Loading...
HomeMy WebLinkAboutStaff Report 4.C 05/02/2016Agenda Item #4.0 . y DATE: May 2, 2016 TO: Honorable Mayor and Members of the City Council through City Manager FROM: Dan St. John, F.ASCE — Director, Public Works and Utilities Larry Zimmer, P.E. — Deputy Director, Public Works and Utilities SUBJECT: Resolution Authorizing Award of Contract for the Petaluma Boulevard North Water Main Replacement Project — Lakeville Street to B Street RECOMMENDATION It is recommended that the City Council adopt the attached Resolution Authorizing the Award of Contract for the Petaluma Boulevard North Water Main Replacement — Lakeville Street to B Street. BACKGROUND The project will replace an existing 4 -inch water main in Petaluma Boulevard North from Lakeville Street to B Street with a new 12 -inch water transmission main, new service laterals, new fire service laterals and fire hydrants. This project will replace the 50 -75 year old main, provide new fire service laterals to the back of curb and significantly reduce maintenance costs. In addition to approximately 3,060 linear feet of the 12" water main, approximately 300' of sewer main will be replaced along addresses 3 -41 Petaluma Boulevard North. The project will include micro - surfacing Petaluma Boulevard North after the underground pipe installation and trench repair is completed. On September 13, 2004, the City Council approved a Fire Sprinkler Retrofit Ordinance No. 2194 N.C.S. for Existing Buildings in the Historic Downtown District. The Ordinance requires the installation of automatic fire sprinklers in pre- existing buildings in the historic downtown business district, which is located south of Washington Street, once the City installs an appropriate sized water main and fire services to the curb. The property owners will then be responsible for installation of the lateral service from the curb line into the building. Property owners with a change of use or who have basements or space below street grade shall install fire sprinklers no later than December 31, six (6) years from the date of the water main installation. All other buildings shall install fire sprinklers no later than December 31, twelve (12) years from the date of the water main installation. This requirement does not apply to businesses north of Washington Street. DISCUSSION Staff designed the project, prepared the contract documents, and issued a Notice Inviting Bids on March 10, 2016. Staff has coordinated with the Petaluma Downtown Association (PDA) and attended three Association meetings to present the project. In addition to meetings, a notice was mailed to all property owners and building occupants fronting the project. Staff will continue to coordinate with the PDA, businesses and property owners throughout construction. On April 6, 2016, two bids were received as follows: Name of Bidder I Bid Total *Team Ghilotti, Inc. of Petaluma $2,895,824.00 Argonaut Constructors of Petaluma $3,098,615.50 Engineer's Estimate $2,850,000.00 * Lowest Responsible Bidder The lowest responsible bidder, Team Ghilotti, Inc., has performed similar water main replacement projects for the City of Petaluma. Staff verified that Team Ghilotti, Inc. possesses the required Class A California Contractor's License, number 895384, which expires on April 30, 2017, which is appropriate for the work. Construction is scheduled to begin in June and will continue for 160 working days. If the project is not completed by the holidays, the Contractor will shut down by November 18, 2016 and will not return until after January 1, 2017. The project is anticipated to be completed by April 2017, weather and conditions permitting. All work will be done at night to reduce the impacts to downtown businesses and traffic. Construction management will be conducted by City staff with assistance from a consulting firm for night time inspection services. The proposed action meets Council Goal: "Plan for and implement priority capital projects as funding permits ". FINANCIAL IMPACTS The project is in the FY 15/16 CIP budget with an estimated total project cost of $4,636,000. Project funding is comprised primarily of water enterprise capital funds with wastewater capital covering the minor sewer work. The following is a breakdown of the proposed FY 16/17 CIP budget and the revised construction budget: 2 Uses Proposed CIP, Budget FY16117 Current Estimate Design $ 232,000 $ 205,000 Legal $ 12,000 $ 12,000 Construction Contracts $ 3,302,000 $ 2,895,824 Construction Management $ 385,000 $ 430,000 CIP Overhead $ 108,000 $ 102,000 Administration $ 22,000 $ 22,000 Project Contingency $ 575,000 $ 575,000 TOTAL $ 4,636,000 $ 4,241,824 Funding Sources Waste Water Capital $ 231,000 $ 212,091 Water Capital $ 4,405,000 $ 4,029,733 TOTAL $ 4,636,000 $ 4,241,824 Note: City staff salary and benefits costs are included in appropriate project phase, and total approximately $300,000 for the project. Any unused funds will be returned to the appropriate account for future projects. ATTACHMENTS 1. Resolution 2. Location Map Attachment 1 RESOLUTION AUTHORIZING AWARD OF CONTRACT FOR THE PETALUMA BOULEVARD NORTH WATER MAIN REPLACEMENT — LAKEVILLE STREET TO B STREET WHEREAS, City staff has prepared construction bid documents and advertised for construction of the Petaluma Boulevard North Water Main Replacement — Lakeville Street to B Street, Project Number C67501304, ( "the Project "); and WHEREAS, in accordance with the City of Petaluma Charter and Municipal Code, California Public Contract Code Section 20162 and other applicable law, City staff solicited bids for the Project; and WHEREAS, the Project was bid on March 10, 2016, and two bids were received and opened on April 6, 2016 in accordance with applicable law; and WHEREAS, the lowest responsible bid with the bid alternate for the Project was submitted by Team Ghilotti, Inc. from Petaluma, CA for $2,895,824.00; and WHEREAS, staff has determined that the Contractor's bid satisfies the bidding requirements for the Project; and WHEREAS, staff has verified that Team Ghilotti, Inc. possesses a valid California Contractor's License, Class A, number 895384 that is acceptable for the Project; and WHEREAS, the Project is statutorily and categorically exempt pursuant to California Environmental Quality Act (CEQA) and Title 14, the California Code of Regulations ( "CEQA Guidelines "), Section 15285(1,-,) and 15302 respectively, because the Project consists of replacement of pipelines up to a mile in length and replacement and reconstruction of existing utility systems and /or facilities involving negligible or no expansion of capacity; and WHEREAS, the approved funds are available are in the 2015/2016 CIP water and waste water system budget. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Petaluma hereby: 1. In accordance with the City of Petaluma Charter and Municipal Code, California Public Contract Code Section 20162 and other applicable law, waives any and all non- conformance in the bid of Contractor for the Petaluma Boulevard North Water Main Replacement and Sewer Main Replacement Project, Project Number C67501304 and finds the bid of $2,895,824.00 to be the lowest, responsive bid and further finds that Team Ghilotti, Inc. is the lowest responsible bidder. 2. Awards the contract for the Petaluma Boulevard North Water Main Replacement and Sewer Main Replacement Project, Project Number C67501304 to Team Ghilotti, Inc. in the amount of $2,895,824.00, the amount of the lowest responsive bid, conditioned on M Team Ghilotti, Inc. timely executing the project contract and submitting all required documents, including but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the project bid documents. 3. Directs staff to issue a notice of award to Team Ghilotti, Inc. 4. Authorizes and directs the City Manager to execute the project contract on behalf of the City of Petaluma upon timely submission by Team Ghilotti, Inc. of the signed project contract and all other required documents, including but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the project bid documents. Attachment 2 PETALUMA BOULEVARD NORTH WATER MAIN REPLACEMENT AND SEWER MAIN REPLACEMENT PROJECT B STREET TO LAKEVI LLE STREET PROJECT NO. C67501304 LOCATION MAP 1. (j, \ �J may./ i "Y' I. . *� CO -. -.PR JECT SITE BOD GA AVE .� ,� -, �� �` LAKEVILLE HIGH I / 1 I CITY LIMIT Date :April 11, 2016 City of Petaluma PROJECT SITE W E Public Works and Utilities S Department'' r85$ I