblllzV _tvc't i ;nciuG in this prG1Ec: 31' savinac arc ccilu^.cn prevention that are pcss;CtE. QElcr• Site (Al InCustnal 'edity has h -_n S21eC:>''+ iCC :hE taasiCIIIP/ Si::C7 arc :nE C:'Jn E.` IS '.VIIIIrC L J.a(:IC:GaI , i rcc._,rice='cls.mc cSaurce r:Cws :=,je!cc .r rrzrcvtnc INC.=..Ic.=. =_:.-a:e ciec: Ccs ;pe -or".. e,,..c1E •. C......r :zn --a a .z 4. ... �. �...� ..�... ..'�:� ...�G .. ,.,�W4Yw w•'!+ttrt„I-.r • 3nGTniJ]i'G+]S �C !6�tli :...e .:=]L�.]t Cn %'•�"1f' %' ' & �:A 'KA"Juvoll mbb.\Vs se V33WVetlt gremmslpubtnf-w atebpat_mCst_dema doe veraom=1M 9 W AM TW 99/00-83 AGREEMENT FOR FUNDING OF THE PETALUMA INDUSTRIAL WATER SURVEY AND INCENTIVE DEMONSTRATION PROGRAM This agreement is between the Sonoma County Water Agency, a body corporate and politic of the State of California (hereinafter "Agency"), and City of Petaluma (hereinafter "City"). RECITALS A. The Agency and City share the goal of promoting increased efficiency of water use in order to reduce operating costs, avoid or defer capital improvement costs associated with expansion of water supply and wastewater disposal systems, minimize associated environmental impacts, and meet criteria and standards of state and federal regulatory agencies. B. Amendment No. 10 to the Agreement for Water Supply and Construction of the Russian River-Cotati Intertie Program, approved by the Agency's Board of Directors (Resolution 97-1128) on August 26, 1997, authorizes the Agency to implement and fund water conservation measures that are cost effective and will reduce water demands on the transmission system. C. The City has implemented a Water Conservation Program which consists of specific programs to improve water efficiency. The City desires the Agency's assistance in funding the Industrial Water Survey and Incentive Demonstration Program as described in Attachments A and B, and hereinafter referred to as "Program." D. The City is requesting a total of 560,000 for Program funding. E. Funding for this Program is available from allocation in the Agency's category of "Water Conservation Program," Sub -object 7247 (Account No. 675108) within the Agency's 1999/00 budget. F. Agency and City do mutually desire to cooperate in the implementation and financing of said Program. AGREEMENT The City and Agency agree as follows: RECITALS The above recitals are true and correct. 2. DEFINITIONS For the purposes of this agreement of following terms and definitions shall be used: Consultant(s) - Consultant(s) hired by City to perform the tasks described in Attachment A associated with the Program and to purchase equipment described in Attachment B. Participant - Sola Optical USA, Inc. is the City water and wastewater customer selected for the Program and is the focus of the tasks described in Attachment A. Funding Agm ment for Petatumd Incustnai Water Survey and Iaconove Demonstration Program 3. COORDINATION City shall coordinate all work with the Agency's Program Administrator, Lynn Hulme, Water Conservation Specialist (Phone: 707-547-1918; Fax: 707-524-3782) or assigned personnel. City contact is Thomas Hargis, Director of Resources and Conservation (Phone: 707-778-4304; Fax: 707-778-4437) or assigned personnel. 4. CITY'S RESPONSIBILITIES City shall complete the Program at its cost and expense, except to the extent of Agency funding provided for in Section 5 below. A. Consultant's Work City shall provide Agency copies of all invoices and work submitted by Consultant B. Program Manaqement: City shall fully operate the Program, as described in Attachments A and B, including contract services. C. Insurance and Indemnification: City shall require its Consultant to insure and indemnify the City and the Agency using the language identified in Attachment C as the language for City and Agency insurance and indemnification requirements and shall provide evidence of such insurance and indemnification to Agency in a form satisfactory to City and Agency. D. Records: City shall maintain complete and accurate records of all transactions in compliance with generally accepted accounting principles for enterprise accounting as promulgated by the American Institute of Certified Public Accountants and the Governmental Accounting Standards Board. Such records shall be available to the Agency at all reasonable times for inspection and analysis. E. Statement of Costs: Within 60 days of completion of the Program as described in Attachments A and B or termination as provided for in Section 7.L, City shall submit to Agency a statement of complete accounting of City's Program costs. F. Invoices: City shall invoice the Agency for costs authorized under this agreement. All invoices submitted to Agency by City shall be clearly marked as follows: • All invoices submitted for services described in Attachment A shall be clearly marked with "City of Petaluma, Funding of Industrial Water Survey and Incentive Demonstration Program, Project(Task No. 3599-09 and Account No. 675108-7247." • All invoices submitted for services described in Attachment B shall be clearly marked with "City of Petaluma, Funding of Industrial Water Survey and Incentive Demonstration Program, Project/Task No. 2319-09 and Account No. 675108-7247." 5. AGENCY'S RESPONSIBILITIES A. Payment Upon execution of this agreement and receipt of an invoice thereof, Agency will deposit with City a maximum of $60,000, which is to finance the following costs: • $25,000 for professional services as necessary to implement the Program • $35,000 to purchase, install, and calibrate metering equipment and integrate software. B. Consultant Agreement: Agency will prepare a draft scope of work for City to consider using to hire Consultants for Program. 6. OWNERSHIP OF EQUIPMENT A. Equipment: Equipment purchased under this equipment and as shown on Attachment B shall remain the property of the Agency. The City may have full use of the aforementioned equipment until which time the agreement is completed or the Agency requests in writing that the equipment be returned. Upon written request from Agency, City shall return the equipment to Agency within 30 calendar days. Furlong Agreement for Petaluma Industnal Water Swvey ano Inoentrve Demonstration Program ADDITIONAL REQUIREMENTS A. Excess Costs: If costs exceed the total amount authorized under this agreement, City shall: 1) not continue the Program; or 2) fund Program costs in excess of the authorized amounts without additional contribution from Agency; or 3) request additional funding from Agency. In such event, City shall submit a written request to Agency's General Manager/Chief Engineer. If Agency's General Manager/Chief Engineer determines that the excess costs are reasonable and that additional funds are available in Agency's water conservation accounts, Agency's General Manager/Chief Engineer may, in his discretion, execute an amendment to this agreement to increase Agency's contribution to Program costs by an additional amount not to exceed $25,000.00. Notwithstanding this authority, Agency is under no obligation to approve such requests. B. General Manaqer/Chief Engineers Authority The Agency's General Manager/Chief Engineer is authorized to execute amendments that cumulatively do not exceed $25,000, pursuant to paragraph 4.A.3 above. C. Refund of Remaining Funds: If the cost accounting statement submitted under paragraph 2.E of this agreement demonstrates that Program costs are less than the amounts paid to City, City shall refund difference to Agency within 30 days of submitting said statement to Agency. D. No Waiver of Breach: The waiver by Agency of any breach of any term or promise contained in this agreement shall not be deemed to be a waiver of such term or provision or any subsequent breach of the same or any other term or promise contained in this agreement. E. Construction: To the fullest extent allowed by law, the provisions of this agreement shall be construed and given effect in a manner that avoids any violation of statute, ordinance, regulation, or law. The parties covenant and agree that in the event that any provision of this agreement is field by a court of competent jurisdiction to be invalid, void, or unenforceable, the remainder of the provisions hereof shall remain in full force and effect and shall in no way be affected, impaired, or invalidated thereby. City and Agency acknowledge that they have each contributed to the making of this agreement and that, in the event of a dispute over the interpretation of this agreement, the language of the agreement will not be construed against one party in favor of the other. City and Agency acknowledge that they have each had an adequate opportunity to consult with counsel in the negotiation and preparation of this agreement. F. No Third -Party Beneficiaries: Nothing contained in this agreement shall be construed to create and the parties do not intend to create any rights in third parties. G. Applicable Law and Forum: This agreement shall be construed and interpreted according to the substantive law of California excluding the law of conflicts. Any action to enforce the terms of this agreement or for the breach thereof shall be brought and tried in the County of Sonoma. H. Ca tions: The captions in this agreement are solely for convenience of reference. They are not a part of this agreement and shall have no effect on its construction or interpretation. I. Merger. This writing is intended both as the final expression of the agreement between the parties hereto with respect to the included terms and as a complete and exclusive statement of the terms of the agreement, pursuant to Code of Civil Procedure Section 1856. No modification of this agreement shall be effective unless and until such modification is evidenced by a writing signed by both parties. J. Time of Essence: Time is and shall be of the essence of this agreement and every provision hereof. K. Term: The term of this agreement shall be one-year from the execution by both parties, unless terminated earlier in accordance with the terms herein. L. Termination: This agreement may be cancelled upon thirty (30) days written notice by either party. Funning Agreement far Petaluma Ineusvml Water Survey anC lmmntrve DemanstmIlm Pmgmm 8. MUTUAL INDEMNIFICATION Each party shall indemnity, defend, protect, hold harmless, and release the other, its officers, agents, and employees, from and against any and all claims, losses, proceedings, damages, causes of action, liability, costs, or expense (including attorneys' fees and witness costs) arising from or in connection with, or caused by any act, omission, or negligence of such indemnifying party. This indemnification obligation shall not be limited in an way by any limitation on the amount or type of damages or compensation payable to or for the indemnifying party under workers' compensation acts, disability benefit acts, or other employee benefit acts. I - Funding Agreement for Petaluma Industrial Water Survey and Incentive Oemonstrauon Program 4 IN WITNESS WHEREOF, the parties hereto have executed this agreement as set forth below. Reviewed as to substance by City: Department Head Reviewed as to funds by City: Finance Director Reviewed as to form by City Attorney: City Attorney Approved as to form: City's Risk Manager CITY OF PETALUMA By: City Manager Date: Attest: City Clerk Reviewed as to substance by Agency: Department Head Reviewed as to funds by Agency: Division Manager - Administrative Services Reviewed as to form by County Counsel: County Counsel SONOMA COUNTY WATER AGENCY By: Chair, Board of Supervisors Date: Attest. County Clerk and ex -officio Clerk of the Board of Directors Funding Agreement for Petaluma Industrial Water Survey and Incentive Demonstration Program 5 ENCLOSURE 1 ATTACHMENT A OUTLINE FOR WATER EFFICIENCY EVALUATION SOLA Optical USA, Inc. • PetaIuma, CA TASK ;1: PLANT WATER BALANCE The plant has a single City water meter for all uses. The first task will be to develop a dynamic water balance for the plant, including indoor and outdoor uses. The main outdoor use is irrigation (front and back separately), which will be estimated from (a) observing the City flowmeter while the irrigation system is on and production is lowest (e. g. on a Sunday), and (b) reviewing the seasonal frequencies and durations of irrigation. The City water used inside the plant can be separated into three main categories: • Deionized process water (DI water), constituting most of the demand, will be measured for hourly demand. . • Sanitary, likely a small fraction of the total, will be calculated as the difference between inflow to the plant and process water discharged to the sewer (the discharge point is just upstream of the sanitary drain). This will be checked against the usage typically expected based on the number of employees. • Clean-up and sinks will be calculated as the difference between (a) plant daily demand measured at the City Water meter, (b) estimated daily demand for irrigation and sanitary, and (c) daily volume measured at the inlets to the DI water systems. The water balance will require a comparison with the volume of wastewater discharged from the plant. Fig. I shows a schematic of water use in the plant and measurement locations. RO-reject volumes will be verified from (a) the difference between the daily volumes measured at the D1 - system inlets and the high and low pressure DI water supply, and (b) applying the fixed RO-reject ratio for each system to the daily volume of DI water produced. The volume of water (and salt) used for softener regeneration will be estimated from an initial measurement of total water usage during regeneration and a Iog of regenerations. Wastewater treatment chemical usage will be estimated from annual purchasing accounts, to create an average unit usage (e.g. lb-chemical/gat- wastewater)- TASK #2: EVALUATION OF WATER USE IN CAST -CLEANING Water is used in batches in the pre -wash and brush -wash systems, so no flowmeters will be needed, but a time log of batches, cast throughputs, and cleaning additives will be required. For each piece of equipment, the water temperature and volume must be verified at least 3 times (for water this will require a totalizing meter to capture the evaporation volume). The flowrate through the cleanup "guns" will be measured manually (with a bucket and stopwatch) at the beginning of the project. To obtain an estimate of averaze batch cleanup volume, times will be observed and recorded on at least 3 days. End -of -day cleanup times will also be observed and measured. SOLA Q)rlciencv Evaluation Page 1 of 9 Fig. 2 shows a schematic of water use in cast -cleaning, and the main parameters to be recorded in the logs. TASK 0: EVALUATION OF WATER USE IN COATING The large number of parallel coating lines probably creates the largest process demand for Dl water in the plant. This evaluation will focus on the coating lines for CR -34 lenses, with detailed measurements for one "4 -pack" assembly of machines. Fig. 3 shows a schematic of water use in the coating machine, and other parameters to be recorded. For the high-pressure rinse, a clamp -on flowmeter will be installed on the high-pressure DI water supply line. To correlate flow with lens throughput and the number of machines operating at a given time, the number of ON/OFF pulses to the automatic valves from the machine PLCs will also be counted. To test nozzle performance (and wear and tear), flowrates for new nozzles will be compared to the flowrate.after a large number of lenses (e.g. 10,000) have been processed. Testing will require running the machines for a given number of lenses (e.g. 3 batches of 100 lenses each on at least 2 machines operating simultaneously). For KOH (potassium hydroxide) cleaning, a time log of KOH and DI water makeup volumes to the recirculation system, along with the temperature will be required. KOH dragout can be measured by diverting the recirculation drain from the high-pressure rinse section, and titrating the sample for KOH (e.g. 3 batches of 100 lenses each on at least 2 machines operating simultaneously). For the low-pressure rinse, a totalizing meter will be required to measure daily DI water makeup. To help evaluate the impact of KOH, a time log of pH measurements in the recirculation tank will be required. To evaluate the build up of solids, several samples of Suspended Solids will be taken and correlated to lens throughput. To evaluate the relative load of KOH from the rinses (dragout) and spent KOH cleaning solution (replenishment and dumps), a pH recorder will be installed on the combined drain for the "4 - pack". TASK 94: EVALUATION OF WATER USE IN EDGING There are several types of edgers, depending on the type of lens material, and whether the edges are cut or ground. All washing is by high-pressure DI water sprays; grinding requires 2 -stage rinsing. For this project, three types of machines will be evaluated. Since the machines have fixed spray nozzles and durations, water usage can be calculated from the number of ON/OFF pulses to the automatic valves from the machine PLCs.. To test nozzle performance (and wear and tear), flowrates for new nozzles will be compared to the flowrate after a large number of lenses (e.g. 10,000) have been processed. Testing will require running the machines for a given number of lenses (e.g. 3 batches of 100 lenses). Fig. 4 shows a schematic of water use in the edginglcutting machines, and other parameters to be recorded; Fie. 5 shows the same for edging/grinding machines. SOLH Efjciencv Evaluation Page: of 9 TASK 45: EVALUATION OF POTENTIAL WATER EFFICIENCY IMPROVEMENTS Evaluation Parameters The evaluations will include: • Reductions in water/wastewater volumes; daily and annual. • Reductions in unit water demands (gallons/lens) for specific processes. • Reductions in unit resource demands (e.g. electricity/gallon DI water; KOH/lens). • Installation costs and annual savings for each process and for plant -wide combinations. • Payback periods with and without City of Petaluma incentive program. Irrigation Possible improvements might include: • Installing a separate irrigation meter to qualify for lower rates. • Leak detection and repair. • Irrigation scheduling with local CEvIIS data. • Piping and landscaping modifications to allow (and maximize) use ofRO-reject. RO/DI Operations Possible improvements might include: • Leak detection and repair. • Additional controls for reducing the reject ratio. • Additional controls for reducing softener regeneration frequency. • Increasing pump and motor efficiencies. • Reducing piping system pressure losses. • Apply RO-reject for equipment bearing seals (e.g. pump seals). • Waste heat exchange to increase RO-membrane flux. SOLO E ciencvEvaluation Page 3 of Cast Cleaning Possible improvements might include: • Gas or waste heat to reduce the cost of heating DI water with electricity. • Replacing existing cleanup guns with a high-pressure/low-flow system. • Monitoring to decrease the frequency of dumping. Coating Possible improvements might include: • Leak detection and repair. • Elimination of any continuous rinse flows. • Increasing the frequency of nozzle maintenance/replacement. • Installation of air -knives and/or PVA rollers to reduce dragout. • Procedural changes to minimize overflows from KOH makeup. • Optimization of spray duration/flowrate to minimize DI water demand while maintaining coating quality and lens throughput. Edging Possible improvements might include: • Leak detection and repair. • Elimination of any continuous rinse flows. • Increasing the frequency of nozzle maintenance/replacement. • Installation of air -knives and/or increasing air blow -off after edging. • Optimization of spray duration/flowrate to minimize DI water demand while maintaining lens throughput. • Recirculation system from rinse �2 to rinse #I after grinding. Sanitary Install additional low -flush toilets and bathroom fixtures wherever appropriate, utilizing the City ofPetaluma's incentive program. SOL 3Y1ciencv Evaluation Page 4 of —---•---•—•—•-----•-----•---•-----•--- — — — ------ I I 1 a I � 2 N i W Y J ? I m V N N3 ❑i K mi 0! N N OU. cI ml a. N N L m m a`� E n V am G u y j I O1 I 'o m E �N+ C N N N Lo 6 n aw 1 v as I mG ova `a O d p I I" wl n 0 vNi N3 ❑i K mi 0! N N OU. cI ml a. 0 c o m m � o v m Eeumv-- E'er m_ _ 3 E U m v U tq F= U 1 v C I � m m � U � c m 051 LL N N L m m a`� E n am u y m 'o m E �N+ C N Lo n 0 c o m m � o v m Eeumv-- E'er m_ _ 3 E U m v U tq F= U 1 v C I � m m � U � c m 051 LL i m c m m CQ d [D CL rF i N a m H E l N G (Q � U m d m c a - E >' � E v L Et C p w » Q m J a O W A N d LL m pm m ~ m 2 Z 0 G E > a tu � � J T SUS a S p w d- E O O m C m E a m m U C m U o� ro a Z z 0 a Z F a p U Z w w C J o cc w U vi z c w c z � n � m a 6cv5 m m u d C a J C a ro J E c v S pm ~ m 2 Z E > a tu � � J 1 SUS a S p w d- E O m m C m E J o cc w U vi z c w c z � n � m a 6cv5 m m u d C a J C a ro J E c v S u N v m E m (D's F Q� C R m m m � R c U_ CI c W Q O a m C 4 Q1 10 W s <Jj � N m c 3 N � c c �a N CIO N. cc m °- y to C N N c W > c0 _Z C > U E m E 5° cc Q O a m C 4 Q1 10 W s <Jj N d 3 N � c c �a w C C NmN > U OC Z N > Ecc . ,... . o E m m Q O a m C 4 Q1 10 W s <Jj m a c r o o g mac m _ ¢a Sa a S O N o O N 0 ry ry P �1 3 z Q} N U wo 0 c e Ilk n o o rv' n � F p° o? W = N S OI � w J N m m m g o aO ry •� a oowPmmam N v m ry mar 3 j'E � g g i "p Qg � eY o Q if ` x � _ v$ nm m ry rvi a o N P N- O 0 M Oi (V m m P .. w _ N IR j O o S! o o N a"momemm'm aa"o'em`�rv'Ra u m r w C w m 0» m M N N ; V Y Yl O fV lV H O m U r N N N N ry N m P �° a c O r ¢ N v w = °¢T U e - uai'nme°ALL>ti � r u emp m°s�i°>'ti � uam�irc n °LL>°S� ATTACHMENT B ENCLOSURE 2 INSTRUMENTATION PACKAGE FOR SCWA INDUSTRIAL WATER EFFICIENCY PROGRAM ITEMS List Extended Sales Tax Price Qty Price (qg 7.5%) Shipping TOTAL Commercially Available Items Panametrics XMT868 Transmitter/Data Logger with 70,000 data point storage and temperature monitor option Part No. XMT868-2-11-OR-0211 Panametrics small pipe (1/2" to 2°) Ultrasonic Transducers and clamping fixtures' PartNo. CF-LP-2EM-40NM-1 Panasonics Instrument Data Manager Software for calibrating and uploading stored data Part No. 910-185 Transducer Cable Extensions needed for long distance connection between the data logger and input and output probes Part Nos. C(90)N3 and Adaptor LFBM DDE driver or equivalent for PLC interface' - Electrical parts for discrete input to Panametrics datalogger' Small mechanical meters w/ fittings3 Miscellaneous materials allowance Subtotal $3,740 3 $11,220 $842 $12,062 $1,195 5 $5,975 $448 $30 $6,453 $295 1 $295 $22 $317 $150 2 $300 $23 $323 $500 1 $500 $38 $20 $558 $100 1 $100 $8 $108 $800 $1,500 $22,119 Custom Services 4 SOLA Project: install and calibrate equipment, develop and integrate software, synchronize production data with water flow data for processes examined, arrange for routine data transfer, create and maintain Access database, and train personnel. 512,900 Subtotal $12,900 TOTAL $35,019 Notes 1. The Panametrics items are selected for their ability to sense flow in liquids ranging from ultrapure to dirty. Additional transducers desioned for larger diameter pipes maybe required in the future. 2. Estimates for the sake of completion. Vendor not yet identified. 3. Mostly hot water meters for use on hoses used for manual cleaning operations. 4. Provided by Santa Rosa industrial automation consultant/chemical engineer Edward C. Myers ATTACHMENT C WORDING FOR CONSULTANT CONTRACT INDEMNIFICATION Consultant agrees to accept all responsibility for loss or damage to any person or entity, and to defend, indemnify, hold harmless, and release Agency and City of Petaluma, their officers, agents, and employees, from and against any and all actions, claims, damages, liabilities, or expenses that may be asserted by any person or entity, including Consultant, arising out of or in connection with the performance of Consultant hereunder, whether or not there is concurrent negligence on the part of Agency, but excluding liability due to the sole active negligence or sole willful misconduct of Agency. This indemnification obligation is not limited in any way by any limitation on the amount or type of damages or compensation payable to or for Consultant or its agents under workers' compensation acts, disability benefits acts, or other employee benefit acts. INSURANCE The Consultant shall obtain insurance acceptable to City of Petaluma from a company or companies acceptable to the City. The required documentation of such insurance shall be furnished to the City at the time Consultant returns the executed contract. The proper insurance shall be provided within ten (10) calendar days after the bidder has received the notice that the contract has been awarded and prior to the City executing the contract and issuing a notice to proceed. The Consultant shall not commence work nor shall he allow his employees or subcontractors or anyone to commence work until all insurance required hereunder has been submitted and approved and a notice to proceed has been issued. With respect to performance of work under this contract, Consultant shall maintain and shall require all of its subcontractors to maintain insurance as described below: A. Workers' Compensation Insurance with statutory limits as required by the Labor Code of the State of California. Said policy shall be endorsed with the following specific language: This policy shall not be canceled or materially changed without first giving thirty (30) days prior written notice to the Sonoma County Water Agency and the City of Petaluma. Commercial General Liability Insurance covering bodily injury and property damage utilizing an occurrence policy form, in an amount no less than $1,000,000 combined single limit for each occurrence. Said commercial general liability insurance policy shall either be endorsed with the following specific language or contain equivalent language in the policy: 1. The Sonoma County Water Agency and the City of Petaluma, their officers, agents, and employees, are named as additional insured for all liability arising out of the operations by or on behalf of the named insured in the performance of this contract. 2. The inclusion of more than one insured shall not operate to impair the rights of one insured against another insured, and the coverage afforded shall apply as though separate policies had been issued to each insured, but the inclusion of more than one insured shall not operate to increase the limits of the company's liability. 3. The insurance provided herein is primary coverage to the Sonoma County Water Agency and the City of Petaluma with respect to any insurance or self-insurance programs maintained by the Sonoma County Water Agency or the City of Petaluma. 4. This policy shall not be canceled or materially changed without first giving thirty (30) days prior written notice to the Sonoma County Water Agency and the City of Petaluma. Funding Agreement for Petaluma Indusmei Water Survey and Incenuve Demonstration Program C-1 C. Automobile Liability Insurance covering bodily injury and property damage in an amount no less than $500,000 combined single limit for each occurrence. Said insurance shall include coverage for owned, hired, and non -owned vehicles. Said policy shall be endorsed with the following language: This policy shall not be canceled or materially changed without first giving thirty (30) days prior written notice to the Sonoma County Water Agency and the City of Petaluma. Funning Agreement lar Petaluma tnd. nalWier Survey ana Incenlrve Oemonsuiwn Program Ci -2 EX Resolution No. N.C.S. I of the City of Petaluma, California 3 4 APPROVING A PROFESSIONAL SERVICES AGREEMENT 5 FOR THE INDUSTRIAL WATER SURVEY 6 AND INCENTIVE DEMONSTRATION PROJECT 7 WITH PACIFIC TECHNOLOGY ASSOCIATES 8 9 10 WHEREAS, the City of Petaluma recognizes that water is an essential and limited resource: and 11 12 WHEREAS, the City of Petaluma has a 5 year Capital Improvement plan (CIP) for Water 13 System Improvements which includes Project 99931 for water conservation; and 14 15 WHEREAS, the City of Petaluma has entered into a cooperative agreement with the Sonoma 16 County Water Agency to fund and administer a Industrial Water Survey and Incentive Program 17 included in the Water CIP Project 99931 for Water Conservation; and 18 19 WHEREAS, the City of Petaluma has determined that conducting extensive water efficiency 20 surveys in industrial facilities is one of the strategies that it will employ to achieve its water 21 conservation goals, and 23 NOW, THEREFORE, BE IT RESOLVED the Petaluma City Council authorizes the City 24 Manager to enter into a Professional Services Agreement for the Industrial Water Survey and 25 Incentive Demonstration Project with Pacific Technology Associates. 26 27 28 S\SB\WATER CONSERVATIONTunding with SCWA & Pacific Technology Agreement 29 Under the rower and authority conferred upon this Council by the Charter of said City. REFERENCE: I hereby certify the foregoing Resolution was introduced and adopted by the Approved as to Council of the City of Petaluma at a (Regular) (Adjourned) (Special) meeting form onthe ......... __....... ...... day of ....... ....... ............................. .........•. 19 ....... •, by the following vote: City Attorney AYES: NOES: ABSENT: ATTEST: ....................... City Clerk C,\ IU HS ars. Nn... .... .... ... ._.... NCS. Mayor PROFESSIONAL SERVICES AGREEMENT INDUSTRIAL WATER SURVEY AND INCENTIVE DEMONSTRATION PROJECT PROJECT NO. 9931 THIS AGREEMENT is made and entered into this day of March . 2000 by and between the City of Petaluma, a Municipal Corporation and a charter city (hereinafter referred to as "City") and Pacific Technoloev Associates. 210 Fourth Street. Suite B. Petaluma. CA 94952 (hereinafter referred to as "Consultant"). The parties hereto enter into this Agreement for the purpose of Consultant providing professional services to City under the following terms and conditions: In consideration hereof; and the mutual promises, contained herein, the parties agree as follows: 1. Consultant shall provide the services described in Exhibit "A" attached hereto and incorporated herein by reference. 2A. City shall compensate Consultant for services rendered hereunder under the following terms: $25.000 for professional services necessary to implement the Industrial Survey and Incentive Program at the demonstration site. $35.000 to purchase, install and calibrate metering equipment and integrate software. 2B. Notwithstanding any provision herein, Consultant shall not be paid any compensation until such time as Consultant has on file with the City Finance Department current information requested on the "Vendor Information" form available from the City, and has obtained a currently valid Petaluma Business Tax Receipt pursuant to the Petaluma Municipal Code. 2C. The Consultant is also required to have paid the appropriate business tax and have a currently valid Petaluma Business Tax Receipt pursuant to the Petaluma Municipal Code. 2D. In no case shall the total contract compensation exceed 560.000 without written authorization by the original signatory or his or her designee. Further, no compensation for a section or work program component attached with a specific budget shall be exceeded without prior written authorization of the original signatory or his or her designee. With every monthly invoice, a brief narrative shall be provided by Consultant along with a revised schedule of progress and supporting materials. 3. Services performed by Consultant to City which exceed those services described in Section 1 herein, shall be considered "extra work." Extra work shall only be performed by Consultant upon written authorization of Director of Water Resources and Conservation. Consultant shall be compensated for extra work at the following rates: $100.00 ner hour. 4. Use Section 4(a) or 4(b) - delete inapplicable section. (a) The term of this Agreement commences on March 28. 2000. and ends on March 28. 2001. However, either party may terminate this Agreement upon providing the other party ten (10) days' written notice of such termination, given in the manner provided in Sections 6 and 11 herein. Consultant represents that Consultant possesses distinct professional skills in performing said services. City has relied upon said representations as a material endorsement to enter into this Agreement. Consultant shall, therefore, provide properly skilled professional and technical personnel to perform all services under this Agreement. It is further understood and agreed that Consultant, including his/her agents and employees, is not an agent or employee of the City, but rather solely responsible for his/her acts and omissions. Consultant has full control over the means and methods of performing said services, and Consultant understands that said services are being performed as an independent Consultant. Nothing in this Agreement shall in any way be construed to constitute the Consultant, or any of its agents or employees, as an agent, employee or representative of the City. 6. Termination. This Agreement may be terminated or suspended by the City upon ten (10) days' written notice. Said notice will be commenced by the City Manager. Upon receipt of such notice, Consultant shall immediately stop all work in process under this Agreement. In the event the City delivers, the Consultant shall be entitled to payment for all services performed to date of termination to the extent they were actually performed in accordance with this Agreement. Consultant shall perform with his/her own organization, all work specified and required in this Agreement. No assignment or transfer in whole or in part of this Agreement shall be made without the written consent of the City. Consultant may retain or subcontract for the services of other necessary consultants, with the written approval of City. Any such subconsultants shall comply, to the extent applicable, with the terms and conditions of this Agreement and all of the obligations and duties imposed upon the Consultant hereunder. 9. Consultant agrees to fully comply with all appropriate local, city, state and federal laws, regulations and ordinances governing performance of contractual services required hereunder, in accordance with professionals' standards of care. 10. During the performance of this Agreement, Consultant will not discriminate against any employee or applicant for employment because of race, religion, creed, color, national origin, sex or age. Consultant shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, creed, color, national origin, sex or age. 11. All notices required or permitted by this Agreement, including notice of change of address, shall be in writing and given by personal delivery or sent by United States Mail, postage prepaid and addressed to the parties intended to be notified. Notice shall be deemed given as of the date of delivery in person or as of the date deposited in any post office or any post office box regularly maintained by the United States Government. Notice shall be given as follows: City: City Clerk City of Petaluma Post Office Box 61 Petaluma, California 94953 Consultant: Pacific Technologv Associates, 210 Fourth Street. Suite B Petaluma. CA 94952 12. All bills shall be sent to the designated project contact person on a monthly basis or upon task completion, whichever is appropriate. Bills will be checked by said contact person for compliance with the provisions of this Agreement and then forwarded to "Accounts Payable." City shall endeavor to make payment of said bill within thirty (30) days of receipt. 13. All original papers, documents or computer material on disk or microfilm, and copies thereof, produced as a result of this Agreement, shall be the property of City and may not be used by Consultant without the consent of City. Copies of such documents or papers shall not be disclosed to others without the written consent of the City Manager or his designated representative. 14. Consultant hereby covenants and agrees to, and shall, indemnify, save harmless and defend, the City of Petaluma, its agents and/or employees against all claims, demands, costs, and liabilities for damages of any kind or nature including, but not limited to, damages for death or injury to any person (including Consultant's employees and agents) or damage or destruction to any property of either party hereto or third persons in any manner arising out of or occasioned by Consultant's performance of its obligations pursuant to this Agreement whether or not there is a contributing act or omission or concurrent, passive or active negligence or otherwise on the part of the City, except those claims arising from the established active sole negligence or sole willful misconduct of the City or the City's employees. The City may retain so much of the money due Consultant as shall be considered necessary, until disposition has been made of claims or suits for damages as aforesaid. 15. Insurance. See "Insurance Requirements for Consultants" in Exhibit B 1 or B2 attached hereto and incorporated herein by reference. Please check and initial exhibit to be incorporated: Exhibit B I Exhibit B2 X 16. Amendment. This Agreement may be amended, provided said amendment is in writing and signed by both parties. 17. If litigation ensues which pertains to the subject matter of Consultant's services hereunder, Consultant, upon request from City, agrees to testify therein at a reasonable and customary fee. 18. This Agreement constitutes the entire agreement between the parties. 19. Breach. City reserves the right to terminate this Agreement immediately in the event of a breach by Consultant. It is further understood and agreed that in the event of a breach of this Agreement by Consultant, in addition to all other remedies, penalties and damages provided by law, City may provide such services or retain another consultant to provide such services, and deduct from the amounts due or to become due to Consultant the actual costs to City to provide or obtain such services. 20. This contract is the product of negotiation and compromise on the part of both parties and that the parties agree, notwithstanding Civil Code section 1654, that in the event of uncertainty, the language is not to be construed against the party causing the uncertainty to exist. 21. Aoolicable Law. Each party's performance hereunder shall comply with all applicable laws of the United States of America, the State of California, and the City of Petaluma. This Agreement shall be enforced and interpreted under the laws of the State of California and the City of Petaluma. If any part, term or provision of this Agreement shall be held void, illegal, unenforceable, or in conflict with any law of the federal, state or local government having jurisdiction over this Agreement, the validity of the remaining portions or provisions shall not be affected thereby. 22. Non -Waiver. The City's failure to enforce any provision of this Agreement or the waiver thereof in a particular instance shall not be construed as a general waiver of any part of such provision. The provision shall remain in full force and effect. 23. Severabilitv. If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. 24. Mediation. The parties agree to make a good faith attempt to resolve any dispute arising out of this Agreement through mediation prior to commencing litigation. The parties shall mutually agree upon the mediator and shall divide the costs of mediation equally. 25. Consultant's Books and Records. A. Consultant shall maintain any and all ledgers, books of accounts, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services, or expenditures and disbursements charged to the City for a minimum period of three (3) years or for any longer period required by law, from the date of final payment to Consultant pursuant to this Agreement. B. Consultant shall maintain all documents and records which demonstrate performance under this Agreement for a minimum period of three (3) years or for any longer period required by law, from the date of termination or completion of this Agreement. C. Any records or documents required to be maintained pursuant to this Agreement shall be made available for inspection or audit, at any time during regular business hours, upon written request by the City Manager, City Attorney, City Finance Director, or a designated representative of these officers. Copies of such documents shall be provided to the City for inspection at Petaluma City Hall when it is practical to do so. Otherwise, unless an alternative is mutually agreed upon, the records shall be available at Consultant's address indicated for receipt of notices in this Agreement. D. Where City has reason to believe that such records or documents may be lost or discarded due to dissolution, disbandment or termination of Consultant's business, City may, by written request by any of the above-named officers, require that custody of the records be given to the City and that the records and documents be maintained in Petaluma City Hall. Access to such records and documents shall be granted to any party authorized by Consultant, Consultant's representatives, or Consultant's successor in interest. 5 IN WITNESS WHEREOF, the parties hereto have executed this document the day, month and year first above written. CITY OF PETALUMA City Manager ATTEST: Bir Title CONSULTANT City Clerk Address APPROVED AS TO FORM: City Attorney APPROVED: Department Head APPROVED: Risk Manager APPROVED: Finance Director prof•« 11/1/99 (fink) I City State Zip Taxpayer I.D. Number Petaluma Business Tar Receipt Number INDUSTRIAL WATER EFFICIENCY Program Development Steps Pacific Technology Associates • 29 November 1999 OBJECTIVE Create a simple and effective program to improve industrial water efficiency. Using a financial incentive provided by a new Public/Private partnership, this program seeks to: • Reduce sector water use by 30% (630,000 gpd for Petaluma) within 15 years; • Limit public investment to the marginal cost of new water and wastewater infrastructure; and • Maximize water savings and economic benefits by simultaneously improving the efficiency with which other natural resources are used. The economic benefits of water efficiency in the industrial sector far surpass those created by programs targeted at other water use sectors. For Mishi Apparel, Inc., the first Case Study in Petaluma, the economic value of a 46% reduction in water use will be multiplied twenty -fold by related chemical and energy savings. In addition to upstream watershed protection, a well-designed Industrial Water Efficiency Program will deliver unique and significant economic development and pollution prevention benefits. STEPS Implement Demonstration Projects I. Afshi Apparel, Inc An audit ofMishi's dyehouse was conducted as part of previous work funded by the Rose Foundation.' Project implementation is now underway, with professional support funded by the City of Petaluma. Equipment installation will commence early in 2000. 3. SOL -1 Optical USA, Inc. Headquartered in Petaluma, SOLA Optical USA manufacturers approximately 1/3 of all ophthalmic lenses worn in the United States. The Pacific Technology team, working with senior SOLA technical staff, has developed a plan to determine cost-effective water saving strategies for this high-tech facility. Implementation will require a 560,000 investment: • S25,000 for professional services (see Enclosure 1); and • S35,000 for instrumentation (clamp -on flowmeters, associated data loggers, and related data integration services — a transportable package available to the Agencv to verifv water savings of future projects: see Enclosure 2).2 Pacific Technology Associates, Industrial Ut ater Ef ciencv Program Proposed for the Gr, ai Petaluma and the Sonoma Count, Warer.dgency (April, 1999) This equipment, needed to precisely characterize .vater use in manufacturing operations. is a}:m to USGS stream gages relied upon by v%ater resource engineers at an earlier era_ To minimize costs, it is assumed that the Agency's equipment for capturing rent -tune usage at the City water meter may also be used. Program Deveiopment Steps: page I of 3 It is likely that these two demonstration projects will alone save as much water as was predicted for the entire first -generation Commercial, Industrial, and Institutional (CII) Program proposed for Petaluma by Montgomery Watson in 1995, and for the same cost (including consulting fees and a financial incentive for saved water).' The nest step is therefore to determine how to expand this service to Petaluma's remaining 850+ CII customers. Develop Program The objective is to grow the first -generation CH Program for Petaluma from one that reduces sector water usage by a half percent to a second -generation Program capable of 30% (saving 8,600 and 630,000 gpd, for public investments of SI 80,000 and $7.9 million, respectively).{ Achieving this result will require methodical work to identify and overcome the institutional barriers that currently shortchange the economic potential of this water efficiency program. As with any other innovation, it is imperative that those to whom the program is directed perceive that the benefits clearly outweigh the effort required. Demonstration projects address the credibility of the program, but are alone insufficient to stimulate action, Widespread adoption requires an artful program design that presents the following characteristics:5 L Relative Advantage: Senior business and institutional officers perceive that participation in the City's Program will be advantageous for their organizations. Z. Simple: The Program is simple to understand and easy to apply. 3. Incremental: Customers may participate in stages — that is, commitment to a massive project is not required at the outset. I. Observable: Results obtained by those who participate in the Program will be easily apparent and attractive to those who have not yet participated. 5. Compatible: Efficiency measures are relatively easy to install, operate, and maintain: they fit with existing operations. Financial incentive payments are spread over time to be compatible with the pace of the public budget process. These objectives, operating within the conceptual framework established by the consultant's earlier Study, will guide program development. An estimated $100,000 is ' tt"crar and 7i'asreiearer Lj%ictenc , .9ioided Cost Stud, (September, 1995). This screened a %vide ranee of Best Management Practices against die avoided costs for die Agency and its contractors. A significant advance in m -pored water efficiency planning, it provides the starting point for the present ivork. The costs and savuies estimated by Monteomery Watson for the CII sector are presented in Enclosure 3. 'lie Monteomery Watson estimate is detailed in Enclosure 3. The 57.9 mullion figure projected for die neiv program represents 630,000 gpd saved for riventy years, valued at the currendy accepted avoided cost of 51_'9/CCF The unit cost for die now program is approximately 399, o less than for its predecessor. ` From the classic ivork in this area: Everett M. Rogers and F. Floyd Shoemaker, Communication of Innovations: A Cross -Cultural Approach, Tice Free Press, New York, 1971: 476 pp. Program Developntent.,tecs: page 2 oi.i required during the year 2000 to launch the program.' Additional work may be required thereafter to expand quality service into the commercial sector, to track and share technical results to enable continuous improvement, and to otherwise respond to feedback from the working program. Petaluma provides exceptionally fertile ground for developing this program, for visionary policy frameworks are emerging here that will require such a pragmatic action plan_ At the City level, ecological sustainability will be addressed by a new committee of the Chamber of Commerce, and by the City's General Plan (now being revised). At the County, the Director of the Waste Management Agency is leading efforts to integrate principles of sustainability into operations, and the Economic Development Board's annual .straight to the Bottom Line Conference headlines the value of eco -efficiency. Treatises such as Natural Capitalism? provide intellectual direction for increasing such efforts, and UNEP's global perspective$ morally compels it. The value of creating modern public policy instruments such as the one proposed, capable of amplifying efforts in the direction Petaluma is moving and the world requires, cannot be underestimated. OUTCOMES This industrial water efficiency program will be beneficial in several ways, in that it will: • Reduce water resource costs to public and private sectors • Increase private sector profitability through lower water use and related resource savings • Implement a morally -sound program with regard to the comprehensive preservation of natural resources • Improve quality of life ' -nus anticipates simplifying die admimsuauon and implementation of die program, creating teciunques to minimize cream skinuning, developing measurement and verification procedures and transferring dorm to die Sonoma County water Agency, ince-rating rite program with die City`s General Plait working with participants (including engineers. vendors, and local banks), exploring additional sources for financial incentives. and so forth. Specific tasks and fees will be developed uitli die City of Petaluma and die Aecncv. Paul Hawken..Aunory Lovins, and L. Hunter Lovins, Vaturat Capitalism: Creaung the Vert Industria! Revolution, Little. Brown 1999 ' united Nations Environment Progmtmnc. Gobal Ouiloo '000. Earthscan. 1999 416 pp Excerpts Cron its Oven -lex {posted at hnp:l/-nd'_.cr.u_gs.2ot:eLo2OOO/ov-z/0002.litm) "The continued povenv of the mniorire of die pi:met's inhabitants and exccssice consumption b% die minority arc die two major causes of environmental desradatwn. -nic present course is unsustainable and postponing action is no longer an option." "A tenfold reduction in resource consumption in die industrialized countries is a necessan long- term target if adequate resources are to be re!eased for die needs of dcccioping countries " (Emphasis added.) Program pace 2 tit'✓ ENCLOSURE 1 OUTLINE FOR WATER EFFICIENCY EVALUATION SOLA Optical USA. Inc. • Petaluma, CA TASK ml: PLANT WATER BALANCE The plant has a single City water meter for all uses. The first task will be to develop a dynamic water balance for the plant, including indoor and outdoor uses. The main outdoor use is irrigation (front and back separately), which will be estimated from (a) observing the City flowmeter while the irrigation system is on and production is lowest (ea. on a Sunday), and (b) reviewing the seasonal frequencies and durations of irrigation. The City water used inside the plant can be separated into three main categories: • Deionized process water (DI water), constituting most of the demand, will be measured for hourly demand. • Sanitary, likely a small fraction of the total, will be calculated as the difference between irulow to the plant and process water discharged to the server (the discharge point is just upstream of the sanitary drain). This will be checked against the usage typically expected based on the number of employees. • Clean-up and sinks will be calculated as the difference between (a) plant daily demand measured at the City Water meter, (b) estimated daily demand for irrigation and sanitary_ , and (c) daily volume measured at the inlets to the DI ware- systems. The water balance will require a comparison with the volume of wastewater discharged from the plant. Fig. 1 shows a schematic of water use in the plant and measurement locations. PO -refect volumes will be verified from (a) the difference between the daily volumes measured at the DI - system inlets and the high and low pressure DI water supply, and (b) apolying the fixed RO-reject ratio for each system to the daily volume of DI water produced. The volume of water (and salt) used for softener regene-ation will be estimated from an initial measurement of total agate- usage during regeneration and a log of re_enerations Wastewater treatment chemical usage '.viil be estimated from annual Purchasing accounts. to create an average unit usage (e g Ib-chemicahstal- wastewaten TASK TZ: EVALUATION OF WATER USE IN CAST -CLEANING Water is used in batches to the ore -wash and brush -wash systems, so no cwmete-s .ctil be needed, but a time lost of batches, cast throu_houts. and cleaning additives -.viii be reoutred For each niece of equipment, the %vater temperature and volume must be verified at leas; : times (,.-or water this "iil require a totalizing me!e- to capture the evaporation volume; The ilowrate through the cleanup "nuns" .v:ii be measere r,anua:i:..v;th _'cuc:.;et cc stopwatch) at the begmning of the proiec: -o obtain a.. esamate of 2vera2e .at cleanup •rolume. times will be obse^:ed and recorded ,in at ;east _ Jags End -r=d _:ecr.ec :.n:es %1;1 also be observed and measured Fla. 2 shows a schematic of water use in cast -cleaning, and the main parameters to be recorded in the loos. TASK m3: EVALUATION OF WATER USE IN COATING The large number of parallel coating lines probably creates the largest process demand for D1 water in the plant. This evaluation will focus on the coating lines for CR -39 lenses, with detailec measurements for one •`4 -pack" assembly of machines. Fig. 3 shows a schematic of water use in the coating machine, and other parameters to be recorded. For the high-pressure rinse, a clamp -on flowmeter will be installed on the high-pressure DI water supply line. To correlate flow with lens throughput and the number of machines operating at a given time, the number of ON/OFF pulses to the automatic valves from the machine PLCs will also be counted. To test nozzle performance (and wear and tear), flowrates for new no«.les will be compared to the flowrate a8er a large number of lenses (e.g. 10,000) have been processed. Testing will require running the machines for a given number of lenses (e.g. 3 batches of 100 lenses each on at least 2 machines operating simultaneously). For KOH (potassium hydroxide) cleaning, a time log of KOH and DI water makeup volumes to the recirculation system, along with the temperature will be required. KOH dragour can be measured by diverting the recirculation drain from the high-pressure rinse section, and titrating the sample for KOH (e.g. 3 batches of 100 lenses each on at least 2 machines operating simultaneously). For the low-pressure rinse, a totalizing meter will be required to measure daily DI water makeup. To help evaluate the impact of KOH, a time log of pH measurements in the recirculation tank will be required. To evaluate the build up of solids, several samples of Suspended Solids will be taken and correlated to tens throughput. To evaluate the relative load of KOH from the rinses (dragout) and spent KOH cleaning solution (replenishment and dumps), a pH recorder will be installed on the combined drain for the "'4- pack" - TASK #4: EVALUATION OF WATER USE IN EDGING There are several types of edgers, depending on the type of lens material, and whether the edges are cut or ground All washing is by high-pressure DI water sprays; grinding requires --stage nnsmg For this project, three types of machines will be evaluated. Since the machines have fixed sorav nozzles and durations, water usage can be calculated from the number of ON/OFF pulses to the automatic vaives from the machine PLCs To test nozzle pe-formance Land wear and tear), flowrates for new ttoz_ies wiil be compared to the ilowrate after a large number of lenses (e.g. 10.000) have been processed. Testing •.viii require running :he machines for a Given number of lenses (e.g. 3 batches of 100 lenses) Fitt. -1 shows a schematic er water use in the edging+'cutting machines, and other parameters to be recorded. F:g shows [he same for edgingiurinding machines. TASK R5: EVALUATION OF POTENTIAL WATER EFFICIENCY IMPROVEMENTS Evaluation. Parameters The evaluations will include: • Reductions in water/wastewater volumes; daily and annual. • Reductions in unit water demands (gallons/lens) for specific processes. • Reductions in unit resource demands (e.g. electricity/gallon DI water; KOH/lens). • Installation costs and annual savings for each process and for plant -wide combinations. • Payback periods with and without City of Petaluma incentive program. Irrigation Possible improvements might include: • Installing a separate irrigation meter to qualify for lower rates. • Leak detection and repair. • Irrigation scheduling with local CEvIIS data. • Piping and landscaping modifications to allow (and maximize) use ofRO-reject. RO/DI Operations Possible improvements might include: • Leak detection and repair. • Additional controls for reducing the reject ratio. • Additional controls for reducing softener regeneration freouenc-: • Increasing pump and motor efficiencies. V • Reducing piping system pressure losses. • Apply RO-reject for equipment bearina seals (e.g. pump seals) • Waste heat exchange to increase RC -membrane flus. Cast Cleaning Possible improvements might include: • Gas or waste heat to reduce the cost of heating DI water with e!ectricity. • Replacing existing cleanup guns with a high-pressure low -flow system. • Monitoring to decrease the frequency of dumping. Coating Possible improvements might include. • Leak detection and repair. • Elimination of any continuous rinse flows. • Increasing the frequency of nozzle maintenance/replacement. • Installation of air -knives and/or PVA rollers to reduce dragout. • Procedural changes to minimize overflows from KOH makeuo. • Optimization of sprav duration/flowrate to minimize DI water demand while maintaining coating quality and tens throughput. Edging Possible improvements might include. • Leak detection and repair. • Elimination of any continuous rinse flows. • Increasing the frequency of nozzle maintenance/replacement. • Installation of air -knives and/or increasing air blow -off ager edging. • Optimization of spray duration/flowrate to nunimize DI water demand while maintaining leas throughout • Recirculation system from rinse E2 to rinse ml a_rzer grinding. Sanitary Install additional low -,lush toilets and bathroom Fixtures wherever appropriate. utilizing the City ofPetaluma's incentive program - i ^ I F - �4 C• _ Q C n N n 71 L w m1 _0 Lm --EI CL E Lo Q E E u > m w > � s EL N d LL m C N m ^L, U ti > C G rH L � w w > m C > n m w m1 _0 Lm --EI CL E Lo Q E E u > m w > � s EL N d LL v Y K U m 5 'a c T � C9 � C Q Z N m 1 WI jp a.U` c (g a a C) L L m > U r o CL W y > U3 ^ Z N i _ E m o E m L V W Lii V LL � N _ 6] C � N N �a wa m � c z E c o E m V W Lii V LL \}\ )} } !: \{! ®;�lE•=:)\ !!;!!i#i!! ° . j\ w$ !!!|)<!t)\ . ENCLOSURE 2 INSTRUMENTATION PACKAGE FOR SCWA INDUSTRIAL WATER EFFICIENCY PROGRAM ITEMS List Extended Sales Tax Price Qty Price (G 7.5%) Shippino TOTAL Commercially Available Items Panametrics XMT868 TransmitterlDsta Logger with 70,000 data point storage and temperature monitor option Part No. XMT868-2-1 i -OR -0211 Panametrics small pipe (112" to 2' Ultrasonic Transducers and clamping fixtures' Part No. CF LP-2ErL1-40NM- i Panasonics Instrument Data Manager Software for calibrating and unloading stored data Part No. 910-185 Transducer Cable Extensions needed for long distance connection between the data logger and input and output probes Parr Nos. C(90)N3 and Adaptor LFBM DOE driver or equivalent for PLC interfaces Electrical parts for discrete input to Panametrics datalooger' Small mechanical meters wi fittings' Miscellaneous materials allowance Subtotal S3,7s0 3 S11,220 5842 S12,062 51.195 5 S5,975 S4a8 S20 $6,4533 Sc9E 1 S295 S22 $317 S;EO 2 5300 S23 5323 5500 1 $500 S28 $20 $558 $100 1 5100 $8 $108 $800 51,500 522.119 Custom Services' SOLA Project: mstail ano calibrate equipment oeveloo ano tntecrate software. s/ncoronize production Qata with ',Vater flow nata for processes examined, ariange for'Outtne Lata transfer, Create and maintain Access d2taca5a ano train Oersonnel 512.900 Subtotal `-12,900 TOTAL 535,019 Notes he Panamemcs items care :e! t!ea for Jtc'r aciilty to sense 'C:v :n liCu1CS 'an C!r_ cm ,. r3Cure ;C Ctrl'✓ A=tranal transoucers designed for ,arcer diameref ptCes .Ta:- 'ecure's .he _. =.nmares for the sake of completion Vencor not ye! Icenrfiec_ ? iWaStiv her rarer meters for use on hoses usec for manual cesnlne ocer-none r.rovlaeu by Santa Posa Industrial automation consultant,, c::emlCal enctneer C,�:t are t'. t:i vers INSURANCE REOUTREMENTS FOR CONSULTANTS Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Consultant, his agents, representatives, or employees. Ivfinimum Scone of Insurance Coverage shall be at least as broad as: L Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001). 2. Insurance Services Office form number CA 0001 (Ed. 1187) covering Automobile Liability, code 1 (any auto). 3. Workers' Compensation insurance as required by the State of California and Employer's Liability Insurance. Minimum Limits of Insurance Consultant shall maintain limits no less than: L General Liability: $500,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. 2. Automobile Liability: $500,000 per accident for bodily injury and property damage. 3. Employer's Liability: $1,000,000 per accident for bodily injury or disease. Deductibles and Self -Insured Retentions Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials, employees and volunteers; or the Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. Other Insurance Provisions The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions: 1. The City, its officers, officials, employees and volunteers are to be covered as insureds as respects: liability arising out of activities performed by or on behalf of the Consultant; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; or automobiles owned, leased, hired or borrowed by the Consultant. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officers, officials, employees or volunteers. Coverage shall not extend to any indemnity coverage for the active negligence of the additional insured in any case where an agreement to indemnify the additional insured would be invalid under subdivision (b) of section 2782 of the Civil Code. 2. For any claims related to this project, the Consultant's insurance coverage shall be primary insurance as respects the City, its officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees or volunteers shall be excess of the Consultant's insurance and shall not contribute with it. 3. Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the City, its officers, officials, employees or volunteers. d. The Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 5. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, cancelled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice by certified mad, return receipt requested, has been given to the City. Exhibit B 1 Page 1 of 2 Accentabilitv of Insurers Insurance is to be placed with insurers with a current A.M. Best's rating of no less than ANII, unless otherwise acceptable to the City. Verification of Coverage Consultant shall furnish the City with original endorsements effecting coverage required by this clause. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. The endorsements are to be on forms provided by the City. All endorsements are to be received and approved by the City before work commences. As an alternative to the City's forms, the Consultant's insurer may provide complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications. Exhibit B 1 Page 2 of 2 INDUSTRIAL WATER EFFICIENCY PROGRAM Proposed for the City of Petaluma and the Sonoma County Water Agency 25 April 26, 1999 (Available in the City Clerk's Office) NDUSTRJAL WATER EMOENCY PROGRAM Proposed for the City of Petaluma and the Sonoma County Water Agency Photograph courtesy or Scott Hess April 26, 1999 Prepared by Pacific Technology Associates for The Bay Institute of San Francisco wirh funding from The Rose Foundation INDUSTRIAL WATER EFFICIENCY PROGRAM A description of the potential costs and benefits of an industrial water efficiency Program as applied to the City of Petaluma April 26, 1999 By Edwin Orrett, M.S. Pacific Technology Associates Petaluma, CA In association with John Rosenblum, Ph.D. Rosenblum Environmental Engineering Project Manager Grant Davis Executive Director, The Bay Institute of San Francisco Funding Tim Little The Rose Foundation Acknowfedgements. City of Petaluma Tom Hargis, Michael Ban, Steve Simmons, and Dave Spriggs Sonoma County Water Agency Randy Poole, Renee Webber, and Lynn Hulme Bay Institute Letter 0 Industrial Water Efficiency Program 0 Case Study for Mishi Apparel, Inc. Original Proposal to The Rose Foundation "Res:onn- Ute BaTi ecoY:s:em on' Me terra = tie 5ea... April 26, 1999 Our report includes two separate documents: the first, entitled "Industrial Water Efficiency Program", provides the framework for a CII water efficiency program; the second is Case Study ni for Nfishi Apparel, Inc. which is designed for application. We identify the most effective program elements in use today, explain their importance, and suggest enhancements. While this work applies specifically to the City of Petaluma, it is also relevant to other cities. 55 Shaver Street, Suite 330 • San Rafael, CA 9901 (u151 721-7630 • email bay1nfi0@bay.orc • •,velasite: vA%..v.%bay.orc i=S 55-=1-7?97 mx Petaluma City Council I I English Street Post Office Box 61 Petaluma, CA 94953 RD OF DIREt OP.S Michael Black Re: Industrial Water Efficiency Project for the City of Petaluma Arthur Brunwasser Dear Councilmembers: Hock G. Chaff Martha Davis On behalf of the Board of Directors of The Bay Institute and Pacific Technology Associates, the Petaluma ecological engineering firm which performed the rnson C. Dunnino pioneering work, I am delighted to present our report on the Industrial Water Rooert EricksonEfficiency Project for the City of Petaluma. Again, we wish to express our sincere larion Lewenstein appreciation to the Petaluma City Council for your prior support for this project. Sidney Pucek The City of Petaluma has demonstrated true leadership with regard to water conservation, and this Industrial Water Efficiency Project builds upon that strong John T. ftacanelL record of achievement. Will Sin Felix E. Smith During the course of this project a number of important meetings took place between the project partners and staff from the City of Petaluma and the Sonoma sncv T, Sw'adesn Chair County Water Agency. We are very grateful for their time, energy and constructive input which enabled us to develop and further refine a strategy for achieving significant water efficiency improvements with regard to the City of ,rn-E DIRECTOR Petaluma's commercial, industrial, and institutional (CII) water users. The result of all this work is a recommendation to establish an incentive program that will Grant Davis invest in and support existing local businesses to use water more efficiently and reduce industrial discharges. As Ned Orrett points out, this program is geared toward "eliminating economic leaks instead of creating new ones." Bill Davoren Our report includes two separate documents: the first, entitled "Industrial Water Efficiency Program", provides the framework for a CII water efficiency program; the second is Case Study ni for Nfishi Apparel, Inc. which is designed for application. We identify the most effective program elements in use today, explain their importance, and suggest enhancements. While this work applies specifically to the City of Petaluma, it is also relevant to other cities. 55 Shaver Street, Suite 330 • San Rafael, CA 9901 (u151 721-7630 • email bay1nfi0@bay.orc • •,velasite: vA%..v.%bay.orc i=S 55-=1-7?97 mx Page 2 Final Report Industrial Water Efficiency Project While the potential to simrificantly improve efficiency of CII water use is well established, such practice remains the exception rather than the norm. We propose a true public/private partnership that will support aggressive water efficiency improvements. Fueled with significant financial incentives, this creates a new and more positive role for the City, as a provider of bottom-line services that will complement its conventional water -related infrastructure and regulatory functions. Another important aspect is that financial responsibility to ratepayers is maintained by adjusting the incentive not to exceed the marginal cost of equivalent water and wastewater services. This partnership will stimulate more than water savings. Targeted first at the City's largest water customers, it is necessary to reduce both water use and pollutant loading to avoid violating discharge standards. The value of this strategy is demonstrated by the Case Study conducted for Mishi Apparel, inc., a Petaluma fashion house with 50 employees. Thanks to attention given to this project by Mishi's President, Mr. Hamish Hafter, we determined the potential to reduce water use by 46 percent — saving $4,800/yr at current water and wastewater rates — and more importantly to reduce Ivfishi's consumption of practically every other physical resource, saving an additional $74,000/year. The thread of water use, when not severed from the whole cloth of related resources, connects to significant economic and environmental opportunities that ripple out from each project site. A successful program will have the ability to consistently develop projects that save impressive amounts of water and money. Our report suggests innovations for accomplishing this, including: (I) high-quality technical designs that follow a protocol beginning with process optimization, (2) long-term partnership that encourages proper operation and maintenance of optimized systems (not just new equipment), (3) verification of savings, (4) savings normalized for economic production, and (5) full valuation of avoided water and wastewater costs. Together, these tools should allow the City to reduce CII water usage by almost 400,000 gallons per day. Approximately seven percent of the City's total estimated wastewater flow in 2010, this exceeds savings projected forthe various complementary toilet replacement programs underway. This work has already engendered support from its intended beneficiaries. We wish to acknowledge support provided on this project from your staff, particularly Tom Hams, Steve Simmons, Lynn Hulme and Mke San. We intend to initiate a small demonstration project at Mrshi and begin to create a specific program. Randy Poole, General Manager and Chief Engineer of the Sonoma County Water Agency, has also pledged funding to help develop a larger demonstration project for another site in Petaluma. We are in the process of securing additional funding from a variety of sources in order to work out the many details and to prepare a CII Program for City and Agency staff to operate. This amount is in line with that required by the baseline CII Program proposed in 1995. The new program, however, should boost water savings approximately forty -fold. Page 3 Final Report Industrial Water Efficiency Project It is the view of The Bay Institute and our colleagues that the most reliable new source of water in California lies with efficiency improvements among existing users. Concurrently, as revealed by our Case Study, public investment in a community's resource efficiency provides highly cost-effective economic development. Thank you again for the confidence expressed in our efforts. We look forward to the opportunity to present our findings in further detail. If you have any further questions or would like additional information, please do not hesitate to call me at (415) 721-7680. Sin ely, Yan 1Zads /9� Executive Director Ercl INDUSTRIAL WATER EFFICIENCY PROGRAM Edwin Orrett, P.E. EXECUTIVE SUMMARY This report, including an accompanying Case Study for one industrial water efficiency project in Petaluma, marks the conclusion of work funded by The Rose Foundation of Oakland, CA, and managed by Grant Davis, Executive Director of The Bay Institute of San Francisco. The results of this 515,000 project strengthen the claim set forth in the original project proposal: there are compelling economic and environmental reasons to invest public funds to encourage private industrial efficiency improvements in Petaluma. This report outlines these benefits and suggests how they may be achieved. The proposed program builds upon the City of Petaluma's tradition of leadership in water efficiency. This tradition began with being one of the first cities in the nation to require Ultra Low Flush (ULF) toilets in homes, and was recently underscored with an innovative program developed with the Sonoma County Water Agency (Agency) that installs new ULF toilets, without charge, for Commercial, Industrial, and Institutional (CII) customers. This report proposes the next step: an approach to saving large volumes of water that is based upon performance, not delivery of specific fixtures. The advantages offered to the City are many. First, wastewater flow and load may be reduced to the wastewater plant. This report explains how a reduction of approximately seven percent may be achieved with a program that addresses 130 customers during the next ten years. The key lies with a public financial incentive that costs less than conventional water supply and wastewater service of equivalent capacity. More important is the economic development aspect ofthis project. The public financial incentive is likely to trigger broad improvements in overall industrial resource efficiency that will improve the bottom Iine of Petaluma businesses. Unlike investing in costly .public works infrastructure, investing in a community's resource efficiency yields savings because it literally plugs economic leaks instead of creating new ones. The Case Study for Miishi Apparel, Inc. illustrates how this might take place. Mishi, a Petaluma fashion house with 50 employees, operates its own dye house. This project revealed the opportunity to reduce Mishi's water use as much as 46 percent for an initial cost of approximately $200,000. When maintained over 20 years, the project will merit a public incentive of $45,000 for saving water, and reduce Mishi's costs by $1.5 million. As this example demonstrates, the economic benefits of water savings may be highly leveraged in industrial situations because of the opportunity to simultaneously reduce use of many physical resources and improve the quality of manufactured goods. In summary, the multiple economic and environmental benefits include: Public Cost Savings: demand for water and wastewater services is reduced at Iess than the cost of supply; the largest volume of potential savings. While there are variations across cities, the most important categories, in order of importance, are: • Offices • Health Care • Sales • Eating and Drinking • Hotels and Accommodations • Education • Laundries RECOMMENDED SERVICE Case for a Public Incentive The need for an incentive to assist private water efficiency projects became apparent to the author when responding to industrial wastewater compliance issues. These companies faced large costs to develop and maintain reliable pretreatment facilities. While the companies responded appropriately, cost is a serious concern, especially when regional competitors face less stringent discharge standards. The entire compliance process, a mostly negative procedure that includes groups with the right to intervene when the governing law is not strictly observed, has room for improvement. The best compliance strategy for industries is typically not to just bite the bullet and build a treatment facility. It is preferable to first consider each of the following steps in sequence: (1) optimize processes and reduce water usage, (2) modernize process equipment, (3) reduce chemical usage or substitute with chemicals less polluting, (4) install water reclamation equipment to reuse water, energy, and chemicals; then, if necessary, (5) install equipment to treat the small wastewater flow remaining. While this may cost more initially than the conventional approach, and is more challenging to design, it often returns a profit instead of unending loss. The accompanying Case Study demonstrates the value of this procedure. This approach is even more appealing on a larger scale. As private water consumption and pollutant generation is reduced, the need to expand public water and wastewater infrastructure capacity is also reduced. The economic value of the latter can be considerable, as is its increasingly apparent ecological value. A partnership is therefore suggested where a portion of the public benefit is transferred to the private sector to assist their water efficiency projects. No mechanism is in effect today to support large CR projects. Some argue that CII customers require no financial assistance, because as businesses, they will do anything that returns a profit. Evidence is to the contrary. Recent analyses indicate, among other things, that ".-many CII users have never implemented even the most basic efficiency improvements ."T Hagler Bailly Services, Inc., following up to determine why measures recommended by 605 CII audits conducted by the Metropolitan Iter District of Southern California were not implemented, found "...financial reasons °re cited most frequently (by 53 percent)...i8 Of six other reasons listed for non action, ieduling received the highest score (only 16 percent). Financial assistance is clearly most important device for improving private sector water -saving performance. This --choed by the guidelines for statewide urban water conservation planning, that place anomic incentives at the top of their list of Potential Best Management Practices;9 and City's own experience with its fabulously successful program of installing free toilets CII customers, addition to financial assistance, a recent study of water efficiency among hotels in ncouver, B.C., found other important factors. "More than 45% of respondents ntified the following factors as somewhat to very important in deciding whether or not ,onserve water: • Knowing that what they do makes a difference in their community • Guest comfort • Believing that water is valuable and should not be wasted • Bearing or reading in the news that water storage capacity is limited • Warning to reduce operating costs at their facility • Guest preferences for `environmentally friendly' services" 10 latter point about guest preferences is also made by Scandic Hotels, a major chain in ope. Following surveys that revealed strong environmental values held by their ntele, Scandic is extensively refitting its hotels to conform to environmental iciples, thereby improving market share," A Public Incentive Program maybe --tied to independently validate "green" water saving claims made by participants, eby providing additional value. ommended Incentive .ntives for CII projects offered by many water utilities, and one water/wastewater ty, were reviewed in the process of developing the following recommendations. 12 most valuable for this project are deemed those programs developed by Seattle lic Utilities, Denver Water, East Bay Municipal Utilities District, and Metropolitan er District of Southern California. The author is also familiar with energy efficiency egies, whose sophistication is beginning to be matched by these projects. basic strategy recommended for Petaluma is a performance contract. The idea is to - public funds — at a rate less than avoided infrastructure costs - for savings actually eyed. Sufficient incentive funds are required at the outset of a project to get it off the nd, but not so much that public ratepayers are placed at risk. A staggered payment (a portion up front, and residual payments (with interest) at scheduled anniversaries .after) provides several important benefits: • Total payments matched to measured savings The annual program budget may be based mostly upon actual projects, thereby improving budget forecasts 0 VOTES 'Robert Wilkinson, Arlene Wong, and Lisa Owens-Viani.An Overview ofWarer-EfficiencvPotenriol in the CII Sector, in Sustainable Use of Water / California Success Stories, Pacific Institute for Studies in Development, Environment, and Security, Oakland, CA. 1999: pp. 77-84; hereafter Wilkinson, Wong, and in Owens-Viani. Private sector resource efficiency projects having simple paybacks greater than two or three years are seldom implemented, despite their inordinately high retum on investment (e.g. 50% for a 2 -year payback). Companies typically require extraordinary stimulation to pursue opportunities outside their areas of expertise. 3 John Olaf Nelson, Ci[v ofPetaluma's 1997 Cll Toilet Replacement Program, 1998; hereafter Nelson Savings derived from Table 10 of page 27. This document is extraordinary in the water efficiency literature for its rich lode of well-documented information. 4 Sonoma County Water Agency, Water and Wastewater Efficiency /Avoided Cost Studv, Montgomery Watson (William Maddaus) in association with Pacific Technology Associates (Ned Orrett), September 1995; hereafter cited as SCW9 1995 Avoided Cost Studv. 'Nelson, p. 12. 6 Charles Pike, Study of Potential Water Ef ciencv Improvements in Commercial Businesses, Final Report, U.S. Envirortmentaf Protection Agency / California Department of Water Resources, Sacramento, CA. April 1997; hereafter Pike. ' Wilkinson, Wong, and Owens-Viani, p.78 8 Robert Wilknson and Arlene Wong, Assessing Commercial, Industrial, and Institutional Water EJ7iciency Potential., The 2WIVD Audit Program, in Sustainable Use of Water / California Success Stories, Pacific Institute for Studies in Development, Environment, and Security, Oakland CA, 1999: pp. 85-97; hereafter Wilkinson and Wong. 9 California Urban Water Conservation Council, 'Best Management Practices, implementation Schedules, Assumptions, and Potential BMPs for Urban Water Conservation in California," revision dated September 30, 1997 (Final Exhibit nl to the MOU, Section G). to Lisa LeBlanc and Frank Huber, P.E., Water Consumption and Conservation Potential at Hotels. A Case Studv ofHatels in the Greater Vancouver Region, paper presented at AW WA CONSERV 99, Monterey, CA: 1999. " Terrence McNally, The Natural Step, presentation co-sponsored by The Environmental Business Council of the North Bay and Santa Rosa Junior College Institute of Environmental Education, Santa Rosa, CA: 18 September 98. Primary contacts: Seattle Public Utilities (Philip Paschke and Tim Skeel), Denver Water (Jim Reed), EBMUD (I'vUe Hazinski), MWD (John Koeller), California DWR (Charlie Pike); also MMWD (James Fryor), Greater Vancouver Regional District (Lisa LeBlanc), San Antonio (Eddie Wiicut), and an Internet tour through Albuquerque. Santa Clam Valley Water District City of San Jose (and attended their March, 1999 Industrial Water Efficiency Workshop). Arizona Municipal Water Users Association, and the EPA WAVE Program " Outlined by Phil Paschke during his presentation at CONSERV 99. A useful description of Seattle's CII program (and others) is in the paper he and his colleagues presented at the conference entitled: At the Vanguard of Commercial Water Conservation. 7� " Everett Rogers with Floyd Shoemaker, Communication of Innovations:_ A Cross-Cultural Annroach (Second Edition), The Free Press, New York: 1971. This classic reference in applied behavioral science describes how innovations diffuse through society. Brash, adventuresome "Innovators" are the first to take up a new idea. Next are the respectable `Early Adopters," then the more deliberate "Early Majority," followed by a skeptical "Late Majority," and finally the "Laggards." A demonstration project has its greatest strategic value if it is accomplished in partnership an Early Adopter. Rogers describes this category (p. 184): Early adopters are a more integrated part ofihe local social system than are innovators. TVhereas innovators are cosmopolites, early adopters are localites. This adopter category, more than any other, has the greatest degree of opinion leadership in most social systems. Potential adopters look to early adopters for advice and information about the innovation. The early adopter is considered by many as 'the man to check with' before using anew idea. This adopter category is usually sought by change agents to be a local missionary for speeding the diffusion process. Because early adopters are not too far ahead of the average individual in innovativeness, they serve as a role model for many other members ofa social system. The early adopter is respected by his peers. He is the embodiment ofsuccess(ul and discrete use of new ideas, And the early adapter knows that he must continue to earn this esteem ofhis colleagues ifhis position in the social structure is to be maintained " 15 The San Antonio Water System, for example, offers a rebate of $300 towards the audit of a customer of Mishi's size that is performed or supervised by a licensed engineer pre-qualified by the City. See: Eddie Wilcut, Chris Brown, and Peggy McCray, Implementing an Integrated Commercial Conservation Program, paper presented at AWWA CONSERV 99, Monterey, CA: 1999; hereafter Wilcut. '6 Most wastewater equipment vendors, for example, have a wealth of explicit hands-on knowledge and provide excellent installation designs. These, however, do not always serve the best interest of an efficiency program because vendors are generally stimulated to sell the largest model(s) of whatever products they offer. The preferred approach here is to minimize flow and load first, then apply appropriate equipment to whatever remains. This caveat applies more to complex industrial than simple commercial projects. " The Arizona Department of Water Resources provided a gram that provided "...an intensive training program for conservation coordinators and water efficiency analysts. Participants received nearly one hundred hours of practical hands-on instruction from senior, highly qualified engineers. City representatives will continue to conduct water use surveys with assistance from mentors under the terms of the grant." Source: httn://www/temne.eov/amwua/water?3.htm. ' 8 For example, the San Antonio Water System, which depends solely on the Edwards Aquifer for its supply, fiends its efficiency programs by a fee proportional to meter size that is added to monthly water bills (Wilcut). g SCIVA 1995 Avoided Cast Study (see above). c0 Sonoma County Water Agency, Recycled TT'ater TT'orkshop (Staff Report), September 1997, p. 2. 'r Tom Chomeau, "Proof of Chinook in Russian River," The Press Democrat, 9 April 99, Front Page, col. 1-2. The origin of the Chinook is unknown at this point Related points presented on the continuation page (Al2) include: "Regardless of the fish's origin, their existence is likely to result in protective action by the National1farine Fisheries Service." "Officials say the impact of a Chinook listing could be fargreater on manv river activities than restrictions alreadv imposed following listing ofthe coho in 1996 and the sreelhead in 1997. _4 primary reason is that the Chinook spawns in the main stem of the river, not in the tributaries as do coho and steelheod." Among quotes attributed to Sonoma County Supervisor / Agency Director Paul Kelley is the following: "Our ability, to provide water to municipal and agricultural users is going to get harder and harder." Another interpretation of this data is that the mitigation efforts are fruimil and must be maintained, if not strengthened (author). 21 A_7 U CD C C C _T O O O U C C C d N v _..0 - O U m LLLL EEE e m N N N o 3Z6 m U N m m m p N a c m N C L a d m m o 3 m m o CL m a s m v m c y c U C m m m N m a x < Q m N 4 O m NN N _ `o C c m N N N N C 6 � Q `m m E Q m s m m m m > > a a o 0 a 0 0 c � C m m m m m T m N> m O m mm jp m m m A Q a N N N m F m T m W m` E a m N m a m m m J J m 0 m a a a a o L U J J J N b N C N R aaa _ G 7 o nUUU '2 w m O � c m 0 N m m 3� a_ m N a � tll ya s maapoo =°� � 30` O aa` U m W 0 �� ��jjR 0 a m au10 O N N O T r 0 i N m y(D(D 0 a E t° C7 C7 (J m 0 T y R o � www N m c m A L o N L U m 3 c o 0 0 0 y N N N T 6 N != N o w w m E v ✓ U y m m t o m m 0 a H d m a_W o 0ca mo a o m c dn c �o m w ° Q'N o m m o = � N O a J W n m C m N N w W n E c u Fi 2�ri R o Lu W A_7 U CD u�m m o w w w w C C C O O O C C C v _..0 - C C C U m LLLL EEE d of 0: N N N o 3Z6 J J J m m m U N m m m p N 48 _ > w a d N N N i m m o a U a s m v m c E E jm u u u < Q n N m m m m NN N N N N p N N N U o 0 0 C m m m m > > a a o 0 a 0 0 c � m m m m m m m m E E E m mm N N N C Q a N N N m u�m m o w w w w N 7 tE d CL a LU I -- LU Q L) LL O LL w z uj m U_ O Z O U ul vm oh u�r Naa mrtn mtO h, Nmm [*� m(o Oh -4't ES of a4i3aN oto hto ac'3 ui d } @ N N r O 4 0 0 0 O m 4 4 4 Kil a m m m m J LL W LU WU 61 O h(�h ---T4o m b mm m Ot¢m 1p mvm-tUN N J a m�,yet et - tri- is is et-sit»cn in eit et t+J a mh NC43 SO m(.ilrNattJ hh O N': (D Q O @ NNNN NNN NNCN 4!'i e7N m C] haaaa mrYr.=airrrr N U en ea vt iia et 5a in is ag in et dt u3 et d3 N e3 e3 et et Z:> y7 u Q W d - 1i (`] m N hr tp m rmr(+Nm ap td N471N J z @ N h m m O o1 O p N N F1 t7 a 113 to m to 1� Q W' O f p r r N N N N N N N N N N N N N N F O y ry fA 64 NS 63 lH ei e3 e3 e3 to e3 iH e3 el e349 to H3 e3 W}} et mOaC1 b mt�hOOlflphmGrp C]113 OrNFi a 0 0 0 CC:7LC1 OpL O-mC Or a43Tmof O OO p OQr rrrr rN � 01. e3 e3 iR Kr3 � � rM- � et s» rs)• ss � itt � 4r9 � 64 � � ,�` ti50N h Nm tO0 V]Om m Nm aOfD O Y N N P7 ^ m m O 4 p O r N N t7 C'1 a m h m d F r`t =O et N}fr3 H}s3 to b3 e}Ut eta 43 iit ff}et et ei fr3 U3 e3 °? a U O _ wn Y � 64 (fl e3 e3 to 69 et e34>et� b3 et IAM et HHtH 63 d ~% U ¢ a z � Net E9 MfH e349 He3 et bt e3 eJ e3 ei FR m to e3 fA e} E @ h � N Vi F w m @ } O W F 3 O Z Q N C) O LL N F LL w z W m U 2 O z 0 U W C'1m N7� m prto ht`lma0mry4tit '7�hm m4OO4rrNNf'I Cl alts L'1 fD tp 1� a � � to 69H el Vi e3 bt e3 to et et to Hei e3 H3 t.H E9 ui e3 ¢ O t - V7 4 ua U to N Fz � Y r r r r r r r r r r r r r r r-- r r o G � N m m prNc7 alis m hm4OrNt")aNm t�mG) `U ' pN N ON N N N N Q N ON N N N QN N t0` t N CO` k N N w } A-3 a w @ r°- �M C O m H C MISHI APPAREL, INC. Petaluma Industrial Water Efficiency Program: Case Study #1 prepared by Pacific Technology Associates and Rosenblum Environmental Engineering for The Bay Institute of San Francisco with fundingfrom The Rose Foundation EXECUTIVE SUIVIN ARY The Rose Foundation announced in late 1997 its intention to award grants for projects addressing the reduction and/or mitigation of pollutants in the Petaluma River watershed area. In response, the Bay Institute of San Francisco (hereafter the Bay Institute) proposed to outline an Industrial Water Efficiency Program for Petaluma and to demonstrate the effectiveness of that program by evaluating its application to one industrial facility. The linkage to the Rose Foundation's objective is the idea that it is possible to cost-effectively improve industrial water efficiency and reduce the mass of pollutants discharged to the Petaluma sewer, and by so doing, improve the health of receiving waters. The Rose Foundation accepted the Bay Institute's proposal and awarded a grant of $15,000 in March 1998. Mr. Hamish Hafter, President of bfishi Apparel, Inc. (hereafter "Mishi"), volunteered to participate in this project by offering his dyehouse as the subject for this Case Study. A manufacturer of organic fiber women's clothing, Mishi has been in business in Petaluma for fifteen years, and has approximately fifty employees. The objectives for this study were to investigate opportunities for reducing water use, select a project suited to Mishi's business needs, andV evaluate the project's financial and environmental performance. Implementation details revealed by this process were also helpful for fine-tuning the simultaneously developed draft Industrial Water Efficiency Program. Mishi's dyehouse water use in 1997 was approximately 8,500 gallons per day (gpd), placing it 44th in water use among the City of Petaluma's 1,197 non-residential customers (a list that includes irrigation accounts). Three factors make Mishi's operation a challenging candidate for cost-effective water efficiency: a difficult wastewater to treat (dyebaths), no pre-existing treatment facilities that might be modified to enable re -using water (no such facilities were needed, given Mishi's perfect compliance record), and relatively short operating hours. This is therefore a perfect Case Study for this program, for an attractive project here portends good opportunities throughout the City. This Case Study affirms that an industrial water efficiency program has the potential to deliver broad environmental and economic benefits. Process improvements are identified that will reduce Mishi's need for water and process additives as much as 46% and 72%, respectively. Because many of the materials required in dyeing operations (such as salt and dyes) are at best only partially removed from wastewater by conventional municipal treatment processes, fewer materials required at the dyehouse translates to improved water quality at the sewer plant discharge. The larger of two projects described herein has an initial cost of approximately $200,000, annual savings of $79,000, and therefore a simple payback of 25 years. The reduced demand on public water supply and wastewater treatment services makes it cost-effective to offer a public financial incentive of $49,000 (payable in stages upon performance verification to minimize risk to public funds). This incentive reduces the project's simple payback to 1.9 years, a level that is sufficiently attractive to stimulate action by most private entities. A simpler project is also described that provides smaller savings with a faster payback. This study demonstrates the value of expanding the water conservation services offered by the City of Petaluma to encompass industrial processes. Unlike the City's current water conservation programs, an industrial program must consider pollutant loads because of concentration limits that apply to these customers. Industrial water efficiency projects therefore must be designed to provide more than water savings. This is illustrated by this project for Mishi, where only 6% of the annual cost savings derive from reduced water and wastewater fees, despite cutting usage practically in half. Not surprisingly, water cost savings alone are typically insufficient to motivate businesses to invest the time necessary to develop water efficiency projects. This Case Study demonstrates how water savings may be embedded in a broader, more attractive package. In addition to reducing water demand, the proposed Industrial Water Efficiency Program directly serves economic development goals. Participating businesses, already established in the community, will be made more profitable. There is also a multiplier effect, for capital invested in water efficiency will remain largely within Petaluma, unlike investments in public water supply and wastewater treatment works. Best of all, this program is intrinsically cost-effective based upon water savings alone, for it provides the equivalent function of conventional public water and wastewater services at a smaller unit cost. INDUSTRIAL SITE Mishi Apparel, Inc., is a 15 -year old Petaluma business that designs, manufacturers, and sells natural fiber women's clothing. Design, manufacturing, and administrative services are based in Petaluma, and retail stores are located in Petaluma and Berkeley, CA. 4fishi, with approximately fifty employees, is in an expansion phase and anticipates improving, if not relocating (within Petaluma), its dyehouse. Figure 1 illustrates how water and related physical resources are used at Mishi for washing and dveing Garments. These resource flows were then quantified and tied to production by examining FIGURE 1 Mishi Apparel, Inc. Spring 1998 FABRIC PATH Sewn Garments Water — > Heath WASH Chemicals —)0 Acid Water Heat 300 Salt 10 DYE h Dyestuffs Soda Ash Water> RINSE Heat )b (1-3 rinses) Chemicals Heath DRY Water q Dyed Garments to Notions 9 v City Sewer Mishi's records. Table 1 presents these data as the Baseline. This is the fundamental data against which all changes in resource use are measured. For example, MisE required, during the Baseline Year (that which ended just before this project began), approximately 23 CCF of water per thousand pounds of finished goods. This important datum establishes the value against which water savings will be measured, and the bulk of the public financial incentive will be based (more precisely, the value is estimated at 23.15 CCF supplied/1,000 lb, or 17.31 glilb). It is also important to note that by tying water use to production (e.g., gallons of water per pound of product), a metric is used that can float regardless of Mishi's level of economic activity. For example, if MisE halves its unit water usage while doubling production, the City's water meter would reflect no savings. However, when information to adjust water usage for economic activity is provided, the 100% improvement in water efficiency will be revealed. Seen another way, Mishi's demand for public water supply and wastewater services would double without the investment to improve its water efficiency. A review of the technical literature related to treating wastewater from dyeing natural -fibers (those that require "reactive" dyes) reveals worldwide respect for this particular effluent. Professors Li and Zhao of the Department of Civil and Structural Engineering at The Hong Kona Polytechnic University, concerned about pollution from textile wastewater in Hong Kong, note: "... There is a practical limit to the degree of COD removal and colour removal due to the inability of biological treatment processes fe.g., municipal wastewater treatment plants] in degrading dye chemicals. With different apes of activated sludge processes, the following removals are normally achieved: about 90% of BOD, 40-50% of COD and 10-30% of colour. " Similarly, Dr. Geoff McMullan and colleagues at the School of Applied Biological and Chemical Sciences, University of Ulster, Northern Ireland, state: "Textile dyes are of environmental interest because of their widespread use, their potential for formation of toxic aromatic amines and their low removal rate during aerobic waste water treatment. " Directly to the point for this application Prof. Pavlostathis of Georgia Tech posits: " The single most pressing environmental problemfacing the textile industry is related to reactive dyes. " Similar statements appear in the introductions of practically every paper reviewed in the preparation of this study (see References). This is not to say there is cause for alarm in Petaluma, for we do not have a situation such as that in Hillsborough, NC, for example, where up to 75% of the inflow to the city's wastewater treatment plant once came from one textile mill. Here we have one small dyehouse, always in compliance with local regulations, that contributes 0.29% of the City's total wastewater flow. However, anything done to reduce the mass of pollutants entering 4 W Q W U 0 (n W W U) 0 W } rn 0 O O w x z LL LL O C0 J 0 0 0 uj W CL F - z LU 2 W O W 61 U d .O C W N Q CL W z J W N m N O H a e00000000e mmrcn mmnor o ccvu)rNc rnNM 0 0 0 0 0 o a o o a o N t7 N T t0 O) r t7 O� m� m � n ae NTtn O) nfnNTNN T [7 •i m t!] Q N m c 0 0 o e e e o 0 0 0 0 vvtn r)nnro moo e v e o v a a o 0 0 0 N [7 M m c N M O u] Oco (D a a ev r r M O N M N T N O W vmu�mr m p) r 0 o v o o a o v e v o NMroT�nNNtAvn T In coconvom m^nrnm NNmONrm tnmT N T N LL LL E U U d 2 :2 .2 .2 o .o .n O m 11] O m O m n m O) N rmin OmNnrmm 6 0 C Oi O O OI 4`T VJ V V? V3 V) tri V3 V3 V V `y 0 N R 0 2 y c N N R R a 0 76 5 N a O N O G O m m N N U L d a m 'a c R o 0 U - o tD N Q O1 C to O c E t O ` m o `m oL c co O ') U E O O c -- O t O O O � R O N N C) C > N y tlaJ >L Q1 (>0a `O m a m c 3 tmd c p 0 0 3° a c y O C C a L N a U N R O NN V - m o 'o -0 3 Mn L a R m q i > > p •C j O N o O C � >L G E = m n. a c c a N >+ Q T ID O= N L O Q, a Um G 3 N C o m 0.0 X y p m -o ° o o m c O G E O N 30 d j R O •N R R T S 0 L C N N `1 CE .0 N _� UN — N C R Nm CL a 0 0 N kn zW U))�w — U rn O U)2i . .- N M c In m I. O. O 2 T the wastewater, particularly dyes, will ultimately prove beneficial to the estuary downstream of Petaluma's wastewater treatment plant, for the latter is not likely to fully treat these materials. These factual circumstances make real the challenge of this demonstration project: is it possible to cost-effectively improve water efficiency and reduce the mass of pollutants discharged to the sewer; and by doing so, improve the health of receiving waters? The claim for this nexus, and that a Public Financial Incentive will stimulate appropriate action, formed the basis for the Rose Foundation's participation. TBE PRO-FORmA PROJECT Means for reducing water use for Mishi's washing and dyeing operation were considered within the constraint of maintaining compliance with City discharge regulations. The primary objectives regarding the latter were to keep the concentration of Biochemical Oxygen Demand (BOD) safely below 250 milligrams per liter (mgil)'the level at which the City is authorized to assess a surcharge on a customer's wastewater bill, and to avoid problems with the concentration of metals. Virtually all textile dyes include small quantities of metal in their molecular design. The strategy followed thereafter was identical to that used by Wenzel et al. in their 1996 study of reactive dyeing in Denmark: "The overall strategp of the research has been to identify, environmental improvements by a stepwise procedure: (1) process optimization and water savings, (3) potential modernization of dyeing equipment, (3) chemical savings or substitutions and (1) water reclamation and reuse of water and chemicals. This order ofpriorities should be followed as far as possible in order not to treat problems that could be avoided successfully by process alterations. Not respecting this order of priority could lead to wrong dimensioning of water reclamation equipment and in worst case total error in investment. " Following the development and evaluation of approximately fifteen scenarios for improving the dyehouse, bench -scale tests of advanced Oxidation Processes for dve removal from samples drawn from Mishi's dye machines, many telephone and e-mail inquiries, and discussing likely alternatives with Mr. Hafter of Mishi, a two-step project emerged. Phase I: Process Optimization: the primary goal is to optimize the dye process. Optimization at Mishi requires more hot water capacity (a new water heater and extensive insulation), improved controls for adjusting and maintaining dyebath temperatures, carefully adjusting the timing and rate of pH adjustments, and softening all process water. Phase I has already begun, as Mishi has changed to a line of dyes that requires less salt than normal, and is experimenting with detergent substitutes. Phase II: Water Savings: Replace ten Ili -year old Maytag residential washing machines with high -efficiency models of the same size. Modernize Dveing Eouioment: This is where the project becomes interesting. Braun manufacturers first-rate dyeing equipment, designed to last at least 20 years, that includes every feature one could want for optimizing the dyeing process. However, the minimum capacity is too large to support Mishi's unique capability for precisely dyeing many small lots, and the equipment is priced at the top of the market. The response: employ Petaluma specialists to develop a small, efficient dye machine based upon the units already owned by IvIiishi, or by redesigning a modern clothes washing machine. This expertise has already been proven by successfully rebuilding a 1940 -era milk bottle washer for a local organic dairy so that it would use ten times less water than originally specified for. Special tricks with dye machines: they operate with corrosive hot salty water (like washing clothes with ocean water), and require lint filters, pressure jets, and precise control for temperature and chemical feeds. Phase II is separated from Phase I because on-site experiments must be made before committing to full-scale implementation. Water Savings: additional water savings will accrue due to improved liquor ratios in the new dye machines. The optimized dyeing process will also reduce the mass of other consumables required. A more complete description of the implementation strategy is attached at to the end of this report (two-page memo from John Rosenblum to Ned Orrett). Other strategies were investigated but did not warrant being included in a project at this point. These included employing cascaded rinses, filtering washwater for reuse, and treating spent dyebaths for reuse with activated carbon, OF membranes, photocatalytic oxidation, LTV/HzO, oxidation, or electrocoagulation. Following the large reductions achieved at relatively low cost by pollution prevention techniques (i.e. the steps listed above), there was insufficient value in the remaining wastewater to justify these technologies. A diligent effort was made to obtain performance data about dyes purportedly available without heavy metals, but with no result. This is an attractive strategy of chemical substitution that will have to wait for another day. PERFORMANCE Table 1 provides the unit resource usage estimated upon implementation of Phase I and E of this project. These estimates were developed on the basis of performance data reported in the literature, manufacturer's information, and standard engineering calculations. The extension of these savings estimates by unit resource costs and production levels (currently approximately 162,000 lb/year of finished goods) provides annual cost savings. TABLE 2 CASH FLOW FOR PRO -FORMA PROJECT Financial Assumptions Project Schedule Annual Inflation (capital and O&M costs): 2.5% Year Private Weighted Cost of Capital 15% Phase Savings Investment Criteria (initial investment only) Begin Loan Period, years 5 1 2000 Annual Interest Rate 9% II 2001 Timing of Financial Incentive Payment Start of Project 25% First Year Confirmation 25% Tenth Year Checkup 25% (adjust for inflation) Fifteenth Year Checkup 25% (adjust for inflation) INVESTMENT BENEFITS YEAR Initial Tuneups & Less Avoided Less TOTAL Annual NET CASH Investment Equipment Baseline Financial COSTS Resource FLOW Renewal Costs Incentive Savings 2000 $32,125 (58,950) $23,175 $25,700 $3,525 2001 $51,176 ($12,175) S39,001 $68,060 $29,059 2002 $51,176 ($3,225) 547,951 $83,418 $35,468 2003 $51,176 $51,176 $85,504 $34,328 2004 S51,176 $51,176 $87,642 $36,466 2005 $19,051 $47,804 (516,292) S50,563 $89,833 $39,270 2006 $0 $92,078 $92,078 2007 $0 $94,380 $94,380 2008 $0 $96,740 $96,740 2009 $0 $99,158 $99,158 2010 $61,767 ($18,433) ($15,585) $27,748 $101,637 $73,889 2011 $0 $104,178 $104,178 2012 $0 $106,783 $106,783 2013 $0 $109,452 $109,452 2014 $0 $112,189 $112,189 2015 $61,193 ($20,855) ($17,633) $22,705 $114,993 $92,288 2016 $0 S117,868 $117,868 2017 $0 $120,815 $120,815 2018 $0 $123,835 $123,835 2019 $0 $1261931 $126,931 8 Table 2 presents the project's financial performance in a cash flow format. The key feature is that Mishi has the opportunity to experience posirfve cash flaw throughout the lifetime of the project (positive compared to the Baseline assumption, which is to maintain the existing setup). Among the many assumptions for Table 2 is that Phase I of the project begins the first year, and includes necessary testing so that Phase H may begin the second year. Both projects require six months to install, and are designed to perform for twenty years. Provision is made ("Tune-ups and Equipment Renewal") to replace equipment and to employ specialists as needed to maintain optimum process efficiency. Superior performance of a sophisticated industrial system ultimately requires careful operation and maintenance more than state-of-the-art equipment. Initial cost estimates include design, equipment, installation, process adjustments ("optimization"), and 20% for contingencies. A five-year loan is assumed. Avoided Baseline Costs are the maintenance costs not spent on the Baseline situation. The Financial Incentive is the sum provided by the City and Sonoma County Water Agency, as described in the companion report. This reflects an 80% share of the public infrastructure costs avoided by this project. Levelized costs for the latter (present value of twenty years of future service divided by relevant volume or mass) are currently estimated at $0.19/CCF, $1.55/CCF, and $0.035/lb for water supply, wastewater management, and BOD removal, respectively. The timing of Incentive payments assumes that 25% is paid upon the project being accepted by the City, 25% after performance is verified following one year of operation (this is also a time to "true -up" the incentive to match actual performance), another 25% after ten years (again after checking performance), and a final 25% at the fifteen -year mark. The presentation on Table 2 is cluttered in the first three years because Phase I and H begin sequentially. These are assumed to become one project thereafter for simplification. Inflation is applied to all investments and benefits except loan payments. A series of charts are appended that illustrate the financial and environmental performance of the project defined above. In all cases, "Phase II" is assumed to be an extension of the "Phase P' project. • Figure 2: This illustrates the relative value of the Public and Private investments. By also showing water savings, one sees (I) increased water savings come at a higher marginal cost; and, nevertheless, (2) the rate paid by the City for saved water remains constant (the Public Investment is a fixed S/CCF). • Fiwre 3: TDS falls dramatically due to changing to a different dye that requires less salt, optimizing use of that dye, and reducing the liquor ratio with better dye machines. These changes are net of salt needed by a water softener. BOD is related to use of detergents. These are conservatively adjusted downward based only upon dye machine replacement, when in fact the use of less water for washing, softened water, and substitution of enzymes in place of some detergents will likely provide a better result than that indicated. Figure 4: The annual cost of dyehouse consumables is calculated by extending Table data by annual production. Dyes, while an insignificant fraction of the mass of consumables, are the fundamental part of the process (after all, this is a dyehouse), and are clearly where the costs lie. Note how the total cost of associated consumables decline in relation to dyes — the total process is becoming more efficient financially as well as ecologically because there is less waste. Also note that the cost for water and sewer service — the tiny bar atop the stacked columns — almost escapes attention. This is why water conservation alone is a non-starter when pitched to business groups. It must be presented in a larger framework. • Figure 5: In America, private resource efficiency projects having simple paybacks in excess of three years rarely fly, despite an internal rate of return that is hard to beat. Here we show two conservatively priced projects that come in with simple paybacks of less than 2.5 years without public assistance — that is, still close to the no-go zone but clearly on the "go" side. The addition of a cost-effective Public Incentive drives the paybacks under two years. Buckle them seat belts. • Figure 6: Ecology teaches that everything is connected. So does water efficiency. Save one resource and save them all. The need for SHMP dispersant is practically eliminated by switching to softened water. • Figure 7: The mass of material used in the washing and dyeing process, especially salt, will decrease substantially. The first Phase of the project will trim the load by more than half; eliminating each year perhaps 109 tons of stuff used once then dumped down the drain for the sewer plant to deal with, and then the estuary. Phase H should remove the need for another 45 tons, for a total mass reduction of 72% relative to Baseline. By this time, Mshi's dyehouse will be among the best performing in the country, and will certainly be a top performer for a plant of its capacity. • Figure 8: This reveals that the final performance parameter will be met — the need to maintain [BOD] at less than 250 mg/l, the threshold above which the City may assess a surcharge on the basic sewer fee. 10 w Un L L E N > cu E .i, oCli m o o W 0 0 o a o 0 0 0 0 0 0 0 o a o O O O O p O N O N N N fR V3 t9 - Ef7 U} 0 11 IM CIO - o m o N _ r U `m U a m m c 0 o J _ r U m m c a` o N = � U 0 L CD 0 i5 R 3 o N 0 N ca o CD w � r 0 ' O r U m c a` U 0 4] 7J W W y o om h 0 a 'G C D H O N N cc .N 0 L Q� cu 3 W co w 0 LL (AeP/ql) Puewaa uaBAxp leolwayool8 V N O o] CD ? N O O O O O O O O O O O O O O O C (AeP/ql) SP!loS Pan1OSSlQ le;o i 12 O G N .^F, vs 410 J 1 O O O cn O O O O 70 - O 8a 0 � 0 U 0 E C 3 U LO U LO co W r twa N C ca 0 Co U) L N h El ❑ ® 0 O O O O O O O O O O 8a 0 Q 0 Q 0 C O O C LO O LO N N r twa t= fi} 6a Ear 13 U) CL (D U) Wo Q� U) o rr) LO LO w cD LL cn a_ LO O LSA O LO p N N T T O O (s.maA) �apqAEd ajdwiS 14 I r, LU LL jue,k jed spun0d 16 a) U) rag U) IS 9 LU -Z3 F (1/6w) puewaa ua6Azp leolwayool9 0 0 0 0 v o 0 0 N N to O O O o O O CD ui o Ln c u� N N r r (IS 000`1) awnlOAJalenna;saAA lenuuy 17 w 0 bya NEx,T STFPS Three things are required to launch the first publicly supported industrial water efficiency project in Sonoma County. I. Commitment by the City of Petaluma to prepare and adopt an Industrial Water Efficiency Program, establish funding for the first project, and develop a contract with Mishi, and 2. Commitment by the Sonoma County Water Agency to support the City of Petaluma by providing appropriate financing, and any other allied services; and s. Commitment by Mishi Apparel, Inc., to implement Phase I of this project. This entails choosing how to develop a project, setting aside sufficient funds, and establishing a target kickoff date. CONCLUSIONS This Case Study describes a project that will achieve the pollution reduction objectives set forth by the Rose Foundation. It will concurrently reduce demand for water from the Russian and Eel River systems, which will help to reduce stress upon threatened native salmonids. Closer to home, it will help a Petaluma business upgrade its manufacturing process to become more competitive. This lays the groundwork for a new economic development strategy that employs a novel public- private partnership that may be more cost-effective and have less risk than conventional strategies. The strategy is new because it is aimed at "plugging the leaks" in the existing economic base, rather than stimulating new, uncertain enterprises. It is a public/private partnership because private investment is leveraged with public funds; public funds otherwise destined to provide water and wastewater services that cost more than saving water. The financial risk that publicly supported water savings will not accrue as intended will be managed by disbursing public funds in accordance with verified performance. The partnership opportunity also offers a role for the City that is an attractive counterpart to its previous relationship with industrial community, which was primarily one of enforcing discharge regulations. is REFERENCES A. Pollution Prevention 1. Drimarene o K: Reactive dves for dyeing cellulasic fibres by the exhaust method, Sandoz Chemicals, Ltd., 1993. Detailed information from the manufacturer describing the most effective technique for using Drimareneo K dyes (those currently used by Mishi Apparel). Related material published by DyStar, L. P., was also reviewed. 2. North Carolina Division of Pollution Prevention and Environmental Assistance, North Carolina Department of Environment Health, and Natural Resources. Source of a rich lode of appropriate technical information including: blanual: Best Practices for Pollution Prevention in the Textile Industry (www.n2t3ays.orJref/02/0109.99.hrm). An extraordinarily sophisticated, detailed, and useful reference document. Case studies from Flynt Fabrics, Inc., a textile mill processing mainly cotton knit fabric that achieved significant resource and cost savings after optimizing dye use (among other strategies). Flynt once contributed 50-75% of the flow to the City of Hillsborough, NC, wastewater treatment plant. Search for Flynt Fabrics at www.o2oays.ore. Water Conservation for Textile Nfrlls. Waste reduction fact sheet (www.owr-ehnr state-nc.us/reV00026.htm). 3. Bill Shireman, Tachi Kiuchi, and Amanda Blake, An Exploration oflndustrio! Ecology and Natural Capitalism: Business Principles for the New Economy, workbook for Industrial Ecology III (April 1993): Global Futures Foundation. Of value to the Mishi project is the discussion about measuring resource throughput as a function of manufacturing output. and a case study about DesignTex — featuring a textile manufacturing process that claims to create "absolutely no pollutants" (p. 4-14). Critical to the latter was a search that yielded 16 dye pigments (out of an initial set of 4,500) that produce no carcinogens, mutagens, persistent toxic chemicals, heavy metals, or endocrine disrupters. 4. Textile hyfill Evaluates Ifays to Reduce BOD Levels in Wastewater Effluent, www.envirosense.com/swdies/hm110062.html. Discusses source reduction strategies that Clyde Fabrics in North Carolina identified to respond to the high BOD concentrations created as the result of water efficiency improvements. 5. Gregory Sullivan and Graham Parker, The Economics of Commercial -Grade Horizontal Axis Clothes Washers: Detailed-Wetering and Real-If'orld Savings, Pacific Northwest National Laboratory, 1999. Paper presented at AWWA CONSERV 99 (Monterey, Feb 99) that provides measured water and energy savings. 6. Equipment Manufacturer's Literature: Braun (industrial washing and dyeing machines), Maytag and Whirlpool (residential -size efficient washing machines), Kemco (beat recovery systems), and others. 7. John Porter and William Walsh, Source Reduction of Pollutants from Wastewater, ntc. te. ncsu. edu/htninFPORTS/NTCRB-FOLDER/source. html. 3. Life Cvcle-4nalvsis in Garment Production, w%vw.emcentre.com/textile/casestudv/nrocess.htm. Describes the anish company Novotex A/S, founded in 1933, and having sales of US S15 millicn in 1995. Their philosophy is to produce cotton with the least possible impact on the environment. Life cycle analyses are presented for each stage of production (Novotex follows the "Cleaner Production" principle). All cotton processed is organically grown. Water use has declined 500,10 from baseline. and dn-ing machines recycle 75% of the hot air used. MIJ B. Direct Reuse 1. Automated Reuse off veboths in Carper Manufacturing. Document produced for the US Department of Energy by the National Renewable Energy Laboratory. httn//syssrv9vhl.nreal.gov?Access/nice3/4063-235.htm1. This process, which is dependent upon a specially designed spectrophotometer (and therefore probably impractical for a small operation), is expected to directly re -use 6% of the dyes, 60% of the auxiliary chemicals, and 42% of the water that otherwise is discharged from dyebaths to the sewer. 2. John Porter and William Walsh, Principal Investigators: The Automated Control of the Recycle of Bleaching Rinse Water to be Used in the Scour Rinsing Operation to Decrease Hot lister Consumption and Wastewater Discharge. Project identified in the National Textile Center Annual Report (Aug 1995). C. Treatment and Reuse Membrane Filtration 1. Henrik Wenzel, Hans Knudsen, Gert Kristensen, and John Hansen, Reclamation and reuse of process water from reactive dyeing of cotton, Desalination 106 (1996) 195-203. A full report is available from Miljo & Energi Ministeriet (Danish Environmental Protection Agency): Genbrug of procesvand fro reaktivfarvning afbomuld, Miljoprojekt at. 374 (1998) 128 pp, These reports describe the application of membrane filtration for reusing washwater, and activated carbon to absorb spent reactive dyestuffs from dyebaths to allow reuse of the hot brine. Though the text in the latter is mostly in Danish, its many graphs are easily understood by those otherwise clueless in Danish. 2. Erwell, Brouckaert, and Buckley, The Reuse ofReactive Dve Liquors using Charged Ultrafiltration Membrane Technology, Desalination 70 (1988) 157-167. Excellent discussion that suggests OF membranes with a nominal molecular weight cutoff of 400 daltons will produce decolorized permeates suitable for dyehouse reuse at —90% water recovery. Payback is estimated at less than three years for a 200-ton/mo cotton dyehouse, and where the value of the electrolyte is $5 to $10/m'. 3. Katarzvna Majewska-Nowak, Tomasz Winnicki, and J. Wisniewski, Effect ofFlow Conditions on Ultrafiltration Efficiency ofLye Solutions and Textile Effluents, Desalination 71 (1989) 127-135. Presents data on COD, TOC, and dye particle removal for OF tests on actual textile effluent (direct dyes). 4. Katarzyna Majewska-Nowak, Malgorrata Kabsch-Korbutowicz- and Tomasz Winnicki, Salt QJect on the Dve Separation by Hvdrophilic.ldembranes, Desalination 108 (1996) 221-229. Promotes a number of closed-loop recycle systems within a dyehouse rather than one end -of -the -line process, to apply the most suitable technologies and to reduce cost by treating the most concentrated effluents. No data for treatment of reactive dves. 5. Rik Hovinga, Srinivas Veempaneni, and Diane Bailey, Recovery of Wastewater from o Textile 2011: Implicarions forMembrane Fouling, w,Nviv.nif.rice.edu/—iviesner/harlinLren.htmi. Investigates the role of dyes and colloidal materials on reverse osmosis membranes at the Harlington, TX wastewater treatment plant 6. John Porter and William Walsh, Principal Investigators: Microfiltration of Direct Dve and Electrolvte Solutions to Evaluate the Removal of Soluble Ionic Dves from Wastewater. Project identified in the National Textile Center Annual Report (Aug 1995). 7. .4 Guide for the Planning, Design and Implementation of il'asrervater Treatment Plants to the Textile Industrv, Pollution Research Group. University of Natal, South Africa (1983). Major government - 20 sponsored study prepared in anticipation of inevitable water shortages in a relatively and nation. Many treatment processes are described. Advanced Oxidation Processes 1. Warren Perkins, Targeting Reactive Dvebaths far Reuse, www.billian.coni/text'les/febmarvl9997/tareeti.html. Discusses brine recovery volume, ozone oxidation, Fenton's Reagent (with and without hydrogen peroxide), and membrane filtration. 2. Sheng Lin and Ming Chen, Purification of textile wastewater effluents by a combined Fenton process and ion exchange, Desalination 109 (1997) 121-130. 3. Sean Cady and Brian Seifert, Andco Advanced Oxidation Process used for the Oxidative Degradation ofReactive Dves. Manufacturer's literature concentrating on electrochemical processes. 4. I. A. Balcioglu and I. Arslan, Treatment of Textile M:istetvater by Heterogeneous Photocatalvtic Oxidation Processes, Environmental Technology 18 (1997) 1053-1059. 5. John Porter and William Walsh, Principal Investigators: The Chemical Oxidation of Dyeing Wastewater Solutions to Remove Color and Facilitate Dvebath JVaste}vater. Project identified in the National Textile Center Annual Report (Aug 1995). 6. X. Z. Li and Y. G. Zhao, On-site Treatment of Dyeing Wastewater by a Bio photoreactor system, Water Science Technology, Vol. 36 No. 2-3 (1997) 165-172. Laboratory test wherein synthetic reactive dve wastewaters are circulated through an extended aeration unit followed by a photoreactor using a TiO2 catalyst. The former unit removes biodegradable BOD; the latter oxides nonbiodegradable molecules. The two processes together provide better treatment than does either process alone. The report does not offer cost estimates for a commercial application, nor does it address the potential problem of interference from chlorides in the briny dyebath (chlorides are a known scavenger of the vital hydroxyl radicals produced within the photoreactor). 7. Yiqi Yang, David Wyatt, and Michael Bahorsky, Decolorization ofLves Using W/H�0' Photochemical Oxidation, Textile Chemist and Colorist April 1998. Biological Methods 1. Spyros Pavlostathis and Wayne Tincher, Biological Renovation and Reuse ofspent Reactive Dvebaths (C96 -G3 (1)). Multi-year research project funded by the National Textile Center underway at Georgia Institute of Technology. 2. C. M. Carliell, S. J. Barclay, and C. A. Buckley, Treatment ofErhausted Reactive Dvebath E07uent using Anaerobic Digestion: Laboratory and Full-scale Trials. Pollution Research Group, Department of Chemical Engineering, University of Natal, South Africa. ivivNv.und.ac-za/nrgJnaners/umbcolor.html. 3. Connel Bell, Anaerobic Decolourizosation of Textile E1J7uents using a Modified Bardenpho Process. wwly.and.ac.za/und/nro/arounievconnel. html. 4. Dr. Geoff Mclvlulan. Dr. Poonam Nigam. Dr. W. Franklin Smyth, and Darren O.xspring, Bioremediation and Chemical Analvsis of Textile Industry Wastewater,wwlv.ulst.ac.uk/faculty/science/anoiolChem/btec07Dr.htm. A research group in Northern Ireland investigating specific bacteria and white -rot fungi having bioremediation potential. 21 ROSENBLUM ENVIRONMENTAL ENGINEERING 5650 Volkerts Road, Sebastopol, CA 95472 TO: FROM: SUBJECT: 1. OVERVIEW Ned Orrett, P.E. John Rosenblum, Ph.D. DRAFT tel (707) 824-8070 fax (707) 824-8071 March 15, 1999 Staaed Imolementaticn for a Pollution Prevention Proiect at Mishi The first objective is to optimize washing and dyeing processes and install efficient machines. The second objective is to verify feasible reductions in water, wastewater, chemicals, and energy, and to validate operational savings. This will confirm the correct design specifications (and costs) for full- scale implementation, including recycling systems to recover salt, detergents, heat, and rinse -water. The key measures for immediate implementation are: • Install water -efficient washing machines for pre -washing. • Install and modify water -efficient washing machines for dyeing. • Optimize the dyeing process to reduce water volume, salt concentration, and dye usage, while improving product quality and reducing defects. • Optimize detergent use in both pre and post -dye washing cycles. From the initial evaluation, the estimated full-scale reductions and savings from these measures are at least as great as those appearing for Phase 11 on Table 1 of the report. 2. PLANT -WIDE MEASURES • Planning and design specifications for installation. • Water softening for supply to the water -heater, using leased equipment. Softening is a key element for optimizing detergent and dye usage. • Flowmeters for supply -lines to hot and cold water inlets for new equipment. The meters will be used for recording total daily volumes, and for optimizing wash and rinse cycles. • Thermometers to verify correct temperatures during optimization, and to estimate heat losses. 3. PRE -DYE WASHING • Install at least one horizontal -axis washing machine, with flowmeters and thermometers. • Optimize detergent usage, temperature, and water volumes for washing and for rinses, by: (a) Analyzing spent wash solutions and rinses for oil/grease, lint, and activity of detergent. (b) Monitoring the impact on dye -quality (e.g. inadequate pre -wash will reduce color uniformity). 4. DYEING • install at least one horizontal -axis washing machine', with flowmeters and thermometers. • Modify the machine for. (a) Recirculation, including: pump, lint filter, heat exchanger, and spray nozzles. (b) Metering of dye, salt, and fixing agent (soda ash or caustic solution), including pH and conductivity control. • Optimize dye dose, salt concentration, fixing agent usage,water volume, and temperature by: (a) Using dye manufacturer's computer -modelling program to select initial combinations, based on color and fabric weight. (b) Analyzing solutions for dye exhaustion and fixation. (c) Monitoring the dyed fabric for color, uniformity, and other textile -dyeing criteria. • Minimize rinse volumes, including post -washing, by: (a) Analyzing rinses for salt and residual color. (b) Monitoring the quality of finished garments. S. ESTIMATED COSTS The intent is to utilize Mishi's in-house capabilities as much as possible, with assistance from a IOC21 plumbing/sanitation contractor. Equipment will be purchased based on Mishi's ability to utilize it regardless of the outcome of the optimization results. ' Also possible to use an existing machine, or machine used for pre -dye optimization. INDUSTRIAL WATER EFFICIENCY PROJECT Proposal for The Rose Foundation Submitted by The Bay Institute of San Francisco December 30, 1997 PROJECT NARRATIVE Overview This project will invoke the power of the marketplace to reduce the mass of pollutants discharged into the City of Petaluma (hereafter "City") sewers. This will be accomplished by identifying a strategy for re -directing a portion of public funds normally used for water and wastewater infrastructure to instead improve water use efficiency for the City's commercial, industrial, and institutional ("CII") customers in a manner that has less economic and environmental impact. Improved water efficiency translates to a reduced demand for public water and wastewater infrastructure. Restrictions on the concentration of pollutants that may be discharged into the public sewer (due to Federal Regulations as interpreted by a local Ordinance) means that the mass of pollutants will decline as water efficiency improves. Indeed, whether or not this linkage is required, it is the natural result of a well-planned efficiency project. One engineering audit reveals, for example, the potential to reduce copper and water discharged from a printed circuit board plant by 75-90% with a 2-5 year payback.' The City of Petaluma, like most cities, is charged with enforcing wastewater discharge regulations. This is an onerous burden that is costly for local industry. This project will outline a strategy for transforming this relationship into an economic development opportunity. By targeting the profit potential for local business, the City should recognize improved performance from its water and wastewater enterprise funds. Many studies demonstrate the potential for large water efficiency improvements in the CII sector. A review of California Best Management Practices prepared in 1991, citing numerous studies and actual projects demonstrating high savings for CII users, concludes "It appears reasonable to conclude that an average savings for the sector of 20% to 30% is achievable with extremely favorable payback rates."' Recent work by the Seattle Water Department, based upon 26 commercial projects that city has co-sponsored, confirms this projection: "Based on the results of this evaluation, customer survey interviews, and projected water rates, it is estimated that the commercial incentive programs could save Seattle Water approximately eight million gallons per day, or a twenty percent overall reduction in sector water use."' This savings rate, if duplicated in Rosenblum, Naser, and Orrett "Pollution Prevention in Practice," in Strategic Planning for Energy and the Emironmem, Vol. 13, No. 1: pp. 37-52. Robert Wilkinson, "California BlvfP Assessment," Rocky Mountain Institute, August 5, 1991: pp. 54-61. ' Dietemann and Paschke, "Program Evaluation of Commercial Conservation Financial Incentives Programs," Seattle Water Department, (no date, but subsequent to 1995). Petaluma ff'atershed Grant Application Pate 1 of 10 The Bav Institute of San Francisco Petaluma, is approximately 50 -fold greater than that projected for the default plan on the books today.' This project will outline a generic methodology for creating such projects in Petaluma, and provide a feasibility study for one industrial demonstration project. The emphasis will be to recommend a financial incentive system that will stimulate projects that significantly reduce the volume of vvater and mass of pollutants discharged over a long time, irregardless of the technology used. Rather than limiting the size of incentive to that which may be justified by avoided water supply costs alone, the value of public savings in wastewater treatment and effluent management will also be considered. The expected completion date for this project is not later than June 30, 1998. It must be noted that the project described herein — using the Rose Foundation grant — cannot be assumed to provide a fully developed CII plan. This instead is an opportunity to accurately describe what needs to be done, to whet the appetite, and thereby catalyze the Iarger effort. Institutional Support This project has been discussed with Mr. Tom Hargis, Director of Engineering for the City of Petaluma, and was presented to the City Council at their regular meeting on December 15, 1997. In accordance with Mr. Hargis' request, Mr. Orrett provided the estimate that this project could result in the cost-effective expenditure of $l to $2 million in support of water efficiency projects in Petaluma over the next five to ten years. A majority of the council members indicated their support for the project. Sonoma County Water Agency ("Agency") water conservation staff also expressed interest in this project, including exploring the feasibility of applying the methodology developed herein to CII customers throughout the Agency's service area. The Agency has already supported the City ofPetalumas and other cities and special districts it provides services to in subsidizing the installation of water efficient toilets. Relation to Existing Planning Methodology This project will build upon existing work. Perhaps most important is an exhaustive study commissioned by the Agency that established the economic basis for significant investments in regional water conservation (cited previously: footnote 4). Secondly are guidelines for statewide urban water conservation planning that define Best Management Practices.6 Significantly, Section G of the latter document places economic incentives to encourage water conservation — the subject of this project -- at the top of the list of Potential Best Management Practices. Rate studies conducted by the City will also be important source material for this project. ° Measure 3 for Petaluma, described in Montgomery Watson and Pacific Technology Associates, "Water and Wastewater Efficiencv/Avoided Cost Study," September, 1995. 5 Nelson and Orrett. 'Plan of Work, City of Petaluma Water Conservation Project: Replacement of Commercial and Industrial Toilets," Oct. 1, 1996. 6 California Urban Water Conservation Council, "Best Management Practices, Implementation Schedules, Assumptions, and Potential BIvIPs for Urban Water Conservation in California," revision dated September 30, 1997 (Final Exhibit 41 to the Memorandum of Understanding beMeen many urban water suppliers, non-profit public advocacy organizations whose prime mission is environmental protection, and other interested groups). Petaluma Watershed Grant --application Page 2 of 10 The Bav Institute o'Scn Francisco Tasks Kickoff Meeting Upon notice of funding, The Bay Institute Executive Director, consultants, and key City and Agency staff will meet to review the goals of this project and update the workplan as appropriate. Work will commence simultaneously on the next two phases (Create Financial Incentive Plan and Site Feasibility Study). Create Financial Incentive Plan 1. Evaluate Avoided Costs Innovative water efficiency programs provide financial incentives that are proportional to water supply costs — the marginal costs — that are avoided. The Agency, which supplies water to the City, has gone further in its water efficiency planning by also considering the marginal cost of managing treated wastewater. This project will add a rare third potential benefit that applies especially to CII customers -the marginal cost of removing pollutants from wastewater. The combination of these three values — marginal water supply, wastewater disposal, and wastewater treatment costs -- provides a yardstick with which to measure the level of public investment that is justified for re -allocation to CII efficiency projects. Additional intangible benefits from such projects include reduced environmental impact, improved financial stability of local industry, and supporting jobs that contribute to ecological sustainability. The limited funds available for this project preclude all but a cursory evaluation of these three sources of avoided costs. Accordingly, the project will review established avoided cost estimates, determine for what reasons they should be revised (e.g. ramifications of Endangered Species Act listings of fish native to the Russian and Eel Rivers, and modifications to City treated wastewater effluent operations), and possibly estimate current avoided costs. 2. Characterize Petaluma CII Sector Water Use The size and characterization of the CII market will be estimated. This involves reviewing City records to determine: • Volume and timing of water use (indoor and outdoor) • Number of users by category • Pollutant discharge characteristics • Detailed information about large users Again, given the budget limitation, an exhaustive analysis cannot be made (one is anticipated in the near future, however, when the City will retain a consulting firm to conduct a new rate study). The objective is to identify the market for CII services well enough to intelligently design a Financial Incentive Plan. Petaluma {t"atershed Grant Application Page 3 of 10 The BavInstitute of San Francisco 3. Review Commercial Existing Efficiency Incentive Programs Program information from other cities and agencies will be collected and reviewed. Key information sought includes: • Source of financing • Eligibility requirements • Financing feasibility studies • Ratepayer equity issues • Financial inducement mechanisms • Cream skimming ("cherry picking") and free rider issues • Performance evaluation • Interaction with pretreatment program • Program administrative costs 4. Outline Key Issues and Discuss with Staff 5. Develop Draft Financial Incentive Plan: Discuss with Staff and Participants Selected by City 6. Prepare Recommended Financial Incentive Plan Site Feasibility Study A site feasibility study is included in this project for the purpose of developing tangible evidence of the magnitude of savings and pollution prevention that are possible. Although insufficient funds are available for a full-blown engineering study, enough is known about some sites already that with relatively little additional work, the "tangible evidence" objective may be achieved. The visceral understanding of the savings potential will help vitalize the additional effort required to move beyond studies to a working program. 1. Select Site The ideal site will be an industrial facility with which the consultant is familiar, and where large flow and pollutant reductions may be achieved in a relatively straightforward manner. This criterion is more reflective of the budget for this project than of ability to achieve savings. Another requirement is an owner willing to participate. The public sharing of information, being the recipient of a "subsidy," or the perceived expectation to invest in a project after a favorable analysis are sensitive issues that could cause an owner to be hesitant about participation. Petaluma li'atershed GrantApplication Page 4 of 10 The Baylnstitute of San Francisca 2. Describe Existing Resource Flows Determine the baseline conditions of an industrial site: resource flows (e.g. water, electricity, gas, chemicals) per unit of time. These should also be standardized by unit of production, or other appropriate parameter, so efficiency can be measured relative to business activity. For example, if a laundry instituted a project that decreased water use by half, but later doubled its business, one might incorrectly assume no savings took place. When resource flows are measured in terms of business activity (e.g. gallons of water per pound of laundry), savings relative to baseline usage are clearly defined. Additionally, resource efficiency can be compared, in this case, to other laundries to reveal relative performance. 3. Develop Plan for Improving Water Efficiency 4. Estimate Project Cost (perform simple pilot testing if possible) S. Prepare Pro -Forma Financials for Owner and City/Agency Staff Deliverables 1. Reports to City and Agency i Recommended Financial Incentive Plan e Feasibility report for one industrial efficiency project in Petaluma 2. Letter Report to Rose Foundation: summary of project accomplishments PROJECT BUDGET 515,000, an amount sufficient to meet the minimum goals of this project, is requested. Details are presented on Table 1. Additional funding will be sought from the Agency and interested cities to allow developing three principal tasks in greater depth than this important seed financing permits: • Develop a Generic Offer -- that is, a model contract document for use between the City (or other Agency contractors) and CII customers who undertake efficiency projects • Update the avoided cost estimates, particularly of the Agency's water supply • Co-sponsor a demonstration project TLIIETABLE A three-month project is envisioned. Petaluma (Gatershed Grant Application Page 5 of 10 The Bay Institute of San Francisco Month l: Kickoff Meeting. Commence review of incentive programs and Petaluma CII sector. Determine site for feasibility evaluation. Month 2: Begin Drafting Incentive Plan, and feasibility study. Month 3: Complete all reports and present findings to staff and City Council ST.4FFUNG AND SUPERVISION The Rose Foundation Project Manager: Mr, Tim Little The Bay Institute of San Francisco Project Manager: Mr. Grant Davis Principal Consultant Ned Orrett, P.E. (Pacific Technology Associates) Sub -consultants John Olaf Nelson, P.E. (Water Resources Management) Mr. Nelson, formerly General Manager of North Marin Water District, is a nationally -recognized leader in water conservation. Gary Carmianani, M.S., Richard Conrad, Ph.D., Paul Palmer, Ph.D., and John Rosenblum, Ph.D.: will assist as needed with feasibility study. Technical Help Kit Rosefield (Sanitation Specialties: water testing and on-site mechanical assistance as needed) City of Petaluma Contact: Mr, Tom Hargis, P.E. Sonoma County Water Agency Contact: Ms. Ali Davidson Table 1 provides the proposed distribution of tasks among the above participants, identifies the lead party for each task, and allocates the S15,000 budget. DISSE=ATION OF RESULTS Given the budget limitation, results will be disseminated in writing only to City and Agency staff, and to the owner of the facility for which the Feasibility Report is prepared. A oral report will also be ma--'-- to the City Council at the conclusion of the project. Petaluma Watershed Grant Application poge 6 of 10 The Bevinstiture ofSan Francisco Table 1: Task Delegation and Budget (Phase I with Rose Foundation Seed Financing) Petaluma liarershedGranrApplication Page 7of10 The BavInstitute ofSan Francisco M� oE of TASKN o 'o E m°�` rs o aur tQ mq rs �a ° w F ¢ v>>< o ca m U Kickoff Meeting ® ❑ $100 ❑ $150 ❑ ❑ Create Financial Incentive Plan Evaluate Avoided Costs ❑ H 5800 s0 ❑ ❑ Characterize Target Market ® $400 ❑ $300 ❑ Review Other Programs ® $1,600 ❑ 5600 ❑ Review Key Issues ❑ ® $400 ❑ $600 ❑ ❑ Identify Interested Parties 50 50 Draft Incentive Plan ❑ ❑ 5400 I E 53,900 ❑ ❑ ❑ Site Feasibility Study Select Site E I 5400 $0 ❑ ❑ Develop Pro Forma Project M 1 $2,400 50 ❑ Demonstrate Technology ❑ ® $400 ❑ $150 ❑ ❑ ❑ Prepare Report ® $600 50 ❑ Present Findings Oral Presentations M $100 50 ❑ ❑ SummaryArticles ® so so ❑ ❑ Report to Rose Foundation ® ❑ 5200 50 Le°end TOTAL FEE: 51,500 $7,800 55,700 Lead: Participate: ❑ Petaluma liarershedGranrApplication Page 7of10 The BavInstitute ofSan Francisco EVALUATION PROCEDURE This project may be evaluated as a success when, within the projected three-month time span, the deliverables described at the conclusion of Project Narrative (above) are produced. Should the concept described herein attract supplemental funding, so much the better. More important measures of success will become apparent later. These include the implementation of a CII program in Petaluma based upon the recommendations of this study that accomplishes one or more of the following: • Reduces water use by an amount more than projected by Measure 3 of the 1995 Water and Wastewater Efficiency/Avoided Cost Study (the default indoor water conservation program for CII customers noted in footnote 4: this projects a maximum estimated savings of -8,600 gallons per day, whereas a 20% sector -wide savings rate in Petaluma, as projected in Seattle, would total approximately 430,000 gpd for the same year) • Reduces the load of pollutants reaching the wastewater treatment plant by a measurable amount below trendlines (this is especially important for heavy metals, which are difficult to reduce by treatment to the minuscule concentration preferred for discharge to the shallow Petaluma River) • Reduces wastewater ordinance compliance concerns for participating industrial. customers • Produces word-of-mouth referrals to the program due to bottom-line performance • Generates credible industrial water efficiency business activity (a new service category) • Triggers the development of similar economic incentives for other water -saving measures, such as irrigation efficiency improvements (inducement proportional to measured results) • City and Agency feted by economic development, taxpayer, and environmental advocates • Project provides evidence and methodology to help the inevitable transformation of water/wastewater utility thinking from throughput to systems approach APPENDICES Attached as Appendices, without further identification, are two letters: A. Internal Revenue Service letter attesting to The Bay Institute's Non Profit Status B. Letter of Support from Mr. Tom Hargis, Director of Engineering, City of Petaluma Note: original document printed on James River Eureka! 100 (100% rec,cled postconsumer fiber). Petaluma Watershed GranlApplication Page 8 of 10 The Bay Institute of San Francisco Internal Revenue Service District Director BAY INSTITUTE OF SA14 FRANCISCO 625 GRAND AVENUE, SME 250 SAN RAFAEL, CA 94901-3577 EIN: 94-2717001 Dear Taxpayer: Department of the Treasury P.O. Box 2350 Los Angeles, Calif. 90053 Person to Contact: L D.MAGAN Telephone Number: (213) 894-2336 Refer Reply to: EO(0711)95 Date: AUGUST 4, 1995 This letter is in response to your request for a copy of the determination letter for the above named organization. Our records indicate that this organization was recognized to be exempt from Federal income tax in AUGUST 1981 as described in Internal Revenue code Section 501(c) (3). It is further classified as an organization that is not a private foundation as defined in Section 509(a) of the Code, because it is an organization described in Section 17 0 (b) (1) (A) (vi) . The exempt status for the determination letter issued in AUGUST 1981 continues to be in effect. If you need iurther assistance, please contact our office at the above address or telephone number. Sincerely, �. (6c'juv�-�, Disclosure Assistant Adayor M. Patricia Hilligess Vice,Vavor ]ane Hamilton Councibeembers David Keller Matt Maguire Nancy C. Read Mary Stompe Pamela Torliatt City ol. Fletalurna II Ln�lisl, Slat t PUSI (MICU BON til -- 1't'liIIL-11110, Cillif01'110 94953 Mr. Grant Davis, Executive Director TIME BAT INSTITUTE 0I7 SAN FRANCISCO 55 Shaver Street, Suite 330 San Rafael, CA 94901 Enginccring Dcpartment (707) 778-3304 FAX (707) 778-3437 December 30, 1997 RE: The Bay Institute's Watershed Grant Proposal to The Rose Foundation Dear Mr. Davis: Based upon the information provided to me, the City of Petaluma will be pleased to make use of the technical assistance proposed in the attached grant application. The timing is excellent, for we anticipate expanding our water conservation program to serve the commercial sector in greater depth beginning in Fiscal Year 1999/2000 (currently, the City is sponsoring a commercial/institutional toilet retrofit program). This project promises to create the generic methodology we need to develop a long -tern, highly effective program. The combination of pollution prevention with water conservation that the proposal describes, particularly as it addresses the removal of metals at their source, will be especially beneficial for the City. Additionally, the concept of approaching these goals within the context of local economic development creates additional opportunities and alternatives. I appreciate your selection of well qualified consultants, and hope we may proceed together next Spring. TSH/slh Very truly yours, Thomas S. Hargis, P.E. Director of Engineering xc: City Manager City Council de file luu hcd a