HomeMy WebLinkAboutStaff Report 5.A 07/20/2015DATE: July 20, 2015 Agenda Item #5.A TO: Honorable Mayor and Members of the City Council through City Manager FROM: Da t. .ACE — Director, Public Works and Utilities Larry Zimmer, P.E. — Deputy Director, Public Works and Utilities SUBJECT: Resolution Authorizing Award of Contract for the East Washington Street Water Main Replacement (McDowell Blvd. to Sutter St.) Project to Argonaut Constructors RECOMMENDATION It is recommended that the City Council adopt the attached Resolution Authorizing the Award of Contract for the East Washington Street Water Main Replacement (McDowell Blvd. to Sutter Street) Project to Argonaut Constructors. BACKGROUND This project involves replacing approximately 2,250 feet of old and deteriorated 8 and 10 -inch cast iron water mains with a new 18 -inch water transmission main on East Washington Street between McDowell Boulevard and Sutter Street. The project also includes installation of new water services and fire hydrants and repaving of pavement that was out to install this and the recent PG &E gas pipeline in the same project area. This is the final phase of the East Washington Street water main replacement program. The last phase extending the water main replacement from Edith to the River was completed last summer while the second phase from US 101 to Edith was constructed in 2013. The first phase from Howard to the River was completed in 2010. Recent failures in these lines have made this water main replacement a top priority. This project will improve service, reliability, increase capacity, and reduce repair and maintenance costs. The project location is shown on Attachment 2. DISCUSSION Staff designed the project, prepared the contract documents, and issued a Notice Inviting Bids on May 20, 2015. The timing and design of the subject project was coordinated with the on -going PG &E gas line replacement project. As a condition of its encroachment permit, PG &E contributed a significant sum to the City to allow it to include the gas -line pavement repairs along with the waterline repairs. This should result in a better and more cost effective repaving of the project area. Bid alternates were added into the bid schedule for pavement restoration for this project on East Washington and the portions of roadways on East Washington and North McDowell Boulevard impacted from the PG &E pipeline replacement project, which is scheduled to be completed by the end of September 2015. On June 24, 2015, three bids were received as follows: Name of Bidder Bid Base Total Base Bid Plus Bid Alternate Argonaut Constructors ( *) $ 1,391,777.50 $ 1,639,277.50 Team Ghilotti, Inc. $ 1,647,970.00 $ 1,798,234.50 W.R. Forde, Inc. $ 2,066,945.00 $ 2,466,945.00 Engineer's Estimate (w/ bid Alt) $ 1,730,000.00 * Lowest Responsible Bidder The lowest responsible bidder, Argonaut Constructors, has performed similar projects for the City of Santa Rosa, City of Napa, and the Marin Municipal Water District. Staff verified that Argonaut Constructors possesses a valid Class A California Contractor's License, number 171432, which expires on December 31, 2015, that qualifies Argonaut Constructors to perform the work. Construction is scheduled to begin in September and to be completed in January 2016. The project will incorporate a combination of day and night work to reduce traffic impacts. It is anticipated that construction management and inspection services will be conducted by City staff. The proposed action meets Council Goal: "Plan for and implement priority capital projects as funding permits ". FINANCIAL IMPACTS The total project budget for the East Washington Street Water Main Replacement (McDowell Blvd. to Sutter St.) (C67401003) is $2,176,000. The project has expended $103,300 to date for PG &E coordination, engineering, assessments and design. The following is a breakdown of the approved and revised CIP budget: Project Phase Approved CIP Budget Estimated Project Cost Design $ 99,000 $ 103,300 Construction Contract $ 1,640,000 $ 1,639,278 Legal & Administration $ 18,000 $ 18,000 Salaries and Benefits* $ 10,000 $ 0 Construction Management $ 126,000 $ 140,000 Contingency $ 240,000 $ 232,422 CIP Overheads $ 43,000 $ 43,000 TOTAL $ 2,176,000 $ 2,176,000 *Salary and Benefits included in appropriate project phase. 2 The project is funded through the water capital fund and from a PG &E paving restoration contribution of $440,000. Any unused funds will be returned to the Water Capital Fund for future projects. ATTACHMENTS 1. Resolution 2. Location Map Attachment 1 RESOLUTION AUTHORIZING AWARD OF CONTRACT FOR THE EAST WASHINGTON WATER MAIN REPLACEMENT (MCDOWELL BLVD. TO SUTTER ST.) PROJECT TO ARGONAUT CONSTRUCTORS WHEREAS, City staff has prepared construction bid documents and advertised for construction the East Washington Street Water Main Replacement (McDowell Blvd to Sutter Street) Project, Project Number C67401003, ( "the Project "); and WHEREAS, in accordance with the City of Petaluma Charter and Municipal Code, California Public Contract Code Section 20162 and other applicable law, City staff solicited bids for the Project; and WHEREAS, the Project was bid on May 20, 2015, and three bids were received and opened on June 24, 2015 in accordance with applicable law; and WHEREAS, the lowest responsible bid with the bid alternate for the Project was submitted by Argonaut Constructors from Santa Rosa, CA for $1,639,277.50; and WHEREAS, staff has determined that the Contractor's bid satisfies the bidding requirements for the Project; and WHEREAS, staff has verified that Argonaut Constructors possesses a valid California Contractor's License, Class A, number 171432 that qualifies Contractor to perform the Project; and WHEREAS, the Project is categorically exempt pursuant to California Environmental Quality Act (CEQA) and Title 14, the California Code of Regulations ( "CEQA Guidelines "), Section 15302, because the Project consists of replacement and reconstruction of existing utility systems and /or facilities involving negligible or no expansion of capacity; and WHEREAS, the approved funds are available are in the 2015/2016 CIP water system budget. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Petaluma hereby: 1. In accordance with the City of Petaluma Charter and Municipal Code, California Public Contract Code Section 20162 and other applicable law, waives any and all non- conformance in the bid of Contractor for the East Washington Street Water Main Replacement (McDowell Blvd to Sutter Street) Project, Project Number C67401003 and finds the bid of $1,639,277.50 to be the lowest, responsive bid and further finds that Argonaut Constructors is the lowest responsible bidder. 2. Awards the contract for the East Washington Street Water Main Replacement (McDowell Blvd to Sutter Street) Project, Project Number C67401003 to Argonaut Constructors in the amount of $1,639,277.50, the amount of the lowest responsive bid, conditioned on 4 Argonaut Constructors timely executing the project contract and submitting all required documents, including but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the project bid documents. 3. Directs staff to issue a notice of award to Argonaut Constructors.. 4. Authorizes and directs the City Manager to execute the project contract on behalf of the City of Petaluma upon timely submission by Argonaut Constructors of the signed project contract and all other required documents, including but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the project bid documents. 5 EAST WASHINGTON STREET WATER MAIN REPLACEMENT PROJECT MCDOWELL BLVD TO SUTTER ST PROJECT NO. C67401003 = e-107 IFQ ► ak lft G sow 8 \�o Attachment 2 Date :JULY 20, 2015 N City of Petaluma PROJECT SITE w E Public Works and Utilities s Department �g5S 1