Loading...
HomeMy WebLinkAboutStaff Report 2 9/2/1997(2) 110x3/ SEP.2 1997 2 1 AGENDA,I-TEM.#+ 2 KEY WORD:; 1997-19981 Oxidation Pond Dike Repair • 3 Account No. 6210 4 DATE: September 2, 1997 5 6 DEPARTMENT: 7 8 Engineering Department • 9 Thomas S. Hargis, Directo of Engineering 10 Fleming Nguyen, Associate-Civil Engineer 11 12 REQUESTED COUNCIL ACTION: 13 14 1. Adopt resolution approving the plans and specifications prepared by the Engineering 15 Department. 16 17 2. Award :a contract to the low bidder, Cal-Neva,Construction Services, Inc., 11365 Folsom 18 Boulevard, Rancho.Cordova, CA 95742, in the amount of$152,355.00. 19 20 RECOMMENDATION: 21 22 1. Approve the plans and specifications prepared by the Engineering Department. 23 24 2. Award a contract+to-the low bidder, Cal-Neva Construction Services, Inc. 25 26 BACKGROUND: 27 28 Bids were opened on Atigust '14, 1997 for the 1997-1998,Oxidation Dike Repair Project. The plans 29 called for placingcrock- slope protection/rip-rap along the dikes of pond numbers 3, 6, 7 and 10 to 30 prevent erosion of the,dikes due to wave action during winter storms. 31 32 The plans and specifications:prepared;by the Engineering Department are available for review at the 33 Engineering Department. 34 35 The following is the summary of the bids: 36 I 37 NAME OF BIDDER BID AMOUNT 38 39 Cal-Neva Construction Services; Inc., Rancho;Cordova, CA $152,355.00 40 Michael Paul'Co., Inc„ Petaluma CA. $157,112.50 41 Goebel Paving, Gradingand Underground Petaluma, CA $158,812.50 42 Ghilotti Brothers Construction, Inc., San Rafael, CA $164,832.00 43 Wickum Construction, Merced, CA -$165,031.00 44 Sitework"s.Construction,Lafayette, CA $173,000.75 45 W. R.FordeAssociates, Greenbrae, CA $174,215.00 46 Liongate Corporation, Alamo; CA $185,425.00 47 Argonaut Constructors, SantaRosa, CA $191,230.00 48 North Bay Construction Inc., Petaluma;.Ca $200,500.00 49 Nelson Construction,Petaluma, CA $202,190.00 • 50 Ghilotti Construction Co,,- Santa-Rosa Ca $218,2.12.50 51 Maggioral& Ghilotti; Inc:, San Rafael,CA $227,050.00 52 Sarott Construction Co., Martinez,,CA $272,860.00 53 54 The Engineer..'s estimate for construction was $172,175.00 1 2 The following is the breakdown of the estimated project costs: 3 4 CONSTRUCTION CONTRACT (LOW BID) $152,355.00 5 ENGINEERING DESIGN 2,500.00 6 CONSTRUCTION MANAGEMENT/INSPECTION 2,500.00 7 CONTINGENCY 15,000.00 8 9 ESTIMATED TOTAL PROJECT COSTS: $172 355.00 10 11 Funding for this project will come'from Water Pollution Control Enterprise Funds in the amount of 12 $172,355.00. 13 14 ALTERNATIVES: 15 16 1. Award the contract to another bidder. 17 18 2. Reject all bids and re-advertise. 19 20 CONSEQUENCES OF NOT ACTING: 21 22 Delay the construction of the above-mentioned project. 23 24 ACTION FOLLOWING,AUTHORIZATION: 25 26 Contractor will enter a contract with City and submit the required bonds and insurance documents. 27 Construction is scheduled to begin in October+1997 and expected to be completed by mid-December 28 1997. 29 30 31 32 xc: de sce ue/ban ace/iiguyen file 33 34 6210awrd/sb/agenda/hd/a: r ± LL ,i = S ■ nr 1 ; ; I: : : SNMOtl6 knsi [, !i i' 4:• '• • :: •:rir:ir:rr'-wi•..r LU m Lz , Q/ 019011 i i L / I � - 4)1 i Z u Q U O y I Ltc T • t ( t s �'' � i�m =iii ) I i ■ �avoe aaNw0 MD �� � � al�l /ii_ci 1 trikrINI l'hr � ,, . Pal-1 - 1 //i. ‘ 11111 IN W 71 maim-4 , rit , \\ -a .....L...