CONSTRUCTION MANAGEMENT
PROGRESS REPORT No. 26
November 2007
PARTICIPANTS
Owner: City of Petaluma
11 English Street
Petaluma, CA 94952
Contractor:
Kiewet Pacific Co.
5000 Marsh Drive
Concord, CA 94520
Design Engineer: Carollo Engineers
2700 Ygnacio Valley Rd, Suite 300
Walnut Creek, CA 94598
Environmental ESA
Management: 8950 Cal Center Drive, Bldg 3, Suite 300
Sacramento, CA 95826
Programmer:
ArcSine engineering
970 Executive Way
Redding, CA 96002
Construction The Covello Group
Manager: 1660 Olympic Blvd, Suite 300
Walnut Creek, CA 94596
2
Mike Ban
Director
(707) 778-4487
Margaret Orr
Engineering Manager
(707)778-4589
Charlie Gardner
Project Manager
(925)516-4600
Larry Koneck
Project Engineer
(707) 782-9826 Ext. 31
Tom Patten
Principal
(925)932-1710
Doug Wing
Design Engineer
(925)299-6733
Jim O'Toole
Project Engineer
(707)795-0900
Jennifer Garrison
Enviroranental Manager
(916)564-4500
Doug McHaney
Project Manager
(530) 222-7204
Steve Stewart
Lead Progratmner
(530) 222-7204
Bruce Presser
Principal
(925)933-2300
Ken Sinclair
Construction Manager
(925)260-2943
Ed O'Brien
Field Engineer
(925)382-1246
SUMMARY OF CONSTRUCTION STATUS
® Contractor: KIEWIT PACIFIC CONSTRUCTION
Base Contract Amount (Total Project) .................................... $ 110,329,000.00
Change Orders Executed .................................................. $ 2,493,341.00
Total Contract Cost ......................................................... $ 112,822,341.00
Contract Amount Earned ................................................... $ 88,327,835.00
Progress Payment for November 2007 (excludes retention)........... $ 3,499,483.00
Previous Progress Payments (excludes retention) ...................... $ 75,996,212.00
Estimated Percent Complete............................................................. 78%
• Design Engineer: Carollo Engineers
Authorized Budget (Total Project) ....................................... $
Billingsto Date............................................................... $
• Environmental Manager: ESA
Authorized Budget (Total Project) ...................................... $
Billings to Date...............................................................$
r ArcSine engineering
Authorized Budget (Total Project) ....................................... $
4,354,075.00
3,421,875.53
1,434,830.00
791,366.12
2,340,951.00
Billings to Date...............................................................$ 1,453,407.06
• Construction Manager: The COVELLO GROUP, Inc.
Authorized Budget (Total Project) ....................................... $ 10,231,509.00
Billings to Date............................................................... $ 5,084,019.72
3
Schedule
Notice to Proceed .........
Base Contract Duration ....................
Original Completion Date ..............................................
Time Extension Authorized ...........................................
Revised Duration............................................................
Revised Completion Date ..............................................
Weather Days (included in base duration) .....................
Weather Days Expended (included in time expended)..
TimeExpended..............................................................
Percent Time Expended .................................................
4
.................. October 10, 2005
.......... 1278 consecutive days
.........................April 9, 2009
..................................67 days
.......... 1345 consecutive days
....................... June 15, 2009
..................................40 days
.....82 days
... 781 Days
........... 58%
Construction Manager's Summary
1. Schedule
The project remains on schedule for completion by June 2009.
2. Work Progress
Rookery
The Heron Rookery is no longer active. The 500 foot buffer has been returned to the
non -breeding period buffer of 250 feet.
Yard Piping
The following pipelines were placed this month:
The 12" 1W pipeline was installed at the main entrance and tied in to City water
supply. Prior to the connection to the City system, the new pipeline was pressure
tested and disinfected.
• The 3" Pumped Drain lines were installed at the Headworks.
• Excavation for the 6" Digested Sludge pipe began.
Electrical Duetbanks
The following ductbanks were placed and backfilled this month:
• A ductbank west of Headworks was placed. This ductbank runs between the
headworks the Headworks Motor Control Center.
• The ductbank east of Headworks was placed.
Oxidation Ditches
Kiewit installed additional aerators at both Oxidation Ditches. Mass Electric continued to
install exterior electrical items such as aerator motors and light posts. The roof deck for
the Oxidation Ditch Motor Control Center building was placed and the interior falsework
was removed.
Secondary Clarifiers
Kiewit continued to install the repaired sweep mechanisms in the clarifiers. Both
walkways and associated safety railings have been installed; these walkways will provide
maintenance access to the central drive motors.
Return Activated Sludge (RAS) Structure
Kiewit formed and poured the stair landing pad at the RAS structure and completed the
pipe supports.
Tertiary Pump Station (TPS)
Kiewit installed various pumps and completed the pipe supports.
Main Electrical Building
Mass Electric continued to install devices within the structure. Workers continued to
install metal studs to the exterior walls in preparation for the installation of exterior metal
wall panels. The first wall panels were placed on the exterior of the building. These
panels were necessary to make the building look like a farm building to reduce the visual
impacts to the existing farmhouse.
Headworks Facility
Crews continued welding T -lock (a corrosion resistant layer) on the channel walls and
roof of the Headworks. Perimeter handrail was placed on the roof deck and one flight of
permanent stairs was placed.
Headworks MCC
Mass Electric continued installing the individual motor control centers and breakers
within this MCC structure. The mechanical crew began installing ventilation ductwork in
the building.
Thickening Building
Kiewit formed and poured the parapet walls at the roof of the Thickening Building. The
raised curb for a roof ventilation structure was poured as well.
Screw Press Building
Crews continued installing falsework within the Screw Press Building. This will provide
temporary support for the placement of the concrete roof deck. The falsework will be
removed after the concrete roof slab cures to the proper strength.
Methane Digester
Installation of falsework for the dome of the digester continued. Work began on the
exterior finish of the structure.
The adjacent mechanical pad was funned and poured. This pad will be the platform for
various pumps and motors used to transport the digested sludge.
Acid Digester
Rebar continued on the Acid Digester walls. Kiewit completed installation of the lower
level wall penetrations and proceeded to form and pour the lower walls. This was the first
of two pours for the walls.
Operations and Maintenance Building
Multiple subcontractors continued interior work in this building. The activities that
continued throughout the month: installation of window glass, file within the bathrooms
and locker rooms, painting the walls and structural steel, installing the ceiling grids,
installing the laboratory equipment and cabinets, installing the copper parapet siding,
installing bathroom fixtures. Several components of the green roof were installed this
month.
Tertiary Filter
Filter wall and elevated slab erection continued throughout the month. There are several
walls that remain to be placed in this structure.
Filter Support
Mass Electric continued to install the motor control center and associated electrical
equipment in the Filter Support electrical room. Mechanical crews continued installation
of ventilation ductwork inside the building. Pipe crews installed chemical pipe and
supports within the building.
Recycled Water Pump Station
Pipe fitters continued installing the above ground piping and valves.
Wetlands Pump Station
The structural work is nearing completion and the above -ground mechanical work
continues. This pump station is required to be operational by early 2008.
Wetlands Planting
The wetland plants that were drill seeded in the polishing treatment wetlands are
beginning to grow. Some of the wetland plants that were plugged in Pond 9 and Pond 10
are doing well. The wetland plants that were hydroseeded in Pond 9 and Pond 10 are yet
to sprout. Plantings that did not survive or failed to grow in pond 9 are being replaced
with plugs per the original schedule in the Contract Documents. Similar work should
begin in pond 10 in the next few months.
Start Up
Meetings continue to refine and discuss the plan to start up the effluent facilities at the
existing chlorine contact basin. The start up will involve several pieces of equipment that
will monitor chlorine levels and then residual to confirm that sufficient levels are
maintained for disinfection and also that no chemical leaves the plant in the river
discharge flows. These meetings are progressing well on this facility.
3. Contract Changes
Thirty-four new change orders were processed in November. The sum of these change
orders results in a net addition to the construction contract of $373,030.00. The complete
list of contract changes is attached. Those executed in November and valued greater than
$10,000 are as follows:
Thickening Walls @ Ox Ditch Aerator Shafts
11,286.00
CCB: Relocation of Ammonia Tank
17,176.00
Tertiary Filter: 12 Inch Inlet Line
17,248.00
Headworks: Epoxy Coat Rebar @ Block-outs
20,579.00
Ops: Addition of Compressed Air @ Laboratory
22,641.00
Replace Farmhouse Roof
34,194.00
Potholing & Excavation existing utilities @ CCB
42,606.00
Electrical Modifications @ UV Bldg.
47,188.00
Modifications to the Potable Water System
105,856.00
4. Field Orders
Ten new field orders were prepared this month. A total of one hundred thirty-one field
orders have been prepared for the project. Of those, forty-five remain active with a total
estimated value of $292,056. Active field orders greater than $10,000 areas follows:
FO No.
Description
Amount
79
Ops. Bldg.: 1 -Hr. Fireproofing at Steel Beams
$10,000.00
85
Ops. Bldg.: Green Roof Detail at Lobby Parapet
$24,249.00
86
Deepen Generator Fuel Lines and Sump
$17,643.00
96
Headworks, Relocation of Local Control Stations and JBs
$25,000.00
99
West Access Natural Gas Line Connection and Meter Pad
$15,000.00
106
CCB: Addition of Drain Vault Float and Clarification on Heat Trace Controller
$15,000.00
108
Add Geotextile Fabric Along East Access Road
$20,000.00
111
Handrail Post Pockets at Headworks
$25,000.00
113
HVAC Modifications at Filter Support, Thickener & Screw Press
$10,000.00
117
Modify Solids Handling Slab
$20,000.00
Active Field Orders < $10,000
$110,164.00
Total
$292,056.00
5. Testing
Pipe was pressure tested and compaction testing was completed as needed throughout the
month. Concrete sampling and testing was on-going. Samples were taken from each
structural concrete placement and compression tests completed.
6. Anticipated Work for Next Month
Mass Electric will continue installing conductors for power and control to the Aerators
and other electrical equipment. Work will continue on a number of structures used to
route flow to and from the oxidation ditches and clarifiers including the Tertiary Pump
Station, Secondary Effluent Junction Box, RAS Pump Station, Secondary Clarifier Flow
Splitter, WAS Pump Station, and Oxidation Ditch Flow Splitter. Kiewit will backfill and
grade around these structures in preparation for paving operations.
Mechanical crews will begin installing equipment at the Headworks. Work will continue
at the solids handling portion of the plant including the Thickening Building, Methane
Digester, the Screw Press Building, and the Septage Receiving Station and Acid Digester.
Work at the mechanical pads associated with these structures will continue as pumps and
connected piping are installed.
Kiewit will continue to grade and pave several areas around the site, mainly
concentrating on areas where structural work is complete.
Several subcontractor activities will continue within the Operations and Maintenance
Buildings, these activities include: installing copper parapet siding, installing ceiling
grids and panels, installation of green roof and planting, continue installing glazing
components, installing lockers and toilet partitions.
SUBMITTAL STATUS
Total Cost of
Total November Active Active Orders
Field Orders Issued 131 10 45 $292,056.00
A I_.Z f] " 0 a R
_
Total November
Value of Change Orders Executed in November 34 $373.030.00
Value of Change Orders Executed to Date 256 $2,493,341.00
Percent to Date of Original Contract 2.26%
WEATHER RELATED DELAYS
Days
Base Contract Allowance 40
Weather Related Days in October 0
Weather Related Days to Date 82
0
Received
To Date
November
Returned
Pending
First Time Shop Drawing Submittals
806
11
803
3
Request for Information
1170
42
1163
7
C. M. Request for Information
182
7
174
8
Total Cost of
Total November Active Active Orders
Field Orders Issued 131 10 45 $292,056.00
A I_.Z f] " 0 a R
_
Total November
Value of Change Orders Executed in November 34 $373.030.00
Value of Change Orders Executed to Date 256 $2,493,341.00
Percent to Date of Original Contract 2.26%
WEATHER RELATED DELAYS
Days
Base Contract Allowance 40
Weather Related Days in October 0
Weather Related Days to Date 82
0
Mass Electricians placed the light poles along the channel
Mass Electricians placed the rigid conduit to the Motors, Hand Switches and Junction
Boxes on the south half of the center deck of Oxidation Ditch No.1.
10
Air Layer, Water Retention Moisture Mat, Drainage Layer, filter Fabric and
3" Soil Layer.
Operations Lobby entrance, sun shade, sidewalk and copper siding along the roof
line.
11
Y
I
kfN
Completed Recycled Water Storage Basin concrete slopes.
Monterey Mechanical sheet Metal workers placed the exterior siding on
the north wall of the Main Electrical Building. Hat Channel can be seen on
the exterior east wall face.
12
Ellis Creek Water Recycling Facility
CONTRACT CHANGE ORDER TRACIONG SHEET
Description
Time extension for additional soil sampling
Lime treatment at Ox Ditch & Secondary Clarifiers
Board up Farmhouse
Hay Stacker Relocation
Terrorism Insurance and Increased Earthwork
Meter in Temporary Recycled Water Pipeline
Temporary Power for Pond 1 Aerators
Pavement Repair on Cypress and McDowell
Conduit Encasement Coloring Agent
Delayed Caltrans Encroachment Permit
Trench Cut -Off Walls
Horizontal Aerators Extended Warranty Testing
Deletion of Prime Coat under AC Pavement
Replace PVC Sched. 40 with EB 20 Conduit in DB
Delete Lakeville Highway Access
Contract Time Extension for Weather Days 03-04/06
Change Valve Types
Replace EMT conduits by MC cable @ O&M Bldg
Inverter Duty Motors at Oxidation Ditch Aerators
Aerated Lagoon and Pond 1 Modifications Milestone
Additional Striping and Loops on McDowell
Catch Basins Invert Changes
Oxidation Ditch Sump Modifications
Change Buried Conduits PVC GRS to PVC Sch. 40
Temporary Power to Existing Aerators 4 and 7
O&M Bldg: Ceiling & Wall Heights Rms
Provide Portable Generator Pads at Ponds
FS Bldg: Extend Conduit Stub -ups Beyond Ductbank
Headworks: Handrail Extension to Complete Deck
Pond 4 Aerator Temp Power
Aerated Lagoon: Reconnecting of Aerator No. 2
Unknown Utility at Pond 1 North Side
Ductbank Encasement with Reinforcing
Gun Safe for Storage of Bid Documents
S&C Pad Mounted Switch Additions
Permanent Power Supply for Pond 1 Aerators
Temporary Fire Hose
13
Amount
0.00
125,000.00
3,385.00
493.00
0.00
3,023.00
1,270.00
419,681.00
(47,000.00)
16, 723.00
(18,600.00)
0.00
(29, 700.00)
(21,774.00)
40,000.00
0.00
0.00
('14,777.00)
16,466.00
0.00
13,747.00
(9,997,00)
(7,750.00)
(213,038.00)
7,956.00
4,287.00
2,554.00
9,190.00
1,254.00
883.00
537.00
855.00
24,884.00
2,410.00
75,200.00
98,000.00
851.00
Time
I RFQ/FO
FO 006
(Days)
I NO.
Status
8
Executed
RFQ 011
Executed
FO 004
Executed
FO 002
Executed
RFQ 001
Executed
FO 006
Executed
FO 007
Executed
RFQ #21
Executed
RFI 062
Executed
FO 005
Executed
RFI 057
Executed
RFI 152
Executed
RFI 084
Executed
RFI 081
Executed
RFQ 15
Executed
38 C to Cm Ltrs
Executed
RFQ 10
Executed
RF1082
Executed
CL 35
Executed
Executed
Executed
RFQ13
Executed
RFQ 02.002
Executed
RFI 154
Executed
FO 8
Executed
RFQ 20
Executed
FO 14
Executed
RFQ26
Executed
RFQ 27
Executed
FO 10
Executed
FO 11
Executed
Executed
RFQ 31
Executed
FO 17
Executed
RFQ 39
Executed
RFQ 4
Executed
FO 12
Executed
38
Change material for Temporary Debris Collector
(36,150.00)
RFI 061
Executed
39
Chemical Tank Pads @ Filter Support Bldg
4,425.00
RFQ 22
Executed
40
Disconnect Aerator No. 2 & reconnect Pond 4 Aerators
607.00
FO 13
Executed
41
Delete Steel Steps in Manholes
(19,012.00)
RFQ 09
Executed
42
Add 4" Butterfly Valve in Acid Digester
1,189.00
RFI 245
Executed
43
Delete Pre -Action Fire System @ Main Elect. Bldg
(19,242.00)
RFQ 49
Executed
44
Headworks Influent Box Modifications
3,000.00
RFQ 44
Executed
45
Transformer Pad at Restroom
9,498.00
RFQ 17
Executed
46
Addition of Construction Joint at Oxidation Ditch Slabs
23,505.00
RFQ 33
Executed
47
Change Conduits from PVC Rigid Steel to PVC Sch. 40
(21,912.00)
RFI 251
Executed
48
Reader Board & Geogrid placement @ Cypress/McDowell
6,000.00
FO 15
Executed
49
Plant Control System PLC Architecture
(6,118.00)
CL 17
Executed
50
Grit Pump Room Sump Pump Modification
1,326.00
RFQ 43
Executed
51
PLC Enclosure Size for PLCs 2, 3 and 8
5,446.00
RFQ 70
Executed
52
Additional Time Switches at O&M Bldg.
2,722.00
RFI 369
Executed
53
Extension for Pond 1 Aerators Milestone Date
0.00
spec 00800
Executed
54
Levee Repair at Berm Existing Ponds 8 & 9
289,279.00
Executed
55
Operations Bldg. Maintenance Window
1,022.00
RFI 151
Executed
56
In -Plant Pump Station Wall Penetration Details
2,807.00
RFQ 36
Executed
57
Alignment of 42" RSG line to Headworks
4,208.00
RFQ 23
Executed
58
Revision of Structural Joints at Headworks Facility
5,628.00
CL 21
Executed
59
Pond 9 & 10 Levee Pothole
1,400.00
FO 24
Executed
60
Add pipe for Future Pump Can (c) RWPS
6,316.00
RFQ 76
Executed
61
Home Inspection of Farm House
746.00
FO 30
Executed
62
Alignment of 42" PWE line to Cell D Transfer Structure
8,171.00
RFQ 86
Executed
63
Delete Locks on Motor Operated Overhead Coiling Doors
(383.00)
RFQ 091
Executed
64
Dewatering of Pond 8 and Mitigated Wetland
3,488.00
FO 19,21
Executed
65
UV System Programming
2,777.00
CL 7
Executed
66
Septic Tank Removal at Farm House
739.00
FO 016
Executed
67
Changes to Slide and Sluice Gates
11,177.00
sub. 190
Executed
68
PLC System Material for C Street Pump Station
14,915.00
RFQ 85
Executed
69
PLC - 10 Analog Input Module
1,873.00
RFQ 98
Executed
70
Change Storm Drain Pipe from RCP to CHDPE
(72,398.00)
RFI 59.001
Executed
71
Deletion of CMU Coating on non -occupied structures
(2,538.00)
RFQ 90
Executed
72
Existing Utilities at West Access Road Entrance
8,543.00
FO 28
Executed
73
Change Handrail for Polishing Wetlands Structures
6,965.00
RFI 442
Executed
74
Change SDR for HDPE Pipe Lines
(52,415.00)
RFI 338
Executed
75
Addition of waterstop in wall Cc? Filter Support Bldg.
1,330.00
RFQ 62
Executed
76
Delete waterstop & starter walls (cD HW, RAS PS, UV
(4,206.00)
RFQ 55.001
Executed
77
Re -Power Pond Aerators, Reconnect Aerated Lagoon
3,718.00
FO 39
Executed
78
Contract Time extension for Weather Days 10/2006
0.00 1
C to Cm Ltrs
Executed
79
Deletion of waterstop and starter walls at Tertiary Filters
(1,384.00)
RFI 352
Executed
14
_ 80
Add waterstop at Grit Pump Area of Headworks Structure
6,167.00
FO 20
Executed
81
Fuel Tank Removal at Farmhouse
2,972.00
FO 29
Executed
_ 82
Revised Anchorage for Oxidation Ditch Aerators
40,941.00
FO 44
Executed
_ 83
Deletion of Integrated System Shop Testing (ISST)
0.00
CL 029
Executed
_ 84
Additional Dowels at Maintenance Bldg.
914.00
FO 45
Executed
85
Replace Fuses at MCC 3A after PG&E power spike
1,706.00
Executed
86
Remove and replace disconnect switch @ Aerated Lagoon
2,919.00
FO 33
Executed
87
Lower Invert Elevation for 42" RSG Line
18,726.00
FO 32.001
Executed
_ 88
Addition of Roof Hatch @_ Main Electrical Bldg.
3,195.00
RFQ 62
Executed
_ 89
Filter Support Bldg: NG Connections and Valving
1,361.00
RFQ 79
Executed
_ 90
Chain Link Fence addition @ Farmhouse
725.00
FO 23
Executed
91
Repair Irrigation Lines @ Kaiser
1,186.00
FO 26
Executed
92
Demo of Spillway at Pond 10
12,109.00
FO 38
Executed
93
Curb and Grading @ Filter Support Bldg
0.00
FO 42
Executed
94
Irrigation System: Concrete Valve Boxes
2,393.00
RFQ 63
Executed
95
Contract time extension for Weather Days 11/06
0.00 5
Ltr 41
Executed
96
Mitigation Wetlands Drain
4,370.00
FO 41
Executed
97
Additional vinyl sheets for Levee Repair @ berm Pond 8 & 9
5,498.00
FO 52
Executed
98
Shoring @ Naval Trail
21,271.00
Executed
99
Extra excavation @ W Access Rd. for 12" 1W line
8,008.00
FO 28
Executed
100
Replace SBS line @ Chlorine Contact Basin
5,936.00
FO 51
Executed
101
Brush clearing @ Farm House
5,209.00
FO 27
Executed
102
Relocate standby Generator @ CCB
2,005.00
FO 50
Executed
103
Drywall Furring @ Elect Rm #2 in O&M Bldg.
1,630.00
RFQ 110
Executed
104
Equipment for MCC -3 retrofit
25,360.00
RFQ 50
Executed
105
Perimeter lighting switching @ Main Elec. Bldg.
1,795.00
RFI 520
Executed
106
Wiring for Time -Off Relay @ Wetlands Elec Bldg.
2,282.00
RFI 597
Executed
107
Changes to SCADA interface Boiler & PLC 3
3,549.00
RFQ 80
Executed
108
Disposal of existing MCC 3 transformer
2,141.00
RFQ 77
Executed
109
Contract time extension for Weather Days 12/06
0.00 7
Itr 53,54
Executed
110
Tree removal @ W Access Rd.
1,419.00
FO 48
Executed
111
Deepening Pull Boxes @ Ox Ditch MCC Bldg.
11,540.00
RFI 685
Executed
112
Rebar modification @ Wetlands Pump St Deck Beam
2,187.00
FO 49
Executed
113
Electrical Equipment Pads
9,018.00
RFQ 47
Executed
114
Delete Catch Basins at W Access Rd.
1,746.00
RFI 594
Executed
115
Naval Bldg Lookout Area
3,000.00
FO 47
Executed
116
Changes to TWE and PWE lines
0.00
RFQ 73,97
Executed
117
Polishing Wetlands FSS: Add Hand Switch
3,444.00
RFQ112
Executed
118
Engineering of Anchorage @ Oxidation Ditch Aerators
(20,089.00)
FO 44
Executed
119
Replace Oxygen Probes @ Aerated Lagoon/Pond 1
13,411.00
RFQ 115
Executed
120
Change Piping Material for Deionized Water Service
0.00
RFQ 7
Executed
121
Filter Support Bldg: Relocation of 1W Line
4,568.00
RFQ 101
Executed
15
i
Executed
122
Security Lighting at Farmhouse
1,200.00
123
Disposal of Asbestos Containing Pipe
2,087.00
FO 31
Executed
124
Investigation and Disposal of FAA Building
20,512.00
FO 31
Executed
_
125
Conduit addition @ Boiler Bldg.
15,780.00
RFQ 87
Executed
_ 126
O&M Bldg: Exhaust fans power supply & controls
34,440.00
RFQ 69
Executed
_ 127
Addition of Disconnect Switches @ Headworks
25,143.00
RFQ 56
Executed
128
Level Transmitter addition @ Headworks
23,058.00
RFQ 52
Executed
129
Contract Time extension Weather Days 01-02/07
7
Executed
_
130
Subgrade Improve & Pipe Encasement @ W Access Rd.
12,128.00
FO 35
Executed
Executed
131
Additional Conduit for Fuel Leak Detection
2,714.00
RFI 586
_
132
HVAC Enclosure Modifications @ Ops Bldg.
8,014.00
RFQ 72
Executed
133
Wiring of Spare I/Os
45,713.00
RFQ 57
Executed
_ 134
PLC Enclosure Size for PLC 5
7,823.00
RFQ 106
Executed
135
Partial Paymentfor PLC Enclosures
0.00
Executed
_ 136
Trench Backfill with Native Material
(72,000.00)
RFQ 53
Executed
137
UV Bldg Top Slab Modifications
14,000.00
RFQ 104
Executed �1
138
Ops Bldg: HVAC Electrical & Mechanical Modifications
2,854.00
RFQ 102.1
Executed 1
139
24" Pumped Storm Drain Line Coverage
30,000.00
RFQ 109
Executed
_
140
Metal Siding @ Main Electrical Bldg.
5,071.00
CL 124
Executed
_
Executed
141
Contract Time Extension for Weather Days April 2007
1
142
Ops: Relocate HVAC duct transition @ Locker Rm Ceiling
878.00
FO 78
Executed
143
Use of Native Material for backfill @ North & Middle Cluster
(77,690.00)
Executed
_ 144
Recycled Water Storage Basin Size Increase
220,867.00
RFQ 89.01
Executed
145
Outlet conduit replacement @ Existing CCB
1,260.00
FO 56
Executed
146
Modify Rebar Expansion Joints @ Thickener Bldg
1,610.00
FO 40.001
Executed
147
Modify Grating Seat @ Headworks Beam B-13
1,737.00
RFQ 125
Executed
148
Added Space Heater for PLC 8 - RIO 1
1,803.00
RFQ 137
Executed
149
Additional G2 Light Fixture @ Ops Bldg Lobby
2,013.00
RFI 756
Executed
150
Connection Grounding Bldg rebar @ MCC HW Bldg.
974.00
FO 80
Executed �1
151
Relocate supply line fire riser @ maintenance Bldg.
3,027.00
FO 36
Executed 1
152
Pipe material for 36" mixed liquor line @ 2ndary Clarifiers
14,271.00
RFQ 8
Executed
153
Modifications HVAC Pads
9,562.00
RFQ 42
Executed
154
Mod per PG&E Requirements to Main Power Supply
19,886.00
FO 18
Executed
155
Addition of Wall Sleeves at Thickener Building
847.00
CL 126
Executed
156
Reduce Deck Slab Openings @ Wetlands Pump Station
782.00
RFI 610
Executed
157
Wall Supports for Pony Wall at Laboratory
2,162.00
RFQ 100
Executed
158
Concrete Encase HCS pipeline @ Headworks Structure
2,393.00
RFQ 129
Executed
159
Convert Conference Rm into 2 Offices @ Ops Bldg.
8,351.00
RFQ 84
Executed
160
Concrete Backfill around Screw Press Equipment Trench
1,588.00
FO 71
Executed
161
Expansion Joint Rebar @ Headworks Grid Line 10
1,151.00
FO 64
Executed
162
Standby Generator Connection @ Wetlands PS
13,527.00
RFQ 135
Executed
163
Deletion of Rotameters @ Tertiary Filters
('1,074.00)
RFQ 118
Executed
i
17
Blockouts for Ox Ditch Aerator Anchorage
1,022.00
FO 67
Executed 1
_164
Concrete Encase SD pipe under HWE pipeline @ HW
1,657.00
RFQ 126
Executed
_165
Executed
166
Temporary Power for Transformer @ Aerated Lagoon
28,343.00
FO 34
Executed
167
Rebar @ Headworks Manual Bar Screen Embed
756.00
FO 57
Subgrade Improvement for Wetlands PS Apron Slab
11,799.00
FO 62
Executed
_168
169
Screw Press Bldg Skylight Size Change
3,465.00
RFQ 140
Executed
_
170
Additional 1/0 from Power Panel to PLC -9
2,887.00
CL 169
Executed
171
Standby pump @ existing CCB during work @ Pond 10
44,000.00
FO 22
Executed
Executed
172
Billing for Potable Water Usage on site through 4/4/07
1,552.00
173
Upgrade starters for Ox Ditch Aerator Motors
78,373.00
RFQ 88
Executed
174
Blind flanges for future effluent line @ Aerated Lagoon
11,709.00
RFQ 24
Executed
175
Remove rebar @ Ox Ditch Aerator Motor Block-outs
3,000.00
FO 66
Executed
_
176
Modification of controls for Tertiary Effluent Bypass Valves
(3,075.00)
RFQ 29
Executed
_
Executed
177
Communication between PLC -8 & Thickener PLC
2,032.00
P RFI 37
Executed
_ 178
Automated 1W Valve @ Recycled Water Storage Basin
46,267.00
RFQ 30
179
Modification to HW Bar Screen Channels
6,130.00
RFQ 74
Executed
_
180
Relocate Fire Pump Can @ RWPS
4,613.00
FO 70
Executed
_
Executed
181
Add Effluent Conductivity Probe @ JB No. 2
9,680.00
RFQ 133
Executed
182
Revise DB Routing @ Ferrous Chloride Area
2,463.00
CL 54
Executed
183
Ventilation Alarms @ Boiler Bldg & Thickener Bldg
20,526.00
RFQ 127
184
Anti Graffiti Coating @ O&M Bldg and Sound Wall
28,736.00
RFQ 109
Executed
185
Deletion of Louvers @ HW Bar Screen Enclosures
(1,374.00)
RFQ 117
Executed
186
Deletion of Combination Smoke Fire Dampers
(18,005.00)
RFQ 83
Executed
187
Fire Rating Janitor Closet Door @ Ops
1,841.00
RFQ 138
Executed
188
Brush clearing @ Farm House fire season 2007
3,186.00
FO 90
Executed
_
189
Ops: CMU alignment & wall cap @ HVAC enclosure
1,826.00
FO 69.1
Executed
190
Ops: addition acoustical ceiling @ electrical rm #1
3,125.00
RFQ 145
Executed
191
Ops: framing details for Lobby
2,163.00
FO 84
Executed
192
RWPS: modified floor drainage
15,107.00
RFQ 41.1
Executed
193
Ops: beam seats in CMU wall pockets
10,067.00
FO 46
Executed
194
Recycled Water Storage Basin Berm Modifications
(2,595.00)
RFQ 147
Executed
195
Double Containment System Modifications
90,172.00
RFQ 37
Executed
196
Site Security Lighting Estimation Cost
10,364.00
RFQ 145
Executed
197
Grading @ Mitigation Wetlands & RWSB
27,012.00
RFQ 161
Executed
198
PG&E power connection @ W Access Rd.
55,335.00
FO 37
Executed
199
UV Disinfection Light Pole Mounting Detail
7,027.00
RFQ 124
Executed
200
Ox Ditch Light Pole Mounting Detail
8,852.00
RFQ 134
Executed
201
Existing CCB: power to New Chemical Metering Pump
8,588.00
RFQ 105
Executed
202
Screw Press grating @ Flocculation Tank Opening
1,969.00
RFQ 94
Executed
203
Anchorage of Diffuser Pipe Ponds 9 & 10
32,659.00
FO 58
Executed 1�
204
Acid Digester changed detail wall penetrations
4,286.00
RFI 645
Executed
205
Existing LPN panel in chemical bldg.
2,576.00
RFI 1031
Executed
17
_ 206
Revised Details @ RWSB
20,881.00
RFQ 152
Executed
_ 207
Ops: Deletion of Closet in Control Room
(932.00)
RFQ 150
Executed
_ 208
Ultrasonic level sensor mount @ Headworks
1,208.00
CL 194
Executed
_ 209
Mitigation Wetlands Drain — Permanent Installation
75,048.00
RFQ 153
Executed
_ 210
Ops Bldg: Plumbing Dwqs
29,571.00
302
Executed
_ 211
Ops: Deletion of decking @ Mechanical Chases
1,719.00
FO 82
Executed 1
_ 212
Headworks: channel floor rebar modification
1,696.00
FO 59
Executed
_ 213
Ops: Furring Men's Restroom Urinal Wall
740.00
FO 102
Executed
_ 214
Informational Kiosks: Addition of 2" PVC 40 Pipe Sleeve
2,560.00
FO 95
Executed
_ 215
Screw Press: Modifications to Underslab Piping
2,607.00
RFQ 95
Executed
_ 216
Below Grading Coatings
72,507.00
RFQ 61
Executed
_ 217
Aerated Lagoon: Unknown utility @ 20" URW Alignment
5,225.00
FO 98
Executed
_ 218
Ops Bldg: Additional Window Clips
3,194.00
FO 103
Executed
219
Silt Fence Repair
1,209.00
Executed
_
_ 220
Ops Bldg: control rm. Backing & wood blocking
2,185.00
FO 101
Executed
_ 221
Ops Bldg: Modifying Welding Studs to 1/8" Tubing
5,293.00
CL 151/152
Executed
_ 222
Pond 10 Apron Slab: Over Ex, Fabric, and Rock
3,870.00
FO 118
Executed
_ 223
Addition of Solenoid Valve @ Recycled Water Surge Tank
5,095.00
RFQ 34
Executed
224
Thickening Walls @ Ox Ditch Aerator Shafts
11,286.00
RFI
_
752
Executed
_ 225
Relocate Receptacles @ Biofilter Mechanical Pad
3,286.00
RFI 874
Executed
_ 226
Equipment Pad Modifications @ Screw Press
5,130.00
RFQ 130
Executed
_ 227
Footing Elevation @ Filter Support Bldg. Tank Farm
2,098.00
FO 75
Executed
_ 228
Relocation of Cell D Transfer Structure
5,162.00
RFI 1068
Executed
_ 229
Pipe Elevations & Drainage Swale @ Polishing Wetlands
1,938.00
CL 219
Executed
_ 230
Farm House: Plywood Cover @ Back Entry
756.00
FO 72
Executed
_ 231
Methane Digester construction joint location & piping
1,057.00
RFI 875
Executed
_ 232
Ops Bldg: Icemaker Legs
893.00
RFQ 169
Executed
_ 233
Acid Digester: Overflow Piping Modifications
1,727.00
RFQ 78
Executed
_ 234
West Cluster: Sitework & Grading Change
277.00
RFQ 166
Executed
_ 235
Ops Bldg: Future access control conduit stub -outs
1,720.00
FO 89
Executed
_ 236
Ops Bldg: Interior lights & furring strips
2,292.00
RFQ 114
Executed
_ 237
Potholing & Excavation existing utilities @ CCB
42,606.00
FO 43
Executed
_ 238
Replace Farmhouse Roof
34,194.00
RFQ 92
Executed
_ 239
SCADA: TWAS sump level set points
1,682.00
RFQ 128
Executed
_ 240
CCB: Relocation of Ammonia Tank
17,176.00
FO 83
Executed
_ 241
Add wire way in PLC 6 @ Existing Chemical Storage Bldg.
1,775.00
RFI 1033
Executed
242
Replace Landscaping on Kaiser Property
2,690.00
Invoice 1003
Executed
_ 243
Electrical Modifications @ UV Bldg.
47,188.00
RFQ 46
Executed
_ 244
Headworks: Rebar Detail @ Channel Wall Ends
1,625.00
FO 65
Executed
_ 245
Rebar @ Screw Press Bldg. Slab Extension
1,625.00
CL 204
Executed
_ 246
Tertiary Filter: 12 Inch Inlet Line
17,248.00
FO 114
Executed
_ 247
Ops: Modifications to Fume Hoods
(490.00)
RFQ 121
Executed
18
- 248
Ops: Addition of Compressed Air (@_ Laboratory
22,641.00
RFQ 136
Executed
- 249
Ops: Training Room Modifications
8,494.00
RFQ 139
Executed
- 250
Emergency Repair Kit Deletion
(567.00)
RFQ 141
Executed
_ 251
Increase Cover Over 14 inch Foul Air Line
1,972.00
FO 120
Executed
- 252
Headworks: Epoxy Coat Rebar (a) Block-outs
20,579.00
FO 60
Executed
- 253
Relocation of Mezzanine Column (aD Screw Press
3,225.00
RFI 1016
Executed
- 254
Additional Rebar @ Oxidation Ditch
1,348.00
FO 73
Executed
- 255
Pipe Class Acid Gas & Methane Gas Pipe
(5,089.00)
Ur 147
Executed
- 256
Modifications to the Potable Water System
105,856.00
FO 124
Executed
_
CHANGE ORDER TOTAL:
2,493,341.00 67
_
Contract Amount:
110,329,000.00 1278
_
Percent Change Orders:
2.26%
_
Totals:
112,822,341.00 1345
_
Total Additive Change Orders
3,294,715.00
Percentage of Contract Amount
_
2.99%
_
Total Credit Change Orders
(801,374.00)
_
Percentage of Contract Amount
0.73%
_
Contract Substantial Completion Date
4/9/09
_
Current Substantial Completion Date
6/15/09
19
in A
Ng
U-
W
17
ar
20
3
u 5
O
Ng
U-
W
�
-__ s_-
,-«\-
-
§�\
\�
«
,
•-J
? m
«
�
.a,
a ;«
\ \
d�
\.
�
\ � \ � : [ `� :
;t
�
' � I i �
� � I
�� �
I � � �I '
it
I �
�iI I
i
i
��
I
i i
i
I
1 I
I '
I
�1
� I
� ' _ i
i 1
'���i �� !
i � � � �
� i
�'
i
1 i � I 'I � � I I ��� I��
.. � j � '
1
1 I
� ' _ i
i 1
'���i �� !
�
I
�
' i
� I
��� ��
� I
�
��
I
,i
i
�
I I
I' y' � � �
r�
��
i
.I
I:
I
�
i
N