Loading...
HomeMy WebLinkAboutStaff Report 5.C 07/20/2015Agenda Item #5.0 DATE: July 20, 2015 TO: Honorable Mayor and Members of the City Council through City Manager FROM: D n St J ASCE - Director, Public Works & Utilities Larry i er, P.E. — Deputy Director, Public Works & Utilities SUBJECT: Resolution Authorizing Award of Contract for the Water Service Replacement 2015 -2016 Project to W.R. Forde Associates RECOMMENDATION It is recommended that the City Council approve the resolution Authorizing the Award of Contract for the Water Service Replacement 2015 -2016 Project to W.R. Forde Associates. BACKGROUND The current project continues the City program to replace defective water services that result in frequent pipe,breaks and water leaks. Many of the water services installed during the 1970's and early 80's included polybutylene "blue- tube" piping to connect the water main to the customer's water meter. Polybutylene (PB) is plastic resin used to manufacture pipes and fittings that becomes brittle causing micro - fractures and pipe failure. The Industry has since moved away from its use, however, and many cities, including Petaluma, are left with thousands of PB water services. Maintenance crews routinely replace these old services as they fail. The subject project will upgrade the deteriorated water services and water main service saddles to current City standards. The increased number of failures of PB service lines has elevated the priority of this proj ect. The City has 4,442 polybutylene service lines remaining to be upgraded. This project will replace a total of 227 polybutylene service lines with high density polyethylene (HDPE) pipe leaving 4,215 to be upgraded in the future. The water service replacements will be phased over multiple years due to the cost and size of the project. The projects will be prioritized based on failure rates. The subject project will provide an 8" PVC water main on west side of Petaluma Blvd north of the Shasta and Sycamore Intersections to replace the existing 2" water main and PB water service lines, and to add a fire hydrant where deemed necessary by the City's Fire Marshal DISCUSSION The project was designed and contract documents compiled in -house by City staff. A Notice Inviting Bids was advertised on May 28, 2015 and three (3) bids were received as follows: Name of Bidder Bid Total W.R. Forde Associates $ 922,000.00 Lowest Responsible Bidder Team Ghilotti Inc. $ 986,659.00 Argonaut Constructors $1,095,325.00 Engineer's Estimate $ 975,000 The lowest responsible and responsive bidder, W.R. Forde Associates, has performed various water projects for the City of Petaluma. Staff verified that W.R. Forde Associates possesses a valid Class A California Contractor's License, number 814744, which qualifies W.R. Forde Associates to perform the work. Construction is scheduled to begin in August 2015 and to be completed by January 2016. Construction management and inspection services will be conducted by City staff with assistance by an outside consultant for geotechnical and material testing. The proposed action meets Council Goals: "Plan for and implement priority capital projects as funding permits." FINANCIAL IMPACTS The following table summarizes the estimated project costs: Phase CIP Budget FY 15 -16 Water Service Replacement 2015- 2016 Planning/Environmental $ - $ - Design $ 60,000.00 $ 60,000.00 Legal Services $ 1,000.00 $ 1,000.00 Administration $ 5,000.00 $ 5,000.00 Construction Contract $ 850,000.00 $ 922,000.00 Construction Management $ 90,000.00 $ 85,000.00 CIP Overheads $ 28,000.00 $ 10,000.00 Contingency $ 130,000.00 $ 81,000.00 TOTAL: $ 1,164,000.00 $ 1,164,000.00 Funding Sources Water Capital 1 $ 1,164,000.00 $ 1,164,000.00 ATTACHMENTS 1. Resolution 2. Location Map 2 Attachment 1 RESOLUTION AUTHORIZING THE AWARD OF CONTRACT FOR THE WATER SERVICE REPLACEMENT 2015 -2016 PROJECT TO W.R. FORDE ASSOCIATES WHEREAS, in accordance with the City of Petaluma Charter and Municipal Code, California Public Contract Code Section 20162 and other applicable law, City staff prepared constiuction bid documents and solicited bids for the Project; and WHEREAS, the project was bid on May 28, 2015, and three (3) bids were received and opened on June 17, 2015 in accordance with applicable law; and WHEREAS, the lowest responsible bid for the Project was submitted by W.R. Forde Associates, from Richmond, CA for $922,000; and WHEREAS, staff has determined that the Contractor's bid satisfies the bidding requirements for the Project; and WHEREAS, staff has verified that W.R. Forde Associates possesses a valid California Contractor's License, Class A, number 814744 that qualifies W.R. Forde Associates to perform the Project; and WHEREAS, the Project is categorically exempt pursuant to California Environmental Quality Act ( "CEQA ") and Title 14, the California Code of Regulations ( "CEQA Guidelines "), Section 15301, because the project consists of repair and maintenance to an existing public street. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Petaluma hereby: 1. In accordance with the City of Petaluma Charter and Municipal Code, California Public Contract Code Section 20162 and other applicable law, waives any and all non - conformance in the bid of W.R. Forde Associates for the Water Service Replacement 2015 -2016, Project No. C67501406, finds the bid of $922,000 to be the lowest, responsive bid and further finds that W.R. Forde Associates is the lowest responsible bidder. Awards the contract for the Water Service Replacement 2015 -2016, Project No. C67501406 to W.R. Forde Associates, in the amount of $922,000, the amount of the lowest responsive bid, conditioned on W.R. Forde Associates' timely executing the project contract and submitting all required documents, including but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the project bid documents. 4. Directs staff to issue a notice of award to W.R. Forde Associates. 3 5. Authorizes and directs the City Manager to execute the project contract on behalf of the City of Petaluma upon timely submission by W.R. Forde Associates of the signed project contract and all other required document, including but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the project bid documents. 11 RM in, K-- __11 Attachment 2 WATER SERVICE REPLACEMENT 2015 -2016 PROJECT NO. C67501406 • • ► N i� O Date: July 20, 2015 N ®PROJECT SITE W E City of Petaluma VARIOUS LOCATIONS Public Works and Utilities S Department �o 5