Loading...
HomeMy WebLinkAboutStaff Report 4.E 06/15/2015. r DATE: June 15, 2015 Agenda Item #4.E TO: Honorable Mayor and Members of the City Council through City Manager FROM: Dan St. John, F.ASCE — Director, Public Works & Utilities Larry Zimmer, P.E. — Deputy Director, Public Works & Utilities SUBJECT: Resolution Approving the Purchase of a Pre - engineered Bathroom and Concession Building Package for East Washington Park RECOMMENDATION It is recommended that the City Council adopt the attached Resolution Approving the Purchase of a Pre - engineered Bathroom and Concession Building Package for East Washington Park. BACKGROUND This project consists of building a split face Concrete Masonry Unit (CMU) block restroom and concession combination building located near the soccer and lacrosse fields at the new park on East Washington Street. Staff has researched pre - engineered model buildings based on the approved Conceptual Master Plan for East Washington Park and recommends such for this project. The restroom would consist of 3 stalls for each gender, concession area, and storage area. Constriction and installation of the building will include building a concrete slab with connection to sidewalks and utilities installed as part of Phase 1. Additional bathroom and concession facilities are planned as part of the Conceptual Master Plan as more fields are built. DISCUSSION Due to budget constraints and the priority placed on providing new playing spaces, the reduced Phase 1 project that was just completed did not include restroom facilities, thus there are currently no permanent facilities in the new park. The project is identified as the next highest priority for development of this park and is included in the FY 15/16 CIP budget. The project is tentatively scheduled for construction in spring 2016 if weather permits. The pre - engineered manufactured restroom and concession building package will be similar in style to bathroom buildings currently at Prince Park and Wiseman Park. In addition to the restroom and concession building, staff is researching the possibility of adding a steel maintenance building as an additive alternate bid item to the project. The building kit does not require bidding because it can be procured via the State of California's California Multiple Award Schedules (CMAS) Program. CMAS obtained very competitive pricing from Romtec, one of the leaders. in pre - engineered buildings. Via the CMAS bid, Romtec's purchase price including tax and delivery is $129,173.92 for the combination building, not including setup and installation. Petaluma recently utilized Romtec for the purchase of the bathroom building at Wiseman Park, which is now in use. Final design of the building will be completed prior to bidding, and manufacturing of the building will occur once a construction contract is awarded by the City Council with delivery estimated within three (3) months of placing the order. It is anticipated that construction and installation of the building, which includes the slab, building and various connections to utilities, will cost between $115,000- 150,000. The estimated total project cost is $312,871, and in addition to the building kit, site preparation and construction, includes design, survey and permits, legal and project management services, CIP overhead and project contingency. The total estimated cost for this project as identified in the park master plan was $461,000. As can be seen, this approach to the project results in significant cost savings. Project funding is comprised of Parkland Impact Fees and Developer Contributions. Please note that construction of the project is contingent on current project close -out, and sufficient project budget available to undertake the installation. Staff is requesting authorization to order the building from Romtec which will activate final design for the building. The project will come back to Council for award of construction prior to placing the final order. In the event that construction bids come in over budget, the City will only be required to pay for design fees of approximately $5,364 of the total building cost. The Recreation, Music & Parks Commission considered the matter at its regular meeting held on May 20, 2015, and approved action recommending City Council support of the proposal. The Public Works Parks Maintenance Division will manage cleaning and regular maintenance service of the building. Also note, contingent on sufficient funding and simultaneous to this project, staff will be conducting selection of a design consultant to begin final design of the regulation baseball field. The proposed action meets Council Goal: "Plan for and implement priority capital projects as funding permits ". FINANCIAL IMPACTS The project is in the proposed FY 15/16 CIP budget with an estimated total project cost of $315,000. Project funding is comprised of Parkland Impact Fees and developer contributions. The project will come back to Council for award of construction prior to ordering the manufacturing of the building. In the event that construction bids come in over budget, the City will only be required to pay for design fees. Approximately $5,364 of the total building cost is to provide engineering plans and specifications by Romtec and an additional $10,000 is estimated for surveying, building review and in -house design for the foundation and existing sidewalks. ATTACHMENTS 1. Resolution 2 2. Romtec Quote and Plan Attachment I RESOLUTION APPROVING THE PURCHASE OF A PRE- ENGINEERED BATHROOM AND CONCESSION BUILDING PACKAGE FOR EAST WASHINGTON PARK WHEREAS, the City of Petaluma is preparing construction of a bathroom and concession facility on City owned land to meet the needs of the Petaluma community at the new park on East Washington Street; and WHEREAS, the City Council has approved a Conceptual Master Plan for development of the park and the City recently completed phase I construction including 3, lighted, artificial surface playing fields; and WHEREAS, at its meeting on May 20, 2015, the Recreation, Music and Parks Commission reviewed the purchase of a pre- engineered bathroom and concession building package for East Washington Park and recommended approval of the purchase to the City Council; and WHEREAS, an Initial Study and Mitigated Negative Declaration (MND) was prepared pursuant to the requirements of the California Enviromilental Quality Act ( "CEQA ") and adopted by the City of Petaluma, which concludes that there is no substantial evidence that the proposed East Washington Park Project, as mitigated, will have a significant adverse effect on the environment; and WHEREAS, the Petaluma Municipal Code section 4.04. 100 provides that purchases made through a cooperative purchasing program with the state, county or other public agencies are exempt from provision of Chapter 4.04 of the Petaluma Municipal Code which requires the City to conduct its own competitive bid process for certain purchases and documentation as to the advantage of the cooperative purchase will be retained; and WHEREAS, the project is identified in the 2015/16 CIP budget. NOW, THEREFORE BE IT RESOLVED, that City Council of the City of Petaluma adopts this Resolution Authorizing the Purchase of a Pre - engineered Bathroom and Concession Building Package from Romtec Inc., utilizing competitive pricing and assigned options from the State of California's California Multiple Award Schedules Program and directs the issuance of a purchase order in the amount of $129,173.92. 4 R P(E?*,)) M T E C Attachment 2 #4 -04 -54 -0011 Oregon Romtec, Inc. CMAS #GS- 07F -0095M GSA Contract #849246 California Contractor's License California Multiple Award Schedules (CMAS) offer a variety of commodities and services at prices that have been assessed to be fair, reasonable and competitive. Orders placed against a Multiple Award Schedule are considered to be issued using fair and open competition. Therefore, ordering offices need not seek further competition or make a separate determination of fair and reasonable pricing. The use of these contracts is optional and is available to both California State and Local Government agencies. Agencies may contact and issue orders to Romtec directly. The CMAS contract includes all Romtec vault and plumbed restrooms, restroom /shower facilities, concession and multi -use buildings, pre- engineered utility buildings plus fixtures, hardware and accessories. For information call or go online to our website, www.romtec.com. Romtec is pleased to provide complete "turnkey" supply and installation of any Romtec facility. Through the above listed CMAS contract, any California State or Local government agency can enjoy the professional supply, design and installation services of Romtec. Contact Romtec to discuss how we can provide and install your facility within budget and on time. To make a CMAS purchase, contact Oregon Romtec Inc. 18240 North Bank Road, Roseburg, OR 97470 Sales Support: 541 - 496 -3541 service @romtec.com CMAS has different regulations, forms, and qualification criteria for State Agencies vs. local governments. For more details and specific information or guidelines you can contact CMAS State of California, Department of General Services, Procurement Division 707 Third Street, 2 d Floor, West Sacramento, CA 95605 916/375 -4365 cmas @dgs.ca.gov Their website at http: / /www.dgs.ca.gov/ has an on -line information packet for state and local agencies. 18240 North Bank Road -- Roseburg, OR 97470 PH: 541- 496 -3541, FAX: 541 -496 -0803 mvw.romtec.com email: service @ronrtec.com approved c,,,, r UVNIWll3Hd taeo-ssrflnl xrj Irs�9sr(IVSI OLVL6 210'J21f183SOTJ -- OOVVOH NNVS HiWN OVZH l 111 Q v LU (`OL 1 Ml R Z d' �LL �Q Ym v �z mz zw s� 0 LL JW ¢7 LL Nv td ',�4001A v,0 ,vHn7H1Ad X3-ldW0,D G- LaiodS yvIn-ldlgd N011 VAv !J 'D3ZI 8 vHn-i /1Ad AO '03LW d0 NGY551 W J?d N31LLU 3H11nOHiM'SNY1d 353H1 ON.1 Q31WWIGN'. * 3G WW SONIMIII9 ON ONb"cmU ,.U9n IT A NO O31dVW 'Q3'JnQO All 39 ION l VN 6W SN' Id 3S3H1 S1HVIN 17Y '9NI '93LW0?J GWO F a= wa Q6 r n n N Q r v N ry N ry K u ZZ ON a_ Jt VI Q O III 0 Y C, J 4 / a m \J J U N AHVNIWI'13Hd coeu -ear flM rri Irsc9cr ll�l um 210'sHnsiS021- OV021 NNVB H18ON 06ZB1 D�l LLW ON SNOI- LV/\313 :3.... b� 'dwmdl�d xg-idwo,D sl�ods �wm�l�d NOIl}/324'::G�!4 8 s>N v`d ON '031WOTJ d0 NOI551 34 NSLUi 9Hl LOH1M SNYid 353H1 NONJ Q310f2ll5NO-) 38 AWW S9MOIMg ON 4Md '031f191?ll'. 2 H12Vld 210 a3JJV4 'MXCOTJc4lN 3910N k" SONiM O ONW GNW 3 H.L '03I. GSIS GIH"'_ 11W '7NI "J3LH0 SIOC L O IJ l O L m l N z r 02 9z mz UW 3° O � LL Uz X J • ip LL Sc iC 11 3 U 0 LL O J a � J a O Nw F zLLQ�N �oa�z zNZg pO�iLL pFdU� /=zw�LL J�ZWI- wLLO-'0 p�mmz �J�Fz z�4zi w wo iz900 FamUz N MENEM Sc iC 11 3 U 0 LL O J a � J a O Nw F zLLQ�N �oa�z zNZg pO�iLL pFdU� /=zw�LL J�ZWI- wLLO-'0 p�mmz �J�Fz z�4zi w wo iz900 FamUz N PART 1: GENERAL 1.1 DESCRIPTION Project Name: Petaluma Sports Complex — Concession and Restroom Location: Petaluma, California Date: 2/17/2015 [ WAMYK1I0 D] A. Romtec is a single source design, engineering, and manufacturer who shall supply the sealed plan set as well and the structural and mechanical building components as a complete, pre - designed packaged restroom building as shown on drawings and as specified herein. B. The contractor is responsible for building installation, hereafter designated as the installer. Installer work will include site preparation and grading, excavations for structures, backfill and /or structural backfill, foundation and pad construction, and building installation. C. Romtec packaged restroom buildings are the latest standard product of a supplier regularly engaged and having at least twenty (20) years of experience in packaged restroom building engineering, design, supply, and construction. D. Romtec buildings are designed to meet local codes for permanent structures. Buildings that are temporary, relocatable, prefabricated, or pre -cast are not an equal to permanent, on site, conventional construction. E. The Romtec building package has been quoted with the specific product colors noted below. Changes to these color selections may result in a price increase. F. The building and its concrete footings, foundation, and slab are engineered by Romtec to meet site specific conditions including wind and snow loading, local frost depth, and ground conditions. Prefabricated modular mats placed on compacted base are not equal to Romtec's site specific, site poured, engineered foundation. 8 G. Typical fasteners such as nails, staples, and screws shall be supplied by installer. Atypical fasteners shall be supplied by Romtec. Contact Romtec for fasteners clarification if necessary. H. Local building departments reserve the right to modify national building codes to meet the needs of their area. There is no way for Romtec to always know what the requirements of the reviewing authority will be. Romtec has made every effort to meet local codes. Any revision after submittal approval and notice to proceed will result in a change order. I. Once submittal approval is received, three (3) wet stamped sets of plans and structural calculations shall be issued. Any additional plan sets and /or structural calculations can be obtained for a fee. J. The specific supplier is indicated for each item. Romtec, installer, and owner supplied components are listed as such. 1.3 SUBMITTAL DOCUMENTATION A. Romtec will submit the Scope of supply and design submittal (SSDS), including the construction drawings and all component data sheets. One full round of SSDS revisions are provided by Romtec in the design and engineering services with building plans under seal of a certified technical designer and complete structural calculations meeting code under seal of a professional engineer with current license in the project state. B. Romtec does not provide LEED /Green submittals as a standard service. Romtec can assist in providing documentation for products that may meet LEED /Green standards, but Romtec does not provide or fill out LEED credit forms. Unless specifically included in Romtec's proposal and quote, Romtec does not supply materials with the intent of meeting LEED standards. Any changes due to LEED or Green building requirements will result in a change order and increased lead times." 1.4 WARRANTY A. The building and all its associated components shall be warranted against defects in materials and workmanship for a period of not less than one (1) year from date of final acceptance. 1V.111m <! E9�Z4111041&1 2.1 FOUNDATION AND WALLS A. All materials, equipment and labor for foundations /footings, interior slabs, exterior /entry slabs, and sidewalks shall be supplied by installer. B. Concrete Masonry Units - CMU shall be supplied by Romtec. 1. Exterior walls shall be constructed of split face, 8" x 16" x 8" mortar joint concrete masonry units (concrete blocks). 2. Block shall be tan. 3. Interior wall finish shall be latex epoxy paint supplied by installer. C. Masonry (concrete) grout and rebar shall be supplied by installer. D. Wire weave gable vents shall be supplied by Romtec. 1. Vents shall be powder coated RAL 8019. E. Kick proof wall vents shall be supplied by Romtec. 1. Vents shall be powder coated RAL 8019. F. Doors, frames and hardware shall be supplied by Romtec. 1. Doors and frames shall be powder coated RAL 8019. G. Aluminum roll -up door with stainless steel counter shall be supplied by Romtec. H. Utility roll -up door shall be supplied by Romtec. 2.2 ROOFING A. Roofing materials shall be supplied by Romtec except where noted. 1. Glulam beams 2. Tongue and groove decking 10 3. Antique Bronze colored metal panel roofing 4. Roof extension shall be decking and roofing extended to posts. B. Sealant for beams and decking shall be supplied by installer. 2.3 PLUMBING AND FIXTURES A. Plumbing rough -in, installation and trim shall be supplied by installer. B. Floor drain(s) shall be supplied by installer. C. Hand washing sink shall be supplied by Romtec. D. Three bay utility sink shall be supplied by Romtec. E. Mop sink and ADA faucet shall be supplied by Romtec. F. Stainless steel non - refrigerate drinking fountain shall be supplied by Romtec. G. Restroom fixtures shall be supplied by Romtec. 1. Stainless steel wall mount toilets and manual lever flush valves. 2. Stainless steel top supply urinal and manual lever flush valves. 3. Stainless steel sinks and push button faucets 4. Natural sand colored phenolic partitions. 5. Grab bars, diaper deck, seat cover dispenser, soap dispensers, and toilet paper dispensers 2.4 ELECTIRCAL A. Electrical rough -in, installation and trim shall be supplied by installer. B. Interior and exterior building light fixtures shall be supplied by Romtec. C. Hand dryers shall be supplied by Romtec. D. Main breaker panel sized for the building components shall be supplied by Romtec. 2.5 OTHER MATERIALS & EQUIPMENT A. Unless otherwise specified, the following products and materials are NOT supplied by Romtec. 1. All items not listed in Romtec Products. I 2. Any item listed as supplied by "installer ", "contractor ", "owner ", or "others ". B. Unless specified in the plans or submittals, Romtec does not supply the following: 1. Building installation 2. Asphalt paving 3. Masonry pavers 4. Sidewalks 5. Landscaping 6. Site grading 7. Cast -in -place concrete foundations, footings, interior slabs and exterior /entry slabs 8. Concrete slab sealer 9. Mortar 10. Concrete grout 11. Rebar 12. Latex epoxy paint 13. Caulk for siding 14. Plumbing rough in, installation and trim 15. Electrical rough in, installation and trim 16. Drain valves and backflow check valves 17. Branch circuit breakers 18. Switches & outlets 19. Fluorescent tubes for light fixtures 20. Wall hangers for toilets 21. Typical fasteners; for example roofing nails, staples, etc. 22. Fasteners not included in product packaging 23. hrrigation Equipment 24. Gutters and downspouts 25. Fire alarm and fire suppression equipment 26. Lighting equipment not attached to the building 27. Clear coat finish for all decking, glulam beams, posts, and extensions 28. All other items indicated on final plans or required by building codes which are not specifically stated as supplied by Romtec. PART 3: EXECUTION 3.1 SPECIAL INSPECTION A. If required, special inspection shall be o;vner supplied. 12 3.2 DELIVERY, STORAGE, AND HANDLING A. Owner or installer will assume responsibility for adequate protection of materials from weather, damage, and pilferage or all warranties, expressed or implied may be voided. 3.3 OPERATION & MAINTENANCE MANUALS A. Do not throw away the Operations & Maintenance manuals that are provided by some manufacturers in their packaging. It is the responsibility of the installer and /or owner to collect and maintain these manuals. 13 ROCKJ )MrlrqE PRE - ENGINEERED BUILDINGS CMAS QUOTATION -CONTRACT #4- 04- 54 -0011A State of California Contractor's License # 849246 1"�idlUfild J�UflS 1iU111�ItrX Company: City of Petaluma Contact: Erica Ahmann Smithies Address: Petaluma, CA 94952 Phone: 707 -776 -3673 Fax: 2089 -0137 18240 North Bank Road Roseburg, OR 97470 P: (541)496 -3541 F: (541)496 -0803 service(a-)romtec.com Date Quote # 02/23/15 81502024 ..._ E-mail: eahmann(a)cl.petaluma.ca.us CA DIR # 1000002582 TERMS: Materials payment due net 35 -day from date of shipment per facility. The construction payments will be billed per progress payment schedule. See Romtec Scope of Supply and Services dated 2/17/15 2089 Sierra III Multi -User Restrooms w/ Concession & Storage OPTIONS - CHANGES TO BASE MODEL 2089 -0015 ROOFING: 26ga, Horizon 16, Metal 2089 -0017 ROOF EXTENSION: Timber Truss & Post, 6' 2089 -0065 STEEL FINISHES: Powder Coat 2089 -0102 HAND DRYER: Fast Air 2089 -0120 TOILETS; SS: Wall Mount 2089 -0137 URINAL; SS: Top Supply 2089 -0130 SINKS: 18 x 18, Stainless 2089 -0153 DRINKING FOUNTAIN: Wall Mt. SS non Ref. 2089 -0132 SINK; FAUCET: Push, Chrome 2089 -0147 SINK; UTILITY: 12" Utilitub $95,999.00 $95,999.00 $2,812.00 $2,812.00 $8,086.00 $8,086.00 $658.00 $658.00 $1,514.00 $1,514.00 $4,305.00 $4,305.00 $2,150.00 $2,150.00 $1,340.00 $1,340.00 $1,743.00 $1,743.00 $300.00 $300.00 $73.00 $73.00 SUBTOTAL j $118,980.001 Design Services SIN# 361 -30 - INCLUDES AN INITIAL SEALED PLAN SET ON 11" X 17" FORMAT AND ONE SEALED REVISION IN RESPONSE TO COMMENTS. If any additional revisions, sealing or change in plan set size are $5,364.00 requested or required, an additional Design Service will be charged. _ LOCAL TAX RATE 0.0825 ESTIMATED SALES TAX $9,442.45 Shipping and handling from Roseburg, OR to: Petaluma CA $5,277.50 TOTAL $1292173.92 1�AGE 1 OF 2 DESIGN SERVICES INCLUDES AN INITIAL SEALED PLAN SET ON 11" X 17" FORMAT AND ONE SEALED REVISION IN RESPONSE TO COMMENTS. If any additional revisions, sealing or change in plan set size are requested or required, an additional Design Service will be charged. Romtec's design services quoted herein are conditioned upon, and cannot be purchased separate from, the purchase of the applicable Romtec building model. This quote includes the design & engineering by Romtec to produce a complete plan set that will meet the architectural and engineering code required in your state. In some cases local code may vary from typical state requirements and may result in a change in price that could not have been anticipated at time of quote. " All prices listed above are F.O.B. Roseburg, OR, freight prepaid and added. Delivery will be in accordance with a mutually agreed upon timeline as stated in the Romtec notice to proceed document Unless otherwise agreed to, the owner of the project is expected to provide "builder's risk" Insurance coverage on this project. Romtec makes no provision for such costs in this quote. • This quote is effective for 90 days from above date; thereafter all prices are subject to change without notice. • Delivery will be in accordance with a mutually agreed upon timeline as stated in the Romtec notice to proceed document • This quote includes estimated sales or use tax based on the information available at the time of quoting. All sales are assumed subject to sales and use tax unless the customer provides Romtec with a resale certificate or proof of exemption. The applicable sales tax is subject to change on final invoice. 1�PAGE 2 O 2