HomeMy WebLinkAboutPCDC Resolution 2011-02 01/31/2011RESOLUTION NO. 2011-02
PETALUMA COMMUNITY DEVELOPMENT COMMISSION
A RESOLUTION OF THE PETALUMA COMMUNITY DEVELOPMENT COMMISSION
AUTHORIZING THE EXPENDITURE OF TAX INCREMENT FUNDS FOR SPECIFIED PUBLIC
IMPROVEMENTS AND REDEVELOPMENT ACTIVITIES, ADOPTING FINDINGS REQUIRED BY
HEALTH AND SAFETY CODE SECTION 33445, AND AUTHORIZING THE EXECUTION OF A
COOPERATIVE AGREEMENT BETWEEN THE CITY OF PETALUMA AND
THE PETALUMA COMMUNITY DEVELOPMENT COMMISSION
WHEREAS, the Petaluma Community Development Commission ( "Agency ") is a
redevelopment agency formed, existing and exercising its powers pursuant to California
Community Redevelopment Law, Health and Safety Code Section 33000 et seq. ( " CRL "); and,
WHEREAS, pursuant to authority granted under the CRL, the City Council ( "City Council ") of
the City of Petaluma ( "City ") has adopted and amended, from time to time, the Redevelopment
Plan (the "Redevelopment Plan "). The Agency has responsibility to implement the Redevelopment
Plan for the Central Business District Project Area and the Petaluma Community Development
Project Area (the "Project Areas "); and,
WHEREAS, in keeping with the goals of the Agency to eliminate blight in the Project Areas in
accordance with the Redevelopment Plan and Agency's current Implementation Plan
( "Implementation Plan "), the City and Agency have been working cooperatively regarding the
development of certain public improvements in the Project Areas; and,
WHEREAS, the City and Agency have determined that it would be mutually beneficial to
enter into a Cooperative Agreement (the "Agreement ") a copy of which is on file with the City
Clerk and Agency Secretary, pursuant to which the Agency would agree to pay for certain
public improvements and other activities to be undertaken by the City in the furtherance of the
redevelopment of the Project Areas; and,
WHEREAS, pursuant to Section 33445 of the CRL, the Agency may, with the consent of
the City, pay for all or a portion of the cost of the land for, and the cost of construction of, any
building, facility, structure, or other improvements that are publicly owned and located within or
contiguous to the Project Areas if the City Council finds based upon evidence in the record,
including, in particular and without limitation the evidence provided in the Staff Report dated
January 31, 201 1, that:
(1) The acquisition of the land or the installation or construction of the buildings,
facilities, structures, or other improvements that are publicly owned are of benefit to the Project
Areas, by helping to eliminate blight within the Project Areas or providing housing for low- or
moderate- income persons;
(2) No other reasonable means of financing the acquisition of the land or the
installation or construction of the buildings, facilities, structures, or other improvements that are
publicly owned, are available to the community;
(3) The payment of funds for the acquisition of land or the cost of buildings, facilities,
structures, or other improvements that are publicly owned is consistent with the implementation
plan adopted pursuant to CRL Section 33490; and,
PCDC Resolution No. 2011 -02 Page 1
WHEREAS, the action approved by this Resolution, entering into a cooperative funding
agreement for payment of costs associated with future activities, including the Auto Center
Drive, the Brownfields Program, the Economic Development Program and the cross -town
connector portion of the Rainier Avenue Cross -Town Connector /Interchange Project described
in Exhibit A attached to the Agreement and incorporated herein by reference, the Vintage
Chateau II Senior Apartment Project described in Exhibit B attached to the Agreement and
incorporated herein by reference, and the Staffing and Administration Expense described in
Exhibit C attached to the Agreement and incorporated herein by reference, has no potential
for physical effects on the environment and does not approve individual entitlements for any of
the Projects described herein, and this action is therefore exempt from review pursuant to the
California Environmental Quality Act (CEQA), 14 California Code of Regulations (CEQA
Guidelines) Section 15061(b) (3); and,
WHEREAS, the Auto Center Drive Project, as described in Exhibit A to the Agreement, is
also categorically exempt from review pursuant to CEQA Guidelines, Sections 15303(d) and /or
15304(b) and /or 15304(h); and,
WHEREAS, the environmental effects of the Old Redwood Highway Interchange Project
described in Exhibit A to the Agreement were evaluated in the EIR for the Highway 101 HOV
Lane Widening and Improvements Project, Old Redwood Highway to Rohnert Park Expressway,
SCH #2003062100, for which an EIR was approved on October 23, 2007 and a Caltrans /NEPA
Notice of Determination issued on October 29, 2007, and require no further environmental
review, because no substantial changes are proposed for this Project and no substantial
changes have occurred in the circumstances under which this Project is being undertaken since
the EIR was approved, and there is no new information which was not known and could not
have been known relating to this Project at the time the EIR was approved. A copy of the EIR is
available at www .dot.ca.gov /dist4 /envdocs.htm; and,
WHEREAS, the environmental effects of the 101 /East Washington Interchange Project
described in Exhibit A to the Agreement were previously reviewed in full in the Mitigated
Negative Declaration, U.S. Route 101 /East Washington Street Interchange, SCH #2007112073, for
which a Caltrans /NEPA Determination was made on March 10, 2008. The Project requires no
further environmental review because no substantial changes are proposed for this Project and
no substantial changes have occurred in the circumstances under which this Project is being
undertaken since the Mitigated Negative Declaration was adopted, and there is no new
information which was not known and could not have been known relating to this Project at the
time the Mitigated Negative Declaration was adopted. A copy of the EIR is available at
www .dot.ca.gov /disf4 /envdocs.hfm; and,
WHEREAS, the environmental effects of the Caulfield Railroad Crossing Project described
in Exhibit A to the Agreement were previously reviewed in the Environmental Impact Report for
the Central Petaluma Specific Plan (CPSP) SCH #2002112039, which was approved prior to
adoption of the CPSP; and for which a notice of determination was issued by the City on June
30, 2003. The Project requires no further environmental review because no substantial changes
are proposed for this Project and no substantial changes have occurred in the circumstances
under which this Project is being undertaken since the EIR was certified was adopted, and there
is no new information which was not known and could not have been known relating to this
Project at the time the EIR was certified. A copy of the EIR is available at the City of Petaluma,
Planning Department, 1 1 English Street, Petaluma, CA; and,
WHEREAS, the environmental effects of the interchange portion of the Rainier Avenue
Cross -town Connector /Interchange ( "Rainier ") Project described in Exhibit A to the Agreement
were previously reviewed in full in the EIR /EIS for the U.S. Highway 101 MSN C -2 Widening Project,
SCH #2001042115, for which a Caltrans Notice of Determination issued on July 27, 2009, and a
PCDC Resolution No. 2011 -02 Page 2
Record of Decision for NEPA was filed on October 29, 2010. The interchange portion of the
Project requires no further environmental review because no substantial changes are proposed
for the interchange portion of the Project and no substantial changes have occurred in the
circumstances under which the interchange portion of the Project is being undertaken since the
EIR /EIS was approved, and there is no new information which was not known and could not
have been known relating to the interchange portion of the Project at the time the EIR /EIS was
approved. A copy of the EIR is available at www .dot.ca.gov /disf4 /envdocs.htm; and,
WHEREAS, the environmental effects of the River Trail - Washington to Lakeville Project
described in Exhibit A to the Agreement were evaluated in a Mitigated Negative Declaration
approved by the City for which a Notice of Determination was issued on May 16, 2005 and
require no further environmental review, because no substantial changes are proposed for this
Project and no substantial changes have occurred in the circumstances under which this Project
is being undertaken since the Mitigated Negative Declaration was approved and there is no
new information which was not known and could not have been known relating to this Project
at the time the Mitigated Negative Declaration was approved. A copy of the Mitigated
Negative Declaration is available at the City of Petaluma, Department of Public Works, 1 1
English Street, Petaluma, CA; and,
WHEREAS, the environmental effects of the Logan Place Senior Apartment Project, APN #
019- 202 -013, described in Exhibit B to the Agreement were previously reviewed in a Mitigated
Negative Declaration adopted by the City on May 18, 2009. The Project requires no further
environmental review because no substantial changes are proposed for this Project and no
substantial changes have occurred in the circumstances under which this Project is being
undertaken since the Mitigated Negative Declaration was adopted, and there is no new
information which was not known and could not have been known relating to this Project at the
time the Mitigated Negative Declaration was adopted. A copy of the Mitigated Negative
Declaration is available at the City of Petaluma, Planning Department, 1 1 English Street,
Petaluma, CA, and,
WHEREAS, the Staff Report accompanying this Resolution, the Agreement, the
Redevelopment Plan, and the Implementation Plan provide additional information upon which
the findings and actions set forth in this Resolution are based; and,
WHEREAS, the expenditure of fax increment funds for the projects identified in the
Agreement will be of benefit to the Project Areas by helping to eliminate blight within the Project
Areas or providing housing for low- or moderate - income persons; and,
WHEREAS, the expenditure of tax increment funds for the publicly -owned improvements is
consistent with the Implementation Plan adopted by the Agency pursuant to Health and Safety
Code Section 33490, in that it will further the goals and objectives of the Redevelopment Plan,
improve the appearance of the Project Areas, eliminate blight, improve access to businesses in
the Project Areas, and support economic development; and,
WHEREAS, the activities and improvements proposed to be funded pursuant to the
Agreement are provided for in the Redevelopment Plan, and the expenditure of tax increment
funds for such improvements is consistent with the Implementation Plan adopted by the Agency
pursuant to Health and Safety Code Section 33490; and,
WHEREAS, the publicly -owned improvements proposed to be funded pursuant to the
Agreement will not generate cash flow to the City or Agency, and therefore cannot support
debt service; the City has no unrestricted general fund revenue available for such purposes
without a reduction in vital community services; and the City does not have and cannot
reasonably obtain revenue available for such purposes, and therefore no other reasonable
means of financing the activities and improvements exists.
PCDC Resolution No. 2011 -02 Page 3
NOW, THEREFORE, BE IT RESOLVED BY THE PETALUMA COMMUNITY DEVELOPMENT
COMMISSION that it hereby:
1. Finds based upon the foregoing recitals and the evidence in the record, including, in
particular and without limitation the evidence provided in the Staff Report accompanying this
Resolution, dated January 31, 2011, that: (i) the expenditure of tax increment funds for publicly -
owned improvements identified in the Agreement will be of benefit to the Project Areas by
helping to eliminate blight within the Project Areas or providing housing for low- or moderate -
income persons, (ii) no other reasonable means of financing such improvements is reasonably
available, and (iii) payment for such improvements is consistent with the Implementation Plan
adopted in connection with the Redevelopment Plan.
2. Approves the Agency's expenditure of tax increment funds in the amounts and for the
purposes specified in the Agreement.
3. Approves the actions to be undertaken and the services to be provided by the City as
specified in the Agreement.
4. Authorizes the Agency Executive Director to execute the Agreement on behalf of the
Agency substantially in the form of the Cooperative Agreement attached hereto and to
undertake such actions and to execute such additional instruments as may be necessary or
desirable in order to carry out the intent of this Resolution, including without limitation, the listing
of the Agency's obligations set forth in the Agreement on the statement of indebtedness to be
filed with the County Auditor.
S. Declares that if any provision, sentence, clause, section or part of this Resolution is found
to be unconstitutional, illegal or invalid, such finding shall affect only such provision, sentence,
clause, section or part, and shall not affect or impair any of the remaining parts.
ADOPTED this 315+ day of January, 2011 by the following vote:
Commissioner � Aye '. No � � - ..Absent Abstam `
Albertson X
Barrett X
Chair Glass X
Harris X
Vice Chair Healy X
Renee X
R
David Glass, air
PCDC Resolution No. 2011 -02 Page 4
ATTEST:
Deborah Padovan, CMC, Recording Secretary
APPROVED AS TQ "FORM:
Eric W. Danly, GeneTlal Counsel
PCDC Resolution No. 2011 -02 Page 5
ATTACHMENT TO PCDC RESOLUTION 2011 -02
CONTRACT NO. 2011 -016
COOPERATIVE AGREEMENT BETWEEN THE
PETALUMA COMMUNITY DEVELOPMENT COMMISSION AND
THE CITY OF PETALUMA
This Cooperative Agreement (this "Agreement ") is entered into effective as of January
31, 2011 ( "Effective Date ") by and between the Petaluma Community Development
Commission, a public body, corporate and politic ( "Agency ") and the City of Petaluma, a
municipal corporation ( "City "). The Agency and the City are hereinafter collectively referred to
as the "Parties."
RECITALS
A. Pursuant to authority granted under Community Redevelopment Law (California Health
and Safety Code Section 33000 et seq.) ( "CRL "), the Agency has responsibility to implement the
redevelopment plan for the Central Business District Project Area and the Petaluma Community
Development Project Area (the "Project Areas ") established by the Redevelopment Plan
adopted for the Project Area pursuant to Ordinance No. 1221, adopted on September 27, 1976;
Ordinance No. 1725, adopted on June 13, 1988; and Ordinance No. 2116, adopted on July 18,
2001 (as subsequently amended, hereafter the "Redevelopment Plan ").
B. Pursuant to Section 33220 of the CRL, any public body is authorized to enter into an
agreement with the Agency for the purpose of aiding and cooperating in the planning,
undertaking, construction, or operation of redevelopment projects located within the jurisdiction
in which such public body is authorized to act, upon the terms and with or without consideration
as such public body determines.
C. Pursuant to Section 33126(b) of the CRL, the Agency may enter into a contract with any
other public agency pursuant to which such public agency furnishes necessary staff services
associated with or required by redevelopment.
D. Pursuant to Section 33445 of the CRL, the Agency may, with the consent of the City, pay
for all or a portion of the cost of the land for, and the cost of construction of, any building,
facility, structure, or other improvements that are publicly owned and located within or
contiguous to the Project Areas if the City Council finds that:
(1) The acquisition of the land or the installation or construction of the buildings,
facilities, structures, or other improvements that are publicly owned are of benefit to the Project
Areas by helping to eliminate blight within the Project Areas or providing housing for low- or
moderate- income persons;
(2) No other reasonable means of financing the acquisition of the land or the
installation or construction of the buildings, facilities, structures, or other improvements that are
publicly owned, are available to the community; and
(4) The payment of funds for the acquisition of land or the cost of buildings, facilities,
structures, or other improvements that are publicly owned is consistent with the implementation
plan adopted pursuant to CRL Section 33490.
E. On the basis of the information and evidence presented to the City Council and the
governing board of the Agency and provided in the staff report and other materials
accompanying the resolutions approving this Agreement, the City Council and the governing
PCDC Resolution No. 2011 -02 Page 6
board of the Agency have adopted the findings described in Recital D with respect to the
public improvements to be funded by the Agency pursuant to this Agreement.
F. The Parties desire to enter into this Agreement to set forth activities, services, and facilities
that the City will undertake or make available to the Agency in furtherance of the
redevelopment of the Project Areas, and to provide that the Agency will pay for or reimburse
the City for actions undertaken and costs and expenses incurred for and on behalf of the
Agency or otherwise in furtherance of the redevelopment of the Project Areas.
NOW, THEREFORE, in consideration of the mutual covenants, conditions and promises
herein contained, the Parties hereby agree as follows.
1. Term. The term of this Agreement shall commence on the Effective Date, and shall continue
in effect until the expiration date of the Redevelopment Plan as in effect on the Effective Date
of this Agreement. Notwithstanding the foregoing, the Parties agree that if and to the extent
any payment obligation incurred by the Agency pursuant to this Agreement may extend
beyond the term during which the Agency is authorized to undertake activities pursuant to state
law, such obligations shall be paid from any resources available to Agency or its successor in
interest (subject to Section 6 below), including without limitation, fax increment revenue
available to the Agency or its successor pursuant to Article XVI, Section 16 of the California
Constitution and CRL Section 33670, the proceeds of bonds or other indebtedness heretofore or
hereafter issued by the Agency (subject to applicable limitations imposed by federal law and
the applicable bond indenture and related documents), reserve funds (to the extent not
otherwise legally obligated), lease revenues, interest, and proceeds from the sale of land or
other assets.
2. Agency to Pay for Public Improvements. The Agency agrees to pay to the City the amounts
set forth in Exhibit A for the cost of construction of the public improvements therein identified
and in accordance with the schedule set forth therein, from all available sources, including
bond proceeds on hand or to be received by the Agency in the future. In the event that the
Agency is unable to issue bonds, the City agrees to enter into financing agreements as
necessary to complete the projects identified in Exhibit A on behalf of the Agency, to be repaid
by the Agency pursuant to Section 5 herein.
3. Agency to Provide Funds for Low and Moderate - Income Housing. The Agency agrees to pay
to the City the amounts set forth in Exhibit B in accordance with the schedule set forth therein for
the purpose of increasing, improving and preserving the supply of low- and moderate - income
housing within the City.
The Agency agrees to pay to the City all funds within its Low and Moderate Income Housing
Fund not previously obligated by Agency pursuant to the Community Redevelopment Law or
otherwise, for the purpose of increasing, improving and preserving the supply of low -and
moderate - income housing within the City, to be utilized for all the costs associated with the
affordable housing program, including salaries of housing staff working to produce Low and
Moderate Income Housing.
4. City to Provide Services In support of the redevelopment of the Project Areas, the City
agrees to provide the staffing and other services described in the attached Exhibit C . Agency
agrees to pay City for the cost of such staffing and other services in the amounts and in
accordance with the schedule described in the attached Exhibit C .
5. Indebtedness The obligations of the Agency to make payment to City pursuant to this
Agreement shall constitute an indebtedness of the Agency within the meaning of Article XVI,
Section 16 of the California Constitution and CRL Section 33670, and shall be payable from tax
increment paid to the Agency pursuant to Article XVI, Section 16 of the California Constitution
PCDC Resolution No. 2011 -02 Page 7
and CRL Section 33670 or from any other source legally available to the Agency for such
payment, and shall constitute an indebtedness of the Agency until paid in full. The Agency shall
include its obligations to the City under this Agreement as an indebtedness on the Agency's
statement of indebtedness filed with the County Auditor pursuant to CRL Section 33675.
6. Subordination. The obligations of the Agency to make payments to City pursuant to this
Agreement shall be subordinate to any obligation of the Agency to pay debt service on bonds
heretofore or hereafter issued by the Agency and to pay any other contractual indebtedness of
the Agency incurred prior to the date of this Agreement.
7. Time for Agency Payment The Agency shall use its available funds to make all payments to
the City required by this Agreement, not later than ten (10) days after the Effective Date.
8. Project Approvals; Environmental Review This Agreement is not intended to limit in any
manner the discretion of City of the agency, as applicable, in connection with the issuance of
approvals and entitlements for the projects described in this Agreement, including without
limitation, the undertaking and completion of any required environmental review pursuant to
CEQA and NEPA, as applicable, and the review and approval of plans and specifications. Prior
to approving any of the projects described herein, the City acting as lead agency or co -lead
agency, shall complete any environmental review required under CEQA or NEPA.
9. Severability If any term, provision, covenant, or condition set forth in this Agreement,
including without limitation the exhibits hereto, is held by the final judgment of a court of
competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions,
covenants, and conditions shall continue in full force and effect to the extent that the basic
intent of the Parties as expressed herein can be accomplished. In addition, the Parties shall
cooperate in good faith in an effort to amend or modify this Agreement in a manner such that
the purpose of any invalidated or voided provision, covenant, or condition can be
accomplished to the maximum extent legally permissible.
10. No Third -Party Beneficiaries; Assignments. Nothing in this Agreement is intended to
create any third -party beneficiaries to the Agreement, and no person or entity other than the
Agency and the City, and the permitted successors and assigns of either of them, shall be
authorized to enforce the provisions of this Agreement.
I]. Further Assurances. Each Party agrees to execute, acknowledge and deliver all
additional documents and instruments, and to take such other actions as may be reasonably
necessary to carry out the intent of the transactions contemplated by this Agreement.
12. Governing Law. This Agreement shall be governed by and construed in accordance
with the laws of the State of California.
13. Counterparts This Agreement may be executed in counterparts, each of which shall be
deemed an original and all of which shall constitute but one and the same instrument.
14. Amendments. This Agreement may be modified or amended, in whole or in part, only by
an instrument in writing, executed by the Parties.
15. Recitals The Recitals set forth above are hereby incorporated into this Agreement as
though fully set herein.
16. Exhibits. Exhibits A , B and C attached hereto are hereby incorporated into this
Agreement by reference.
PCDC Resolution No. 2011-02 Page 8
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date first
written above.
CITY:
CITY OF PETALUMA,
a municipal corporation
I
B y : 1 .a w
D va id Glass, Mayor
ATTEST:
By:
Claire Cooper, CMC, City Clerk
APPROVED AS TO FORM:
By:
Eric Danly, City Attorney
AGENCY:
PETALUMA COMMUNITY DEVELOPMENT COMMISSION,
a public body, corporate and politic
By:
John C. Brown, Executive Director
ATTEST:
By:
Claire Cooper, CMC, Agency Secretary
APPROVED AS TO FORM:
By:
Eric W. Danly, Agency Counsel
PCDC Resolution No. 2011-02 Page 9
EXHIBIT A TO AGREEMENT
1. Old Redwood Highway Interchange Project
Location - Highway 101 and Old Redwood Highway
Project Description -This project upgrades the Old Redwood Highway 101 interchange to meet
current standards and future traffic requirements. The proposed interchange includes ramp
widening and reconfiguration, traffic operations system improvements, over - crossing structure
widening to six lanes, including bicycle lanes and enhanced signalization improvements at the
intersections. It is to be constructed independently of the Central B portion of the proposed
future widening on US 101, and will provide both safety and congestion relief enhancements.
The project has $I OM Measure M funds allocation, with the City /local funds paying for the
remaining $20.885M costs.
Anticipated PCDC Project Cost: $ 899,000 2010-2011
$14,101,000 2011 -2012
2. Auto Center Drive Extension Project
Location - Auto Center Drive
Project Description - This project extends Auto Center Drive from its current dead end to create
a connection to Petaluma Boulevard North, near the Highway 101 interchange. Utility mains will
be installed along with new roadway on existing right of way.
Anticipated PCDC Project Cost: $1,172,000 2010 -2011
3. 101 /East Washington Interchange Project
Location - East Washington Street and Highway 101
Project Description - This project improves the East Washington Street Interchange with Highway
101 by adding a new northbound on -ramp and realigning the existing southbound on -ramp.
Currently, project funding consists of SAFTLU $13.5M, demonstration funds $1 M, Measure M
$2.9M, and the City $4M local funds toward project right -of -way acquisitions and construction of
the East Washington Interchange, for total available funding of $21 AM. The estimated cost to
design the MSN -C is $6.5M, for a total project cost of $28M.
Anticipated PCDC Project Cost: $2,732,000 2010-2011/2011-2012
4. Caulfield Railroad Crossing Project
Location - Caulfield Lane and Hopper Street
Project Description - Completion of a railroad crossing, the intersection improvements, and the
closing of the existing railroad crossing at Hopper Street /Jefferson Street. Due to future
expected rail use, the new location will improve safety and promote future development in the
area.
Anticipated PCDC Project Cost: $300,000 2010 -2011
PCDC Resolution No. 2011-02 Page 10
5. Rainier Avenue Cross -town Connector /Interchange Project
Location - Rainier Avenue
Project Description - This project provides a new interchange and cross -town roadway under -
crossing of US 101. SCTA has agreed to incorporate the under - crossing structure as part of the US
101 MSN C -2 widening project, which is currently in design. To ensure inclusion of the under -
crossing structure into the MSN C -2 schedule, the interchange component and the under -
crossing component are being studied as two separate, independent projects. As part of the
work effort for the cross -town connector roadway portion of the project, a project study
report /project report and environmental document must be completed.
Anticipated PCDC Project Cost: $1,356,000 2010 -2011
$ 116,000 2011 -2012
$7,000,000 2012 -2013
6. River Trail - Washington to Lakeville Project
Location - various locations in PCD project area
Project Description - This project implements a portion of the Petaluma River Access and
Enhancement Plan from Lynch Creek (Near Lakeville Street) to Washington Street. The project
will construct a multimodal path along the project limits and construct a pedestrian bridge over
the Petaluma River to close a gap in this important pedestrian route.
Anticipated PCDC Project Cost: $1,374,000 2011 -2012
$ 626,000 2013 -2014
7. Brownfields Program
Location - with entire PCD and CBD project areas
Project Description -The City has committed to a $200,000 match to a $1 Million Environment
Protection Agency Revolving Loan Fund (RLF) Grant. The RLF works in conjunction with several
EPA funded assessment grants to provide financial and technical assistance to property owners
for assessment and clean -up of Brownfields within the redevelopment area.
Anticipated PCDC Project Cost: $200,000 2010 -2016
8. Economic Development /Site Development
Location: Throughout PCD and CBD project areas
Project Description: The goal of economic development activities is to develop and promote
incentives that address the specific needs of existing businesses and enhance the City's ability to
attract new businesses and visitors.
Anticipated PCDC Project Cost: $6,000,000 2010 -2016
PCDC Resolution No. 2011 -02 Page 11
EXHIBIT B TO AGREEMENT
Affordable Housing Projects:
1. Vintage Chateau II Senior Apartments
Location: 325 North McDowell Blvd., Petaluma
APN #007 - 350 -013
Project Description: Construction of 68 affordable rental units for seniors to be built on
approximately 1.67 acres by a nonprofit developer in the Petaluma Community Development
Project Area of Petaluma's redevelopment agency. This project will be funded using the
California Tax Credit Allocation program.
Project Cost: Total project cost is $15,900,000. $4,500,000 has been committed by the Petaluma
Community Development Commission of which $2,500,000 of the Agency funds has been spent
on site acquisition.
Documentation: This project has all its land use approvals and is applying for 4% tax credit
bonds in March of 2011. Construction to begin in July of 2011.
Future Anticipated PCDC Project Cost: $2,000,000 2010-2011
2. Logan Place Apartments
Location: 1200 Petaluma Blvd. North, Petaluma
APN #019- 202 -013
Project Description: Construction of 66 affordable multifamily rental units on approximately 2.61
acres by a nonprofit developer in the Petaluma Community Development Project Area of
Petaluma's redevelopment agency. This project has been approved for HOME and MHP funds
of approximately $10,000,000.
Project Cost: Total project cost is $25,600,000. $5,150,000 has been committed by Petaluma's
Redevelopment Agency in support of this development. Approximately $3,450,000 of Agency
funds has been spent on site acquisition and pre - development costs. The balance of
$1,700,000 will be spent over the next two years during construction.
Documentation: This project has all its land use approvals and is applying for 4% tax credit
bonds in June of 2011. Construction to begin in September of 2011.
Future Anticipated PCDC Project Cost: $ 400,000 2011-2012
$ 1,300,000 2012 -2013
Affordable Housing Programs:
Redevelopment funds can be used for the purpose of increasing, improving and preserving the
supply of low -and moderate - income housing within the City and for all the costs associated with
the affordable housing program. These programs are listed below along with the nonprofit
agency that partners with the City of Petaluma.
1. Rental Assistance Program - Petaluma People Services Center
2. Transitional Housing Program - Salvation Army
3. Transitional Housing Program - Committee on the Shelterless
4. Family Transitional Housing - Committee on the Shelterless
PCDC Resolution No. 2011 -02 Page 12
5. Fair Housing - Landlord and Tenant Mediation - Petaluma People Services Center
6. Mobile Home Rent Control - City of Petaluma
7. Rehab of low- income families and seniors - Rebuilding Together
Anticipated Housing Program Cost: $1,026,400 2010 -2011
$5,132,000 2011-2016
PCDC Resolution No. 2011 -02 Page 13
EXHIBIT C TO AGREEMENT
Staffing and Administrative Expenses
In support of the redevelopment Petaluma's projects areas, the City agrees to provide the
staffing and other services by which the Agency agrees to pay City for the cost of such staffing
and other services as listed below. Table 1 will be delivered by the City Manager's Office, Public
Works, and Finance Department staff persons for project management, construction
management, environmental review, survey, financial accounting and project reporting. The
expenses of administering the Agency Programs and Projects are payable to the City on an
annual basis.
Table 1 - Agency Administration Annual Costs 2011-2016
201 1 -2012
2012 -2013
2013 -2014
2014 -2015
2015 -2016
1,198,500
1,198,500 1
1,150,000
1,150,000
1,150,000
Affordable Housing Programs and Projects Administrative Expenses
City staff will provide administration, fiscal reporting, project management, marketing and grant
administration services for a wide range of affordable housing programs and projects. The
expenses of administering the Affordable Housing Programs and Projects are payable to the City
on an annual basis.
Table 2 - Affordable Housinq program Administration Annual Costs 2011-2016
[:205:11 -2012
2012 -2013
2013 -2014
2014 -2015
2015 -2016
375,000
375,000
1375,000
375,000
375,000
:1.11
PCDC Resolution No. 2011 -02 Page 14