Loading...
HomeMy WebLinkAboutStaff Report 5 06/01/1998 704- o5I vi - 11998 CITY OF PETALUMA,CA AGENDA SUIVIART AgendaSSub'iect, Meeting Date: 1998 StormDrain Iinprovenent& SewerMain Installafion' June,1, 1998 Department Contact Person Phone Number Engineering '222 c^ Fleming`Nguyen 778-4304 Cost of Proposal $228,725.00 . Amount Budgeted $306,725.00 Account Number 9746 & 9799 Attachmentsto A gendaPacketItem. Location map: Summary Statement Bids were opened on.May 12, 1998. The low bid was $228,725.00. The 'project involves installing a storm drain pipe.system in Stuart'Drive between McGregor Avenue and McKenzie Avenue, andin"G" Street near Eighth!Street to alleviate localiflooding: The project also involves extending existing sewer mains from the backyards•into McNeil Avenue between McDowell Boulevard South„find Coronado Drive to provide accesses for maintenance crew to service the mains. Construction'is scheduled for mid-July and is expected to be completed by September 1998. This project will be funded:by a combination of Storm Drain Mitigation Fees and Sewer Funds. Recommended City`Council iaction Adopt the resolution approving,plans;and specifications prepared by the Engineering,Department, awarding the construction contract;,and;approving the!project budget. Submitted to Finance Director: ; SubmifteI'to City Manager: S / 0 / _ S- ewj Today'sDate: File Code 5/20/98 9746awrd/sb #21998 1 AGENDA ITEM# 2 KEY WORD:, • 1998 Storm Drain Improvement 4 &.Sewei'Main.Installation , 5 • Project Nos. 9746:& 9799 6 7 DATE: June 1, 1998 8 9 DEPARTMENT: 10 11 Engineering Department 12 Thomas S. Hargis, Director of Engineering" 13 Fleming Nguyen, Associate.Civil.Engineer 14 15 REQUESTED COUNCIL,ACTION: 16 17 Adopt resolution approving plans; and specifications prepared by the Engineering Department, 18 awarding the construction contract to the low bidder, Nelson Construction, 2400 Petaluma 19 Boulevard North, Petaluma, CA 94952, in the amount;of$228;725400; and approving the project 20 budget in the amount of $306,725.00, which includes design, "planning, administration, 21 construction, inspection and project contingency, for the 1998 Storm Drain Improvements in 22 Stuart Drive between McGregor,Avenue;and McKenzie Avenue; in"G" Street near Eighth Street; 23 and the Sewer Main Installation in M cNeil Avenue between McDowell Boulevard •South and 24 Coronado Drive. 25 26 RECOMMENDATION: 27 28 Approve. 29 30 BACKGROUND: 31 • 32 Bids were opened on May 12, 1998 for the 1998 Storm Drain.Improvement and Sewer Main 33 Installation Project (Project Nos. 9746 and 9799). The project involves installing a storm drain 34 pipe system in Stuart Drive between McKenzie,Avenue and McGregor Avenue; and in"G" Street 35 near Eight Street to alleviate local flooding This project also involves extending existing sewer 36 mains from the backyards into McNeil Avenue between McDowell Boulevard South and 37 Coronado,Drivepto provide accesses for maintenance crew to service'the mains: The storm drain 38 and sewer projects are combined into one project because they.are located in the same vicinity. 39 40 The plansand specifications prepared by the Engineering Department are available for review at 41 the Engineering Department. 42 i f • 1 The following is the summary of thebids: 2 3 Name of Bidders Amounts. 4 5 Nelson:Construction, Petaluma,CA • $228,725:00 6 Bimkan,Construction, Redwood,City,,CA $234,134.00 7 Maggiora& Ghilotti Inc., San Rafael, CA $236,525.00 8 TGHPipelines, Inc.,.Larkspur, CA $250,730.00 9 North Bay Constriction, Inc., Petaluma,,CA $267,620.00 10 11 The Engineer's estimate for the',bid•was $241,550.00. 12 13 The following is the breakdown of the estimated project costs: 14 15 CONSTRUCTION CONTRACT (LOW BID) $228,725.00 16 ENGINEERING DESIGN $ 16,000.00 17 ADMINISTRATION/INSPECTION $ 23,000.00 18 GEOTECHNICA. TESTING $ 4,000.00 19 PROJECT CONTINGENCY $ 35,000.00 20 21 TOTAL ESTIMATED PROJECT COSTS: $3062725.00 22 23 This project will belfunded by Storm DrainageMitigation Fees in the amount of$268,238 00 and 24 by Sewer Funds in the amount.of$38,487,00. 25 26 ALTERNATIVES: 27 28 1. Award the contractto another•,bidder. 29 2. Reject all bids;and`readvertise. 30 31 CONSEQUENCES OF NOT ACTING: 32 33 Delay the construction. 34 35 ACTION FOLLOWING AUTHORIZATION: 36 37 The contractor will enter a contract with the City and submit the required contract documents and 38 insurance document and insurance certificates! Construction is scheduled to begin in mid-July 39 1998 and is expected to be completed by September 1998. 40 41 42 43 xc• de sce ace/Nguyen file 44 45 sb/9746awrd 0 0 EXHIBIT" A • . 'Capti al Improvement Project Numbers 9746 - 9799 Catch Basin Installation .rirSill IFAINIO 1=1 ell SSW VOA rifil gld'ito- IZel 1 I 'E "SO 0 la 44,S SWAINIS IN IONStriltill PO WS Sewer Main Extensions ve. • ni 4 ales McDOWELL BOOLIEVARD SOUTH I "41(; , n i 1 :‘ IN ma pRIV_E • [ z tv • . • 0 i91111111110 • 2 (7, Pm Aaron my • DEIRiE fi t ± w • , 1 cr'„ NI __ _ cn eammulni mmonam Es { < ratimear miana Ni - - U1 111--■---'"- "- w- ■I• -aft ant AM r r _ _ _ • L. 111Z1111111ffirtitil—ft'xze„, PRI. DM MI .- u` a o" I I I I 1:„,,„............motim i a RI_ m ..__ Truro', wifir.444 "mill "A-REEK/Ay 1#41,4• , aallStorm Drain Insta lation a or LOCATION MAPS SCALE: N.T. S. •