Loading...
HomeMy WebLinkAboutPCDC Minutes 04/17/1995MINUTES OF A PETALUMA COMMUNITY DEVELOPMENT COMMISSION MEETING MONDAY, APRIL 17, 1995 ROLL CALL: Present: Shea, Maguire, Stompe, Hamilton, Vice Chairman Read, Chairman Hilligoss Absent: Barlas MINUTES: The minutes of the March 20 meeting were approved as submitted. RESO. 95-03 COMPLETE RIVER WALK PHASE 4, ZONE 4 Resolution 95-03 accepting completion of River Walk Phase 4 Zone 4 which was constructed by Maggiora and Ghilotti of San Rafael. The final cost of construction was $51,326. This project included the easterly pedestrian curb `fop -out" on Petaluma Blvd. North as well as the walkway along the parking area between Petaluma Blvd. North and Water Street. The building owner of the Century 21 building wants to repair the mortar between the buildings bricks. Due to the inclement weather this past winter, this has not been done. When the mortar has been repaired, the building wall facing the parking lot will be painted and the one light fixture will be installed. An automobile destroyed two trees and grates in the pedestrian `fop -out" curb area. The cost is estimated to be $3,300. The repairs will be installed in approximately 3 weeks. Introduced by Lori Shea, seconded by Jane Hamilton. Ayes: Shea, Maguire, Stompe, Hamilton, Vice Chairman Read, Chairman Hilligoss Noes: None Absent: Barlas ADJOURN 3:10 p.m.zw� ATTEST:, -,M. Patricia Hilligoss, Chairman :e atricia E. Bernard, Recording Secretary PCDC Meeting Monday. April 17, 1995 Page 1 of 1 page