HomeMy WebLinkAboutStaff Report 5.A 11/07/2016DATE: November 7, 2016
Agenda Item #5.A
TO: Honorable Mayor and Members of the City Council through City Manager
FROM: Dan St. John, F.ASCE — Director, Public Works & Utilities
Larry Zimmer, P.E. — Deputy Director, Public Works & Utilities
SUBJECT: Resolution Authorizing Award of Contract for the City Hall West Wing and Fire
Station 3 Roof Overlay to Cornerstone Roofing, Inc.
RECOMMENDATION
It is recommended that the City Council adopt the attached Resolution Authorizing Award of
Contract for the City Hall West Wing and Fire Station 3 Roof Overlay to Cornerstone Roofing,
Inc.
BACKGROUND
The existing roofs on the West Wing of City Hall and Fire Station 3 have reached the end of
their useful life and need to be rehabilitated. The Council approved $94,000 towards the City
Hall West Wing and $59,000 towards Fire Station 3 Roof Overlay, project numbers C11201704
and C11201708, respectively, in the FY 16/17 budget.
DISCUSSION
These projects involve installation of a 60 -mil thermoplastic polyolefin (TPO) single -ply
membrane over the total roof area of both locations and on parapet walls at Fire Station 3. These
projects will reduce the ongoing repair and maintenance costs and eliminate leaks during winter
rains. Staff prepared contract documents to bid the roof overlay. The Notice Inviting Bids for the
work was issued on September 22 and 29, 2016. On October 6, 2016, four (4) bids were received
as follows:
Bids were ranked in accordance with the specifications by the base bid amount. The base bid
includes the roof overlay on City Hall West Wing and the roof overlay of Fire Station #3. The
lowest responsible bidder, Cornerstone Roofing Inc., has not performed work for the City of
Petaluma, but has performed similar public works projects. Staff verified that Cornerstone
Roofing Inc. possesses the necessary California Contractor's License, Class C -39 number
909400, which expires on 1/31/2018.
The bid broke out three additive alternate bid schedules to allow the City to maximize additional
improvements if funding permitted and to retain a contingency on each project for unforeseen
conditions. The Bid Alternate 1 for the City Hall West Wing would replace the gutters and
downspouts around the west wing perimeter. This bid alternate is recommended. The Bid
Alternates 2 and 3 for Fire Station #3 included the removal of a portion of the roof top equipment
screen and the replacement of the asphalt shingles on the mansard portion of the roof. Facilities
maintenance staff have requested selective removal of two of the four equipment screen sides to
ease the maintenance process on the HVAC equipment. The screen sides will remain on the
street view sides to obscure general view.
Construction is tentatively scheduled to begin at the end of November if the weather is dry
enough to complete one facility. Otherwise, the project will be postponed until dry weather is
forecasted. The contract documents allow a Winter Shut -Down period from December 1, 2016 to
March 15, 2017 if needed due to weather. Once begun, the work will be completed within forty
(40) working days per the contract documents.
It is recommended that the City Council authorize the City Manager to execute a contract for the
City Hall West Wing and Fire Station 3 Roof Overlay Project with the apparent low bidder,
Cornerstone Roofing Inc. for the base bid and the Bid Alternates 1 and 2 to replace gutters and
downspouts at City Hall and to remove a portion of the equipment screen at Fire Station 3.
2
Bid Alternates
2: Fire
3: Fire
l: Replace
Station #3
Station #3
City Hall
Remove
Replace
Business
Total Base
Gutters and
Equipment
Mansard
Name of Bidder
Location
Bid
Downspouts
Screen
Roof
Cornerstone
Sebastopol
$88,701.00
$9,752.00
$2,571.00
$7,563.00
Roofing Inc.
Henris Roofing
Petaluma
$113,370.00
$30,744.00
$910.00
$16,225.00
Company
Andy's Roofing
San
$146,935.00
$22,900.00
$3,250.00
$24,965.00
Company, Inc.
Leandro
Roofing and Solar
Hayward
$206,205.00
$8,664.00
$2,000.00
$15,200.00
Construction
Engineer's Estimate
N/A
$105,000.00
$4,000.00
$2,000.00
$4,000.00
Bids were ranked in accordance with the specifications by the base bid amount. The base bid
includes the roof overlay on City Hall West Wing and the roof overlay of Fire Station #3. The
lowest responsible bidder, Cornerstone Roofing Inc., has not performed work for the City of
Petaluma, but has performed similar public works projects. Staff verified that Cornerstone
Roofing Inc. possesses the necessary California Contractor's License, Class C -39 number
909400, which expires on 1/31/2018.
The bid broke out three additive alternate bid schedules to allow the City to maximize additional
improvements if funding permitted and to retain a contingency on each project for unforeseen
conditions. The Bid Alternate 1 for the City Hall West Wing would replace the gutters and
downspouts around the west wing perimeter. This bid alternate is recommended. The Bid
Alternates 2 and 3 for Fire Station #3 included the removal of a portion of the roof top equipment
screen and the replacement of the asphalt shingles on the mansard portion of the roof. Facilities
maintenance staff have requested selective removal of two of the four equipment screen sides to
ease the maintenance process on the HVAC equipment. The screen sides will remain on the
street view sides to obscure general view.
Construction is tentatively scheduled to begin at the end of November if the weather is dry
enough to complete one facility. Otherwise, the project will be postponed until dry weather is
forecasted. The contract documents allow a Winter Shut -Down period from December 1, 2016 to
March 15, 2017 if needed due to weather. Once begun, the work will be completed within forty
(40) working days per the contract documents.
It is recommended that the City Council authorize the City Manager to execute a contract for the
City Hall West Wing and Fire Station 3 Roof Overlay Project with the apparent low bidder,
Cornerstone Roofing Inc. for the base bid and the Bid Alternates 1 and 2 to replace gutters and
downspouts at City Hall and to remove a portion of the equipment screen at Fire Station 3.
2
The proposed action meets Council Goal: "Plan for and implement priority capital projects as
funding permits ".
FINANCIAL IMPACTS
The projects are included in the FY 16/17 CIP Budget as 011201704 and C11201708 with an
approved combined total project budget of $153,000.
The following table shows the existing FY 16/17 CIP Budgets for the subject project compared
to the revised estimate based on the recommended bid.
ATTACHMENTS
1. Resolution
3
FY 16/17 CIP
Revised
FY 16/17 CIP
Revised
011201704 of
Project
C11201708
Project
the West Wing
Estimate
Fire Station 3
Estimate
City Hall Roof
Roof
Project Budget
Replacement
Project
Budget
Design
$6,000
$6,000
$6,000
$6,000
Administration
$0
$0
$1,000
$1,000
Construction Contract
$70,000
$64,059
$40,000
$36,965
Construction Management
$6,000
$6,000
$6,000
$6,000
Contingency
$10,000
$10,000
$4,000
$4,000
CIP Overhead
$2,000
$2,000
$2,000
$2,000
Total
$94,000
$88,059
$59,000
$55,965
ATTACHMENTS
1. Resolution
3
Attachment 1
RESOLUTION AUTHORIZING AWARD OF CONTRACT FOR
CITY HALL WEST WING AND FIRE STATION 3 ROOF OVERLAY AND
HVAC REPLACEMENT PROJECT, REVISING THE PROJECT BUDGET, AND
AUTHORIZING THE TRANSFER OF FUNDS
WHEREAS, City staff has prepared construction bid documents and advertised for
construction of this Project; and
WHEREAS, in accordance with the City of Petaluma Charter and Municipal Code,
California Public Contract Code Section 20162 and other applicable law, City staff solicited bids
for the Project; and
WHEREAS, the project was bid on September 22 and 29, 2016, and four (4) bids were
received and opened on October 6, 2016 in accordance with applicable law; and
WHEREAS, the lowest responsive bid, with Bid Alternates 1 and 2, for the Project was
submitted by Cornerstone Roofing Inc. from Sebastopol, CA for $101,024.00; and
WHEREAS, staff has determined that the Contractor's bid satisfies the bidding
requirements for the Project; and
WHEREAS, staff has verified that Contractor possesses a valid California Contractor's
License, Class C -39, number 909400 that is appropriate for the work to be performed for the
Project; and
WHEREAS, the Project is categorically exempt pursuant to California Environmental
Quality Act ( "CEQA ") and Title 14, the California Code of Regulations ( "CEQA Guidelines "),
Section 15301, because the project consists of the operation, repair, maintenance or minor
alteration of existing public structures involving negligible or no expansion of use beyond that
previously existing; and
WHEREAS, the FY 16/17 budget for the City Hall West Wing And Fire Station 3 Roof
Overlay, projects C11201704 and C11201708, has sufficient funds for this project.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
Petaluma hereby:
Awards the contract for the City Hall West Wing and Fire Station 3 Roof Overlay,
Project No. C11201704 and C11201708 to Cornerstone Roofing Inc. in the amount of
$101,024.00, the amount of the lowest responsive bid, conditioned on Cornerstone
Roofing Inc.'s timely executing the project contract and submitting all required
documents, including but not limited to, executed bonds, certificates of insurance, and
endorsements, in accordance with the project bid documents.
2. Directs staff to issue a Notice of Award to Cornerstone Roofing, Inc.
in
3. Authorizes and directs the City Manager to execute the project contract on behalf of the
City of Petaluma upon timely submission by Cornerstone Roofing Inc. of the signed
project contract and all other required documents, including but not limited to, executed
bonds, certificates of insurance, and endorsements, in accordance with the project bid
documents.