TO: Honorable Mayor and` Members of the City Council through Ciccty Manager
FROM: Pamela Tuft -Interim Director, Water Resources & Conservatl~.~'
SUBJECT: Resolution Approving the Project Budget and Award of Contract for the Recycled
Water Booster Pump StationNo. 2 Improve"rrients Project.
RECONINIENI)AT1ON
It is recommended that the City Council adopt ~tfie,attached:Resoluton approving the project
budget and award of contract for the Recycled Water Booster Pump Station No. 2 Improvements
Project to Cats 4U, Inc.
>BACKG12O1JND
,. r
s Lane (see attached location
"" y p don Brown
Rec cled Water Boost y y y
p). 981and conve s lsecondar~ retc Bled water from, the oxidation ponds at
ma It was built in 1
°; i~,- ~ Lakeville Highway to agricultural land for' irrigation. During`the,~dry weather season this pump
station operates at full-:capacity to deliver recycled water to the agricultural users. The pump
station comprises .four 75-hp pumps;, two of which are controlled by variable frequency drives
"' (VFDs) a surge tank, instrumentation, and motor control centers. ~ The existing electrical
equipment -and control systems of the pump station have been operating for almost 30 years and
are in need of upgrade to' prevent system:failure.
The project was origina'lly'bd in Eebruary201.0. City.Councl awarded the construction contract
to the low bidder on Apri17, 2010; and on June 7, 20,10, the contract was terminated after it
becarrie apparent that',:;the~ low bidder would not be able to meet project deadlines in time for the
start ~of the-recycled`~water irrigation season.
D1S:CUSSION
The Recycled Water,Booster Pump Station:No. 2 Improvements:Project includes demolition and
installation of riew electrical equipment and motor control systerris..The~project includes
upgrading the'equipment to current National Electric Code standards, and installation:'ofthrce,
City supplied„ variable frequency drives, conductors,; and motor and .heat sensors which. wild
City~to. optimize pump operations. These improvements will. increase the energy ..
allow the;
effi'ciency.of the pump.. station and reduce maintenance costs. ,
n.
Agenda.Revew: - .
y ~ Finance:Director Cite Mana ei 1
"~ ~ ~ City Attorne, ~ ° ~ ' .~ ~ Y ~ g ~ ~ .
. , ,~, r
,~~~
„~„~ ~ ,
w
~u
~, . ~ ~ ,
f
The Notice Invitin Bi tuber 15 201 ~ n S'e ternber 29 20:1"0 two bids i ^ ~ I I I '~I
g ds w~as~ issued on ,S~~epte ~ 0: Q ~ p "
were received ~as'~ fo lbws:
-Name. of Bidder Bid Total
Cats 4U, Inc. $67,65,0 Lowest. Responsible Bidder
G. D. Nielson Construction, .Inc. $79,690 .
Engineer's Estimate $80,000 ~~
Cats 4U, Inc. has performed similar projects for the City of Petaluma and the City of Rohnert
Park. Staff verified that Cats ~4U, Inc. possesses a valid Class A California Contractor's License,
license number 465781, which expires on October 1, 2011, that :qualifies Cats 4U, Inc. to
perform the work.
Construction is scheduled to begin in November 2010 and be completed in February 20.11 prior
to the start of the dry weather irrigation season:
FINANCIAL IMPACTS
The total 09/10 budget for this project. (000500908) was $612,OOO..,,,,,The current project balance
is $486,921.55. Project funds utilized to date have been' for professional engineering services to
evaluate the recycled water boost"er pump stations; design of pump station 2 .improvements,
programming and instrumentation for system. integraton,.b`id~services and;purehase long lead
items including two variable frequency drives, two pressure transmitters, a flowmeter, and the
control panel The construction contract with Cats 4U, .Inc: will be for a not to exceed. amount of
$67,650; with a construction.contingency of$25;000 budgeted to address issues, arising during
. ,~J
construction. There. are,also current Professional Services' Agreements. with ArcSine
Engineering for Design Services and Construction Management Services. The total cost of this
project is anticipated to be $3:00,000:
This item was originally budgeted in FY 09/1.0 and thus the project will be reflected in the FY
10/11 mid-year budget adjustment.
A'T'TACHMENTS
1. Resolution
2. Location Map
2
Attachment 1
' , „~,„~ ,
U. ~~ .
~~H •{w~
~ ~. ,i,.
RESOLUTION APPROV~G T>FIE PR®.TEC,~' ~i:TDGET AND
AWA12D; OF CONTRAC'T' FOR TTIE RECYCLED WATER.
BO®STEIt PUMP NO.. 2 IIVIPROVEIVIENTS; PROJECT
CITY PRO.TEGT NO: 000500908
W>EIEREAS, City staff, working with ArcSine Engineering, has prepared construction bid
documents and advertised forconstrizction ofthis Project; and
WIEIEREAS, in accordance with the City of'Petaluma.Charter and.Municipal Code, California
Public Contract Code. Section 20162 and other applicable law, City staff solicited bids for the
Project; and
WTIEREAS, the project was bidon September 1.5, 20.10, and two (2).bids were received and
opened on September 29, 2010 in accordance with applicable law; .and
WIIEREAS, the lowest bid.:for•the Project was from' Cats 4U, .Iris: for' $67,650 and
WHEREAS, staff has determined that Cats. 4U, Inc.'s bid satisfies the bidding requirements for
the Project.; and
WHEREAS, staff has verified that Cats 4U, Inc. possesses a valid. California Contractor's
License; Class A, number 46578:1. that qualifies Cats 4U, Inc. to perform the Project; and
WI~EREAS, the Project is categorical'l`y exempt pursuant to California Environmental Quality
Act ("CEQA"). and Title 14, the California Code of Regulations ("CEQA Guidelines"), Section
1530:1, because the project consists: of rehabilitation of existing structures, facilities, or
mechanical equipment involving negligible or no expansion of an existing use.
N®W, TIIEREFORE,.BE IT:RESOLVED that the City Council of the City hereby:
1. In accordance with the City of Petaluma.Charter and Municipal Code, California Public
Contract .Code;Secto_n'201.62 and other applicable law, waives any acid all non-
conformance. in the bid of Cuts 4U, Inc. forthe Recycled Water Booster Pump No. 2
Improvements. Project; Project No. 000500908, finds the lid of $'67,650 to be the lowest,
responsive bid, and. further finds that Cats 4U, Inc. is the lowest responsible bidder.
3
~:
... ~ 7I, ,
Attachment ;l
d~+, ~ ~i~i ~ it o ~ i ~~: r ~ ~~ ~ , '
i ~ ~C I , n
~dF.
. ~ i ..
2. Authorizes the inclusion of the necessary budget adjustment in the mid-year. Budget r
Adjustment as follows:
Account Number 'Description Amount
000500908-30300-54110 Recycled Water Pump Station 2 $145,000
Improvements -Design
~, 000500908-30600-54'1.51 Recycled Water Pump Station 2 $80,000
Improvements -Construction
000500908-30700=541.52 Recycled .Water Pump Station.2 $50,000
Improvements - Construction,Management
~~' ; 000500908-3.0800-54151 Recycled Water Pump Station 2 $25,000
'' Improvements - Contmgency
Total $300,000
3. Awards the contract for the Recycled Water .Booster. Pump; No:: 2 Improvements Project
~~ " to Cats 4U, Inc. in the amount of $67;650, the. amount of the lowest responsive bid,
~' conditioned on Cats 4U, Iric's timely executing the project contract and submitting all
required documents, including but not limited to, executed bonds, :certificates of
insurance, and endorsements, in accordance with the project bid documents.
4. The City Manager and/or his designee is hereby authorized to execute on behalf of the
City of Petaluma amendments to the contract, so long as: such amendments in the
aggregate do not increase the original contract not-to-exceed amount by more than
$25,000.
5. Directs staff to issue a notice of award to Cats 4U, Inc.
6. Authorizes and directs~~the City Manager to, execute the project contract on behalf of the
City of Petaluma upon timely submission by^Cats"'4U, Inc. ofthe signed project contract
and all other required document, including but notaimited to, executed bonds, certificates
of insurance, and endorsements; in accordance with the project bid, documents.
G:. .,
4
„~
,,,
;,,,
~~a'~ ~~
a, o I I~„ um ~ i 'i"7, i n , ,~ iii
ATTACHMENT 2
~.~
~~,~
'; ;~
r',,. .,
~ ;~,
i
~~ ~ /
~~.
\. ~~ pP~/
i ~ ~
i
.'
i ; ~ <F<Y
i i•~.
~~ ~'
~ ~~.
-~~> y~~ i S~~
is
(ST'9?F` \~`
~i o~
Ellis Creek b'J ~
Water Recycling Facility, ~
~C.
i ~.
i
i
i
.~
i
i ~
i
~O
\'~O
_~. ~
~. ~
~. •~
~ ~~ .. /
\ / i
\\~ V/ ~
~~ ~ 1
Project Site
/ v
~ V~