Loading...
HomeMy WebLinkAboutStaff Report 3.D 08/06/2007CITY OF PETALUMA, CALIFORNIA AGENDA BILL Agenda Title: Resolution Awarding a Construction Contract to FEDCO Construction, Inc. for FEMA Street Pavement Replacement 2007 Project F070006, F071106, F073106, F073306, F073606, F073706, F073906, F074106, and F074406 3.D August 6, 2007 Meeting Date: August 6, 2007 Meeting Time: M 3:00 PM ❑ 7:00 PM Category: ❑ Presentation M Consent Calendar ❑ Public Hearing ❑ Unfinished Business ❑ New Business Department: Dir tor: Contact Person: Phone Number: Public Works Vi e Marengo Susan Lackie 778-4478 Cost of Proposal: FEMA-OES has approved 100% funding for the actual Account Number: total project cost (design, construction management/inspection, and F070006, F071106, F073106, construction). 17073306,17073606,F073706, Amount Budgeted: F073906, F074106, and F074406 F070006: $19,220.00 F071106: $38,830.00 Name of Fund: F073106: $35,850.00 F073306: $80,570.00 3850 F073606: $43,400.00 F073706: $104,000.00 F073906: $63,150.00 F074106: $113,875.40 F074406: $22,850.00 TOTAL $521,745.40 Attachments to Agenda Packet Item: 1. Resolution Location Maps Summary Statement: On July 11, 2007, the City received 3 bids for FEMA Street Pavement Replacement 2007 Project Nos. F070006, F071106, F073106, F073306, F073606, F073706, F073906, F074106, and F074406, ranging from $369,295.40 to $438,471.80. In general, the work includes repair of a 1,265 foot section of gravel shoulder along the east side of Stony Point Rd., north of Petaluma Blvd. N.; repair of a section of ditch slope at the SW comer of Petaluma Blvd. N. and Industrial Ave.; and street pavement replacement on sections of Maria Dr., Ely Blvd. S., Casa Grande Rd. and Pine View Way. Recommended Citv Council Action/Suggested Motion: Adopt the resolution awarding the construction contract to the low bid submitted by FEDCO Construction, Inc. in the amount of $369,295.40, and authorize the City Manager to execute the construction contract. Reviewedrbv Admin. Svcs. Dir: Reviewed by City Attornev: Annrov v Citv Manager: / Date: 1'L1 Un Date: vik Date. Rev. # 1 1 Date Last Revised: Page 1 File: G:\Public Works\FEMA-OES\I FEMA Projects\Sneet Repairs 01 PW 700- 711-731-733-736-737-739-741-744\Dcsign\330 PCDC-City Council\8-6-07 Agenda and Resol FEMA Streets PW 700, 711, 731 ete-doc CITY OF PETALUMA, CALIFORNIA AUGUST 6, 2007 AGENDA REPORT FOR RESOLUTION AWARDING A CONSTRUCTION CONTRACT TO FEDCO CONSTRUCTION, INC. FOR FEMA STREET PAVEMENT REPLACEMENT 2007 PROTECT F070006, F071106, F073106, F073306, F073606, F073706, F073906, F074106, and F074406 1. EXECUTIVE SUMMARY: On July 11, 2007, the City received 3 bids for FEMA Street Pavement Replacement 2007 Project Nos. F070006, F071106, F073106, F073306, F073606, F073706, F073906, F074106, and F074406, ranging from $369,295.40 to $438,471.80. In general, the work includes repair of a 1,265 foot section of gravel shoulder along the east side of Stony Point Rd., north of Petaluma Blvd. N.; repair of a section of ditch slope at the SW corner of Petaluma Blvd. N. and Industrial Ave.; and street pavement replacement on sections of Maria Dr., Ely Blvd. S., Casa Grande Rd. and Pine View Way. 2. BACKGROUND: During the storm events of December 17, 2005 to January 3, 2006, rising flood waters caused the following to occur: washed out gravel shoulder along the north shoulder of Stony Point Rd., and washed out gravel shoulder at the end of a concrete slab within 10 ft. of a traffic lane on Petaluma Blvd. N., scouring the adjacent drainage ditch. During the storm events of March 29, 2006 to April 16, 2006, record-setting heavy rains resulted in prolonged surface runoff, roadway flooding and adjacent soil saturation, causing sections of Maria Dr., Ely Blvd. S., Casa Grande Rd. and Pine View Way to subside vertically. The costs for the various work areas are to be tracked separately for FEMA cost recovery. All work associated with this contract will be 100% funded by FEMA. 3. ALTERNATIVES: A. Award the contract. B. Reject the bids and re -advertise. C. Reject the bids and do not perform the work. Page 2 C! E on FINANCIAL IMPACTS: The engineer's estimate was $330,769.00. The following is the summary of bids: Name of Bidder Bid Amount 1. FEDCO Construction, Inc. $369,295.40 2 North Bay Construction $371,449.34 3 Ghilotti Brothers, Inc. $438,471.80 Revenue Source: FEMA/OES Tasks Design Construction Management/Inspection Construction Contingency Total Total Project Cost $65,450.00 $32,000.00 $369,295.40 $55,000.00 $521,745.40 The above budget is an estimate of the actual project cost. FEMA/OES will reimburse the City 100% of the actual costs for design, construction management/inspection, and construction. CONCLUSION: On July 11, 2007, the City received 3 bids for this project. The apparent low bidder is FEDCO Construction Co., with a low bid of $369,295.40. Staff believes that the City received good bids and is recommending award of the contract. OUTCOMES OR PERFORMANCE MEASUREMENTS THAT WILL IDENTIFY SUCCESS OR COMPLETION: Following the award, the Contractor will enter into agreement with the City and submit the required contract documents, bonds and insurance. Construction is anticipated to start by the end August, 2007. 7. RECOMMENDATION: Adopt the resolution awarding the construction contract to the low bid submitted by FEDCO Construction Co. in the amount of $369,295.40 and authorize the City Manager to execute the construction contract. Page 3 ATTACHMENT 1 RESOLUTION APPROVING THE PROJECT BUDGET AND AUTHORIZING THE AWARD OF CONTRACT TO FEDCO CONSTRUCTION, INC. FOR THE FEMA STREET PAVEMENT REPLACEMENT 2007 PROJECT F070006, F071106, F073106, F073306, F073606, F073706, F073906, F074106, AND F074406 WHEREAS, City staff has worked diligently with FEMA/OES consultants to prepare construction bid documents and advertise for construction of this Project; and WHEREAS, in accordance with California Public Contract Code Section 20162 and other applicable law, City staff solicited bids for the Project; and WHEREAS, the project was bid on July 11, 2007, and three (3) bids were received and opened in accordance with applicable law; and WHEREAS, the lowest bid for the Project was from FEDCO Construction, Inc. for $369,295.40; and WHEREAS, staff has determined that FEDCO Construction, Inc.'s bid satisfies the bidding requirements for the Project; and WHEREAS, staff has verified that FEDCO Construction Inc. possesses a valid California Contractor's License, Class A, number 479227 that qualifies FEDCO Construction Inc. to perform the Project; and WHEREAS, the Project has a Negative Declaration under the California Environmental Quality Act ("CEQA"), pursuant to Article 19, Section 15301, of Title 14 of the California Code of Regulations ("CEQA Guidelines"). NOW, THEREFORE, BE IT RESOLVED that the City Council of the City hereby: 1. Approves the Project Budget in the amount of $521,745.40. 2. In accordance with California Public Contract Code Section 20162 and other applicable law, waives any and all non -conformances in the bid of FEDCO Construction, Inc. for the FEMA Street Pavement Replacement 2007 Project and finds the bid of $369,295.40 to be the lowest, responsible bid. Page 4 3. Awards the contract for the FEMA Street Pavement Replacement 2007 Project to FEDCO Construction, Inc. in the amount of $369,295.40, the amount of the lowest responsible bid, conditioned on FEDCO Construction, Inc. timely executing the project contract and submitting all required documents, including but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the project bid documents. 4. Directs staff to issue a notice of award to FEDCO Construction, Inc. 5. Authorizes and directs the City Manager to execute the project contract on behalf of the City of Petaluma upon timely submission by FEDCO Construction, Inc. of the signed project contract and all other required documents, including but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the project bid documents. Page 5