HomeMy WebLinkAboutStaff Report 5.A 01/09/2017DATE: January 9, 2016
Agenda Item #5.A
TO: Honorable Mayor and Members of the City Council through City Manager
FROM: Heather Hines, Planning Manager
SUBJECT: Adopt Resolutions Approving a Mitigated Negative Declaration and Mitigation
Monitoring and Reporting Program; Approving the Unit Development Plan and
PUD Development Standards and Design Guidelines; Approving a Vesting
Tentative Subdivision Map for Brody Ranch; Introduction of Ordinance
Approving a Zoning Map Amendment.
RECOMMENDATION
It is recommended that the City Council:
a) Approve a Resolution adopting a Mitigated Negative Declaration and Mitigation Monitoring
and Reporting Program for the Brody Ranch Project;
b) Introduce an Ordinance approving a Zoning Map Amendment to rezone the parcel from
Residential 4 (R4) and Residential 5 (R5) to Planned Unit District (PUD);
c) Approve a Resolution approving the Unit Development Plan and PUD Development
Standards and Design Guidelines for the Brody Ranch PUD; and
d) Approve a Resolution approving a Vesting Tentative Subdivision Map (VTSM) to subdivide
the 15.92 -acre site into 61 single-family lots, (59 detached single-family homes and two
attached single-family homes) and one lot to accommodate 138 multi -family units.
BACKGROUND
Location and Context
The Brody Ranch Project is a 199 -unit residential development proposed on an approximately
16 -acre parcel adjacent to the future site of the Corona Road Sonoma Marin Area Rapid Transit
(SMART) Station in the northwestern portion of Petaluma. The project site is bounded by
Corona Road, Sonoma Mountain Parkway, Wellington Place, Corona Creek, and North Coast
Railroad right-of-way.
Existing land uses in the vicinity include single-family residences, a mix of industrial and mobile
home development, an industrial and business park, and rural fanning.
Page 1
Project Site
The project site is relatively flat and drains east into Corona Creek. There are two existing
residences on the westerly side of the project site fronting Corona Road. One is located in the
project site's southwesterly corner near the SMART rail line and one is in the northwesterly
corner near the traffic circle at the "T" intersection of Corona Road and Sonoma Mountain
Parkway. Industrial and agricultural structures and uses occupy the central portion of the
property and consist of an approximately 4,000 square foot shop, three barns, livestock pens and
open lumber and landscape material storage.
Most areas of the site with an elevation below 35 feet (above sea level) are within the 100 -year
flood plain and contain wetlands. There are also a dozen isolated wetlands ranging in size from
29 square feet to 2,471 square feet scatted throughout the undeveloped portions of the site.
Existing vegetation consists primarily of open ruderal grassland and a mix of 82 native and non-
native trees, most of which are near the two existing residences on the site. The undeveloped
portions of the site are presently used for cattle grazing.
Project Description
The project proposes 61 single-family lots, (59 detached single-family homes and two attached
single-family homes on Lot Nos. 9 and 10), and one multi -family lot (Lot 62) to accommodate
138 multi -family units in nine three-story buildings. The project includes preserved wetlands,
open space areas, bicycle and pedestrian paths, connections to the Corona Creek trail, seating
areas, landscape buffers, and a common playground and picnic area. All streets in the project are
proposed to remain private and some will have public access easements. A public easement for
nine parking spaces is proposed adjacent to a playground and picnic area. Affordable housing is
proposed on-site under the terms of a Memorandum of Understanding between the Sonoma
County Land Trust and the project proponent (Attachment 10).
The proposed Zoning Map Amendment would rezone the site from R4 and R5 to a PUD
containing three distinct land use districts: Open Space, Single -Family and Multi -Family.
Development standards proposed in the PUD largely follow those of the existing zoning except
for the minimum parcel size criteria, minimum front yard setback for primary structures, and
minimum street side and rear setbacks for accessory structures. In addition, the PUD proposes
more restrictive standards for the height of primary and accessory structures.
A more detailed project description is provided in the Planning Commission Staff Report in
Attachment 5, as follows:
Page 2
TOPIC
PAGE #
Location and Context
1 - 2
Project Site
3
Existing Public Access and Utility Easements
3
Page 2
"'
srn*tnc Cocosill'I+ -51 (ATarcm►NS)
- f
Project Description
3-4
Existing and Proposed Development Standards
5
Site Plan and Architectural Review
6
Site Access and Circulation
6-7
Utilities
8-9
Landscaping and Fencing
9-10
Proposed Trees
10
Tree Removal
10-11
Buildings
11-12
Pedestrian and Bicycle Advisory Committee (PBAC)
12
Affordable Housing
12-14
DISCUSSION
Planning Commission Recommendation
At its November 8, 2016 meeting, the Planning Commission recommended the Council approve
all actions up for consideration, subject to the conditions recommended by staff and with the
addition of the following conditions:
1) Address the loss of public street parking on Wellington Place by increasing from nine to
12 the number of parking spaces in the development open to the public (Attachment 4,
COA 17),
2) Limit the height of accessory structures to 12 feet, rather than 15 feet as proposed to
address potential impacts of accessory structure with zero rear yard setbacks (Attachment
4, COA 18); and
3) Increase from 100 feet to 120 feet the aggregate width of multi -family structures which
are setback between 15 and 30 feet from Sonoma Mountain Parkway (Attachment 4,
COA 19).
In addition, the Planning Commission asked staff and the project applicant to investigate the
feasibility of implementing a pedestrian crossing over the railroad right-of-way with the
objective of providing more direct access to the future North Petaluma SMART Station. As
proposed, access to the SMART Station is along a sidewalk to be constructed along Corona
Road. At its July 6, 2016 meeting, the Pedestrian and Bicycle Advisory Committee (PBAC)
suggested an additional crossing approximately 500 to 600 feet east of Corona Road
(approximately the middle of the project site).
Page 3
The Planning Commission acknowledged PBAC's suggestion and, in order to both avoid
additional impacts to wetlands and to provide a connection point convenient to a larger number
of pedestrians and cyclists (beyond the boundary of the project site), staff was directed to explore
the feasibility of providing a crossing further east in the general location of an existing Class 1
path along Corona Creek, near the southeast corner of the project site.
A count of the number of residential units within 1/4-,1/2- and 3/4—mile of the proposed crossing at
Corona Road and the two alternative locations recommended for consideration are shown below
and in the maps in Attachment 6.
CROSSING LOCATION
DISTANCE FROM CROSSING
1/4 MILE 1 1/2 MILE 1 3/4 MILE
Corona Road 246
460
584
Near middle of Project site 319
466
695
Corona Creek 412
490
835
Subsequent to the Planning Commission meeting, the City Engineer contacted staff at the City of
Santa Rosa and SMART to inquire about the costs associated with an at grade railroad crossing
recently constructed at Jennings Avenue. According to staff from those agencies, costs for that
crossing were approximately $2,000,000. In the course of that conversation, an estimate of a
grade -separated crossing was estimated to cost approximately $9,200,000.
Although the concept of an additional crossing was encouraged by both the Planning
Commission and the PBAC, the City Engineer does not recommend that a new railroad crossing
be further considered due to the high costs of a railroad crossing, the marginal reduction in
walking distance resulting from a crossing at the approximate middle of the site or Corona Creek
(approximately 1,000 to 1,200 feet), and based on feedback from SMART that it is unlikely that
the California Public Utilities Commission would approve a new at -grade crossing.
Under the project, pedestrian access to the future SMART Station from the project site and
neighboring areas to the north and east would occur via Corona Road, North McDowell Blvd, a
pedestrian path at Kellgren Senior Apartments (to North McDowell Blvd), and Southpoint Blvd
(to North McDowell Blvd).
At their November 81h hearing the Commission provided feedback to the applicant team on the
conceptual site and architectural plans and made the following suggestions for the applicant's
consideration prior to returning for formal SPAR review:
• Add variety to proposed roof forms;
Increase the number of plan types available;
Include a single -story plan type;
Page 4
• Ensure adequate landscaping is provided in the front yards given minimal front setbacks
and the lack of planter strips between curb and sidewalks in the development.
Project Analysis
An analysis of the project as it relates to the applicable policies and regulations of the City of
Petaluma is provided in the Planning Commission Staff Report, as follows:
NN
ro M, o
TOPIC
o
W
N G.
PAGE #
General Plan Consistency
14-17
Brody Ranch Density,
15
Housing Element Consistency
17-18
Corona Ely Specific Plan
18-19
Zoning Map Amendment
19-20
Tentative Subdivision Map
20-22
PUBLIC COMMENT
Neighborhood Meeting
The applicant team hosted a neighborhood meeting on July 26, 2016. Approximately 15
residents attended and inquired about a range of issues including the average lot size, whether or
not there would be one story homes, project timing, assessments and fees, transit stops, and
traffic and circulation concerns. A significant portion of the discussion centered on concerns
about existing on -street parking at Wellington Place during seasonal youth sports activities at
Turnbridge Park. Due to the existing narrow width of Wellington Place, traffic is reduced to one-
way when cars are parked on both sides of the street.
In response to the neighbor's concerns, the applicant revised their plans to prohibit parking on
the west side of Wellington Place with the exception of three parking spaces located in recessed
parking pockets out of the travel lane of the road. In addition, public parking for nine vehicles
was added on the proposed private roadway which intersects Wellington Place (see Parcel D on
Sheet TM -6 and TM -21 at Attachment 13). The Planning Commission recommended that three
additional parking spaces on the private street in the development be made available to the
public. This is reflected as Condition of Approval No. 17 of the draft City Council resolution
(Attachment 4).
Public Notice
Public notice of the January 9, 2017 City Council meeting was published in the Argus Courier on
December 22, 2016 and mailed to all property owners and occupants within 500 feet of the
project site. As of the writing of this staff report, no comments were received in response.
Page 5
ENVIRONMENTAL REVIEW
A Draft Initial Study and Mitigated Negative Declaration (MND) was prepared for the project
and distributed for a 30 -day comment period beginning on September 23, 2016. (Attachment 1,
Exhibit A) The Initial Study found that with mitigation measures the project's potentially
significant effects on environment could be mitigated to a less than significant level. The
applicant has agreed to implement the mitigation measures identified. The Planning
Commission considered the environmental analysis at their hearing on November 8, 2016 and
recommended Council adoption of the IS/MND and MMRP without changes.
FINANCIAL IMPACTS
The project is subject to cost recovery with all expenses paid by the applicant. The applicant has
paid $102,405 cost recovery fees to date.
ATTACHMENTS
Attachment 1:
Resolution adopting a Mitigated Negative Declaration and Mitigation
Monitoring and Reporting Program
Exhibit A: IS/MND
Exhibit B: MMRP
Attachment 2:
Ordinance approving Zoning Map Amendment
Attachment 3:
Resolution approving Planned Unit Development Plan and Standards
Exhibit A: PUD Plan
Exhibit B: PUD Standards and Guidelines
Attachment 4:
Resolution approving Vesting Tentative Subdivision Map
Attachment 5:
Planning Commission Staff Report, November 8, 2016
Attachment 6:
Pedestrian Walkability Maps
Attachment 7:
Planning Commission Resolution No. 2016-19
Attachment 8:
Planning Commission Resolution No. 2016-20
Attachment 9:
Planning Commission Resolution No. 2016-21
Attachment 10:
Memorandum of Understanding between DeNova Homes and Land Trust of
Sonoma County, August 5, 2016 and Affordable Housing Cost Analysis
Attachment 11:
Cal Trans Comment letter on MND, October 20, 2016
Attachment 12:
SPAR deferred Landscape Plans (Sheet SPAR -1 to SPAR -5) (Half size and
full size) and Architectural Plans (Sheets SP -1 to MF -3.7) (Half size only)
Attachment 13:
Vesting Tentative Subdivision Map (Sheets TM -1 to TM -21) (Half size)
Page 6
ATTACHMENT 1
RESOLUTION OF THE CITY OF PETALUMA CITY
COUNCIL ADOPTING A MITIGATED NEGATIVE
DECLARATION AND MITIGATION MONITORING AND
REPORTING PROGRAM FOR THE BRODY RANCH
RESIDENTIAL PROJECT LOCATED AT 360 CORONA
ROAD (APN: 137-061-042)
FILE NO. PLMA-15-0007
WHEREAS, the project applicant, DeNova Homes, LLC submitted applications to the
City of Petaluma for a Vesting Tentative Subdivision Map and establishment of a Planned Unit
District (PUD) (File No. PLMA-15-0007) to subdivide the 15.93 -acre property located at 360
Corona Road (APN: 137-061-040) into 61 single-family lots, (59 detached single-family homes
and two attached single-family homes) and one lot to accommodate 138 multi -family units
("Project"); and
WHEREAS, the Project is subject to the Petaluma General Plan 2025, adopted by the
City on May 19, 2008; and,
WHEREAS, in evaluating certain potential environmental effects of the Project in the
Initial Study, including but not limited to effects of climate change, water supply, and traffic, the
City relied on the Program EIR for the City of Petaluma General Plan 20205, certified on April
7, 2008 (General Plan EIR) by the adoption of Resolution No. 2008-058 N.C.S., which is
incorporated herein by reference; and,
WHEREAS, the General Plan EIR identified potentially significant environmental
impacts and related mitigation measures and the City also adopted a Statement of Overriding
Considerations for significant impacts that could not be avoided; and,
WHEREAS, the City prepared an Initial Study for the proposed Project consistent with
CEQA Guidelines §§15162 and 15163 and determined that a Mitigated Negative Declaration
(MND) was required in order to analyze the potential for new or additional significant
environmental impacts of the Project beyond those identified in the General Plan EIR; and,
WHEREAS, on or before September 22, 2016, the City's Notice of Intent to Adopt a
Mitigated Negative Declaration based on the Initial Study, providing for a 30 -day public
comment period commencing September 23, 2016 and ending October 25, 2016, and a Notice of
Public Hearing to be held on October 25, 2016 before the City of Petaluma Planning
Commission, were published and mailed to all residents and property owners within 500 feet of
the Project as well as all persons having requested special notice of said proceedings; and,
WHEREAS, on October 25, 2016 the Planning Commission continued the item to a date
certain of November 8, 2016; and,
WHEREAS, on November 8, 2016, the Planning Commission held a duly noticed public
hearing at which time all interested parties had the opportunity to be heard; and,
i—\
Page 1 of 3
WHEREAS, on November 8, 2016, the Planning Commission considered the Project,
the MND, the supporting Initial Study, the staff report, and received and considered all written
and oral public comments on environmental effects of the Project which were submitted up to
and at the time of the public hearings; and
WHEREAS, on November 8, 2016, the Planning Commission adopted Resolution No.
2016-19 and, in doing so, forwarded a recommendation that the City Council adopt the Mitigated
Negative Declaration and associated Mitigation Monitoring and Reporting Program for the
Project; and
WHEREAS, on January 9, 2017 the City Council held a duly noticed public hearing and
considered the Project, the MND, the supporting Initial Study, the staff report, and received and
considered all written and oral public comments on the environmental effects of the Project
which were submitted up to and at the time of the public hearing; and
WHEREAS, the Initial Study applies the BAAQMD's California Environmental Quality
Act - Air Quality Guidelines, May 2012, including the BAAQMD thresholds of significance
adopted in June 2010. As lead agency under CEQA, the City of Petaluma has the discretion to
rely upon the BAAQMD CEQA Guidelines and thresholds of significance since they include the
best available scientific data and most conservative thresholds available for comparison of the
Project's emissions. Comparison of the Project's emissions against these thresholds provides a
conservative assessment as the basis for a determination of significance; and,
WHEREAS, pursuant to further analysis in the Initial Study, including evaluation using
the BAAQMD CEQA Guidelines and thresholds of significance, the Project does not make a
considerable contribution to a significant cumulative air quality or greenhouse gas emissions
impact found to be significant and unavoidable in the General Plan 2025 EIR, because of the
Project's emissions are below significance thresholds identified; and,
WHEREAS, the MND reflects the City's independent judgment and analysis of the
potential for environmental impacts fiom the Project; and,
WHEREAS, the MND, Initial Study and related project and environmental documents,
including the General Plan 2025 EIR and all documents incorporated herein by reference, are
available for review in the City Community Development Department at Petaluma City Hall,
during normal business hours. The custodian of the documents and other materials which
constitute the record of proceedings for the proposed project is the City of Petaluma Community
Development Department, 11 English St. Petaluma, CA 94952, Attention: Emmanuel Ursu; and
WHEREAS, while the Initial Study for the Project identified potentially significant
impacts, all significant impacts are mitigated to a less than significant level and therefore the
Project would not result in any significant impacts to the environment; and,
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PETALUMA AS FOLLOWS:
A. The foregoing recitals are true and correct and incorporated herein by reference.
-2.Pa1-2-
Page
ge 2 of 3
B. Based on the its review of the entire record herein, the City Council findings as follows:
1. The Project is consistent with the Medium Density and High Density Residential land
use designations in that the proposed residential uses are within the density ranges
specified in the General Plan.
2. The Project is, for the reasons discussed in the November 8, 2016 Planning
Commission staff report and referenced in the January 9, 2017 City Council staff
report, consistent with the following General Plan policies: 'Policy 1-P-1
(Development Within UGB); Policy 1-P-2 and Policy 2-P-1 (Efficient Land Use in
UGB); Policy 2-P-5 (Arterial Corridors); Policy 2-P-11 (River Oriented
Development); Goal 2-G-5 (Lakeville Highway Connectivity); Policy 2-P-97 (High
Density housing on Project site); Policy 4-P-6 (Street Trees to Improve Air Quality);
Policy 5-P-19 (Bicycle and Pedestrian Friendly Design); Policy 10 -P -3(f) (Integrate
Sound Walls in Streetscape); Policy 11-P-2013 (Street and Parking Lot Trees);
Housing Element Policy 4.2 (Affordable Housing).
3. Pursuant to the analysis in the Initial Study, the Project does not make a cumulatively
considerable contribution to the significant and unavoidable cumulative traffic and/or
noise impacts identified in the General Plan 2025 EIR because although the Project
would contribute vehicle trips to intersections identified in the General Plan EIR as
operating at an unacceptable LOS at build -out, the affected intersections have either
already been determined to acceptably operate at an LOS E or LOS F due to
overriding considerations and conflicts with other General Plan policies or the
Project's contribution to those intersections are below the threshold established by the
General Plan EIR (cause the LOS to deteriorate to the next lowest level).
4. With regard to noise, the Project is considered to result in an effect that is less than
cumulatively considerable because the project excludes new stationary noise sources
and its incremental contribution through vehicular trips is insufficient to result in a
perceptible change in noise level.
C. Based on its review of the entire record herein, including the MND, the Initial Study, all
supporting, referenced and incorporated documents and all comments received, the City
Council finds that there is no substantial evidence that the Project as mitigated will have a
significant effect on the environment, that the MND reflects the City's independent
judgment and analysis, and that the MND, Initial Study and supporting documents
provide an adequate description of the impacts of the Project and comply with CEQA, the
State CEQA Guidelines and the City of Petaluma Environmental Guidelines.
D. The Mitigation Monitoring and Reporting Program, included as Exhibit A, is hereby
adopted. Implementation of the mitigation measures included therein mitigates or avoids
significant environmental effects.
Page 3 of 3
EXHIBIT A
ENVIRONMENTAL CHECKLIST AND INITIAL STUDY
MITIGATED NEGATIVE DECLARATION
Prepared By:
City of Petaluma
11 English Street
Petaluma, CA 94952
858
September 20, 2016
A --t
CITY OF PETALUMA
BRODY RANCH SUBDIVISION
CEQA ENVIRONMENTAL CHECKLIST AND INITIAL STUDY
Project Title:
Brody Ranch Subdivision
Lead Agency:
City of Petaluma
11 English Street
Petaluma, CA 94952
Contact Person:
Emmanuel Ursu, Principal Planner
(707) 778-778-4401
eursu@ci.petaluma.ca.us
Project Location:
360 Corona Road, Petaluma, CA
Project Sponsor:
DeNova Homes, LLC
1500 Willow Pass Road
Concord, CA 94950
Property Owners:
Allan J. Brody, Beverly Ann Brody and Sharon L. Moore
General Plan
Split General Plan Land Use Designation:
Designation:
7.48 acres - Medium Density Residential
8.44 acres - High Density Residential
Zoning:
Existing Zoning:
Proposed Zoning:
7.48 acres — Residential 4
7.48 acres — PUD
8.44 acres — Residential 5
8.445 acres — PUD
Description of project:
Zoning change from R4 and R5 to Planned Unit Development (PUD) to allow
reduced lot sizes and setbacks for the single-family component of the project,
Tentative Subdivision Map, tree removal permit and Site Plan and
Architectural Review (SPAR) for the subdivision of a 15.92 -acre site for
development of 199 units including 59 single-family homes, a duplex and 138
multi -family units. Project amenities include open .space and conservation
easement, landscape buffers, pedestrian and bicycle trails, neighborhood
park/picnic area, resident and guest parking and public parking for nine cars.
All existing structures on the project site and 32 trees are to be removed and
311 trees are proposed to be planted.
Surrounding land uses
Land uses surrounding the site are as follows:
and setting; briefly
West- Corona Road and low density rural residential (located outside City of
describe the project's
Petaluma and outside the Urban Growth Boundary);
surroundings:
North - Single family residential in the R1 zone and Planned Unit District;
East — A 2.72 -acre neighborhood park (Turnbridge Park) and Corona Creek
in the Open Space -Park District (OSP). Single-family residences in a Planned
Unit District are located east of the park and Corona Creek.
South —The rail line for the Sonoma Marin Area Rail Transit (SMART) abut
the project's southerly property line and the future site of the North Petaluma
SMART station is on the south side of the tracks. Currently, the future station
site is used for truck storage and is zoned Mixed Use - 1 B (MU1 B).
Other public agencies
Army Corp of Engineers
whose approval is
CA Department of Fish and Wildlife
required (e.g. permits,
US Fish and Wildlife Service
financial approval, or
Regional Water Quality Control Board
participation
Sonoma County Water Agency
agreements):
Page 2 of 96
September 2016 4-2—
BRODY RANCH SUBDIVISION
TABLE OF CONTENTS
PAGE #
1. OVERVIEW AND BACKGROUND..............................................................................................................5
1.1. ENVIRONMENTAL SETTING...................................................................................................................6
1.2. PROJECT DESCRIPTION......................................................................................................................10
2. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED...................................................................15
3. EVALUATION OF ENVIRONMENTAL IMPACTS....................................................................................17
3.1. AESTHETICS..........................................................................................................................................17
3.2. AGRICULTURAL AND FORESTRY RESOURCES...............................................................................21
3.3. AIR QUALITY..........................................................................................................................................23
3.4. BIOLOGICAL RESOURCES...................................................................................................................30
3.5. CULTURAL RESOURCES......................................................................................................................38
3.18. GEOLOGY AND SOILS..........................................................................................................................41
3.7. GREENHOUSE GAS EMISSIONS..........................................................................................................45
3.8. HAZARDS/HAZARDOUS MATERIALS.................................................................................................48
3.9. HYDROLOGY AND WATER QUALITY..................................................................................................54
3.10. LAND USE AND PLANNING..................................................................................................................59
3.11. MINERAL RESOURCES.........................................................................................................................62
3.12. NOISE......................................................................................................................................................63
3.13. POPULATION AND HOUSING: ..............................................................................................................
70
3.14. PUBLIC SERVICES: ...............................................................................................................................
71
3.15. RECREATION.........................................................................................................................................74
3.16. TRANSPORTATION AND CIRCULATION.............................................................................................76
3.17. UTILITIES AND SERVICE SYSTEMS....................................................................................................87
3.18. MANDATORY FINDINGS OF SIGNIFICANCE (Cal. Pub. Res. Code §15065) ....................................93
4. REFERENCE DOCUMENTS: .................................................................................................................... 95
TABLE OF FIGURES
FIGURE1: REGIONAL LOCATION.............................................................................................................................7
FIGURE 2: GENERAL PLAN LAND USE MAP............................................................................................................8
FIGURE3: PROJECT VICINITY.................................................................................................................................8
FIGURE 4: BRODY RANCH EXISTING ZONING...........................................................................................................9
FIGURE 5: BRODY RANCH PROPOSED ZONING........................................................................................................9
FIGURE 6: MULTI -FAMILY PLAN AREA..................................................................................................................13
FIGURE 7: SINGLE-FAMILY AND DUPLEX PLAN AREA............................................................................................13
FIGURE 5: WETLANDS DELINEATION.....................................................................................................................32
FIGURE9: FIRM FLOOD ZONE.............................................................................................................................55
FIGURE 10: NOISE MEASUREMENT LOCATIONS.....................................................................................................64
FIGURE 11: STUDY AREA INTERSECTIONS.............................................................................................................79
Page 3 of 96
September 2016 Q ��
BRODY RANCH SUBDIVISION
TABLE OF CONTENTS CONTINUED PAGE #
LIST OF TABLES
TABLE 1: BRODY RANCH DENSITY.......................................................................................................................10
TABLE 2. AIR QUALITY THRESHOLDS OF SIGNIFICANCE.........................................................................................24
TABLE 3. CONSTRUCTION PERIOD EMISSIONS.......................................................................................................25
TABLE 4. OPERATIONAL EMISSIONS.....................................................................................................................27
TABLE 5. COMMUNITY RISK IMPACT TO BRODY RANCH RESIDENTS.......................................................................29
TABLE 6. ANNUAL PROJECT GHG EMISSIONS.....................................................................................................46
TABLE 7. EXISTING PEAK HOUR INTERSECTION LEVELS OF SERVICE....................................................................79
TABLE 8. BASELINE PEAK HOUR INTERSECTION LEVELS OF SERVICE...................................................................80
TABLE 9. FUTURE PEAK HOUR INTERSECTION LEVELS OF SERVICE......................................................................81
TABLE 10. EXISTING,AND EXISTING PLUS PROJECT PEAK HOUR INTERSECTION LEVELS OF SERVICE ....................82
TABLE 11. BASELINE AND BASELINE PLUS PROJECT PEAK HOUR INTERSECTION LEVELS OF SERVICE ..................83
TABLE 12. FUTURE AND FUTURE PLUS PROJECT PEAK HOUR INTERSECTION LEVELS OF SERVICE ........................ 84
Page 4 of 96
September 2016
1. OVERVIEW AND BACKGROUND
General Plan: The Petaluma General Plan 2025, adopted in 2008, serves the following purposes:
❑ Reflects a commitment on the part of the City Council and their appointed representatives and staff to
carry out the Plan;
❑ Outlines a vision for Petaluma's long-range physical and economic development and resource
conservation; enhances the quality of life for all residents and visitors; recognizes that human activity
takes place within the limits of the natural environment; and reflects the aspirations of the community;
❑ Provides strategies and specific implementing policies and programs that will allow this vision to be
accomplished;
❑ Establishes a basis for judging whether specific development proposals and public projects are in
harmony with Plan policies and standards;
❑ Allows City departments, other public agencies, and private developers to design projects that will
enhance the character of the community, preserve and enhance critical environmental resources, and
minimize impacts and hazards; and
❑ Provides the basis for establishing and setting priorities for detailed plans and implementing
programs, such as Development Codes, the Capital Improvement Program (CIP), facilities and
Master Plans, redevelopment projects, and the Urban Growth Boundary (UGB).
General Plan EIR: Because California Environmental Quality Act (CEQA) discourages "repetitive discussions
of the same issues" (CEQA Guidelines section 15152b) and allows limiting discussion of a later project that is
consistent with a prior plan to impacts which were not examined as significant effects in a prior EIR or to
significant effects which could be reduced by revisions in the later project (CEQA Guidelines section 15152d),
no additional benefit to the environment or public purpose would be served by preparing an EIR merely to
restate the analysis and the significant and unavoidable effects found to remain after adoption of all General
Plan policies/mitigation measures. All General Plan policies adopted as mitigation apply to the subject Project.
The EIR reviewed all potentially significant environmental impacts and developed measures and policies to
mitigate impacts. Nonetheless, significant and unavoidable impacts were determined to occur under the
General Plan. Therefore, the City adopted a statement of overriding considerations, which balances the
merits of approving the project despite the potential environmental impacts. The impacts identified as
significant and unavoidable in the General Plan are:
❑ Increased motor vehicle traffic which would result in unacceptable level of service (LOS) at six
intersections covered in the Master Plan:
o McDowell Boulevard North/Corona Road, Lakeville Street/Caulfield Lane, Lakeville Street/East D
Street, Petaluma Boulevard South/D Street, Sonoma Mt. Parkway/Ely Boulevard South/East
Washington Street, and McDowell Boulevard North/Rainier Avenue.
❑ Traffic related noise at General Plan buildout, which would result in a substantial increase in existing
exterior noise levels that are currently above City standards.
❑ Cumulative noise from proposed resumption of freight and passenger rail operations and possible
resumption of intra -city trolley service, which would increase noise impacts.
❑ Air quality impacts resulting from General Plan buildout to population levels that could conflict with the
Bay Area 2005 Ozone Strategy. (This regional air quality plan has since been replaced by the 2010
Clean Air Plan, which is further discussed in Sections 3.3 Air Quality and 3.7 Greenhouse Gases.)
❑ A possible cumulatively considerable incremental contribution from General Plan development to the
significant impact of global climate change.
This environmental document tiers off of the General Plan EIR (SCH NO.: 2004082065), which was certified
on April 7, 2008, to examine site- and project -specific impacts of the proposed subdivision project as
described below. A copy of the City of Petaluma's General Plan and EIR are available at the Community
Development Department, 11 English Street, Petaluma, California 94952, during normal business hours and
online at http://cityofpetaluma.net/cdd/plan-general-plan.html.
September 2016
Corona Ely Specific Plan
In 1989 the City of Petaluma adopted the Corona -Ely Specific Plan (CESP) to facilitate the annexation of
approximately 675 acres of what were then principally agricultural lands. The CESP provides land uses and
densities, transportation, neighborhood design, and public amenities in the City's northeast quadrant,
extending to Sonoma Mountain Parkway from E. Washington and north to Corona Road. The Corona -Ely
Annexation No. 1 occurred in 1989 and implemented the Specific Plan. Development of the CESP area
occurred over the past 27 years such that today very few vacant/ underdeveloped parcels remain. The
Northern Tier of the CESP encompasses approximately 160 acres and is characterized as, "...being north of
the central 285 acres beyond Corona Creek and consisting of a band of urban residential development which
drops off to rural density along Corona Road, but climbs to urban high densities to the west toward McDowell
Boulevard."
The proposed Brody Ranch Subdivision project site is located within the Corona- Ely Specific Plan (CESP) on
of the few remaining undeveloped parcels.
Station Area Master Plan
The City adopted the Station Area Master Plan in April 2012 in an effort to promote transit oriented
development by capitalizing on existing employment centers, commercial activities, and facilitating the
complementary development of housing and job generating uses in close proximity to commuter rail services.
The Station Area Master Plan endeavors to promote walkable and livable environments adjacent to the
Downtown Station Area and Corona Road Station Area, and encourage an integrated development strategy
that incorporates the Sonoma -Marin Area Rail Transit (SMART) rail system.
The proposed Brody Ranch Subdivision project site is located immediately north of the SMART corridor and
the planned Corona Road SMART Rail station.
1.1. ENVIRONMENTAL SETTING
Reaional Settina
Petaluma is located in southwestern Sonoma County along the US 101 corridor approximately 15 miles south
of Santa Rosa and 20 miles north of San Rafael. It is situated at the northernmost navigable end of the
Petaluma River, a tidal estuary that snakes southward to San Pablo Bay. The City originated along the banks
of the Petaluma River, spreading outward over the floor of the Petaluma River Valley as the City developed.
The valley itself is defined by Sonoma Mountain on the northeast and by the hills extending northward from
Burdell Mountain on the west. To the south are the Petaluma Marshlands and the San Francisco Bay beyond.
Petaluma's Urban Growth Boundary (UGB) defines the limits within which urban development may occur and
encompasses approximately 9,911 acres. The UGB was implemented in 1987 (as the Urban Limit Line),
formally adopted as the UGB in 1998 via Measure 1, and will expire in 2025 without subsequent action. The
General Plan and EIR evaluated potential impacts associated with existing and proposed development within
the UGB. The project site is located within the UGB and has been used for residential, agricultural, and light
industrial uses. The project's location within the City of Petaluma and surrounding environs is shown at
Figure 1 (Project Location in Petaluma) below.
Page 6 of 96
September 2016
Figure 1: Regional Location
r��t
M
0 0.5 1 1.5 9
N
FE
Neighborhood Settinq
s� t
�u
t�1`n
t%
� 3 L
KI_ ly
-
Q
Brody Ranch
Petaluma, California
Cli}'V�7Nt
Sonoma County Line
Fpure t
The project site is in the northwestern portion of Petaluma adjacent to the municipal boundary. It is in the
Corona Road Station Area and the site is identified in the Petaluma Station Area Master Plan as a
"Opportunity Site" that is intended to be redeveloped with transit oriented development. The site is bound by
Corona Road to the west, Sonoma Mountain Parkway to the north, Wellington Place and a segment of
Corona Creek to the east and the Sonoma Marin Area Rail Transit (SMART) rail line to the south. The
segment of Corona Road fronting the project site forms the municipal boundary between the City of Petaluma
and County of Sonoma and the Urban Growth Boundary.
The area transitions from rural farming and ad hoc industrial uses located west of the site to urbanized
residential development to the north and east and commercial, industrial and mobile home uses to the south
and southwest. Corona Creek, a blue line intermittent creek, and Turnbridge Park, a 2.72 -acre public
neighborhood park are located immediately to the east. Figure 2 is the General Plan Land Use Map of the
project site and its surrounding and Figure 3 provides an aerial photograph of the project site that shows the
project site features and the surrounding land uses.
Figure 4 below shows the existing zoning onsite as R4 and R5 and Figure 5 shows the proposed zoning
amendment to change the zoning to PUD.
Page 7 of 96
September 2016 (�
�C �
Figure 2: General Plan Land Use Map
` Brody Ranch �e�r r PtgectArea
Petaluma, California
Figure 3: Project Vicinity
Mlles Project Vicinity cwmit
0 0.05 0.1 0.15 0.2
y` Brody Ranch Project Area
s Petaluma, California
Fgure 3
Page 8 of 96
September 2016
Figure 4: Brody Ranch Existing Zoning
ornia
Figure 4
Figure 5: Brody Ranch Proposed Zoning
ifornia
Figure 5
Page 9 of 96
September 2016 VI
Prosect Site
The 15.92 -acre site is generally flat with an approximately 1% grade sloping to the southeast toward Corona
Creek. It is elevated 33 to 43 feet above sea level and most areas of the site below elevation 35 are within the
100 -year flood plain and contain wetlands. There are several isolated wetlands ranging in size from 29 square
feet to 2,471 square feet scatted throughout the undeveloped portions of the site. Vegetation consists
primarily of open ruderal grassland and a mix of 82 native and non-native trees, most of which are near the
two existing residences on the west side of the site.
The two residences on the project site front Corona Road. One is located near the project site's southwesterly
corner and the other is near the traffic circle at the intersection of Corona Road and Sonoma Mountain
Parkway. Driveways to these existing residences are accessed from Corona Road. Industrial and agricultural
structures and uses occupy the central portion of the property and consist of an approximately 4,000 square
foot shop, three barns, livestock pens and open lumber and landscape material storage. The easterly portion
of the site is used for grazing.
The eastern limit of the project site is bounded by Wellington Place and Corona Creek. Wellington place is an
existing public roadway that provides connectivity into the neighborhood on the east side of Corona Creek. At
the southern eastern property line is Corona Creek and the existing pedestrian path located on the western
top of bank of Corona Creek and stubbed out at its southern limit to the project site.
Existinq Public Access and Utility Easements
A 25 -foot wide easement to Sonoma County Flood Control and Water Conservation District runs the length of
the south property boundary adjacent to the SMART corridor.
1.2. PROJECT DESCRIPTION
The following requested approvals from the City of Petaluma are required for the proposed project: (1)
Amendment of the zoning from R4 and R5 to PUD to allow a decrease in the minimum parcel size and
reduced front and rear setbacks for the single family parcels so the minimum density standards may be met
while preserving the majority of wetlands on the site; (2) A vesting tentative subdivision map to subdivide the
site into 59 single-family lots, one duplex and two multi -family lots for the development of 138 multi -family
units in nine three story buildings; (3) Site Plan and Architectural Review for the for the site, building and
landscaping details; and (4) removal of 32 trees, six of which are protected by the Implementing Zoning
Ordinance.
The proposed density is presented in Table 1 below as follows:
Table 1: Brody Ranch Density
General Plan Use
(Zoning)
MDR
1114)
HDR
1115)
Total
Gross Acres
7.482
8.44
15.92
Open Space and Wetlands
2.599
1.181
3.78
Roads
1.14
1.537
2.677
Net Acres
3.743
5.718
9.461
Units Proposed
40
159
199
Density Range (Units/Acre)
10.7
(8.1-18.0)
27.8
(18.1 — 30.0)
21.0
Source: Density Land Use Plan Brody Ranch Subdivision TM -4.
Page 10 of 96
September 2016
Features of the project include a private street system, a play/picnic area, a network of bicycle and pedestrian
paths, wetlands and open space areas.
Inclusionary Housing
Affordable housing will be provided on-site and under the terms of a Memorandum of Understanding between
the Land Trust of Sonoma County and the project proponent. The project proponent will develop 25 affordable
housing units including 21 condominiums consisting of a mix of one, two and three bedroom units, as needed,
dispersed throughout the nine buildings; a duplex; and two single family homes. The affordable units shall be
restricted to households with low- to moderate- income earners (80% to 120% of Area Median Income).
Resale of all affordable units will be restricted to lower income households at affordable prices via a 99 -year
renewable ground lease.
Site Access and Circulation
Primary vehicular access to the site is proposed from Sonoma Mountain Parkway directly across from Mauro
Pietro Drive which is approximately 300 feet east of the traffic circle at the "T" intersection of Corona Road
and Sonoma Mountain Parkway. A second vehicular access point is provided from Wellington Place just north
of the existing bridge over Corona Creek. Internal circulation to the single-family homes is provided along
private streets that have an overall right-of-way width of 45 feet (56 feet wide at the project entrance) and a
curb -to -curb roadway width of 36 feet. Four and one half -foot sidewalks are provided on both sides of the
private streets. Private driveways serving the condominium buildings are 24 feet wide. All driveway access
for single family homes (Lots 1-55) will be taken internally from new private roadways within the subdivision
with the exception of the six lots that front onto Wellington Place, those lots will be accessed via driveways off
of Wellington Place (Lots 56 — 61). A row of through -lots (Lots 18 to 25) back up to Sonoma Mountain
parkway and have driveway access and front a new internal roadway ("Street C"). These lots are setback an
average of 39 feet from the face of curb of Sonoma Mountain Parkway right-of-way and are separated by an
open split rail fence at the back of the sidewalk, a 15 -foot wide landscape buffer, a 6 -foot wooden fence
topped by a two -foot privacy screen with gated pedestrian access to the rear yard of each home, and the rear
yards.
An approximately 160 -foot long left turn lane is proposed from the westerly direction of Sonoma Mountain
Parkway into the project. To accommodate the new left turn lane, changes to pavement stripping and a center
median are proposed including elimination of a portion of the existing median and one of the two eastbound
lanes and widening of the existing westbound bicycle lane, right -turn lane and travel lane. These changes are
proposed along the length of the new left turn lane.
Pedestrian and bicycle access to the site is provided at both vehicular access points. In addition, pedestrians
and cyclist may access the site from Corona Road at the southwesterly corner of the site and from the
existing trail and Class I bicycle path along Corona Creek at the southeastern corner of the site. Gated
resident -only pedestrian access to the multi -family portion of the site is provided at two locations along
Corona Road, at one location at the traffic circle at the intersection of Corona Road and Sonoma Mountain
Parkway and at two locations from the Class I path along the south property line near Corona Road and
between building Numbers 6 and 7. The pedestrian access gates are designed to include a 13 -foot tall
covered entry structure with wood siding and wire mesh walls under a corrugated steel roof topped by a
decorative cupola designed to match features of the existing barn on the project site.
Within the development, four and one half -foot wide sidewalks are provided along the private streets, a Class
I bicycle trail and pedestrian path is proposed between Corona Road and Corona Creek along the southerly
side of the project site just north of the wetlands to be preserved.
A public sidewalk and a Class II bicycle path is also proposed along the project side of Corona Road and will
be stubbed out to the SMART crossing to allow for future extension of the sidewalk. Consistent with the
Corona Ely Specific Plan the project proposes a continuous sidewalk with a planter strip along the length of
the Corona Road frontage. In order to preserve the existing redwood trees while accommodating a 4 -foot
wide sidewalk and planter strip, a specialized reinforced concrete sidewalk is proposed that would allow for
at -grade placement of the sidewalk closer to the existing trees without causing damage.
Page 11 of 96
September 2016
Existing sidewalks along both sides of Sonoma Mountain Parkway will remain and a new sidewalk will be
added to the project side of Wellington Place along with three street parking spaces set in between the
proposed driveways. Painted ladder crosswalks will be added across both vehicular access roads to the
subdivision and across Sonoma Mountain Parkway on either side of the main access road into the
subdivision. The Sonoma Mountain Parkway/ Mauro Pietro crosswalks will also have Rectangular Rapid
Flashing Beacons. Internal crosswalks made of a stamped concrete will be provided at all street intersections
and at the play/picnic area.
As an offsite improvement, the project will construct a bus stop on eastbound Sonoma Mountain Parkway,
just east of Wellington Place at the Turnbridge Park frontage. The bus stop will include a bus turn out,
accommodating one municipal bus; a 5 x 15 foot bus shelter; and a bench. The existing sidewalk will be
reconstructed behind the proposed bus turn out.
Utilities
Sanitary sewer, water and joint trench connections to existing utilities are proposed at both vehicular access
points to the project. These utilities would be carried through the project site within right of way of new internal
roadways. The subdivision lots will be served via lateral connections from new utilities within internal
roadways, with the exception of those lots that front onto Wellington Place. Lots 56 — 61 front Wellington
Place and will be served via lateral utility extensions from existing utilities in the Wellington Place right-of-way.
Stormwater runoff will be collected from impervious surfaces in the development and allowed to percolate into
the soils on site for treatment before release. The stormdrain system incorporates a series of bioretention
features including on -lot drainage, roadside bioretention, drainage swales, bioretention ditch, and rolled curb
and gutter with pervious concrete. Stormwater runoff will be collected and conveyed through these
bioretention swales prior to release into the wetlands area and eventually into Corona Creek.
In addition to the stormwater treatment facilities proposed, a stormwater detention basin is included at the
southerly corner of the site. The detention basin occupies 0.26 acres (11,300 square feet), with a depth of
0.75 feet. The water storage capacity of the detention basin is 9,025 cubic feet. The detention basin is sized
to accommodate the post development run-off increase impacting Corona Creek. The basin increases the
existing flood plain capacity located in the undeveloped portion of the project. Floodwaters originate from
Corona Creek. When Corona Creek waters rise the detention basin begins to accept stormwater from the
creek through a new storm drain line connecting the basin to the creek. The additional capacity created by the
basin mitigates the downstream impacts from the development. A catch basin at the bottom of the basin
connecting the storm drain to Corona Creek drains the basin when the storm subsides and the creek
hydraulic grade line drops. A berm around the detention basin prevents small storm on-site flows from
entering into the depression. The berm elevation is set below the base flood elevation so as not to impact the
existing flood plain.
Buildings
Nine condominium buildings are proposed on the western side of the project site. Three buildings contain 12
units and six buildings contain 17 units. All of the condominium structures are three stories; have a mix of
one, two and three bedrooms and have garages along the alley side. Resident parking is provided in 99 alley -
loaded garages and 38 designated open spaces in a centrally located parking lot. Additional uncovered guest
parking is provided in the parking lot and alongside the private roadways in the development.
Three architectural styles are proposed for the condominium buildings: Craftsman, Mediterranean and
Farmhouse. Four buildings (Nos. 3, 4, 5 and 6) are oriented perpendicular and adjacent to Corona Road with
access driveways that terminate in eight -foot tall wooden fences. The remaining condominium buildings are
parallel to Corona Road and are located toward the interior of the site between the proposed main vehicular
entrance to the project and the four buildings abutting Corona Road. Figure 6 is a partial site plan of the
multi -family area of the project (building numbers 1, 2 and 7 are 12-plex and buildings 3, 4, 5, 6, 8 and 9 are
17-plex units).
Page 12 of 96
September 2016 A 12—
Figure 6: Multi -Family Plan Area
Figure 7: Single -Family and Duplex Plan Area
Page 13 of 96
September 2016
Fifty-nine single-family homes and a duplex are proposed on the easterly side of the project's main entry
roadway (see Figure 7 above). The single-family homes range in size from 1,909 square feet to 2,347 square
feet on lots ranging in size from 3,307 square feet to 7,095 square feet with a median lot size of 3,431 square
feet. The duplex units are each 1,611 square feet. Three architectural styles are proposed: Cottage,
Farmhouse and Craftsman. Each single-family home design includes a two -car garage plus two on-site open
parking spaces. The two parking spaces in the duplex garages are in tandem and one open parking space is
provided in the driveway for each unit in the duplex. Six-foot wooden privacy fences are proposed along the
side property lines starting behind the front corners of the homes and along rear property lines. Gated fence
returns connect the side yard fences to the side of the houses.
Landscaped focal points providing pedestrian access from within the subdivision to the ten -foot wide multiuse
path are located at the "T" intersection termini of the main entry road (Street "A") and Street "D." These focal
points are improved with low planter seating walls and enhanced paving in the roadway intersections.
Planned Unit Development (PUD)
The project proposes a Planned Unit District (PUD) zoning in accordance with Chapter 19 of the City's
Municipal Code. The purpose of the PUD is to provide specific standards and design guidelines for the
development of the Brody Ranch Subdivision. The overall objective is to provide specific standards and
guidelines for the development of the site that is sensitive to abutting wetlands, surrounding neighborhoods,
and Sonoma Mountain Parkway recognizing the project's location adjacent to the future site of a SMART
Station and its function as the southwesterly gateway to Corona -Ely Specific Plan area while providing
residential ownership opportunities, including on-site affordable housing.
The Planned Unit District (PUD) provides a more community- and pedestrian -oriented design and form of
ownership than that provided by the existing R4 and R5 zoning. Figure 4 and Figure 5 above show the
existing zoning and proposed amendment from R4/R5 to PUD. Quantitative development standards of the
PUD largely follow those of the existing zoning except for the minimum parcel size and parcel depth criteria of
the R-4 zoning district and the Sonoma Mountain Parkway setback required by the Corona -Ely Specific Plan.
Site Preparation and Construction
Development of the Brody Ranch Subdivision is presumed to occur over an approximately 18 -month
construction period and will initiate with site preparation and grading. Site preparation will initiate with the
demolition of the existing structures, buildings and facilities onsite. The two residences will be demolished and
removed in order to accommodate the proposed development. Demolition debris will be sorted and off
hauled for disposal. A number of mature trees scattered across the project site will also be removed during
the site preparation and grubbing stage. All existing utilities onsite will be removed.
Grading will occur over the proposed development area only and will avoid the wetland area in the southern
portion of the site. Site grading will result in the distribution of soil across the site to achieve level topography
for building pads, roadways and infrastructure. No import or export of soil will be necessary as excess cut will
be reused onsite. Construction equipment expected to be utilized during grading includes tractors, backhoes,
haul trucks, graders, pavers and water trucks. Staging of construction equipment and materials will occur
within the footprint of the project area towards Corona Road and at least 100 feet from the wetlands to be
preserved.
Following completion of grading activities, infrastructure improvements and building foundations will be
constructed. Utilities, storm drains and catch basins will be installed. As all public utilities currently extend to
the project site, improvements will be limited to the installation of new laterals and tie-ins to connect to the
existing water, sewer, power, and gas services in place within the Sonoma Mountain Parkway and Wellington
Place. Frontage improvements along Corona Road, Sonoma Mountain Parkway and Wellington Place will be
installed including new or reconstructed sidewalks, restriping, landscaping and signage.
September 2016 V''A
Single and Multi -Family buildings are presumed to be constructed concurrently, A post tension slab
foundation will be developed for residential buildings using wood frame construction and in accordance with
the CalGreen California Building Code.
2. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this project, involving at
least one impact that Is a "Potentially Significant Impact Unless Mitigation is Incorporated" as
Indicated by the checklist on the following pages.
1, Aesthetics 7. GHG Emissions X 13, Population / Housing
2, Ag I Forest 8. Hazards X 14. Public Services
3. Air Quality X 0, Hydrology 16. Recreation
4. Biological Resources X 10, Land Use 16. Transportation i Traffic
5. Cultural Resources X 11. Mineral Resources 17. Utilities
6. Geology / SoilsX 12. Noise X 18, Mandatory Findings
DETERMINATION (To be cornpletedby the Lead Agency)
On the basis of this initial evaluation:
I find that the proposed project COULD NOT have a significant effect on the environment. A
NEGATIVE DECLARATION will be prepared.
I find that although the proposed project could have a significant effect on the environment,
there will not be a significant effect in this case because revisions in the project have been
X
made by or agreed to by the project proponent, A MITIGATED NEGATIVE DECLARATION
will be prepared,
i find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required,
I find that the proposed project MAY have a "'potentially significant impact" or "potentially
significant unless mitigated" impact on the environment, but at least one effect 1) has been
adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has
been addressed by mitigation measures based on the earlier analysis as described on
attached streets, An ENViRONMENTAL IMPACT REPORT is required, but It must analyze
only the effects that remain to be addressed,
i find that although the proposed project could have a significant effect on the environment,
because all potentially significant effects .(a) have been analyzed adequately in an earlier EIR
or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided
or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION; Including revisions or
mitigation measures that are imposed upon the proposed project, nothing further is required,
Signature:
Page 15 of 96
September 2016
Date
A—� 5
Applicant Signature: Gate
Page 16 of 96 n
September 2016 A — ( G
3. EVALUATION OF ENVIRONMENTAL IMPACTS
The following discussion addresses the potential level of impact relating to each aspect of the environment.
3.1. AESTHETICS
Would the project:
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
p
a)
Have a substantial adverse effect on a scenic
❑
❑
❑
vista?
b)
Substantially damage scenic resources,
including, but not limited to, trees, rock
outcroppings, and historic buildings within a state
❑
❑
❑
scenic highway?
c)
Substantially degrade the existing visual
character or quality of the site and its
❑
❑
®
❑
surroundings?
d) Create a new source of substantial light or glare
which would adversely affect day or nighttime ❑ ❑ ® ❑
views in the area?
Sources: Sources: 2025 GP And EIR; Corona- Ely Specific Plan, 1987; Phase 1 ESA prepared by AEI Consultants,
April 29, 2014; Project Plans; Brody Ranch Subdivision- Landscape Project Narrative, November 24, 2015;
Architectural Plans, June 22, 2016.
Setting:
The natural features that characterize Petaluma and its surroundings provide for a visually rich setting. The
City of Petaluma is located in the Petaluma River Valley, which is northwest -southeast trending between
Sonoma Mountain and Mount Burdell. The City is flanked by the foothills and peaks associated with these
mountain ranges which provide views of rolling hills and agricultural landscapes. Petaluma is also traversed
by the Petaluma River and tributaries, which further contribute to the aesthetic quality of the City. A long
established urban form within the City limits contrasts with the surrounding natural and agricultural features
and provides for a distinct visual character.
The project site lies within the North East Planning Subarea and borders the North McDowell Subarea, which
is located directly to the southwest. The Northeast Planning Subarea is characterized by relatively low-density
suburban residential development. The area is generally defined by the "neighborhood unit concept" with
common uses at intersections of arterials, schools at the center of neighborhoods, and dwelling uses
interspersed throughout. The Northeast Planning Subarea is unique in that it features measurably more parks
than any other subarea and walking and bike trails are common throughout. The subarea is well established
and features little vacant and underdeveloped land.
The Project is also located within the boundaries of the Corona -Ely Specific Plan, which consists of a 675 -
acre area located in Northwest Petaluma, In 1989 the City of Petaluma adopted the Corona -Ely Specific Plan
(CESP) thereby facilitating the annexation of approximately 675 acres of what were then principally
agricultural lands. The Corona -Ely Annexation No. 1 occurred later that year and implemented the Specific
Plan. Development of the CESP area occurred over the intervening 27 years such that today only a very few
vacant and underdeveloped parcels remain including that of the project site at 360 Corona Road,
Page 17 of 96
September 2016
The project site is located on one of the few remaining developable parcels and at the far north end of the
CESP. The site is comprised of 15.9 acres of land and presently supports rural residential and commercial
land uses. While historically agricultural, the project site has been developed since the 1900's and today
features two dwellings, a single story welding shop, several barns, and ancillary structures. A large portion of
the site is devoted to open grassland. The site is bounded on the north by Sonoma Mountain Parkway beyond
which is residential development. To the south are railroad tracks and a trucking yard and to the east is
Wellington Place beyond which are park and residential land uses. Corona Road, which serves as the
municipal boundary and urban growth boundary, is to the west beyond which is land developed with low
density rural residential uses. Aesthetic and visual resources present in the project area include intermittent
views of open space, rolling hillocks, and the Sonoma Mountains to the northeast.
The project proposes 199 dwelling units consisting of 59 single family homes, a duplex and 138 multi -family
units (condominiums) that will be distributed on a split lot exhibiting a medium and high density land use
designation, respectively. The developed area will consist of approximately 12.14 acres with the remaining
acreage (3.78 acres) devoted to preserved wetlands and open space.
The architecture of the proposed subdivision includes neo -traditional styles that consist of modern
interpretations of Craftsman, Cottage, Vernacular farmhouse, and Mediterranean styles. The building forms
vary little with the primary distinguishing elements being the siding materials, fenestration and rooflines. The
single family residences and duplex are two story and the multi -family dwelling units are three stories in height
and feature massed plans capped with gabled or hipped roofs and exhibit strong articulation of spaces and
varied wall and roof planes.
Landscaping consisting primarily of drought tolerant plants and a mix of native and non-native species
Landscaping will be introduced along Sonoma Mountain Parkway, in planter strips along segments of Corona
Road and along Wellington Place, along the multi -use path, in the bio-swale and in the yards around the
single-family homes, duplex and condominiums. Landscaping is designed to promote unification of the
neighborhood, connectivity, privacy, shading and aesthetics. The plant palette consists of drought tolerant
plants and a mix of native and non-native species, except in the bioswale and near the preserved wetlands
were only California native species are proposed.
To address potential noise impacts generated by traffic along Sonoma Mountain Parkway, Corona Road and
SMART, portions of the project site's perimeter are to be screened by double sided wood fencing. Six-foot
fencing setback 15 feet from the property line will attenuate street noise at the rear of the homes along
Sonoma Mountain Parkway. Trees and shrubs will screen the fence from the roadway and an open 42 -inch
wire mesh fence is provided at the back of the sidewalk.
Landscaping along Corona Rd will consist of landscape parkway strips featuring a mix of perennials, shrubs
and groundcovers. Vines may be incorporated along the proposed fences to deter graffiti. Fencing along this
side of the project will include an eight -foot wood sound fence which will align with the sides of the buildings
and be set back approximately 15 feet from the property line. A three-foot split rail fence will be incorporated
at or near the property line and the landscape material will include existing mature redwood trees and a mix of
native and non-native trees, shrubs, groundcover and vines.
A six-foot fence with gabion pillars will be threaded between the grove of trees along the multi -use path at the
southern property boundary and then transition into a three-foot split rail wood fence across the site to the
playground/picnic area at the east side of the site.
Impact Analysis:
3.1 (a). (Scenic Vista) No Impact: The 2025 General Plan EIR identifies vistas of Sonoma Mountain and the
Petaluma Valley as significant visual resources with notable viewpoints seen from Washington Street
Overpass, McNear Peninsula and Rocky Memorial Dog Park. The proposed Brody Subdivision is not located
in the immediate vicinity of any of the notable viewpoints and would neither obstruct nor diminish any existing
viewsheds. The project is proposed on an underdeveloped parcel located within the bounds of the UGB.
Page 18 of 96
September 2016—�$
Since the site is surrounded on at least three sides by existing "urban" development the project is considered
infill. The GP EIR (Page 3.11-5) states that within the built city, infill development would not have a significant
effect on the visual quality of the city, because new development will be similar in scale and character to that
of existing development and be subject to Site Plan and Architectural Review. The proposed subdivision,
constructed pursuant to the applicable zoning standards will be similar in scale and character to existing/
adjacent development. Accordingly, the project is not expected to have an impact to any identified scenic
vistas.
3.1 (b). (Resources viewed from a State Designated Scenic Highway) No Impact: In 1963 the California
legislature established the California Scenic Highway Program with the purpose of preserving the character of
scenic highways and protecting them from changes that may diminish the aesthetic value of adjacent lands.
Sonoma County includes two state designated scenic highways located along stretches of Highway 116 and
Highway 12; however, Petaluma does not currently feature any state designated highways.
While not state or locally designated, the portion of Corona Road located east of the intersection with Sonoma
Mountain Parkway, is identified in the Corona Ely Specific Plan (1987) as a being "locally valued for its
picturesque, country qualities." The road is further appreciated because it "provides a scenic transition
between country and town." As the project site is located directly south of that intersection there is little
expectation that the proposed project would affect the scenic character of the identified stretch of Corona
Corridor and/or scenic resources viewed from the Corona corridor. Accordingly, the project is not expected to
have any impact to a designated State Scenic Highway or locally valued Scenic Corridor.
Mitigation Measures: None required.
3.1 (c). (Visual Character and Quality) Less than Significant Impact: Impact 3.11-3 of the General Plan
EIR concludes that infill development (such as the Brody Subdivision) may potentially degrade the existing
visual quality of the city if is substantially departs from the character of surrounding areas and existing
development therein in terms of density, scale, and/or design principles.
As shown in Figure 3 above, the project is surrounded generally by urban development (commercial and
residential land uses) and major arterials (e.g., Corona Road and Sonoma Mountain Parkway) and, across
from Corona Road, rural residential uses. The project is located within the city's UGB at a site designated by
the General Plan as medium and high density residential. The Zoning Map designates the project site as R-4
and R-5, respectively. The project's scale, as proposed, is similar to that of the residential subdivisions
located to the north and east of the project site and is consistent with the density envisioned in the General
Plan.
The Corona- Ely Specific Plan (1987), within which the project site is located, does address the likelihood that
future development consistent with the respective land use designations would displace former rural/
agricultural land and replace those former uses with more residential/commercial type uses giving the area a
decidedly more "urban" character. The necessity of accommodating development was considered more
important than retaining the character of the Specific Plan area in its entirety, and therefore, the EIR prepared
for the Corona -Ely Specific Plan identified the impact as significant and unavoidable and adopted a statement
of overriding considerations. Accordingly, the displacement of more rural -like uses and open grazing land with
suburban development is not expected to result in a significant impact beyond that already analyzed in the
CESP EIR.
The design and spatial organization of the single-family component of the project are generally similar to, or
an enhancement of, the surrounding residential development. While the scale, massing and structure size
relative to parcel size of the proposed homes are greater than the existing homes in nearby subdivisions, the
homes are well designed with a variety of roof forms, building articulation and will be adequately screened
with trees and shrubs. The proposed architecture does not depart significantly in density, scale or design
principles such that it would degrade the existing visual environment. In addition, the project is not expected
to have a significant effect on the city's rural visual character since it is surrounded on three sides by
Page 19 of 96
September 2016
residential and industrial development and thus it will not introduce a new modern development into an
otherwise rural area, but rather provide continuity of the existing development trends. The multi -family
component of the project is proposed on the portion of the site designated High Density Residential and
identified for Transit Oriented Development in the Station Area Master Plan. Its scale and mass is
appropriate for the applicable zoning and land use designation.
Lastly, compliance with the Implementing Zoning Ordinance's requirement in §24.010.G to obtain Site Plan &
Architectural Review from the Planning Commission would further ensure compatibility with the established
character. As proposed, the design is consistent with the guiding regulation and is complimentary to the
existing neighborhood. Therefore the project's potential to impact the established visual character and quality
of the area would be less than significant.
Mitigation Measures: None required.
3.1 (d) (Light and Glare) Less Than Significant Impact: The project site is bounded on all sides by existing
development including industrial, residential and rural residential uses, all of which currently contain lighting
associated with buildings, landscaping and parking areas.
Exterior lights installed in conjunction with the proposed development will increase artificial light in the vicinity,
as will headlights from vehicles accessing the project site. The potential exists for headlights from cars
entering and exiting the proposed subdivision to introduce new light and glare onsite and along project area
roadways. However, the project access driveway along Sonoma Mountain Parkway and Wellington Place
would be directed into the proposed subdivision and would not introduce substantial new turning movements
that could result in headlight intrusion onto adjacent properties. Landscaping design, the perimeter fencing,
and screening that utilizes a mixture of shrubs and trees will minimize light and glare onsite and projected
onto adjacent properties from vehicle headlights. Accordingly, light and glare from new vehicles is expected to
have a less than significant impact.
New lighting onsite associated with the parking areas, pathways, common areas, and on -building lighting will
introduce new sources on light onsite and has the potential to result in light pollution associated with street
lamps and exterior residential lighting that could affect nighttime view in the project area. Uniformly applied
conditions of project approval require that all exterior lighting be directed onsite and shielded to prevent glare
and intrusion onto adjacent properties. Only low -intensity light standards and/or wall -mounted lights will be
used (no flood lights) and lights attached to buildings will provide a "soft wash" of light against the wall in order
to avoid direct glare. The proposed Brody Subdivision project is required to conform with §21.040.D of the
Petaluma Implementing Zoning Ordinance (IZO), which specifies lighting standards for all new exterior
lighting such as the provision that the cone of direct illumination be 60 degrees if the luminary is greater than
six feet above the ground.
While the project has the potential to result in new lighting associated with street lamps and exterior
residential lighting that could affect nighttime view in the project area, mandatory compliance with the city's
conditions of approval and adherence to IZO §21.040.D would ensure the project's potential light and glare
impacts would be less than significant.
Mitigation Measures: None required.
Page 20 of 96
September 2016 ( ID
3.2. AGRICULTURAL AND FORESTRY RESOURCES
b) Conflict with existing zoning for agricultural ❑ ❑ ❑
use, or a Williamson Act contract?
c) Conflict with existing zoning for, or cause
rezoning of, forest land (as defined in Public
Resources Code §12220(g)), timberland (as ❑ ❑ ❑
defined by Public Resources Code section
4526), or timberland zoned Timberland
Production (as defined by Government Code
section 51104(g))?
d) Result in the loss of forest land or conversion ❑ ❑ ❑
of forest land to non -forest use?
e) Involve other changes in the existing
environment which, due to their location or ❑ ❑ ❑
nature, could result in conversion of Farmland,
to non-agricultural use or conversion of forest
land to non -forest use?
Sources: City of Petaluma General Plan Land Use and UGB; Petaluma General Plan DER (Figure 3-7-3); and
California Department of Conservation, Important Farmland Finder,
http://maps.conservation.ca.gov/ciff/ciff.html, Accessed August 19, 2016.
Setting:
Agricultural lands within the City's UGB are limited to "Farmland of Local Importance", "grazing land", and
"other land." There are no identified forestlands within the UGB. Agricultural resources are prevalent outside
of City limits, within the County of Sonoma. An impetus to the establishment of the UGB was to preserve
natural resources, agricultural lands, and other open spaces and focus encourage development to occur on
undeveloped and underutilized lands within the UGB. No agricultural or forestland designations are present
on the project site and the project site's existing General Plan and Zoning designations anticipate residential
development. The nearest land designated for agricultural use is located approximately half a mile to the
northwest.
Page 21 of 96
September 2016 A — 1--K
Less Than
Potentially
Significant
Less than No
Significant
with
Significant Impact
Would the project:
Impact
Mitigation
Impact
Incorporated
a) Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland),
as shown on the maps prepared pursuant to
❑
❑
❑
the Farmland Mapping and Monitoring
Program of the California Resources Agency,
to non-agricultural use?
b) Conflict with existing zoning for agricultural ❑ ❑ ❑
use, or a Williamson Act contract?
c) Conflict with existing zoning for, or cause
rezoning of, forest land (as defined in Public
Resources Code §12220(g)), timberland (as ❑ ❑ ❑
defined by Public Resources Code section
4526), or timberland zoned Timberland
Production (as defined by Government Code
section 51104(g))?
d) Result in the loss of forest land or conversion ❑ ❑ ❑
of forest land to non -forest use?
e) Involve other changes in the existing
environment which, due to their location or ❑ ❑ ❑
nature, could result in conversion of Farmland,
to non-agricultural use or conversion of forest
land to non -forest use?
Sources: City of Petaluma General Plan Land Use and UGB; Petaluma General Plan DER (Figure 3-7-3); and
California Department of Conservation, Important Farmland Finder,
http://maps.conservation.ca.gov/ciff/ciff.html, Accessed August 19, 2016.
Setting:
Agricultural lands within the City's UGB are limited to "Farmland of Local Importance", "grazing land", and
"other land." There are no identified forestlands within the UGB. Agricultural resources are prevalent outside
of City limits, within the County of Sonoma. An impetus to the establishment of the UGB was to preserve
natural resources, agricultural lands, and other open spaces and focus encourage development to occur on
undeveloped and underutilized lands within the UGB. No agricultural or forestland designations are present
on the project site and the project site's existing General Plan and Zoning designations anticipate residential
development. The nearest land designated for agricultural use is located approximately half a mile to the
northwest.
Page 21 of 96
September 2016 A — 1--K
Impact Analysis:
3.2 (a -e) (Farmland Conversion, Williamson Act, Forestland/Timberland Conflict) No Impact: There are
no forest lands, important farmlands, agricultural resources or agricultural preserves located within the project
site. The project site is not classified as Prime Farmland, Unique Farmland, or Farmland of Statewide
Importance. The 2014 Sonoma County Important Farmland map identifies the project site as "Urban and
Built -Up Land" with approximately 11 acres defined as, "Farmland of local Importance." The project site,
however, does not exhibit an agricultural zoning designation and is not under Williamson Act contract. There
are no forestlands, timberlands or such zoning on the subject site or vicinity. While the project is located in
relatively close proximity to agricultural land as designated by the Sonoma County General Plan, no impacts
to these lands are expected to occur as a result of development. The proposed project would have no impacts
to forest uses and would not result in the conversion of such lands since none exist on-site or in the project
vicinity. Therefore, the project would have no impact to agricultural and forestry resources.
Mitigation Measures: None required.
Page 22 of 96
September 2016 ZZ
3.3. AIR QUALITY
Where available, the significance criteria established
Less Than
by the applicable air quality management or air
Potentially
Significant
Less than
pollution control district may u to make
p y be relied on p
Significant
Impact
with
Mitigation
significant No Impact
Impact
the following determinations. Would the project:
Incorporated
a) Conflict with or obstruct implementation of the
❑
❑
❑
applicable air quality plan?
b) Violate any air quality standard or contribute
substantially to an existing or projected air
❑
❑
® ❑
quality violation?
c) Result in a cumulatively considerable net
increase of any criteria pollutant for which the
project region is in non -attainment under an
applicable federal or state ambient air quality ❑ ❑ ® ❑
standard (including releasing emissions which
exceed quantitative thresholds for ozone
precursors)?
d) Exposure of sensitive receptors to substantial
pollutant concentrations? ❑ ® ❑ ❑
e) Create objectionable odors affecting a
substantial number of people? ❑ ❑ ® ❑
Sources: 2025 General Plan and EIR; 2010 BAAQMD Clean Air Plan; BAAQMD CEQA Guidelines; Brody Ranch
Project Air Quality and Greenhouse Gas Emissions Assessment prepared by Illingworth and Rodkin, October 22, 2015.
Settincr
The City of Petaluma including the project site is located within the San Francisco Bay Area Air Basin (Air
Basin), which is under the jurisdiction of the Bay Area Air Quality Management District (BAAQMD). BAAQMD
is charged with managing air quality for the region through the implementation of planning, regulation,
enforcement, technical innovation and education. The intent of which is to achieve conformance with
established air quality standards that are set by the U.S. Environmental Protection Agency for the Federal
Clean Air Act and the California Air Resources Control Board for the California Clean Air Act.
Air quality within the Bay Area Air Basin is influenced by natural geographical and meteorological conditions
as well as human activities such as construction and development, operation of vehicles, industry and
manufacturing, and other anthropogenic emission sources. The Bay Area Air Basin is designated as non -
attainment for both the one-hour and eight-hour state ozone standards; 0.09 parts per million (ppm) and 0.070
ppm, respectively. The Bay Area is also in non -attainment for the PM10 and PM2.5 state standards, which
require an annual arithmetic mean (AAM) of less than 20 pg/m3 for PM10 and less than 12 Ng/m3 for PM2.5.
All other national ambient air quality standards within the Bay Area Air Basin are in attainment.
This Initial Study applies the BAAQMD's California Environmental Quality Act — Air Quality Guidelines, May
2012, including the BAAQMD thresholds of significance adopted in June 2010. In March 2012, the Alameda
County Superior Court ordered BAAQMD to set aside use of the significance thresholds within the BAAQMD
CEQA Guidelines until they complete an assessment of the environmental effects of the thresholds in
accordance with CEQA.
Page 23 of 96
September 2016 A - 22,
The Court found that the thresholds, themselves, constitute a "project" for which environmental review is
required. Lead agencies may continue to rely on the BAAQMD CEQA Guidelines, "for assistance in
calculating air pollution emissions, obtaining information regarding the health impacts of air pollutants, and
identifying potential mitigation measures." The BAAQMD CEQA Guidelines include the best available
scientific data and most conservative thresholds available. Comparison of the project's emissions against the
BAAQMD thresholds provides a conservative assessment as the basis for a determination of significance. In
the absence of other applicable thresholds, the City of Petaluma, as lead agency, has chosen to utilize the
June 2010 BAAQMD thresholds and May 2011 Guidelines as a means to conservatively assess the project's
potential environmental effects. BAAQMD air quality thresholds are presented in Table 1, below.
Table 2. Air Quality Thresholds of Significance
Pollutant
Construction Thresholds
lbs per day
Operational Threshold
lbs per day
ROG
54
54
NO,,
54
54
PM10
82
82
PM25
54
54
CO
Not Applicable
9.0 ppm (8 -hour avg.) or
20.0 ppm (1 -hour avg.)
Fugitive Dust
Construction Dust
Ordinance or other Best
Management Practices
Not Applicable
Source: BAAQMD's CEQA Guidelines: May 2011
Petaluma General Plan
The City's General Plan set forth policies and programs to maintain and enhance air quality. The following are
applicable to the proposed project:
Policy 4-P-6: Improve air quality through required planting of trees along streets and within park and
urban separators, and retaining tree and plant resources along the river and creek corridors.
Policy 4 -P -15D: Reduce emissions from residential and commercial uses by requiring the following:
• Use of high efficiency heating and other appliances, such as cooking equipment,
refrigerators, and furnaces, and low NOx water heaters in new and existing residential
units;
• Compliance with or exceed requirements of CCR Title 24 for new residential and
commercial buildings;
• Incorporation of passive solar building design and landscaping conducive to passive solar
energy use for both residential and commercial uses, i.e., building orientation in a south
to southeast direction, encourage planting of deciduous trees on west sides of structures,
landscaping with drought resistant species, and use of groundcovers rather than
pavement to reduce heat reflection;
• Encourage the use of battery -powered, electric, or other similar equipment that does not
impact local air quality for nonresidential maintenance activities; and
• Provide natural gas hookups to fireplaces or require residential use of EPA -certified wood
stoves, pellet stoves, or fireplace inserts.
Policy 4-P-16: To reduce combustion emissions during construction and demolition phases, the contractor
of future individual projects shall encourage the inclusion in construction contracts of the
following requirements or measures shown to be equally effective:
Page 24 of 96
September 2016 ��{
• Maintain construction equipment engines in good condition and in proper tune per
manufacturer's specification for the duration of construction;
• Minimize idling time of construction related equipment, including heavy-duty equipment,
motor vehicles, and portable equipment;
• Use alternative fuel construction equipment (i.e., compressed natural gas, liquid
petroleum gas, and unleaded gasoline);
• Use add-on control devices such as diesel oxidation catalysts or particulate filters;
• Use diesel equipment that meets the ARB's 2000 or newer certification standard for off-
road heavy-duty diesel engines;
• Phase construction of the project; and
• Limit the hours of operation of heavy duty equipment.
_Impact Analysis:
3.3 (a) (Air Quality Plan) No Impact: The BAAQMD adopted the Bay Area 2010 Clean Air Plan (CAP) in
September 2010 to comply with state air quality planning requirements set forth in the California Health &
Safety Code. The 2010 CAP updates the 2005 Ozone Strategy and provides control strategies to address air
quality pollutants including ozone (03), Particulate Matter (PM), toxic air contaminants (TACs), and
greenhouse gases (GHGs). Control strategies apply to the topics of land use, energy and climate, and
stationary, transportation, mobile sources. Examples of programmatic measures that implement the control
strategies include the use of clean and efficient vehicles, Green Fleets, enhanced bicycle and pedestrian
access, energy efficiency, and others.
The Bay Area 2010 CAP was based on land use and growth projections consistent with those used in the
Petaluma General Plan. The project's land use and development intensity is consistent with that assumed by
the General Plan for the project site. There are no other control measures of the 2010 CAP that apply to the
project. Therefore, the project will not conflict with or obstruct implementation of the Bay Area 2010 Clean Air
Plan and no impacts are expected.
Mitigation Measures: None required.
3.3 (b -c) (Air Quality Standard, Criteria Pollutant) Less Than Significant Impact: Air quality emissions
associated with the proposed project would result from short-term construction activities and ongoing
operation. Consultants, Illingworth and Rodkin prepared a project specific Air Quality Assessment (October
2015) that quantifies air quality emissions anticipated to result from development and operation of the Brody
Ranch Subdivision Project (see Appendix A).
Construction Emissions
The project's construction emissions are compared to the BAAQMD thresholds of significance as set forth
above in Table 1. Construction activities will generate air quality emissions caused by fugitive dust, operation
of heavy-duty equipment, vehicle trips generated by workers and hauling, and off gassing from paving and the
application of architectural coatings. The air quality assessment assumed a construction period of
approximately 220 workdays over a period of 18 months. As shown, in Table 3 below, the project's
construction related emissions are not expected to exceed the BAAQMD thresholds.
Table 3. Construction Period Emissions
Scenario
ROG
NO,,
PM10
Exhaust
PW5
Exhaust
Construction emissions tons
2.08 tons
2.70 tons
0.16 tons
0.15 tons
Average daily emissions(pounds)
11.2 lbs.
14.6 lbs.
0.9 lbs.
0.8 lbs.
BAAQMD Thresholds(pounds per day
54 lbs.
54 lbs.
82 lbs.
54 lbs.
Exceed Threshold?
No
No
I No
No
Source: Air Quality and Greenhouse Gas Emission Assessment, prepared by Illingworth and Rodkin, October 22, 2015.
Page 25 of 96
September 2016 �S
While the project's predicted construction emissions fall below the established thresholds, potential remains
for the project to generate fugitive dust during site preparation and grading. Sources of fugitive dust may
include disturbed soils at the construction site and haul trucks transporting. The amount of fugitive dust
emissions generated depends on soil moisture, silt content of soil, wind speed, and the amount of equipment
operating. In order limit the potential for fugitive dust generation the City imposes a condition of approval
consistent General Plan Policy 4-P-16 and in accordance with BAAQMDs Best Management Practices (BMP)
as follows:
The applicant shall incorporate the Best Management Practices for construction into the construction and
improvement plans and clearly indicate these provisions in the specifications. In addition an erosion
control program shall be prepared and submitted to the City of Petaluma prior to any construction activity.
BMPs shall include but not be limited to the BAAQMD Basic Construction Mitigation Measures as
modified below:
1. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved
access roads) shall be watered three times per day.
2. All haul trucks transporting soil, sand, or other loose material shall be covered.
3. All visible mud or dirt track -out onto adjacent public roads shall be removed using wet power vacuum
street sweepers at least once per day. The use of dry power sweeping is prohibited.
4. All vehicle speeds on unpaved roads shall be limited to 15 mph.
5. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building
pads shall be laid as soon as possible after grading unless seeding or soil binders are used.
6. Idling times shall be minimized either by shutting equipment off when not in use or reducing the
maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title
13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for
construction workers at all access points.
7. All construction equipment shall be maintained and properly tuned in accordance with manufacturer's
specifications. All equipment shall be checked by a certified mechanic and determined to be running
in proper condition prior to operation.
8. Construction equipment staging shall occur as far as possible from existing sensitive receptors.
9. The Developer shall designate a person with authority to require increased watering to monitor the
dust and erosion control program and provide name and phone number to the City prior to issuance
of grading permits. Post a publicly visible sign with the telephone number of designated person and
person to contact at the Lead Agency regarding dust complaints. This person shall respond and take
corrective action within 48 hours. The Air District's phone number shall also be visible to ensure
compliance with applicable regulations.
The City's Public Works Inspector will perform visual inspections during grading to assure that these BMPs
are executed. Based on the fact the project's construction period air quality emissions are below BAAQMD
thresholds of significant and that BMP will be implemented, construction related impacts associated with the
project will have less than significant impacts to air quality.
Operational Emissions
The BAAQMD CEQA Guidelines also contain operational emission thresholds to determine whether a
proposed project could result in potentially significant air quality impacts at operation (i.e., post -construction).
As described in the Air Quality and GHG Emissions Assessment CalEEMod was used to predict emissions
from operation assuming full buildout of the project. Air quality emission generated at project operation would
result from the new 200 residential units that will be introduced onsite including vehicles, electricity and
natural gas, water and wastewater conveyance and treatment and waste decomposition at landfills. Area
source emission such as the use of consumer products, paints, solvents and landscaping equipment are also
captured in the operational emissions projection. The operational emission estimates assume a build out date
of 2018 as that is the earliest year the project would be expected to be fully operational. Table 2, below
presents the annual emissions that are expected to be generated by the proposed use at operation.
Page 26 of 96
September 2016
Table 4. Operational Emissions
Scenario
ROG
NOX
PM10
PMZ6
Annual Project Operation Emissions tons per year
2.12
2.13
1.28
0.38
BAA QMD Thresholds tons per ear
10
10
15
10
Exceed Threshold?
No
No
No
No
Average daily emissions (pounds per day)
11.6 lbs.
11.7 lbs.
7.0 lbs.
2.1 lbs.
BAA QMD Thresholds(pounds per day54
lbs.
54 lbs.
82 lbs.
54 lbs.
Exceed Threshold?
No
No
No
No
Source: Air Quality and Greenhouse Gas Emission Assessment,
prepared by Illingworth and Rodkin, October 22, 2015.
Given the results of Table 2, it can be concluded that the project would result in a less than significant
impacts to air quality due to an exceedance of an established standard for criteria pollutants at operation. The
Brody Ranch development is not expected to violate any air quality standard or result in a cumulatively
considerable net increase of any criteria pollutant in non -attainment, namely 03, PM1o, and/or PM2.5•
Therefore, air quality construction and operational air quality emissions generated by the proposed project will
be less than significant.
Mitigation Measures: None required.
3.3 (d) (Sensitive Receptors) Less Than Significant Impact with Mitigation: The project has the potential
to bring sensitive receptors (e.g., children, elderly persons) to an area with existing and future sources of toxic
air contaminants (TACs) consisting, generally, of fine particulate matter from mobile sources (i.e. vehicles)
and stationary source emissions. Examples of sensitive receptors include places where people live, play or
convalesce and include schools, hospitals, residential areas and recreation facilities.
Sensitive receptors near the project include residences to the northeast, opposite Sonoma Mountain
Parkway, to the southeast along Hogwarts Circle and Liverpool Way and to the northwest opposite Corona
Road. Construction activity would generate dust and equipment exhaust on a temporary basis and operation
of the project would not generate TAC emissions onsite, although vehicle trip will contribute to level generated
along project area roadways.
Health Risk Screening — Construction
Project -related construction activities will result in short term air quality emissions that have the potential to
affect nearby sensitive receptors if not controlled. Heavy equipment used during construction activities would
emit diesel particulate matter (DPM), which is recognized by the State of California as containing carcinogenic
compounds. The risks associated with exposure to substances with carcinogenic effects are evaluated based
on a lifetime of exposure. This is defined by the California Air Pollution Control Officers Association as 24
hours per day, 7 days per week, 365 days per year, for 70 years for residences and 40 years for children.
Emissions from construction activity were estimated and a dispersion model was used to predict the off-site
DPM concentrations at sensitive receptors near to the site so that lifetime cancer risks could be predicted.
Results of this assessment indicate that for project construction the incremental residential lifetime cancer
risk, assuming infant exposure, at the maximally exposed individual (MEI) receptor would be 14.6 in one
million and the incremental lifetime cancer risk, assuming adult exposure) would be 0.8 in one million. These
increased cancer risks for infant exposure would be above the BAAQMD significance threshold of 10 in one
million or greater for single sources. In order to reduce on-site diesel exhaust emissions, Mitigation Measure
AQ -1 shall be implemented and requires the use of Tier 2 construction equipment for all diesel -powered
equipment greater than 50 hp. The use of Tier 2 equipment achieves a 50% reduction in exhaust emission
relative to traditional equipment. With implementation of AQ -1 the residential child cancer risk would be
Page 27 of 96
September 2016
reduced from 14.6 to approximately 6.8 in one million, which is below the BAAQMD threshold of 10 per one
million. Therefore, the project's potential health risk impacts to nearby sensitive receptors generated by
construction activities would be reduced to less than significant level with mitigation.
Health Risk Screening - Operational
At operation, the project will not generate stationary source emissions that could affect sensitive receptors.
However, the project's new residents have the potential to be exposed to toxic air contaminants released by
vehicles traveling on nearby roads, trains along the SMART corridor, as well as from stationary sources
permitted by BAAQMD in the vicinity. In accordance with BAAQMD recommended methodology the following
emission sources were evaluated by Illingworth & Rodkin as set forth in the Air Quality and GHG Emission
Assessment.
Local Roadways
BAAQMD's Roadway Screening Calculator was used to identify the screening community risk levels from
both N. McDowell Boulevard and Corona Road. N. McDowell Blvd impacts were identified for a north -south
roadway with average daily traffic of 22,000 vehicles and a receptor at 300 feet south. Impacts from Corona
Road were based on an east -west roadway at 50 feet south and an average daily traffic volume of 15,000
vehicles.
The project's air quality study identifies a maximum increased cancer risk of 4.5 in one million and 4.4 in one
million for N. McDowell Blvd and Corona Road respectively. This maximum was calculated at a receptor
location representative of the residential units closest to each location and therefore represents the worst-
case scenario; cancer risks at all other residents onsite would be lower than the maximums. None of the
roadways in the project vicinity support a sufficient volume of traffic to expose new residents onsite to
elevated health risk levels. As such, health risks impacts to new residents onsite will be less than significant.
Stationary Sources
The only operational stationary source that would have a measureable impact upon the site within 1,000 feet
is a diesel generator at 1031 N. McDowell Boulevard, approximately 900 feet from the site. When adjusted for
distance, the project's air quality study determines that risk levels are below significance thresholds and,
therefore, impacts from this source would be less than significant.
SMART Rail Line
The SMART corridor is located at the southern property line of the Brody Ranch Subdivision and about 150
feet away from the nearest new residence that will be introduced onsite. At present, the rail line experiences
infrequent freight activity, but it is anticipated that freight activity will become increasingly regular, along with
commuter services expected to begin in 2017. For the purposes of the project's air quality study, maximum
risk levels were predicted assuming a position 30 feet from the rail line. The predicted levels where further
increased by a factor of 1.7 in order to account for age sensitivity for infants and children. The air quality
study's analysis determined that cancer risk, annual PM2.5, concentrations and non -cancer hazards at 30 feet
from tracks are below the BAAQMD significance thresholds and therefore, impacts from SMART this source
would be less than significant.
Cumulative
The combined community risk levels were computed by the project's air quality study by adding the maximum
TAC impacts together. The computation indicated a combined cancer risk of less than 15.8 per million,
combined PM2.5 of 0.23pg/m3 and the non -cancer Health Index would be less than 0.2. Table 4 below
presents the Community Risk Impact to Brody Ranch residents. As none of the BAAQMD threshold are
projected to be exceeded at occupancy impacts to new residents would be less than significant including from
single sources and cumulative sources.
Page 28 of 96
September 2016 ry
Table 5. Community Risk Impact to Brody Ranch Residents
Source
Maximum
Cancer Risk
per million
Maximum
Hazard
Index
Maximum
Annual PM2.5
Concentration
g/m3)
Project Sensitive Receptors
N. McDowell Blvd. —300 feet
4.5
<0.01
0.11
Corona Rd. —50 feet
4.4
<0.01
0.11
Diesel Generator —900 feet
0.3
0.0
0.0
SMART Corridor —100 feet
<6.6
0.0
0.01
Cumulative Sum
<15.8
<0.2
0.23
BAA QMD Threshold — Single Source
>10.0
>1.0
>0.3
BAA QMD Threshold — Cumulative Sources
>100
>10.0
>0.8
Significant
No
No
No
Source: Table 4 : Air Quality and Greenhouse Gas Emission Assessment, prepared b
Illingworth and Rodkin, October 22, 2015.
Mitigation Measures:
AQ -1: All diesel -powered off-road equipment larger than 50 horsepower and operating on site for more than
two days continuously shall, at a minimum, meet U.S. EPA particulate matter emissions standards for
Tier 2 engines or equivalent.
3.3 (e) (Odors) Less Than Significant Impact: As a residential development, the project will not create
objectionable odors affecting a substantial number of people. Although there may be occasional odors during
construction associated with street paving and architectural coating, these are short term in duration, will
cease once construction is complete, and not likely to adversely affect people off site. Therefore, the project
will have less than significant impacts to air quality due to objectionable odors.
Mitigation Measures: None required.
September 2016 /�C
3.4. BIOLOGICAL RESOURCES
Would the project:
Potentially Less Than Less than No Impact
Significant Significant Significant
Impact with Impact
Mitigation
Incorporated
a)
Have a substantial adverse effect, either directly or
through habitat modifications, on any species
identified as a candidate, sensitive, or special status
E] ® ❑
species in local or regional plans, policies, or
regulations, or by the California Department of Fish
and Wildlife (Formerly Fish and Game) or U.S. Fish
and Wildlife Service?
b)
Have a substantial adverse effect on any riparian
habitat or other sensitive natural community
identified in local or regional plans, policies,
❑ ® ❑ ❑
regulations or by the California Department of Fish
and Wildlife (formerly Fish and Game) or U.S. Fish
and Wildlife Service?
c)
Have a substantial adverse effect on federally
protected wetlands as defined by Section 404 of the
❑ ® ❑ FJ
Clean Water Act (including, but not limited to, marsh,
vernal pool, coastal, etc.) through direct removal,
filling, hydrological interruption, or other means?
d) Interfere substantially with the movement of any
native resident or migratory fish or wildlife species or ❑ ❑ ® ❑
with established native resident or migratory wildlife
corridors, or impede the use of native wildlife nursery
sites?
e) Conflict with any local policies or ordinances ❑ ® ❑ ❑
protecting biological resources, such as a tree
preservation policy or ordinance?
f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation ❑ ❑ ❑
Plan, or other approved local, regional, or state
habitat conservation plan?
Sources: 2025 General Plan and EIR Figure 3.8-1: Habitat Areas and Special Status Species; and Open Space
Lands Map of the Petaluma General Plan: Figure 6-1; Biological Resource Analysis Brody Ranch Subdivision,
prepared by Monk & Associates, Inc., October 2015; Brody Ranch Subdivision Arborist's Report & Tree Inventory,
prepared by Becky Duckles, October 2015; Wetlands Runoff Report Brody Ranch Subdivision, prepared by Steven
J. Lafranchi & Associates, Civil Engineers, October 2015; and Preliminary Stormwater Mitigation Report Brody
Ranch Subdivision, prepared by Steven J. Lafranchi & Associates, Civil Engineers, October 2015.
Page 30 of 96
September 2016 �L^j
Setting:
Biological resources are protected by statute including the Federal Endangered Species Act (FESA), the
California Endangered Species Act (CESA), and the Clean Water Act (CWA). The Migratory Bird Treaty Act
(MBTA) affords protection to migratory bird species including birds of prey. These regulations provide the
legal protection for plant and animal species of concern and their habitat.
As reported in the 2025 General Plan EIR several plant and animal species with special -status have been
recorded or are suspected to occur within the Urban Growth Boundary of the City of Petaluma. The City also
contains species that are identified in the California Natural Diversity Database (CNDDB) due to rarity and
threats, and are considered sensitive resources.
Within the Urban Growth Boundary, biological resources are largely limited to the Petaluma River and its
tributaries, which contain aquatic and riparian resources as well as wetlands. The National Wetland inventory
identifies fresh emergent wetlands in the southern portion of the Petaluma River and Northern coastal salt
marsh wetland and brackish marsh wetland in the lower reaches of the Petaluma River. The Petaluma River
Access and Enhancement Plan, prepared in 1996, contains policies and guidelines to protect these important
biological resources.
The Brody Ranch project site totals approximately 16 acres, situated north of the SMART corridor, east of
Corona Road, west of Corona Creek and south of Sonoma Mountain Parkway. Within the central portion of
the project site is an industrial area that currently contains a lumberyard and storage of landscaping materials.
Livestock paddocks, pipe stalls and a small barn also exist on the site. Two residences are situated on the
project site with associated landscaping, with one residence on the southwestern corner and one in the
northwestern corner. The central portion of the site is dominated by weedy, ruderal vegetation. The southern
portion of the site contains a large wetland and there are small isolated wetlands in the central and northern
portions. The area adjacent to Corona Creek, east of the project site, contains a narrow riparian corridor.
A Biological Resources Analysis was conducted by Monk & Associates (M&A) in October 2015 and is used to
inform the following discussion. M&A conducted background research, field reconnaissance, a preliminary
wetland delineation, and a special -status plant surveys as part of the biological resources investigation.
Additionally M&A referenced biological databases including the California Department of Fish and Wildlife's
(CDFW's) Natural Diversity Database, RareFind 3.2 application and the California Native Plant Society's
Inventory of Rare and Endangered Plants for any records of special -status plant or animal species known to
occur on the project site or vicinity.
The biological resources analysis identified habitats onsite and recorded all plant and wildlife species present.
Habitat requirements of local or regionally known special -status species where reviewed. Special -status plant
surveys were conducted in spring 2015 during the months when special -status species from the region are
known to be evident. During surveying, areas within the project site were examined by crossing transects
through potential habitat, and by examining microhabitats for their potential to support special -status species.
Three plant communities occur on the site: anthropogenic/landscaped areas, ruderal herbaceous habitat, and
seasonal wetlands. A number of mature trees are scattered across the site including native oaks and
redwoods, which are protected trees under Chapter 17 of the Implementing Zoning Ordinance (1ZO). Chapter
17 provides regulations for the protection, preservation, and maintenance of trees within Petaluma's
jurisdiction. The purpose of these regulations is to prevent the loss of tree canopy and perpetuate the urban
forest through the replacement of trees as a result of new development.
The preliminary wetland delineation for the project site occurred in October 2014. The wetland delineation
used information on vegetation, hydrology, and soils from 13 data points. Data from the wetland delineation
indicates that uplands and seasonal wetlands are present onsite, with a majority of the wetlands occurring in
the southern portion of the project site. Wetlands are present on 59,364 square feet or 1.36 acres of the
project site. Of these wetlands, many are small and shallowly inundated. However, there is a large
topographic low area in the southeastern portion of the project site that receives water from direct
precipitation and surface sheet flows. The depression likely holds 10 inches of standing water and satisfies
the wetland hydrology criteria, despite the lack of hydrophilic vegetation. The Army Corps of Engineers
conducted a site verification visit in April 2015. Figure 5: Wetlands Delineation shows the occurrence of
wetlands on the project site.
Page 31 of 96
September 2016 l
Figure 8: Wetlands Delineation
(925; 747-4110 Peralama, Cali rarnia b. -April 16, t0l6
jlA.i
lMl+.w, JrrrhW PYrranY ngxcl>f M
ilc �eR
t.7.Nrty GVipi
IwFbrdoca,i 4 r,ftr..
In �ie"nli,�d in�M=N
csF+rtFas Ilam Gle llIllM1L)fll
d Y.ngfnan
=arrld,,,.�ctda
fc}armrvgynm
Ullipb, A 404
t:kan l'y4trrha iCVdt): 1.3G a'rn �. H�",.�,,.
Oiler Waters-Afeawtie lto Sed 404CNA
—
131WykeaBcoMary
Deis
Page 32 of 96
September 2016 /� J
Corona Creek, an intermittent blue line stream, is located along the project site's southeastern boundary. The
wetlands on the site have indirect hydraulic connectivity to Corona Creek. The project includes the
construction of two storm water outfall structures into Corona Creek. The Storm Water Management Plan
prepared for the project will provide pre-treatment of storm water prior to release into Corona Creek.
Impact Analysis:
3.4 (a -b) (Special Status Species/ Riparian Habitat) Less than Significant Impact with Mitigation: The
Biological Resources Analysis identified the potential presence of seven special status wildlife species within
three miles of the project site. Twenty special -status plant species are known to occur in the vicinity of the
project site, however no special -status plant species were found on the project site during site-specific
surveys. The Biological Resources Analysis (Appendix B) summarizes the potential for occurrence of special
status species and found that due to the disturbed nature of the site, surrounding urban environment, and
fragmentation, special status species either have very low or no potential to occur onsite.
Sensitive Plant Species
No special -status plants have been mapped on or adjacent the project site. Plant surveys were conducted in
March, April and May of 2015 and did not indicate the presence of any special -status plant species. The site
contains no specialized habitats such as marshes, swamps, chaparral or meadows that would support
special -status plant communities. Queries on the California Native Plant Society s (CNPS) Inventory of Rare
and Endangered Plants of California (CN PS 2010) were conducted for records of special -status plants known
to occur in the vicinity of the project site. Because no rare plant species or special plant species are expected
to be present within the study area, and none where identified through site specific reconnaissance, there
would be no impacts to special -status plants from the development of the project.
Sensitive Animal Species
Wildlife species
While no special -status wildlife records have ever been mapped on the project site, recordings of seven
special -status wildlife species occurring within three miles of the project site were found. Of those seven
species, one special status species was identified as having a moderate potential to occur onsite. The
Townsend's big -eared bat (Corynorhinus pallidus), which is a CDFW Species of Special Concern, could roost
within onsite structures and mature trees. This bat species is extremely sensitive to disturbance of roosting
site and demolition could adversely impact this species if present. Although no evidence of this bat was
observed onsite, the existing old buildings and vegetation present potential habitat for this species and could
become occupied by Townsend bat prior to construction. In order to avoid impact to this bat species
preconstruction surveys as forth in Mitigation Measure 13I0-1 shall be implemented. Therefore, with
implementation of mitigation measure BIO -1, potential impacts would be reduced to levels below significance.
It should be noted that there is no potential for the occurrence of the California Tiger Salamander
(Ambystoma californiense). The project site is located outside of the mapped critical habitat area for this
species. Additionally, the project site is isolated from current records of California Tiger Salamander (CTS) by
urban development, heavily trafficked roads, and separation from the Santa Rosa Plain where CTS occurs.
Nor is there the potential for the occurrence of the California Red -legged Frog (Rana draytonii) onsite, which
is listed as Federally Threatened and a CDFW Species of Special Concern. While there are occurrences of
California Red -legged Frog (CRLF) within three miles of the site, there is no suitable breeding or estivation
habitat present on the site and the site is located outside of the Critical Habitat for the CRLF, as defined by
the U.S. Fish and Wildlife Service. Therefore the proposed project development, including the installation of
outfall structures in Corona Creek adjacent to the project site would not impact CRLF, because the creek
does not provide suitable habitat for this species.
Additionally, there is no potential for the impact to the Western Pond Turtle (Actinemys marmorata) as neither
the project site nor Corona Creek provide suitable aquatic habitat for this species. Corona Creek, at the
location proximate to the project site, is shallow and lacks adequate plunge pools necessary for western pond
Page 33 of 96
September 2016
turtles. There are no other special status wildlife species that would be potentially affected by the proposed
project.
Fish Species
The project site does not provide fisheries habitat, nor does Corona Creek support sensitive fish species. The
segment of Corona Creek adjacent to the project site is an engineered channel and does not support listed
fish species. Therefore, no impacts to federally listed fish species resulting from the project are expected.
Avian Species
As an underutilized site, the project area may provide suitable nesting habitat for raptors and other bird
species protected under the Migratory Bird Treatment Act (META). The project site also provides nesting
opportunities for common songbirds such as the California towhee, northern mocking bird, and California
scrub jay. Additionally, waterfowl commonly nest in open fields near areas of standing water, such as the
wetland area in the southern portion of the project site. As such, the project has the potential to impact
nesting birds if present onsite.
In order to avoid impacts to nesting birds, Mitigation Measure BIO -2 shall be implemented. BIO -2 requires
that a nesting bird survey for raptors be conducted prior to tree removal within the bird -nesting season. In the
event that nesting birds are discovered, a buffer around the nesting site shall be established and no
construction activity shall occur until the young have left the nest.
The Corona Creek riparian corridor located adjacent to the project site may offer nesting opportunities to
raptors, passerine birds, waterfowl and other avian species protected under the MBTA. This area is located in
close proximity to the project site and may be affected by construction activities and noise. Mitigation
measures BIO -2 requires surveys within 200 feet of activities, which includes the riparian corridor. Therefore,
with implementation of BIO -2 impacts to nesting birds within the riparian corridor adjacent to the project site
will be reduced to less than significant levels.
Additionally, Mitigation Measure 13I0-3 requires that construction activities including tree removal and
grubbing occur outside of the bird -nesting season. In order to protect bird nests from construction activities,
should construction occur during the nesting season, BIO -3 stipulates that preconstruction surveys shall be
conducted. To comply with the MBTA all active nest sites shall be avoided while birds are nesting. Suitable,
non -disturbance buffers shall be established around the nest sites until the nesting cycle is complete. Upon
completion of nesting, as verified by a qualified biologist, project construction activities may proceed. With
implementation of mitigation measures BIO -2 and BIO -3, potential impacts to nesting birds protected under
the MBTA would be avoided. Accordingly, impacts to birds protected under the MBTA will be reduced to less
than significant levels.
Conclusion
Policy 4 -P -1-D of the City's General Plan "create[s] setbacks for all tributaries to the Petaluma River
extending a minimum of 50 feet outward from the top of each bank, with extended buffers where significant
habitat areas, vernal pools or wetlands exist." The landscaping plan includes the planting of native species
proximate to the wetland area in the southern portion of the site and adjacent to Corona Creek. The use of
native species will ensure that the riparian corridor is preserved and enhanced.
Preconstruction surveys per mitigation measures BIO -1, BIO -2 and BIO -3 shall be conducted in order to avoid
and/or reduce any potential impacts to sensitive species. With the implementation of these measures, the
proposed project will not have a substantial adverse effect, either directly or indirectly, on any species identified
by the California Department of Fish and Wildlife. Therefore, impacts to special status species would be reduced
to less than significant levels.
Mitigation Measure:
BIO -1. In order to avoid impacts to bat maternity and/or bat hibernation periods and ensure protection of any
bat species potentially present within onsite structures, a biologist shall conduct a preconstruction
survey of trees and structures that would be removed or demolished by the project 15 days prior to
commencement of ground work to determine if there is evidence of bat use (guano accumulation,
Page 34 of 96
September 2016 ZL
acoustic or visual detections). The survey shall be conducted by a qualified biologist with experience
conducting surveys for bats. If no evidence of bat use is found, then there would be no further regard
for special -status bat species. If bat use is found, the biologist shall determine if young are present. If
young are found in any tree or structure that will be impacted by the project, such activities shall be
avoided until the young are flying and feeding on their own. A non -disturbance buffer zone shall be
determined by a biologist at the same time of the survey. If mature bats are found roosting in a tree or
structure without the presence of young, the adult bats shall be flushed out using a one-way eviction
placed over the tree cavity or structural opening for a 48-hour period prior to the time the tree or
structure would be removed or demolished.
BIO -2. To avoid impacts to nesting raptors and birds protected under the META, a nesting survey shall be
conducted prior to the commencement of any tree removal if this work occurs between February 1St
and August 31St. The nesting survey shall include the examination of all trees within 200 feet of the
project site, including those not identified for removal. If construction work occurs after August 31St
and before February 1St, a nesting bird survey would not be needed.
In the event that nesting birds are discovered, an adequate buffer shall be established by a qualified
ornithologist around the nesting site(s) until the completion of the nesting cycle. The buffer area shall
be marked with construction fencing. No construction activity shall occur within the buffer area until a
qualified ornithologist has determined that the young have left the nest, typically around mid-July or
as otherwise determined by the ornithologist.
BIO -3. If construction work occurs between March 1St and August 31St a nesting survey shall be conducted
not more than 15 days prior to the commencement of work in order to avoid impacts to passerine
birds or nesting waterfowl. The nesting survey shall be conducted on the project site and within a
zone of influence where waterfowl could be disturbed by vibrations or noise generated by
construction activities. If passerine birds or waterfowl are discovered nesting on or adjacent to the
project site, a non -disturbance buffer of 75 feet shall be established by a qualified ornithologist. The
buffer area shall be marked with construction fencing. Nesting buffers should be maintained until
September 1St, or until a qualified ornithologist determines that the young have fledged. If buffers are
removed prior to September 1St, the biologist shall prepare a report providing details of the nesting
outcome and their decision to remove the buffers. This report shall be submitted to the City of
Petaluma's Community Development Department prior to the removal of these buffers.
3.4 (c) (Wetlands) Less than Significant Impact with Mitigation: A Wetland Delineation of the project site
was conducted in accordance with the United States Army Corps of Engineers' (USACOE) 1987 Wetlands
Delineation Manual in conjunction with the regional supplement for the Arid West Region. Vegetation,
hydrology, and soils information were taken at 13 data points to confirm the boundaries of USACOE
jurisdiction and to characterize the remaining portions of the project site. The USACOE conducted a site
verification visit on April 15, 2015.
The wetland delineation identified 1.36 acres of seasonal wetlands and 0.005 acres of other waters, which are
subject to Section 404 of the Clean Water Act (CWA). The project will retain and protect approximately 1. 177
acres of wetlands located in the southern portion of the site. The Biological Resources Analysis prepared by
Monk & Associates found that the proposed project will result in impacts to approximately 8,091 square feet
(0.185 acre), of seasonal wetlands on the project site. Impacts to wetlands include those associated with the
proposed development footprint (residential unit, internal road, and sidewalks), the pedestrian trail, detention
basin, and the outfall structure on the bank of Corona Creek.
As proposed the project will introduce a meandering pedestrian trail in the southern portion of the project site
that roughly follows along the northern portion of the large wetland area to be preserved. The trail includes a 526
square foot footbridge that would cross over a narrow portion of the wetland and tie into the existing pedestrian
trail along Corona Creek.
As the proposed project and pedestrian trail will introduce people to the wetlands area, there is a potential
that wetlands could be impacted from trampling, trash, and domestic pets. In order to ensure that impacts to
the 1.177 acres of wetlands to be preserved onsite are avoided Mitigation Measure BIO -4 shall be
Page 35 of 96
September 2016 _ 1��
implemented. BIO -4 below requires appropriate signage, design treatments and barriers to preclude access
into the wetlands and to alert residents and visitors of the sensitive habitat. The installation of signage, railing
or fencing at key locations and requiring that pets be on leashes will provide protection to the 1.177 acres of
wetlands that will be preserved.
A detention area, for the storage and release of stormwater, is proposed in the southeastern portion of the
project site, between the wetland area to be retained and Corona Creek. The detention basin would result in fill
to a 1,171 square foot wetland.
The two outfall structures will be installed on the banks of Corona Creek during a time when water levels are low
and dewatering will not be required. A Storm Water Management Plan prepared for this project will be
implemented in order to provide pre-treatment of stormwater prior to the release into Corona Creek. One outfall
structure will result in the introduction of 82 square feet of riprap to the area above the high water mark, while
the other outfall will utilize existing riprap along the bank. Since any impacts associated with the bed, bank or
channel of Corona Creek are regulated by the CDFW, a Streambed Alteration Agreement (SBAA) under the
Fish and Game Code Section 1600 may be required.
Jurisdictional wetlands are regulated under Section 404 of the Clean Water Act. Prior to project construction the
applicant must obtain a Section 404 permit from the U.S. Army Corps of Engineers for fill to 0.185 acres
(expected to qualify for a nationwide permit) and a Section 401 water quality certificate from the Regional
Water Quality Control Board. Since the proposed project will result in impacts to less than 0.5 acre of waters of
the U.S. and less than 300 linear feet of tributary, the proposed project would qualify to use Nationwide Permit
39 (Residential Development). Fill to wetlands requires offsets to ensure no net loss.
In order to offset the loss of wetlands, the project applicant shall secure wetland mitigation bank credits, per
Mitigation Measure 13I0-5 at a ratio of 2:1 or as otherwise required by resource agencies. With implementation
of Mitigation Measure BIO -5, the project's impacts to waters of the U.S. and areas protected under the Clean
Water Act will be reduced to less than significant levels.
Mitigation Measure:
BIO -4. In order to avoid impacts to the wetland to be preserved onsite, the pedestrian trail and footbridge
shall be designed in a manner that restricts direct access to the wetland area. Signage, fencing, and
paving treatments shall be utilized to discourage access into the sensitive wetland area.
BIO -5. To offset impacts to the 0.185 acres of US waters, credits shall be purchased from an approved
mitigation bank at a ratio of two acre for every one acre impacted, or as otherwise directed by
regulatory agencies, in addition to the preservation of the remaining wetlands onsite within the
project's open space area. The ratio of 2:1 is proposed or as otherwise required by resource agencies
given the low -quality habitat of the onsite seasonal wetlands. The applicant shall provide proof of
purchase of credits and notification to the City and regulatory agencies.
BIO -6. The applicant shall install temporary orange exclusion fencing (or staking) between the wetland area
to be preserved and the limits of grading for the duration of site preparation and construction activities
in order to prevent inadvertent disturbance during project related activities. Following completion of
construction activities, the exclusionary fencing shall be removed.
3.4 (d) (Wildlife/Fish Movement & Nursery) Less Than Significant Impact: There is no evidence of
migratory wildlife corridors or nursery sites on the project site or in the project vicinity. The Biological
Resources Analysis concluded that the surrounding roadways to the north, south, east and west effectively
isolate the project site from wildlife movements, eliminating the possibility of the site functioning as a
movement corridor. The project is an urban infill development, and will not substantially interfere with the
movement of fish or other wildlife species including migrating species. Therefore, the project will have less
than significant impacts to wildlife corridors and species movements.
Mitigation Measures:
September 2016 ��
3.4 (e) (Tree Preservation) Less than Significant Impact with Mitigation: Chapter 17 of Petaluma's
Implementing Zoning Ordinance (IZO) addresses tree preservation requirements for development projects.
Section 17.040 defines which tree species are subject to review. When "protected trees" are potentially
affected by a development project, an arborist report is required. Prior to the removal of any protected tree, a
Tree Removal Permit must first be obtained under Section 17.060 and mitigated in accordance with Section
17.065. An Arborist's Report and Tree Inventory was prepared by Becky Duckles, an ISA Certified Arborist, in
October 2015 (see Appendix C).
Four Coast Redwood trees (Sequoia sempervirens), one Valley Oak tree (Quercus lobata), and one Coast
Live Oak (Quercus agrifolia) are proposed for removal as part of the subject development. Replacement trees
totaling 17 inches in diameter are required to mitigate the removal of the Valley Oak tree. Replacement trees
totaling 6 inches in diameter are required to mitigate the removal of the Coast Live Oak tree. Additionally,
replacement trees totaling 121 inches in diameter are required to mitigate the removal of the four Coast
Redwood trees. In sum, replacement trees totaling 144 inches in diameter shall be planted to mitigate the six
protected trees to be removed.
According to the City's tree replacement schedule, tree mitigation may be through in-kind replacement or in -
lieu replacement. Replacement trees shall be at least 24 -inch box size. The City may accept payment of in -
lieu fees by the applicant, which shall also be based on a minimum 24 -inch box size.
Both native oaks and redwoods trees are present on the project site. While many of these protected trees will
be preserved under the current development plan, six protected trees will be removed. Petaluma defines any
native oak species with a Diameter at Breast Height (DBH) of 4 inches or greater and coast redwoods with an
18 -inch diameter or greater as protected. Pursuant to the IZO, Section 17.065 (Tree Mitigation and
Replacement) trees identified with general health and structural integrity of good to excellent condition are
required to be replaced at a one to one ratio. In order to offset the removal of protected trees on the site,
Mitigation Measure 13I0-7, in accordance with IZO section 17.065 A.3.c.3, requires one to one trunk
diameter replacement. Mitigation Measure BIO -6 requires replacement trees with a total of 144 inches in
diameter at breast height (DBH). Therefore, with mitigation measure BIO -6, the removal of protected trees will
be offset and the project's impacts due to a conflict with the tree preservation ordinance would be reduced to
levels below significance.
Mitigation Measures:
BIO -7. Replacement trees totaling 144 inches or as otherwise specified by the City's Tree Preservation
Ordinance shall be introduced onsite to off -set the removal of the 6 protected trees. Tree mitigation
may be through in-kind replacement or in -lieu replacement. Replacement trees shall be at least 24 -
inch box size. The City may accept payment of in -lieu fees by the applicant, which shall also be
based on a minimum 24 -inch box size.
3.4 (f) (Habitat Conservation Plan) No Impact: There is no Habitat Conservation Plan, Natural Community
Conservation Plan, or other regional or state habitat conservation plan that exists for Petaluma, which would
regulate the proposed development on this parcel. Development of the project will not conflict with any
adopted biological resource plan. Therefore, the project will have no impacts to biological resource
management plans, conservation plan, or their implementation.
Mitigation Measures: None required.
Page 37 of 96
September 2016 , 3
3.5. CULTURAL RESOURCES
b) Cause a substantial adverse change in the ❑ ® ❑ ❑
significance of an archaeological resource pursuant
to §15064.5?
c) Directly or indirectly destroy a unique paleontological ❑ ❑ ® ❑
resource or site or unique geologic feature?
d) Disturb any human remains, including those interred ❑ ❑ ® ❑
outside of formal cemeteries?
Sources: 2025 General Plan and EIR; A Cultural Resources Study for the Brody Subdivision Project, Petaluma,
Sonoma County, California, prepared by Julianne Mercer, B.A. and Eileen Barrow, M.A./ R.P.A of Tom Origer and
Associates, October 2015; and Phase 1 Environmental Site Assessment prepared by AEI consultants, April 29, 2014.
Setting:
The City of Petaluma features a rich variety of historic and cultural resources that contribute to Petaluma's
character and identifiable sense of place. The City and adjacent areas contain resources that date to the
inhabitation of the Coastal Miwok Tribe and a number of resources that visibly chronicle the evolution of the
City from early settlement through present day. Such resources include artifacts, buildings, structures,
landscapes, sites, objects, and districts.
Within the UGB there exist 14 Native American Resources that have been identified, 19 historic sites and 3
historic districts: Oakhill -Brewster, A -Street and the Downtown Historic District which is listed on the National
Register of Historic Places. In addition to those properties already designated there are upwards of 300
properties that have been identified as potentially eligible for listing on a local, state, or national register of
historic places. In order to perpetuate the unique character found in Petaluma, the City has adopted policies
and programs that serve to compliment and reinforce the sense of place. The City has implemented policies
to regularly update and/or expand surveys of local historic resources and pursue incentives and programs
that will aid in preservation efforts. Existing policies and regulations governing historic preservation within the
City can be found in Chapter 3 of the 2025 Petaluma General Plan and Chapter 15 of the Implementing
Zoning Ordinance.
The proposed project site consists of approximately 16 acres of relatively flat land that contains several
buildings associated with an early twentieth century poultry farm. In order to assess the potential historic
and/or archeological significance of the site a Cultural Resource Study was prepared by Origer and
Associates in October 2015 (see Appendix D). Extant historic -era buildings on the site include two houses, a
cabin, and several outbuildings, with the oldest building/structure dating to the early 1900s. All extant
buildings were evaluated against the eligibility criteria prescribed by the California Register of Historic
Resources (CRHR) and none were found eligible for listing based on any of the four criterion. In addition, a
review of available archeological records and a field survey were conducted.
Page 38 of 96
September 2016 7
�'� l7
Less Than
Potentially
Significant
Less than No
Would the
Significant
with
Significant Im act
p
project:
Impact
Mitigation
Impact
Incorporated
a) Cause a substantial adverse change in the
❑
R
❑
significance of a historical resource as defined in
§15064.5?
b) Cause a substantial adverse change in the ❑ ® ❑ ❑
significance of an archaeological resource pursuant
to §15064.5?
c) Directly or indirectly destroy a unique paleontological ❑ ❑ ® ❑
resource or site or unique geologic feature?
d) Disturb any human remains, including those interred ❑ ❑ ® ❑
outside of formal cemeteries?
Sources: 2025 General Plan and EIR; A Cultural Resources Study for the Brody Subdivision Project, Petaluma,
Sonoma County, California, prepared by Julianne Mercer, B.A. and Eileen Barrow, M.A./ R.P.A of Tom Origer and
Associates, October 2015; and Phase 1 Environmental Site Assessment prepared by AEI consultants, April 29, 2014.
Setting:
The City of Petaluma features a rich variety of historic and cultural resources that contribute to Petaluma's
character and identifiable sense of place. The City and adjacent areas contain resources that date to the
inhabitation of the Coastal Miwok Tribe and a number of resources that visibly chronicle the evolution of the
City from early settlement through present day. Such resources include artifacts, buildings, structures,
landscapes, sites, objects, and districts.
Within the UGB there exist 14 Native American Resources that have been identified, 19 historic sites and 3
historic districts: Oakhill -Brewster, A -Street and the Downtown Historic District which is listed on the National
Register of Historic Places. In addition to those properties already designated there are upwards of 300
properties that have been identified as potentially eligible for listing on a local, state, or national register of
historic places. In order to perpetuate the unique character found in Petaluma, the City has adopted policies
and programs that serve to compliment and reinforce the sense of place. The City has implemented policies
to regularly update and/or expand surveys of local historic resources and pursue incentives and programs
that will aid in preservation efforts. Existing policies and regulations governing historic preservation within the
City can be found in Chapter 3 of the 2025 Petaluma General Plan and Chapter 15 of the Implementing
Zoning Ordinance.
The proposed project site consists of approximately 16 acres of relatively flat land that contains several
buildings associated with an early twentieth century poultry farm. In order to assess the potential historic
and/or archeological significance of the site a Cultural Resource Study was prepared by Origer and
Associates in October 2015 (see Appendix D). Extant historic -era buildings on the site include two houses, a
cabin, and several outbuildings, with the oldest building/structure dating to the early 1900s. All extant
buildings were evaluated against the eligibility criteria prescribed by the California Register of Historic
Resources (CRHR) and none were found eligible for listing based on any of the four criterion. In addition, a
review of available archeological records and a field survey were conducted.
Page 38 of 96
September 2016 7
�'� l7
Impact Analvsis:
3.5 (a) (Historical Resource) No Impact: The Cultural Resource Study identified the presence of two
houses, a cabin and several outbuildings on the subject property, with the oldest on-site building/structure
dating to the early twentieth century. The property was evaluated against the criteria prescribed by the
California Register of Historic Resources (CRHR) and recorded on a DPR 523 form. The evaluation
concluded that while the property could have been eligible for listing based on its association with the theme
of poultry production in Sonoma County, it did not retain sufficient integrity and/or intact poultry farm
components (e.g. most features that define a poultry farm operation, the poultry houses, yards, ponds, and
processing buildings have been removed) to convey historic significance. Accordingly, the property and
buildings/structures do not appear eligible for listing on the CRHR and therefore are not considered "historic
resources" for the purposes of CEQA. As such, there is no expectation that the project may result in an
adverse effect to the significance of a historic resource and no impacts are anticipated from demolition of
onsite buildings/structures and development of the proposed Brody Ranch Subdivision.
Mitigation Measures: None required.
3.5 (b) (Archaeological Resources) Less Than Significant Impact with Mitigation: At the time of
European settlement, the study area was within territory controlled by the Coast Miwok. The Coast Miwok
settled in large, permanent villages comprised of distributed seasonal camps and task -specific sites. Primary
village sites were occupied throughout the year and other sites were visited in order to procure particular
resources that were especially abundant or available only during certain seasons. In the City of Petaluma
undisturbed (or mildly disturbed) lands within the Urban Growth Boundary, particularly lands in the vicinity of
ridgetops, midslope terraces, alluvial flats, ecotones, and sources of water tend have a greater possibility of
containing a prehistoric archaeological resources.
The study area lies within the Rancho Petaluma granted to Mariano Vallejo in 1834. The Rancho was largely
devoted to hay and grain cultivation and cattle ranching. Beginning in 1851, General Vallejo parceled out the
Rancho to accommodate new settlers, which resulted in widely scattered ranches and farmsteads surrounded
by open lands. Examination of historic -era maps indicate presence of a house in the northwest corner of the
property in 1867, possibly two houses on the parcel in 1916, and four houses and three outbuildings in 1954.
In addition, documentation performed for the Historic American Buildings Survey in 1934 indicates the
presence of a Mexican -era adobe structure (c.1800) in the northwest vicinity of the site; however, the Adobe
structure is no longer present onsite.
While no archaeological records were identified onsite, archival research and field observations indicate
evidence of an early -1800s adobe and an 1860s dwelling on the property; scattered historic -period items
were observed in the vicinity of the adobe location. As such, there remains a possibility that intact historic -era
archaeological deposits and/or structural features could be encountered if earth -disturbing activities occur in
the northwestern part of the property. Potentially significant archeological resources include, but are not
limited to concentrations of artifacts or culturally modified soil deposits, modified stone, shell, bone, or other
cultural materials such as charcoal, ash, and burned rock indicative of food procurement or processing
activities, or prehistoric domestic features including hearths, fire pits, or house floor depressions or other such
historic artifacts (potentially including trash pits and all by-products of human land use greater than 50 years
of age).
In order to avoid inadvertently causing a substantial adverse change in the significance of an archaeological
resource, the applicant shall be required to retain the services of a professional archeologist who meets the
Secretary of the Interior's Professional Standards for Archeology to monitor earth -disturbing work in the
northwestern portion of the site in accordance with the recommendations provided by the Cultural Study and
set forth in Mitigation Measure CULA below. Implementation of CULA will ensure that in the event of
accidental discovery the potential for the project to adversely impact or result in a change to the significance
of archeological resources would be reduced to less than significant levels.
Page 39 of 96
September 2016
In the event that potential archeological resources are unearthed on other portions of the site, the
contractor/applicant shall proceed pursuant to Mitigation Measure CUL -2, which requires construction
activity to halt close proximity to the find until a qualified profession can evaluate the potential significance of
the resource. Should any features be identified during construction, the condition requires compliance with
CEQA §21083.2 and CEQA Guidelines §15064.5. With implementation of Mitigation Measures, the project's
potential impacts to archeological resources will be reduced to less than significant levels.
Mitigation Measures:
CUL -1. The applicant shall retain the services of a professional archeologist who meets the Secretary of the
Interior's Standards Professional Qualifications for Archeology to monitor ground disturbing activities
located in the northwestern portion of the site in the vicinity of the former adobe structure. If a
potentially significant archeological resource is encountered the archeologist shall be provided
sufficient time to evaluate the resource and make treatment recommendations in accordance with
CEQA Guidelines §15064.5.
CUL -2. If during the course of ground disturbing activities, including, but not limited to excavation, grading and
construction, a potentially significant prehistoric or historic resource is encountered, all work within a 100
foot radius of the find shall be suspended for a time deemed sufficient for a qualified and city -approved
cultural resource specialist to adequately evaluate and determine significance of the discovered
resource and provide treatment recommendations. Should a significant archeological resource be
identified a qualified archaeologist shall prepare a resource mitigation plan and monitoring program to
be carried out during all construction activities.
3.5 (c) (Unique Paleontological Resource) Less Than Significant Impact: The Petaluma General Plan
does not identify the presence of any paleontological or unique geological resources within the boundaries of
the UGB. Limited expectation exists for paleontological resources to be present on the project site.
Nevertheless, potential remains for the discovery of buried paleontological resources. Accordingly, a condition
of approval will be imposed on the project that requires construction activity to halt in the event of accidental
discovery during grading activities in accordance with CEQA §21083.2 and CEQA Guidelines §15064.5.
Given the project's location and application of a condition addressing accidental discovery, the project is not
expected to result in a substantial adverse change to unique paleontological or geologic resources and
impacts will be less than significant.
Mitigation Measures: None required.
3.5 (d) (Human Remains) Less Than Significant Impact: No evidence suggests that human remains have
been interred within the boundaries of the project site. However, in the event that during ground disturbing
activities, human remains are discovered to be present, all requirements of state law pursuant to California
Health and Safety Code Section (CA HSC) 7050.5 shall be duly complied with, including the immediate
cessation of ground disturbing activities near or in any area potentially overlying adjacent human remains and
contacting the Sonoma County Coroner upon the discovery of any human remains. If it is determined by the
Coroner that the discovered remains are of Native American descent the Native American Heritage
Commission shall be contacted immediately. If required, the project sponsor shall retain a City -qualified
archeologist to provide adequate inspection, recommendations and retrieval. Compliance with CA HSC
Section 7050.5 and performance of actions therein will ensure that in the event of accidental discovery of
historically significant remains all impacts will remain at levels below significance.
Mitigation Measures: None required.
Page 40 of 96
September 2016 (A, tjo
3.18. GEOLOGY AND SOILS
Less Than
Potentially Significant Less than No
Significant with Significant Im act
Would the project: Impact Mitigation Impact p
Incorporated
a) Expose people or structures to potential substantial
adverse effects, including the risk of loss, injury, or
death involving:
i. Rupture of a known earthquake fault, as delineated on
the most recent Alquist-Priolo Earthquake Fault
Zoning Map issued by the State Geologist for the area
or based on other substantial evidence of a known
fault? Refer to Division of Mines and Geology
Publication 42.
Strong Seismic ground shaking?
iii. Seismic -related ground failure, including liquefaction?
iv. Landslides?
b) Result in substantial soil erosion or the loss of topsoil?
c) Be located on a geologic unit or soil that is unstable,
or that would become unstable as a result of the
project, and potentially result in on or off-site
landslide, lateral spreading, subsidence, liquefaction
or collapse?
d) Be located on expansive soil, as defined in Table 18-
1-B of the Uniform Building Code (1994), creating
substantial risks to life or property?
❑ ❑ ® ❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
®
❑
e) Have soils incapable of adequately supporting the use
of septic tanks or alternative waste water disposal ❑
systems where sewers are not available for the
disposal of waste water?
®
❑
❑
Sources: Petaluma General Plan 2025: Chapter 10.1 Natural Hazards, Petaluma General Plan DEIR Figures 3.7-2
(Local Geology), 3.7-4 (Ground Shaking Intensity), 3.7-5 (Geological Hazards); and Geotechnical Investigation for Brody
Ranch Subdivision, prepared By Stevens, Ferrone, & Bailey Engineering Company, Inc., October 16, 2015.
Setting:
The City of Petaluma lies within a seismically active region classified by the California Building Code (CBC)
as Seismic Zone 4 where the most stringent CBC standards apply. Geologic hazards within the City of
Petaluma are largely related to seismic ground shaking and associated effects such as liquefaction, ground
failure, and seismically induced landslides. Principal faults in the vicinity of Petaluma are capable of
generating large earthquakes that could produce strong to violent ground shaking.
Page 41 of 96
September 2016 nn [�
The Rodgers Creek Fault is located less than 5 miles to the northeast of the City. Although branches of the
Rodgers Creek closest to the City are not historically active (within the last 200 years), they do show evidence
of activity during the last 11,000 years, which is a relatively short time in terms of geologic activity.
Expansive soils and soil erosion are also of general concern within the City of Petaluma. Expansive soil
materials occur in the substrate of the clays and clayey loams in the City and present a potential geologic
hazard. Without proper geotechnical considerations, buildings, utilities and roads can be damaged by
expansive soils due to the gradual cracking, settling, and weakening that can occur. These effects create
safety concerns and risk of financial loss. To reduce the risks associated with expansive soils, the City's
Building Code, Chapter 18, requires that each construction site, intended for human occupancy, that is
suspected of containing expansive soils be investigated and the soils be treated to eliminate the hazard.
A site-specific geotechnical engineering study was prepared by Stevens, Ferrone, & Bailey Engineering
Company, Inc. on October 16, 2015 (see Appendix E). The purpose of the investigation was to identify any
geotechnical constraints associated with the proposed Brody Ranch Subdivision Project. Subsurface
exploration was performed at the site on March 12, 2015 and included five exploratory borings to a maximum
depth of approximately 40 feet. Subsurface conditions were found to consist of clayey or sandy fill material.
Fill material was identified in some areas to a depth of about 2 to 2-1/2 feet. According to the results of
laboratory testing, the near -surface soils have a very high plasticity and critical expansion potential.
Groundwater was encountered at depths between 9.5 and 14.5 feet below.
Geology and Soils Impact Discussion:
3.6 (a.i.) (Faults) No Impact: The project site is not located within an Alquist-Priolo Earthquake Fault Zone
and no known active faults directly traverse the site. Therefore, there is no risk of fault -related ground rupture
during earthquakes within the limits of the site due to a known Alquist-Priolo Earthquake Fault zone.
Mitigation Measures: None required.
3.6 (a.ii) (Ground -Shaking) Less Than Significant Impact: As is the case throughout the City's UGB,
development has the potential to expose people or structures to substantial adverse effects from strong
seismic ground shaking. The project site is located within Zone IX -Violent of the Mercalli Intensity Shaking
Severity Level. In the event of a magnitude 7.1 earthquake, the project area and the City of Petaluma could
experience severe ground shaking that could damage buildings, structures, infrastructure and result in the risk
of loss of life or property.
Conformance with Title 24 (California Building Code Standards)and the Seismic Hazards Mapping Actas
required by the 2013 California Building Code of regulations will assure that potential impacts from seismic
shaking are less than significant. Mandatory compliance with standards set forth in the Building Code of
Regulations, Title 24, Part 2 (the California Building Code 3.7-20 Chapter 3: Setting, Impacts, and Mitigation
Measures [CBC]) and the California Public Resources Code, Division 2, Chapter 7.8 (the Seismic Hazards
Mapping Act) will ensure that potential impacts from seismic shaking are less than significant.
Based on the geotechnical engineering study prepared for the project, the CBC parameters for a Site Class D
apply, and will translate to specifications for foundation types, appropriate structural systems, and ground
stabilization strategies. The geotechnical engineering study advances preliminary recommendations for
compliance with Site Class D requirements.
With utilization of Site Class D specifications and mandatory compliance with all other related building code
standards as well as conformance with the recommendations set forth in the geotechnical report for
construction purposes, the project would not expose a substantial number of people or structures to adverse
effects, including the risk of loss, injury, or death resulting from strong seismic ground shaking. Therefore, the
project will have a less than significant impact resulting from strong seismic ground shaking.
Mitigation Measure: None required.
September 2016 R, 1- 1
3.6 (a.iii) (Ground Failure) Less Than Significant Impact: Liquefaction is the rapid transformation of
saturated, loosely packed, fine-grained sediment to a fluid like state as a result of ground shaking. Potential
for liquefaction is most pronounced when the groundwater table is shallow (typically less than 50 feet below
the surface) and the liquefaction potential becomes increasingly heightened as the water table becomes
shallower. The Petaluma water table is generally found 10-20 feet below the surface.
Based on the subsurface exploration, lab testing, and engineering analyses, the liquefaction potential for the
project site is determined to be low since the liquefiable soil lenses are limited on the project site. The
geotechnical report concludes an estimated liquefiable induced ground surface settlements of about a'/z inch
with a differential settlement of about a % inch across residential structures. These are within tolerable limits
for liquefaction. Similarly, the Geotechnical Investigation concluded that the site's potential for lateral
spreading was also low and did not pose a substantial risk. Compliance with CBC standard will ensure that
liquefaction, lateral spreading and ground failure do not pose substantial risks. Therefore, impacts related to
ground failure is considered a less than significant impact.
Mitigation Measures: None required.
3.6 (a.iv) (Landslide) No Impact: Landslides typically occur on slopes steeper than 15% and in areas
underlain by geologic units that have demonstrated stability problems. The project site is located outside of
the Landslide Complex (areas of previous ground failure) as identified in Figure 3.7-5 of the Petaluma
General Plan 2025. No landslides have been identified as having occurred onsite or within the project vicinity.
Based on the site's flat topography and setback from Corona Creek, there would be no impacts associated
with landslides.
Mitigation Measures: None required.
3.6 (b) (Erosion) Less Than Significant Impact: Development of the project will require site preparation
including grubbing (removal of vegetation) and grading to achieve a uniform distribution of soil across the
project site.
Water and wind serve as the primary catalyst of soil erosion, with steeper slopes intensifying the effects.
Vegetation removal as part of the site preparation process as well as grading and ground disturbing activities
associated with development can heighten the potential for and accelerate soil erosion. It is expected that site
development will necessitate excavation to a depth of approximately 36 inches in order to remove fill
materials which is encountered a depth up to 2'/2 feet.
All earthwork, grading, trenching, backfilling and compaction activities associated with the project are subject
to the City of Petaluma's Grading and Erosion Control Ordinance (Chapter 17.31 of the Petaluma Municipal
Code). The erosion control plan is required to identify techniques such as site watering, sediment capture,
equipment staging and laydown pad, and other erosion control measures to be implemented during
construction activity on the project site. Similarly, construction activities are also covered by the mandatory
requirements of the National Pollution Discharge Elimination System (NPDES) General Permit, which is
implemented through a Storm Water Pollution Prevention Plan (SWPPP). Compliance with these mandatory
requirements would prevent substantial soil erosion and loss of topsoil. Therefore, the project will result in a
less than significant impact under this topic.
Mitigation Measures: None required.
3.6 (c) (Unstable Geologic Unit) Less Than Significant Impact: Lateral spreading, lurching and associated
ground cracking can occur during strong ground shaking. Lurching and ground cracking generally occurs
along the tops of slopes where stiff soils are underlain by soft deposits or along steep channel banks whereas
lateral spreading generally occurs where liquefiable deposits flow towards unconfined spaces, such as
channel banks, during an earthquake. Therefore, as part of the geotechnical report conducted by Stevens,
Ferrone, and Bailey Engineering Co, lateral spreading potential of the southeastern adjacent creek bank was
evaluated. Based on the available literature, field exploration results, and liquefaction analysis, the report
concluded that risk of lurching, ground cracking and lateral spreading is low.
Page 43 of 96
September 2016
The Geotechnical Investigation considered the project relative to the adjacent Corona Creek and
recommended at minimum setback of 10 feet. The City requires a minimum setback of 50 feet for all
hardscape improvements excluding trails, detention basins and other approved non -habitable improvements.
Based on site plans the project complies with the City's minimum set back requirements from Corona creek.
The project plans do not place habitable structures within the setback area, although a detention basin is
proposed in the southeastern most portion of the project site. The detention basin will include a stormdrain
pipe that extends to an existing riprap outfall within Corona Creek. The detention basin and outfall are not
expected to affect slope integrity or otherwise compromise the creek embankment. Therefore, impacts
relating to unstable geologic units will be less than significant.
Mitigation Measures: None required.
3.6 (d) (Expansive Soils) Less Than Significant with Mitigation: The project's geotechnical investigation
indicates that the onsite near -surface clay soils exhibit a very high plasticity and critical expansion potential.
Critically expansive surface soil materials will be subjected to volume changes during fluctuations in moisture
content. Changes in soil moisture content can result from seasonal variations in precipitation, perched
groundwater, landscape practices, broken or leaking irrigation, utility lines or poor site drainage. Changes in
soil moisture content can incite differential movements (settlement or heave) of building foundations, slabs -
on -grade, or flatwork supported on expansive soils, which could result in potentially significant impact if not
properly treated and controlled.
To reduce the potential for post -construction distress to the proposed improvements as a result of the highly
expansive soils onsite, adherence to recommendations set forth in the Geotechnical Investigation shall be
implemented as well as all other measures derived through mandatory compliance with Title 24 (California
Building Code Standards). Mitigation Measure GEO-1 as set forth below shall be implemented. GEO-1
requires that construction techniques adhere to the recommendations set forth in the Geotechnical
Investigation including that site preparation remove potentially weak and compressible fills and re -compaction
prior to re -use onsite, adhere to compaction recommendations for structural fill and pavements, and focused
attention to exterior flatwork such as reinforcement with steel bars rather than wire mesh. Further, it is
recommended that foundations be designed to account for at least some expansive soil movement.
Adherence to those recommendations outlined in the project's geotechnical investigation and in accordance
with Mitigation Measure GEO-2 will ensure that potential impacts from expansive soils are reduced to less
than significant levels.
Mitigation Measures:
GEO-1. As determined by the City Engineer and/or Chief Building Official, all recommendations outlined in the
Geotechnical Investigations dated October 16, 2015 prepared for the subject property by Stevens,
Ferrone, and Bailey Engineering Co., Inc., including but not limited to, site preparation and grading,
excavation, seismic design, and foundations system design are herein incorporated by reference and
shall be adhered to in order to ensure that appropriate construction measures are incorporated into the
design of the project. Nothing in this mitigation measure shall preclude the City Engineer and/or Chief
Building Official from requiring additional information to determine compliance with applicable
standards. The geotechnical engineer shall inspect the construction work and shall certify to the City,
prior to issuance of a certificate of occupancy that the improvements have been constructed in
accordance with the geotechnical specifications.
3.6 (e) (Septic Tanks) No Impact: The proposed project would connect to the existing sanitary sewer system
that would convey effluent to the City's wastewater treatment facility. There are no onsite septic tanks or
alternative wastewater treatment facilities proposed as part of the Project. Therefore, there would be no
Impacts due to the disposal of wastewater where sewer are not available.
Mitigation Measures: None required.
Page 44 of 96
September 2016 —(,'�
3.7. GREENHOUSE GAS EMISSIONS
Would the project:
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less than
Significant No Impact
Impact
a) Generate greenhouse gas emissions, either
❑
El
® El
directly or indirectly, that may have a
significant impact on the environment?
b) Conflict with an applicable plan, policy or
regulation adopted for the purpose of
El
®
E
reducing the emissions of greenhouse
gases?
Sources: BAAQMD 2010 Clean Air Plan and BAAQMD CEQA Guidelines 2010 and 2012;
Air Quality and Greenhouse
Gas Emissions Assessment, Prepared by Illingworth & Rodkin, Inc. October 22, 2015;
GHG Settina:
Greenhouse gases (GHGs) trap heat in the atmosphere, which in turn heats up the surface of the Earth.
GHGs are generated both from natural geological and biological processes and through human activities
including the combustion of fossil fuels and industrial and agricultural processes. Other than water vapor, the
GHGs contributing to global climate change include carbon dioxide, nitrous oxide, methane,
chlorofluorocarbons, hydrofluorocarbons and perfluorocarbons. In the United States, carbon dioxide
emissions account for about 85 percent of anthropogenic GHG emissions.
To address GHG's at the State level, the California legislature passed Assembly Bill 32 in 2006, requiring that
statewide GHG emissions be reduced to 1990 levels by 2020. Further, Senate Bill 375, adopted 2008,
endeavors to curb GHGs through a reduction in urban sprawl and vehicle miles traveled.
The City of Petaluma has also taken steps to address GHG emissions within its city limits. The City adopted
Resolutions 2002-117 and 2005-118, which call for the City's participation in the Cities for Climate Project
effort and established GHG emission reduction targets of 25% below 1990 level by 2015 for community
emissions and 20% below 2000 levels by 2010 for municipal operations. In addition, the City is currently
preparing a Climate Action Plan in partnership with the County and other local jurisdictions. This effort will
implement General Plan Policy 4-P-27.
In 2013, the City adopted an update to the California Building Standards Code, which contains the mandatory
California Green Building Standards Code (CalGreen). All new development within the City of Petaluma must
comply with these standards, which generally achieve energy efficiency approximately 15% beyond Title 24.
As such, new development is expected to be more energy efficient, use less resources and emit fewer GHGs.
The City is also working with regional agencies to implement the Sonoma Marin Area Rail Transit (SMART)
Plan, which will provide light rail commuter service to Petaluma. The light rail effort is estimated to take more
than 1.4 million car trips off Highway 101 annually and reduce greenhouse gases, which contribute to global
warming, by at least 124,000 pounds per day. It is anticipated that commuter rail service will begin in 2017.
The Brody Ranch Subdivision is located in the immediate vicinity of the Corona Road SMART station, which
will provide future residents with an opportunity to utilize close and convenient commuter rail service once the
station is operational.
Page 45 of 96
September 2016
In 2007, the City prepared a revised Air Quality section for the General Plan EIR to address greenhouse gas
emissions. Appendix A of the 2007 Revised EIR includes all of the applicable policies from the General Plan
that reduce Greenhouse Gas Emissions. However, the General Plan is not considered a "qualified" GHG
reduction strategy by the BAAQMD. As such, BAAQMD's screening threshold of 1,100 metric tons (MT) of
carbon dioxide equivalents per year (CO2e/yr) or service population of 4.6 MT/service population/year is used
to evaluate the proposed project.
Impact Analysis:
3.7 (a) (Significant GHG Emissions) Less Than Significant Impact: Construction of the project will result
in GHG emissions from heavy-duty construction equipment, worker trips, and material delivery and hauling.
Construction GHG emissions are short-term and will cease once construction is complete. The BAAQMD has
not established thresholds of significance for GHG emissions resulting from construction activities.
Nonetheless, the project's Air Quality and GHG Assessment calculated emission levels generated by project
construction and evaluated impacts relative to the operational thresholds established by BAAQMD (1,100 MT
CO2e/year) Based on the Air Quality and GHG Assessment prepared by Illingworth and Rodkin (see
Appendix A) construction of the Brody Ranch Subdivision will emit an estimated 415 MT of CO2e over the
entire construction period. As such, construction period GHG emission generated by the project will result in
less than significant impacts. Additionally, BAAQMD encourages the incorporation of best management
practices to reduce GHG emissions during construction. As stated under the air quality discussion above,
best management practices will be imposed on the project as a condition of approval and will further limit
emission of GHGs. Accordingly, GHG emissions generated from the project's construction activities will result
in less than significant impacts.
The project's GHG emissions were estimated at operational including the following sources: (1) emissions
associated with energy use and area sources, including electricity and natural gas, consumer products,
hearths and landscaping equipment; (2) emissions from vehicle use; (3) emissions associated with
conveyance and treatment of potable water and wastewater; and (4) emissions associated with solid waste
disposal. The total operational GHG emissions are calculated in tons per year and tons per capita. Per capita
emissions are computed by dividing the annual GHG emissions by the number of new residences or service
population. The project's population was calculated by applying the number of new residences (199 units) to a
rate of 2.7 persons per household, which is based on the latest census data for the City of Petaluma. The
project is expected to add approximately 537 new residents.
As shown in Table 6, operation of the project would generate 1,888 metric tons of CO2e per year. The project
per capita emissions of 3.5 MT of CO2e per year would not exceed the per capita significance threshold of
4.6 MT of CO2e/yr/capita.
Table 6. Annual Project GHG Emissions
Source Category
Project Emissions CO2e
Metric Tons)
Area
11
Energy Consumption
457
Mobile
1,325
Solid Waste Generation
60
Water Usage
35
Total
1,888
Per Capita Efficiency Rate
3.5 MT CO2e/year/capita
BAAQMD Threshold
4.6 MT CO2e/year/capita
Significant?
No
Source: Table 6 of `Brody Ranch Air Quality and GHG Emissions Assessment,"
prepared by Illingworth & Rodkin, Inc., October 22, 2015.
1 Based on the latest US Census data for the City of Petaluma, 2012
Page 46 of 96
September 2016 �' l
GHG emissions generated by the project are below the BAAQMD-recommended "Per -Capita" emissions
threshold. As a result, the project would not generate greenhouse gas emissions, either directly or indirectly,
that may have a significant impact on the environment. Therefore, impacts due to GHG emissions at
operation would be less than significant.
Mitigation Measures: None required.
3.7 (b) (GHG Plan Conflict) Less Than Significant with Mitigation: The City of Petaluma has adopted
GHG emission reduction policies and programs as part of the General Plan 2025. These policies and
programs address energy efficiency, transportation, and conservation and provide for educational programs.
Most of these policies and programs do not relate directly to development projects. However, General Plan
Policy 4-P-9 does apply to the project and states, "Require a percentage of parking spaces in large parking
lots be equipped to provide electric vehicle charging facilities." In order to comply with this General Plan
policy and ensure a less than significant impact for this criterion, Mitigation Measure GHG-1, requiring
the installation of electric charging facilities within onsite parking stalls, shall be implemented. Charging
stations will only be required at the multi -family parking area of the project and will not be required for the
single-family component. Additionally, the project will comply with Title 24 Part 6 (Building Energy Efficiency
Standards), Cal Green Modified Tier 1 Standards, which will help to minimize GHG emissions. No other
element of the proposed project is expected to conflict or otherwise inhibit an adopted plan, policy or
regulation adopted for the purpose of reducing the emissions of greenhouse gases. Therefore, potential
impacts will be reduced to less than significant levels.
Mitigation Measures:
GHGA:In accordance with Section A4.106.8.2 of the 2013 California Green Building Standards Code, the
project shall provide at least 3% of the total condo parking spaces as capable of supporting future
electric vehicle supply equipment. Of the spaces and equipment requirements of the California Green
Building Standards Code and as required by City of Petaluma General Plan Policy 4-P-9, the project
shall be constructed to include electrical vehicle charging stations at a ratio of least 1% of the total
parking spaces.
Page 47 of 96
September 2016
3.8. HAZARDS/HAZARDOUS MATERIALS
Less Than
Potentially Significant Less than
Would the project: Significant with Significant No Impact
P Impact Mitigation Impact
Incorporated
a)
Create a significant hazard to the public or
the environment through the routine
❑ ❑ ® ❑
transport, use, or disposal of hazardous
materials?
b)
Create a significant hazard to the public or
the environment through reasonably
foreseeable upset and accident conditions
❑ ® ❑ ❑
involving the release of hazardous materials
into the environment?
c)
Emit hazardous emissions or handle
hazardous or acutely hazardous materials,
❑ ❑ ❑
substances, or waste within one-quarter mile
of an existing or proposed school?
d)
Be located on a site that is included on a list
of hazardous materials sites compiled
pursuant to Government Code Section
❑ ❑ ® ❑
65962.5 and, as a result, would create a
significant hazard to the public or the
environment?
e)
For a project located within an airport land
use plan or, where such a plan has not been
adopted, within two miles of a public airport
❑ ❑ ❑
of public use airport, would the project result
in a safety hazard for people residing or
working in the project area?
f)
For a project within the vicinity of a private
airstrip, would the project result in a safety
❑ ❑ ❑
hazard for people residing or working in the
project area?
g)
Impair implementation of or physically
interfere with an adopted emergency
❑ ❑ E
response plan or emergency evacuation
plan?
h)
Expose people or structures to a significant
risk of loss, injury or death involving wildland
fires, including where wildlands are adjacent
❑ ❑ ❑
to urbanized areas or where residences are
intermixed with wildlands?
Sources: 2025 General Plan and EIR; Sonoma County 2020 General Plan and EIR; Phase I Environmental Site
Assessment conducted by AEI Consultants dated April 29, 2014; Limited Phase II Subsurface Investigation conducted
by AEI Consultants dated July 15, 2014; and Sonoma County General Plan 2020 Public Safety Element.
Page 48 of 96
September 2016 ,L tQ
Setting:
Reaulatory Settin
Hazardous materials and waste management is implemented by a number of governmental agencies that
have established regulations regarding the proper transportation, handling, management, use, storage, and
disposal of hazardous materials for specific operations and activities. Pursuant to the Planning and Zoning
Law, the Department of Toxic Substances Control (DTSC) maintains a hazardous waste and substances sites
list (e.g., Cortese List).
Existing hazardous materials and/or waste within Petaluma include underground storage tanks,
Polychlorinated Biphenyls (PCBs), asbestos, and pesticides. There are approximately sixty (60) open Leaking
Underground Storage Tank (LUST) sites dispersed throughout the city. There are no identified "brownfield"
properties in the city. Reuse and intensified use of former industrial and commercial areas, particularly in
Central Petaluma, has the potential to expose one or more hazardous materials during demolition and/or
excavation. Remediation of these hazards is necessary before rehabilitation or construction can begin.
Hazardous waste management in Petaluma is administered by the Sonoma County Waste Management
Agency (SCWMA) through the Countywide Integrated Waste Management Plan (CoIWMP). As required by
State law, the General Plan includes the Source Reduction and Recycling Element (SRRE), Household
Hazardous Waste Element (HHWE), Non -Disposal Facility Element (NDFE), as well as the Siting Element.
State law requires that communities form a Consolidated Unified Protection Agency (CUPA) to manage the
acquisition, maintenance, and control of hazardous waste by industrial and commercial business. In
Petaluma, the Fire Marshall's Office administers the CUPA programs.
Existing Conditions
There are no hazardous waste disposal sites in the city. The Sonoma County Waste Management Agency
(SCWMA), through the Countywide Integrated Waste Management Plan, conducts hazardous waste
management programs. A new Households Toxics Facility recently opened at the Central Landfill (500
Mecham Road, Petaluma), where households and businesses within Sonoma County can drop off hazardous
materials. In addition, community toxics collections are conducted in a different city each week by the
SCWMA. These services are available to households and businesses that qualify as small quantity
generators (i.e., generate a maximum of 100 kilograms (27 gallons or 220 pounds) or less of hazardous
waste per month). Residential pick-up service is available by appointment.
In 2005 the Association of Bay Area Governments (ABAG) released "Taming Natural Disasters", which acts
as a multi -jurisdictional local hazard mitigation plan for the San Francisco Bay Area. The intent of the plan is
to enhance disaster resilience throughout the region, pursuant to the Disaster Mitigation Act,of 2000. The
Plan was subsequently updated in 2010 and has since been approved by the Federal Emergency
Management Agency (FEMA) and formally adopted by ABAG. The City of Petaluma's "2010 Local Hazard
Mitigation Plan Annex," prepared August 24, 2011, complies with the Federal Disaster Mitigation Act of 2000
by demonstrating a commitment to increasing disaster resilience within the City's jurisdiction. As required by
the Disaster Mitigation Act, the City of Petaluma has pledged to update this Plan Annex at least once every
five years and is monitored on an on-going basis by the Capital Improvement Monitor for the City. An update
to the City's Annex Plan is anticipated to occur in 2016.
Phase I Environmental Site Assessment
A Phase I Environmental Site Assessment (ESA) was conducted by AEI Consultants (AEI) on April 29, 2014
to evaluate the potential to encounter hazardous substances on the project site (see Appendix F).
Page 49 of 96
September 2016 N -4q
The Phase I identified the following Recognized Environmental Conditions associated with the project site:
• Based on a review of aerial photographs and interviews with the subject property owner, the subject
property was historically used for agricultural purposes. There is a potential that agricultural
chemicals, such as pesticides, herbicides and fertilizers, were used on site, and that the subject
property has been impacted by the use of such agricultural chemicals.
According to the Phase I ESA, no Controlled Recognized Environmental Conditions were identified for the
project site.
The Phase I identified the following Historical Recognized Environmental Condition for the project site:
According to information obtained from the Sonoma County Public Health Department, the subject
property was formerly equipped with one approximately 500 -gallon underground storage tank (UST),
associated with the current tenant identified as Beauchamp's Welding. The tank was reportedly
removed in 1987 and one soil sample was collected. The sample was analyzed for total petroleum
hydrocarbons as gasoline (TPHg). The number of samples and analyses taken were below current
standards, however, TPHg was not detected in the sample taken. One additional document indicates
the presence of two more underground storage tanks; however, according to an inspection report
from 1987, the inspector indicated the presence of two aboveground 500 -gallon tanks and one
underground tank.
The Phase I identified the following environmental issues for the project site:
• Due to the historic use of the subject property, there is a potential that additional fuel tanks or
subgrade features may have been present on-site.
The Phase I identified the following Non -ASTM Considerations for the project site:
• Due to the age of the subject property buildings, there is a potential that asbestos containing
materials (ACMs) are present. All observed suspect ACMs were in good condition and are not
expected to pose a health and safety concern to the occupants of the subject property at this time.
• Due to the age of the subject property buildings, there is a potential that lead-based paint (LBP) is
present. All painted surfaces were observed in good condition and are not expected to pose a health
and safety concern to the occupants of the subject property at this time.
The property adjacent to and south of the project site, located at 320 Corona Road, was .identified in the
regulatory database as a Resource Conservation and Recovery Act Non -Generator (RCRA NonGen) site.
According to the database, the adjacent site to the south did not generate hazardous waste in 1988, however,
the site was identified as a transporter of hazardous wastes. No violations were reported.
Limited Phase II Subsurface Investigation
AEI conducted a Limited Phase II Subsurface Investigation (Phase 11) on July 15, 2014 (see Appendix G). The
investigation included the collection of soil and groundwater samples in the location of the documented former
UST and collection of shallow soil samples from the area historically under agricultural production.
The Phase II soil samples collected and analyzed for the UST investigation concluded the following:
• TPHg and total petroleum hydrocarbons as diesel (TPHd) were not detected in the sample above the
laboratory detection limits.
• Xylene -volatile aromatic compounds (BTEXM) and lead were not detected in the sample above the
laboratory detection limits.
The Phase II soil samples collected and analyzed for the agricultural land survey concluded the following:
Page 50 of 96
September 2016 V�
• Dieldrin was detected in two composite samples at concentrations of 0.0038 milligrams per kilogram
(mg/kg) and 0.0043 mg/kg, which exceeds the Environmental Screening Levels (ESLs) from the San
Francisco Bay Regional Water Quality Control Board for residential land use for leaching to
groundwater. However, it does not exceed the ESL for direct exposure in residential land use.
• Dichlorodiphenyldichloroethene (DDE) was detected in one composite sample at a concentration
which does not exceed the applicable ESL value.
• Arsenic was detected in six composite samples at concentrations which exceed the applicable ESL
value. However, these concentrations are consistent with naturally occurring concentrations
throughout soil of the area and the findings do not indicate anthropogenic source of arsenic.
• Lead and chromium were detected in six composite samples at concentrations which do not exceed
the applicable ESL values and which are also consistent with naturally occurring conditions.
The Phase II groundwater sample and analysis concluded the following:
• TPHg and TPHd were not detected in the groundwater sample above the laboratory detection limits.
• Benzene, toluene, ethylbenzene, xylenes, and methyl tert-butyl ether (BTEXM) and lead were not
detected in the groundwater sample above the laboratory detection limits.
Impact Analysis:
3.8 (a) (Routine Transport) Less Than Significant Impact: The proposed project will involve the demolition
of existing structures followed by the construction of residential units, parking, and other improvements.
Demolition, site preparation, and construction activities may result in the temporary presence of potentially
hazardous materials including, but not limited to fuels and lubricants, paints, solvents, insulation, electrical
wiring, and other construction related materials onsite. Although there may be potentially hazardous materials
onsite during construction, the applicant will comply with all existing federal, state and local safety regulations,
as overseen by the City of Petaluma's COPA, governing the transportation, use, handling, storage and
disposal of potentially hazardous materials. In the event that construction activities involve the on-site storage
of potentially hazardous materials, a declaration form shall be filed with the Fire Marshall's office and a
hazardous materials storage permit must be obtained. While the project site is expected to house hazardous
materials on both a temporary and permanent basis, strict adherence to Best Management Practices (BMPs)
in accordance with the NPDES Permit requirements and compliance with all applicable regulations will ensure
that potential impacts remain at levels below significance.
Mitigation Measures: None required.
3.8 (b) (Upset and Accident Involving Release) Less Than Significant With Mitigation: The project site is
currently occupied by several buildings of considerable age. Asbestos containing materials (ACMs) and lead-
based paints (LBPs) may be present on site and could be disturbed during demolition activities. Pursuant to
the recommendations set forth in the Phase I ESA, Mitigation Measure HAZA shall be implemented,
requiring an asbestos survey adhering to sampling protocols outlined by the Asbestos Hazard Emergency
Response Act (AHERA) and material sampling to determine lead presence of the on-site buildings to occur
prior to any demolition activities. In the event that such substances are found, the applicant will adhere to all
requirements put forth by the Occupational Health and Safety Administration (OSHA) and other relevant
agencies regarding the treatment and handling of these materials.
Due to the historic use of the project site, there is a potential that unidentified fuel tanks or subgrade features
may be present on-site, and could be encountered during construction. Therefore, as recommended in the
Phase I ESA, Mitigation Measure HAZ-2 shall be implemented, which would require the preparation and
implementation of a Site Management Plan (SMP) to monitor for and appropriately manage localized impacts
of buried hazardous features encountered during construction activities.
Page 51 of 96 1
September 2016 4 J
According to the Limited Phase II, in the area of the UST, TPHg, TPHd, BTEXM, and lead were not detected
in soil or groundwater samples above laboratory detection limits. Shallow soil samples did not identify arsenic,
lead or chromium at concentrations of concern. The pesticides dieldrin and DDE were also detected in the
shallow soil, however, at concentrations below the residential direct contact ESL. Based on these results,
there does not appear to be have been a release from the former 500 -gallon UST. Additionally, the site has
not been significantly impacted by the historic use of agricultural chemicals. Therefore, impacts are
considered less than significant.
With implementation of mitigation measures HAZ-1 and HAZ-2 potential impacts due to accident upset or
release of hazards or potentially hazardous materials will be reduced to less than significant levels.
Mitigation Measures:
HAZA. Prior to any activities involving the demolition or alteration of the existing buildings an site, an
asbestos survey adhering to sampling protocols outlined by the Asbestos Hazard Emergency
Response Act and material sampling to determine lead presence will occur. Construction activities
that disturb materials or paints containing any amount of lead and/or asbestos may be subject to
certain requirements of the Occupational Safety and Health Administration (OSHA) lead standard
contained in 29 CFR 1910.1025 and 1926.62, AHERA requirement, and any other local, state, or
federal regulations. In the event that such substances are found, the applicant will adhere to all
requirements put forth by OSHA and other agencies regarding the treatment, handling, and disposal
of these materials.
HAZ-2. Prior to any subsurface construction activities, a Site Management Plan (SMP) shall be prepared and
implemented to monitor for and appropriately manage any hazardous features unearthed during
construction activities. The Site Management Plan shall at a minimum provide detail on the protocol
to be followed in the event that an underground storage tank is encountered and proper procedures
for excavation, remedial action and noticing to the appropriate regulatory agency (Sonoma County
Department of Health Services).
3.8 (c) (Emit of Handle within "A Mile of School) No Impact: The project site is not located within a quarter
mile of a school. The nearest school, Meadow Elementary School, is located approximately 0.35 miles east of
the project site. Corona Creek Elementary School is located approximately 0.5 miles northeast of the project
site. As a residential land use, the project would not emit or handle hazardous materials capable of impacting
the school. Therefore, no impacts related to the emission or handling of hazardous, or acutely hazardous
materials, within one-quarter mile of an existing or proposed school are expected.
Mitigation Measures: None required.
3.8 (d) (Government Code §65962.5 Site) Less Than Significant: As previously discussed, the Phase I
ESA identified one historical Recognized Environmental Condition for the project site, an approximately 500 -
gallon UST. As stated in 3.8 (b) above, there does not appear to be have been a release from the former 500 -
gallon UST. The property adjacent to and south of the project site, located at 320 Corona Road, was identified
in the regulatory database as a Resource Conservation and Recovery Act Non -Generator (RCRA NonGen)
site. According to the database, the adjacent site to the south did not generate hazardous waste in 1988,
however, the site was identified as a transporter of hazardous wastes. No violations were reported. Based on
this information and the lack of a documented release, this adjacent site is not expected to represent a
significant environmental concern. Therefore, impacts are considered less than significant.
Mitigation Measures: None required.
3.8 (e -f) (Public and Private Airport Land Use Plan) No Impact: The project is not located within the
boundaries of an airport land use plan or located in close proximity to a private airstrip. The nearest airport is
the Petaluma Municipal Airport, which located approximately 2.2 miles east of the project site. The project site
is not subject to any safety restrictions from an adopted Airport Land Use Compatibility Plan. Therefore, no
impacts associated with airport -related hazards are expected.
Page 52 of 96
September 2016 -�ji.
Mitigation Measures: None required.
3.8 (g) (Impair Emergency Response Plan) No Impact: The project would not impair implementation of, or
physically interfere with, an adopted emergency response plan or emergency evacuation plan. The project will
not alter any emergency response or evacuation routes. Site plans include ingress and egress access that
accommodate emergency vehicles and provide connectivity to the existing circulation and street system.
California has developed an emergency response plan to coordinate emergency services by federal, state,
and local government, including responding to hazardous materials incidents. The State Office of Emergency
Services (OES) employs a Hazardous Materials (Haz Mat) Division which enforces multiple programs that
address hazardous materials. There are no aspects of the proposed project that will interfere with an adopted
emergency or evacuation plan and no impacts are anticipated.
Mitigation Measures: None required.
3.8 (h) (Wildland Fire) Less Than Significant Impact: The project site is bounded by existing residential
development to the north and east and mixed use south as dictated by Land Use from the Petaluma General
Plan 2025. According to the Land Use Element of the Sonoma County General Plan 2020, land abutting
Corona Road to the western edge of the project site is designated as Rural Residential. The Public Safety
Element of the Sonoma County General Plan 2020 has classified this area as a Moderate Fire Hazard
Severity Zone. While the project site is near an area known to be a moderate fire hazard, the Petaluma
General Plan Policy 7-P-17, 7-P-19, and 7-P-27 aim to address the effects a wildland fire may have on the
project area by providing adequate fire suppression personnel, maintaining a 6 -minute response time for
emergencies, and executing preventative tasks aimed at reducing the impacts of wildland fires. Mitigation
Measure 4.9-10 of the Sonoma County General Plan EIR also requires all new residential areas to be
equipped with sprinkler systems in order to reduce the risk of loss, injury, or death. Furthermore, the project
site is located across the North McDowell Boulevard / Corona Road intersection from Station 2 of the
Petaluma Fire Department, ensuring prompt response times in the event of a wildland fire. The adjacent rural
residential land will also act as an arterial buffer against potential damage caused by wildland fires. Therefore,
impacts associated with wildland fires are expected to be less than significant.
Mitigation Measures: None required.
Page 53 of 96
September 2016 —5�
3.9. HYDROLOGY AND WATER QUALITY
Would the1 ro ect:
p
Less Than
Potentially Significant Less than No
Significant with Significant Impact
Impact Mitigation Impact
Incorporated
a) Violate any water quality standards or waste
❑ ❑ ® ❑
discharge requirements?
b) Substantially deplete groundwater supplies or
interfere substantially with groundwater recharge
such that there would be a net deficit in aquifer
volume or a lowering of the local groundwater table
❑ ❑ ® ❑
level (e.g., the production rate of pre-existing
nearby wells would drop to a level which would not
support existing land uses or planned uses for
which permits have been granted)?
c) Substantially alter the existing drainage pattern on
the site or area, including through the alteration of
the course of a stream or river, in a manner that
❑ ❑ ❑
would result in substantial erosion or siltation on -
or off-site?
d) Substantially alter the existing drainage pattern on
the site or area, including through the alteration of
the course of a stream or substantially increase the
❑ ❑ ❑
rate or amount of surface runoff in a manner, which
would result in flooding on- or off-site?
e) Create or contribute runoff water that would
exceed the capacity of existing or planned
❑ ❑ ❑
stormwater drainage systems or provide
substantial additional sources of polluted runoff?
f) Otherwise substantially degrade water quality?
❑ ❑ ® ❑
g) Place housing within a 100 -year flood hazard area
as mapped on a federal Flood Hazard Boundary or
❑ ❑ ® ❑
Flood Insurance Rate Map or other flood hazard
delineation map?
h) Place within a 100 -year flood hazard area
structures that would impede or redirect flood
❑ ❑ ® ❑
flows?
i) Expose people or structures to a significant risk of
loss, injury or death involving flooding, including
❑ El ® ❑
flooding as a result of the failure of a levee or
dam?
j) Inundation by seiche, tsunami, or mudflow?
❑ ❑ ❑
Sources: Sources: 2025 General Plan and EIR; Preliminary Stormwater Mitigation Report, prepared by Steve
Lafranchi & Associates, October 2015; Wetlands Run -Off Report, prepared
by Steve Lafranchi & Associates, October
2015; Biological Resource Analysis for Brody Ranch Subdivision,
prepared by Monk & Associates, October 2015;
Brody PUD Site Plan (Sheet TM -7); and Federal Emergency Management Agency's Flood Insurance Rate Map.
wy�
September 2016 oq
Setting:
The Petaluma River is the primary watercourse within the City of Petaluma and the Petaluma watershed (an
area of approximately 46 square miles). The Petaluma River is tidally influenced and flows in a southeast
direction into San Pablo Bay. The Petaluma River is used for recreational boating and water sports as well as
long-standing river -dependent industrial operations.
The Brody Ranch site is located adjacent to Corona Creek immediately to the southeast and approximately
0.5 miles northeast of the Petaluma River. The site varies between 33 feet and 43 feet above sea level, and
drains to a depression at the southern portion of the site adjacent to the railroad tracks along. Several isolated
seasonal wetlands have formed in depressions throughout the undeveloped portions in the project site and
are small, shallowly inundated and lack sensitive wetland species (as described above under the Biological
Resources discussion). The onsite wetlands have indirect hydrologic connectivity to Corona Creek, which is
located to the southeast of the project site. In total 1.365 acres of seasonal wetlands (1.36 acres) and other
waters (0.005 acres) are present on-site. As proposed, the project would result in fill to 0.185 acres of
seasonal wetland and would retain 1.18 acres.
Section 402 of the Clean Water Act regulates the discharge of pollutants to waters of the U.S. Locally, this is
implemented through the National Pollution Discharge Elimination System (NPDES) General Permit.
Requirements apply to the project's construction activities (e.g. grading, grubbing, and other site disturbance).
Construction activities on more than one acre (i.e. the project site) are subject to NPDES permitting
requirements including, the preparation of a Storm Water Pollution Prevention Plan (SWPPP). The SWPPP
identifies stormwater collection and discharge points, drainage patterns across the site, and best
management practices that dischargers will use to reduce the pollutants in stormwater runoff. The NPDES
General Permit requirements also address post -construction conditions resulting from development including,
but not limited to, through Low Impact Development (LID) requirements. Under LID requirements, new
development, including the project, is required to mimic pre -developed conditions, protect water quality, and
retain runoff from impervious surfaces onsite.
The southeastern most portion of the project site is subject to inundation under flood Zone AE as mapped by
the Federal Emergency Management Agency's Flood Insurance Rate Map (panel number 06097 C 0894 F
revised February 19, 2014). Based on review of the site plans relative to the limits of the 100 -year flood
inundation area, the project will not introduce habitable structures within this area. Rather, the 100- year flood
zone largely coincides with the wetland area in the southern portion of the site that will be persevered.
Figure 9: FIRM Flood Zone
Page 55 of 96
September 2016 A _ S 5
Impact Analvsis:
3.9 (a,f) (Water Quality Standards and Degrade Water Quality) Less Than Significant: The mandatory
requirements of the NPDES General Permit address and apply to the project construction and post -
construction stormwater discharges. Prior to construction, the project applicant is required to file for coverage
under the State Water Resources Control Board (SWRCB), Order No. 99-08—DWQ, NPDES General Permit
No. CAS000002 for Discharges of Storm Water Runoff Associated with Construction Activity (General
Permit). Mandatory requirements cover construction activities including, but not limited to, clearing, grading,
excavation, stockpiling, and reconstruction of existing facilities involving removal and replacement.
Compliance is initiated through submittal of a Notice of Intent (NOI) to the State Water Resources Control
Board (SWRCB) and carried out through a Storm Water Pollution Prevention Plan (SWPPP). The SWPPP
contains a site map, existing and proposed buildings, lots, roadways, storm water collection and discharge
points, general topography both before and after construction, and drainage patterns across the project. The
SWPPP must also identify Best Management Practices (BMPs) to protect storm water runoff.
The NPDES General Permit also includes performance standards for post -construction that are consistent
with State Water Board Resolution No. 2005-0006, "Resolution Adopting the Concept of Sustainability as a
Core Value for State Water Board Programs and Directing Its Incorporation," and 2008-0030, "Requiring
Sustainable Water Resources Management." Standards require all construction sites to match pre -project
hydrology to help ensure that the physical and biological integrity of aquatic ecosystems are sustained. This
"runoff reduction" approach is analogous in principle to Low Impact Development (LID) and serves to protect
related watersheds and water bodies from both hydrologic -based and pollution impacts associated with post -
construction conditions.
The proposed project will result in impacts to areas that are within the Corps' jurisdiction pursuant to Section
404 of the Clean Water Act and the RWQCB's jurisdiction pursuant to Section 401 of the Clean Water Act.
The proposed project will impact 8,091 square feet (0.185 acre) of waters of the U.S., including small isolated
seasonal wetlands and other waters within the development footprint. As set forth above under the Biological
Resources discussion, the project has the potential to result in direct impact wetlands from introducing fill, as
such Mitigation Measure BIO -5 shall be implemented in order to mitigate potential impacts. Additionally, the
applicant will obtain a Section 404 permit from the Corps and a Section 401 permit from the RWQCB prior to
project construction and will implement any additional mitigation measures identified by the Corps or RWQCB
as part of these permits.
No other water quality degradations are expected to occur from the project development. Implementation of
the required Stormwater Pollution Prevention Plan (SWPPP) will ensure that there are no other impacts to water
quality due to the subject project. Therefore, impacts are expected to be less than significant to water quality.
Mitigation Measures: None required.
3.9 (b) (Groundwater Supply and Recharge) Less Than Significant Impact: The City has adequate water
supply resources to accommodate development of the subdivision without depleting, degrading or altering
groundwater supplies or interfering substantially with groundwater recharge. The subject project would not
result in the lowering of the aquifer or the local groundwater table. The project's water demands are
consistent with water demands evaluated in the City Urban Water Management Plan (UWMP), which found
sufficient water supplies are available to meet existing and planned future development within the UGB.
Groundwater reserves will not be depleted due to the proposed development as the City's water supply is
largely dependent on surface water flows from the Sonoma County Water Agency. There are no groundwater
wells proposed as part of the project, rather the project will be served by the City's municipal water supply.
Therefore, potential impacts to groundwater will be less than significant.
Mitigation Measures: None required.
Page 56 of 96
September 2016 pp
3.9 (c -e) (Drainage Pattern or Runoff, Stormwater Drainage System Capacity) Less Than Significant
Impact: The proposed project will not alter the course of a stream or river and the post development flow
regime will largely mimic predevelopment conditions. Runoff currently flows towards the southern portion of
the site where it accumulates into a topographically low area. The project's preliminary stormwater mitigation
report addresses post -construction treatment through the introduction of over 300 trees, bio -retention areas
(including those on individual lots, roadside sidewalks and shared pathway, and the detention basin), and soil
treatment.
Pollutants will be removed and runoff reduced through implementing Post -Construction Low Impact Design
(LID) measures and through the use of Bio -Retention Basins on each proposed lot and along roadsides.
Sidewalks and other impervious surfaces will be sloped or otherwise designed to direct stormwater in order to
prevent pooling and disperse stormwater into bio -retention area, and will not directly connect into the storm
drain system until after they have had the opportunity to settle out and percolate. In addition to filtering and
reducing the volume of water discharges from the introduction of impervious surfaces onsite, bio -retention
areas are also designed to increase percolation and remove sediment from surface flows.
With the proposed post construction LID measures, the introduction of new impervious surfaces onsite would
not substantially increase the rate or amount of surface runoff in a manner that would result in flooding on or
off site. The proposed detention basin in the southeastern portion of the site will provide additional flood
control capacity by retaining additional surface flow contributions of the project outside of Corona Creek. The
proposed storm drain system onsite and offsite connections will accommodate new surface flows resulting
from the project.
A distribution trench with a concrete lip set at a constant elevation has been designed to evenly disperse
stormwater emanating from the developed portion of the project across a wide area. This discharge will occur
upstream of the wetland area to be preserved after passing through bio -retention catch basins and swales.
The proposed detention basin in the southeastern portion of the site in conjunction with the wetland area to be
preserved will provide sufficient capacity to accommodate increased surface water runoff and retain the
floodplain function in the southern portion of the site.
Onsite drainage, consisting of appropriately sized pipes, is proposed to provide stormwater protection during
storm events. The general direction and pattern of drainage proposed will match pre -development conditions.
Existing storm drain facilities currently in the project vicinity and proposed as part of the project would
effectively capture and evacuate the 10 -year and 100 year flood event from the site. New storm drain systems
onsite will not contribute runoff water that exceeds the capacity of the existing storm drain system.
Accordingly, existing hydrology and drainage patterns will generally be retained. The project will not result in a
drainage pattern that causes substantial erosion or siltation on- or off-site; nor will it result in flooding on- or
off-site. Therefore, impacts to the storm drain system would be less than significant.
Mitigation Measures: None required.
3.9 (g -h). (Flood Hazard) Less Than Significant: Based on the Federal Emergency Management Agency's
Flood Insurance Rate Map (FIRM) Panel # 06097CO894F (see Figure 9 above), revised and effective
February 19, 2014, a portion of the project site is located within the 100 -year flood plain. The 100 -year
floodplain, identified as Zone AE, encompasses the topographically low area that consists of the wetland
along the southern portion of the site. Zone AE is subject to inundation by the 1 -percent -annual -chance flood
event and has a mapped base flood elevation of 35 feet. Zone X, or non -special flood hazard zones,
encompasses the balance of the project site.
Setback from the wetland area to be preserved and will place the nearest residential structures about 30
linear feet away from Zone AE and about 2-3 feet above the base flood elevation of Zone AE. The proposed
project will not introduce a substantial flood hazard and will not impede or redirect flood flows. The project will
not place housing or structures in a flood hazard area and, as a result, will not expose people or structures to
risks related to flooding. As such, flooding due to the 100 -year flood plain would result in a less than
significant impact.
Page 57 of 96
September 2016
A-51
Mitigation Measures: None required.
3.9 (i j). (Seiche, Tsunami, Mudflow) No Impact: The site is not located within an inundation area of a
levee or dam, nor is the site expected to be impacted by inundation by seiche, tsunami or mudflow. The
Petaluma River and Corona Creek would not cause inundation due to seiche, tsunami or mudflow. Therefore,
there will be no impact.
Mitigation Measures: None required.
Page 58 of 96
September 2016 �e��
3.10. LAND USE AND PLANNING
Potentially Less Than Less than No
Significant Significant Significant Impact
Impact with Impact
Would the project: Mitigation
Incorporated
a) Physically divide an established community? ❑
b) Conflict with any applicable land use plan, policy, or
regulation of an agency with jurisdiction over the
project (including, but not limited to the general plan, ❑
specific plan, local coastal program, or zoning
ordinance) adopted for the purpose of avoiding or
mitigating an environmental effect?
c) Conflict with any applicable habitat conservation plan
or natural community conservation plan? ❑
❑ ® ❑
Sources: Petaluma General Plan 2025; Petaluma SMART Rail Station Master Plan (April 2012); Corona -Ely Specific
Plan (May 1998); and Brody Ranch Vesting Tentative Subdivision Map.
Land Use and Planninq Setting: The City's land uses within the Urban Growth Boundary include residential,
commercial, industrial, agricultural, open space and public lands. Approximately 44% of the UGB lands are
designated for residential development with 40% of the existing residential development consisting of single
family residential. The project site is located within the North East Planning Subarea, which consists primarily
of residential uses.
The Project is further located within the boundaries of the Corona -Ely Specific Plan which consists of a 675
acre area located in Northeast Petaluma. In 1989 the City of Petaluma adopted the Corona -Ely Specific Plan
thereby facilitating the annexation of approximately 675 acres of what were then principally agricultural lands.
The Corona -Ely Annexation No. 1 occurred later that year and implemented the Specific Plan. Development
of the CESP area occurred over the intervening 27 years such that today very few vacant/ underdeveloped
parcels remain including that of the project site at 360 Corona Road.
The subject site is located within what is delineated as the "Northern Tier" of the CESP comprising
approximately 160 acres. This area is described as being north of the central 285 acres beyond Corona
Creek and consisting of a band of urban standard residential development which drops off to rural density
along Corona Road, but climbs to urban high densities to the west toward McDowell Boulevard.
The Brody Subdivision project is subject to Land use policies outlined in the Petaluma General Plan and in
the Corona -Ely Specific Plan, which have been adopted for the purpose of avoiding or mitigating an
environmental effect. Applicable policies are outlined below:
Petaluma's General Plan 2025
The following policies from the General Plan are particularly applicable to the subject project:
1-P-2: Use land efficiently by promoting infill development at equal or higher density and intensity than
surrounding uses.
Page 59 of 96
September 2016 A —5q
2-P-1 As depicted on the land use map, allow for urban development at defined densities and
intensities to prevent the need to extend outward beyond the Urban Growth Boundary (UGB)
2-P-2 For development adjacent to the UGB, the intent of the designated land use is to feather or
reduce densities to provide a transition from urban to rural.
2-P-5 Strengthen the visual and aesthetic character of major arterial corridors through:
• Intensification via infilling;
• Orientation towards street; and
• Prohibiting use of soundwalls facing street
2-P-97 The parcel at the corner of Sonoma Mountain Parkway and Corona Road with a split designation
of medium density and high density residential shall reflect the intent of providing a mixture of unit
types both consistent with the surrounding neighborhoods and the desire for high density housing
in proximity to the proposed rail station. Distribution of a mixture of medium and high-density unit
types across the property may be permitted.
5-P-19: All new and redesigned streets shall be bicycle and pedestrian friendly in design.
10 -P -3(f) Discourage use of soundwalls anywhere except along Highway 101 Corridor and or along
NWRA Corridor without findings that such walls will not be detrimental to the community
character. When sound walls are deemed necessary, integrate them into the streetscape.
11 -P -20B: Continue to require the planting of street and parking lot trees as part of residential projects to
provide cooling during the summer months.
Corona Ely Specific Plan
The following policies from the CESP are particularly applicable to the subject project:
Major Design Policies:
Policy 29 Conventional, fully exposed noise barriers are to be avoided along the (Sonoma Mountain)
Parkway
Building Design along SMP
Policy 25 Design review shall be mandatory for all development proposals involving properties
contiguous to the Sonoma Mountain Parkway Right of Way
Policy 34 Development Plans for both the Commercial Center and the adjacent "Urban High"
residential component shall reflect a high standard of design quality and shall be made
harmonious with the local parkway setting by incorporating the Central design parameters.
Street Planting
Policy 90 All Corona/Ely residential streets shall have a 4 to 5 foot planting strips within the right of way
on both sides of the street between the curb and sidewalk, rather than having the sidewalk
adjacent to the street.
Land Use and Planning Impact Discussion:
3.10(a) (Divide An Established Community) Less Than Significant Impact: The project proposes the
development of a medium to high density residential subdivision on an underutilized lot within the northern tier
of the CESP and within the Northeast Planning Subarea. The project is considered infill development in that it
is surrounded by existing urban (rural residential, residential and industrial) land uses on all sides and is
generally similar in scale and density to the surrounding development within the UGB.
Page 60 of 96
September 2016 O
Division of an established community typically occurs when a new physical feature, in the form of an interstate
or railroad, physically transects an area, thereby removing mobility and access within an established
community. The introduction of a sound wall can also contribute to the division of an established community in
that it introduces a potentially obtrusive visual and physical division, which reduces cohesiveness and
promotes the introversion of development. The division of an established community can also occur through
the removal of an existing road or pathway, which would reduce or remove access between a community and
outlying areas.
The project is considered infill; is consistent with the established character of the surrounding area; has
multiple points of access for automobiles, pedestrians and cyclists and connections to surrounding
development. Although the project includes noise barriers to provide noise attenuation they have been
designed and located in a manner that is sensitive to the goals and policies of the General Plan and Specific
Plan. Noise barriers are set back from roadway rights of way, are softened by landscaping, heights of not
more than 6 feet, and by use of wood fencing materials. As such, the project is not expected to divide an
established community nor create a walled off character. Rather the proposed Brody Ranch subdivision will
act as an extension of and reinforce the already established character and spatial organization that defines
the subarea/ CESP and its components. Therefore impacts from the project due to division of an established
community will be less than significant.
Mitigation Measures: None required.
3.10(b) (Land Use Plan, Policy, Regulation Conflict) Less Than Significant Impact: As proposed the
Project site will be developed in accordance with the established high and medium density land use
designations. The proposed Planned Unit Development (PUD) maintains the overall densities of the existing
zoning, while allowing for clustering of development away from the southern portion of the site where 3.78
acres of open space and wetlands will be protected. The project will feature a density of 10.7 du/acre on the
7.48 acres with the Medium Density Residential land use designation and a density of 27.8 units per acre on
the 8.44 acres with the High Density Residential designation. It is consistent with the General Plan land use
designations and existing zoning. Although the project proposes a zoning amendment to change the zoning
from R4 and R5 to PUD, the proposed project density is consistent with what is currently allowed and what
has been envisioned by the City's long range planning document.
As proposed the project achieves the overall intent of the General Plan, Corona Ely Specific Plan and the
SMART Station Master Plan. The 1989 CESP sets forth the vision for development within the area at that
time. The 2008 General Plan provides more up to date guidelines for development within the UGB. The 2012
SMART Station Master Plan incorporates principals of transit-oriented development (TOD). Some of the
policies and programs of the CESP, General Plan and SMART Station Master Plan present competing
objectives such as maintaining the rural character of the CESP while promoting TOD development proximate
to SMART facilities. The Brody Ranch project aims to balance the competing policies of these regulatory
documents and achieves consistency with the overall intent.
Additionally, the project proposes residential development that is consistent with surrounding development
and features a design and architecture that is consistent with the established character of the surrounding
area. The project does not conflict with the City's land use plan, policies or programs of the General Plan,
CESP, and the SMART Station Area Master Plan or other regulatory documents. Therefore, impacts will be
less than significant.
Mitigation Measures: None required.
3.10(c). (Habitat Conservation Plan) No Impact: The project is not subject to a habitat conservation plan or
a natural community conservation plan. There are no conservation plans that apply to the UGB. Therefore,
the project will have no impact on any conservation plan or natural community plan.
Mitigation Measures: None required.
Page 61 of 96
September 2016
3.11. MINERAL RESOURCES
Less Than
Potentially Significant Less than No
Would the project: Significant with Significant Impact
p Impact Mitigation Impact
Incorporated
a) Result in the loss of availability of a known
mineral resource that would be of value to
the region and the residents of the state?
b) Result in the loss of availability of a locally -
important mineral resource recovery site
delineated on a local general plan, specific
plan or other land use plan?
Sources: 2025 General Plan and EIR.
Mineral Resources Impact Discussion:
❑ ❑ ❑
❑ ❑ ❑
3.11 (a -b). (Mineral Resources or Plan) No Impact: There are no known mineral resources within the UGB.
The project site has not been delineated as a locally important resource recovery site. It is not expected that
the project will result in the loss of availability of a known mineral resources, including those designated as
"locally important". Therefore, the proposed project will have no impact that results in the loss of availability of
mineral resources.
Mitigation Measures: None required.
Page 62 of 96
September 2016 �^ r
3.12. NOISE
Less Than
Potentially Significant Less than No
Significant with Significant Impact
Would the project result in: Impact Mitigation Impact p
Incorporated
a) Exposure of persons to or generation of noise
Sources: 2025 General Plan and EIR; and Environmental Noise Assessment Brody Ranch Subdivision, prepared by
Illingworth & Rodkin, September 2016.
Setting:
Noise is generally characterized as "unwanted sound." Noise sources within the City's Urban Growth
Boundary (UGB) include vehicular traffic along roadways and Highway 101, trains and industrial activities
such as mechanical equipment and refrigeration units. Freight train service through Petaluma is currently
irregular, and thus does not constitute a significant noise source. For the project site, vehicular traffic on
nearby roadways (e.g., Corona Road, Sonoma Mountain Parkway) is currently considered to be a potentially
significant noise source. The SMART rail line south of the project opposite of McDowell Blvd is not currently
operating, but will produce potentially significant noise in the future.
Implementing Zoning Ordinance (IZO) §21.040(A)(3)(a) limits noise generating construction activities to the
hours of 7:00 a.m. to 10:00 p.m. on weekdays and 9:00 a.m. to 10:00 p.m. on weekends and holidays. For
daily operational noise, both the General Plan and IZO provides guidelines and standards for acceptable
levels. IZO §21.040(4)(A) establishes an hourly average level of 60 dBA as the maximum that may be
generated on one land use that would be affecting another land use. Allowable levels are adjusted to account
for existing ambient noise levels though the maximum allowed noise level may not exceed 75 dBA after
adjustments are made.
Page 63 of 96
September 2016 f
levels in excess of standards established in the
❑
®
❑ ❑
local general plan or noise ordinance, or applicable
standards of other agencies?
b)
Exposure of persons to or generation of excessive
groundborne vibration or groundborne noise
❑
❑
® ❑
levels?
c)
A substantial permanent increase in ambient noise
levels in the project vicinity above levels existing
❑
❑
® ❑
without the project?
d)
A substantial temporary or periodic increase in
ambient noise levels in the project vicinity above
❑
®
❑ ❑
levels existing without the project?
e)
For a project located within an airport land use
plan or, where such a plan has not been adopted,
within two miles of a public airport or public use
❑
❑
❑
airport, would the project expose people residing
or working in the project area to excessive noise
levels?
f)
For a project within the vicinity of a private airstrip,
would the project expose people residing or
❑
❑
❑
working in the project area to excessive noise
levels?
Sources: 2025 General Plan and EIR; and Environmental Noise Assessment Brody Ranch Subdivision, prepared by
Illingworth & Rodkin, September 2016.
Setting:
Noise is generally characterized as "unwanted sound." Noise sources within the City's Urban Growth
Boundary (UGB) include vehicular traffic along roadways and Highway 101, trains and industrial activities
such as mechanical equipment and refrigeration units. Freight train service through Petaluma is currently
irregular, and thus does not constitute a significant noise source. For the project site, vehicular traffic on
nearby roadways (e.g., Corona Road, Sonoma Mountain Parkway) is currently considered to be a potentially
significant noise source. The SMART rail line south of the project opposite of McDowell Blvd is not currently
operating, but will produce potentially significant noise in the future.
Implementing Zoning Ordinance (IZO) §21.040(A)(3)(a) limits noise generating construction activities to the
hours of 7:00 a.m. to 10:00 p.m. on weekdays and 9:00 a.m. to 10:00 p.m. on weekends and holidays. For
daily operational noise, both the General Plan and IZO provides guidelines and standards for acceptable
levels. IZO §21.040(4)(A) establishes an hourly average level of 60 dBA as the maximum that may be
generated on one land use that would be affecting another land use. Allowable levels are adjusted to account
for existing ambient noise levels though the maximum allowed noise level may not exceed 75 dBA after
adjustments are made.
Page 63 of 96
September 2016 f
The General Plan applies an exterior noise level standard of 65 dB Community Noise Equivalent Level
(CNEL) at outdoor activity areas of new residential land uses exposed to transportation noise sources (i.e.,
traffic). The intent of this standard is to provide an acceptable exterior noise environment for outdoor
activities. These limits are normally applied at the common outdoor activity areas. The common outdoor
activity areas of this project would be the open space picnic area at the northwest and east portions of the
project. The General Plan applies an interior noise level standard of 45 dB CNEL or less within dwellings. The
intent of this interior noise limit is to provide a suitable environment for indoor communication and sleep.
Existing Noise Conditions
The proposed project is located southeast of the intersection of Corona Road and Sonoma Mountain
Parkway, and northeast of the SMART rail line. The project site is bordered by residential buildings to the east
across a creek greenway (Corona Creek). The existing noise environment at the project site results primarily
from vehicular traffic on Corona Road and Sonoma Mountain Parkway. Other sources of noise in the area
include residential and park uses to the east, South McDowell Blvd traffic and industrial activities to the south
of the SMART rail line and overhead noise from general aviation aircraft using the Petaluma Airport.
In order to quantify the existing noise environment and project future noise levels, a noise monitoring survey
including three long-term noise measurements was conducted by Illingworth & Rodkin (see Appendix H). The
noise measurement locations are illustrated in Figure 10 below. The purpose of the noise level survey was to
determine existing traffic noise exposure on the project site in terms of the Community Noise Equivalent Level
(CNEL). The long-term noise measurements were taken near the western (LT -1), eastern (LT -2), and
southern (LT -3) extent of the project site and recorded CNELs over the 48-hour measurement period as 73
dBA, 63 dBA, and 60 dBA, respectively.
Figure 10: Noise Measurement Locations
Impact Analysis:
3.12 (a) (Noise Standards) Less Than Significant with Mitigation:
Exterior Noise Levels
Page 64 of 96
September 2016
The proposed project would introduce new residents to a site with existing ambient noise levels that are within
the conditionally acceptable range as identified by the City's General Plan.
The future exterior noise levels at the rear yards of single -family homes backing onto Sonoma Mountain
Parkway are projected to be exposed to a CNEL of 66 dBA, and the side yards of the single -family homes on
the southernmost portion of the site are projected to be exposed to a CNEL of 59 to 63 dBA. Outdoor use
areas at the multi-family residential uses adjacent to Corona Road and the SMART rail line are projected to
be exposed to a CNEL of 73 dBA, and the open space multifamily residential areas adjacent to Sonoma
Mountain Parkway are projected to be exposed to a CNEL of 66 to 67 dBA. Residences exposed to dBA's
below 70 are considered "conditionally acceptable" by the City's General Plan. With this designation,
residential uses are generally permitted following a detailed analysis of the noise reduction requirements and
the identified noise insulation features included in the building design. The multi-family residential uses
adjacent to Corona Road and the SMART rail line are considered "normally unacceptable" by the City's
General Plan.
As the ambient noise environment would expose new residents to exterior noise levels that exceed the
normally acceptable range, a detailed acoustical analysis was prepared by Illingworth and Rodkin and
includes site-specific noise insulation recommendations. In order to reduce potential impacts due to
exceedance of an established noise standard the project shall implement Mitigation Measure N0I-1, which
requires that double sided wood fencing, gabion wall barrier or other acceptable noise attenuation barrier be
utilized in order to reduce exterior noise to acceptable levels (e.g. 60 dBA for single -family homes and 65 dBA
for multi-family). Although the proposed project has the potential to introduce new residents onsite to
conditionally acceptable noise level, implementation of mitigation measure NOI-1 will ensure that potential
impacts are reduced to acceptable exterior noise levels. Therefore, with measure NOI-1 impacts due to noise
exposure will be reduced to less than significant levels.
Interior Noise Levels
The project has the potential to expose the interiors of residences on portions of the project site to noise
levels that exceed the City required interior noise standard of 45 dBA, which would be considered a
potentially significant impact if not properly mitigated. The lower floor of new residences would be protected
by exterior noise mitigation (NOI-1), which requires noise barriers to achieve outdoor noise levels of 60 dBA
and 65 dBA for single -family and multi-family areas respectively. The outdoor to indoor noise attenuation of
standard construction reduces noise levels by 15 dBA with windows open and up to 25 dBA with windows
closed. Areas where exterior noise barrier are provided would adequately attenuate outdoor to indoor noise
level to acceptable standards. However, upper stories and locations where exterior noise barriers are not
provided could potentially be exposed to elevated interior noise levels if not mitigated.
Upper floors of two story single -family homes and the multi-family residences with views of Sonoma Mountain
Parkway would be exposed to levels of up to 67 dBA CNEL. The upper floors of two story single family homes
with a view of the SMART rail line would be exposed to levels of up to 63 dBA CNEL, and multi-family
residences with views of SMART rail line and/or Corona Road would be exposed to levels of up to 73 dBA
CNEL. Since portions of the fagade would be exposed to noise levels in excess of 65 dBA, there is a potential
that indoor noise level will not achieve the standard of 45 dBA, which would be considered a potentially
significant impact.
In order to reduce interior noise levels to acceptable standards, the project shall implement Mitigation
Measure N0I-2, which requires the incorporation of forced air mechanical ventilation systems, sound rated
windows and doors, and exterior wall assemblies on units facing noise sources (e.g. Sonoma Mountains
Parkway, Corona Road, and the SMART Corridor). Based on preliminary calculations a standard insulated
stud wall with wood exterior and sheetrock interior (STC 39) is expected to be satisfactory. However, interior
noise levels vary depending on the construction materials, technique and final building envelope. In order to
ensure that the City's interior noise standards are achieved NOI-2 also requires design level analysis
demonstrating interior level of 45-dBA or less. Minimum sound transmission class (STC) rating of 28 and STC
30-32 are recommended in the preliminary noise report on a unit by unit basis. The minimum STC sound
rated windows and doors as recommended would be effective in reducing noise levels below established
standard. With implementation of mitigation measure NOI-2 below, interior noise levels can be reduced to
below 45 dBA. Therefore, impacts due to exposure to excessive noise level would be mitigated and impacts
Page 65 of 96
September 2016
would be less than significant.
Although implementation of NOI-2 will reduce interior noise levels from traffic along project area roadways,
noise generated by fright and commuter rail service along the SMART rail corridor has the potential to exceed
interior noise standard without enhanced noise attenuation measures. The project site is bounded on the
south by the SMART rail corridor, which currently supports freight service and is planned to introduce
commuter rail service by 2017. Railway noise is generated by train engines and by train horns, which are
required to be sounded when approaching an at -grade crossing. The SMART tracks cross at grade over
Corona Road near the project site. Although, the City and SMART are working towards implementing a Quiet
Zone within City limits, which would preclude sounding horns when approaching at -grade crossing, it is
unknown at this time when and if Quite Zones will be developed at the Corona Road at grade crossing. In
order to ensure that noise generated by activity along the SMART corridor does not result in an exceedance
of an interior noise standard Mitigation Measure NOI-3 shall be implemented. NOI-3 sets forth requirements
both with and without implementation of Quiet Zones and includes the use of enhanced exterior window
glazing and acoustical exterior wall upgrades as specified below. With implementation of NOI-3, as well as
NOI-1 and NOI-2 as described herein, potential impacts due to exposure of new residents to excess noise
levels will be reduced to levels below significance.
Mitigation Measure:
NOI-1. To reduce noise levels noise levels in the rear yards of single-family homes to a CNEL of 60 dBA the
following noise barriers shall be incorporated into the project design as specified below:
A noise barrier with a minimum top of wall elevation of six (6) feet above yard grade level on
the rear and side yard property lines of the single-family residential lots 18 to 25 and 61 along
Sonoma Mountain Parkway and on the side yard property lines of single-family residential
lots 1, 9, and 47.
To reduce noise levels in the outdoor activity and open space areas designated for the multi -family
homes to a CNEL of 65 dBA the following shall be incorporated into the project design as specified
below:
A noise barrier with a minimum elevation of eight (8) feet above residential grade level on the
property lines of the multi -family residential areas along the SMART rail line and Corona
Road.
3. A noise barrier with a minimum elevation of six (6) feet above residential grade level on the
property lines of the multi -family residential areas along Sonoma Mountain Parkway.
Noises barriers shall be constructed without cracks or gaps in the face or base, or where they adjoin
structures. To be effective, noise barriers shall have a minimum surface weight of 3.0 pounds per
square foot. Small, dispersed gaps for landscape irrigation or drainage are acceptable so long as they
do not exceed more than 0.5% of the total barrier face. Acceptable noise barriers include double
sided wood fencing, Gabion Walls or other means with demonstrated noise attenuation. Double sided
wood fencing shall be comprised of 1 x 8 redwood boards butted to each other and staggered on both
sides of the fence and limited to 6 feet in height along Sonoma Mountain Parkway and at lots 1, 9,
and 47. Along Corona Road, 8 foot high wood fencing shall be provided between buildings. The
Gabion wall, located in the southwestern portion of the site shall be comprised of steel columns
supporting gabion baskets filled with stones and limited to 8 feet in height.
For expanded detail on the characteristics of these barrier walls and figures of where they will be
placed, refer to the technical report prepared by Illingworth and Rodkin2.
2 Environmental Noise Assessment Prepared By Illingworth & Rodkin, September 2016.
Page 66 of 96
September 2016 . ��
NOI-2. In order to achieve interior noise standard of 45 dBA CNEL the following shall be implemented:
Some form of forced air mechanical ventilation, satisfactory to the local building official, shall
be required in all residences with partial or full line of sight to the SMART rail line, Corona
Road traffic, and/or Sonoma Mountain Parkway traffic.
Given the anticipated exterior noise levels along Sonoma Mountain Parkway, Corona Road,
and the SMART rail line, sound -rated windows and doors at single family homes on lots 1, 9,
10, 18 through 25, 47 through 51, and 61 and at the multi -family residences facing or
perpendicular to Sonoma Mountain Parkway, Corona Road, and the SMART rail line to
maintain interior noise levels at or below 45 dBA CNEL. The degree of sound mitigation
needed to achieve an interior CNEL of 45 dBA or less would vary depending on the final
design of the building (relative window area to wall area) and the design of the exterior wall
assemblies. However, based on the future exterior noise levels and typical residential
construction, we would expect that windows and doors facing or with a view of Sonoma
Mountain Parkway, Corona Road, and the SMART rail line may require STC ratings of
between 28 and 32.
The specific determination of exterior wall assemblies and window/door STC ratings shall be
conducted on a unit -by -unit basis during the project design. The results of the analysis,
including the description of the necessary noise control treatments, shall be submitted to the
City along with the building plans and approved prior to issuance of a building permit.
NOI-3. In order to achieve an interior noise standard of 45 dBA CNEL and/or the recommended sleep
disturbance/annoyance criteria of 55 dBA Lmax the following shall be implemented:
1. With Quite Zone Implementation: To reduce interior maximum levels due to train engine
noise to the recommended 55 Lmax levels, windows with STC ratings of between 30 and 32
shall be provided in the single-family residences with views of the SMART corridor and
windows with STC rating of between 32 and 34 shall be provided in the multi -family
residences with view of SMART corridor and adjacent to Corona Road at grade crossing.
2. Without Quite Zone Implementation: To reduce interior maximum levels due to train horn and
engine noise to the recommended 55 Lmax levels, the exterior walls of the exposed
residences shall provide for acoustical upgrades to allow for 50 to 55 STC ratings (as
appropriate). With upgraded exterior walls, windows with STC ratings of between 36 and 38
shall be provided in the single-family residences with views of the SMART corridor and
windows with STC rating of 40 shall be provided in the multi -family residences with views of
the SMART corridor and adjacent to Corona Road at grade crossing.
3.12 (b) (Groundbourne Vibration and Noise) Less Than Significant Impact: Construction activities
would include site preparation work such as grading and the installation of utilities, foundation work, and new
building framing. Construction techniques that generate the highest vibration levels, such as impact or
vibratory pile driving are not expected at this project. Construction activities would generally occur at
distances of 200 feet or more from the nearest residential units, but activities near the eastern and northern
project perimeter could occur at distances of as close as 100 to 130 feet from existing residential units.
Construction activities at these distances are not expected to generate vibration levels exceeding 0.05 in/sec
peak particle velocity (PPV), which is well below the 0.50 in/sec PPV vibration limit set by the California
Department of Transportation.
In areas where vibration would not be expected to cause structural damage, vibration levels may still be
perceptible. However, as with any type of construction, this would be anticipated and it would not be
considered significant given the intermittent and short duration of the phases that have the highest potential of
producing vibration Qackhammers and vibratory rollers). By use of administrative controls such as notifying
adjacent land uses of scheduled construction activities and scheduling construction activities with the highest
potential to produce perceptible vibration to hours with the lowest potential to affect nearby residences,
perceptible vibration can be kept to a minimum and as such would not result in a significant impact with
September 2016 R _ �
respect to perception.
Information provided in the Draft EIR for the SMART project indicates that at distances between 20 and 100
feet from the tracks, vibration levels may be perceptible; however, they are expected to produce a RMS
vibration velocity of less than 0.01 inches per second, which equates to a level of 68 VdB level, which is less
than the applicable Federal Transit Administration impact significance criteria for residential uses. Therefore
impacts due to groundborn vibration or noise would be less than significant.
Mitioation Measure: None required.
3.12 (c) (Ambient Noise Levels) Less Than Significant Impact: A significant impact would be identified if
traffic generated by the project would substantially increase noise levels at sensitive receivers in the vicinity. A
substantial increase would occur if the project traffic on area roadways were to result in a noise level increase
of 4 dBA CNEL or greater. In order to cause a 4 dBA increase in noise along area roadways, the project
would have to generate enough traffic to more than double current roadway volumes. Given the size of the
proposed project, limited to 199 residential units, traffic volumes will not increase substantially on project area
roadways. Traffic noise levels from new residents will not be elevated by 4 dBA and impacts due to an
increase in ambient noise levels would be less than significant.
Mitigation Measure: None required.
3.12 (d) (Temporary or Periodic Noise Increase) Less Than Significant Impact with Mitigation: The
noise report prepared by Illingworth and Rodkin determined that construction of the project would generate
noise and would temporarily increase noise levels at adjacent residential receivers. Noise impacts resulting
from construction depend on the noise generated by various pieces of construction equipment operating on
site, the timing and duration of noise generating activities, and the distance between construction noise
sources and noise sensitive receptors. Construction of the project would involve site improvements, such as
the removal of existing structures and pavement, establishment of utilities, excavation of fuel tanks and
foundations, building erection, paving, and landscaping. The hauling of excavated material and construction
materials would also generate truck trips on local roadways. Construction activities are typically carried out in
stages. Construction noise levels would vary by stage and vary within stages based on the amount of
equipment in operation and location where the equipment is operating. Most demolition and construction
noise is in the range of 80 to 90 dBA at a distance of 50 feet from the source. The nearest noise sensitive
uses will be between 100 and 130 feet from the closest project construction activities. Average noise levels at
this distance would range from 79 to 81 dBA during busy construction periods. In order to ensure that
construction related noise is reduced to the greatest extent practicable Mitigation Measure NOI-4, as set for
below shall be implemented.
With the implementation of NO[ -4, and the limited duration of the noise generating construction period, the
temporary increase in ambient noise levels associated with construction activities would be reduced to less
than significant levels.
Mitigation Measure:
NOI-4. Construction activities shall comply with the following measures and all shall be noted on construction
documents:
Pursuant to the Municipal Code, restrict noise -generating activities at the construction site or
in areas adjacent to the construction site to the hours between 7:00 a.m. and 10:00 p.m.,
Monday through Friday and 9:00 a.m. to 10:00 p.m. on Saturday, Sunday and State, Federal
or Local Holidays.
Equip all internal combustion engine driven equipment with intake and exhaust mufflers that
are in good condition and appropriate for the equipment.
Page 68 of 96
September 2016 /� ��
Locate stationary noise generating equipment (e.g., compressors) as far as possible from
adjacent residential receivers.
Acoustically shield stationary equipment located near residential receivers with temporary
noise barriers.
5. Utilize "quiet" air compressors and other stationary noise sources where technology exists.
6. The contractor shall prepare a detailed construction plan identifying the schedule for major
noise -generating construction activities. The construction plan shall identify a procedure for
coordination with the owner/occupants of nearby noise sensitive residential land uses so that
construction activities can be scheduled to minimize noise disturbance.
7. Generators: No generators shall be utilized during nighttime hours (I.e., sunrise to sunset) to
power equipment (e.g., security surveillance) when normal construction activities have
ceased for the day. All such equipment should be powered through temporary electrical
service lines.
8. Designate a "disturbance coordinator" responsible for responding to any complaints about
construction noise. The disturbance coordinator will determine the cause of the noise
complaint (e.g., bad muffler, etc.) and will require that reasonable measures be implemented
to correct the problem.
3.12 (e -f) (Airport Noise) No Impact: The project site is not located within a private airstrip, an airport land
use plan or within two miles of a public airport or public use airport and would therefore not expose people
residing or working in the project area to excessive noise levels. The Community Noise Equivalency Level
(CNEL) noise contours from the Petaluma Municipal Airport do not affect the subject site. The project would
not expose people residing or working onsite to significant noise levels generated by the Petaluma Municipal
Airport. Therefore, noise from the Petaluma Airport will have no impact to people residing or working onsite.
Mitigation Measure: None required.
Page 69 of 96
September 2016 6—M
3.13. POPULATION AND HOUSING:
Would the1 ro ect:
p
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a) Induce substantial growth in an area, either directly
(for example, by proposing new homes and
❑
❑
®
❑
businesses) or indirectly (for example, through
extension of roads or other infrastructure)?
b) Displace substantial numbers of existing housing,
necessitating the construction of replacement housing
elsewhere?
❑
❑
®
❑
c) Displace substantial numbers of people, necessitating
the construction of replacement housing elsewhere?
❑
❑
®
❑
Sources: 2025 General Plan and EIR; City of Petaluma 2015-2023 Housing Element;
and Memorandum of
Understanding Brody Ranch Subdivision Inclusionary Zoning Units, August 5, 2016.
Setting:
The City of Petaluma General Plan 2025 proposes development of approximately 6,000 additional residential
units and a buildout population of approximately 72,700. This represents an annual growth rate of nearly 1.2%
per year. The City of Petaluma 2015-2023 Housing Element identifies the Brody Ranch Subdivision project
site as an underutilized Residential Land Inventory Opportunity Site (Site #2). Per the Housing Element, the
site exhibits an estimated housing potential of 300 units, as outlined in Table 6: Vacant and Underutilized
Sites. As such, the Brody Ranch project site is identified as a key development opportunity site to enhance
the City's housing stock including accommodation of low- and moderate -income housing.
The project proposed to construct 199 dwelling units on the site, including 138 multi -family condominium units
59 single-family homes and a duplex. The project proponent will develop 25 affordable housing units including
21 condominiums consisting of a mix of one, two and three bedroom units, as needed, dispersed throughout
the nine buildings; a duplex; and two single family homes. The affordable units shall be restricted to
households with low- to moderate- income earners (80% to 120% of Area Median Income). Resale of all
affordable units will be restricted to lower income households at affordable prices via a 99 -year renewable
ground lease.
Impact Analysis:
3.13 (a) (Substantial Growth) Less Than Significant Impact: The project site is located within the UGB and
will not directly or indirectly induce substantial growth beyond what has already been anticipated in the
General Plan and EIR. The Housing Element states that within Petaluma, the average household size is 2.70
persons. As a project that would introduce 199 new residential units and based on the average household
size, it is expected that approximately 537 persons would reside on the site at buildout, which does not
necessarily constitute the addition of 537 new persons to the City's population, as some may relocate from
nearby areas within the City. The projected population does not constitute a substantial increase and remains
sufficiently below the General Plan 2025 population projections. The project site is surrounded by existing
development and serves as one of the few remaining housing opportunity sites identified in the Housing
Element. The extension of utilities will be limited to provide services to the subject property and will not extend
services to areas where services were previously unavailable. Development of the proposed Brody Ranch
Subdivision is consistent with the General Plan, EIR, and Housing Element and the density evaluated therein.
Page 70 of 96
September 2016 4_1
Therefore, the project will have less than significant impacts related to growth inducement.
Mitigation Measures: None required.
3.13 (b -c) (Housing or Person Displacement) Less Than Significant Impact: At present the project site
contains two existing residences, a welding shop, several barns, and auxiliary buildings. While the Project
would result in the demolition of these existing residences and structures onsite, it is not considered a
significant displacement of people or houses. Furthermore, the proposed project will introduce 199 new
residential units with various housing stock options that would otherwise be unavailable. Given the City's need
for housing units, and project's proposal to introduce 199 new units including affordable units, the removal of
the 2 existing residences is not considered a potentially significant impact and will not necessitate the
construction of replacement housing elsewhere. The project implements the City's Housing Element by
contributing 199 new residential units to the existing housing stock within the City of Petaluma. Therefore, the
project will result in a less than significant impact due to displacing a substantial number of people or existing
housing units.
Mitigation Measures: None required.
3.14. PUBLIC SERVICES:
Would the project result in substantial adverse physical
impacts associated with the provision of new or
physically altered governmental facilities, need for new or
physically altered governmental facilities, the
construction of which could cause significant
environmental impacts, in order to maintain acceptable
service ratios, response times or other performance
objectives for any of the public services:
a) Fire protection?
b) Police protection?
c) Schools?
d) Parks?
e) Other public facilities?
Sources: 2025 General Plan and EIR.
Setting:
Less Than
Potentially Significant Less than
Significant with Significant No Impact
Impact Mitigation Impact
Implemented
❑
❑
®
❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
®
❑
❑ ❑ ❑
The City of Petaluma charges one-time impact fees on new private development in order to offset the cost of
improving or expanding City facilities to accommodate the demand generated by new development. Impact
fees are used to fund the construction, expansion or maintenance of fire and police protection services, open
space, parkland, schools and other public services. Development impact fees are necessary in order to
finance required public facilities and service improvements and to pay for new development's fair share of the
costs of the required public facilities and service improvements.
Page 71 of 96
September 2016
Impact Analysis:
3.14 (a -b) (Fire & Police Protection) Less Than Significant: The project site is located in the North East
Planning Subarea of the General Plan, in an already developed area that is well served by public services.
The increase in residents resulting from the proposed Brody Ranch Subdivision project will result in elevated
demands for onsite police and fire service protection. However, increased demands on fire and police service
have been anticipated as part of General Plan buildout and are accounted for with the Fire Suppression
Facilities impact fee and Law Enforcement Facilities fee that are intended to offset the impacts of growing
demand for fire and policing services.
General Plan Policy 7-P-19 establishes a four -minute travel time and a six -minute response time for
emergencies within the city. The project site is located less than 1,000 feet to the northeast of existing Fire
Station 2, which is located at 1001 N. McDowell Boulevard at Corona Road. As such, the project is well within
the response radii (see General Plan EIR Figure 3.4-2) and travel time to the site is achievable within the
targeted 4 minutes. The project is consistent with the General Plan 2025 because of the redundancy of
approach access, the ability of emergency response vehicles to override traffic controls with lights, sirens, and
signal pre-emption, and their ability to travel in opposing travel lanes in congested conditions. The addition of
project trips to the adjacent street network is not expected to cause a reduction in travel speeds sufficient to
cause significant delays for emergency vehicles.
Although additional fire and/or police service calls may occur as a result of the project, substantial new fire
protection or police protection facilities will not be warranted to maintain services. As a standard condition of
project approval, the applicant shall pay all development impact fees applicable to a residential development
project, including fire suppression facilities and law enforcement facilities. These funds are sufficient to offset
any cumulative increase in demands to fire and police protection services and ensure that impacts from new
development are less than significant.
Mitigation Measures: None required.
3.14 (c) (Schools) Less Than Significant Impact: The Project will not result in substantial adverse physical
impacts or require new school facilities. The project site is located within the Waugh Elementary School
District and about equidistant between Corona Elementary School to the north and Meadow Elementary
School to the east. The General Plan projects that the Waugh Elementary School District will experience a
substantial decrease in enrollment by buildout, and that overall projected enrollment would not exceed the
existing capacity of the public elementary schools located within the city limits. At General Plan buildout,
which anticipated the Brody Ranch Subdivision, the projected enrollment for public elementary schools would
decline and would utilize 93.9 percent of school enrollment capacity. As such, sufficient school facilities are in
place to accommodate any increase in enrollment associated with development of the proposed Brody Ranch
Subdivision. Additionally, the project is subject to the payment of statutory school impact fees to offset any
cumulative impacts on the school system. Therefore, the proposed project will have less than significant
impacts to schools.
Mitigation Measures: None required
3.14 (d) (Parks) Less Than Significant Impact: The City has adopted a citywide parks standard of 5 acres
of parkland per 1,000 residents. Turnbridge Neighborhood Park is adjacent to the eastern extent of the project
area; McDowell Meadows, Meadow View, and Maria & Sonoma Mountain Parkway parks are each within one
mile of the project site; and Lucchesi Community Park is located approximately 1.5 miles southeast of the
project site. These existing neighborhood and community parks provide recreation opportunities to future
residences. Additionally, there is an existing pedestrian path along the Corona Creek which will connect to
existing sidewalk and paths proposed as part of the Brody Ranch Project.
The project proposes the construction of 200 residential units comprised of both multi -family units and single-
family homes. Additionally, the project includes onsite passive and recreational amenities consisting of
walking paths along the wetland area to be preserved as open space and an area that would accommodate a
Page 72 of 96
September 2016
picnic area, tot -lot or additional public open space.
These proposed amenities are identified along the southern and eastern portion of the proposed development
footprint, would be open to the public and would provide connectivity to the existing path along Corona Creek.
The Petaluma General Plan 2025 anticipates that, at buildout, population increases would not substantially
impact the parkland ratio or adversely impact recreational amenities. As the Brody Ranch Subdivision was
anticipated by the General Plan its development would not constitute a substantial growth in population.
Existing and proposed park facilities are expected to be sufficient to meet active and passive recreational
demands of new residents. A substantial adverse impact to park facilities is not expected to occur from
implementation of the subject project. Therefore, impacts to park lands due to project implementation will be
less than significant.
Mitigation Measures: None required.
3.14 (e) (Other Public Facilities) No Impact: The Project will not result in substantial adverse impacts
associated with any other public facilities. The proposed project site is surrounded by established residential
land uses, and is already well served by existing public services. The project will not generate a substantial
increase in demands that warrant the expansion or construction of new public facilities beyond what has been
anticipated by buildout of the General Plan. Therefore, no impacts related to other public facilities will occur as
a result of the proposed Brody Ranch Subdivision.
Mitigation Measures: None required.
Page 73 of 96
September 2016 2
3.15. RECREATION
Less Than
Potentially Significant Less than
Significant with Significant No Impact
Would the project: Impact Mitigation Impact
Incorporated
a) Would the project increase the use of
existing neighborhood and regional parks or ❑ ❑ ® ❑
other recreational facilities such that
substantial physical deterioration of the
facility would occur or be accelerated?
b) Does the project include recreational facilities
or require the construction or expansion of
recreational facilities which might have an ❑ ® ❑ ❑
adverse physical effect on the environment?
Sources: 2025 General Plan: Figure 6-1 Parks and Open Space; General Plan EIR; and Landscaping Plan for Brody
Ranch Subdivision L-1 through L-3.
Setting:
The City of Petaluma contains approximately 1,400 acres of parks and open spaces, which represents
approximately 17% of the acreage within the UGB. The public parks and recreational opportunities within the
UGB accommodate a wide range of uses and activities that include both active and passive recreation.
Parkland development and open space acquisition impact fees are required and offset any cumulative
impacts of new development on recreational resources.
Impact Analysis:
3.15 (a) (Park Deterioration) Less Than Significant Impact: The proposed project may result in a minimal
increase in the use of nearby parks which include Turnbridge Neighborhood Park, McDowell Meadows,
Meadow View, Maria & Sonoma Mountain Parkway, and designated open space areas; all of which are
located within approximately one mile of the project site. The nearby parks have sufficient capacity to
accommodate additional use by new residents. Increased patronage to these parks and open space areas,
and/or other parks within the UGB, would not result in substantial physical deterioration of facilities nor would
deterioration be accelerated. The project is not expected to substantially increase the use of existing parks or
recreational facilities therefore impacts would be less than significant.
Mitigation Measures: None required.
3.15 (b) (Recreation Facilities) Less than Significant Impact with Mitigation: The project proposes the
construction of on-site recreational facilities, including a redwood grove, common open space area, and a
possible picnic area, tot lot or other open space amenity (the specific design of these areas will be developed
through a subsequent Site Plan and Architectural Review stage, however preliminary design identifies their
location and conceptual design). Additionally, the project proposes several open space areas, seating areas,
and a 10 -foot wide shared pathway that will meander around the large wetland area to be preserved as open
space. The Brody Ranch Subdivision improvements will result in the fill to approximately 0.185 acres of
wetlands as described above in the Biological Resources discussion. The meandering trail along the wetland
is designed to provide a 10 -foot landscape setback from the edge of the wetland where no landscaping will be
permitted. Additionally, the project provides a 25 -foot landscape setback from the wetland within which non -
Page 74 of 96
September 2016 AT4
native planting are prohibited, rather all plantings within this buffer zone must be California natives. Project
plans further specify that irrigation within the 25 -foot setback will be provided by drip irrigation at surface
grade and no trenched irrigation will be permitted.
The project does not include the construction of any off-site recreational facilities that may adversely affect the
environment. The new path would connect with an existing path running along the northwestern bank of
Corona Creek. The construction of this pathway does have the potential to expose existing wetlands,
considered an environmentally sensitive habitat, to increased pedestrian traffic. As such, Measures BIO -4 and
BIO -5 as described in Section 3.4 above, are required in order to mitigate potential impacts to onsite wetlands
as a result of the project. Based on the above and with implementation of Mitigation Measures, potential
physical effects on the environment as a result of any new recreational facility will be reduced to less than
significant levels.
Mitigation Measures: Other than BIO -4 and BIO -5 above, no additional Mitigation Measures are required.
Page 75 of 96
September 2016
3.16. TRANSPORTATION AND CIRCULATION
Would the project:
p
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less than
Significant No Impact
Impact
a) Conflict with an applicable plan, ordinance or policy
establishing measures of effectiveness for the
performance of the circulation system, taking into
account all modes of transportation including mass
❑
❑
® ❑
transit and non -motorized travel and relevant
components of the circulation system, including but
not limited to intersections, streets, highways and
freeways, pedestrian and bicycle paths, and mass
transit?
b) Conflict with an applicable congestion
management program, including, but not limited to
level of service standards and travel demand ❑ ® ❑
measures, or other standards established by the
county congestion management agency for
designated roads or highways?
c) Result in a change in air traffic patterns, including
either an increase in traffic levels or a change in ❑ ❑ ® ❑
location that results in substantial safety risks?
d) Substantially increase hazards due to a design
feature (e.g., sharp curves or dangerous ❑ ❑ ® ❑
intersections) or incompatible uses (e.g., farm
equipment)?
e) Result in inadequate emergency access? ❑ ❑ ® ❑
f) Conflict with adopted policies, plans, or programs
regarding public transit, bicycle, or pedestrian ❑ ❑ ® ❑
facilities, or otherwise decrease the performance or
safety of such facilities?
Sources: 2025 General Plan and EIR; GP Figure 5-1; Brody Ranch Subdivision Traffic Impact Study, Prepared by W -
Trans, May 26, 2016.
Setting:
The City of Petaluma is bisected by U.S. 101, which serves as the primary route between San Francisco and
Marin and Sonoma Counties. U.S. 101 accommodates over 92,000 vehicles per day within Petaluma. The
circulation system within the City of Petaluma consists of approximately 140 miles of streets including,
arterials, collectors, connectors, and local streets.
The Petaluma General Plan 2025 provides the following policies with regard to mobility:
Page 76 of 96
September 2016 j� �1
Policy 5-P-8 The priority of mobility is the movement of people within the community including the
preservation of quality of life and community character.
A. Develop formal transportation impact analysis guidelines that consider multi -modal
impacts of new developments.
B. Develop and adopt multi -modal level of service standards that examine all modes
and vary the standards by facility type to imply a preference to selected modes based
upon the context (including street type and location).
C. LOS analysis data shall utilize the peak hour (60 minutes) rather than the peak period
(15 minutes) for determining intersection LOS.
Policy 5-P-10 Maintain an intersection level of service (LOS) standard for motor vehicle circulation that
ensures efficient traffic flow and supports multi -modal mobility goals. LOS should be
maintained at Level D or better for motor vehicles due to traffic from any development project.
A. A lower Level of Service may be deemed acceptable, by the City, in instances where
the City finds that potential vehicular traffic mitigations (such as adding additional
lanes or modifying signal timing) would conflict with the Guiding Principles of the
General Plan, particularly with regard to:
Guiding Principle #2. Preserve and enhance Petaluma's historic character.
Guiding Principle #6. Provide a range of attractive and viable transportation
alternatives, such as bicycle, pedestrian, rail and transit.
Guiding Principle V. Enhance Downtown by preserving its historic character,
increasing accessibility, and ensuring a broad range of business and activities and
increasing residential activities.
The above does not relieve any need to mitigate development related impacts, which may
include multi -modal improvements to reduce identified impacts.
Because the City of Petaluma has not implemented General Plan Policy 5-P-8, this Initial Study addressed
LOS with respect to passenger vehicles only. When assessing the LOS of passenger vehicles, this Initial
Study applies the following thresholds of significance of the General Plan EIR: ,
City Roadway and Intersection Impact Criteria
Traffic impacts are identified as significant if the project would cause:
Operations (LOS) at a signalized intersection to deteriorate from an acceptable level (LOS C or
better) under conditions without the project to an unacceptable level (LOS D, E, or F);
2. For signalized intersections that operate at an LOS D or E under conditions without the project, the
LOS to deteriorate to the next lowest level;
3. For signalized intersections operating at LOS F without the project, any additional vehicle trips to the
intersection;
4. For unsignalized intersections operating acceptably (LOS C or better) under conditions without the
project, the LOS to deteriorate to unacceptable (LOS D, E, or F) conditions AND the traffic volumes at
the intersection would satisfy the Caltrans peak -hour volume warrant criteria for traffic signal
installation; or
Page 77 of 96
September 2016 A-11
5. For unsignalized intersections operating at unacceptable levels (LOS D, E, or F) under conditions
without the project, average delay to increase by five or more seconds AND the traffic volumes at the
intersection would satisfy the Caltrans peak -hour volume warrant criteria for traffic signal installation.
U.S. 909 Impact Criteria
Significant traffic impacts on freeway segments are identified as when a project causes:
The volume on the freeway segment to exceed its capacity (Cause LOS E or better to deteriorate to
LOS F); or
An increase in the amount of traffic on a freeway segment already exceeding its capacity by more
than one percent of the freeway segment's design capacity.
Existinq Conditions
Passenger Vehicles
The project site is located northeast of U.S. 101 and is bound by Corona Road to the west, Sonoma Mountain
Parkway to the north, and Wellington Place to the east. The Traffic Impact Study (TIS) prepared by W -Trans
(see Appendix K) for the project addresses LOS at the following eight study intersections:
1. Old Redwood Highway/North McDowell Boulevard
2. Petaluma Boulevard North/Skillman Lane -Corona Road
3. North McDowell Boulevard/Corona Road
4. Sonoma Mountain Parkway/Corona Road
5. Sonoma Mountain Parkway/Wellington Place
6. East Washington Street/US 101 Southbound Ramps
7. East Washington Street/US 101 Northbound Ramps
8. East Washington Street/McDowell Boulevard
The location of these study intersection in relation to the project is shown at Figure 11 below. The existing LOS
for each study intersection without the project is shown at Table 7 below.
rays � u vi vv
September 2016 —�
Figure 11: Study Area Intersections
Table 7. Existing Peak Hour Intersection Levels of Service
Study Intersection
AM Peak
PM Peak
Delay
LOS
Delay
LOS
1. Old Redwood Hwy/N McDowell Blvd
21.9
C
25.2
C
2. Petaluma Blvd N/Skillman Ln -Corona Rd
39.4
D
37.6
D
3. N McDowell Blvd/Corona Rd
31.8
C
41.4
D
4. Sonoma Mountain Pkwy/Corona Rd
7.6
A
7.7
A
5. Sonoma Mountain Pkwy/Wellington PI
Eastbound Approach
0.5
13.3
A
B
0.3
14.6
A
B
6. E Washington St/US 101 SB Ramps
26.3
C
30.3
C
7. E Washington St/US 101 NB Ramps
6.9
A
17.4
B
8. E Washington St/McDowell Blvd
30.9
C
38.7
D
Source: Traffic Impact Study for the Brody Ranch Subdivision, prepared by W -Trans, May 26, 2016.
Page 79 of 96
September 2016 A-19
Baseline Conditions
As part of the analysis provided by the TIS, Baseline Conditions were assessed to represent operation with
the addition of traffic added by other known projects that will become operational and add trips to the study
area over the next two or three years. Expected traffic expected to be generated from these projects were
then added to existing volumes in order to determine Baseline volumes. As shown in Table 8 below, the
intersection at East Washington Street/McDowell Boulevard is expected to operate unacceptably at LOS E
during the p.m. peak period.
Table 8. Baseline Peak Hour Intersection Levels of Service
Study Intersection
AM Peak
PM Peak
Delay
LOS
Delay
LOS
1. Old Redwood Hwy/N McDowell Blvd
22.7
C
25.9
C
2. Petaluma Blvd N/Skillman Ln -Corona Rd
40.0
D
39.0
D
3. N McDowell Blvd/Corona Rd
32.6
C
44.3
D
4. Sonoma Mountain Pkwy/Corona Rd
8.3
A
8.5
A
5. Sonoma Mountain Pkwy/Wellington PI
Eastbound Approach
0.7
13.4
A
B
0.4
14.6
A
B
6. E Washington St/US 101 SB Ramps
29.9
C
53.4
D
7. E Washington St/US 101 NB Ramps
6.0
A
11.6
B
8. E Washington St/McDowell Blvd
39.6
D
70.6
E
Source: Traffic Impact Study for the Brody Ranch Subdivision, prepared by W -Trans, May 26, 2016.
Future Conditions
The project's TIS presents a Future Condition for circulation as envisioned at buildout of the City's General
Plan. The General Plan was developed with a horizon year of 2025. However, due to changes in economic
conditions since the General Plan was completed in 2008, it is expected that build -out of the General Plan
land uses would occur after 2025. For this reason, the horizon year for future projections is considered to be
at least 2035.
As seen in Table 9 below, study area intersections are expected to operate acceptably at LOS D or better
during the two peak hour periods. While the intersection of East Washington Street/McDowell Boulevard is
expected to operate unacceptably under Baseline Conditions, it is projected to operate acceptably in the
future after completion of the planned Rainer Interchange, which will provide an east -west crossing of US 101
along with a mid -city connection to US 101.
Page 80 of 96
September 2016 N_Q®
Table 9. Future Peak Hour Intersection Levels of Service
Study Intersection
AM Peak
PM Peak
Delay
LOS
Delay
LOS
1. Old Redwood Hwy/N McDowell Blvd
9.2
A
6.3
A
2. Petaluma Blvd N/Skillman Ln -Corona Rd
51.1
D
47.7
D
3. N McDowell Blvd/Corona Rd
40.3
D
38.5
D
4. Sonoma Mountain Pkwy/Corona Rd
8.4
A
8.3
A
5. Sonoma Mountain Pkwy/Wellington PI
Eastbound Approach
0.5
14.0
A
B
0.3
15.4
A
C
6. E Washington St/US 101 SB Ramps
28.0
C
29.0
C
7. E Washington St/US 101 NB Ramps
10.6
B
16.8
B
8. E Washington St/McDowell Blvd
34.5
C
44.3
D
Source: Traffic Impact Study for the Brody Ranch Subdivision, prepared by W -Trans, May 26, 2016.
Impact Analysis:
3.16 (a) (Plan, Policy, Ordinance: Circulation System) Less Than Significant Impact: As mentioned in
the setting section above, the project's TIS evaluates effects on LOS at eight study intersections for three
scenarios: Existing Conditions, Baseline Conditions, and Future Conditions. The project is expected to
generate an average of 1,489 trips per day, including 115 trips during the a.m. peak hour and 146 during the
p.m. peak hour. The following narrative summarizes the outcome of the LOS analysis.
Existing Conditions/Existing Plus Proiect
Upon the addition of project -related traffic to the Existing volumes, study intersections are expected to
continue operating at the same levels of service as without the project during the a.m. and p.m. peak hours.
The results from the TIA analysis are shown in Table 10 below.
Page 81 of 96
September 2016 p r p I
Table 10. Existing and Existing Plus Project Peak Hour Intersection Levels of Service
Study Intersection
Existing Conditions
Existing plus Project
AM Peak
PM Peak
AM Peak
PM Peak
Delay
LOS
Delay
LOS
Delay
LOS
Delay
LOS
1. Old Redwood Hwy/N McDowell Blvd
21.9
C
25.2
C
22.2
C
25.2
C
2. Petaluma Blvd N/Skillman Ln -Corona
39.4
D
37.6
D
40.6
D
38.2
D
3. N McDowell Blvd/Corona Rd
31.8
C
41.4
D
33.8
C
43.6
D
4. Sonoma Mountain Pkwy/Corona Rd
7.6
A
7.7
A
8.5
A
8.6
A
5. Sonoma Mountain Pkwy/Wellington PI
Eastbound Approach
0.5
13.3
A
B
0.3
14.6
A
B
0.7
13.6
A
B
0.4
14.9
A
B
6. E Washington St/US 101 SB Ramps
26.3
C
30.3
C
27.2
C
30.7
C
7. E Washington St/US 101 NB Ramps
6.9
A
17.4
B
7.1
A
18.6
B
8. E Washington St/McDowell Blvd
30.9
C
38.7
D
31.2
C
39.1
D
Source: Traffic Impact Study for the Brody Ranch Subdivision, prepared by W -Trans, May 26, 2016.
Baseline Conditions/ Baseline plus Proiect Conditions
With project -related traffic added to Baseline volumes, the study intersections are expected to operate
acceptably at the same levels of service as without the project, except East Washington Street/McDowell
Boulevard, which is expected to continue operating unacceptably at LOS E during the p.m. peak hour as
shown below in Table 11.
Baseline Conditions without inclusion of the project are expected to contribute to the intersection at East
Washington Street and McDowell Boulevard operating at unacceptable LOS E, but will be relieved back to
acceptable levels (LOS D) as planned infrastructure improvements are completed under future conditions.
While the project itself does contribute towards the unacceptable level of service E under baseline conditions,
it does not create an new exceedance of unacceptable standards and impacts would be considered less than
significant under the City's significance criteria. Nonetheless, the project will be required to pay traffic impact
fees, which will contribute, to infrastructure improvements including those to reduce congestion at the
intersection of East Washington Street and McDowell Boulevard. Therefore, the project impacts under
baseline conditions would be less than significant.
Page 82 of 96
September 2016 n ^
Table 11. Baseline and Baseline Plus Project Peak Hour Intersection Levels of Service
Study Intersection
Existing Conditions
Existing plus Project
AM Peak
PM Peak
AM Peak
PM Peak
Delay
LOS
Delay
LOS
Delay
LOS
Delay
LOS
1. Old Redwood Hwy/N McDowell Blvd
22.7
C
25.9
C
22.9
C
25.9
C
2. Petaluma Blvd N/Skillman Ln -Corona
40.0
D
39.0
D
33.9
C
46.9
D
3. N McDowell Blvd/Corona Rd
32.6
C
44.3
D
33.9
C
46.9
D
4. Sonoma Mountain Pkwy/Corona Rd
8.3
A
8.5
A
9.5
A
9.7
A
5. Sonoma Mountain Pkwy/Wellington PI
Eastbound Approach
0.7
13.4
A
B
0.4
14.6
A
B
0.9
13.6
A
B
0.6
15.3
A
B
6. E Washington St/US 101 SB Ramps
29.9
C
53.4
D
31.3
C
54.7
D
7. E Washington St/US 101 NB Ramps
6.0
A
11.6
B
6.2
A
12.4
B
8. E Washington St/McDowell Blvd
39.6
D
70.6
E
39.9
D
75.2
E
Source: Traffic Impact Study for the Brody Ranch Subdivision, prepared by W -Trans, May 26, 2016.
Future Conditions/Future plus Project Conditions
As shown below in Table 12, study area intersections will continue operating acceptably with project traffic
added to the roadway network. LOS for each intersection is expected to operate at the same LOS under the
future condition without the project as with the project.
Level of service for the deficient intersection will be relieved as a result of planned infrastructure
improvements under Future Conditions at Buildout of the General Plan. As shown at below, all study area
intersection would operate acceptably at LOS D or better. Therefore, the project would result in a less than
significant impact with regard to LOS under future year conditions.
Page 83 of 96
September 2016 n (�
Table 12. Future and Future Plus Project Peak Hour Intersection Levels of Service
Study Intersection
Existing Conditions
Existing plus Project
AM Peak
PM Peak
AM Peak
PM Peak
Delay
LOS
Delay
LOS
Delay
LOS
Delay
LOS
1. Old Redwood Hwy/N McDowell Blvd
9.2
A
6.3
A
9.3
A
6.4
A
2. Petaluma Blvd N/Skillman Ln -Corona
51.1
D
47.7
D
53.3
D
48.6
D
3. N McDowell Blvd/Corona Rd
40.3
D
38.5
D
48.2
D
43.5
D
4. Sonoma Mountain Pkwy/Corona Rd
8.4
A
8.3
A
9.4
A
9.4
A
5. Sonoma Mountain Pkwy/Wellington PI
Eastbound Approach
0.5
14.0
A
B
0.3
15.4
A
C
0.7
14.3
A
B
0.4
15.7
A
C
6. E Washington St/US 101 SB Ramps
28.0
C
29.0
C
28.2
C
29.4
C
7. E Washington St/US 101 NB Ramps
10.6
B
16.8
B
10.8
B
17.9
B
8. E Washington St/McDowell Blvd
34.5
C
44.3
D
34.9
C
45.3
D
Source: Traffic Impact Study for the Brody Ranch Subdivision, prepared by W -Trans, May 26, 2016.
Mitigation Measures: None required.
3.16 (b) (Congestion Management Plan) No Impact: Sonoma County opted out of performing Congestion
Management Plans in 1997. Thus, the proposed project would not exceed, either individually or cumulatively,
a level of service standard established by the county congestion management agency for designated roads or
highways. No further analysis of this issue is required.
Mitigation Measures: None required.
3.16 (c) (Air Traffic Patterns) No Impact: The project will have no impact on air traffic patterns, given the
nature and location of the residential development, which is well outside of the established airport flight
pattern.
Mitigation Measures: None required.
Page 84 of 96
September 2016 4
3.16 (d) (Design Feature Hazard) Less Than Significant Impact: Access to the project site would be
provided by a street connection on Wellington Place and another to Sonoma Mountain Parkway. Additionally,
the project proposed modifications these roadways at the project site in order to accommodate vehicles and
ensure that safe site access is provide. The project includes installation of a left -turn pocket from Sonoma
Mountain Parkway to the new access roadway across from Mauro Pietro Drive. This adjustment to roadway
geometry will be accommodated by removing the existing right turn striping from Sonoma Mountain Parkway
onto Mauro Pietro Drive and re -striping to include a left4urn pocket, a through/right-turn lane and a bike lane.
The current right -turn lane that would be eliminated was created at the time the roundabout was installed at
Corona Road/ Sonoma Mountain Parkway as a means of dropping one lane of traffic and is not needed for
capacity purposes. Additionally, right turn movement may proceed unencumbered and do not result in
queuing within travel lanes.
Wellington Place will also be modified to ensure sufficient travel width. Currently, parking is allowed on both
sides of Wellington Place, which restricts travel lane width. The project proposed to remove on -street parking
on the west side of Wellington Place in order to maximize travel lane width. A series of bulb in parking stalls
will provide for a few public parking stalls along the project side of Wellington Place.
W -Trans reviewed the project site in order to determine if sight distances from Wellington Place and Sonoma
Mountain Parkway intersection were adequate. Based on site design speed of 25 mph for Wellington Place
the minimum stopping sight distance would be 150 feet. Review of the field conditions verified that sight
distances from Wellington Place are more than adequate. Based on site design speed of 40 mph for Sonoma
Mountain Parkway the minimum stopping sight distance would be 300 feet. Review of the field conditions
identified a potential conflict due to the close proximity of the roundabout. However, it was noted that traffic
speed leaving the roundabout are not expected to exceed 25 mph and these speeds sight distances are
visible for the required 275 feet. In order to ensure that site distance and visibility is maintained with the
introduction of the Brody Ranch Subdivision a condition of approval has been added that requires
landscaping to be maintained with tree canopies at least seven feet above the ground and low lying
vegetation no greater than 3 feet above the ground. Additionally, monument signage will be placed in a
manner that does not interfere with site distances. Therefore impacts due to an introduction of a design
feature hazard will be less than significant.
Mitigation Measures: None required.
3.16 (e) (Emergency Access) Less Than Significant Impact: The project's internal circulation plan has
been reviewed and meets all conditions imposed by the Petaluma Public Works and Fire Departments. Site
circulation was determined to be adequate, including sufficient drive aisle widths to allow for fire truck turn
around and access. Therefore, emergency vehicle access is adequate and potential impacts due to a conflict
with emergency access will be less than significant.
Mitigation Measures: None required.
3.16 (f) (Transit, Bicycle, Pedestrian Facilities) Less Than Significant Impact with Mitigation: Public
transit, bicycle, and pedestrian facilities in the project vicinity will not be substantially impacted by the
proposed development. Sidewalks currently exist along both sides of Sonoma Mountain Parkway, but only
along the south side of Wellington Place. There exists a Class I multi -use path west of the project site (along
Corona Creek) that connects to Wellington Place. The project proposed frontage improvement along Corona
Road including a median and a sidewalk that would extend from the SMART crossing north to Sonoma
Mountain Parkway and tie into the existing sidewalk at that location. Pedestrian connectivity would also be
provided along the southern portion of the project site via a new proposed 10 -foot wide meandering path
located north of the wetlands to be preserved as open space. The path would connect through the project site
to the existing Class I path along Corona Creek. Additionally, a sidewalk would be installed on the west side of
Wellington Place along the project frontage (a sidewalk with landscaping currently exists along the east side of
Wellington Place). Crosswalks are planned across the project access roadways at Sonoma Mountain Parkway
and Wellington Place.
Page 85 of 96
September 2016
Existing Class II bike lanes on Sonoma Mountain Parkway and shared use on Wellington Place would provide
access for bicyclists. Per the City's Bicycle and Pedestrian Master Plan, a Class II bike lane is planned on
Corona Road. An eastbound Class II bike lane would be constructed along the project frontage on Corona
Road, with a bike ramp accessing the Class I path that runs along the perimeter of the roundabout at Sonoma
Mountain Parkway/Corona Road.
Existing transit routes are capable of accommodating project -generated transit trips within the area. Three
separate transit agencies provide regular service to the City of Petaluma: Petaluma Transit, Sonoma County
Transit, and Golden Gate Transit. The project proposed an offsite improvement consisting of the installation of
a bus turnout near the intersection of Willington Place and Sonoma Mountain Parkway. The bus turn out would
provide for loading and loading fully outside of the travel lane and contain a bus shelter and a bench.
Additionally, a Sonoma -Marin Area Rail Transit (SMART) station is proposed near the project site. Sidewalks
along Corona Road are proposed at the project site frontage and would extend to the limits of the project site.
In the future when the planned SMART station site is developed, sidewalk connectivity will be provided and will
connect to the stub out sidewalk at the limit of the Brody Ranch Project site.
The project includes plans to appropriately accommodate pedestrian and bicycle use including connecting
sidewalks and paths along Wellington Place, Corona Road, and internally, and installing a Class II bike lane
along project site's frontage on Corona Road. Existing paths, sidewalks, and bike lanes currently serving the
project site will provide sufficient access to future residents and current residents of the surrounding
residential areas. As a condition of approval the project will be required to install a minimum of 39 bicycle
parking spaces pursuant to Petaluma Zoning Code (Standard 11.090).
Given the proximity of other residences, park space, schools, and the proposed SMART station to the site, it is
reasonable to assume that some project residents will walk, bicycle, and/or ultimately utilize commuter rail
transit once available. Therefore sufficient pedestrian, bicycle and public transit facilities will be available and
impacts would be less than significant.
Mitigation Measures: None required.
Page 86 of 96
September 2016 n ���
3.17. UTILITIES AND SERVICE SYSTEMS
b) Require or result in the construction of new
water or wastewater treatment facilities or ❑ ❑ ® ❑
expansion of existing facilities, the construction
of which could cause significant environmental
effects?
c) Require or result in the construction of new
storm water drainage facilities or expansion of ❑ ❑ ® ❑
existing facilities, the construction of which
could cause significant environmental effects?
d) Have sufficient water supplies available to
serve the project from existing entitlements ❑ ❑ ® ❑
and resources, or are new or expanded
entitlements needed?
e) Result in a determination by the wastewater
treatment provider which serves or may serve
the project that it has adequate capacity to 1:1 ❑ ® ❑
serve the project's projected demand in
addition to the provider's existing
commitments?
f) Be served by a landfill with sufficient permitted El El® El
to accommodate the project's solid
waste disposal needs?
g) Comply with federal, state, and local statutes ❑ ❑ ® ❑
and regulations related to solid waste?
Sources: 2025 General Plan and EIR; City of Petaluma 2015 Urban Water Management Plan; Sonoma County Water
Agency 2010 UWMP; and http://www.scwa.ca.gov/current-water-supply-levels/.
Settings
The City charges one-time impact fees on new private development in order to offset the cost of improving or
expanding City facilities to accommodate the project. Impact fees are used to help fund the construction or
expansion of needed capital improvements due to new development. Petaluma collects impact fees for
wastewater, water capacity, storm drain, and other public utilities and services. As a project located within a
developed area of the UGB, the project site is well served by existing public utilities and will not necessitate
the expansion or enhancement of existing facilities.
Page 87 of 96
September 2016
Less Than
Potentially
Significant
Less than
Would the project:
Significant
with
Significant No Impact
Impact
Mitigation
Impact
Incorporated
a) Exceed wastewater treatment requirements of
❑
❑
® ❑
the applicable Regional Water Quality Control
Board?
b) Require or result in the construction of new
water or wastewater treatment facilities or ❑ ❑ ® ❑
expansion of existing facilities, the construction
of which could cause significant environmental
effects?
c) Require or result in the construction of new
storm water drainage facilities or expansion of ❑ ❑ ® ❑
existing facilities, the construction of which
could cause significant environmental effects?
d) Have sufficient water supplies available to
serve the project from existing entitlements ❑ ❑ ® ❑
and resources, or are new or expanded
entitlements needed?
e) Result in a determination by the wastewater
treatment provider which serves or may serve
the project that it has adequate capacity to 1:1 ❑ ® ❑
serve the project's projected demand in
addition to the provider's existing
commitments?
f) Be served by a landfill with sufficient permitted El El® El
to accommodate the project's solid
waste disposal needs?
g) Comply with federal, state, and local statutes ❑ ❑ ® ❑
and regulations related to solid waste?
Sources: 2025 General Plan and EIR; City of Petaluma 2015 Urban Water Management Plan; Sonoma County Water
Agency 2010 UWMP; and http://www.scwa.ca.gov/current-water-supply-levels/.
Settings
The City charges one-time impact fees on new private development in order to offset the cost of improving or
expanding City facilities to accommodate the project. Impact fees are used to help fund the construction or
expansion of needed capital improvements due to new development. Petaluma collects impact fees for
wastewater, water capacity, storm drain, and other public utilities and services. As a project located within a
developed area of the UGB, the project site is well served by existing public utilities and will not necessitate
the expansion or enhancement of existing facilities.
Page 87 of 96
September 2016
Water Service System
The Petaluma Department of Public Works and Utilities is the water purveyor for the City of Petaluma. The
City purchases potable water wholesale from the Sonoma County Water Agency (SCWA). The primary
source of water is supplied by the Russian River and supplemented with groundwater from the Santa Rosa
Plain via the Petaluma Aqueduct. The City of Petaluma also extracts groundwater from the Petaluma Valley
Basin. Groundwater serves as an emergency water supply in the event that SCWA water deliveries are
curtailed.
The City's 2010 Urban Water Management Plan (UWMP) updates information from General Plan 2025
background and environmental documents and extended the term of water demand analysis through 2035.
The 2010 UWMP was determined to be consistent with the General Plan 2025. The UWMP includes a water
supply/demand analysis based on population trends and land uses set forth in the 2025 General Plan, the
City's existing water supply contract with the Sonoma County Water Agency (SCWA), and planned City water
recycling and water conservation programs.
In 2015, the City updated its UWMP including a baseline demand analysis in compliance with the interim
2015 Urban Water Use target, an Urban Water Use target analysis for 2020, projected urban Water Use
through the year 2040, and a description of programs to achieve the target demand reductions in the UWMP.
Instream flow requirements have also been established to protect fish and wildlife species and recreation.3
Based on regional water supply availability, the SCWA expects to be able to increase annual water deliveries
to Petaluma from approximately 7,200 acre-feet (AC -FT) in 2010 to 11,400 AC -FT by 2035.
Based on the evaluation of future Russian River supply including, minimum in -stream flow requirements,
SCWA expects to obtain water rights approvals necessary to increase its total diversions above 75,000 acre-
feet per year (AC-FTNR) by 2027 and to 80,000 AC-FTNR by 2035. This assumption is based on the most
likely outcome of decisions by regulatory agencies and implementation of the Restructured Agreement
(executed in 2006) and proposed improvements to the water delivery system.
To assure that the City of Petaluma has sufficient water supplies to meet increased water demand, the
General Plan requires routine monitoring of water supplies against actual use and evaluation for each new
development project (see Policy 8-P4).
Severe Drought Conditions
California has experienced several consecutive dry years and on January 17, 2014, Governor Brown
proclaimed a state of emergency to exist through the State of California due to severe drought conditions. On
April 25, 2014, Governor Brown issued a follow-up proclamation declaring a continued state of emergency
throughout the State of California due to the ongoing drought. On April 1, 2015, Governor Brown issued
Executive Order B-29-15 imposing a mandatory 25 percent reduction for the State's 400 local water supply
agencies and requiring that local water agencies save water, increase enforcement to prevent wasteful water
use, streamline the state's drought response, and invest in new technologies that will make California more
drought -resilient.
On March 17, 2014, the State Water Resources Control Board (SWRCB) adopted emergency regulations for
water conservation .4 Those regulations were subsequently updated in response to Executive Order B-29-15
and, as approved by the SWRCB, are intended to increase water conservation in urban settings by 25%
statewide. For the City of Petaluma, the SWRCB established a 16% reduction in annual per capita water use.
Based on monthly water use reports provided to the SWRCB, the City of Petaluma has exceeded that
mandate; i.e., between June 2014 and May 2015, water by residential customers decreased by 33.56%.
3 State Water Resources Control Board: Decision No. 1610 (http://www.waterboards.ca.gov/waterrights)
4 Office of Administrative Law File No. 2015-0320-01 EE.
Page 88 of 96
September 2016 ��Q
On June 1, 2015, the Petaluma City Council adopted a resolution pursuant to the SWRCB directive and which
implements a Stage 2 Water Shortage Contingency Plan. In addition to furthering mandates of the SWRCB,
the City of Petaluma is also pursuing a host of other measures to increase water conservation (e.g., public
outreach, rebates and incentives) and will soon consider amendments to Municipal Code Chapter 15.17
(Water Conservation Regulations).
The City of Petaluma has developed a Water Shortage Contingency Plan, which outlines four stages of water
shortage and implements water use reduction measures according to severity of the drought. The four stages
are as follows: Stage 1 (minimal); Stage 2 (Moderate); Stage 3 (Severe); and Stage 4 (Critical). In March of
2014 the City of Petaluma imposed voluntary measures in accordance with Stage 1 of the Water Contingency
Plan to reduce water usage by twenty percent. Although the City of Petaluma implemented Stage 2 mandates
to conserve water in 2015, as of August 16, 2016, the City was officially relieved of their state mandatory
water -saving target of 16 percent.
According to the City's Water Supply Self -Certification 2016, the City of Petaluma no longer has a mandatory
conservation target but encourages water customers to voluntarily reduce demand by 10 percent, which can
be met by limiting outdoor irrigation and participating in the City's Water Conservation Programs. Also,
effective February 4, 2016, the City of Petaluma adopted an ordinance for new water conservation
regulations.
Wastewater Treatment
Ellis Creek Water Recycling Facility treats all wastewater generated by the City of Petaluma and
unincorporated Sonoma County community of Penngrove. The collection system is comprised of more than
190 miles of underground piping and nine (9) pump stations. The Facility's treatment capacity is about 6.7
million gallons per day (average dry weather flow). The facility treats approximately 5 million gallons per day,
leaving approximately 1.7 million gallons in available treatment capacity. During the summer, recycled water
is introduced to the City's recycled water system and is used for irrigation of 800 acres of agricultural lands,
two golf courses, and a vineyard. In the winter, secondary treated wastewater is conveyed to the Petaluma
River.
Stormwater
Within the City of Petaluma storm drains convey runoff from impervious surfaces such as streets, sidewalks,
and buildings to gutters that drain to creeks and the Petaluma River and ultimately the San Pablo Bay. This
water is untreated and carries with it any contaminants picked up along the way such as solvents, oils, fuels
and sediment. The City has implemented a storm drain -labeling program to provide a visual reminder that
storm drains are for rainwater only. The City's Stormwater Management and Pollution Control Ordinance, set
forth in Chapter 15.80 of the City's Municipal Code, establish the standard requirements and controls on the
storm drain system. All existing and proposed development must adhere to the City's Stormwater
Management and Pollution Control Ordinance, as well as the policies set forth in the General Plan including:
8 -P -30C: On-site and off-site improvements, deemed necessary by the City to reduce the surface water
impacts associated with a specific development proposal shall be designed, constructed, and
maintained in perpetuity at the cost of the development associated with said impacts.
8 -P -33A: Any project within an area subject to inundation in a 1 % (100 -year) storm event shall include site
specific analysis of impacts and identification of mitigations.
8 -P -37J: Projects may construct detention/retention facilities as mitigation for surface water impacts, so
long as the improvements result in an improvement to the pre -project conditions by way of a net
reduction in storm water elevations and downstream flows.
As described in the hydrology and water quality section above, a portion of the project site is located within a
flood hazard area (Zone AE) and underwent review in accordance with General Plan Policy 8 -P -33A. The
proposed subdivision precludes habitable development within the flood hazard area and lot base elevations
are sufficiently elevated above the base flood elevation of 35 feet. The lowest lot elevations are proposed at
Page 89 of 96
September 2016
37 feet, which is 2 feet above the base flood elevation.
Policies 8 -P -30C and 8 -P -37J are implemented through the Stormwater Management and Pollution Control
Ordinance, which locally codifies the requirements of the NPDES permit issued by the State Water Resources
Control Board. The project also includes an onsite stormdrain system as well as a detention basin at the
southern extent of the site in order to accommodate stormwater and generally retain pre -development runoff
conditions.
Solid Waste
Solid waste disposal facilities are owned and operated by the Sonoma County Department of Transportation
and Public Works and the City maintains a franchise solid waste hauling agreement requiring the franchise
hauler as part of its contractual obligations to select properly permitted Approved Disposal Location(s) with
adequate capacity to serve city service needs. The multi -family condominiums on-site will be served by trash
enclosure containing trash and recycling bins. The proposed single-family homes and duplex will be served
by once a week curbside pick up of trash, recycling and compost.
Impact Analysis:
3.17 (a, b, e) (Exceed Wastewater Treatment Requirements, New On -Site Water or Wastewater
Treatment Facilities, Wastewater Treatment Capacity) Less Than Significant Impact: The project is not
expected to exceed wastewater treatment requirements set forth by the Regional Water Quality Control Board
(RWQCB), nor necessitate the expansion or construction of wastewater treatment facilities. The estimated
wastewater generation of the proposed project falls within the capacity of the existing sanitary sewer lines and
Ellis Creek's wastewater treatment plant. The project does not propose any industrial uses that would
generate wastewater requiring special treatment or would contain constituents exceeding applicable
standards. Therefore, the project would not exceed wastewater treatment requirements and impacts would be
less than significant.
The existing water supplies, facilities, and infrastructure are sufficient to meet the demands of the project
without the need for expansion or new construction of water supply facilities, and service needs have been
anticipated by the Petaluma General Plan 2025. Wastewater will connect to an existing 12 -inch sanitary
sewer line under Wellington Place in the eastern extent of the project area and another at Sonoma Mountain
Parkway to the north. Water will be connected to the existing 8" water pipeline within Wellington Place and the
existing 12" pipeline within Sonoma Mountain Parkway,
City Water and Wastewater Capacity fees will be collected from the applicant in order to fund the applicant's
share for use of existing facilities, planned improvements and ongoing maintenance of public utilities.
Development of the proposed Brody Ranch project site was considered in the General Plan and EIR and
water and wastewater treatment, conveyance and demand have been anticipated by existing City Planning
documents. The project is a residential development of the type and density anticipated in the General Plan
and EIR. The project's contribution to wastewater flows and municipal water demands were anticipated in the
General Plan and have been considered for operating capacity of the water and wastewater treatment
facilities. The introduction of the proposed project including 199 new residential units is well within the
capacity analyzed as part of the General Plan build out. The proposed project will not generate wastewater
that exceeds the capacity of the City's wastewater treatment plant, when added to existing and projected
commitments through General Plan buildout. There are no new or more substantial impacts that would result
from the proposed project. Therefore, the project will have less than significant impacts due to new water or
wastewater treatment facilities or expansion of existing facilities.
Mitigation Measures: None required.
3.17 (c) (Require New Stormwater Facilities) Less Than Significant Impact: The proposed Brody Ranch
Subdivision project will increase the amount of impervious surfaces onsite relative to existing conditions.
Onsite drainage improvements will be installed during construction and designed to capture stormwater runoff
and convey flows either in an easterly direction towards Corona Creek or south to the existing wetlands and
proposed detention basin. The project has been designed with the integration of Low Impact Design (LID)
Page 90 of 96
September 2016 A ,9 b
standards as discussed in Section 3.9 above. Proposed LID measures include a series of tree plantings, soil
treatment, and bioretention basins and swales that will capture stormwater runoff during precipitation events
and provide for treatment and filtration of stormwater runoff onsite prior to release. A rolled curb with a
pervious concrete gutter will serve to disperse stormwater flows across the wetland area and ensure that pre
development hydrology is mimicked post development. With the proposed LID measures and compliance C.3
stormwater requirements, the project will not significantly increase runoff relative to the existing condition and
no new stormwater facilities are anticipated. Therefore, the project is expected to result in less than significant
impacts due to the expansion of existing storm water drainage facilities or construction of new facilities.
Mitigation Measures: None required.
3.17 (d) (Sufficient Water Supplies) Less Than Significant Impact: The project will utilize water obtained
from the City's municipal water system to meet on-site water demands. Water mainlines under Wellington
Place and Sonoma Mountain Parkway will provide connection to new residences by extending water service
to the project site. The increase in on-site water demand resulting from the proposed project is consistent with
what has been anticipated in the 2015 UWMP as the City's service area population is based on the General
Plan buildout projection, which anticipate that the Brody Ranch project site will support residential uses at
densities reflective of the R4 and R5 zoning district.
Based on the 2015 UWMP the demand for potable water supplies in 2015 was 6,744 acre feet for all uses
including single and multi -family residential, commercial, industrial, institutional/governmental, and
landscaping. By 2040 the water demand for buildout of the General Plan is projected to be 9,623 acre-feet per
year for potable water supplies and 1,424 acre-feet per year for recycled water supplies. s The UWMP
establishes a 2015 baseline daily per capita water use of 111 gallons based on a gross water use of 7,678
acre-feet per year. For year 2015, the UWMP concludes that the City is in compliance with the 2020 water
use target, which aims to achieve a 5% reduction in the per capita use relative to the 5 -year baseline.
Surface water supplies are provided to the City of Petaluma pursuant to the Restructured Agreement, which
states that the Sonoma County Water Agency is not obligated to provide more than 13,400 acre-feet per year
and 21.8 million gallons per day on average during any given month. The City supplements surface water
supplies with local groundwater extraction and the use of recycled water. In 2015 375 acre-feet of
groundwater was extracted from the Petaluma Valley Groundwater Basin. In 2015 a total of 846 acre-feet of
recycled water was used within the City's service area. The total actual water supply for the City of Petaluma
was 8,524 acre-feet in 2015. The projected water supply for 2040 at buildout of the General Plan and service
area is expected to be 14,824 acre feet per year. Based on water supply availability and projected water
demands, the City of Petaluma has sufficient water supplies to accommodate buildout of the General Plan.
The UWMP establishes Demand Management Measures and a Water Shortage Contingency Plan (2016
Updated), which provide a means for water conservation and planning for periods of drought. Additionally,
individual development projects are required to comply with the City's Water Conservation Ordinance for
interior and exterior water usage, thereby minimizing water demands generated by new development.
The UWMP concludes that there are sufficient water supplies to meet water demands projected by the
General Plan. The proposed Brody Ranch Subdivision project is consistent with the population projections
anticipated by the General Plan and water demands are captured in the 2015 UWMP for future year
conditions. Additionally the Brody Ranch Subdivision will be subject to the latest California Building Code
requirements including plumbing and water efficiency standard as well as the City's Water Conservation
Ordinance, which will further reduce water demands generated by the proposed Project. Therefore, existing
water supplies, facilities, and infrastructure are sufficient to meet the demands of the project without need for
expansion or new construction.
Mitigation Measures: None required.
e 2015 UWMP Table 4-3, Total Water Demands.
September 2016 A— r
3.17 (f -g) (Landfill Capacity, Solid Waste Statutes) Less Than Significant Impact: The Brody Ranch
project is expected to generate solid waste that is typical of residential uses. The applicant will be required to
adhere to all regulations governing the disposal of solid waste. Solid waste disposal facilities are owned and
operated by the Sonoma County Department of Transportation and Public Works. As mentioned previously,
the City maintains a hauling agreements with contractual obligations requiring hauling to Approved Disposal
Locations with adequate capacity to serve the City's needs. At present, the City is under contract with
Petaluma Refuse and Recycling for solid waste disposal and recycling services, and they will be serving the
project by transferring waste to Sonoma County landfill sites with remaining capacity. Pursuant to General
Plan Policy 2-P-122, the project will also include a Construction Waste Management Plan (CWMP), which
typically includes various waste reduction and recycling strategies such as reuse measures, on-site material
specific debris boxes, waste inventorying, standard material design, and accurate material orderings.
While the project will generate solid waste during construction and operation, it is not expected to exceed
landfill capacity and is not expected to result in violation of federal, state, or local statutes and regulations
relating to solid waste. Therefore, disposal of solid waste generated by the project construction and operation
will have less than significant impacts.
Mitigation Measures: None required.
6 California Department of Housing and Community Development Construction Waste Management Plan, Revised 7/1/12.
Page 92 of 96
September 2016
3.18. MANDATORY FINDINGS OF SIGNIFICANCE (CAL. PUB. RES. CODE §15065)
A focused or full environmental impact report for a project may be required where the project has a
significant effect on the environment in any of the following conditions:
Less Than
Potentially Significant Less than No
Significant with Significant Impact
Would the project: Impact Mitigation Impact p
Incorporated
a) Does the project have the potential to degrade the
quality of the environment, substantially reduce the
habitat of a fish or wildlife species, cause a fish or
wildlife population to drop below self-sustaining
levels, threaten to eliminate a plant or animal ❑ ❑ ® ❑
community, reduce the number or restrict the range of
a rare or endangered plant or animal or eliminate
important examples of the major periods of California
history or prehistory?
b) Does the project have impacts that are individually
limited, but cumulatively considerable? ("Cumulatively
considerable" means that the incremental effects of a
project are considerable when viewed in connection ❑ ❑ ® ❑
with the effects of past projects, the effects of other
current projects, and the effects of probable future
projects)?
c) Does the project have environmental effects, which
will cause substantial adverse effects on human ❑ ❑ ® ❑
beings, either directly or indirectly?
Mandatory Findings Discussion:
3.18 (a) Less Than Significant Impact: The project is located along the northern extent of the City of
Petaluma's UGB and potential impacts associated with its development have been anticipated and
analyzed in the Corona Ely Specific Plan EIR and the General Plan's EIR. The proposed Brody Ranch
Subdivision is consistent with the designated General Plan Land Use and supports the goals, policies,
and programs outlined in the General Plan. As described above in the Biological Resources discussion,
impacts to special -status plants, wildlife species, or sensitive habitat communities will be avoided or
substantially reduced with implementation of mitigation measures. Mitigation measures set forth in the
Biological Resources discussion ensure that potential impacts due to possible presence of special -status
bats, nesting raptors, nesting passerine birds or waterfowl, and fill to wetlands will be reduced to less than
significant levels. Additionally, the Cultural Resources discussion identifies measures to ensure that
potential impact to cultural resources are avoided. No other impacts associated with environmental
degradation, plant or animal communities, species population and ranges, or California history or pre-
history have been identified. As such, the project will not degrade the quality of the environment, reduce
habitat, or affect cultural resources. Therefore, the project will have less than significant impacts due to
degradation of the environment.
Page 93 of 96
September 2016
3.18 (b) Less Than Significant: The proposed project is consistent with the City's General Plan, zoning
requirements and long range plan for future development. The project will not promote further
development beyond what is called for by the City's General Plan.
The project will contribute to cumulative impacts identified in the City's GP EIR but not to a level that is
considered cumulatively considerable. As described in the analysis above, when the project
contributes to a cumulative impact identified in the General Plan, its contribution is incremental or
the project includes design features or mitigation measures that reduce cumulative impacts to
levels below significance.
The project has the potential to incrementally contribute in the following cumulative impacts identified
and analyzed in the General Plan EIR:
Intersection LOS (Impact 3.2-1): The project would contribute vehicle trips to intersections
identified in the General Plan EIR as operating at an unacceptable LOS at build -out. However, as
described in the analysis above, the affected intersections have either already been determined
to acceptably operate at an LOS E or LOS F due to overriding considerations and conflicts with
other General Plan policies or the project's contribution to those intersections are below the
threshold established by the General Plan EIR (i.e., cause the LOS to deteriorate to the next
lowest level).
• Water Demand (Impact 3.5-1, Impact 8-P-20): The project will increase water demand during a
period of extreme drought. However, with implementation of mandatory water conservation
measures (e.g., through SWRCB and California Green Building Standards Code) and
information about current and projected water supplies, the project's incremental increase in
demand is not considered cumulatively considerable.
• Noise (Impact 3.9-1, Impact 3.9-2): The project will increase vehicle trips on local roadways and,
in doing so, incrementally contribute to noise levels determined by the General Plan to be
significant at build -out. However, the project excludes new stationary noise sources and its
incremental contribution through vehicular trips will not result in a perceptible change in noise
level along roadways. Therefore, the project will not result in cumulatively considerable impacts
due to noise.
The project is consistent with the surrounding land uses and implements the intent of the UGB through
the development of an underutilized parcel in the existing urbanized area at an elevated density (per
Table 6 of the 2015-2023 Housing Element). Public utility and service providers will be capable of serving
the project with existing or planned facilities. Potential environmental impacts are expected to remain at,
or be mitigated to levels below significance, and long-term environmental goals are not expected to be
adversely impacted by the project. The Project does not increase the severity of any of the impacts from
the levels identified and analyzed in the General Plan, and development of the Project site is proposed at
densities consistent with those set forth in the General Plan EIR and the zoning code.
The project will contribute to cumulative impacts identified in the City's General Plan EIR but not to a level
that is considered cumulatively considerable. When the project contributes to a cumulative impact
identified in the General Plan, its contribution is incremental or the project includes design features or
mitigation measures that reduce cumulative impacts to levels below significance. Therefore the project's
cumulative impacts will be less than significant.
3.18 (c) Less Than Significant Impact: The project has the potential to result in adverse impacts to
humans due to air quality, biological resources, geology and soils, noise, hazard and hazardous
materials, hydrology and water quality, and circulation/transportation. With those mitigation measures set
forth above, environmental effect that would directly or indirectly impact human beings onsite or in the
project vicinity will be reduced to less than significant levels. Therefore the project will have less than
significant impacts due to substantial adverse effects on human beings.
Page 94 of 96
September 2016
4. REFERENCE DOCUMENTS:
General Plan and Zoning Ordinance
General Plan Chapter 1. Land Use,
Growth Management, & the Built
Environment
General Plan Chapter 7. Community
Facilities, Services & Education
General Plan Chapter 2. Community
Design, Character, &Green Building
General Plan Chapter 8. Water
Resources
General Plan Chapter 3. Historic
Preservation
General Plan Chapter 9. Economic
Health & Sustainability
General Plan Chapter 4. The Natural
Environment
General Plan Chapter 10. Health &
Safety
General Plan Chapter 5. Mobility
General Plan Chapter 11. Housing
General Plan Chapter 6. Recreation,
Music, Parks, & the Arts
Implementing Zoning Ordinance/
Maps
Other Sources of Information
Petaluma UWMP
Published geological maps
SCWA UWMP
General Plan 2025 EIR
FEMA Flood Insurance Rate Maps
SMART Station Master Plan
BAAQMD CAP
BAAQMD CEQA Guidelines
Ely Corona Specific Plan
National Research Council
Technical Appendices: The following resources were prepared in order to further identify project specific
parameters. Copies of these technical documents are incorporated herein by reference are available for
review during normal business hours at the City of Petaluma, 11 English Street, in the Community
Development Department.
A. Air Quality and Greenhouse Gas Emissions Assessment Brody Ranch Project, prepared by
Illingworth & Rodkin, October 22, 2015.
B. Biological Resource Analysis Brody Ranch Subdivision, prepared by Monk & Associates, Inc.,
October 2015.
C. Brody Ranch Subdivision Arborist's Report & Tree Inventory, prepared by Becky Duckles, October
2015.
D. A Cultural Resources Study for the Brody Subdivision Project, prepared by Tom Origer & Associates,
October 2015.
Page 95 of 96
September 2016 A-15
E. Geotechnical Investigation Brody Ranch Subdivision, prepared by Stevens, Ferrone & Bailey
Engineering Company, Inc., October 16, 2015.
F. Phase I Environmental Site Assessment Brody, prepared by AEI Consultants, April 29, 2014.
G. Limited Phase II Subsurface Investigation Brody, prepared by AEI Consultants, July 15, 2014.
H. Environmental Noise Assessment Brody Ranch Subdivision, prepared by Illingworth & Rodkin, Inc.,
October 2015.
I. Wetlands Runoff Report Brody Ranch Subdivision, prepared by Steven J. Lafranchi & Associates,
Civil Engineers, October 2015.
J. Preliminary Stormwater Mitigation Report Brody Ranch Subdivision, prepared by Steven J. Lafranchi
& Associates, Civil Engineers, October 2015.
K. Brody Ranch Traffic Impact Study, prepared by W-Trans, May 26, 2016.
Page 96 of 96
September 2016
4'L EXHIBIT B
City of Petaluma, California
Community Development Department
Y85$ Planning Division
11 English Street, Petaluma, CA 94952
Project Name: BRODY RANCH SUBDIVISION
File Number: File No. PLMA 201.5-007
Address/Location: 360 Corona Road, Petaluma, CA
(APN: 137-061-040)
MITIGATION MONITORING AND REPORTING PROGRAM
This Mitigation Monitoring and Reporting Program (MMRP) has been prepared in conformance with Section
21081,6 of the California Environmental Quality Act (CEQA) and Section 15097 of the CEQA Guidelines. This
document has been developed to ensure implementation of mitigation measures and proper and adequate
monitoring/reporting of such implementation. CEQA requires that this MMRP be adopted in conjunction with
project approval, which relies upon a Mitigated Negative Declaration.
The purpose of this MMRP is to: (1) document implementation of required mitigation; (2) identify
monitoring/reporting responsibility, be it the lead agency (City of Petaluma), other agency (responsible or
trustee agency), or a private entity (applicant, contractor, or project manager); (3) establish the frequency and
duration of monitoring/reporting; (4) provide a record of the monitoring/reporting; and (5) ensure
compliance.
The following table lists each of the mitigation measures adopted by the City in conjunction with project
approval, the implementation action, timeframe to which the measure applies, the monitoring/reporting
responsibility, reporting requirements, and the status of compliance with the mitigation measure.
Implementation
The responsibilities of implementation include review and approval by City staff including the engineering,
planning, and building divisions. Responsibilities include the following:
1. The applicant shall obtain all required surveys and studies and provide a copy to the City prior to
issuance of grading permits or approvals of improvements plans.
2. The applicant shall incorporate all applicable code provisions and required mitigation measures and
conditions into the design and improvements plans and specifications for the project.
3. The applicant shall notify all employees, contractors, subcontractor, and agents involved in the project
implementation of mitigation measures and conditions applicable to the project and shall ensure
compliance with such measures and conditions.
4. The applicant shall provide for the cost of monitoring of any condition or mitigation measure that
involves on-going operations on the site or long-range improvements.
Planning Commission Resolution No. 2016-19 Page 4
5. The applicant shall designate a project manager with authority to implement all mitigation measures
and conditions of approval and provide name, address, and phone numbers to the City prior to issuance
of any grading permits and signed by the contractor responsible for construction.
6. Mitigation measures required during construction shall be listed as conditions on the building or grading
permits and signed by the contractor responsible for construction.
7. All mitigation measures shall be incorporated as conditions of project approval.
8. The applicant shall arrange a pre -construction conference with the construction contractor, City staff
and responsible agencies to review the mitigation measures and conditions of approval prior to the
issuance of grading and building permits.
Monitoring and Reporting
The responsibilities of monitoring and reporting include the engineering, planning, and building divisions, as
well as the fire department. Responsibilities include the following:
1. The Building, Planning, and Engineering Divisions and Fire Department shall review the improvement
and construction plans for conformance with the approved project description and all applicable codes,
conditions, mitigation measures, and permit requirements prior to approval of a site design review,
improvement plans, grading plans, or building permits.
2. The Planning Division shall ensure that the applicant has obtained applicable required permits from all
responsible agencies and that the plans and specifications conform to the permit requirements prior to
the issuance of grading or building permits.
3. Prior to acceptance of improvements or issuance of a Certificate of Occupancy, all improvements shall
be subject to inspection by City staff for compliance with the project description, permit conditions, and
approved development or improvement plans.
4. City inspectors shall ensure that construction activities occur in a manner that is consistent with the
approved plans and conditions of approval.
MMRP Checklist
The following table lists each of the mitigation measures adopted by the City in connection with project
approval, the timeframe to which the measure applies, the person/agency/permit responsible for
implementing the measure, and the status of compliance with the mitigation measure.
Planning Commission Resolution No. 2016-19 Page 5
B-2
BRODY RANCH MITIGATION MONITORING AND REPORTING PROGRAM
MITIGATION MEASURE
IMPLEMENTATION
RESPONSIBLE
COMPLETION OF
PARTY
IMPLEMENTATION
ACTIVITY
DATE
COMPLETED
a� r � ., cc ar• - ., r- ,r -1��'c Y c � � -
� t i � � 413.tM F ., l � �-
� 1 �1 i )..
, a ry
�, a
...., { .. .
C t,
• Measures shall be included
'Applicant
A41: All diesel -powered off-road equipment larger than 50 horsepower and
into project design and
operating on site for more than two days continuously shall, at a minimum,
construction documents.
Planning Division
meet U.S. EPA particulate matter emissions standards for Tier 2 engines or
Building Division
equivalent.
Applicant shall provide for
periodic inspection during
construction to ensure that
measures are in place.
t
• Conduct construction in
• Applicantconformance
-1. In order to avoid impacts to bat maternity and/or bat hibernation periods and
with
ensure protection of any bat species potentially present within onsite
• CA Dept. Fish &
measures herein.
structures, a biologist shall conduct a preconstruction survey of trees and
Wildlife
structures that would be removed or demolished by the project 15 days prior to
Notify Planning Division
'Planning Division
commencement of ground work to determine if there is evidence of bat use
and CA Department of Fish
(guano accumulation, acoustic or visual detections). The survey shall be
& Wildlife in the event of
conducted by a qualified biologist with experience conducting surveys for bats.
nest discovery.
If no evidence of bat use is found, then there would be no further regard for
special -status bat species. If bat use is found, the biologist shall determine if
young are present. If young are found in any tree or structure that will be
impacted by the project, such activities shall be avoided until the young are
flying and feeding on their own. A non -disturbance buffer zone shall be
determined by a biologist at the same time of the survey. If mature bats are
found roosting in a tree or structure without the presence of young, the adult
bats shall be flushed out using a one-way eviction placed over the tree cavity or
structural opening for a 48-hour period prior to the time the tree or structure
would be removed or demolished.
Planning Commission Resolufiion No. 2016-19 Page 6 October 11, 2016
Brody Ranch - City of Petaluma
Mitigation Monitoring and Reporting Program
BRODY RANCH MITIGATION MONITORING AND REPORTING PROGRAM
MITIGATION MEASURE
IMPLEMENTATION
RESPONSIBLE
COMPLETION OF
PARTY
IMPLEMENTATION
ACTIVITY
DATE
COMPLETED
-2. To avoid impacts to nesting raptors and birds protected under the MBTA, a
Conduct construction in
Applicant
nesting survey shall be conducted prior to the commencement of any tree
conformance with
CA Dept. Fish &
removal if this work occurs between February 1st and August 31st. The nesting
measures herein.
Wildlife
survey shall include the examination of all trees within 200 feet of the project
As required, conduct pre -
site, including those not identified for removal. If construction work occurs after
construction survey in
'Planning Division
August 31st and before February 1st, a nesting bird survey would not be
accordance with actions
needed.
specified in Measure.
In the event that nesting birds are discovered, an adequate buffer shall be
Notify Planning Division
established by a qualified ornithologist around the nesting site(s) until the
and CA Department of Fish
completion of the nesting cycle. The buffer area shall be marked with construction
& Wildlife in the event of
fencing. No construction activity shall occur within the buffer area until a qualified
nest discovery.
ornithologist has determined that the young have left the nest, typically around mid-
July or as otherwise determined by the ornithologist.
-3_ If construction work occurs between March 1st and August 31st a nesting
Conduct construction in
- Applicant
survey shall be conducted not more than 15 days prior to the commencement
conformance with
CA Dept. Fish &
of work in order to avoid impacts to passerine birds or nesting waterfowl. The
measures herein.
Wildlife
nesting survey shall be conducted on the project site and within a zone of
- As required, conduct pre -
influence where waterfowl could be disturbed by vibrations or noise generated
construction survey in
'Planning Division
by construction activities. If passerine birds or waterfowl are discovered nesting
accordance with actions
on or adjacent to the project site, a non -disturbance buffer of 75 feet shall be
specified in Measure.
established by a qualified ornithologist. The buffer area shall be marked with
construction fencing. Nesting buffers should be maintained until September 1st,
Notify Planning Division
or until a qualified ornithologist determines that the young have fledged. If
and CA Department of Fish
buffers are removed prior to September 1st, the biologist shall prepare a report
& Wildlife in the event of
providing details of the nesting outcome and their decision to remove the
nest discovery.
buffers. This report shall be submitted to the City of Petaluma's Community
Development Department prior to the removal of these buffers.
Planning Commission Resolution No. 2016-19
Page 7
October 11, 2016
BRODY RANCH MITIGATION MONITORING AND REPORTING PROGRAM
MITIGATION MEASURE
IMPLEMENTATION
RESPONSIBLE
COMPLETION OF
PARTY
IMPLEMENTATION
ACTIVITY
DATE
COMPLETED
4. In order to avoid impacts to the wetland to be preserved onsite, the pedestrian
- Conduct construction in
Applicant
trail and footbridge shall be designed in a manner that restricts direct access to
conformance with
'Planning Division
the wetland area. Signage, fencing, and paving treatments shall be utilized to
measures herein.
discourage access into the sensitive wetland area.
-5. To offset impacts to the 0.185 acres of US waters, credits shall be purchased
Incorporate into
Applicant
from an approved mitigation bank at a ratio of two acre for every one acre
construction documents.
Planning Division
impacted, or as otherwise directed by regulatory agencies, in addition to the
Purchase mitigation bank
preservation of the remaining wetlands onsite within the project's open space
credit and submit proof to
Army Corps of
area. The ratio of 2:1 is proposed or as otherwise required by resource agencies
City and USACE.
Engineers
given the low -quality habitat of the onsite seasonal wetlands. The applicant
shall provide proof of purchase of credits and notification to the City and
regulatory agencies.
-6. The applicant shall install temporary orange exclusion fencing (or staking)
Identify required fencing
- Applicant
between the wetland area to be preserved and the limitslocations
of grading for the
and
-Planning Division
duration of site preparation and construction activities in order to prevent
specifications in
inadvertent disturbance during project related activities. Following completion
construction documents.
of construction activities, the exclusionary fencing shall be removed.
Conduct construction in
conformance with
measures herein-
-7. Replacement trees totaling 144 inches or as otherwise specified by the City's
Conduct construction in
Applicant
Tree Preservation Ordinance shall be introduced onsite to off -set the removal of
conformance with
Planning Division
the 6 protected trees. Tree mitigation may be through in-kind replacement or
measures herein.
in -lieu replacement. Replacement trees shall be at least 24 -inch box size. The
City may accept payment of in -lieu fees by the applicant, which shall also be
based on a minimum 24 -inch box size_
i
K
CUL -1. The applicant shall retain the services of a professional archeologist
Conduct construction in
• Applicant
who meets the Secretary of the Interior's Standards Professional
conformance with
- Professional
Planning Commission Resolution No. 2016-19 Page 8 October 11, 2016
Brody Ranch - City of Petaluma
Mitigation Monitoring and Reporting Program
BRODY RANCH MITIGATION MONITORING AND REPORTING PROGRAM
MITIGATION MEASURE
IMPLEMENTATION
RESPONSIBLE
COMPLETION OF
PARTY
IMPLEMENTATION
ACTIVITY
DATE
COMPLETED
Qualifications for Archeology to monitor ground disturbing activities
measures herein.
Archaeologist
located in the northwestern portion of the site in the vicinity of the
Notify Planning Division
Planning Division
former adobe structure. If a potentially significant archeological
and Federated Indians of
resource is encountered the archeologist shall be provided sufficient
Graton Rancheria in the
'Federated
time to evaluate the resource and make treatment
event of potentially
Indians Craton
recommendations in accordance with CEQA Guidelines §15064.5.
significant archaeological
Rancheria a
resource discovery.
CUL -2. If during the course of ground disturbing activities, including, but not
' Conduct construction in
Applicant
limited to excavation, grading and construction, a potentially significant
conformance with
Professional
prehistoric or historic resource is encountered, all work within a 100 foot
measures herein.
Archaeologist
radius of the find shall be suspended for a time deemed sufficient for a
• Notify Planning Division
qualified and city -approved cultural resource specialist to adequately
and Federated Indians of
. Planning Division
evaluate and determine significance of the discovered resource and
Graton Rancheria in the
• Federated
provide treatment recommendations. Should a significant archeological
event of potentially
Indians of Graton
resource be identified a qualified archaeologist shall prepare a resource
significant archaeological
Rancheria
mitigation plan and monitoring program to be carried out during all
resource discovery.
construction activities.
I, I
• Incorporate into project
Applicant/Contradesign
As determined by the City Engineer and/or Chief Building Official, all
and construction
ctor/Geotechnica
Petaluma
recommendations outlined in the Geotechnical Investigations dated October 16,
Building
Planning Commission Resolution No. 2016-19
Page 9
October 11, 2016
BRODY RANCH MITIGATION MONITORING AND REPORTING PROGRAM
MITIGATION MEASURE
IMPLEMENTATION
RESPONSIBLE
COMPLETION OF
PARTY
IMPLEMENTATION
ACTIVITY
DATE
COMPLETED
2015 prepared for the subject property by Stevens, Ferrone, and Bailey Engineering
documents.
I Engineer
Division and
Co., Inc., including but not limited to, site preparation and grading, excavation,
Department of
seismic design, and foundations system design are herein incorporated by reference
The project geotechnical
Public Works and
Public Works
and shall be adhered to in order to ensure that appropriate construction measures
engineer shall inspect the
Utilities
are incorporated into the design of the project. Nothing in this mitigation measure
construction work and
Building Division
And
shall preclude the City Engineer and/or Chief Building Official from requiring
shall certify to the City,
additional information to determine compliance with applicable standards. The
prior to issuance of a
Applicant/
geotechnical engineer shall inspect the construction work and shall certify to the
g g p fY
certificate of occupancy
Contractor/
City, prior to issuance of a certificate of occupancy that the improvements have
that the improvements
Geotechnical
been constructed in accordance with the geotechnical specifications.
have been constructed in
Engineer
g
accordance with the
geotechnical specifications.
In accordance with Section A4.106.8.2 of the 2013 California Green Building
Submittal of construction
Applicant
Standards Code, the project shall provide at least 3% of the total condo parking
documents demonstrating
Planning Division
spaces as capable of supporting future electric vehicle supply equipment. Of the
compliance with Green
spaces and equipment requirements of the California Green Building Standards
Building Standards Code.
Building Division
Code and as required by City of Petaluma General Plan Policy 4-P-9, the project shall
be constructed to include electrical vehicle charging stations at a ratio of least 1% of
the total parking spaces.
Prior to any activities involving the demolition or alteration of the existing buildings
Submittal of asbestos
• Applicant
on site, an asbestos surveyadhering to sampling
g p g protocols outlined by the Asbestos
survey and acceptance by
•Planning Division
Hazard Emergency Response Act and material sampling to determine lead presence
.
the City.
will occur. Construction activities that disturb materials or paints containing any
- Fire Department
amount of lead and/or asbestos may be subject to certain requirements of the
Occupational Safety and Health Administration (OSHA) lead standard contained in
Planning Commission Resolution No. 2016-19 Page 10 October 11, 2016
Brody Ranch - City of Petaluma
Mitigation Monitoring and Reporting Program
BRODY RANCH MITIGATION MONITORING AND REPORTING PROGRAM
MITIGATION MEASURE
IMPLEMENTATION
RESPONSIBLE
COMPLETION OF
PARTY
IMPLEMENTATION
ACTIVITY
DATE
COMPLETED
29 CFR 1910.1025 and 1926.62, AHERA requirement, and any other local, state, or
federal regulations. In the event that such substances are found, the applicant will
adhere to all requirements put forth by OSHA and other agencies regarding the
treatment, handling, and disposal of these materials.
Prior to any subsurface construction activities, a Site Management Plan (SMP) shall be
Applicant
prepared and implemented to monitor for and appropriately manage any hazardous
Applicant shall have a
Planning Division
features unearthed during construction activities. The Site Management Plan shall at
management plan
a minimum provide detail on the protocol to be followed in the event that an
prepared by a qualified
Fire Department
underground storage tank is encountered and proper procedures for excavation,
professional and include
remedial action and noticing to the appropriate regulatory agency (Sonoma County
measures in the
Department of Health Services).
Construction Specifications
for grading and
improvement plans.
• SMP shall be submitted to
the City.
a. -
To reduce noise levels noise levels in the rear yards of single-family homesto a CNEL
Conduct construction in
• Applicant
of 60 dBA the following noise barriers shall be incorporated into the project design
conformance with
• Planning Division
as specified below:
measures herein.
• Building Division
1. A noise barrier with a minimum top of wall elevation of six (6) feet
above yard grade level on the rear and side yard property lines of the
Incorporate into project
single-family residential lots 18 to 25 and 61 along Sonoma Mountain
design and construction
Parkway and on the side yard property lines of single-family
documents.
residential lots 1, 9, and 47.
To reduce noise levels in the outdoor activity and open space areas designated for
Planning Commission Resolution No- 2016-19
Page 11
October 11, 2016
BRODY RANCH MITIGATION MONITORING AND REPORTING PROGRAM
MITIGATION MEASURE
IMPLEMENTATION
RESPONSIBLE
COMPLETION OF
PARTY
IMPLEMENTATION
ACTIVITY
DATE
COMPLETED
the multi -family homes to a CNEL of 65 dBA the following shall be incorporated
into the project design as specified below:
2. A noise barrier with a minimum elevation of eight (8) feet above
residential grade level on the property lines of the multi -family
residential areas along the SMART rail line and Corona Road.
3. A noise barrier with a minimum elevation of six (6) feet above
residential grade level on the property lines of the multi -family
residential areas along Sonoma Mountain Parkway.
Noises barriers shall be constructed without cracks or gaps in the face or base, or
where they adjoin structures. To be effective, noise barriers shall have a minimum
surface weight of 3.0 pounds per square foot. Small, dispersed gaps for landscape
irrigation or drainage are acceptable so long as they do not exceed more than
0.5% of the total barrier face. Acceptable noise barriers include double sided wood
fencing, Gabion Walls or other means with demonstrated noise attenuation.
Double sided wood fencing shall be comprised of 1 x 8 redwood boards butted to
each other and staggered on both sides of the fence and limited to 6 feet in height
along Sonoma Mountain Parkway and at lots 1, 9, and 47. Along Corona Road, 8
foot high wood fencing shall be provided between buildings. The Gabion wall,
located in the southwestern portion of the site shall be comprised of steel columns
supporting gabion baskets filled with stones and limited to 8 feet in height.
For expanded detail on the characteristics of these barrier walls and figures of
where they will be placed, refer to the technical report prepared by Illingworth
and Rodkin'.
In order to achieve interior noise standard of 45 dBA CNEL the following shall be
The applicant shall obtain
• Applicant
implemented:
the services of an
Building Division
acoustical specialist to
1. Some form of forced air mechanical ventilation, satisfactory to
provide acoustical study
the local building official, shall be required in all residences with
demonstrating that an
partial or full line of sight to the SMART rail line, Corona Road
interior noise level of 45
traffic, and/or Sonoma Mountain Parkway traffic.
dBA is achieved.
1 Environmental Noise Assessment Prepared By Illingworth & Rodkin; September 2016.
Planning Commission Resolution No. 2016-19 Page 12 October 11, 2016
Brody Ranch - City of Petaluma
Mitigation Monitoring and Reporting Program
BRODY RANCH MITIGATION MONITORING AND REPORTING PROGRAM
MITIGATION MEASURE
IMPLEMENTATION
RESPONSIBLE
COMPLETION OF
PARTY
IMPLEMENTATION
ACTIVITY
DATE
COMPLETED
2. Given the anticipated exterior noise levels along Sonoma
• The study shall be
Mountain Parkway, Corona Road, and the SMART rail line,
conducted on a unit by unit
sound -rated windows and doors at single family homes on lots 1,
basis and submitted to the
9, 10, 18 through 25, 47 through 51, and 61 and at the multi-
City.
family residences facing or perpendicular to Sonoma Mountain
Parkway, Corona Road, and the SMART rail line to maintain
Incorporate into project
interior noise levels at or below 45 dBA CNEL. The degree of
design and construction
sound mitigation needed to achieve an interior CNEL of 45 dBA
documents.
or less would vary depending on the final design of the building
(relative window area to wall area) and the design of the exterior
wall assemblies. However, based on the future exterior noise
levels and typical residential construction, we would expect that
windows and doors facing or with a view of Sonoma Mountain
Parkway, Corona Road, and the SMART rail line may require STC
ratings of between 28 and 32.
3. The specific determination of exterior wall assemblies and
window/door STC ratings shall be conducted on a unit -by -unit
basis during the project design. The results of the analysis,
including the description of the necessary noise control
treatments, shall be submitted to the City along with the
building plans and approved prior to issuance of a building
permit.
In order to achieve an interior noise standard of 45 dBA CNEL and/or the
Conduct construction in
Applicant
recommended sleep disturbance/annoyance criteria of 55 dBA Lmax the following
conformance withmeasures
Building Division
shall be implemented:
herein.
Incorporate into project
1. With Quite Zone Implementation: To reduce interior maximum levels
design and construction
due to train engine noise to the recommended 55 Lmax levels,
documents.
windows with STC ratings of between 30 and 32 shall be provided in
the single-family residences with views of the SMART corridor and
Planning Commission Resolution No- 2016-19
Page 13
October 11, 2016
BRODY RANCH MITIGATION MONITORING AND REPORTING PROGRAM
MITIGATION MEASURE
IMPLEMENTATION
RESPONSIBLE
COMPLETION OF
PARTY
IMPLEMENTATION
ACTIVITY
DATE
COMPLETED
windows with STC rating of between 32 and 34 shall be provided in
the multi -family residences with view of SMART corridor and
adjacent to Corona Road at grade crossing.
2. Without Quite Zone Implementation: To reduce interior maximum
levels due to train horn and engine noise to the recommended 55
Lmax levels, the exterior walls of the exposed residences shall
provide for acoustical upgrades to allow for 50 to 55 STC ratings (as
appropriate). With upgraded exterior walls, windows with STC
ratings of between 36 and 38 shall be provided in the single-family
residences with views of the SMART corridor and windows with STC
rating of 40 shall be provided in the multi -family residences with
views of the SMART corridor and adjacent to Corona Road at grade
crossing.
NC[ -4. Construction activities shall comply with the following measures and all
Conduct construction in
• Applicant/
shall be noted on construction documents:
conformancewith
Contractor
measures herein.
• Building Division
1. Pursuant to the Municipal Code, restrict noise -generating activities at
- Measures shall be included
the construction site or in areas adjacent to the construction site to
in the Construction plans.
the hours between 7:00 a.m. and 10:00 p.m., Monday through Friday
and 9:00 a.m. to 10:00 p.m. on Saturday, Sunday and State, Federal
Applicant shall provide for
or Local Holidays.
periodic inspection during
construction to ensure that
2. Equip all internal combustion engine driven equipment with intake
measures are in place.
and exhaust mufflers that are in good condition and appropriate for
the equipment.
3. Locate stationary noise generating equipment (e.g., compressors) as
far as possible from adjacent residential receivers.
4. Acoustically shield stationary equipment located near residential
receivers with temporary noise barriers.
5. Utilize "quiet" air compressors and other stationary noise sources
where technology exists.
Planning Commission Resolution No. 2016-19 Page 14 October 11, 2016
Brody Ranch - City of Petaluma
Mitigation Monitoring and Reporting Program
BRODY RANCH MITIGATION MONITORING AND REPORTING PROGRAM
MITIGATION MEASURE
IMPLEMENTATION
RESPONSIBLE
COMPLETION OF
PARTY
IMPLEMENTATION
ACTIVITY
DATE
COMPLETED
6. The contractor shall prepare a detailed construction plan identifying
the schedule for major noise -generating construction activities. The
construction plan shall identify a procedure for coordination with the
owner/occupants of nearby noise sensitive residential land uses so
that construction activities can be scheduled to minimize noise
disturbance.
7. Generators: No generators shall be utilized during nighttime hours
(i.e., sunrise to sunset) to power equipment (e.g., security
surveillance) when normal construction activities have ceased for the
day. All such equipment should be powered through temporary
electrical service lines.
8. Designate a "disturbance coordinator" responsible for responding to
any complaints about construction noise. The disturbance
coordinator will determine the cause of the noise complaint (e.g.,
bad muffler, etc.) and will require that reasonable measures be
implemented to correct the problem.
UD
N
Planning Commission Resolution No. 2016-19 Page 15
October 11, 2016
ATTACHMENT 2
ORDINANCE OF THE CITY OF PETALUMA CITY
COUNCIL AMENDING THE ZONING MAP OF THE
IMPLEMENTING ZONING ORDINANCE TO REZONE
THE PROPERTY LOCATED AT 360 CORONA ROAD (APN
137-061-040) FROM RESIDENTIAL 4 (R4) AND
RESIDENTIAL 5 (R5) TO PLANNED UNIT DISTRICT
(PUD)
File No.: PLMA - 15-0007
WHEREAS, on November 30, 2015, the project applicant, DeNova Homes, LLC
submitted application to the City of Petaluma for a Zoning Map Amendment (File No. PLMA-
15-0007) to change the zoning on the 15.93 -acre property located at 360 Corona Road (APN:
137-061-040) from R4 and R5 to PUD ("the Project" or the "proposed Project"); and
WHEREAS, the property is designated Medium Density Residential and High Density
Residential in the General Plan Land Use Map; and
WHEREAS, the proposed zoning is consistent with the Medium and High Density
Residential land use designations in the General Plan; and
WHEREAS, on November 8, 2016, the Planning Commission held a duly noticed public
hearing, pursuant to Implementing Zoning Ordinance Section 25.050, to consider the Project, at
which time all interested parties had the opportunity to be heard; and
WHEREAS, on November 8, 2106 the Planning Commission considered the staff report
dated November 8, 2016 analyzing the application, including the California Environmental
Quality Act (CEQA) determination therein; and
WHEREAS, on November 8, 2016 the Planning Commission approved Resolution No.
2016-21 recommend the City Council rezone the subject parcel (APN 137-61-040) from R4 and
R5 to PUD; and
WHEREAS, on January 9, 2017, the City Council held a duly noticed public hearing to
consider the proposed Zoning Map Amendment.
NOW THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
PETALUMA AS FOLLOWS:
Section 1. Findings. The City Council approves the Project based on the findings made below:
1. The proposed Zoning Map amendment is consistent with the following policies of the
Petaluma General Plan:
1-P-1: Promote a range of land uses at densities and intensities to serve the
1
0-(
community needs within the Urban Growth Boundary (UGB)
The proposed project is infill development within the UGB and within the density ranges
designated in the General Plan. There are 10.7 du/ac proposed on the portion of the site
designated MDR and 27.8 du/ac in the portion of the site designated HDR.
1-P-2: Use land efficiently by promoting infill development, at equal or higher
density and intensity than surrounding uses.
The proposed zoning amendment allows for efficient use of land in that it will result in
infill development on underutilized property designated for medium density residential
development and high density residential development at the intersection of two arterials,
Sonoma Mountain Parkway and Corona Road, and adjacent to the planned Corona Road
SMART Station. The density of the project is consistent with existing zoning and
General Plan designation and has been designed to complement development
characteristics of surrounding properties and increase density of development closer to
the main arterial and future SMART station. Single family detached units are included on
the eastern side of the development to relate to the more traditional single family
neighborhood on the eastern side of Wellington Place and Corona Creek and north of
Sonoma Mountain Parkway. The multi -family portion of the project is on the western
side where a greater number of residents will have direct pedestrian access to the adjacent
site planned for a SMART Station.
2-P-1 As depicted on the land use map, allow for urban development at defined densities
and intensities to prevent the need to extend outward beyond the Urban Growth
Boundary ((JGB).
The project is proposed at densities consistent with the City's adopted land use map as
noted in Table Four above.
2-P-2 For development adjacent to the UGB, the intent of the designated land use is to
feather or reduce densities to provide a transition from urban to rural.
Property west of the project site is currently outside of the UGB; however, it is identified
in the Planning Boundaries exhibit (General Plan Figure i-3) of the Petaluma General
Plan as a "Possible UGB Expansion Area." Furthermore, the density proposed in the
portion of the site designated HDR is consistent with the density range for the HDR Land
Use designation.
Feathering of density between existing single-family homes east and north of the project
site and the multi -family homes proposed on the western side of the site is accomplished
by the single-family homes in the development.
2-P-5 Strengthen the visual and aesthetic character of the major arterial corridors
through
• Orientation towards street; and
• Prohibiting use of soundwalls facing streets.
J— 2
Although the proposed residences will not front Sonoma Mountain Parkway, the visual
and aesthetic character of Sonoma Mountain Parkway is maintained through a landscape
buffer, generous building setbacks and building setbacks which increase as the building
height increases. To attenuate noise generated by vehicular traffic, a six-foot double
sided wood fence set back 15 feet from the Sonoma Mountain Parkway and screened
with landscaping is proposed.
2-P-97 The parcel at the corner of Sonoma Mountain Parkway and Corona Road with a
split designation of medium density and high density residential shall reflect the intent of
providing a mixture of unit types both consistent with the surrounding neighborhoods and
the desire for high density housing in proximity to the proposed rail station. Distribution
of a mixture of medium and high-density unit types across the property may be permitted.
As proposed, the Brody Ranch subdivision will contain a mix of single-family, duplex
and multi -family homes with the lower density development in the subdivision closer to
existing single-family neighborhoods and the higher density multi -family development
near Corona Road and the proposed Corona Road SMART Station.
4-P-6: Improve air quality through required planting of trees along streets.
A total of 140 trees along the project's three roadway frontages and along the multi -use
trail near the southerly side of the development are proposed with the subdivision
application. An additional 180 trees are included in the SPAR application for the project.
5-P-19: All new and redesigned streets shall be bicycle and pedestrian friendly in
design.
A ten foot wide multi -use path is proposed along the southern end of the development,
four and a half foot sidewalks are proposed along both sides of all private streets within
the development, a pedestrian access path is proposed at the end of the proposed cul-de-
sac to provide connection to the play/picnic area, and new sidewalks separated by a
landscaped parkway are proposed along the Corona Road and Wellington Place
frontages. The existing sidewalk and Class 1 bike lane along Sonoma Mountain Parkway
will remain and a Class II bike lane will be added to the Corona Road frontage.
10 -P -3(f) Discourage use of sound walls anywhere except along Highway 101
Corridor and or along NWRA Corridor without findings that such walls will not be
detrimental to the community character. When sound walls are deemed necessary,
integrate them into the streetscape.
To attenuate vehicle noise from Sonoma Mountain Parkway a six-foot tall double -sided
redwood fence set back 15 feet from the right-of-way line and screened by landscaping is
proposed. Along the Corona Road frontage, sound is attenuated by building placement
and, in the areas between the buildings, by eight -foot, double -sided redwood fence panels
set back 15 feet from the roadway and screened with landscaping. Along a portion of the
SMART railroad, an eight -foot, double -sided redwood fence with gabion columns is
9— 3
proposed. The fence is proposed along an approximately 200 -foot length of the southerly
property line starting near Corona Road.
11 -P -20B: Continue to require the planting of street and parking lot trees as part of
residential projects to provide cooling during the summer months.
Seventy-two trees are proposed along the Corona Road, Sonoma Mountain Parkway and
Wellington Place frontages. As a part of the SPAR application, trees in compliance with
the code standards for parking lot landscaping shall be provided.
Housing Element Policy 4.2 Assign a share of the responsibility for providing
affordable housing to the developers of market -rate housing and non-residential projects.
Housing Element Program 4.3 Continue to require residential projects of five or more
units to contribute to the provision of below-market rate housing in one of the following
ways:
a. Dedicate 15% of the units on-site or a portion of the project site or property to the
City or a non-profit organization for use as affordable housing.
b. Within a half -mile radius of the planned SMART stations, developers are
encouraged to provide at least 15 percent of the units in a rental housing project
at rents affordable to very low -and low-income households for a minimum period
of 30 years.
c. Within a half -mile radius of the planned SMART stations, developers may be
required to provide at least 15 percent of the units in a for -sale project at prices
affordable to low- and moderate -income households for a minimum period of 30
years.
d. The developer can make an in -lieu payment to the City's Housing Fund.
e. Use alternative methods to meet the intent of the inclusionary requirement,
subject to approval by the City Council.
Twenty-five housing units in the development will be sold at prices affordable to low -
and moderate -income households. The units will be affordable for 99 years through a
renewable ground lease for the detached and attached single-family homes and a deed
covenant for the condominiums with the Housing Land Trust of Sonoma County and
units will be scattered throughout the development and consist of a mix of one, two and
three bedrooms, as is needed. Although this represents 12.5 percent of the total units
which is less than the 15 percent specified by Housing Element Program 4.4(a), the term
of the affordability restrictions is more than two times longer than that required by the
Housing Element and Program 4.4(e) allows use of alternative methods to meet the intent
of the inclusionary requirement, subject to approval by the City Council. Furthermore,
based on analysis prepared by the City of Petaluma Housing Division, the developer
contribution for providing units on-site is approximately $516,000 more than paying the
in -lieu fee. Based on these facts, the City Council finds the project is consistent with the
Housing Element of the General Plan.
a ` 4
2. The project is consistent with the public necessity, convenience, and general welfare in
that it promotes residential, transit -oriented development of an in -fill site with on-site
affordable housing consistent with the Petaluma General Plan.
Section 2. The Zoning Map contained in the Petaluma Implementing Zoning Ordinance is
hereby amended to modify the zoning district of the property located at 360 Corona Road from
R-4 and R-5 to PUD.
Section 3. Severability. If any provision of this ordinance or the application thereof to any
person or circumstance is held invalid, the remainder of the ordinance, including the application
of such part or provision to other persons or circumstances shall not be affected thereby and shall
continue in full force and effect. To this end, provisions of this ordinance are severable. The
City Council hereby declares that it would have passed each section, subsection, subdivision,
paragraph, sentence, clause, or phrase hereof irrespective of the fact that any one or more
sections, subsections, subdivisions, paragraphs, sentences, clauses, or phrases be held
unconstitutional, invalid, or unenforceable.
Section 4. This ordinance shall become effective thirty (30) days after the date of its adoption by
the Petaluma City Council.
Section 5. Posting/Publishing of Notice. The City Clerk is hereby directed to post and/or
publish this ordinance or a synopsis of it for the period and in the manner required by the City
Charter.
INTRODUCED and ordered posted/published this 9th day of January, 2017.
ADOPTED this day of , 2017 by the following vote:
a- 5
ATTACHMENT 3
RESOLUTION OF THE CITY OF PETALUMA CITY
COUNCIL APPROVING THE BRODY RANCH PLANNED
UNIT DISTRICT AND DEVELOPMENT STANDARDS AND
DESIGN GUIDELINES FOR THE BRODY RANCH
RESIDENTIAL PROJECT LOCATED AT 360 CORONA
ROAD (APN 137-061-040)
File No.: PLMA —15-0007
WHEREAS, on November 30, 2015, the project applicant, DeNova Homes, LLC
submitted applications to the City of Petaluma for a Zoning Map Amendment (File No. PLMA-
15-0007) to change the zoning and establish a Planned Unit District (PUD) on the 15.93 -acre
property located at 360 Corona Road (APN: 137-061-040) from R4 and R5 to PUD ("the
Project" or the "proposed Project"); and
WHEREAS, on November 8, 2016, the Planning Commission reviewed the California
Environmental Quality Act (CEQA) evaluation and by Resolution No. 2016-19 recommended
City Council adoption of a Mitigated Negative Declaration (MND) in accordance with CEQA;
and
WHEREAS, on November 8, 2016 the Planning Commission approved Resolution No.
2016-21 recommend the City Council rezone the subject parcel (APN 137-61-040) from R4 and
R5 to PUD and establish the Brody Ranch PUD; and
WHEREAS, Chapter 19.030 and 19.040 of the IZO provides for the adoption of new
residential PUDs; and
WHEREAS, on January 9, 2017, the City Council held a duly noticed public hearing to
consider the PUD Development Standards and Design Guidelines.
NOW THEREFORE, BE IT RESOLVED that the City Council approves the Brody
Ranch Residential PUD Development Standards and Design Guidelines.
Section 1.Findings. The City Council finds that the proposed project is in compliance with IZO
section 19.030 as described below and subject to the provisions of the Brody Ranch PUD
Development Standards and Design. Guidelines, attached as Exhibit 1 hereto and incorporated
herein by reference:
a. The PUD results in a more desirable use of land and a better physical environment than
would be possible under any single zoning district or combination of zoning district in
that approval of the PUD will allow preservation of the primary wetlands areas on the
southern side of the site and a buffer between the railroad and housing while maintaining
the density range envisioned in the General Plan for the property. Two key differences
between the existing R4 zoning on the site and the Brody Ranch PUD are (1) a minimum
lot size of 3,000 instead of 3,500 square feet and (2) a minimum front yard setback of 5
feet instead of 10 feet. A reduction of the lot size and front yard setback criteria allow
development of the site at 10.7 du/ac in the MDR portion of the site where the permitted
density range is 8.1 to 18.0 du/ac. (IZO section 19.030).
b. The PUD is proposed on property which has a suitable relationship to one or more
thoroughfares that are adequate to carry additional traffic generated by the development.
Sonoma Mountain Parkway and Corona Road are two thoroughfares that front the project
site. Primary vehicular access is from Sonoma Mountain Parkway with secondary access
from a local residential street that feeds into Sonoma Mountain Parkway, Wellington
Place. As documented in the Traffic Impact Study prepared by W -Trans, May 26, 2016,
there is adequate roadway capacity of the roadways in the project vicinity to carry
additional traffic generated by the development. (IZO section 19.030.A)
c. The plan for the proposed development presents a unified and organized arrangement of
buildings and service facilities which are appropriate in relation to adjacent or nearby
properties and landscaping and/or screening is included as necessary to insure
compatibility. Structures in the Brody Ranch PUD are organized to provide inhabitants
access to outdoor living spaces, pedestrian and bicycle paths, parking, and convenient
vehicular circulation. On the Sonoma Mountain Parkway and Corona Road frontages,
where traffic volumes are high, the development is buffered with landscaping, the sides
of buildings, and wood fencing screened with landscaping. Along the Wellington Place
frontage where traffic volumes are low, homes front the street. (IZO section 19.030.13)
d. Natural and scenic qualities of the site will be protected and enhanced and adequate
public and private spaces provided by limiting tree removal in the southwestern corner of
the site and along Corona Road where several mature redwood trees exist; by planting
140 trees and over 1,800 shrubs; by outdoor living areas with seating among the multi-
family buildings; and by a 3.7 -acre open space with a playground/picnic area, Class 1
multi -use path and wetland preservation area. In addition, convenient pedestrian and
bicycle access is provided to the existing multi -use path along Corona Creels. (IZO
section 19.030.C)
e. The development of the subject property, in the manner proposed by the applicant, will
not be detrimental to the public welfare, will be in the best interests of the City, and will
be in keeping with the general intent and spirit of the zoning regulations of the City of
Petaluma, with the Petaluma General Plan, and with any applicable plans adopted by the
City in that it adds to the housing supply, consistent with Goal 1 of the Housing Element
of the Petaluma General Plan, it provides 25 on-site affordable housing units with a mix
of one-, two- and three bedrooms, is in keeping with the general intent and spirit of the
zoning regulations in that the design, layout and density is consistent with the existing
surrounding neighborhoods and the density of the project is consistent with the HDR and
MDR density ranges specified in the General Plan land use designations for the site. (IZO
section 19.030.D)
- 2
£ The requirements of the California Environmental Quality Act (CEQA) have been
satisfied through the preparation of an Initial Study and the drafting of a Mitigated
Negative Declaration to avoid or reduce to a level of insignificance, potential air quality
and noise impacts generated by the proposed project. In compliance with the
requirements of the California Environmental Quality Act, an Initial Study was prepared
for the PUD rezoning of the property. Based upon the Initial Study, a determination was
made that no significant environmental impacts would result. A copy of this notice was
published in the Argus Courier on September 22, 2016, and provided to residents and
occupants within 500 feet of the site, in compliance with CEQA requirements.
g. The project, as conditioned per the resolution approving the Tentative Subdivision Map
(Resolution No. 2016-20), complies with the applicable provisions of the Municipal Code
and the General Plan.
h. The Unit Development Plan for Brody Ranch shall be subject to the applicable conditions
of the Tentative Subdivision Map for the Project and Mitigation Measures adopted as
conditions of approval.
Section 2. Severability. If any provision of this resolution or the application thereof to any
person or circumstance is held invalid, the remainder of the resolution, including the application
of such part or provision to other persons or circumstances shall not be affected thereby and shall
continue in full force and effect. To this end, provisions of this resolution are severable. The
City Council hereby declares that it would have passed each section, subsection, subdivision,
paragraph, sentence, clause, or phrase hereof irrespective of the fact that any one or more
sections, subsections, subdivisions, paragraphs, sentences, clauses, or phrases be held
unconstitutional, invalid, or unenforceable.
3- 3
Brody Ranch Subdivision
Planned Unit District (PUD)
OCTOBER, 2016
Revised 10-13-16
EXHIBIT A
m
This page intentionally left blank
A-�
Brody Ranch Subdivision
Planned Unit District
Table of Contents
1.0 Brody Ranch PUD
1.1 Purpose
2.0 Definitions
2.1 Purpose
2.2 Definitions of Specialized Terms and Phrases
3.0 Applicability
3.1 Terms
3.2 Location
3.3 Relationship to IZO
4.0 Land Use Districts
4.1 Purpose
4.2 Land Use Districts Established
4.3 Land Use District Map
5.0 Allowed Land Uses and Permit Requirements
6.0 Development Standards
7.0 Access & Parking
7.1 Purpose
7.2 Bicycle Parking
7.3 Vehicle Parking Spaces
7.4 IZO Provisions Not Applicable
8.0 PUD Modifications
9.0 Site Plan and Architectural Review (SPAR)
9.1 SPAR Procedures
10.0 Landscape and Fencing
11.0 Lighting
Exhibit A: Land Use District Map
M-3
6
This page intentionally left blank
R -W
1.0 Brody Ranch PUD
1.1 Purpose: The purpose of the Brody Ranch Planned Unit District ("Brody Ranch
PUD") is to provide a compatible mix of land uses that promotes single household
dwellings, including attached townhomes and multiple dwelling households prioritizing
pedestrian and bicycle access to public transit and public spaces within the community.
2.0 Definitions
2.1 Purpose: To establish the definitions of terms and phrases that are technical,
specialized or that may not reflect common usage.
2.2 Definitions of Specialized Terms and Phrases: All specialized terms and
phrases used in the Brody Ranch PUD are defined at City of Petaluma
Implementing Zoning Ordinance ("IZO") Chapter 27 (Glossary), excepted as
noted herein.
3.0 Applicability
3.1 Terms: These regulations apply to all land uses, subdivisions, and development
within the Brody Ranch PUD in the same manner provided at IZO §1.040
(Applicability of the Zoning Ordinance).
3.2 Location: These regulations are applicable to the property within the PUD as
shown at Exhibit A.
3.3 Relationship to IZO: Except as noted herein, when the Brody Ranch PUD is
silent on a matter, the IZO shall apply. The Brody Ranch PUD shall apply in all
other cases.
4.0 Land Use Districts
4.1 Purpose: To precisely indicate the areas to be used for each particular land use
within the Brody Ranch PUD.
4.2 Land Use Districts Established: The Brody Ranch PUD is divided into three
land use districts:
a) Single Household Dwellings
b) Multiple Household Dwellings
C) Open Space
4.3 Land Use District Map: The boundary of each land use district is shown on
Exhibit A.
A-5
s
5.0 Allowed Land Uses and Permit Requirements
A—b
P Permitted Use
Table 5.1
C Conditional Use Permit Required
Allowed Land Uses and Pet7ritt
S Permit Requirement in Specific Use Regulations
A Accessory Use
Requirements
---- Use Not Allowed
Peimit Required by Zone
Specific Use
Single
Multiple
Open
Household
Household
Space
Regulations
LAND USE TYPE
Dwelling
Dwelling
OPEN SPACE
Trails
--- ---
P
Community Playground
--- ---
P
Community Picnic Areas
--- ---
P
RESIDENTIAL
Dwelling, Multiple
--- P
---
Dwelling, Single
P ---
---
Home Occupation
A A
--- IZO 7.050
Accessory Dwelling
--- ---
---
A—b
6.0 Development Standards
1
10
REQurpxI II NT BY DISTRICT
DEVELOPMENT FEATURE
SINGLE HOUSEHOLD DWELLINGS
MULTIPLE HOUSEHOLD DWELLINGS
OPEN SPACE
LOT SIZE
Minimum area and width required for each lot in a nese subdivision
Minimum Area
3000 sf
NA
NA
35 ft Interior 40 It corner
NA
NA
Minimum Width
Minimum Depth
70 ft
NA
NA
SETBACKS
Alininuan setbacks required.
Primary structure
5 ft
0 ft
Front
0 ft
0 ft
Side — Brterior
loft
0 ft
Side — Street side
Not
Rear
loft
0 ft
Permitted
30 ft. setback. Portions above 15ft in
Same as Single Household Dwellings, except, up
height at 30 ft setback line shall be
to 120 feet of aggregate building width may have a
setback an additional foot for every foot
15 ft setback and portions above 15 ft in height at
Sonoma Mountain Parkway
above 15 feet.
the 15 ft setback shall be setback one additional
(Building Plane Line)
foot for every foot above 15 feet in height.
Minimum setbacks required.
Accessory Structure
Not Permitted
Not Permitted
Front
4 ft
4 ft
Side — Interior
Not
Permitted
5 ft
5 ft
Side —Street
0 ft
5 ft
Rear
The percent of the total site area covered by structures, open or enclosed, excluding uncovered
Site Coverage
steps, patios and terraces.
Maximum Coverage
Primary structure
60%
NA
NA
Accessory structure
detached
10% of the required setback area or
NA
NA
500 sf, whichever is greater
Height Limit
Alarinuun allowable height ofstructures. See Glossary (Chapter 27) for height measurement
Maximum Height
requirements, and Chapter l2 for height limit modifications.
30 ft
40 ft
Principal Building
Accessory Stricture
Not
12 ft
12 ft
Permitted
Accessory Dwelling
25 ft
NA
400 sf/unit
NA
USABLE OPEN SPACE
300 sflunit
May include common open space
FENCING, LANDSCAPING &
TREE PRESERVATION
See Section 10.0
PARKING
Not Permitted
See Section 7.0
SIGNS
See IZO Chapter 20
1
10
7.0 Access & Parking
7.1 Purpose: To facilitate public access to the open space and public path through
the provision of on -street parking spaces and access ways for vehicles, bicycles
and pedestrians. To provide adequate on -street parking spaces for the public
and residents at on -street parking spaces within the Brody Ranch PUD.
7.2 Bicycle Parking: Bicycle facilities shall be provided in accordance with IZO
§11.090 (Standards for Bicycle Facilities).
7.3 Vehicle Parking Spaces: Except as provided below, individual uses within the
Brody Ranch PUD are exempt from the requirement to provide off-street parking
facilities. Rather, the Brody Ranch PUD shall, at all times, maintain shared on -
street parking facilities:
Single Household Detached Dwellings: 2 covered and 2 uncovered.
Single Household Attached Dwellings: 2 covered and 1 uncovered.
Multiple Household Dwellings: 99 dedicated covered, 39 dedicated uncovered,
21 visitor/undedicated and 4 accessible.
On -Street: 125 visitor/undedicated spaces
On -Street: 9 public parking spaces
7.4 IZO Provisions: The following IZO standards shall not apply in the Brody Ranch
PUD:
a) §11.030(6) (Off -Street Parking Facilities to Serve One Use)
b) §11.030(C) (More Than One Use on a Site)
C) §11.060 (Number of Bicycle Parking Spaces Required)
8.0 PUD Modifications
8.1 Modification Procedures: From time to time, it may be necessary and desirable
to modify the Brody Ranch PUD. Modifications shall be in accordance with IZO
Chapter 19 (Planned Unit District and Planned Community District).
9.0 Site Plan and Architectural Review (SPAR)
9.1 SPAR Procedures: All new development or changes to the exterior of existing
structures or site features shall require Site Plan and Architectural Review in
accordance with IZO Chapter 24 (Administrative Procedures). The Director may
grant administrative Site Plan and Architectural Review for minor additions or
modifications to existing buildings and/or site features.
9.2 SPAR Findings: All new development or changes to the exterior of existing
A_S
11
structures or site features shall, in addition to the findings required by IZO
§24.010(G)(1), also be found to be substantially consistent with the building form,
materials and architectural style of existing buildings at the Brody Ranch PUD.
10.0 Landscaping and Fencing
10.1 Private landscape areas within the interior fence boundaries of the single family
residential lots are not subject to the following PUD restrictions.
10.2 Overall project landscaping and fencing maintenance shall follow an approved
landscape maintenance manual provided for the project by the Landscape
Architect. The governing HOA shall use the submitted manual as a guide for
landscape maintenance requirements throughout areas designated to be
maintained by the HOA per the approved improvement plans.
10.3 All landscaping, fencing, landscape structures and related hardscaped areas
that are to be maintained by appointed HOA or Landscape Assessment District
shall maintain consistency with the approved landscape plans design and intent.
10.4 Other landscape areas not to be maintained by HOA or individual home owners
will be maintained by a Landscape Assessment District governed by the City of
Petaluma. These areas include landscaping along the wetland/ multi -use path,
landscaping along Corona Rd, Sonoma Mountain Parkway and landscape strips
located between Wellington Street and the sidewalk at lots 56-61.
10.5 Owners of single family residences can make alterations to their front yard
landscapes so long as they follow the PUD guidelines and receive approval by
the appointed HOA.
10.6 Landscape areas along the delineated wetland shown on the approved
landscape construction drawings shall not negatively impact the wetland habitat
or natural characteristics and shall comply with the recommendations provided
by Monk and Associates Biological Assessment Report.
10.7 Trees shown on the approved subdivision map to remain shall be retained and
best arboricultural practices shall be used in their care. Tree mitigation
requirements shall follow the City of Petaluma's Tree Preservation Section of the
IZO as necessary to mitigate future removal of any protected trees shown on the
approved landscape construction plans.
10.8 All landscaping and irrigation shall comply with the current City of Petaluma
adopted water ordinance.
10.9 Future replacement of plants may be allowed if plants used are from the
proposed plant lists as shown on said plan. The Planning Director must approve
modifications to the approved plant list.
10.10 All fence replacement must match design and detail shown in the approved
landscape construction plans. Modifications to the approved fence design may
be approved in accordance with Section 19.040.E.4 of the Implementing Zoning
Ordinance as well as the requirements of the CC&R's.
10.11 Fencing height and location of all fencing facing public streets and SMART shall
comply with recommendations provided in the Environmental Noise Assessment
by Illingworth and Rodkin, Inc. All other fencing shall comply with the City of
Petaluma IZO for fencing height and location restrictions.
10.12 Minor entry features associated with fences shall be subject to the City of
Petaluma Zoning Ordinance requirements for minor entry features.
9
12
11.0 Exterior Lighting
11.1 Lighting shall be maintained in such a manner as to provide safety and comfort
for occupants of the development and the general public.
11.2 Lighting design shall be such as not to produce hazardous and annoying glare to
motorists and building occupants, adjacent residents, or the general public.
11.3 Lighting shall be oriented away from the properties adjacent to the PUD and
sensitive habitats such as wetlands, creeks and open space areas where lighting
is not proposed to be used.
11.4 Exterior lighting fixtures design and locations shall maintain consistency with the
SPAR approved light fixtures and lighting plan.
A—(o
13
ON0
LAND USE DISTRICT MAP
S,M.A,R. T.
I�X7_ilWl
SITE BOUNDARY
SINGLE-FAMILY
MULTI -FAMILY
®
OPEN SPACE
am 1 ■,0111 A
RESOLUTION OF THE CITY OF PETALUMA CITY
COUNCIL APPROVING A VESTING TENTATIVE
SUBDIVISION MAP FOR BRODY RANCH RESIDENTIAL
PROJECT LOCATED AT 360 CORONA ROAD (APN 137-
061-040)
File No.: PLMA —15-0007
WHEREAS, on November 30, 2015, the project applicant, DeNova Homes, LLC,
submitted an application to the City of Petaluma for a Vesting Tentative Subdivision Map (File
No. PLMA-15-0007) to subdivide the 15.93 -acre property located at 360 Corona Road (APN:
137-061-040) into 61 single-family lots (59 detached single-family homes and two attached
single-family homes) and one parcel to accommodate 13 8 multi -family units ("the Project"); and
WHEREAS, on November 8, 2016, the Planning Commission held a duly noticed public
hearing to consider the Project, including an associated Zoning Map Amendment to establish the
Brody Ranch Planned Unit District (PUD), at which time all interested parties had the
opportunity to be heard; and
WHEREAS, on November 8, 2016, the Planning Commission considered a staff report
and accepted public comment regarding the project including the related Zoning Map
Amendment; and
WHEREAS, on November 8, 2016, the Planning Commission also considered a
proposed Mitigated Negative Declaration (MND) prepared pursuant to the California
Environmental Quality Act (CEQA) ; and
WHEREAS, on November 8, 2016, the Planning Commission adopted Resolution Nos.
2016-19, 2016-20, and 2016-21 recommending the City Council approve the Project; and
WHEREAS, on January 9, 2017, at a duly noticed public hearing, the City Council
considered all written and oral public testimony, the Planning Commission recommendations,
and the administrative record for the Project and proposed Vesting Tentative Subdivision Map.
NOW THEREFORE, BE IT RESOLVED that the City Council approves the Vesting
Tentative Subdivision Map for the Project based on the findings made below and subject to the
conditions of approval attached as Exhibit 1 hereto and incorporated herein by reference:
1. The Tentative Subdivision Map, as conditioned, is consistent with the provisions of Title
20 of the Petaluma Municipal Code (Subdivision Ordinance) and the California
Subdivision Map Act.
a. The proposed map is consistent with the general plan in that it is on property
designated for Medium Density Residential and High Density Residential use in the
General Plan Land Use Map with a density range of 8.1 to 18 dwelling units per acre
for the MDR designation and 18.1 to 30.0 dwelling units per acre for the HDR
designation. The project has density of 10.7dwelling units per acre in the MDR area
0—c
and 27.81 dwelling units per acre in the HDR area. Furthermore, the proposed
subdivision, together with provisions for its design and improvements will not be
detrimental to the public health, safety, or welfare in that adequate public facilities
exist or will be installed, including road, sidewalks, water, sewer, storm drains, and
other infrastructure. Lastly, as detailed in the General Plan Consistency section of
this report, the proposed map is consistent with the applicable general plan policies.
b. As designed, the subdivision is consistent with the General Plan and the Corona -Ely
Specific Plan, in that the project density is consistent with that of the General Plan
and for the reasons stated in the Staff Report.
c. Physically, the site is well suited for residential development in that it is relatively
flat, generally rectangular in shape, adequate in size, has direct access to Sonoma
Mountain Parkway and Corona Road, major thoroughfares, is adjacent to residential
uses and structures of a similar density and scale and to the future site of the Corona
Road SMART Station, and as designed, has appropriate screening and buffers from
the adjacent thoroughfares and railroad tracks.
d. Physically, the site is suitable for the density of the proposed development in that the
proposed densities of 10.7 dwelling units per acre for the area designated MDR and
27.81 dwelling units for the area designated HDR are within the density ranges
specified in the general plan for the site and the site can accommodate reasonable
sized single-family and multi -family homes with adequate private and public open
space, parking, landscaping and amenities including a playground and pedestrian and
bicycle paths.
e. As documented in the draft Mitigated Negative Declaration (MND) prepared for the
project, the project will not cause substantial environmental damage or substantially
and avoidably injure fish or wildlife or their habitat. Furthermore, the project has
been designed to avoid the primary wetlands on the site and the site's drainage
features comply with water quality standards.
f. The design of the subdivision and the residential improvements in the subdivision are
not likely to cause serious public health problems in that the project will be not
expose inhabitants of the homes to any known hazards.
g. The design of the subdivision does not conflict with easements, acquired by the
public at large, for access through or use of, property within the proposed subdivision.
The existing easements to the Sonoma County Flood Control and Water Conservation
District along the southerly property line will not be affected by the design of the
subdivision or any type of improvement associated with the project.
4-a
BRODY RANCH RESIDENTIAL PROJECT
VESTING TENTATIVE SUBDIVISION MAP
CONDITIONS OF APPROVAL
FILE NO. PLMA 2015-007
APN 163-010-040
Planning Division
EXHIBIT A
Effective Date. The tentative map approval shall not be effective until the related zoning
map amendment is adopted and effective.
2. These conditions of approval and the mitigation measures of the Mitigated Negative
Declaration shall be printed on the Building Permit plans.
3. The plans submitted for building permit review shall be in substantial compliance with the
plans prepared by Steven J. Lafranchi & Associates and date stamped received September
20, 2016, except as modified by these Conditions of Approval.
4. The applicant shall pay the Notice of Determination ("NOD") Clerk's fee to the Planning
Division. The applicant shall provide a $50.00 check made payable to the Sonoma
County Clerk. Planning staff will file the Notice of Determination with the County
Clerk's office. The applicant shall also provide a check for the State Department of Fish
and Wildlife environmental filing fee (as required under Fish and Wildlife Code Section
711.4d) to the Sonoma County Clerk on or before the filing of the Notice of
Determination.
5. No building permits shall be issued for any buildings on the site until a Final Map has
been approved that covers the project locations for which building permits are sought.
6. Prior to building or grading permit issuance, the applicant shall provide a Construction
Phase Recycling Plan that would address the reuse and recycling of major waste materials
(soil, vegetation, concrete, lumber, metal scraps, cardboard, packing, etc.,) generated by
any demolition activities and construction of the project, in compliance with General Plan
Policy 2-P-122 for review by the planning staff.
7. Prior to issuance of a grading/ building permit, the applicant shall provide a lighting plan
for planning staff reviewing and approval. The lighting plan shall include exterior light
locations and details of the proposed fixture type and brightness (lumens). All lighting
shall be glare -free, hooded and downcast in order to prevent light pollution and glare into
bicyclists' and pedestrians' eyes.
8. The applicant shall be subject to any fees in affect at time of building permit issuance.
Said fees are due at time of issuance of building permit at which time, other pertinent fees
that are applicable to the proposed project will be required.
9. Signs are not approved as part of this project approval. Signs require a separate sign
permit.
10. The applicant shall defend, indemnify and hold harmless the City and its officials, boards,
commissions, agents, officers and employees ("Indemnitees") from any claim, action or
proceeding against Indemnitees to attack, set aside, void or annul any of the approvals of
the project to the maximum extent permitted by Government Code section 66477.9. To
the extent permitted by Government Code section 66477.9, the applicant's duty to defend,
indemnify and hold harmless in accordance with this condition shall apply to any and all
claims, actions or proceedings brought concerning the project, not just such claims,
actions or proceedings brought within the time period provided for in applicable State
and/or local statutes. The City shall promptly notify the subdivider of any such claim,
action or proceeding concerning the subdivision. The City shall cooperate fully in the
defense. Nothing contained in this condition shall prohibit the City from participating in
the defense of any claim, action, or proceeding, and if the City chooses to do so, applicant
shall reimburse City for attorneys' fees and costs incurred by the City to the maximum
extent permitted by Government Code section 66477.9.
11. If the applicant elects to install Public Art on-site, the proposed locations shall be
incorporated into SPAR plans and shall be reviewed and approved by the Public Art
Committee prior to installation.
12. All standpipes, check valves and other utilities shall be placed underground or fully
screened from view by decorative screening structures or landscaping to be reviewed and
approved by the Planning Manager.
13. All earthwork, grading, trenching, backfilling, and compaction operations shall be
conducted in accordance with the City of Petaluma's Subdivision Ordinance (#1046, Title
20, Chapter 20.04 of the Petaluma Municipal Code). An erosion and sediment control
plan will be required for the subdivision grading plans. The proposed subdivision grading
and subsequent development phases that are over one acre in size will be required to
prepare a SWPPP in accordance with City and State regulations, and all future
development will be subject to City grading and erosion control regulations.
14. In the event that human remains are uncovered during earthmoving activities, all
construction excavation activities shall be suspended and the following measures shall be
undertaken:
a. The Sonoma County Coroner shall be contacted.
b. If the coroner determines the remains to be Native American the coroner shall
contact the Native American Heritage Commission within 24 hours.
c. The project sponsor shall retain a City -approved qualified archaeologist to provide
adequate inspection, recommendations and retrieval, if appropriate.
d. The Native American Heritage Commission shall identify the person or persons it
believes to be the most likely descended from the deceased Native American, and
shall contact such descendant in accordance with state law.
The project sponsor shall be responsible for ensuring that human remains and associated
grave goods are reburied with appropriate dignity at a place and process suitable to the
most likely descendent.
15. Consistent with Policy 4.2, Program 4.3(e) of the 2015-2023 Housing Element of the
General Plan, the applicant shall develop no less than 25 on-site dwelling units affordable
in perpetuity to low- and moderate -income households. The affordable units shall be
constructed concurrently with the market -rate units. As determined by the Housing
Division, to the extent qualified purchasers are available, no less than nine of the
affordable units shall be sold to low-income households. The remaining units shall be
sold to moderate -income households.
-4
Development of the affordable housing shall be consistent with the terms of the August 5,
2016 Memorandum of Understanding (MOU) between Housing Land Trust of Sonoma
County (HLT) and DeNova Homes. Modifications to the August 5, 2016 MOU shall not
apply unless prior Planning Commission approval is obtained for a change pertaining to
the total number of affordable units in the Project. Any other change to the MOU may be
considered by the Planning Manager and at the Planning Manager's discretion, may be
deferred to the Planning Commission for a decision.
16. A landscaped parkway along the entire Corona Road frontage separating the sidewalk
from the Corona Road curb as shown in Option 2 on plan Sheet TM -20 shall be
implemented. All recommendations of the Project arborist pertaining to preserving the
health and vitality of the trees shall be implemented.
17. The public parking easement along Street `B" shall be extended west to accommodate
three public parking spaces in addition to the nine public spaces included in the plans
presented to the Planning Commission.
18. In Table 6 of the Planned Unit District (PUD), the accessory structure height standards
shall be reduced from 15 feet to a maximum of 12 feet.
19. In Table 6 of the PUD, the standard for the aggregate width of multi -family structures
adjacent to Sonoma Mountain Parkway which may have a 15 foot setback shall be
increased from 100 feet to 120 feet.
Mitigation Measures
AIR QUALITY
20. AQ -1: All diesel -powered off-road equipment larger than 50 horsepower and operating on
site for more than two days continuously shall, at a minimum, meet U.S. EPA
particulate matter emissions standards for Tier 2 engines or equivalent.
BIOLOGICAL RESOURCES
21. 13I0-1. In order to avoid impacts to bat maternity and/or bat hibernation periods and ensure
protection of any bat species potentially present within onsite structures, a biologist
shall conduct a preconstruction survey of trees and structures that would be removed
or demolished by the project 15 days prior to commencement of ground work to
determine if there is evidence of bat use (guano accumulation, acoustic or visual
detections). The survey shall be conducted by a qualified biologist with experience
conducting surveys for bats. If no evidence of bat use is found, then there would be no
further regard for special -status bat species. If bat use is found, the biologist shall
determine if young are present. If young are found in any tree or structure that will be
impacted by the project, such activities shall be avoided until the young are flying and
feeding on their own. A non -disturbance buffer zone shall be determined by a
biologist at the same time of the survey. If mature bats are found roosting in a tree or
structure without the presence of young, the adult bats shall be flushed out using a
one-way eviction placed over the tree cavity or structural opening for a 48-hour period
prior to the time the tree or structure would be removed or demolished.
22. 13I0-2. To avoid impacts to nesting raptors and birds protected under the MBIA, a nesting
0-�
survey shall be conducted prior to the commencement of any tree removal if this
work occurs between February 1st and August 31st. The nesting survey shall
include the examination of all trees within 200 feet of the project site, including
those not identified for removal. If construction work occurs after August 31st and
before February 1 st, a nesting bird survey would not be needed.
In the event that nesting birds are discovered, an adequate buffer shall be established
by a qualified ornithologist around the nesting site(s) until the completion of the
nesting cycle. The buffer area shall be marked with construction fencing. No
construction activity shall occur within the buffer area until a qualified ornithologist
has determined that the young have left the nest, typically around mid-July or as
otherwise determined by the ornithologist.
23. BIO -3. If construction work occurs between March 1st and August 31st a nesting survey
shall be conducted not more than 15 days prior to the commencement of work in
order to avoid impacts to passerine birds or nesting waterfowl. The nesting survey
shall be conducted on the project site and within a zone of influence where
waterfowl could be disturbed by vibrations or noise generated by construction
activities. If passerine birds or waterfowl are discovered nesting on or adjacent to
the project site, a non -disturbance buffer of 75 feet shall be established by a
qualified ornithologist. The buffer area shall be marked with construction fencing.
Nesting buffers should be maintained until September 1st, or until a qualified
ornithologist determines that the young have fledged. If buffers are removed prior to
September 1 st, the biologist shall prepare a report providing details of the nesting
outcome and their decision to remove the buffers. This report shall be submitted to
the City of Petaluma's Community Development Department prior to the removal
of these buffers.
24. BIO -4. In order to avoid impacts to the wetland to be preserved onsite, the pedestrian trail
and footbridge shall be designed in a manner that restricts direct access to the
wetland area. Signage, fencing, and paving treatments shall be utilized to discourage
access into the sensitive wetland area.
25. BIO -5. To offset impacts to the 0.185 acres of US waters, credits shall be purchased from
an approved mitigation bank at a ratio of two acre for every one acre impacted, or as
otherwise directed by regulatory agencies, in addition to the preservation of the
remaining wetlands onsite within the project's open space area. The ratio of 2:1 is
proposed or as otherwise required by resource agencies given the low -quality
habitat of the onsite seasonal wetlands. The applicant shall provide proof of
purchase of credits and notification to the City and regulatory agencies.
26. BIO -6. The applicant shall install temporary orange exclusion fencing (or staking) between
the wetland area to be preserved and the limits of grading for the duration of site
preparation and construction activities in order to prevent inadvertent disturbance
during project related activities. Following completion of construction activities, the
exclusionary fencing shall be removed.
27. BIO -7. Replacement trees totaling 144 inches or as otherwise specified by the City's Tree
Preservation Ordinance shall be introduced onsite to off -set the removal of the 6
protected trees. Tree mitigation may be through in-kind replacement or in -lieu
replacement. Replacement trees shall be at least 24 -inch box size. The City may
accept payment of in -lieu fees by the applicant, which shall also be based on a
minimum 24 -inch box size.
CULTURAL RESOURCES
28. CUL -1. The applicant shall retain the services of a professional archeologist who
meets the Secretary of the Interior's Standards Professional Qualifications for
Archeology to monitor ground disturbing activities located in the northwestern
portion of the site in the vicinity of the former adobe structure. If a potentially
significant archeological resource is encountered the archeologist shall be provided
sufficient time to evaluate the resource and make treatment recommendations in
accordance with CEQA Guidelines §15064.5.
29. CUL -2. If during the course of ground disturbing activities, including, but not limited
to excavation, grading and construction, a potentially significant prehistoric or
historic resource is encountered, all work within a 100 foot radius of the find shall
be suspended for a time deemed sufficient for a qualified and city -approved cultural
resource specialist to adequately evaluate and determine significance of the
discovered resource and provide treatment recommendations. Should a significant
archeological resource be identified a qualified archaeologist shall prepare a
resource mitigation plan and monitoring program to be carried out during all
construction activities.
GEOLOGY AND SOILS
30. GEO-1. As determined by the City Engineer and/or Chief Building Official, all
recommendations outlined in the Geotechnical Investigations dated October 16,
2015 prepared for the subject property by Stevens, Ferrone, and Bailey Engineering
Co., Inc., including but not limited to, site preparation and grading, excavation,
seismic design, and foundations system design are herein incorporated by reference
and shall be adhered to in order to ensure that appropriate construction measures are
incorporated into the design of the project. Nothing in this mitigation measure shall
preclude the City Engineer and/or Chief Building Official from requiring additional
information to determine compliance with applicable standards. The geotechnical
engineer shall inspect the construction work and shall certify to the City, prior to
issuance of a certificate of occupancy that the improvements have been constructed
in accordance with the Geotechnical specifications.
31. GHG-l: In accordance with Section A4.106.8.2 of the 2013 California Green
Building Standards Code, the project shall provide at least 3% of the total condo
parking spaces as capable of supporting future electric vehicle supply equipment. Of
the spaces and equipment requirements of the California Green Building Standards
Code and as required by City of Petaluma General Plan Policy 4-P-9, the project
shall be constructed to include electrical vehicle charging stations at a ratio of least
1% of the total parking spaces.
� --7
32.
33.
34.
HAZARDOUS MATERIALS
HAZ-1. Prior to any activities involving the demolition or alteration of the existing
buildings on site, an asbestos survey adhering to sampling protocols outlined by the
Asbestos Hazard Emergency Response Act and material sampling to determine lead
presence will occur. Construction activities that disturb materials or paints
containing any amount of lead and/or asbestos may be subject to certain
requirements of the Occupational Safety and Health Administration (OSHA) lead
standard contained in 29 CFR 1910.1025 and 1926.62, AHERA requirement, and
any other local, state, or federal regulations. In the event that such substances are
found, the applicant will adhere to all requirements put forth by OSHA and other
agencies regarding the treatment, handling, and disposal of these materials.
HAZ-2. Prior to any subsurface construction activities, a Site Management Plan (SMP)
shall be prepared and implemented to monitor for and appropriately manage any
hazardous features unearthed during construction activities. The Site Management
Plan shall at a minimum provide detail on the protocol to be followed in the event
that an underground storage tank is encountered and proper procedures for
excavation, remedial action and noticing to the appropriate regulatory agency
(Sonoma County Department of Health Services).
NOISE
NOI-1. To reduce noise levels noise levels in the rear yards of single-family homes to a
CNEL of 60 dBA the following noise barriers shall be incorporated into the project
design as specified below:
1. A noise barrier with a minimum top of wall elevation of six (6) feet above yard
grade level on the rear and side yard property lines of the single-family
residential lots 18 to 25 and 61 along Sonoma Mountain Parkway and on the
side yard property lines of single-family residential lots 1, 9, and 47.
To reduce noise levels in the outdoor activity and open space areas designated for
the multi -family homes to a CNEL of 65 dBA the following shall be incorporated
into the project design as specified below:
2. A noise barrier with a minimum elevation of eight (8) feet above residential
grade level on the property lines of the multi -family residential areas along the
SMART rail line and Corona Road.
3. A noise barrier with a minimum elevation of six (6) feet above residential
grade level on the property lines of the multi -family residential areas along
Sonoma Mountain Parkway.
W.
35.
Noises barriers shall be constructed without cracks or gaps in the face or base, or
where they adjoin structures. To be effective, noise barriers shall have a minimum
surface weight of 3.0 pounds per square foot. Small, dispersed gaps for landscape
irrigation or drainage are acceptable so long as they do not exceed more than 0.5%
of the total barrier face. Acceptable noise barriers include double sided wood
fencing, Gabion Walls or other means with demonstrated noise attenuation.
Double sided wood fencing shall be comprised of 1 x 8 redwood boards butted to
each other and staggered on both sides of the fence and limited to 6 feet in height
along Sonoma Mountain Parkway and at lots 1, 9, and 47. Along Corona Road, 8
foot high wood fencing shall be provided between buildings. The Gabion wall,
located in the southwestern portion of the site shall be comprised of steel columns
supporting gabion baskets filled with stones and limited to 8 feet in height.
For expanded detail on the characteristics of these barrier walls and figures of
where they will be placed, refer to the technical report prepared by Illingworth and
Rodkinl .
NOI-2. In order to achieve interior noise standard of 45 dBA CNEL the following shall be
implemented:
1. Some form of forced air mechanical ventilation, satisfactory to the local
building official, shall be required in all residences with partial or full line
of sight to the SMART rail line, Corona Road traffic, and/or Sonoma
Mountain Parkway traffic.
2. Given the anticipated exterior noise levels along Sonoma Mountain
Parkway, Corona Road, and the SMART rail line, sound -rated windows
and doors at single family homes on lots 1, 9, 10, 18 through 25, 47
through 51, and 61 and at the multi -family residences facing or
perpendicular to Sonoma Mountain Parkway, Corona Road, and the
SMART rail line to maintain interior noise levels at or below 45 dBA
CNEL. The degree of sound mitigation needed to achieve an interior
CNEL of 45 dBA or less would vary depending on the final design of the
building (relative window area to wall area) and the design of the exterior
wall assemblies. However, based on the future exterior noise levels and
typical residential construction, we would expect that windows and doors
facing or with a view of Sonoma Mountain Parkway, Corona Road, and the
SMART rail line may require STC ratings of between 28 and 32.
3. The specific determination of exterior wall assemblies and window/door
STC ratings shall be conducted on a unit -by -unit basis during the project
design. The results of the analysis, including the description of the
necessary noise control treatments, shall be submitted to the City along
with the building plans and approved prior to issuance of a building permit.
36. NOI-3. In order to achieve an interior noise standard' of 45 dBA CNEL and/or the
recommended sleep disturbance/annoyance criteria of 55 dBA Lmax the following
1 Environmental Noise Assessment Prepared By Illingworth & Rodkin, September 2016.
shall be implemented:
1.
With Quite Zone Implementation: To reduce interior maximum levels due to
train engine noise to the recommended 55 Lmax levels, windows with STC
ratings of between 30 and 32 shall be provided in the single-family residences
with views of the SMART corridor and windows with STC rating of between
32 and 34 shall be provided in the multi -family residences with view of
SMART corridor and adjacent to Corona Road at grade crossing.
2.
Without Quite Zone Implementation: To reduce interior maximum levels due
to train horn and engine noise to the recommended 55 Lmax levels, the
exterior walls of the exposed residences shall provide for acoustical upgrades
to allow for 50 to 55 STC ratings (as appropriate). With upgraded exterior
walls, windows with STC ratings of between 36 and 38 shall be provided in
the single-family residences with views of the SMART corridor and windows
with STC rating of 40 shall be provided in the multi -family residences with
views of the SMART corridor and adjacent to Corona Road at grade crossing.
37. NOI-4. Construction activities shall comply with the following measures and all shall be
noted
on construction documents:
1.
Pursuant to the Municipal Code, restrict noise -generating activities at the
construction site or in areas adjacent to the construction site to the hours
between 7:00 a.m. and 10:00 p.m., Monday through Friday and 9:00 a.m. to
10:00 p.m. on Saturday, Sunday and State, Federal or Local Holidays.
2.
Equip all internal combustion engine driven equipment with intake and
exhaust mufflers that are in good condition and appropriate for the equipment.
3.
Locate stationary noise generating equipment (e.g., compressors) as far as
possible from adjacent residential receivers.
4.
Acoustically shield stationary equipment located near residential receivers
with temporary noise barriers.
5.
Utilize "quiet" air compressors and other stationary noise sources where
technology exists.
6.
The contractor shall prepare a detailed construction plan identifying the
schedule for major noise -generating construction activities. The construction
plan shall identify a procedure for coordination with the owner/occupants of
nearby noise sensitive residential land uses so that construction activities can
be scheduled to minimize noise disturbance.
7.
Generators: No generators shall be utilized during nighttime hours (Le.,
sunrise to sunset) to power equipment (e.g., security surveillance) when
normal construction activities have ceased for the day. All such equipment
should be powered through temporary electrical service lines.
8.
Designate a "disturbance coordinator" responsible for responding to any
complaints about construction noise. The disturbance coordinator will
determine the cause of the noise complaint (e.g., bad muffler, etc.) and will
require that reasonable measures be implemented to correct the problem.
38. Construct frontage improvements along Sonoma Mountain Parkway, Corona Road and
Wellington Place as shown on the tentative map and as required or modified by these
conditions of approval.
39. Construct a new transit stop/turnout on southbound Sonoma Mountain Parkway, east of
Wellington Place, in the location shown on the tentative map. The dimensions of the
turnout shall meet City standards. Install a 4 -foot deep by 15 -foot long concrete pad and
shelter at the southerly end of the turnout. Install a signpost to be installed near north end
of bus stop area, for a bus stop sign and no parking sign. Install a blue perforated metal 6
feet bench with anti -vagrant bars to be installed towards south end of new concrete pad,
per City specifications. Hardwired electrical facilities shall be installed for the stop.
40. The exact pavement sawcut line on Corona Road shall be determined and approved by the
City. A minimum of a 1/2 half street pavement crack seal and microsurfacing seal shall be
installed on Corona Road along the project frontage, from the railroad grade crossing to
the roundabout.
41. A pavement crack seal and microsurfacing seal per City requirements shall be constructed
on Wellington Place (curb to curb) from the intersection of Sonoma Mountain parkway to
project limits near Corona Creek.
42. A 2 -inch pavement grind and overlay shall be constructed on Sonoma Mountain Parkway
at and within the intersection of Street A/Mauro Pietro Drive and within the full street
area (curb to curb) on Sonoma Mountain Parkway between the end of the existing median
and Street A/Mauro Pietro Drive.
43. Prior to the issuance of the first building permit for a residential structure, the applicant
shall pay a fair share contribution to the City towards pedestrian crossing improvements at
the Corona Road railroad grade crossing. The applicant shall coordinate design
requirements with Sonoma Marin Area Rail Transit and provide a preliminary cost
estimate of the improvements to the City for review and approval. The fair share shall be
based on the number of residential units within the project area and within a %2 mile radius
of the future train station site, east of the railroad tracks.
44. All existing pedestrian ramps along the Sonoma Mountain Parkway, Corona Road
(including the roundabout) and Wellington Place frontages shall be removed and replaced
with new pedestrian ramps that meet current City requirements and accessibility
standards.
45. All portions of existing broken, displaced, cracked and/or settled City sidewalk, curb and
gutter along the Sonoma Mountain Parkway, Corona Road (including the roundabout) and
Wellington Place frontages shall be removed and replaced with City standard sidewalk,
curb and gutter.
46. A rapid rectangular flashing beacon enhanced crosswalk system with advanced warning
signage and pavement markings shall be installed on both crosswalks across Sonoma
Mountain parkway at the intersection of Street A/Mauro Pietro. The systems shall be
hardwired and shall meet City specifications and requirements.
47. Striping and signage shall be required per City specifications. Thermoplastic striping shall
be required for all street striping.
48. Bicycle and pedestrian warning and wayfinding signage shall be installed at the
intersection of Street A and Sonoma Mountain Parkway. The wayfinding signage shall
direct cyclists and pedestrians to the Class I path within Parcel A, Corona Creels and
Corona Road and adjacent land uses.
4-t(
49. Grading shall conform to the project geotechnical investigation report submitted with the
tentative map application and the geotechnical report prepared as part of the construction
documents.
50. Any existing structures above or below ground shall be removed if not a part of the new
subdivision. Structures shall include, but shall not be limited to buildings, concrete pads,
fences, retaining walls, pipes, debris, etc.
51. All streets within the subdivision shall be privately owned and maintained with public
access and public utility easements as shown on the tentative map, dedicated to the City
of Petaluma.
52. The private streets shall generally be constructed as shown on the tentative map,
including conforms to Sonoma Mountain Parkway and Wellington Place; 36 -feet wide
with two 10 -foot travels lanes and two 8 -foot parking lanes, as well as sidewalks on both
sides of the street.
53. The private shared driveways shall have a paved surface of at least 20 -feet wide and a
pavement section of at least 3 -inches of asphalt over 12 -inches of class 2 aggregate base.
Private shared driveways shall be posted for no parking. Surface drainage shall not be
allowed to flow across the public sidewalk and shall be collected and directed to a storm
drain system.
54. A minimum 2 -inch grind and AC overlay will be required on all utility and joint trench
cuts along the length of the trench, for a minimum of 1/2 the street width within Sonoma
Mountain Parkway, Corona Road or other existing affected City streets.
55. All private interior street improvements shall be designed and constructed to City
standards with a minimum pavement section of 4 -inches of asphalt concrete over 12 -
inches of class 2 aggregate base. The minimum longitudinal gutter slope is 0.5% per City
standards. All other street related improvements such as sidewalk, curb, gutter, signage,
striping, etc. shall be designed and constructed to City standards.
56. Street lights in the interior streets shall be publicly owned and operated, and installed per
City standards. LED streetlight fixtures shall be installed. The City will provide the
developer the LED specification prior to submittal of the final map and improvement
plans. Streetlight poles shall match existing poles as required per the Corona Ely Specific
Plan. Final street light locations shall be determined at the time of improvement plan
review and approval. Pull boxes and electrical conduits shall be installed per City
requirements.
57. "No parking" signs and red curbs shall be installed on curved sections of interior streets
and on all curb returns.
58. Crosswalks shall be installed between all pedestrian ramps. A stop sign and legend shall
be installed at all interior street intersections per City requirements.
59. All improvement work shall be completed prior to issuance of a final
inspection/certificate of occupancy for the last 20% percent of units.
60. Traffic control plans are required for all stages of construction and shall be per latest
Manual on Uniform Traffic Control Devices (MUTCD) standards.
61. The storm drain system shall generally be constructed as shown on the tentative map. All
proposed storm drain lines located on private property shall be privately owned and
maintained. The storm drain system design shall be reviewed and approved by the
Sonoma County Water Agency prior to approval of the final map and subdivision
improvement plans,. Submit final construction level hydrology calculations with the final
map and the subdivision improvement plan application.
62. Prior to issuance of a building permit, an operations and maintenance manual is required
for the proposed detention basin/wetlands area and public storm water treatment systems,
and shall be submitted with the final map and improvement plan application for review
and approval by the City Engineer. The manual shall include annual inspection, by a
Civil Engineer registered in the State of California, to ensure the detention and treatment
systems are operating as designed and constructed as well as provisions to make any
necessary repairs to the system. A signed and sealed copy of the report shall be provided
annually to the Office of the City Engineer.
63. Prior to acceptance of the public improvements, the developer shall enter into a Storm
Water Quality Treatment Facility Access and Maintenance Agreement/Declaration with
the City of Petaluma, subject to City approval. The agreement shall include language that
the subsequent entity responsible for maintenance shall comply with terms of the
agreement in perpetuity. The agreement shall be recorded.
64. Erosion control and water quality control measures shall be employed throughout the
construction life of the project. The necessary documentation including Notice of Intent,
Storm Water Pollution Prevention Plan (SWPPP) and Notice of Termination shall be
filed as required by the responsible agencies. The project shall comply with the City of
Petaluma Phase II Storni Water Management Plan including attachment four post
construction requirements.
65. No lot -to -lot drainage is allowed without drainage easements, subject to the approval of
the City Engineer.
66. The water main system shall generally be constructed as shown on the tentative map and
be capable of delivering a continuous fire flow as required by the Fire Marshal. Provide
final, construction level water system flow and pressure calculations with the subdivision
improvement plan and final map submittal. All new water services shall be 1.5 -inches in
diameter with 1 -inch meters. Water meters shall be located within public easements.
67. All water main valves shall be located at curb extensions.
68. Landscaping in public utility easements shall be limited to ground cover and shallow
rooted, low lying shrubs. Trees are not allowed.
69. All existing unused water and sewer mains and services shall be identified on
construction drawings and abandoned per City standards.
70. Draft joint trench plans are required with the public improvement plan submittal. PG&E
approval of the joint trench plans is required prior to the start of any construction.
71. The sanitary sewer system shall generally be constructed as shown on the tentative map.
All sanitary sewer lines on private property shall be designated private and privately
maintained.
72. Any existing wells not proposed to be reused for irrigation purposes, and any existing
septic systems shall be properly abandoned per Sonoma County standards. Any existing
easements for leach fields and wells to be removed/abandoned shall be quitclaimed.
4—c3
73. The water and sewer in the private courts shall be private. Driveways A -F shall have the
meters in a public easement in front of the complexes. No meters will be permitted in
the driveways or at the end of the driveways. Install sewer manholes as required by the
Utilities Division.
74. The private driveway at the end of Street C shall have private Sewer and Water. Install a
SSMH in the Cul-de-sac for transition from private to public. Meters shall be installed
on lot 31 in a public easement to serve Lots 31-35.
75. A 15 -foot wide concrete pathway shall be constructed over the watermain in the access
from Street B to the cul-de-sac. A driveway ramp shall be installed on Street B for
maintenance access. No trees shall be planted in the alley or within 10 feet of the main.
76. The proposed drainage from Street B and the outfalls for the wetlands system shall be
privately owned and maintained.
77. All landscaping shall meet City water efficiency standards for low water use including the
following:
Prior to the issuance of a building permit, the applicant shall submit an irrigation design
plan as specified in PMC Section 15.70.050 (C)(5). Please refer to the PMC for detailed
requirements of this plan. The irrigation design plan shall include the following:
• Landscape water meters, dedicated water meters or private submeters shall be
installed for all multi -family residential landscape
• Automatic irrigation controllers utilizing evapotranspiration or soil moisture
sensor
• Pressure regulating devices
• Manual shut-off valves as close to the point of connection of the water supply
• Backflow prevention devices
• Flow sensors required in residential landscapes of 5,000 sf or larger
• Master shut-off valves
• Isolation valves installed at point of connection and before each valve or valve
manifold
• Irrigation system shall be designed to prevent runoff, low head drainage,
overspray, etc.
• Relevant t information from soil report shall be shall be utilized
• Design of irrigation system shall conform to the-hydrozones
• Must be installed to meet the irrigation efficiency regarding the MAWA
calculation
• Mulched planting areas require low volume irrigation
• Sprinkler heads and emission devices shall have matched precipitation rates
• Head-to-head coverage required, sprinkler shall be designed to have highest
possible distribution uniformity
• Swing joints or other riser -protection required on all risers
• Check valves or anti -drain valves required on all sprinkler heads where there
may be low point drainage
4(` Iq
• Areas less than 10 ft in width shall be irrigated with subsurface irrigation,
runoff prohibited
• Overhead irrigation not permitted within 24 inches of any nonperrneable
surface
• Slopes greater than 15% require point source or low-volume irrigation
• Each valve shall irrigation a similar hydrozone
• Emission devices to be selected based on what is appropriate for plant type in
that hydrozone
• Trees to be placed on separate valves
• Hydrozones shall not mix low and high water use plants
• Show or list hydrozones on irrigation plan or landscape design plan
• Hydrozone table that lists each hyrdozone, plant factor, irrigation method,
landscape area and percent of total landscape
78. Prior to issuance of first certificate of occupancy, the applicant shall submit the following
in accordance with PMC Section 15.70.050. Please refer to the following sections of the
PMC for detailed requirements of each item:
• Grading Design Plan (if applicable) PMC Section 15.70.050 (C)(6)
• Soil Management Report — PMC Section 15.70.050 (C)(3)
• Certificate of Completion — PMC Section 15.70.050 (D)(1-3) to include the
following attachments:
o Certification by either the signer of the landscape design plan, the
signer of the irrigation design plan, or the licensed landscape contractor
that the landscape project has been installed per the approved landscape
water use efficiency standards.
o Irrigation Schedule — shall be regulated by automatic irrigation
controllers, applied water should be the ETW . Annual water applied
shall be less than or equal to the MAWA.
o Landscape and Irrigation Maintenance Schedule - including routine
inspection, adjustment and repair of irrigation system, fertilizing,
pruning, weeding, etc.
79. Landscape Irrigation Audit conducted by a certified landscape irrigation auditor.
Landscape audits shall not be conducted by the person who designed the landscape or
installed the landscape. Audit reports shall meet the criteria listed in Section 15.70.050
(D)(2)(c)
80. All necessary right of ways and easements shall be dedicated on the final map, subject to
City approval.
81. Public access easements for the proposed Class I bicycles and pedestrian pathways shall
be dedicated to the City of Petaluma.
82. The easements for the shared driveways shall be at least 20 -feet wide and include private
access, private water line, private sanitary sewer and private drainage.
83. Public utility easements (PUE) shall be provided adjacent to and parallel to both sides of
new streets and within the public right-of-way. Any proposed PUE's less than 10 feet
wide shall be approved by the responsible public utility agencies. Additional PUE's may
be required in shared driveways.
84. Easements shall be dedicated to the City for the nine proposed public parking stalls on
the private Street B near Wellington Place. The public parking stalls shall be signed
appropriately for enforcement purposes.
85. Any existing overhead distribution utilities (electrical and communication) along the
project frontages and traversing the site shall be placed underground.
86. The areas proposed on sheet TM -13 on the tentative map to be within a Community
Facilities District shall be privately owned and maintained through a homeowner's
association or other privately funded mechanism.
87. Maintenance agreements shall be required for any shared utilities or facilities within
common areas and shall be recorded with the final map. Agreements shall identify the
utility or facility to be maintained, the parties responsible for maintenance and the
funding mechanism for maintenance, replacement and repair. All agreements shall be
reviewed and approved prior to recordation.
88. Each multi -family building shall have its own bike racks (inverted U style) and lockers
installed in accordance with City requirements.
89. Prepare final map and improvement plans per the latest City policies, standards, codes,
resolutions and ordinances. Final map fees and technical review deposits shall be
required at the time of the application submittal. Public improvements shall be designed
and constructed in accordance with City of Petaluma Standards, Caltrans and Manual of
Uniform Traffic Control (MUTCD).
90. Prior to issuance of any permits, a subdivision agreement package including City
standard surety bonds and insurance, is required for the subdivision improvements.
91. To mitigate limited access, the three-story multi -family buildings shall be equipped with
a Class 1 Standpipe in each shared stairwell, and buildings' sprinkler system shall be
designed per NFPA 13 with a 4 head calc. for Residential Occupancies (to include an
FDC and sprinkler coverage in attics, garages, bathrooms, closets, and covered porch
areas).
DATE:
TO:
FROM:
REVIEWED BY:
SUBJECT:
November 8, 2016
Planning Commission
Emmanuel Ursu, Principal Planner
Heather Hines, Planning Manager
ATTACHMENT 5
AGENDA ITEM NO. 8.A
BRODY RANCH SUBDIVISION AND PLANNED UNIT DISTRICT
360 Corona Road
File No. PLMA 2015-007
RECOMMENDATION
It is recommended that the Planning Commission approve the following resolutions:
Resolution recommending the City Council approve a Mitigated Negative Declaration
and Mitigation Monitoring and Reporting Program for the Brody Ranch Project (At-
tachment A).
• Resolution recommending the City Council approve a Zoning Map Amendment to rezone
the parcel from Residential 4 (R4) and Residential 5 (R5) to Planned Unit District (PUD)
and approve the Unit Development Plan and PUD Development Standards and Design
Guidelines (Attachment B).
• Resolution recommending the City Council approve a Vesting Tentative Subdivision
Map (VTSM) to subdivide the 15.92 -acre site into 61 single-family lots, (59 detached
single-family homes and two attached single-family homes) and one lot to accommodate
138 multi -family units. (Attachment Q.
Additionally, it is recommended that the Planning Commission provide feedback as appropriate
on the preliminary site plan and architectural plans that will be brought back to the Planning
Commission for consideration of SPAR.
BACKGROUND
Location and Context
The Brody Ranch Project is proposed on an approximately 16 -acre parcel adjacent to the future
site of the Corona Road Sonoma Marin Area Rapid Transit (SMART) Station in the northwest-
ern portion of Petaluma. The site is bound by Corona Road to the west, Sonoma Mountain Park-
way to the north, Wellington Place and Corona Creek to the east and the SMART rail line to the
south. The segment of Corona Road fronting the project site forms the municipal boundary be -
Page 1
15—(
tween the City of Petaluma and the County of Sonoma and is also the Urban Growth Boundary.
Both the municipal boundary and UGB are on the west side of this segment of the Corona Road
right-of-way and north of the Sonoma Mountain Parkway, the municipal boundary and UGB are
on the east side of Corona Road.
Areas to the north and east of the site are developed with single-family residences, areas to the
south contain a mix of industrial and mobile home development and areas to the southwest con-
tain industrial and business park uses. Rural farming and ad hoc industrial uses are located to the
west of the site outside the City limits. The area to the west is identified as a "Possible UGB Ex-
pansion Area" in the Planning Boundaries exhibit of the Petaluma General Plan. (General Plan
Figure i-3)
Highway 101 is approximately 1,500 feet southwest of the site and vehicular access to Highway
101 is approximately 1.5 miles from the site. Corona Creek, a blue line intermittent creek, and
Turnbridge Park, a 2.72 -acre public neighborhood park, are located immediately to the east of
the site. Figure 1 provides an aerial photograph of the project site that shows the project site fea-
tures and the surrounding land uses.
0 0.05 0.1 0.15 0.2 ..,.�. �...�.....� Lnyuma
®®®®®
0i
HPddy Ranch ®®®® Project Area
Petaluma, California
Figure 1. Project site and vicinity
Page 2
J5-2_
Project Site
The project site is elevated 33 to 43 feet above sea level with an approximately 1% grade sloping
to the southeast toward Corona Creek. As noted in Figure 3 and on plan Sheet TM -3, most areas
of the site with an elevation below 35 feet are within the 100 -year flood plain and contain wet-
lands. There are also a dozen isolated wetlands ranging in size fi•om 29 square feet to 2,471
square feet scatted throughout the undeveloped portions of the site. Plan Sheets TM -8 and TM -9
identify the location of the wetlands on the site including the wetlands impacted by the proposed
project. Existing vegetation consists primarily of open ruderal grassland and a mix of 82 native
and non-native trees, most of which are near the two existing residences on the site. The unde-
veloped portions of the site are used for cattle grazing.
The two residences on the project site front Corona Road. One is located in the project site's
southwesterly corner near the SMART rail line and one is in the northwesterly corner near the
traffic circle at the "T" intersection of Corona Road and Sonoma Mountain Parkway. Industrial
and agricultural structures and uses occupy the central portion of the property and consist of an
approximately 4,000 square foot shop, three barns, livestock pens and open lumber and land-
scape material storage.
Existing Public Access and Utility Easements
A 25 -foot wide easement to Sonoma County Flood Control and Water Conservation District runs
the length of the westerly property boundary, adjacent to the SMART railroad.
Project Description
Applications for a Vesting Tentative Subdivision Map (VTSM) and Zoning Map Amendment to
establish a Planned Unit District (PUD) were submitted by DeNova Homes on November 30,
2015 to subdivide the site into 199 residential units and to change the R4 and R5 zoning on the
site to PUD. The project includes a request to remove 32 trees, six of which are considered pro-
tected by the Implementing Zoning Ordinance. Site Plan and Architectural Review (SPAR) for
the new residential structures has not been submitted at this time and will be required prior to
issuance of any construction permits.
The VTSM proposes 61 single-family lots, (59 detached single-family homes and two attached
single-family homes on Lot Nos. 9 and 10), and one multi -family lot (Lot 62) to accommodate
13 8 condominium units in nine three-story buildings. In addition to the residential lots, four par-
cels are proposed. Parcel A is an open space parcel adjacent to the SMART railroad and Corona
Creek and contains preserved wetlands and open space areas, bicycle and pedestrian paths, con-
nections to the Corona Creek trail, seating areas, landscape buffer, and a common playground
and picnic area. Three parcels are proposed for the private streets in the development. Sheets
with no public access easement are on Parcel B, streets with a public access easement are on Par-
cel C, and a public parking easement for nine street parking spaces on Parcel C adjacent to the
playground and picnic area are on Parcel D. The project includes bicycle and automobile park-
ing, landscaping, and subdivision infrastructure (roads, utilities, stormwater management facili-
ties, etc.), in compliance with applicable code requirements. Affordable housing will be provid-
ed on-site under the terms of a Memorandum of Understanding between the Sonoma County
Land Trust and the project proponent as described in detail below.
Page 3
S^'�3
The proposed Zoning Map Amendment would change the zoning of the site from R4 and R5 to a
PUD with three land use districts: Open Space, Single -Family and Multi -Family. The Planned
Unit District (PUD) provides a more community oriented and pedestrian oriented design than
could be designed under the existing R4 and R5 zoning. Quantitative development standards of
the PUD largely follow those of the existing zoning except for the minimum parcel size criteria,
minimum front yard setback for primary structures and minimum street side and rear yard set-
back for accessory of the R4 zoning district. In addition, the PUD proposes more restrictive
standards for the height of primary and accessory structures.
The proposed Brody Ranch PUD contains ten sections:
1. Purpose;
2. Definitions;
3. Applicability;
4. Land Use Districts;
5. Allowed Land Uses and Permit Requirements;
6. Development Standards;
7. Access and Parking;
8. PUD Modifications;
9. SPAR; and
10. Landscape and Fencing.
Key provisions of the PUD include project design that provides a compatible mix of detached
and attached single-family and multi -family housing, open space for the preservation of wet-
lands, and a priority on pedestrian and bicycle connectivity and access to public transit and pub-
lic spaces within the community.
Table One contains a summary of the existing development standards of the R4 and R5 Zoning
Districts and the proposed standards of the Brody Ranch PUD. Standards of the PUD which are
less restrictive than those of the existing zoning are in bold typeface and standards of the PUD
which are more restrictive than those of the existing zoning are underlined. The PUD incoarpo-
rates by reference standards of the IZO pertaining to Fencing, Landscaping and Tree Preserva-
tion (IZO § 10.0) Parking (IZO) §7.0 and Signs (IZO Chapter 20).
The Corona -Ely Specific Plan (CESP) contains a setback requirement for structures adjacent to
Sonoma Mountain Parkway. For portions of structures up to 15 feet tall the setback is 30 feet
and for every foot over 15 feet in height, the setback increases one -foot. The setback on Sonoma
Mountain Parkway proposed for single household dwellings is consistent with the existing set-
back requirement of the CESP. The proposed setback for the multiple household dwellings along
Sonoma Mountain Parkway allows three story development on the portion of the site adjacent to
Sonoma Mountain Parkway that is designated for High Density Residential development. At-
tachment G (Sheet SP -2 and SP -3) illustrates application of the setbacks adjacent to Sonoma
Mountain Parkway.
Page 4
5_9
Table One: Existing and Proposed Development Standards
Page 5
5-S
EXISTING ZONING STANDARDS AND PROPOSED PUD STANDARDS
DEVELOPMENT FEATURE
SINGLE HOUSEHOLD DWELLINGS
MULTIPLE HOUSEHOLD DWELLINGS
LOT SIZE
Brody Ranch
Brody Ranch
Mininnon area and width required
R4
PUD
RS
PUD
for each lot in a new subdivision
Minimum Area
3,500 sf
3,000 sf
1,500
NA
Minimum Width
35 ft Interior
35 ft Interior
NA
NA
40 ft corner
40 ft corner
Minimum Depth
70 ft
70 ft
NA
NA
SETBACKS
Minimum setbacks required.
Primary structure
loft
5 ft
Oft
O ft
Front
O ft
Oft
O ft
Oft
Side — Interior
loft
loft
O ft
O ft
Side — Street side
loft
loft
Oft
Oft
Rear
Same as Single Household Dwellings, except, up
30 ft. setback. Portions above 15ft in height at 30
to 100 feet of aggregate building width may have a
Sonoma Mountain Parkway —
ft setback line shall be setback an additional foot
15 ft setback and portions above 15 ft in height at
Primary and Accessory Structure
for every foot above 15 feet.
the 15 ft setback shall be setback one additional
Setbacks
I foot for every foot above 15 feet in height.
Minirnum setbacks required
Accessory Structure
Not Permitted
Not Permitted
Not Permitted
Not Permitted
Front
4
4 ft
4 ft
5 ft
Side —Interior
10
5 ft
loft
5 ft
Side — Street
5
Oft
5 ft
5 ft
Rear
The percent of the total site area covered by structures, open or enclosed, excluding uncovered steps,
Site Coverage
patios and terraces.
Maximum Coverage
60%
60%
NA
NA
Primary structure
Accessory structure
10% of the required
10% of the required
detached
setback area or 500 sf,
setback area or 500 sf,
NA
NA
whichever is greater
whichever is greater
Height Limit
Maximum allowable height of structures. See Glossaty (Chapter 27) for height measurement require -
Maximum Height
ments and Chapter 12 for height limit modifications.
35 ft
29 ft
45 ft
40 ft
Principal Building
25 ft
15 ft
25 ft
15 ft
Accessory Structure
Accessory Dwelling
21 ft
25 ft
NA
NA
400 sf/unit
400 sf/unit
USABLE OPEN SPACE
May include common
May include common
300 sf/unit
300 sf/unit
open space
open space
FENCING, LANDSCAPING & TREE
PRESERVATION
See PUD Section 10.0
PARKING
See PUD Section 7.0
SIGNS
See IZO Chapter 20
Page 5
5-S
Site Plan and Architectural Review
While the City received a SPAR application for the Brody Ranch project and the architectural
plans are attached to this report (Attachment G), review of the site layout, building architecture,
and landscape plans for the new lots is not part of the proposal before the Planning Commission
at this time. The attached architectural plans are intended to facilitate review and discussion of
the VTSM and PUD and to provide the applicant an opportunity to hear Planning Commission
and public input on the conceptual site and architectural plans. Planning Commission will con-
sider the SPAR application after the VTSM and PUD are approved by the City Council. The
Planning Commission does not have a complete SPAR application or associated staff analysis
for consideration at this time. Therefore, if the Planning Commission chooses to provide input
on the conceptual architectural plans, , it is not bound by feedback it provides at this time and the
applicant's reliance on Commission input is at their own risk. Nevertheless, Commission and
public input on the site and architectural plans contemplated for the development may help guide
the applicant in preparing a complete SPAR application.
Site Access and Circulation
Primary vehicular access to the site is proposed from Sonoma Mountain Parkway directly across
fiom Mauro Pietro Drive which is approximately 300 feet east of the traffic circle at the "T" in-
tersection of Corona Road and Sonoma Mountain Parkway. A second vehicular access point is
provided from Wellington Place just north of the existing bridge over Corona Creek. Internal cir-
culation to the single-family homes is provided along private streets that have an overall right-of-
way width of 45 feet (56 feet wide at the project entrance) and a curb -to -curb roadway width of
36 feet. Four and one half -foot sidewalks without planter strips are provided on both sides of the
private streets. Private driveways serving the condominium buildings are 24 feet wide. Drive-
way access for single family homes on Lots 1 through 55 will be taken from the new private
roadways within the subdivision and the six lots that front onto Wellington Place (Lots 56 — 61)
will be accessed via driveways off of Wellington Place. A row of through -lots (Lots 18 to 25)
will back up to Sonoma Mountain Parkway and have driveway access and front a new internal
roadway ("Street C"). These lots are setback an average of 39 feet from the face of curb of the
Sonoma Mountain Parkway right-of-way and are separated by an open split rail fence at the back
of the sidewalk, a 15 -foot wide landscape buffer, a 6 -foot wooden fence topped by a two -foot
privacy screen with gated pedestrian access to the rear yard of each home, and the rear yards.
Single-family lots adjacent to Sonoma Mountain Parkway have setbacks that meet the criteria of
the Corona -Ely Specific Plan.
An approximately 160 -foot long left turn lane is proposed from the westerly direction of Sonoma
Mountain Parkway into the project. To accommodate the new left turn lane, changes to pavement
stripping and the center median are proposed including elimination of a portion of the existing
median; removal of one of the two eastbound lanes; and widening of the existing westbound bi-
cycle lane, right -turn lane and travel lane. These changes are proposed along the length of the
new left turn lane.
Pedestrian and bicycle access to the site is provided at both vehicular access points. In addition,
pedestrians and cyclist may access the site from Corona Road at the southwesterly corner of the
site and from the existing trail and Class I bicycle path along Corona Creek at the southeastern
Page 6 !-r G
corner of the site. Gated resident -only pedestrian access to the multi -family portion of the site is
provided at two locations along Corona Road, at one location at the traffic circle at the intersec-
tion of Corona Road and Sonoma Mountain Parkway and at two locations from the Class I path
along the south property line near Corona Road and between building Numbers 6 and 7. The pe-
destrian access gates are designed to include a 13 -foot tall covered entry structure with wood sid-
ing and wire mesh walls under a corrugated steel roof topped by a decorative cupola designed to
match features of the existing barn on the project site.
Within the development, four and one half -foot wide sidewalks are provided along the private
streets and a Class I bicycle trail and pedestrian path is proposed between Corona Road and Co-
rona Creek along the southerly side of the project site just north of the wetlands to be preserved.
A public sidewalk and a Class II bicycle path are proposed along the project side of Corona
Road. The sidewalk will end at the SMART crossing in a location and manner that will allow
for future extension of the sidewalk. Two options are provided for the sidewalk along Corona
Road with the objective of preserving seven mature redwood trees ranging in size from 26" to
37" DBH (see plan Sheet TM -20). Option 1 provides a landscaped parkway in two sections
along the roadway and no landscaped parkway to separate the sidewalk from the street where
necessary to avoid the critical root zone of the mature redwood trees. Option 2 provides a land-
scaped parkway along the entire length of the Corona Road frontage with a reinforced concrete
sidewalk constructed at grade to minimize impacts to the redwood trees. Option 2 is consistent
with the Corona Ely Specific Plan which requires a planter strip between the roadway and the
sidewalk along the length of the Corona Road frontage.
Existing sidewalks along both sides of Sonoma Mountain Parkway will remain and a new side-
walk will be added to the project side of Wellington Place along with three street parking spaces
set in between the proposed driveways. Painted ladder crosswalks will be added across both ve-
hicular access roads to the subdivision and across Sonoma Mountain Parkway on either side of
the main access road into the subdivision. The Sonoma Mountain Parkway/ Mauro Pietro cross-
walks will also have Rectangular Rapid Flashing Beacons. Internal crosswalks made of a
stamped concrete will be provided at all street intersections and at the play/picnic area.
As an offsite improvement, the project will construct a bus stop on eastbound Sonoma Mountain
Parkway, just east of Wellington Place at the Turnbridge Park frontage. The bus stop will include
a bus turn out, accommodating one municipal bus; a 5 foot x 15 foot bus shelter; and a bench.
The existing sidewalk will be reconstructed behind the proposed bus turn out.
Page 7
S-1
Figure 2. Tentative Map Site Plan
Utilities
Sanitary sewer, water and joint trench connections to existing utilities are proposed at both ve-
hicular access points to the project. These utilities would be carried through the project site with-
in the right-of-way of new internal roadways. The subdivision lots will be served via lateral con-
nections from new utilities within internal roadways, with the exception of those lots that front
onto Wellington Place. Lots 56 — 61 front Wellington Place and will be served via lateral utility
extensions from existing utilities in the Wellington Place right-of-way.
Stormwater runoff will be collected from impervious surfaces in the development and allowed to
percolate into the soils on site for treatment before release. The stormdrain system incorporates a
series of bioretention features including on -lot drainage, roadside bioretention, drainage swales,
bioretention ditch, and rolled curb and gutter with pervious concrete. Stormwater runoff will be
collected and conveyed through these bioretention swales prior to release into the wetlands area
and eventually into Corona Creek.
In addition to the Stormwater treatment facilities proposed, a stormwater detention basin is in-
cluded at the southeasterly corner of the site. The detention basin occupies 0.26 acres (11,300
square feet), with a depth of 0.75 feet. The water storage capacity of the detention basin is 9,025
Page 8 5--
cubic feet. The detention basin is sized to accommodate the post development run-off increase
impacting Corona Creek. The basin increases the existing flood plain capacity located in the un-
developed portion of the project. Floodwaters originate from Corona Creek. When Corona Creek
waters rise the detention basin begins to accept stormwater from the creek through a new storm
drain line connecting the basin to the creek. The additional capacity created by the basin miti-
gates the downstream impacts from the development. A catch basin at the bottom of the basin
connecting the storm drain to Corona Creek drains the basin when the storm subsides and the
water level in the creek drops. A berm around the detention basin prevents small storm on-site
flows from entering into the depression. The berm elevation is set below the base flood eleva-
tion so as not to impact the existing flood plain.
Plan Sheet TM -14 illustrates the type of stormwater treatment facilities employed in various are-
as of the project. Except for the roadway adjacent to the open space area, runoff from the roads
in the project is treated through pervious concrete gutters. Stormwater runoff from all other are-
as including the roadway next to the open space area, sidewalks, rooftops and parking lots is
treated through bioretention swales located adjacent to sidewalks, in landscaped areas and in the
parking lot island.
Landscaping and Fencing
As a part of the subdivision improvements, landscaping around the perimeter of the project site
consisting primarily of drought tolerant plants and a mix of native and non-native species will be
introduced along Sonoma Mountain Parkway, in a planter strip along Corona Road and along
Wellington Place, and along the multi -use path. Additional landscaping in the bio-swales and in
the yards around the single-family homes, duplex and condominiums will be included in the
SPAR application to be considered at a later date. Landscaping is designed to promote unifica-
tion of the neighborhood, connectivity, privacy, shading and aesthetics. The plant palette con-
sists of drought tolerant plants and a mix of native and non-native species, except in the bioswale
and near the preserved wetlands were only California native species are proposed.
To address potential noise impacts generated by traffic along Sonoma Mountain Parkway, Coro-
na Road and SMART, portions of the project site's perimeter are to be screened by double sided
wood fencing. Six-foot fencing setback 15 feet from the property line will attenuate street noise
at the rear of the homes along Sonoma Mountain Parkway. Trees and shrubs will screen the
fence from the roadway and an open 42 -inch wire mesh fence is provided at the back of the
sidewalk. Consistent with streetscape design for Sonoma Mountain Parkway as outlined in the
Corona Ely Specific Plan, the six-foot wood fence intended to attenuate noise is set back from
the roadway and is screened with landscaping.
Landscaping along Corona Rd will consist of a landscape parkway strip featuring a mix of per-
ennials, shrubs and groundcovers. Vines may be incorporated along the proposed fences to deter
graffiti. Fencing along this side of the project will include an eight -foot wood sound fence which
will align with the sides of the buildings and be set back approximately 15 feet from the property
line. A three-foot split rail fence will be incorporated at or near the property line and the land-
scape material will include existing mature redwood trees and a mix of native and non-native
trees, shrubs, groundcover and vines.
Page 9
A six-foot fence with gabion pillars will be threaded between the grove of trees along the multi-
use path at the southern property boundary and then transition into a three-foot split rail wood
fence across the site to the playground/picnic area at the east side of the site.
Table Two provides a summary of the type, container size and quantity of trees proposed along
the street frontages and along the multi -use path. In addition to the 140 trees proposed to be
planted with the subdivision application, 180 trees are proposed in the interior of the subdivision
in front yards and among the multi -family structures with the SPAR application.
Table Two: Proposed Trees
Tree Name (Commwo_�Size
ntainer :
Quantity
Replacement
Equivalent*'
Trees proposed
along street frontages
Red Maple
15 gallon
8
0
Columnare Red Maple
15 gallon
21
0
Marina Strawberry Tree
24" box
12
24"
Coast Live Oak
24" box
36" box
6
16
12"
48"
Pineapple Guava
15 gallon
9
0
Subtotal
72
84"
Trees proposed along multi -use path
California Buckeye
24" box
10
20"
Western Redbud
15 gallon
8
0
Western Cottonwood
36" box
3
9"
Valley Oak
36" box
4
12"
Blue Elderberry
15 gallon
19
0
Coast Live Oak
36" box
17
51"
Marina Strawberry
24" box
7
14"
Subtotal
68
106"
Total
140
190"
* 15 gallon = 0 replacement, 24" box = 2" replacement and 36" box = 3" replacement
Tree Removal
Thirty-two trees are proposed for removal, including six trees protected by code. Twenty-seven
trees will remain, 16 of which are protected by code. Protected trees approved for removal must
be replaced at a ratio of one inch replacement equivalent for each diameter inch of tree approved
for removal if the tree removed is in good or excellent condition and one inch of replacement
equivalent for every two diameter inches of tree approved for removal if the tree removed is in
fair or marginal condition. Table Three identifies the protected trees to be removed, their size,
condition and replacements required.
Page 10 S-10
Table Three: Protected Trees Proposed to be Removed
#
Species
Trunk
DHB*
Condition
Replacements Required
5
Valley Oak
14
Fair
7"
5
Valley Oak
17
Good
17"
6
Redwood
45
Good — Excellent
45"
47
Redwood
27
Excellent
27"
47
Redwood
34
Excellent
34"
48
Redwood
27
Good
27"
49
Redwood
22
Good — Excellent
22"
82
Coast Live Oak
6
Excellent
6"
Total
192
185"
*DBH is the diameter at breast height, or 4 %2 feet above grade.
Buildings
As noted above, SPAR review is not currently before the Commission for consideration. Prelim-
inary architectural plans attached to this report are intended to facilitate review and discussion of
the VTSM and PUD and to provide the applicant an opportunity to hear Planning Commission
and public input before consideration of the SPAR application after the Council's decision on the
MND, VTSM, and PUD. A site plan identifying the proposed roadways and building placement
is shown in Figure 3, below.
Nine condominium buildings are proposed on the western side of the project site. This will be
broken up into three buildings contain 12 units and six buildings contain 17 units. All of the con-
dominium structures are three stories; have a mix of one, two and three bedrooms; and have gar-
ages for each unit accessed from the alley. Resident parking is provided in 99 alley -loaded gar-
ages and 39 designated uncovered and unreserved parking spaces in a centrally located parking
lot. Additional 21 uncovered guest parking and 4 accessible parking spaces are provided in the
parking lot and 134 parking spaces are provided alongside the private roadways within the de-
velopment, including nine spaces near Wellington Place which are open to the general public.
The 2017 CalGreen Building Code requires all 61 single-family residences and three percent of
multi -family residences to accommodate future installation of electric vehicle charging stations.
Three architectural styles are proposed for the condominium buildings: Craftsman, Mediterrane-
an and Farmhouse. Four buildings (Nos. 3, 4, 5 and 6) are oriented perpendicular and adjacent to
Corona Road with access driveways that terminate in eight -foot tall wooden fences. The remain-
ing condominium buildings are parallel to Corona Road and are located toward the interior of the
site between the proposed main vehicular entrance to the project and the four buildings abutting
Corona Road.
Three floor plans and three architectural styles are proposed for the detached single-family
homes: Craftsman, Cottage and Farmhouse. Plan 1 is a 3 bedroom 2 V2 bathroom home with
1,909 square feet, Plan 2 is a 4 bedroom 3 bathroom home with 2,080 square feet and Plan 3 is a
4 bedroom 3 bathroom home with 2,347 square feet. All of the detached single-family homes
have a two -car garage plus open parking for two cars in the driveway.
Page 11
'5-1(
The attached single-family homes on Lot Nos. 9 and 10 have 4 bedrooms and 2 bathrooms in
1,611 square feet. They each have a two -car garage with tandem stalls plus open parking for one
car.
PUD SITE PLAN
BRODY RANCH SUBDIVISION
Figure 3. Site Plan
Pedestrian and Bicycle Advisory Committee
At its July 6, 2016 meeting, PBAC recommended the applicant include bicycle parking in multi-
ple locations among the complex of multi -family buildings. The bicycle parking is to be in en-
closed areas with locked access, a roof and lighting. A suggested condition of project approval is
the provision of bicycle parking consistent with the recommendations of SPAR. In addition, the
Committee recommended the applicant investigate the feasibility of a pedestrian crossing over
the SMART railroad in the project's southeasterly corner near Corona Creek.
Affordable Housing.
The City's Housing program is mission -driven and intended to be flexible and simple, allowing
it to change with the changing needs of the community. The 2015-2023 Housing Element states
that it is the city's goal to promote the development of housing affordable to very -low, low and
Page 12 S—(-2-
moderate -income households. Policy 4.2 supports that goal by assigning a share of the responsi-
bility for providing affordable housing to the developers of market -rate housing and non-
residential projects. Program 4.4 of the Housing Element requires developers of residential pro-
jects within a half -mile radius of a planned SMART station to provide at least 15 percent of the
units at below market rates. Program 4.4 also provides flexibility to allow developers to imple-
ment the inclusionary housing program in a manner that works best for the project and the City's
housing program.
With their November 2015 VTSM and PUD application, the developer proposed making an in -
lieu payment to the City to fulfill 100% of their affordable housing obligation. Staff informed the
applicant of Housing Element Program 4.4(a) and that per City Council direction and as noted in
the November 2, 2015 City Council Staff Report regarding amendments to the City's Inclusion-
ary Housing Program, it is the "City Council's strong desire to have affordable residential units,...
within a half -mile radius of the planned SMART station." To that end, staff encouraged the de-
veloper to continue its conversation with the Housing Land Trust of Sonoma County (HLT) re-
garding providing on-site affordable housing through its First Time Homebuyer Program.
In cooperation with the City's Housing Division and with HLT, DeNova Homes entered into a
Memorandum of Understanding (MOU) with HLT and revised its proposal to include 25 afford-
able housing units on site which is 12.5% of the total units. The MOU in pertinent part states
that:
1. DeNova Homes will develop 21 affordable condominium units that will be distributed
throughout the nine multi -family buildings with a unit -mix goal of six one -bedroom
units, nine two-bedroom units and six three-bedroom units.
2. DeNova Homes will develop one two -unit home (i.e. duplex) and dedicate the land to
HLT who will execute 99 -year renewable ground lease to ensure affordability of the
homes.
DeNova Homes will develop two detached single-family homes and dedicate the land to
HLT who will execute a 99 -year renewable ground lease to ensure affordability of the
homes. HLT will contribute up to $300,000 per affordable detached single-family home
to off -set the cost of the market rate unit and thereby make it affordable to the ultimate
buyer.
4. DeNova Homes will contribute $600,000 to HLT so that HLT will have sufficient funds
to subsidize the purchase of the two affordable detached single-family homes.
5. All affordable units will be resale restricted to households with low to moderate income
earners.
6. HLT will ensure the continued affordability of the units for the term of the 99 -year re-
newable ground lease and administer the affordable housing program for the project.
The MOU is available in Attachment D.
Page 13
5-13
Program 4.4(e) of the Housing Element gives a developer the option to use alternative methods
to meet the intent of the inclusionary requirement, subject to approval by the City Council. To
better understand the benefits of providing the 25 units on-site, Housing Division staff calculated
the developer contribution for providing units on-site in contrast to paying the in -lieu fee. As the
analysis in Attachment D indicates, the developer's cost of providing on-site affordable housing
is approximately $516,000 more than paying the in -lieu fee. The units will be affordable in per-
petuity through a ground lease with the Housing Land Trust of Sonoma County.
DISCUSSION
General Plan Consistency
Existing zoning and General Plan land use designation of the site are split with 7.48 acres desig-
nated Medium Density Residential (MDR) and zoned Residential -4 (R4) and 8.445 acres desig-
nated High Density Residential (HDR) and zoned Residential -5 (R5). Figure 4 identifies areas of
the site designated MDR and HDR. Forty units at a density of 10.7 du/acre are proposed on the
eastern portion of the site in the area designated MDR and 159 units at a density of 27.81 du/acre
are proposed in the western portion of the site in the area with the HDR designation.
Existing Zoning C3 WN NE
FIRM 0111
Brody Ranch
Petaluma, California
Figure 4
Figure 4. Land Use Designation, Existing Zoning and Proposed Densities
Table Four provides a breakdown of the gross and net land area and the project density by land
use designation and plan Sheet TM -4 delineates the land use designations on the site.
Page 14
Table Four: Brody Ranch Density
General Plan Use
(Zoning)
MDR
(R4)
HDR
(R5)
Total
Gross Acres
7.48
8.44
15.92
Open Space and Wetlands
2.59
1.18
3.78
Roads
1.14
1.53
2.67
Net Acres
3.74
5.71
9.46
Units Proposed
40
159
199
Density Range
(Units/Acre)
10.7
(8.1-18.0)
27.8
(18.1— 30.0)
21.0
Source: Density Land Use Plan Brody Ranch Subdivision TM -4.
Goals, policies and programs of the 2025 General Plan applicable to the proposed subdivision
and PUD are listed below in italics followed by a staff analysis.
1-P-1: Promote a range of land uses at densities and intensities to serve the community
needs within the Urban Growth Boundary (UGB).
The proposed project is infill development within the UGB and within the density ranges desig-
nated in the General Plan. There are 10.7 du/ac proposed on the portion of the site designated
MDR and 27.8 du/ac in the portion of the site designated HDR.
1-P-2: Use land efficiently by promoting infill development, at equal or higher density
and intensity than surrounding uses.
The proposed subdivision represents efficient use of land in that it is infill development on un-
derutilized property designated for medium density residential development and high density res-
idential development at the intersection of two arterials, Sonoma Mountain Parkway and Corona
Road, and adjacent to the planned Corona Road SMART Station. The density of the project is
consistent with existing zoning and General Plan designation and has been designed to comple-
ment development characteristics of surrounding properties and increase density of development
closer to the main arterial and future SMART station. Single family detached units are included
on the eastern side of the development to relate to the more traditional single family neighbor-
hood on the eastern side of Wellington Place and Corona Creek and north of Sonoma Mountain
Parkway. The multi -family portion of the project is on the western side where a greater number
of residents will have direct pedestrian access to the adjacent site planned for a SMART Station.
2-P-1 As depicted on the land use map, alloiv for urban development at defined densities
and intensities to prevent the need to extend ouh4,ard beyond the Urban Growth
Boundary (UGB).
Page 15
5-I5
The project is proposed at densities consistent with the City's adopted land use map as noted in
Table Four above.
2-P-2 For development adjacent to the UGB, the intent of the designated land use is to
feather or reduce densities to provide a transition from urban to rural.
Property west of the project site is currently outside of the UGB; however, it is identified in the
Planning Boundaries exhibit (General Plan Figure i-3) of the Petaluma General Plan as a "Possi-
ble UGB Expansion Area." Furthermore, the density proposed in the portion of the site desig-
nated HDR is consistent with the density range for the HDR Land Use designation.
Feathering of density between existing single-family homes east and north of the project site and
the multi -family homes proposed on the western side of the site is accomplished by the single-
family homes in the development.
2-P-5 Strengthen the visual and aesthetic character of the major arterial corridors
through
• Orientation towards street; and
• Prohibiting use of soundwalls facing streets.
Although the proposed residences will not front Sonoma Mountain Parkway, the visual and aes-
thetic character of Sonoma Mountain Parkway is maintained through a landscape buffer, gener-
ous building setbacks and building setbacks which increase as the building height increases. To
attenuate noise generated by vehicular traffic, a six-foot double sided wood fence set back 15
feet from the Sonoma Mountain Parkway and screened with landscaping is proposed.
2-P-97 The parcel at the corner of Sonoma Mountain Parkway and Corona Road with a split
designation of medium density and high density residential shall reflect the intent of
providing a mixture of unit types both consistent with the surrounding neighborhoods
and the desire for high density housing in proximity to the proposed rail station.
Distribution of a mixture of medium and high-density unit types across the property
may be permitted
As proposed, the Brody Ranch subdivision will contain a mix of single-family, duplex and mul-
ti -family homes with the lower density development in the subdivision closer to existing single-
family neighborhoods and the higher density multi -family development near Corona Road and
the proposed Corona Road SMART Station.
4-P-6: Improve air quality through required planting of trees along streets.
A total of 140 trees along the project's three roadway frontages and along the multi -use trail near
the southerly side of the development are proposed with the subdivision application. An addi-
tional 180 trees are included in the SPAR application for the project.
5-P-19: All new and redesigned streets shall be bicycle and pedestrian friendly in design.
Page 16
A ten foot wide multi -use path is proposed along the southern end of the development, four and a
half foot sidewalks are proposed along both sides of all private streets within the development, a
pedestrian access path is proposed at the end of the proposed cul-de-sac to provide connection to
the play/picnic area, and new sidewalks separated by a landscaped parkway are proposed along
the Corona Road and Wellington Place frontages. The existing sidewalk and Class 1 bike lane
along Sonoma Mountain Parkway will remain and a Class II bike lane will be added to the Coro-
na Road frontage.
10-P-3 (f) Discourage use of sound walls anywhere except along Highway 101 Corridor and or
along NWRA Corridor without findings that such walls will not be detrimental to the
community character. When sound walls are deemed necessary, integrate them into
the streetscape.
To attenuate vehicle noise from Sonoma Mountain Parkway a six-foot tail double -sided redwood
fence set back 15 feet fiom the right-of-way line and screened by landscaping is proposed.
Along the Corona Road frontage, sound is attenuated by building placement and, in the areas
between the buildings, by eight -foot, double -sided redwood fence panels set back 15 feet fiom
the roadway and screened with landscaping. Along a portion of the SMART railroad, an eight -
foot, double -sided redwood fence with gabion columns is proposed. The fence is proposed along
an approximately 200 -foot length of the southerly property line starting near Corona Road.
11 -P -20B: Continue to require the planting of street and parking lot trees as part of residential
projects to provide cooling during the summer months.
Seventy-two trees are proposed along the Corona Road, Sonoma Mountain Parkway and
Wellington Place frontages. As a part of the SPAR application, trees in compliance with the
code standards for parking lot landscaping shall be provided.
Housing Element Consistency
There are several policies for provision of affordable housing in the City's adopted Housing
Element including policies specific to private development located within a half mile radius of
planned SMART stations. Table 6: Vacant and Underutilized Sites of the Housing Element
identifies the Brody Ranch site as an underutilized site with an estimated housing potential for
300 units and which is a key site to accommodate low- and moderate -income housing. The
following Housing Element policies apply to Brody Ranch.
Policy 4.2 Assign a share of the responsibility for providing affordable housing to the
developers of market -rate housing and non-residential projects.
Program 4.3Continue to require residential projects of five or more units to contribute to the
provision of below-market rate housing in one of the following ways:
a. Within a half -mile radius of the planned SMART stations, the developer shall provide at
least 15 percent of the units in a rental housing project at rents affordable to very low -
and low-income households and 15 percent of the units in a for -sale project at prices
affordable to low- and moderate -income households for a minimum period of 30 years.
Page 17
S -I1
b. Dedicate a portion of the project site or property elsewhere to the City or a non-profit
organization for use as a site for affordable housing. This option is allowed only if the
City or a non-profit agency has a pending project.
c. When the project is non -transit oriented, the developer can make an in -lieu payment to
the City's Housing Fund.
d. Use alternative methods to meet the intent of the inclusionary requirement, subject to
approval by the City Council.
Twenty-five housing units in the development will be sold at prices affordable to low- and
moderate -income households. The units will be affordable for 99 years through a renewable
ground lease for the detached and attached single-family homes and a deed covenant for the
condominiums with the Housing Land Trust of Sonoma County and units will be scattered
throughout the development and consist of a mix of one, two and three bedrooms, as is needed.
Although this represents 12.5 percent of the total units which is less than the 15 percent specified
by Housing Element Program 4.4(a), the term of the affordability restrictions is more than two
times longer than that required by the Housing Element and Program 4.4(e) allows use of
alternative methods to meet the intent of the inclusionary requirement, subject to approval by the
City Council.
To better understand the benefits of providing the 25 units on-site, Housing Division staff
calculated the developer contribution for providing units on-site in contrast to paying the in -lieu
fee. As the analysis in Attachment D indicates, the developer's cost of providing on-site
affordable housing is approximately $516,000 more than paying the in -lieu fee.
Condition of Approval No. 15 requires the project applicant to comply with the inclusionary
housing requirements per the terms outlined in the Memorandum of Understanding between the
developer and the Housing Land Trust of Sonoma County.
Corona Ely Specific Plan
The project site is governed by the Corona Ely Specific Plan (CESP) which was adopted by the
City Council in 1989. The following policies from the CESP are particularly applicable to the
subject project:
Major Design Policies.-
Policy
olicies:
Policy 29 Conventional, fidly exposed noise barriers are to be avoided along the (Sonoma
Mountain) Parlovay
The noise barrier along Sonoma Mountain Parkway is a double sided wood fence to compliment
the residential character instead of a masonry sound wall. Additionally, the fence is setback 15
feet from the property line and screened with multi -layered landscaping to soften the visual char-
acter along Sonoma Mountain Parkway.
Page 18 S _ ( g
Policy 90 All Corona/Ely residential streets shall have a 4 to S foot planting strips within
the right of way on both sides of the street between the curb and sidewalk, rather
than having the sidewalk adjacent to the street.
Brody Ranch fronts three public streets; Corona Road, Sonoma Mountain Parkway and Welling-
ton Place. The existing sidewalk along Sonoma Mountain Parkway does not have a planter strip
and it is proposed to remain as constructed. Sidewalks with planter strips will be added along
Corona Road and Wellington Place. Along the private streets within the proposed subdivision,
there are no landscape planter strips between the sidewalks and the curb.
Zoning Map Amendment
Approval of a PUD requires a Zoning Map Amendment and is subject to findings of fact by the
Planning Commission and the City Council to support standards of IZO section 19.030, as listed
below.
Staff analysis of the project as it relates to each standard of IZO section 19.030, in italics, is in-
cluded below.
The PUD clearly results in a more desirable use of land and a better physical environ-
ment than would be possible tinder any single zoning district or combination of zoning
district. (1Z0 section 19.030).
Approval of the PUD will allow preservation of the large wetlands areas on the southern side of
the site and a buffer between the railroad and housing while maintaining the density range envi-
sioned in the General Plan for the property. Two key differences between the existing R4 zoning
on the site and the proposed PUD are (1) a minimum lot size of 3,000 instead of 3,500 square
feet and (2) a minimum front yard setback of 5 feet instead of 10 feet. A reduction of the lot size
and front yard setback criteria allow development of the site at 10.7 du/ac in the MDR portion of
the site where the permitted density range is 8.1 to 18.0 du/ac.
2. That any PUD is proposed on property which has a suitable relationship to one (1) or
more thoroughfares, and that said thoroughfares are adequate to carry any additional
traffic generated by the development. (IZO section 19.030.A)
Sonoma Mountain Parkway and Corona Road are two thoroughfares that front the project site.
Primary vehicular access is from Sonoma Mountain Parkway with secondary access from a local
residential street that feeds into Sonoma Mountain Parkway, Wellington Place. As documented
in the Traffic Impact Study prepared by W -Trans, May 26, 2016, there is adequate capacity on
the roadways in the project vicinity to carry additional traffic generated by the development.
That the plan for the proposed development presents a unified and organized arrange-
ment of buildings and service facilities which are appropriate in relation to adjacent or
nearby properties and that adequate landscaping and/or screening is included if neces-
sary to insure compatibilio). (1Z0 section 19.030.8)
Structures are arranged in a unified and organized manner with appropriate setbacks, points of
ingress and egress, landscaping, and orientation to adjacent and nearby properties. On the Sono -
Page 19
(�' �9
ma Mountain Parkway frontage, where traffic volumes are high, the development has large set-
backs and is adequately landscaped consistent with the established pattern of development on the
north side of Sonoma Mountain Parkway. Where wood fencing is at the property's boundaries,
it is screened with landscaping. Along the Wellington Place frontage where traffic volumes are
low, homes front the street as is consistent with existing homes in the neighborhood east of Bro-
dy Ranch.
4. That the natural and scenic qualities of the site are protected, with adequate available
public and private spaces designated on the Unit Development Plan or General Devel-
opment Plan. (IZO section 19.030. C)
Scenic qualities of the site will be protected and enhanced and adequate public and private spac-
es provided by a 3.7 -acre open space with a playground/picnic area, Class 1 multi -use path and
natural wetland preservation area; by limiting tree removal in the southwestern corner of the site
and along Corona Road where several mature redwood trees exist; by planting 140 trees and over
1,800 shrubs; and by outdoor living areas with seating among the multi -family buildings. In ad-
dition, convenient access is provided to the existing multi -use path along Corona Creek.
5. That the development of the subject property, in the manner proposed by the applicant,
will not be detrimental to the public welfare, will be in the best interests of the City, and
will be in keeping with the general intent and spirit of the zoning regulations of the City
of Petaluma, with the Petaluma General Plan, and with any applicable plans adopted by
the City. (IZO section 19.030.D)
The project is in the best interests of the City in that it adds to the housing supply, consistent with
Goal 1 of the Housing Element of the Petaluma General Plan and includes 25 on-site affordable
housing units with a mix of one-, two- and three bedrooms. Furthermore, the project is in keep-
ing with the general intent and spirit of the zoning regulations in that the design, layout and den-
sity is consistent with the existing surrounding neighborhoods and the density of the project is
consistent with the HDR and MDR density ranges specified in the General Plan land use desig-
nations for the site.
Tentative Subdivision Map
Subdivision of land is governed by the CA Subdivision Map Act (SMA) and by Chapter 20 of
the Petaluma Municipal Code. There are seven standards in the SMA (Government Code section
66474) by which subdivisions are evaluated. The SMA standards are listed in italics below fol-
lowed by staff analysis of the project as it relates to each standard.
a. That the proposed map is consistent with applicable general and specific plans as specified
in Section 65451.
The proposed map is consistent with the general plan in that it is on property designated for Me-
dium Density Residential and High Density Residential use in the General Plan Land Use Map
with a density range of 8.1 to 18 dwelling units per acre for the MDR designation and 18.1 to
30.0 dwelling units per acre for the HDR designation. The project has density of 10.7 dwelling
units per acre in the MDR area and 27.81 dwelling units per acre in the HDR area. Furthermore,
Page 20
5- Zo
the proposed subdivision, together with provisions for its design and improvements will not be
detrimental to the public health, safety, or welfare in that adequate public facilities exist or will
be installed, including road, sidewalks, water, sewer, storm drains, and other infrastructure.
Lastly, as detailed in the General Plan Consistency section of this report, the proposed map is
consistent with the applicable general plan policies.
b. That the design or improvement of the proposed subdivision is consistent ivith applicable
general and specific plans.
As designed, the subdivision is consistent with General Plan and the Corona -Ely Specific Plan in
that the project density is consistent with that of the General Plan and for the reasons stated in the
previous standard and in the Corona -Ely Specific Plan section of this report.
c. That the site is physically suitable for the type of development.
Physically, the site is well suited for residential development in that it is relatively flat, generally
rectangular in shape, adequate in size to support the proposed housing, has direct access to
Sonoma Mountain Parkway and Corona Road which are major thoroughfares, is adjacent to resi-
dential uses and structures of a similar density and scale and to the future site of the Corona Road
SMART Station, and as designed, has appropriate screening and buffers from the adjacent thor-
oughfares and railroad tracks.
d. That the site is physically suitable for the proposed density of development.
Physically, the site is suitable for the density of the proposed development in that the proposed
densities of 10.7 dwelling units per acre for the area designated MDR and 27.81 dwelling units
for the area designated HDR are within the density ranges specified in the general plan for the
site and the site can accommodate reasonable sized single-family and multi -family homes with
adequate private and public open space, parking, landscaping and amenities including a play-
ground and pedestrian and bicycle paths.
e. That the design of the subdivision or the proposed improvements are not likely to cause sub-
stantial environmental damage or substantially and avoidably injure fish or wildlife or their
habitat.
As documented in the draft Mitigated Negative Declaration (MND) prepared for the project, the
project will not cause substantial environmental damage or substantially and avoidably injure
fish or wildlife or their habitat. Furthermore, the project has been designed to avoid the primary
wetlands on the site and the site's drainage features comply with water quality standards.
f. That the design of the subdivision or type of improvements is not likely to cause serious pub-
lic health problems.
The design of the subdivision and the residential improvements in the subdivision are not likely
to cause serious public health problems in that the project will be not expose inhabitants of the
homes to any known hazards.
Page 21
�;-a)A
g. That the design of the subdivision or the type of improvements 14)ill not conflict lvith ease-
ments, acquired by the public at large, for access through or use of, property -Wdthin the pro-
posed subdivision.
The design of the subdivision does not conflict with easements, acquired by the public at large,
for access through or use of, property within the proposed subdivision. The existing easements
to the Sonoma County Flood Control and Water Conservation District along the southerly prop-
erty line will not be affected by the design of the subdivision or any type of improvement associ-
ated with the project.
INTERDEPARTMENTAL REVIEW
As required by the City's subdivision ordinance, the City Engineer prepared a written report to
the Planning Commission with recommended conditions for approval of the Tentative Subdivi-
sion Map (TSM). Those recommendations along with recommended conditions of approval from
the Planning Division, and Fire Department are incorporated into the draft TSM Resolution (At-
tachment C, Exhibit A).
PUBLIC COMMENT
Neighborhood Meeting
Approximately 15 residents attended a neighborhood meeting on July 26, 2016 that was facilitat-
ed by the development team. Residents inquired about a range of issues including the average lot
size, whether or not there would be one story homes, project timing, assessments and fees, transit
stops, and traffic and circulation concerns. Discussion centered on concerns with cars parked on
both sides of Wellington Place during the seasonal youth sports activities at Turnbridge Park.
Due to the narrow width of Wellington Place, traffic is reduced to one-way when cars are parked
on both sides of the street.
In response to the neighbor's comments, the development team revised their plans to prohibit
parking on the west side of Wellington Place with the exception of three parking spaces located
in recessed parking pockets out of the travel lane of the road. In addition, public parking for nine
vehicles is proposed on the proposed private roadway which intersects Wellington Place (see
Parcel D on plan Sheet TM -6 and TM -21)
Noticing
Public notice of the October 25, 2016 Planning Commission meeting and Notice of Intent to
adopted a Mitigated Negative Declaration was published in the Argus Courier on September 22,
2016 and mailed to all property owners and occupants within 500 feet of the project site. Due to
the large number of items on the October 25, 2016 agenda, the project was not heard on October
25 and was continued to the November 8, 2016 meeting.
As of the writing of this staff report, two nearby homeowners that attended the neighborhood
meeting contacted staff. One met with staff at City Hall and the other neighbor provided written
comments (Attachment E) and contacted staff by telephone. Both neighbors expressed con-
cerns with parking along Wellington Place. Two additional inquiries were received from pro-
spective home buyers, including an inquiry regarding the affordable units in the project.
Page 22
5-22
ENVIRONMENTAL REVIEW
A Draft Initial Study and Mitigated Negative Declaration (MND) was prepared for the project
and distributed for a 30 -day comment period beginning on September 23, 2016 (Attachment F)
and one comment letter was received (Attachment G). The Initial Study found that with mitiga-
tion measures the project's potentially significant effects on environment could be mitigated and
the applicant has agreed to implement the necessary mitigation measures.
Mitigation Measures proposed in the draft MND reduce potentially significant environmental
effects below the threshold of significance.
ATTACHMENTS
Attachment A:
Draft MND Resolution
Exhibit 1: MMRP
Attachment B:
Draft ZMA Resolution Recommending Council approval
Exhibit 1: PUD Development Standards and Design Guidelines
Attachment C:
Draft TSM Resolution
Exhibit 1: Conditions of Approval
Attachment D:
Memorandum of Understanding between DeNova Homes and Land Trust
of Sonoma County, August 5, 2016 and Affordable Housing Cost Analysis
Attachment E:
Public Correspondence
Attachment F:
Initial Study and Mitigated Negative Declaration (previously distributed)
Attachment G:
Cal Trans Comment letter on MND, October 20, 2016
Attachment H:
SPAR deferred Landscape Plans (Sheets SPAR -1 to SPAR -5) (Half size
and full size) and Architectural Plans (Sheets SP -1 to MF -3.7) (Half size
only)
Attachment I:
Vesting Tentative Subdivision Map (Sheets TM -1 to TM -21 and EX -1)
and Subdivision Landscape Plans (L-1 to L-3) (Half size and full size)
Page 23
I
ATTACHMENT 6
L90M
LU
���
� � �
�§§
k��
LU
IL LU
IL
1%
Im
M-0
N
LEGM
W
QWE$BAN WA SAB r TABLE
ALTENNATNE E
QI
W
F
m
Q
o rot/� wi n+wu�
Q
t/t ro t/i wL xbv:
f/t ro �/a iuL xMua
�
�wutoWn wpeA r uwn wt� axorsiy ro
m
T
�6W
V
,{
W
Q
9
U)
W
G
a
M
spa
0� F�YF
o�Ana��cA�e
�2
H
v 3
Vi
LEO=
��ava=,m
P® SMAN WA KA rry TADU
Qw
z
ALTENNATVE G
0.1
LU
F
m
W
/.ro+nw�..w�a
�nrooa�..w.
.2 as
c�
�sd
�
LU
qa
a
lu
w
c
Lu
a
M
3
0
0�
E3
• munx�c/+L
IX -C
a 3 .
ATTACHMENT 7
RESOLUTION 2016-19
CITY OF PETALUMA PLANNING COMMISSION
RECOMMENDING THE CITY COUNCIL ADOPT A MITIGATED NEGATIVE DECLARATION FOR
THE BRODY RANCH RESIDENTIAL PROJECT
LOCATED AT 360 CORONA ROAD
APN: 137-061-042
FILE NO, PLMA-15-0007
WHEREAS, the project applicant, DeNova Homes, LLC submitted applications to the City of
Petaluma for a Vesting Tentative Subdivision Map and establishment of a Planned Unit District (PUD)
(File No. PLMA-15-0007) to subdivide the 15.93 -acre property located at 360 Corona Road (APN: 137-
061-040) into 61 single-family lots, (59 detached single-family homes and two attached single-family
homes) and one lot to accommodate 138 multi -family units ("Project"); and
WHEREAS, the Project is subject to the Petaluma General Plan 2025, adopted by the City on May
19, 2008; and,
WHEREAS, in evaluating certain potential environmental effects of the Project in the Initial Study,
including but not limited to effects of climate change, water supply, and traffic, the City relied on the
Program EIR for the City of Petaluma General Plan 20205, certified on April 7, 2008 (General Plan EIR) by
the adoption of Resolution No. 2008-058 N.C.S., which is incorporated herein by reference; and,
WHEREAS, the General Plan EIR identified potentially significant environmental impacts and
related mitigation measures and the City also adopted a Statement of Overriding Considerations for
significant impacts that could not be avoided; and,
WHEREAS, the City prepared an Initial Study for the proposed Project consistent with CEQA
Guidelines §§ 15162 and 15163 and determined that a Mitigated Negative Declaration (MND) was
required in order to analyze the potential for new or additional significant environmental impacts of the
Project beyond those identified in the General Plan EIR; and,
WHEREAS, on or before September 22, 2016, the City's Notice of Intent to Adopt aMitigated
Negative Declaration based on the Initial Study, providing for a 30 -day public comment period
commencing September 23, 2016 and ending October 25, 2016, and a Notice of Public Hearing to be
held on October 25,2016 before the City of Petaluma Planning Commission, were published and mailed
to all residents and property owners within 500 feet of the Project as well as all persons having requested
special notice of said proceedings; and,
WHEREAS, on October 25, 2016 the Planning Commission continued the item to a date certain of
November 8,2016; and,
WHEREAS, the Planning Commission held a duly noticed public hearing on November 8, 2016, at
which time all interested parties had the opportunity to be heard; and,
WHEREAS, the Planning Commission considered the Project, the MND, the supporting Initial Study,
the staff report, and received and considered all written and oral public comments on environmental
effects of the Project which were submitted up to and at the time of the public hearings; and
WHEREAS, the Initial Study applies the BAAQMD's California Environmental Quality Act - Air
Quality Guidelines, May 2012, including the BAAQMD thresholds of significance adopted in June 2010.
As lead agency under CEQA, the City of Petaluma has the discretion to rely upon the BAAQMD CEQA
Guidelines and thresholds of significance since they include the best available scientific data and most
Planning Commission Resolution No. 2016-19 Page 1
-7-1
conservative thresholds available for comparison of the Project's emissions. Comparison of the Project's
emissions against these thresholds provides a conservative assessment as the basis for a determination
of significance; and,
WHEREAS, pursuant to further analysis in the Initial Study, including evaluation using the BAAQMD
CEQA Guidelines and thresholds of significance, the Project does not make a considerable contribution
to a significant cumulative air quality or greenhouse gas emissions impact found to be significant and
unavoidable in the General Plan 2025 EIR, because of the Project's emissions are below significance
thresholds identified; and,
WHEREAS, the MND reflects the City's independent judgment and analysis of the potential for
environmental impacts from the Project; and,
WHEREAS, the MND, Initial Study and related project and environmental documents, including
the General Plan 2025 EIR and all documents incorporated herein by reference, are available for review
in the City Community Development Department at Petaluma City Hall, during normal business hours.
The custodian of the documents and other materials which constitute the record of proceedings for the
proposed project is the City of Petaluma Community Development Department, 11 English St.
Petaluma, CA 94952, Attention: Emmanuel Ursu; and
WHEREAS, while the Initial Study for the Project identified potentially significant impacts, all
significant impacts are mitigated to a less than significant level and therefore the Project would not
result in any significant impacts to the environment.
NOW THEREFORE, BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF PETALUMA AS
FOLLOWS:
A. The foregoing recitals are true and correct and incorporated herein by reference.
B. Based on the its review of the entire record herein, the Planning Commission makes the following
findings:
1. The Project is consistent with the Medium Density and High Density Residential land use
designations in that the proposed residential uses are within the density ranges specified in
the General Plan
2. The Project is, for the reasons discussed in the November 8, 2016 Planning Commission staff
report, consistent with the following General Plan policies: Policy 1-P-1 (Development Within
UGB); Policy 1-P-2 and Policy 2-P-1 (Efficient Land Use in UGB); Policy 2-P-5 (Arterial
Corridors); Policy 2-P-11 (River Oriented Development); Goal 2-G-5 (Lakeville Highway
Connectivity); Policy 2-P-97 (High Density housing on Project site); Policy 4-P-6 (Street Trees to
Improve Air Quality); Policy 5-P-19 (Bicycle and Pedestrian Friendly Design); Policy 10 -P -3(f)
(Integrate Sound Walls in Streetscape); Policy 11 -P -20B (Street and Parking Lot Trees); Housing
Element Policy 4.2 (Affordable Housing).
3. Pursuant to the analysis in the Initial Study, the Project does not make a cumulatively
considerable contribution to the significant and unavoidable cumulative traffic and/or noise
impacts identified in the General Plan 2025 EIR because although the Project would
contribute vehicle trips to intersections identified in the General Plan EIR as operating at an
unacceptable LOS at build -out, the affected intersections have either already been
determined to acceptably operate df an LOS E or LOS F due to overriding considerations
and conflicts with other General Plan policies or the Project's contribution to those
intersections are below the threshold established by the General Plan EIR (i.e., cause the LOS
to deteriorate to the next lowest level).
4. With regard to noise, the Project is considered to result In an effect that is less than
Planning Commission Resolution No, 2016-19 Page 2
cumulatively considerable because the project excludes new stationary noise sources and
its incremental contribution through vehicular trips is insufficient to result in a perceptible
change in noise level.
C. Based on its review of the entire record herein, including the MND, the Initial Study, all
supporting, referenced and incorporated documents and all comments received, the Planning
Commission finds that there is no substantial evidence that the Project as mitigated will have a
significant effect on the environment, that the MND reflects the City's independent judgment
and analysis, and that the MND, Initial Study and supporting documents provide an adequate
description of the impacts of the Project and comply with CEQA, the State CEQA Guidelines
and the City of Petaluma Environmental Guidelines,
D. The MND, Initial Study and related project and environmental documents, including the General
Plan 2025 EIR and all documents incorporated herein by reference, are available for review in
the City Community Development Department at Petaluma City Hall, during normal business
hours. The custodian of the documents and other materials which constitute the record of
proceedings for the proposed project is the City of Petaluma Community Development
Department, 11 English St. Petaluma, CA 94952.
E. The Mitigation Monitoring and Reporting Program, included as Exhibit 1, is hereby adopted.
Implementation of the mitigation measures included therein mitigates or avoids significant
environmental effects.
ADOPTED this 8th day of November, 2016, by the following vote:
ATTEST: APPROVED AS TO F RM:
J(
H ather Hines, Commission Secretary Eric Danly, City Attorney
Planning commission Resolution No. 2016-19 Page 3
-7-5
ATTACHMENT 8
RESOLUTION 2016-20
CITY OF PETALUMA PLANNING COMMISSION
RECOMMENDING CITY COUNCIL APPROVAL OF A ZONING MAP AMENDMENT TO
REZONE THE PROPERTY LOCATED AT 360 CORONA ROAD FROM RESIDENTIAL 4 (R4)
AND RESIDENTIAL 5 (115) TO PLANNED..UNIT DISTRICT (PUD) AND RECOMMENDING
APPROVAL OF UNIT DEVELOPMENT PLAN
APN 137-061-040
File No: PLMA-15-0007
WHEREAS, on November 30, 2015, the project applicant, DeNova Homes, LLC submitted
applications to the City of Petaluma for a Zoning Map Amendment (File No. PI -MA -1 5-0007) to change
the zoning on the 15,93 -acre property located at 360. Corona Road (APN: 137-061-040) from R4 and R5
to PUD ("the Project" or the "proposed Project"}; and
WHEREAS, on November 8, 201'6, the Planning Commission reviewed the California Environmental
Quality Act (CEQA) evaluation and by Resolution No. 2016-19 dated November 8, 2016, recommend to
the City Council adoption of a Mitigated Negative Declaration (MND) in accordance with CEQA; and
WHEREAS, the Planning Commission held a duly noticed public hearing to consider the Project,
including the proposed Zoning Map Amendment do November 8, 2016, at which time all interested
parties had the opportunity to be heard; and
WHEREAS, at said hearing, the Planning Commission considered the staff report dated
November 8, 2016, analyzing the Project, including the related Tentative Subdivision Map and the
Mitigated Negative Declaration; and
WHEREAS, Chapter 19.030 of the IZO provides for the adoption of new residential PUD's; and
WHEREAS, Chapter 25.065 of the IZO provides for the amendment to the zoning map; and
NOW THEREFORE, BE 17 RESOLVED that the Planning Commission hereby recommends the City
Council rezone the Project site from R4 and R5 td Brody Ranch PUD based on the findings of IZO section
19.030 made below and subject to the provisior)s of the Brody Ranch PUD Development Standards and
Design Guidelines, attached as Exhibit 1 hereto and incorporated herein by reference:
The PUD clearly results in a more desirable use of land and a better physical environment than
would be possible under any single zoning district or combination of zoning district in that
approval of the PUD will allow preservation of the primary wetlands areas on the southern side of
the site and a buffer between the railroad and housing while maintaining the density range
envisioned in the General Plan for the property. Two key differences between the existing R4
zoning on the site and the Brody Ranch PUD are (1) a minimum lot size of 3,000 instead of 3,500
square feet and (2) a minimum front yard setback of 5 feet instead of 10 feet. A reduction of the
lot size and front yard setback criteria allow development of the site at 10.7 du/ac in the MDR
portion of the site where the permitted density range is 8.1 to 18.0 du/ac. (IZO section 19,030)
2. The PUD Is proposed on property which has a suitable relationship to one or more thoroughfares
that are adequate to carry additional traffic generated by the development. Sonoma Mountain
Parkway and Corona Road are two thoroughfares that front the project site. Primary vehicular
access is from Sonoma Mountain Parkway with secondary access from a local residential street
Planning Commission Resolution No. 2016-20 Page 1
that feeds into Sonoma Mountain Parkway, • Wellington Place. As documented in the Traffic
Impact Study prepared by W -Trans, May 26, 2016, there is adequate roadway capacity of the
roadways in the project vicinity to carry additional traffic generated by the development. (IZO
section 19.030.A)
The plan for the proposed development presents a unified and organized arrangement of
buildings and service facilities which are appropriate. in relation to adjacent or nearby properties
and landscaping and/or screening is included as necessary to insure compatibility. Structures in
the Brody Ranch PUD are organized to provide inhabitants access to outdoor living spaces,
pedestrian and bicycle paths, parking, and convenient vehicular circulation. On the Sonoma
Mountain Parkway and Corona Road frontages, where traffic volumes are high, the
development is buffered with landscaping, the sides of buildings, and wood fencing screened
with landscaping. Along the Wellington Place frontage where traffic volumes are low, homes
front the street. (IZO section 19.030.13)
4. Natural and scenic qualities of the site' will be protected and enhanced and adequate public
and private spaces provided by limiting -free removal in the southwestern corner of the site and
along Corona Road where several mature redwood trees exist; by planting 140 trees and over
1,800 shrubs; by outdoor living areas with seating among the multi -family buildings; and by a 3.7 -
acre open space with a playground/picnic area, Class 1 multi -use path and wetland
preservation area. In addition, convenient pedestrian and bicycle access is provided to the
existing multi -use path along Corona Creek. (IZO section 19.030.C)
5. The development of the subject property, in the manner proposed by the applicant, will not be
detrimental to the public welfare, will be in the best interests of the City, and will be in keeping
with the general intent and spirit of the zoning regulations of the City of Petaluma, with the
Petaluma General Plan, and with any applicable plans adopted by the City in that it adds to
the housing supply, consistent with Goal 1 of the Housing Element of the Petaluma General Plan,
it provides 25 on-site affordable housing units with a mix of one-, two- and three bedrooms, is in
keeping with the general intent and spirit of the zoning regulations in that the design, layout and
density is consistent with the existing surrounding neighborhoods and the density of the project is
consistent with the HDR and MDR density ranges specified in the General Plan land use
designations for the site. (IZO section 19.030.D)
6. The requirements of the California Environmental Quality Act (CEQA) have been satisfied
through the preparation of an Initial Study and the drafting of a Mitigated Negative Declaration
to avoid or reduce to a level of insignificance, potential air quality and noise impacts generated
by the proposed project. In compliance with the requirements of the California Environmental
Quality Act, an Initial Study was prepared for the PUD rezoning of the property. Based upon the
Initial Study, a determination was made that no significant environmental impacts would result.
A copy of this notice was published in the Argus Courier on September 22, 2016, and provided to
residents and occupants within 500 feet of the site, in compliance with CEQA requirements.
7. The project, as conditioned per the - resolution approving the Tentative Subdivision Map
(Resolution No. 2016-21), complies with the applicable provisions of the Municipal Code and the
General Plan.
8. The Unit Development Plan for Brody Ranch shall be subject to the applicable conditions of the
Tentative Subdivision Map for the Project and Mitigation Measures adopted as conditions of
approval.
Planning commission Resolution No. 2016-20 Page 2
+M
ADOPTED this 81h day of November, 2016, by the following vote:
Commission Member
Aye
No
Absent
Abstain
Councilmember King
X
Benedetti -Petnic
X
Chair Gomez
X
Lin
X
Vice Chair Marzo
X
Pierre
X
Woipert
X
ATTEST:
c
WMarzo, Chair
APPROVED AS TO FORM:
.Lao &I
H ather Hines, Co mission Secretary Eric Daniy, City Attorney
Planning Commission Resoiutlon No. 2016-20 Page 3
CW
Exhibit 1
Brody Ranch Subdivision
Planned Unit District (PUD)
OCTOBER, 2016
Revised 10-13-16
Planning Commission Resolution No, 2016-20 Page 4
M
This page intentionally left blank
Planning Commission Resolution No. 2016-20 Page 5
O-5-
Brody Ranch Subdivision
Planned Unit District
Table of Contents
1.0 Brody Ranch PUD
1.1 Purpose
2.0 Definitions
2.1 Purpose
2.2 Definitions of Specialized Terms and Phrases
3.0 Applicability
3.1 Terms
3.2 Location
3.3 Relationship to IZO
4.0 Land Use Districts
4.1 Purpose
4.2 Land Use Districts Established
4.3 Land Use District Map
5.0 Allowed Land Uses and Permit Requirements
6.0 Development Standards
7.0 Access & Parking
7.1 Purpose
7.2 Bicycle Parking
7.3 Vehicle Parking Spaces
7.4 IZO Provisions Not Applicable
8.0 PUD Modifications
9.0 Site Pian and Architectural Review (SPAR).
9.1 SPAR Procedures
10.0 Landscape and Fencing
11.0 Lighting
Exhibit A: Land Use District Map
Planning Commission Resolution No. 2016-20 Page 6
This page intentionally left blank
Planning Commission Resolution No, 2016-20 Page 7
�I
1.0 Brody Ranch PUD
1.1 Purpose: The purpose of the Brody Ranch Planned Unit District ("Brody Ranch
PUD") is to provide a compatible mix of land uses that promotes single household
dwellings, including attached townhomes and multiple dwelling households prioritizing
pedestrian and bicycle access to public transit and public spaces within the community.
2.0 Definitions
2.1 Purpose: To establish the definitions of terms and phrases that are technical,
specialized or that may not reflect common usage.
2.2 Definitions of Specialized Terms and Phrases: All specialized terms and
phrases used in the Brody Ranch PUD are defined at City of Petaluma
Implementing Zoning Ordinance ("IZO") Chapter 27 (Glossary), excepted as
noted herein.
3.0 Applicability
3.1 Terms: These regulations apply to all land uses, subdivisions, and development
within the Brody Ranch PUD in the same manner provided at IZO §1.040
(Applicability of the Zoning Ordinance).
3.2 Location: These regulations are applicable to the property within the PUD as
shown at Exhibit A.
3.3 Relationship to IZO: Except as noted herein, when the Brody Ranch PUD is
silent on a matter, the IZO shall apply. The Brody Ranch PUD shall apply in all
other cases.
4.0 Land Use Districts
4.1 Purpose: To precisely indicate the areas to be used for each particular land use
within the Brody Ranch PUD.
4.2 Land Use Districts Established: The Brody Ranch PUD is divided into three
land use districts:
a) Single Household Dwellings
b) Multiple Household Dwellings
c) Open Space
4.3 Land Use District Map: The boundary of each land use district is shown on
Exhibit A.
Planning Commission Resolution No. 2016-20 Page 8
1
5.0 Allowed Land Uses and Permit Requirements
-
P �ei7nztted Use
_ _
Table 5 1� -
C Condzhozzal Use Pelrmzt R,equzred - � ,4
S PterxnztRequuementm,SpeaifieUseRegulahons -
A.11owedL�nd`Uses�zidPermt
A -
}t
AccessoryUe = }
Reguue�nents -
r , ,Vse Not:Allowed,;;
a t
Pe�mitR�quhed byZone -
:
_
� SpeeiftcUse
Szngle
Multiple
Open
Hogsel�ol
IHousehold
Space'
Regglatrons
ZAND SSE �`YPE
- pwelizng
Dv�elhng1
_
OPEN SPACE
Trails --- --- P
Community Playground --- --- P
Community Picnic Areas --- --- P
RESIDENTIAL
Dwelling, Multiple --- P ---
Dwelling, Single P --- ---
Home Occupation A A --- IZO 7.050
Accessory Dwelling --- --- ---
Planning Commission Resolution No. 2016-20 Page 9
I
6.0 Development Standards
LOT SIZE
Minimum Area 3000 sf NA NA
Minimum Width 35 ft Interior 40 ft corner NA NA
Minimum Depth 70 ft NA NA
SETBACKS -
Primary structure+nth+utn selbacks7eq+{reed c
Front 5 ft 0 ft
Side — Interior 0 ft 0 ft
Side — Street side loft 0 ft
Rear 10 ft 0 ft
30 ft, setback. Portions above 15ft in Same as Single Household Dwellings, except, up
height at 30 ft setback line shall be to 120 feet of aggregate building width may have a
setback an additional foot for every foot 15 It setback and portions above 15 ft in height at
Sonoma Mountain Parkway the 15 ft setback shall be setback one additional
(Building Plane Line) above 15 feet. foot for every foot above 15 feet in height.
Mitttntut}lsetbcicksYggtltred � s '' � '�
Accessory Structure
Front Not Permitted Not Permitted
Side—Interior 4 ft 4 ft
Side—Street 5 ft 5 ft
Rear 0 ft 5 ft
Not
Permitted
Not
Permitted
Site Coverage
Ole s'patios'anid Jertaces
Maximum Coverage
60%
NA
NA
Primary structure
Accessory structure
detached
10% of the required setback area or
NA
NA
500 st whichever is greater
Height Limit
Maxiintnn crlloivable height of sh Ncf:{res See. Glossa+y(Chppter :27Jfo+ height »+egsrrenrejtf
Maximum Height
.1 e3titrenter:ts,:aq(1 Ghdp(er l2fo+ lie{gh) Ittttil..anodp"icq'ttons , „_
30 ft
40 ft
Principal Building
Accessory Structure
Not
12 ft
12 It
Permitted
Accessory Dwelling
25 ft
NA
400 sf/unit
NA
USABLE OPEN SPACE
300 sf/unit
May include common opens ace
TENCING, LANDSCAPING &
TREE PRESERVATION
See Section 10.0
PARIQNGNot
See Section 7.0
Permitted
SIGNS
See IZO Chapter 20
Planning Commission Resolution No. 2016-20 Page 10
g -f G
7.0 Access & Parking
7.1 Purpose: To facilitate public access to the open space and public path through
the provision of on -street parking spaces and access ways for vehicles, bicycles
and pedestrians. To provide adequate on -street parking spaces for the public
and residents at on -street parking spaces within the Brody Ranch PUD.
7.2 Bicycle Parking: Bicycle facilities shall be provided in accordance with IZO
§11.090 (Standards for Bicycle Facilities),
7.3 Vehicle Parking Spaces: Except as provided below, individual uses within the
Brody Ranch PUD are exempt from the requirement to provide off-street parking
facilities. Rather, the Brody Ranch PUD shall, at all times, maintain shared on -
street parking facilities:
Single Household Detached Dwellings: 2 covered and 2 uncovered.
Single Household Attached Dwellings: 2 covered and 1 uncovered.
Multiple Household Dwellings: 99 dedicated covered, 39 dedicated uncovered,
21 visitor/undedicated and 4 accessible.
On -Street: 125 visitor/undedicated spaces
On -Street: 9 public parking spaces
7.4 IZO Provisions: The following IZO standards shall not apply in the Brody Ranch
PUD:
a) §11.030(B) (Off -Street Parking Facilities to Serve One Use)
b) §11.030(C) (More Than One Use on a Site)
c) §11.060 (Number of Bicycle Parking Spaces Required)
8.0 PUD Modifications
8.1 Modification Procedures: From time to time, it may be necessary and desirable
to modify the Brody Ranch PUD. Modifications shall be in accordance with IZO
Chapter 19 (Planned Unit District and Planned Community District).
9.0 Site Plan and Architectural Review (SPAR)
9.1 SPAR Procedures: All new development or changes to the exterior of existing
structures or site features shall require Site Plan and Architectural Review in
accordance with IZO Chapter 24 (Administrative Procedures). The Director may
grant administrative Site Plan and Architectural Review for minor additions or
modifications to existing buildings and/or site features.
9.2 SPAR Findings., All new development or changes to the exterior of existing
Planning Commission Resolution No. 2016-20 Page 11
structures or site features shall, in addition to the findings required by IZO
§24.010(G)(1), also be found to be substantially consistent with the building form,
materials and architectural style of existing buildings at the Brody Ranch PUD.
10.0 Landscaping and Fencing
10.1 Private landscape areas within the interior fence boundaries of the single family
residential lots are not subject to the following PUD restrictions.
10.2 Overall project landscaping and fencing maintenance shall follow an approved
landscape maintenance manual provided for the project by the Landscape
Architect. The governing HOA shall use the submitted manual as a guide for
landscape maintenance requirements throughout areas designated to be
maintained by the HOA per the approved improvement plans.
10.3 All landscaping, fencing, landscape structures and related hardscaped areas
that are to be maintained by appointed HOA or Landscape Assessment District
shall maintain consistency with the approved landscape plans design and intent.
10.4 Other landscape areas not to be maintained by HOA or individual home owners
will be maintained by a Landscape Assessment District governed by the City of
Petaluma. These areas include landscaping along the wetland/ multi -use path,
landscaping along Corona Rd, Sonoma Mountain Parkway and landscape strips
located between Wellington Street and the sidewalk at lots 56-61.
10.5 Owners of single family residences can make alterations to their front yard
landscapes so long as they follow the PUD guidelines and receive approval by
the appointed HOA.
10.6 Landscape areas along the delineated wetland shown on the approved
landscape construction drawings shall not negatively impact the wetland habitat
or natural characteristics and shall comply with the recommendations provided
by Monk and Associates Biological Assessment Report.
10.7 Trees shown on the approved subdivision map to remain shall be retained and
best arboricultural practices shall be used in their care. Tree mitigation
requirements shall follow the City of Petaluma's Tree Preservation Section of the
IZO as necessary to mitigate future removal of any protected trees shown on the
approved landscape construction plans.
10.8 All landscaping and irrigation shall comply with the current City of Petaluma
adopted water ordinance.
10.9 Future replacement of plants may be allowed if plants used are from the
proposed plant lists as shown on said plan. The Planning Director must approve
modifications to the approved plant list.
10.10 All fence replacement must match design and detail shown in the approved
landscape construction plans. Modifications to the approved fence design may
be approved in accordance with Section 19.040.E.4 of the Implementing Zoning
Ordinance as well as the requirements of the CC&R's.
10.11 Fencing height and location of all fencing facing public streets and SMART shall
comply with recommendations provided in the Environmental Noise Assessment
by Illingworth and Rodkin, Inc. All other fencing shall comply with the City of
Petaluma IZO for fencing height and location restrictions.
10.12 Minor entry features associated with fences shall be subject to the City of
Petaluma Zoning Ordinance requirements for minor entry features.
Planning Commission Resolution No. 2016-20 Page 12
13-12,
11.0 Exterior Lighting
11.1 Lighting shall be maintained in such a manner as to provide safety and comfort
for occupants of the development and the general public.
11.2 Lighting design shall be such as not to produce hazardous and annoying glare to
motorists and building occupants, adjacent residents, or the general public.
11.3 Lighting shall be oriented away from the properties adjacent to the PUD and
sensitive habitats such as wetlands, creeks and open space areas where lighting
is not proposed to be used.
11.4 Exterior lighting fixtures design and locations shall maintain consistency with the
SPAR approved light fixtures and lighting plan.
Planning Commission Resolution No. 2016-20 Page 13
M
ATTACHMENT 9
RESOLUTION 2016-21
CITY OF PETALUMA. PLANNING COMMISSION
RECOMMENDING CITY COUNCIL APPROVAL OF A VESTING TENTATIVE SUBDIVISION MAP
FOR BRODY RANCH RESIDENTIAL PROJECT
LOCATED AT 360 CORONA ROAD
APN 137-061-040
File No: 'PLMA-15-0007
WHEREAS, on November 30, 2015, the project applicant, DeNova Homes, LLC, submitted an
application to the City of Petaluma for a Vesting Tentative Subdivision Map (File No. PLMA-15-0007) to
subdivide the 15.93 -acre property located at 360 Corona Road (APN: 137-061-040) into 61 single-family
lots (59 detached single-family homes and two attached single-family homes) and one parcel to
accommodate 138 multi -family units ("the Project"); and
WHEREAS, the Planning Commission held a duly noticed public hearing to consider the Project,
including an associated Zoning Map Amendment to establish the Brody Ranch Planned Unit District
(PUD) on November 8, 2016, at which time all interested parties had the opportunity to be heard; and
WHEREAS, at said hearing, the Planning Commission considered the staff report dated
November 8, 2016, including the related Zoning Map Amendment and the Mitigated Negative
Declaration; and
WHEREAS, at said hearing the Planning Commission recommended the City Council adopt the
Mitigated Negative Declaration (MND) prepared pursuant to the California Environmental Quality Act
(CEQA) for the project via Resolution 2016-19,
NOW THEREFORE, BE IT RESOLVED that the Planning. Commission hereby recommends the City
Council approve the Vesting Tentative Subdivision Map for the Project based on the findings made
below and subject to the conditions of approval attached as Exhibit 1 hereto and incorporated herein
by reference:
1. The Tentative Subdivision Map, as conditioned, is consistent with the provisions of Title 20 of the
Petaluma Municipal Code (Subdivision Ordinance) and the California Subdivision Map Act.
a. The proposed map is consistent with the general plan in that it is on property designated
for Medium Density Residential and High Density Residential use in the General Plan Land
Use Map with a density range of 8.1 to 18 dwelling units per acre for the MDR designation
and 18.1 to 30.0 dwelling units per acre for the HDR designation. The project has density
of 10.7dwelling units per acre in the MDR area and 27.81 dwelling units per acre in the
HDR area. Furthermore, the proposed subdivision, together with provisions for its design
and improvements will not be detrimental to the public health, safety, or welfare in that
adequate public facilities exist or will be installed, including road, sidewalks, water, sewer,
storm drains, and other infrastructure. Lastly, as detailed in the General Plan Consistency
section of this report, the proposed map is consistent with the applicable general plan
policies.
b. As designed, the subdivision is consistent with the General Plan and the Corona -Ely
Specific Plan, in that the project density is consistent with that of the General Plan and for
the reasons stated in the Staff Report.
C. Physically, the site is well suited for residential development in that it is relatively flat,
generally rectangular in shape, adequate in size, has direct access to Sonoma Mountain
Planning Commission Resolution No. 2016-21 Page 1
91-1
Parkway and Corona Road, major thoroughfares, is adjacent to residential uses and
structures of a similar density and scale and to the future site of the Corona Road SMART
Station, and as designed, has appropriate screening and buffers from the adjacent
thoroughfares and railroad tracks.
d. Physically, the site is suitable for the density of the proposed development in that the
proposed densities of 10.7 dwelling units per acre for the area designated MDR and 27.81
dwelling units for the area designated HDR are within the density ranges specified in the
general plan for the site and the site can accommodate reasonable sized single-family
and multi -family homes with adequate private and public open space, parking,
landscaping and amenities including a playground and pedestrian and bicycle paths.
e. As documented in the draft Mitigated Negative Declaration (MND) prepared for the
project, the project will not cause substantial environmental damage or substantially and
avoidably injure fish or wildlife or their habitat. Furthermore, the project has been
designed to avoid the primary wetlands on the site and the site's drainage features
comply with water qualify standards.
The design of the subdivision and the residential improvements in the subdivision are not
likely to cause serious public health problems In that the project will be not expose
inhabitants of the homes to any known hazards.
g. The design of the subdivision does not conflict with easements, acquired by the public at
large, for access through or use of, property within the proposed subdivision. The existing
easements to the Sonoma County Flood Control and Water Conservation District along
the southerly property line will not be affected by the design of the subdivision or any type
of improvement associated with the project.
ADOPTED this 81h day of November, 2016, by the following vote:
Commission Member
Aye
No Absent
Abstain
Councilmember King
X
Benedetti-Petnic
X
Chair Gomez
X
Lin
X
Vice Chair Marzo
X
Pierre
X
Wolpert
ATTEST:
r
J
He eirHi n Commi on Secretary
G
Richard o, Vi e Chair
APPROVED AS TO FORM:
Eric Danly, Clil Attorney
Planning Commission Resolution No. 2016-21
Page 2
Exhibit 1
BRODY RANCH VESTING TENTATIVE MAP
AND PLANNED UNIT DISTRICT
CONDITIONS OF APPROVAL
FILE NO. PLMA 2015-007
APN.163-010-040
No, Condition of Approval
1. Effective Date. The tentative map approval shall not be effective until the related zoning
map amendment is adopted and effective.
2. These conditions of approval and, the mitigation measures of the Mitigated Negative
Declaration shall be printed on the Building Permit plans.
3. The plans submitted for building permit review shall be in substantial compliance with the
plans date stamped September 20, 2016, except as modified by these Conditions of
Approval.
4. The applicant shall pay the Notice of Determination ("NOD") Clerk's fee to the Plamling
Division. The applicant shall provide a $50.00 check made payable to the Sonoma
County Clerk. Planning staff will file the Notice of Determination with the County
Clerk's office. The applicant shall also provide a check for the State Department of Fish.
and Wildlife environmental filing fee (as required under Fish and Wildlife Code Section
711.4d) to the Sonoma County Clerk on or before the filing of the Notice of
Determination.
5. No building permits shall be issued for any buildings on the site -until a Final Map has
been approved that covers the project locations for which building permits are sought.
6. Prior to building or grading permit issuance, the applicant shall provide a Construction
Phase Recycling Plan that would address the reuse and recycling of major waste materials
(soil, vegetation, concrete, lumber,' metal scraps, cardboard, packing, etc.,) generated by
any demolition activities and construction of the project, in compliance with General Plan
Policy 2-P-122 for review by the planning staff.
7. Prior to issuance of a grading/ building permit, the applicant shall provide a lighting plan
for planning staff reviewing and approval. The lighting plan shall include exterior light
locations and details of the proposed fixture type and brightness (l unens). All lighting
shall be glare -free, hooded and downcast in order to prevent light pollution and glare into
bicyclists' and pedestrians' eyes.
8. The applicant shall be subject to any fees in affect at time of building permit issuance.
Said fees are due at time of issuance *of building permit at which time, other pertinent fees
that are applicable to the proposed project will be required.
9. Signs are not approved as part of this project approval. Signs require a separate sign
permit.
10. The applicant shall defend, indenniify and hold harmless the City and its officials, boards,
commissions, agents, officers and employees ("Indenmitees") from any clahn, action or
proceeding against Indemnitees to attack, set aside, void or aumul any of the approvals of
the project to the maximum extent permitted by Govermnent Code section 66477.9. To
the extent permitted by Goveriunent'Code section 66477.9, the applicant's duty to defend,
indemnify and hold harmless in accordance with this condition shall apply to any and all
Planning Commission Resolution No. 2016-21 Page 3
9-3
No. Condition of Approval
claims, actions or proceedings brought concerning the project, not just such claims,
actions or proceedings brought within the ti 'me period provided for in applicable State
and/or local statutes. The City shall - promptly notify the subdivider of any such claim,
action or proceeding concerning the subdivision. The City shall cooperate fully in the
defense. Nothing contained in this condition shall prohibit the City from participating in
the defense of any claim, action, or proceeding, and if the City chooses to do so, applicant
shall reimburse City for attorneys' fees and costs incurred by the City to the maximum
extent permitted by Government Code section 66477.9.
11. If the applicant elects to install Public Art on-site, the proposed locations shall be
incorporated into SPAR plans and shall be reviewed and approved by the Public All
Committee prior to installation.
12. All standpipes, chectc valves and other utilities shall be placed underground or fully
screened from view by decorative screening structures or landscaping to be reviewed and
approved by the Planning Manager,
13. All earthwork, grading, trenching, backfilling, and compaction operations shall be
conducted in accordance with the City of Petaluma's Subdivision Ordinance (#1046, Title
20, Chapter 20.04 of the Petaluma Municipal Code). An erosion and sediment control
plan will be required for the subdivision grading plans. The proposed subdivision grading
and subsequent development phases that are over one acre in size will be required to
prepare a SWPPP in accordance with City and State regulations, and all Riture
development will be subject to City grading and erosion control regulations.
14. In the event that human remains are uncovered during earthmoving activities, all
construction excavation activities shall bd suspended and the following measures shall be
undertaken:
a., The Sonoma County Coroner shall be contacted.
b. If the coroner determines the remains to be Native American the coroner shall
contact the Native American Hdiitage Conunission within 24 hours.
c. The project sponsor shall retain a City -approved qualified archaeologist to provide
adequate inspection, recommendations and retrieval, if appropriate.
d. The Native American Heritage Commission shall identify the person or persons it
believes to be the most likely descended from the deceased Native American, and
shall contact such descendant in accordance with state law.
The project sponsor shall be responsible for ensuring that human remains and associated
grave goods are reburied with appropriate dignity at a place and process suitable to the
most likely descendent.
15. Consistent with Policy 4.2, Program 4.3(e) of the 2015-2023 Housing Element of the
General Plan, the applicant shall develop no less than 25 on-site dwelling units affordable
in perpetuity to low- and moderate -income households. The affordable units shall be
constricted concurrently with the market -rate units. As determined by the Housing
Division, to the extent qualified purchasers are available, no less than nine of the
affordable units shall be sold to low-income households. The remaining units shall be
sold to moderate -income households:
Development of the affordable housing shall be consistent with the terms of the August 5,
Planning Commission Resolution No. 2016-21 Page 4
q-4
No. Condition of Approval
2016 Memorandum of Understanding (MOU) between Housing Land Trust of Sonoma
County (HLT) and DeNova Homes. Modifications to the August 5, 2016 MOU shall not
apply unless prior Planning Coins nission approval is obtained for a change pertaining to
the total number of affordable units in the Project. Any other change to the MOU may be
considered by the Planning Manager and at the Planning Manager's discretion, may be
deferred to the Planning Com nission.for a decision.
16. A landscaped parkway along the entire Corona Road frontage separating the sidewalk
from the Corona Road curb as shown in Option 2 on plan Sheet TM -20 shall be
implemented. All recommendations of the Project arborist pertaining to preserving the
health and vitality of the trees shall be implemented,
17. The public parking easement along Street "B" shall be extended west to acconunodate
three public parking spaces in addition to the nine public spaces included in the plans
presented to the Planning Commission.
18. In Table 6 of the Planned Unit District (PUD), the accessory structure height standards
shall be reduced from 15 feet to a maxinnunn of 12 feet.
19. In Table 6 of the PUD, the standard for the aggregate width of multi-fannily structures
adjacent to Sonoma Mountain Parkway which may have a 15 foot setback shall be
increased from 100 feet to 120 feet,
MITIGATION MEASURES
AIR QUALITY
20. AQ -l: All diesel -powered off-road equipment larger than 50 horsepower and operating on
site for more than two days cotntinuously shall, at a minimum, meet U.S. EPA
particulate matter emissions standards for Tier 2 engines or equivalent.
BIOLOGICAL RESOURCES
21. BIO -1. In order to avoid impacts to bat maternity and/or bat hibernation periods and ensure
protection of any bat species potentially present within onsite structures, a biologist
shall conduct a preconstruction survey of trees and structures that would be removed
or demolished by the project, 15 days prior to commencement of ground work to
determine if there is evidence of bat use (guano accumulation, acoustic or visual
detections). The survey shall be conducted by a qualified biologist with experience
conducting surveys for bats. If no evidence of bat use is found, then there would be no
further regard for special -status bat species. If bat use is found, the biologist shall
deternnine if young are present. -If young are found in any tree or structure that will be
impacted by the project, such activities shall be avoided until the young are flying and
feedinng on their own. A non -disturbance buffer zone shall be determined by a
biologist at the same time of the survey. If mature bats are found roosting in a tree or
structure without the presence of young, the adult bats shall be flushed out using a
one-way eviction placed over the tree cavity or structural opening for a 48-liour period
prior to the time the tree or structure would be removed or demolished.
22. BIO -2. To avoid impacts to nesting raptors,and birds protected under the MBTA, a nesting
survey shall be conducted prior to the commencement of any tree removal if this
work, occurs between February 1st and August 31st. The nesting survey shall
Planning Commission Resolution No. 2016-21 Page 5
No. Condition of Approval
include the examination of all trees within 200 feet of the project site, including
those not identified for removal. If construction work occurs after August 31st and
before February 1 st, a nesting bird survey would not be needed.
In the event that nesting birds are discovered, an adequate buffer shall be established
by a qualified ornithologist arotuid the nesting site(s) until the completion of the
nesting cycle. The buffer area shall be marked with construction fencing. No
construction activity shall occur within the buffer area until a qualified ornithologist
has determined that the young have left the nest, typically around mid-July or as
otherwise determined by the ornithologist.
23. BIO -3. If construction work occurs between March 1 st and August 31 st a nesting survey
shall be conducted not more than .15 days prior to the conunencement of work in
order to avoid impacts to passerine birds or nesting waterfowl. The nesting survey
shall be conducted on the project site and within a zone of influence where
waterfowl could be disturbed by vibrations or noise generated by construction
activities. If passerine birds or waterfowl are discovered nesting on or adjacent to
the project site, a non -disturbance buffer of 75 feet shall be established by a
qualified ornithologist, The buffer area shall be marked with construction fencing.
Nesting buffers should be maintained until September 1st, or uultil a qualified
ornithologist determines that the young have fledged. If buffers are removed prior to
September 1st, the biologist shall prepare a report providing details of the nesting
outcome and their decision to remove the buffers. This report shall be submitted to
the City of Petaluma's Community Development Department prior to the removal
of these buffers.
24. BIO -4. hi order to avoid impacts to the wetland to be preserved onsite, the pedestrian trail
and footbridge shall be designed in a maimer that restricts direct access to the
wetland area. Signage, fencing, andpaving treatments shall be utilized to discourage
access into the sensitive wetland area.
25. BIO -5. To offset impacts to the 0.185 acres of US waters, credits shall be purchased fiom
an approved mitigation bank at a ratio of two acre for every one acre impacted, of as
otherwise directed by regulatory agencies, in addition to the preservation of the
remaining wetlands onsite within the project's open space area, The ratio of 2:1 is
proposed or as otherwise required by resource agencies given the low -quality
habitat of the onsite seasonal wetlands. The applicant shall provide proof of
purchase of credits and notification to the City and regulatory agencies.
26. BIO -6. The applicant shall install temporary orange exclusion fencing (or staking) between
the wetland area to be preserved and the limits of grading for the duration of site
preparation and construction activities in order to prevent inadvertent disturbance
during project related activities. "Following completion of construction activities, the
exclusionary fencing shall be removed,
27. BIO -7. Replacement trees totaling 144 inches or as otherwise specified by the City's Tree
Preservation Ordinance shall be introduced onsite to off -set the removal of the 6
protected trees. Tree ,mitigation may be through in-kind replacement or in -lieu
Planning Commission Resolution No. 2016-21 Page6
q4 4�
No. Condition of Approval
replacement. Replacement trees shall be at least 24 -inch boa size, The City may
accept payment of in -lieu fees by,the applicant, which shall also be based on a
mininnum 24 -inch boa size.
CULTURAL RESOURCES
28. CUL -1, The applicant shall retain the. services of a professional archeologist who
meets the Secretary of the Interior's Standards Professional Qualifications for
Archeology to monitor ground disturbing activities located in the northwestern
portion of the site in the vicinity of the former adobe structure. If a potentially
significant archeological resource is encountered the archeologist shall be provided
sufficient time to evaluate the resource and make treatment recommendations in
accordance with CEQA Guidelines §15064.5.
29. CUL -2. If during the course of ground disturbing activities, including, but not limited
to excavation, grading and . construction, a potentially significant prehistoric or
historic resource is encountered, all work within a 100 foot radius of the find shall
be suspended for a time deemed sufficient for a qualified and city -approved cultural
resource specialist to adequately evaluate and determhie significance of the
discovered resource and provide treatment recommendations. Should a significant
archeological resource be identified a qualified archaeologist shall prepare a
resource mitigation plan and monitoring program to be carried out during all
construction activities.
GEOLOGY AND SOILS
30, GEO-1, As determined by the City Engineer and/or Chief Building Official, all
recommendations outlined in the Geotechnical Investigations dated October 16,
2015 prepared for the subject property by Stevens, Ferrone, and Bailey Engineering
Co., Inc,, including but not limited to, site preparation and grading, excavation,
seismic design, and foundations system design are herein incorporated by reference
and shall be adhered to in order to ensure that appropriate construction measures are
incorporated into the design'of the project. Nothing in this mitigation measure shall
preclude the City Engineer acid/6r Chief Building Official from requiring additional
information to determine compliance with applicable standards. The geotechnical
engineer shall inspect, the construction work and shall certify to the City, prior to
issuance of a certificate of occupancy that the improvements have been constructed
in accordance with the geotechnical specifications,
GREENHOUSE GAS EMISSIONS
31, GHG-l; In accordance with Section' A4.106.8.2 of the 2013 California Green
Building Standards Code, the project shall provide at least 3% of the total condo
parking spaces as capable of supporting fature electric vehicle supply equipment. Of
the spaces and equipment requirements of the California Green Building Standards
Code and as required by City of Petal -Luna General Plan Policy 4-P-9, the project
shall be constructed to include electrical vehicle charging stations at a ratio of least
1% of the total parking spaces.-
HAZARDOUS
paces:HAZARDOUS MATERIALS
32.
HAZ-1. Prior to any activities involving the demolition or alteration of the existing
Planning Commission Resolution No. 2016-21 Page] 7
No, Condition of Approval
buildings on site, an asbestos sutvey adhering to sampling protocols outlined by the
Asbestos Hazard Emergency Response Act and material sampling to determine lead
presence will occur. Construction activities that disturb materials or paints
containing any amount of lead 'and/or asbestos may be subject to certain
requirements of the Occupational- Safety and Health Administration (OSHA) lead
standard contained in 29 CFR 1910.1025 and 1926.62, AHERA requirement, and
any other local, state,. or federal regulations. hi the event that such substances are
found, the applicant will adhere to all 'requirements put forth by OSHA and other
agencies regarding the treatment; handling, and disposal of these materials.
33.
34.
HAZ-2, Prior to any subsurface construction activities, a Site Management Plan (SMP)
shall be prepared and implemented to monitor for and appropriately manage any
hazardous features unearthed during construction activities. The Site Management
Plan shall at a minimum provide detail on the protocol to be followed in the event
that an underground storage tank is encountered and proper procedures for
excavation, remedial action and noticing to the appropriate regulatory agency
(Sonoma County Department of Health Services).
NOISE
NOI-1. To reduce noise levels noise levels in the rear yards of single-family homes to a
CNEL of 60 dBA the following noise barriers shall be incorporated into the project
design as specified below:
1. A noise barrier with a minimum top of wall elevation of six (6) feet above yard
grade level on the rear and side yard property lines of the single-family
residential lots 18 to 25 and 61 along Sonoma Mountain Parkway and on the
side yard property lilies of single-family residential lots 1, 9, and 47.
To reduce noise levels in the outdoor activity and open space areas designated for
the multi-fannily homes to a CNEL, of 65 dBA flie following shall be incorporated
into the project design as specified below:
2. A noise barrier with a minimum elevation of eight (8) feet above residential
grade level on the property lines of the multi -family residential areas along the
SMART rail line and Coro ha Road,
3. A noise barrier with a minimum elevation of six (6) feet above residential
grade level on the property. lines of the multi -family residential areas along
Sonoma Mountain Parkway.
Noises barriers shall be constructed without cracks or gaps in the face or base, or
where they adjoin structures. To be effective, noise barriers shall have a minimum
surface weight of 3.0 pounds per square foot. Small, dispersed gaps for landscape
Planning Commisslori'Resoluflori No. 2016-21 Page 8
l—S
No. Condition of Approval
irrigation or drainage are acceptable so. long as they do not exceed more than 0.5%
of the total barrier face. Acceptable noise barriers include double sided wood
fencing, Gabion Walls or other means with demonstrated noise attenuation.
Double sided wood fencing shall be comprised of 1 x 8 redwood boards butted to
each other and staggered on both sides of the fence and limited to 6 feet in height
along Sonoma Mountain Parkway and at lots 1, 9, and 47. Along Corona Road, 8
foot high wood fencing shall be provided between buildings. The Gabion wall,
located in the southwestern portion of the site shall be comprised of steel columns
supporting gabion baskets filled with. stones and limited to 8 feet in height.
35.
For expanded detail on the characteristics of these barrier walls and figures of
where they will be placed, referto the tecluiical report prepared by Illingworth and
Rodkin I .
NOI-2. In order to achieve interior noise standard of 45 dBA CNEL the following shall be
implemented:
1. Some form of forced air mechanical ventilation, satisfactory to the local
building official, shall be required in all residences with partial or Rill line
of sight to the SMART rail line, Corona Road traffic, and/or Sonoma
Mountain Parkway traffic.
2. Given the anticipated exterior noise levels along Sonoma Mountain
Parkway, Corona Road, and the SMART rail line, sound -rated windows
and doors at single family homes on lots 1, 9, 10, 18 through 25, 47
through 51, and 61. and at the multi -family residences facing or
perpendicular to Sonoma Mountain Parkway, Corona Road, and the
SMART rail line to maintain interior noise levels at or below 45 dBA
CNEL. The degree of sound mitigation needed to achieve an interior
CNEL of 45 dBA or less would vary depending on the final design of the
building (relative window area to wall area) and the design of the exterior
wall assemblies. However, based on the future exterior noise levels and
typical residential construction, we would expect that windows and doors
facing or with a view `of Sonoma Mountain Parkway, Corona Road, and the
SMART rail line may require STC ratings of between 28 and 32.
3. The specific determination of exterior wall assemblies and window/door
STC ratings shall be conducted on a unit -by -unit basis during the project
design. The results of the analysis, including the description of the
necessary noise control treatments, shall be submitted to the City along
with the building plans and approved prior to issuance of a building permit.
36. NOI-3.In order to achieve an interior noise standard of 45 dBA CNEL and/or the
reconunended sleep disturbance/annoyance criteria of 55 dBA Lmax the following
shall be implemented:
1. With Quite Zone Implementation: To reduce interior maximum levels due to
train engine noise to the reconunended 55 Lmax levels, windows with STC
I Environmental Noise Assessment Prepared By Illingworth & Rodkin, September 2016.
Planning Commission Resolution No. 2016-21 Page 9
9-9
No. Condition of Approval
ratings of between 30 and 32 shall be provided in the single-family residences
with views of the SMART corridor and windows with STC rating of between
32 and 34 shall be provided 'in the multi -family residences with view of
SMART corridor and adjacent to Corona Road at grade crossing.
2.
Without Quite Zone Implementation: To reduce interior maximum levels due
to train horn and engine noise . to the recommended 55 Lmax levels, the
exterior walls of the exposed residences shall provide for acoustical upgrades
to allow for 50 to 55 STC ratings (as appropriate). With upgraded exterior
walls, windows with STC ratings of between 36 and 38 shall be provided in
the single-family residences with views of the SMART corridor and windows
with STC rating of 40 shall be provided in the multi -family residences with
views of the SMART corridor and adjacent to Corona Road at grade crossing.
37. NOI-4. Construction activities shall.comply with the following measures and all shall be
noted
on construction documents:
1.
Pursuant to the Municipal Code, restrict noise -generating activities at the
construction site or in areas adjacent to the construction site to the hours
between 7:00 a.m. and 10:00 p.m., Monday through Friday and 9:00 a.m. to
10:00 p.m. on Saturday, Sunday and State, Federal or Local Holidays.
2.
Equip all internal combustion engine driven equipment with intake and
exhaust mufflers that are in good condition and appropriate for the equipment.
3.
Locate stationary' noise generating equipment (e.g., compressors) as far as
possible from adjacent residential receivers.
4.
Acoustically shield stationary equipment located near residential receivers
with temporary noise barriers.
5.
Utilize "quiet" air compressors and other stationary noise sources where
technology exists.
6.
The contractor shall prepare a detailed construction plan identifying the
schedule for major noise -generating construction activities. The construction
plan shall identify a procedure for coordination with the owner/occupants of
nearby noise sensitive residential land uses so that construction activities can
be scheduled to minimize noise disturbance.
7.
Generators: No generators shall be utilized during nighttime hours (I.e.,
sunrise to sunset) to power equipment (e.g., security surveillance) when
normal construction activities have ceased for the day, All such equipment
should be powered through temporary electrical service lines.
8.
Designate a "disturbance coordinator" responsible for responding to airy
complaints about construction noise. The disturbance coordinator will
determine the cause of the "noise complaint (e.g., bad muffler, etc.) and will
reauire that reasonable measures be implemented to correct the problem.
38. Construct frontage improvements along Sonoma Mountain Parkway, Corona Road and
Wellington Place as shown on the tentative inap and as required or modified by these
conditions of approval.
39. Construct a new transit stop/turnout on southbound Sonoma Mountain Parkway, east of
Planning Commission Resolution No. 2016-21 Page 10
No. Condition of Approval
Wellington Place, in the location shown on the tentative map. The dimensions of the
turnout shall meet City standards. Install a 4 -foot deep by 15 -foot long concrete pad and
shelter at the southerly end of the turnout, Install a signpost to be installed near north end
of bus stop area, for a bus stop sign and no parking sign. Install a blue perforated metal 6
feet bench with anti -vagrant bars to be installed towards south end of new concrete pad,
per City specifications. Hardwired electrical facilities shall be installed for the stop.
40. The exact pavement sawcut line on Corona Road shall be determined and approved by the
City. A minimum of a Y2 half street pavement crack seal and microsurfacing seal shall be
installed on Corona Road along the project frontage, from the railroad grade crossing to
the roundabout.
41. A pavement crack seal and microsurfaeing seal per City requirements shall be constructed
on Wellington Place (curb to curb) from the intersection of Sonoma Mountain parkway to
project limits near Corona Creels.
42. A 2 -inch pavement grind and overlay shall be constructed on Sonoma Mountain Parkway
at and within the intersection of Street A/Mauro Pietro Drive and within the fitll street
area (curb to curb) on Sonoma Mountain Parkway between the end of the existing median
and Street A/Mauro Pietro Drive.
43. Prior to the issuance of the first building permit for a residential structure, the applicant
shall pay a fair share contribution to the City towards pedestrian crossing improvements at
the Corona Road railroad grade crossing. The applicant shall coordinate design
requirements with Sonoma Marin Area Rail Transit and provide a preliminary cost
estimate of the improvements to the City for review and approval. The fair share shall be
based on the number of residential units within the project area and within a'/2 anile radius
of the future train station site, east of the railroad tracks.
44. All existing pedestrian ramps along the Sonoma Mountain Parkway, Corona Road
(including the roundabout) and Wellington Place frontages shall be removed and replaced
with new= pedestrian ramps that meet ' current City requirements and accessibility
standards.
45. All portions of existing broken, displaced, cracked and/or settled City sidewalk, curb and
gutter along the Sonoma Mountain Parkway, Corona Road (including the roundabout) and
Wellington Place frontages shall be removed and replaced with City standard sidewalk,
curb and gutter.
46. A rapid rectangular flashing beacon enhanced crosswalk system with advanced warning
signage and pavement markings .shall be installed on both crosswalks across Sonoma
Mountain parkway at the intersection' of Street A/Mauro Pietro. The systems shall be
hardwired and shall meet City specifications and requirements.
47. Striping and signage shall be required per City specifications. Thermoplastic striping shall
be required for all street striping.
48. Bicycle and pedestrian warning and wayfinding signage shall be installed at the
intersection of Street A and Sonoma Mountain Parkway. The wayfindirig signage shall
direct cyclists and pedestrians to the Class I path within Parcel A, Corona Creek and
Corona Road and adjacent land uses.
49. Grading shall conform to the project geotechnical investigation report submitted with the
tentative map application and the geotechnical report prepared as part of the construction
documents.
Planning Commission Resolution No. 2016-21 Page 11
No. Condition of Approval
50. Any existing structures above or below ground shall be removed if not a part of the new
subdivision. Structures shall include, but shall not be limited to buildings, concrete pads,
fences, retaining walls, pipes, debris; -etc,
51. All streets within the subdivision shall be privately owned and maintained with public
access and public utility easements as shown on the tentative map, dedicated to the City
of Petaluma.
52. The private streets shall generally be constructed as shown on the tentative map,
including conforms to Sonoma Mountain Parkway and Wellington Place; 36 -feet wide
with two 10 -foot travels lanes and two 8 -foot parking lanes, as well as sidewalks on both
sides of the street.
53. The private shared driveways shall have a paved surface of at least 20 -feet wide and a
pavement section of at least 3 -inches of asphalt over 12 -inches of class 2 aggregate base.
Private shared driveways shall be posted for no parking. Surface drainage shall not be
allowed to flow across the public sidewalk and shall be collected and directed to a storm
drain system.
54. A minimum 2 -inch grind and AC overlay will be required on all utility and joint trench
cuts along the length of the trench, for a minimum of 1/2 the street width within Sonoma
Mountain Parkway, Corona Road or other existing affected City sheets.
55. All private interior street improvements shall be designed and constructed to City
standards with a minimum pavement: pavement: section of 4 -inches of asphalt concrete over 12 -
inches of class 2 aggregate base. The minimum longitudinal gutter slope is 0.5% per City
standards. All other street related improvements such as sidewalk, curb, gutter, signage,
striping, etc. shall be designed and constructed to City standards.
56. Street lights in the interior streets shall be,publicly owned and operated, and installed per
City standards. LED streetlight fixtures shall be installed. The City will provide the
developer the LED specification prior to submittal of the final map 'and improvement
plans. Streetlight poles shall match existing poles as required per the Corona Ely Specific
Plan. Final street light locations shall be determined at the time of improvement plan
review and approval. Pull boxes and electrical conduits shall be installed per City
requirements.
57. "No parking" signs and red curbs shall be installed on curved sections of interior streets
and on all curb returns. .
58. Crosswalks shall be installed between all pedestrian ramps. A stop sign and legend shall
be installed at all interior street intersections per City requirements.
59. All improvement work shall be completed prior to issuance of a final
inspection/certificate of occupancy for *the' last 20% percent of units.
60. Traffic control plans are required for all stages of construction and shall be per latest
Manual on Uniform Traffic Control Devices (MUTCD) standards.
61. The storm drain system shall generally be constructed as shown on the tentative map. All
proposed storm drain lines. located on private property shall be privately owned and
maintained. The storm drain system design shall be reviewed and approved by the
Sonoma County Water Agency prior to approval of the final map and subdivision
improvement plans. Submit final construction level hydrology calculations with the final
Planning Commission Resolution No. 2016-21 Page 12
9 -rz-
No. Condition of Approval
map and the subdivision improvement plan application.
62. Prior to issuance of a building perm t, -an operations and maintenance manual is required
for the proposed detention basin/wetlands area and public storm water treatment systems,
and shall be submitted with the final map and improvement plan application for review
and approval by the City Engineer: The manual shall include annual inspection, by a
Civil Engineer registered in the State of. California, to ensure the detention and treatment
systems are operating as designed and constructed as well as provisions to make any
necessary repairs to the system. A signed and, sealed copy of the report shall be provided
annually to the Office of the City Engineer.
63. Prior to acceptance of the public improvements, the developer shall enter into a Storm
Water Quality Treatment Facility Access and Maintenance Agreement/Declaration with
the City of Petaluma, subject to City approval. The agreement shall inchide language that
the subsequent entity responsible for maintenance shall comply with terms of the
agreement in perpetuity. The agreement shall be recorded.
64. Erosion control and water quality control measures shall be employed throughout the
construction life of the project. The necessary documentation including Notice of Intent,
Storm Water Pollution Prevention Plan (SWPPP) and Notice of Termination shall be
filed as required by the responsible agencies. The project shall comply with the City of
Petaluma Phase Il Storm Water Management Plan including attachment four post
construction requirements.
65. No lot -to -lot drainage is allowed without drainage easements, subject to the approval of
the City Engineer.
66. The water main system shall generally be constructed as shown on the tentative map and
be capable of delivering a continuous fire flow as required by the Fire Marshal. Provide
final, construction level water system flow and pressure calculations with the subdivision
improvement plan and final map submittal. All new water services shall be 1.5 -inches in
diameter with 1 -inch meters. Water meters shall be located within public easements.
67. All water main valves shall be located at curb extensions.
68. Landscaping in public utility easements shall be limited to ground cover and shallow
rooted, low lying shrubs. Trees are not allowed.
69. All existing unused water and sewer mains and services shall, be identified on
construction drawings and abandoned per City standards.
70. Draft joint trench plans are required with the public improvement plan submittal. PG&E
approval of the joint trench plans is required prior to the start of any construction.
71. The sanitary sewer system shall generally be constructed as shown on the tentative map.
All sanitary sewer lines on private property shall be designated private and privately
maintained.
72. Any existing wells not proposed to be reused for irrigation purposes, and any existing
septic systems shall be properly abandoned per Sonoma County standards. Any existing
easements for leach fields and wells to be removed/abandoned shall be quitclaimed.
73. The water and sewer in the private courts shall be private. Driveways A -F shall have the
meters in a public easement in front of the complexes. No meters will be permitted in
the driveways or at the end of the driveways. Install sewer manholes as required by the
Planning Commission Resolution No. 2016-21 Page 13
No. Condition of Approval
Utilities Division.
74. The private driveway at the end of Street C shall have private Sewer and Water. Install a
SSMH in the Cul-de-sac for transition from private to public. Meters shall be installed
on lot 31 in a public easement to serve Lots 31-35.
75, A 15 -foot wide concrete pathway shall be constructed over the watermain in the access
from Street B to the cul-de-sac. A driveway ramp shall be installed on Street B for
maintenance access. No trees shall be planted in the alley or within 10 feet of the main.
76. The proposed drainage from Street B and the outfalls for the wetlands system shall be
privately owned and maintained.
77. All landscaping shall meet City water efficiency standards for low water use including the
following:
Prior to the issuance of a building permit, the applicant shall submit an irrigation design
plan as specified in PMC Section 15.70.050 (C)(5). Please refer to the PMC for detailed
requirements of this plan. The irrigation design plan shall include the following:
• Landscape water meters, dedicated water meters or private submeters shall be
installed for all multi -family residential landscape
• Automatic irrigation controllers utilizing evapotranspiration or soil moisture
sensor
• Pressure regulating devices
• Manual shut-off valves as close to the point of connection of the water supply
• Backflow prevention devices
• Flow sensors required in residential landscapes of 5,000 sf or larger
• Master shut-off valves
• Isolation valves installed* at point of connection and before each valve or valve
manifold
• Irrigation system shall be designed to prevent runoff, low head drainage,
overspray, etc.
• Relevant t information from soil report shall be shall be utilized
• Design of irrigation system shall conform to the hydrozones
• Must be installed to meet the irrigation efficiency regarding the MAWA
calculation
• Mulched planting areas -require low volume irrigation
• Sprinkler heads and emission devices shall have matched precipitation rates
• Head-to-head coverage required, sprinkler shall be designed to have highest
possible distribution uniformity
• Swing joints or other riser -protection required on all risers
• Check valves or anti -drain valves required on all sprinkler heads where there
may be low point drainage
• Areas less than 10 ft in width shall be irrigated with subsurface irrigation,
runoff prohibited
• Overhead irrigation not permitted within 24 inches of any nonpermeable
Planning Commission Resolution No. 2016-21 f�Page 14
No, Condition of Approval
surface
• Slopes greater than 15% require point 'source or low-volume irrigation
• Each valve shall irrigation a similar hydrozone
• Emission devices to be selected based on what is appropriate for plant type in
that hydrozone
• Trees to be placed on separate valves
• Hydrozones shall not mix low and high water use plants
• Show or list hydrozones on irrigation plan or landscape design plan
• Hydrozone table that lists.each hyrdozone, plant factor, irrigation method,
landscape area and percent of total landscape
78. Prior to issuance of first certificate of occupancy, the applicant shall submit the following
in accordance with PMC Section 15.70.050. Please refer to the following sections of the
PMC for detailed requirements of each item:
• Grading Design Plan (if applicable) PMC Section 15.70.050 (C)(6)
• Soil Management Report—PMC Section 15.70.050 (C)(3)
• Certificate of Completion—PMC Section 15.70.050 (D)(1-3) to include the
following attachments:
o Certification by either the signer of the landscape design plan, the
signer of the irrigation design plan, or the licensed landscape contractor
that the landscape project has been installed per the approved landscape
water use efficiency standards.
o Irrigation Schedule — shall be regulated by automatic irrigation
controllers, applied water should be the ETWU. Annual water applied
shall be less than or equal to the MAWA.
o Landscape and Irrigation Maintenance Schedule - including routine
inspection,. adjustment and repair of irrigation system, fertilizing,
pruning, weeding, etc.
79. Landscape Irrigation Audit conducted' by a certified landscape irrigation auditor.
Landscape audits shall not be conducted by.the person who designed the landscape or
installed the landscape. Audit reports shall meet the criteria listed in Section 15.70.050
(D)(2)(c)
80. All necessary right of ways and easements shall be dedicated on the final map, subject to
City approval.
81. Public access easements for the proposed Class I bicycles and pedestrian pathways shall
be dedicated to the City of Petaluma.
82. The easements for the shared driveways shall be at least 20 -feet wide and include private
access, private water line, private sanitary sewer and private drainage.
83. Public utility easements (PUE) shall be provided adjacent to and parallel to both sides of
new streets and within the public right-of-way. Any proposed PUE's less than 10 feet
wide shall be approved by the responsible public utility agencies. Additional PUE's may
be required in shared driveways.
84. Easements shall be dedicated to the City for the nine proposed public parldng stalls on
the private Street B near Wellington Place. The public parking stalls shall be signed
appropriately for enforcement purposes.
Planning Commission Resolution No. 2016-21 Page 15
No. Condition of Approval
85. Any existing overhead distribution utilities (electrical and communication) along the
project frontages and traversing the site sltall be placed underground.
86. The areas proposed on sheet TM -13 on the tentative map to be within a Community
Facilities District shall be privately owned and maintained tlu•ouigh a homeowner's
association or other privately fiuided'ineclhanism.
87. Maintenance agreements shall be ' i equired for any shared utilities or facilities within
common areas and shall be recorded with the final map. Agreements shall identify the
utility or facility to be maintained, the parties responsible for maintenance and the
fiinding mechanism for maintenance, replacement and repair. All agreements shall be
reviewed and approved prior to recordation.
88. Each multi -family building shall have its own bike racks (inverted U style) and lockers
instal led in accordance with City requirements.
89. Prepare final map and improvement plans per the latest City policies, standards, codes,
resolutions and ordinances. Final map fees and technical review deposits shall be
required at the time of the application submittal. Public improvements shall be designed
and constructed in accordance with City of Petahima Standards, Caltrans and Manual of
Uniform Traffic Control (MUTCD).
90. Prior to issuance of any permits, a subdivision agreement package including City
standard surety bonds and insurance, is required for the subdivision improvements.
Fire Department
91. To mitigate limited access, the three-story multi -family buildings shall be equipped with
a Class 1 Standpipe in each shared stairwell, and buildings' sprinkler system shall be
designed per NFPA 13 with a 4 head cale. for Residential Occupancies (to include an
FDC and sprinkler coverage in attics, garages, bathrooms, closets, and covered porch
areas).
Planning Commission Resolution No. 2016-21 Page 16
q-l�
ATTACHMENT 10
MEMORANDUM OF UNDERSTANDING
Brody Ranch Subdivision Inclusionary Zoning Units
This Memorandum of Understanding ("MOU") is entered into as of August 5, 2016 by
and among DeNova Homes, Inc. or its related assigns ("DeNova"), and Housing Land
Trust of Sonoma County (HLT), in order to facilitate the development of twenty-five (25)
affordable housing units in the Brody Ranch Subdivision (defined below).
1. Application for Development. DeNova has filed an application for development
("Application") of approximately 15.9 acres, in the City of Petaluma, State of
California, and more particularly described as Assessor's Parcel No. 137-061-042
located at 360 Corona Road and more commonly known as the `Brody Ranch
Subdivision."
2. Inclusionary Housing Requirements. In reviewing DeNova's Application, the
City has accepted DeNova's proposal to provide twenty-five (25) affordable
housing units ("Affordable Units") and pay certain sums (as set forth below) in
order to meet the City's inclusionary housing requirements under the City's
Municipal Code.
3. Development and Construction of Affordable Units. DeNova has agreed to
provide the Affordable Units (made up of the Affordable Condos, Affordable
Duplex, and Affordable SFs as those terms are hereinafter defined), and will do so
under the following terms and conditions:
a. DeNova shall develop and construct, at its sole cost and expense, twenty-
one (21) condominium units ("Affordable Condos"), which Affordable
Condos shall be distributed throughout the entire condominium portion of
the Brody Ranch Subdivision (i.e., these condominium units will be
intermixed with the market rate condominium units). The goal for the unit
mix for the twenty-one (21) Affordable Condos shall include the
following: DeNova shall provide six (6) one -bedroom units, nine (9) two-
bedroom units, and six (6) three-bedroom units. Because condominium
units do not include ownership of the land underlying the condominium
building, there shall be no requirement for land transfer in connection with
the development and construction of the Affordable Condos.
b. DeNova shall develop and construct, at its sole cost and expense, one (1)
two -unit home (i.e., a duplex) on one of the Brody Ranch Subdivision lots
("Affordable Duplex"). DeNova shall dedicate the land underlying the
Affordable Duplex to the City, the City shall deed the land to HLT who in
MOU for DeNova Homes Brody Ranch
18866:6507809.2
10-1
turn will execute a long term ground lease (under the terms hereinafter
specified) to ensure affordability.
c. DeNova shall develop and construct, at its sole cost and expense, two (2)
single family homes ("Affordable SFs") within the Brody Ranch
Subdivision. To make the Affordable SFs homes "affordable," DeNova
shall dedicate the land underlying the Affordable SFs to the City so that
the City may deed it to HLT who will in turn execute a long term ground
lease (under the terms hereinafter specified) to ensure affordability.
Housing Land Trust shall contribute a maximum of Three Hundred
Thousand Dollars ($300,000.00) per Affordable SF to DeNova (as set
forth in Section 3(d) below) to off -set the total cost of the market rate unit
thereby making it affordable to the ultimate buyer.
d. In addition to providing the Affordable Units, DeNova shall provide the
total sum of Six Hundred Thousand Dollars ($600,000.00) to the Housing
Land Trust (the sum is based upon the in -lieu fees that would be due under
the City's inclusionary housing ordinance) so that the Housing Land Trust
will have sufficient funds to subsidize the funds required for purchase of
the two Affordable SFs (at $300,000.00 per unit).
e. All Affordable Units shall be resale restricted for sale to households with
low to moderate income earners (i.e., made affordable to households with
incomes from 80% to 120% of Area Median Income).
f. DeNova shall sell the Affordable Units and shall recover and retain all
proceeds from such sales.
g. From the sales proceeds at each close of escrow for each of the Affordable
Units, DeNova shall pay to Housing Land Trust the sum of Seven
Thousand Five Hundred Dollars ($7,500) per unit, which sum shall be a
fixed cost that will cover all costs incurred by Housing Land Trust related
to marketing, homebuyer selection, homebuyer education and preparation
of documents for the close of escrow as related to the Affordable Units.
4. City's Obligations.� The City will work in partnership with the Housing Land
Trust of Sonoma County ("Housing Land Trust") to take and retain title to the
land beneath the Affordable Duplex and the Affordable SFs, and will thereafter
transfer that land to the Housing Land Trust (subject to a Regulatory Agreement)
so that the Housing Land Trust may enter into a 99 -year renewable term ground
lease with each buyer to ensure continued affordability. Working with the
Housing Land Trust, the City will draft all documents necessary to effectuate the
intent of this MOU, including any leases, and any affordability and occupancy
restrictions designed to protect the City's interest in maintaining the homes as
affordable workforce housing over time. The City, in conjunction with Housing
Land Trust, will coordinate outreach efforts to income -qualified buyers. DeNova
MOU for DeNova Homes Brody Ranch
18866:6507809.2
shall have no liability to the City and/or the Housing Land Trust for the policies
and procedures adopted to effectuate any workforce housing program offered.
Housing Land Trust Obligations. Housing Land Trust will work in partnership
with the City to effectuate a 99 -year renewable ground lease that will ensure
continued affordability for the Affordable Duplex and the Affordable SFs.
Housing Land Trust shall implement a deed covenant for the condominiums to
ensure long term affordability. Working with the City, Housing Land Trust will
draft all documents necessary to effectuate the intent of this MOU, including any
leases, deed restrictions and any affordability and occupancy restrictions designed
to protect the City's interest in maintaining the homes as affordable workforce
housing over time and the Housing Land Trust's interest in creating workforce
housing. Housing Land Trust, in conjunction with the City, will coordinate
outreach efforts to income -qualified buyers. Housing Land Trust will be
responsible for marketing the units and finding qualified buyers. DeNova shall
have no liability to the City and/or the Housing Land Trust for the policies and
procedures adopted to effectuate any workforce housing program offered.
IN WITNESS WHEREOF, the parties hereto have executed this MOU on the first date
written above.
-A
DeNova Homes
Trent Sanson, Director of Land Acquisition
Housing Land Trust of Sonoma County
Dev Goetschius, Executive Director
MOU for DeNova Homes Brody Ranch
18866:6507809.2
BRODY RANCH
AFFORDABLE HOUSING COSTS
TOTAL IN LIEU FEES (estimate - should applicant not build units on-site):
Condominiums
30 units — 700 s.f.
$2,649/Unit
$ 79,470
70 units —1,100 s.f.
$3,072/Unit
215,040
38 Units —1,200 s.f.
$4,876/Unit
185,288
Total
$479,798
Du lex
2 units —1500 s.f.
$6,449/Unit
$ 12,898
Single Family Residences
59 SFD — 2,000 s.f. avg
$9,022/Unit
$532,298
TOTAL IN LIEU FEES
$1,024,994
ON-SITE UNIT COST (estimate):
To calculate the developer contribution for on-site units, you need to take into consideration the
cost of building the unit and the sale price of the below-market rate unit. Another factor that has
not been calculated is the loss of equity to the developer due to selling the 25 units at below
market rate prices. This amount can range anywhere from $2,000,000 to $3,000,000 for the 25
proposed units.
The assumptions used to calculate the on-site cost contribution are as follows:
Development Cost Assumptions
• Cost to build the unit - $237.56/s.f.*
• 1 bedroom unit - 700 s.f.
• 2 bedroom unit - 1,100 s.f.
• 3 bedroom unit - 1,200 s.f.
• Duplex unit - 1,500 s.f.
*(Data from City of Santa Rosa's Nexus Study dated January, 2013)
One Bedroom Condo Unit:
Cost (237.56 sf x 700)
80% AMI Sales Price
Developer Subsidy
100% AMI Sales Price
$166,292
(134,000)
$ 32,292 3 — 80% units
(195,000)
$96,876
Developer Subsidy
($28,708) 3 —100% units
(86,124)
Total Subsidy for 1 bedroom units
$10,752
Two Bedroom Condo Unit:
Cost (237.56/sf x 1,100)
$261,316
80% AMI Sales Price
(160,000)
Developer Subsidy
$101,316 4 — 80% units
$405,264
100% AMI Sales Price
(225,000)
Developer Subsidy
$ 36,316 5 —100% units
$181,580
Total Subsidy for 2 bedroom units
$586,844
Three Bedroom Condo Unit:
Cost (237.56/sf x 1,200) $285,072
80% AMI Sales Price (185,000
Developer Subsidy $100,072 2 — 80% units $200,144
100% AMI Sales Price (260,000)
Developer Subsidy $ 25,072 3 — 100% units $ 75,216
120% AMI Sales Price (335,000)
Developer Subsidy ( 49,928) 1-120% 49,928)
Total Subsidy for 3 bedroom units $225,432
Duplex Unit:
Cost (237.56/sf x 1,500) $356,340
100% AMI Sales Price (260,000)
Development Subsidy $ 96,340 1-100% $ 96,340
120% AMI Sales Price (335,000)
Developer Subsidy $ 21,240 1-120% $ 21,340
Total Subsidy for Duplex $117,680
Cash to Subsidize purchase of 2 Single Family Dwellings
(and aeeount for equivalent in -lieu fees for total single fancily ]rousing units) $600,000
TOTAL DEVELOPER CONTRIBUTION FOR ON-SITE UNITS $1,540,708
IUB
ATTACHMENT 11
SE,L OP TNF '
STATE OF CA.L1FORN1A
Governor's Office of Planning and R.6search
IPORM State Clearinghouse and Planning Unit
Edmund G, Brown Jr.
Governor
October 24, 2016
Emmanuel Ursu
City of Petaluma
11 English Street
Petaluma, CA 94952
Subject: Brody Ranch Subdivision
SCHM 2016092048
Dear Emmanuel Ursu:
yo��\�EOF PlAlyy�'ey
O
m
N
Q�Aloft
E
111471 F 1 10to,
Ken Alex
Director
OCT 3 1 .2016
PLANNING DIVISION
The State Clearinghouse submitted the above named Mitigated Negative Declaration to selected state,
agencies for review. On the enclosed Document Details Report please note that the Clearinghouse has
listed the state agencies that reviewed your document. The review period closed on October21, 2016, and
the comments from the responding agency (ies) is (are) enclosed, If this comment package is not in order,
please notify the State Clearinghouse immediately. Please -refer to the project's ten -digit State
Clearinghouse number in future correspondence so'that we may respond promptly.
Please note that Section 21104(c) of the California Public Resources Code states that:
"A responsible or other public agency shall only make substantive comments regarding those
activities involved in a project which are within an area of expertise of the agency or which are
required to be carried out or approved by the agency. Those comments shall be supported by
specific documentation."
These continents are forwarded for use in preparing your final environmental document. Should you need
more information or clarification of the enclosed comments, we recommend that you contact the
commenting agency directly. '
This letter acknowledges that you have complied with the State Clearinghouse review requirements for
draft environmental documents, pursuant to the California Environmental Quality Act. Please contact the
State Clearinghouse at (916) 445-0613 if you have any questions regarding the environmental review
process.
Sincerolp -�
,57
Cott Morgan
Director, State Clearinghouse
Enclosures
cc: Resources Agency
1400 TENTH STREET P.O. BOX 3044 SACRAMENTO, CALIFORNIA 96812-3044
TEL (916) 446-0613 FAX (916) 323-3018 www.opr.ca.gov
( Document Details Report
State Clearinghouse Data Base
SCH# 2016092048
Project Title Brody Ranch Subdivision
Lead Agency Petaluma, City of
Type MND Mitigated Negative Declaration,
Description The project Includes zoning change from R4 to R5 to planned unit development to allow reduced lot
sizes and setbacks for the single family component of the project, tentative subdivision map, tree
removal permit and site plan and architectural review for the subdivision of a 15.92 acre site for
redevelopment of 199 units include 59 single family homes, a duplex and 138 multi family units.
Project amenities include open space and conservation easement, landscape buffers, pedestrian and
bicycle trails, neighborhood park/picnic area, resident and guest parking and public parking for nine
cars.
Lead Agency Contact
Name Emmanuel Ursu
Agency City of Petaluma
Phone 707-778-4401 Fax
email
Address 11 English Street
City Petaluma State CA .Zip 94952
'Project Location
County Sonoma
City Petaluma
Region
Lat/Long 38° 16'03" N / 122° 39' 13" W
Cross Streets 360 Corona Rd - Corona Rd/Sonoma Mountain Pkwy/Wellington Place
Parcel No. 137-061-042
Township Range Section Base
Proximity to:
Highways.
101
Airports
Railways
SMART
Waterways
Corona Creek
Schools
Meadow ES/Corona
Land Use
GP: Medium density residential & high density residential; Z: Residential 4, Res 5
Project Issues Air Quality; Archaeologic -Historic; Biological Resources; Geologic/Seismic; Noise; Toxic/Hazardous
Reviewing Resources Agency; Department of Fish and Wildlife, Region 3; Department of Parks and Recreation;
Agencies Department of Water Resources; California Highway Patrol; Caltrans, District 4; Regional Water
Quality Control Board, Region 2; Department of Housing and Community Development; Native
American Heritage Commission; Public Utilities Commission
Date Received 09/22/2016 Start of Review 09/22/2016 End of Review 10/21/2016
It.— 12' .
Note: Blanks in data fields result from insufficient information provided by lead agency.
RECEIVED 10/20/2016 13;23 916-323-3018 STATE CLEARINGHOUSE
Cot 20 2015 12t40PM HP( ISERJET FAX P,1
Y •i• •.1 I. •t .�
DEPARTMENT OF TRANSPORTATION
DISTRICT 4
P,O, BOX 23660
OAKLAND, CA 94623-0660
PHONE (510) 286.5528
FAX (510)286-9559
TTY 711
tvww,dPt.Mg0Y
October 20, 2016
lvir, Emmanuel Ursu
Community Development
City of Petaluma
11 -English Street
Petaluma, CA 94952
Dear Mr. Ursu;
GovemftOffice ofPlanning, Research
CCT 20 2016
8TATECLEARIN H(jj8e
Brody Rfinch Subdivision -- Mitigated Negative Declaration (MND)
Serbia Droltght
M4.1p Save water/
04 -SON -2016-00038
SCR # 2016092048
Cle'u--r
w1 o E,
Thank you for including the California Department of Trmsportation (Caltrans) in the
environmental review process for the above -referenced project, In tand%h with the Metropolitan
Transportation Commission's (MTC) Sustainable Communities Strategy (SCS), Caltrans new
mission signals a modomization of our approach to evaluating and mitigating impacts to the State
Transportation Network (STN), We aim to reduce.Vchiole Miles Travelled (VMT) by tripling
bioycle and doubling both pedestrian and transit travel by 2020, Our comments -are based on the
MN -D.
Profeat Understanding
The proposed project would Construct 199 units on the 15.92 acre site inoluding 59 single-family
homes, one duplex, and 136 multifamily units, p'6ct amonities would include open space and
conservation easements, landscape buffers, pedestrian and bicycle trails, a neighborhood
park/picnio area, and resident, guest, and public parking for nine cars, All existing structures on
the projeet site and 3 2 trees are to be removed and 311 trees at'e proposed to be planted, Access
to the site would be provided by the US ] 01 on- and off -ramps at Petaluma Boulevard North and
Old Redwood HiAway North,
Lead Agency
As the lead agency, the City of Petaluma is responsible for all project mitigation, including any
needed improvements to State highways. The projeat 's.fair share contribution, financing,
scheduling, implementation responsibilities and lead agency monitoring'should be fully
disoussed for all proposed mitigation measures,
Araffla Impact Fees
Please identify traffic impact fees to be used for project mitigation. Developramit plans should
"Provide a P sustaUlaDle, NtPgmod and efNoiwd 1twttj orlaHon
Jyplem 10 enhanee CalUornla'.r ecwwu0; and QvaNllo,
RECEIVED 10/20/2016 13:23 916-323-3018 STATE CLEARINGHOUSE
Oot. 20 2016 1 2; 4OPM HP( 1SERJET FAX p, 2
Mr, Ursu, City of Petaluma
October 20, 2016
Page 2
require traffip impact fees based on projected traffic and/or based on associated cost estimates for
public transportation facilities necessitated by development.
Traf c Operations
• Please provide a copy of the Traffic Impact Study for us to complete the review.
• How many trips will this project generate?
a page 83, Table 1, first raw should read: Baseline Conditions and B$sellne plus Project,
+ Page 84, Table 12, first row should read; Future Conditions and Future plus Project.
Multimodal Planning
The proposed project should be conditioned to ensure connections to existing bike lanes and multi-
use trails to facilitate walking and biking to nearby jobs, neighborhood services, and transit nodes
such as the North Petaluma Sonoma. -Marin Area Rail Transit (SMA" Station; this includes
connecting to the proposed Class II bike lane on Corona. Road as shown in the 2014 update to the
Sonoma County Transportation Authority's Bicycle and Pedestrian Master Plan, Providing these
connections with streets configured for alternative transportation modes will reduce VMT by
promoting usage of tlearby Sonoma County Transit Bus Route 44, The.project should also consider
the following:
• Install sidewalks around the,entire perlmoter and widen proposed sidewalks $om 4/4,5 -feet
wide to S -feet wide where capacity permits,
+ Connect the Corona Creek bike trail/multi•use path with the project -and the North McDowell
Boulevard bus facilities.
+ Create more walking paths within the development, especially within bulky cut-de,sao areas,
so as to encourage walking and community building.
Create ars additional pedestrian gateway in/out of the subdivision,
Transportation Demand Mai agement (TDM)
The project conditions should Include all relevant TDM policies to pronlcte smart mobility and
reduce regional VMT and traffic impacts to the STH The specific TDM elements below should
be evaluated in the MND:
• Project design to encourage walking, bicycling, and convenient transit access;
• Lower parking ratios;
• Transit fare incentives for residents such as subsidized transit passes on a'continuing basis;
• Enhanced bus stops;
• Designated bicy6le parking;
• Charging stations for electric vehicles;
+ Pardolpation/Formation, in/of a Transportation Management Association (TMA,) in partnership
with other developments in the area; and
• Aggressive trip reduction targets with Lead Agency monitoring and enforcement; and
• Reducing headway tuns of nearby Sonoma County Transit Bus Route 44.
"Provide a sq/e, n alalnpble, Intagmted and ?ffivient le&jsportatfon
s)vlem la enhange VWt&rnia a eoonongi end lAvebtllty"
RECEIVED 10/20/2016 13:23 316-323-3018 STATE CLEARINGHOUSE
Oot 20 2016 12: 40PM HP( 9SERJET FAX
Mr. ursu, City of Petalu=
October 20, 2016
Page 3
For additional TDM options, please refer to Chapter 8 of * FHWA:'s Integrating Demand
Management into the Transportation Plannitag Procan A.peskReference, regarding TDM at the
local planning, level, The reference is available online at:
http://www,ops.fhwa.dot.gov/publications/fhwahopl2035/f`hwah,opl2035,pdf. For information
about parking ratios, please see MTC's report, Reforaiiag Parking Policies to Support Smart
Growth, or visit the MTC parking webpage:
http://www,mto.ca.go'v/plawn ng/smart growth/parking,
Should you have any questions regarding this letter, please call Erik Bird -at 510-286-5521 or
Erik,Bird@dot,ca.gov.
Sincerely,
PATPJCIA MA1. RICE
District Branch Chief
Local Development - Intergover=ental Review
"Provldd a NO, .s-tauiable, Intirw ted and 4B?alenl trtrn+partatto,r
,I)WIPm !n dMance G'ailJarnla a econwny and ltpabttlfy"
Y RECEIVED 10/20/2016 13:23 916-323-3018 STATE CLEARINGHOUSE
Cot 20 8016 12t40PM HP� 1SERJET FR}{ — —p,4
Mr. Ursu, City of Petaluma
October 20, 2016
Page 4
0, State Cloaringhouse