TRASH RECEPTACLES FOR McNEAR BUILDING FRONTAGE
The Commission discussed design of trash receptacles in this part of the
redevelopment area, Chairman Mattei suggested that staff proceed
with the purchase of receptacles that do not have sharp edges.
Commissioner Cavanagh asked staff to look into the possibility
of steam cleaning some of the containers that are downtown now.
STREET TREE PURCHASING PROPOSAL
The Project Area Committee (PAC) reported on a proposal received
from Hillside Nursery for the following contract work @ $160/tree.
-Remove section of cement 3 feet square
-Recondition soil with 2 parts topsoil and 1 part nitrolized
redwood sawdust
-Plant 15 gallon Myoporum laetum standard trees
-Stake trees with 2 inch diameter steel poles (8 feet high)
-Install 4 inch pipe vertically and fill with 3/4 inch crushed
rock leaving a 6 foot pocket at bottom of pipe (36 inches long)
-Mortar cobblestones or water washed rock around perimeter of
cement edge
The proposal of the PAC is to use PCDC funds to plant these trees
in front of businesses which have substantially upgraded their
properties since the enactment of the Redevelopment Act in
November of 1976. The obligation of the business owner would be
to assume responsibility for maintenance of the trees. The planting
scheme indicates trees would be located at approximately each
parking meter, or every 23 feet.
PCDC MINUTES -2- October 9, 1979
STREET TREE PROPOSAL cont'd.
Moved /Seconded, Bond --Perry, we proceed with the tree
purchase and planting.
Ayes: Balshaw, Battaglia, Bond, Cavanagh, Harberson,
Perry, Chairman Mattei
Commission consensus was that staff should inspect each tree
before it is planted and, if necessary, a hardier variety would
be chosen for particularly vulnerable locations.
PROJECT AREA COMMITTEE/BUSINESS IMPROVEMENT AREA COMMITTEE
Vice Chairman Bond expressed the desire to combine these two
committees for discussion of those items they both put their
energies towards, particularly parking problems. The Commission
asked that the Project Area Committee Chairman be added to the
membership of the Business and Improvement Area Committee.
PEDESTRIAN BRIDGE (GOLDEN EAGLE SHOPPING CENTER TO GOLDEN CONCOURSE
The Commission asked staff to submit a schedule of procedure on
development of this bridge prior to the December PCDC meeting.
MAHONEY PARKING LOT (across from Mary Street/Petaluma Blvd. North)
The Commission expressed its original intent that the only
participation that was intended was sidewalk and fence construction.
Staff was directed to have a final report ready for Commission
consideration at the November meeting.
ANNUAL REPORT
The Commission received the financial statement for the Agency
as of June 30, 1979.
PROJECT AREA COMMITTEE INQUIRIES ANSWERED
The Commission received a copy of staff's answers to the PAC's
requests for clarifications and direction of its charge.