HomeMy WebLinkAboutStaff Report 4.A 12/07/2007PROJECT NUMBER C500402
" LU
.185
CONSTRUCTION MANAGEMENT
PROGRESS REPORT No. 25
October 2007
4.A
December 17, 2007
The
® Covello
Group
PARTICIPANTS
Owner: City of Petaluma Mike Ban
11 English Street Director
Petaluma, CA 94952 (707) 778-4487
Margaret Orr
Engineering Manager
(707)778-4589
Contractor: Kiewet Pacific Co. Charlie Gardner
5000 Marsh Drive Project Manager
Concord, CA 94520 (925) 516-4600
Larry Koneck
Project Engineer
(707) 782-9826 Ext. 31
Design Engineer: Carollo Engineers Tom Patten
2700 Ygnacio Valley Rd, Suite 300 Principal
Walnut Creek, CA 94598 (925) 932-1710
Doug Wing
Design Engineer
(925)299-6733
Environmental ESA Jim O'Toole
Management: 8950 Cal Center Drive, Bldg 3, Suite 300 Project Engineer
Sacramento, CA 95826 (707) 795-0900
Jennifer Garrison
Environmental Manager
(916)564-4500
Programmer: ArcSine engineering Doug McHaney
970 Executive Way Project Manager
Redding, CA 96002 (530) 222-7204
Steve Stewart
Lead Programmer
(530)222-7204
Construction The Covello Group
Bruce Presser
Manager: 1660 Olympic Blvd, Suite 300
Principal
Walnut Creels, CA 94596
(925) 933-2300
Ken Sinclair
Construction Manager
(925)260-2943
Ed O'Brien
Field Engineer
(925)382-1246
SUMMARY OF CONSTRUCTION STATUS
® Contractor: KIEWIT PACIFIC CONSTRUCTION
Base Contract Amount (Total Project) .................................... $ 110,329,000.00
Change Orders Executed .................................................. $ 2,121,311.00
Total Contract Cost ......................................................... $ 112,450,311.00
Contract Amount Earned ................................................... $ 84,439,521.00
Progress Payment for October 2007 (excludes retention) .............. $ 3,567,818.00
Previous Progress Payments (excludes retention) ...................... $ 72,428,394.00
Estimated Percent Complete............................................................. 75%
a Design Engineer: Carollo Engineers
Authorized Budget (Total Project) ....................................... $
Billingsto Date...............................................................$
• Environmental Manager: ESA
Authorized Budget (Total Project) ...................................... $
Billingsto Date...............................................................$
ArcSine engineering
Authorized Budget (Total Project) ....................................... $
4,354,075.00
3,351,311.05
1,434,830.00
773,205.67
2,340,951.00
Billings to Date...............................................................$ 1,428,497.16
• Construction Manager: The COVELLO GROUP, Inc.
Authorized Budget (Total Project) ....................................... $ 10,231,509.00
Billings to Date...............................................................$ 4,807,449.81
3
Schedule
Notice to Proceed ...................................
Base Contract Duration ..........................
Original Completion Date ......................
Time Extension Authorized ...................
Revised Duration ....................................
Revised Completion Date ............................................
Weather Days (included in base duration) ...................
Weather Days Expended (included in time expended)
TimeExpended............................................................
Percent Time Expended ...............................................
4
....................... October 10, 2005
............... 1278 consecutive days
.............................. April 9, 2009
.......................................67 days
............... 1345 consecutive days
............................ June 15, 2009
.......................................40 days
....................................... 82 days
.................................... 751 Days
............................................ 56%
Construction Manager's Summary
1. Schedule
The project remains on schedule for completion by June 2009.
2. Work Progress
Rookery
The Heron Rookery is no longer active. The 500 foot buffer has been returned to the
non -breeding period buffer of 250 feet.
Yard Piping
The following pipelines were placed this month:
• The 16" Headworks Effluent pipe was installed at the Oxidation Ditches.
• The 20" RAS pipe was installed at the RAS pump station.
• The 20" Foul Air piping was installed at the Screw Press building.
Electrical Duetbanks
The following ductbanks were placed and backfilled this month:
• The ductbank south of the Oxidation Ditches was placed.
Oxidation Ditches
Kiewit's electrical subcontractor, Mass Electric, placed several light posts and aerator
motors at Oxidation Ditch No. 1.
Secondary Clarifiers
The repaired sweep mechanisms were re -installed into the clarifiers. The walkway at
each clarifier was placed; these walkways will provide maintenance access to the central
drive motors.
Return Activated Sludge (RAS) Structure
Pipe fitters finished installing pipe, pipe supports, and valves within the structure.
Tertiary Pump Station
Pipe fitters finished installing pipe, pipe supports, and valves at this structure.
Main Electrical Building
Mass Electric continued to install devices within the structure. Metal studs were attached
to the exterior walls in preparation for the installation of the exterior metal wall panels.
Headworks Facility
Kiewit completed pouring the remaining small concrete pads on top of the Headworks
deck. Crews began welding T -lock (a corrosion resistant layer) within the inside channels
of the Headworks.
Headworks MCC
Mass electric began installing the individual motor control centers and breakers within
this MCC structure.
Thickening Building
Kiewit poured the roof slab of this structure and formed the parapet walls. Once the roof
slab cured to proper strength, the falsework holding the roof up was disassembled and
removed.
Screw Press Building
The screw press was lifted into the building and anchored to the concrete pad within the
structure. Workers began installing falsework that will provide temporary support for the
concrete roof slab.
Methane Digester
Kiiewit completed pouring the perimeter walls of the tank and workers welded the T -lock
within the structure. Falsework erection began to provide temporary support for the
domed, post -tensioned concrete roof.
Operations and Maintenance Building
Multiple subcontractors continued interior work in the building. The operations that
continued throughout the month: installation of window glass, tile within the bathroom
areas, painting the walls and structural steel, installing the ceiling grids, installing the
laboratory equipment and cabinets, installing the copper parapet siding.
Tertiary Filter
Filter wall erection continued throughout the entire month. There are several walls that
remain to be placed in this structure.
Filter Support
Mass Electric continued to install the motor control center and associated electrical
equipment in the Filter Support electrical room. Mechanical crews installed ventilation
ductwork inside the building.
Recycled Water Pump Station
Pipe fitters began installing the above ground piping and valves.
Wetlands Pump Station
The structural work is nearing completion and the above -ground mechanical work
continues. This pump station is required to be operational by early 2008.
Wetlands Planting
The wetland plants that were drill seeded in the polishing treatment wetlands are
begimiing to grow. Some of the wetland plants that were plugged in Pond 9 and Pond 10
are doing well. The wetland plants that were hydroseeded in Pond 9 and Pond 10 are yet
to sprout. Plantings that did not survive or failed to grow in pond 9 are being replaced
with plugs per the original schedule in the Contract Documents. Similar work should
begin in pond 10 in the next few months.
Start Up
Meetings continue to refine and discuss the plan to start up the effluent facilities at the
existing clrlorine contact basin. The start up will involve several pieces of equipment that
will monitor chlorine levels and then residual to confirm that sufficient levels are
maintained for disinfection and also that no chemical leaves the plant in the river
discharge flows. These meetings are progressing well on this facility.
3. Contract Changes
Thirty-two new change orders were processed in October. The sum of these change
orders results in a net addition to the construction contract of $401,424.00. The complete
list of contract changes is attached. Those executed in October and valued greater than
$10,000 are as follows:
Site Secutiry Lighting Estimation Cost
Grading @ Mitigation Wetlands & RWSB
PG&E power connection @ W Access Rd.
Anchorage of Diffuser Pipe Ponds 9&10
Revised Details @ RWSB
Mitigation Wetlands Drain — Permanent Installation
Ops Building: Plumbing Dwqs.
Below Grading Coatings
4. Field Orders
$10,364
$27,012
$55,335
$32,659
$20,881
$75,048
$29,571
$72,507
Twelve new field orders were prepared this month. A total of one hundred twenty-one
field orders have been prepared for the project. Of those, forty-two remain active with a
total estimated value of $320,481. Active field orders greater than $10,000 areas
follows:
FO No.
Description
Amount
60
Headworks: Details for Stop Plates and Gates
$20,068.00
79
Ops. Bldg.: 1 -Hr. Fireproofing at Steel Beams
$10,000.00
85
Ops. Bldg.: Green Roof Detail at Lobby Parapet
$24,249.00
86
Deepen Generator Fuel Lines and Sump
$17,643.00
96
Headworks, Relocation of Local Control Stations and JBs
$25,000.00
99
West Access Natural Gas Line Connection and Meter Pad
$15,000.00
106
CCB: Addiition of Drain Vault Float and Clarification on Heat Trace Controller
$15,000.00
108
Add Geotextile Fabric Along East Access Road
$20,000.00
111
Handrail Post Pockets at Headworks
$25,000.00
113
HVAC Modifications at Filter Support, Thickener & Screw Press
$10,000.00
114
12 In. FI Connection to Filters
$16,732.00
117
Modify Solids Handling Slab
$15,000.00
Active Field Orders < $10,000
$106,789.00
Total
$320,481.00
5. Testing
Pipe was pressure tested and compaction testing was completed as needed throughout the
month. Concrete sampling and testing was on-going. Samples were taken from each
structural concrete placement and compression tests completed.
6. Anticipated Work for Next Month
Mass Electric will continue installing conductors and for power and control to the
aerators and other electrical equipment in the oxidation ditches. Work will also continue
on a number of structures used to route flow to and from the oxidation ditches and
clarifiers including the Secondary Effluent Junction Box, RAS Pump Station, Secondary
Clarifier Flow Splitter, WAS Pump Station, and Oxidation Ditch Flow Splitter.
Electrical work will also continue on the Tertiary Pump Station.
Mechanical crews will begin installing equipment at the Headworks. Work will continue
at the solids handling portion of the plant including the Thickening Building, Methane
Digester, the Screw Press Building, and the Septage Receiving Station. The Acid
Digester structural work will continue into the upcoming months.
Kiewit will continue to pave several areas around the site, mainly concentrating on areas
where structural work is complete.
Installation of the Green Roof will continue at the Operation and Maintenance Building.
Subcontractors will continue with various finish work throughout the building.
SUBMITTAL STATUS
FIELD ORDERS
Total Cost of
Total October Active Active Orders
Field Orders Issued 121 12 42 $320,481.00
Total October
Value of Change Orders Executed in October 32 $401,424.00
Value of Change Orders Executed to Date 222 $2,121,311.00
Percent to Date of Original Contract 1.92%
WEATHER RELATED DELAYS
Days
Base Contract Allowance 40
Weather Related Days in October 0
Weather Related Days to Date 82
G
Received
To Date
October
Returned
Pending
First Time Shop Drawing Submittals
795
13
783
12
Request for Information
1128
41
1024
4
C. M. Request for Information
175
2
161
14
FIELD ORDERS
Total Cost of
Total October Active Active Orders
Field Orders Issued 121 12 42 $320,481.00
Total October
Value of Change Orders Executed in October 32 $401,424.00
Value of Change Orders Executed to Date 222 $2,121,311.00
Percent to Date of Original Contract 1.92%
WEATHER RELATED DELAYS
Days
Base Contract Allowance 40
Weather Related Days in October 0
Weather Related Days to Date 82
G
O.C. Jones placed and compacted asphalt along the east access road at the existing Oxidation
Ponds. the crew placed the asphalt from the gate to just north of CCB.
10
II
Kiewit Millwirght's placed the motors for the aeration equipment in the Oxidation Ditches.
12
Ellis Creel, Water Recycling Facility
CONTRACT CHANGE ORDER TRACKING SHEET
CCO
Time
RFQIFO
#
Description
Amount
(Days)
NO.
Status
1
Time extension for additional soil sampling
0.00
8
Executed
2
Lime treatment at Ox Ditch & Secondary Clarifiers
125,000.00
RFQ 011
Executed
3
Board up Farmhouse
3,385.00
FO 004
Executed
4
Hay Stacker Relocation
493.00
FO 002
Executed
5
Terrorism Insurance and Increased Earthwork
0.00
RFQ 001
Executed
6
Meter in Temporary Recycled Water Pipeline
3,023.00
FO 006
Executed
7
Temporary Power for Pond 1 Aerators
1,270.00
FO 007
Executed
8
Pavement Repair on Cypress and McDowell
419,681.00
RFQ
Executed
9
Coloring Age
Conduit Encasement Col
,000.00)
RFI 62
Executed
10
Delayed Caltrans Encroackment Permit
16,723.00
FO 005
Executed
11
Trench Cut -Off Walls
(18,600.00)
RFI 057
Executed
12
Horizontal Aerators Extended Warranty Testing
0.00
RFI 152
Executed
13
Deletion of Prime Coat under AC Pavement
(29,700.00)
RFI 084
Executed
14
Replace Schad. Conduit in DB
( 21,774.00)
RFI 081
Executed
15
Delete Lakeville Highway Access
40,000.00
RFQ 15
Executed
16
Contract Time Extension for Weather Days 03-04/06
0.00
38
C to Cm Ltrs
Executed
17
Change Valve Types
0.00
RFQ 10
Executed
18
Replace EMT conduits by MC cable @ O&M Bldg
(14,777.00)
RFI 082
Executed
19
Inverter Duty Motors at Oxidation Ditch Aerators
16,466.00
CL 35
Executed
20
Aerated Lagoon and Pond 1 Modifications Milestone
0.00
Executed
Executed
21
Additional ng and Loops on McDowell
13,747.00
22
Catch Basins Invert Changes
(9,997.00)
RFQ 13
Executed
23
Oxidation Ditch Sump Modifications
(7,750.00)
RFQ 02.002
Executed
24
Change Buried Conduits PVC GRS to PVC Sch. 40
(213,038.00)
RFI 154
Executed
25
Temporary Power to Existing Aerators 4 and 7
7,956.00
FO 8
Executed
26
O&M Bldg: Ceiling & Wall Heights Rms
4,287.00
RFQ 20
Executed
27
Provide Portable Generator Pads at Ponds
2,554.00
FO 14
Executed
28
FS Bldg: Extend Conduit Stub -ups Beyond Ductbank
9,190.00
RFQ26
Executed
29
Headworks: Handrail Extension to Complete Deck
1,254.00
RFQ 27
Executed
Executed
30
Pond 4 Aerator Temp Power
883.00
FO 10
31
Aerated Lagoon: Reconnecting of Aerator No. 2
537.00
FO 11
Executed
32
Unknown Utility at Pond 1 North Side
855.00
Executed
Executed
33
Ductbank Encasement with Reinforcing
24,884.00
RFQ 31
34
Gun Safe for Storage of Bid Documents
2,410.00
FO 17
Executed
35
S&C Pad Mounted Switch Additions
75,200.00
RFQ 39
Executed
13
36
Permanent Power Supply for Pond 1 Aerators
98,000.00
RFQ 4
Executed
37
Temporary Fire Hose
851.00
FO 12
Executed
38
Change material for Temporary Debris Collector
(36,150.00)
RFI 061
Executed
39
Chemical Tank Pads (a) Filter Support Bldg
4,425.00
RFQ 22
Executed
40
Disconnect Aerator No. 2 & reconnect Pond 4 Aerators
607.00
FO 13
Executed
41
Delete Steel Steps in Manholes
(19,012.00)
RFQ 09
Executed
42
Add 4" Butterfly Valve in Acid Digester
1,189.00
RFI 245
Executed
43
Delete Pre -Action Fire System C) Main Elect. Bldg
(19,242.00)
RFQ 49
Executed
44
Headworks Influent Box Modifications
3,000.00
RFQ 44
Executed
45
Transformer Pad at Restroom
9,498.00
RFQ 17
Executed
46
Addition of Construction Joint at Oxidation Ditch Slabs
23,505.00
RFQ 33
Executed
47
Change Conduits from PVC Rigid Steel to PVC Sch. 40
(21,912.00)
RFI 251
Executed
48
Reader Board & Geogrid placement @ Cypress/McDowell
6,000.00
FO 15
Executed
49
Plant Control System PLC Architecture
(6,118.00)
CL 17
Executed
50
Grit Pump Room Sump Pump Modification
1,326.00
RFQ 43
Executed
51
PLC Enclosure Size for PLCs 2, 3 and 8
5,446.00
RFQ 70
Executed
52
Additional Time Switches at O&M Bldg.
2,722.00
RFI 369
Executed
53
Extension for Pond 1 Aerators Milestone Date
0.00
spec 00800
Executed
54
Levee Repair at Berm Existing Ponds 8 & 9
289,279.00
Executed
55
Operations Bldg. Maintenance Window
1,022.00
RFI 151
Executed
56
In -Plant Pump Station Wall Penetration Details
2,807.00
RFQ 36
Executed
57
Alignment of 42" RSG line to Headworks
4,208.00
RFQ 23
Executed
58
Revision of Structural Joints at Headworks Facility
5,628.00
CL 21
Executed
59
Pond 9 & 10 Levee Pothole
1,400.00
FO 24
Executed
60
Add pipe for Future Pump Can C_ RWPS
6,316.00
RFQ 76
Executed
61
Home Inspection of Farm House
746.00
FO 30
Executed
62
Alignment of 42" PWE line to Cell D Transfer Structure
8,171.00
RFQ 86
Executed
63
Delete Locks on Motor Operated Overhead Coiling Doors
(383.00)
RFQ 091
Executed
64
Dewatering of Pond 8 and Mitigated Wetland
3,488.00
FO 19,21
Executed
65
UV System Programming
2,777.00
CL 7
Executed
66
Septic Tank Removal at Farm House
739.00
FO 016
Executed
67
Changes to Slide and Sluice Gates
11,177.00
sub. 190
Executed
68
PLC System Material for C Street Pump Station
14,915.00
RFQ 85
Executed
69
PLC - 10 Analog Input Module
1,873.00
RFQ 98
Executed
70
Change Storm Drain Pipe from RCP to CHDPE
(72,398.00)
RFI 59.001
Executed
71
Deletion of CMU Coating on non -occupied structures
(2,538.00)
RFQ 90
Executed
72
Existing Utilities at West Access Road Entrance
8,543.00
FO 28
Executed
73
Change Handrail for Polishing Wetlands Structures
6,965.00
RFI 442
Executed
74
Change SDR for HDPE Pipe Lines
(52,415.00)
RFI 338
Executed
14
75
Addition of waterstop in wall @ Filter Support Bldg.
1,330.00
RFQ 62
Executed
76
Delete waterstop & starter walls @ HW, RAS PS, UV
(4,206.00)
RFQ 55.001
Executed
77
Re -Power Pond Aerators, Reconnect Aerated Lagoon
3,718.00
FO 39
Executed
78
Contract Time extension for Weather Days 10/2006
0.00
1 C to Cm Ltrs
Executed
79
Deletion of waterstop and starter walls at Tertiary Filters
(1,384.00)
RFI 352
Executed
80
Add waterstop at Grit Pump Area of Headworks Structure
6,167.00
FO 20
Executed
81
Fuel Tank Removal at Farmhouse
2,972.00
FO 29
Executed
82
Revised Anchorage for Oxidation Ditch Aerators
40,941.00
FO 44
Executed
83
Deletion of Integrated System Shop Testing (ISST)
0.00
CL 029
Executed
84
Additional Dowels at Maintenance Bldg.
914.00
FO 45
Executed
85
Replace Fuses at MCC 3A after PG&E power spike
1,706.00
Executed
86
Remove and replace disconnect switch @ Aerated Lagoon
2,919.00
FO 33
Executed
87
Lower Invert Elevation for 42" RSG Line
18,726.00
FO 32.001
Executed
88
Addition of Roof Hatch @ Main Electrical Bldg.
3,195.00
RFQ 62
Executed
89
Filter Support Bldg: NG Connections and Valving
1,361.00
RFQ 79
Executed
90
Chain Link Fence addition @ Farmhouse
725.00
FO 23
Executed
91
Repair Irrigation Lines @ Kaiser
1,186.00
FO 26
Executed
92
Demo of Spillway at Pond 10
12,109.00
FO 38
Executed
93
Curb and Grading @ Filter Support Bldg
0.00
FO 42
Executed
94
Irrigation System: Concrete Valve Boxes
2,393.00
RFQ 63
Executed
95
Contract time extension for Weather Days 11/06
0.00
5 Ltr 41
Executed
96
Mitigation Wetlands Drain
4,370.00
FO 41
Executed
97
Additional vinyl sheets for Levee Repair @ berm Pond 8 & 9
5,498.00
FO 52
Executed
98
Shoring @ Naval Trail
21,271.00
Executed
99
Extra excavation @ W Access Rd. for 12" 1W line
8,008.00
FO 28
Executed
100
Replace SBS line @ Chlorine Contact Basin
5,936.00
FO 51
Executed
101
Brush clearing @ Farm House
5,209.00
FO 27
Executed
102
Relocate standby Generator @ CCB
2,005.00
FO 50
Executed
103
Drywall Furring @ Elect Rm #2 in O&M Bldg.
1,630.00
RFQ 110
Executed
104
Equipment for MCC -3 retrofit
25,360.00
RFQ 50
Executed
105
Perimeter lighting switching @ Main Elec. Bldg.
1,795.00
RFI 520
Executed
106
Wiring for Time -Off Relay @ Wetlands Elec Bldg.
2,282.00
RFI 597
Executed
107
Changes to SCADA interface Boiler & PLC 3
3,549.00
RFQ 80
Executed
108
Disposal of existing MCC 3 transformer
2,141.00
RFQ 77
Executed
109
Contract time extension for Weather Days 12/06
0.00
7 Itr 53,54
Executed
110
Tree removal @ W Access Rd.
1,419.00
FO 48
Executed
111
Deepening Pull Boxes @ Ox Ditch MCC Bldg.
11,540.00
RFI 685
Executed
112
Rebar modification @ Wetlands Pump St Deck Beam
2,187.00
FO 49
Executed
113
Electrical Equipment Pads
9,018.00
RFQ 47
Executed
15
114
Delete Catch Basins at W Access Rd.
1,746.00
RFI 594
Executed I
115
Naval Bldg Lookout r ea
3,00 0.00
FO 47
Executed
116
Changes oTWE and PWE lines
0.00
RFQ 3,97
Executed
117
Polishing Wetlands FSS: Add Hand Switch
3,444.00
RFQ112
Executed
118
Engineering of Anchorage @ Oxidation Ditch Aerators
(20,089.00)
FO 44
Executed
119
Replace Oxygen Probes @ Aerated Lagoon/Pond 1
13,411.00
RFQ 115
Executed
120
Change Piping Material for Deionized Water Service
0.00
RFQ 7
Executed
121
Filter Support Bldg: Relocation of 1W Line
4,568.00
RFQ 101
Executed l
122
Security Lighting at Farmhouse
1,200.00
Executed
123
Disposal of Asbestos Containing Pipe
2,087.00
FO 31
Executed
124
Investigation and Disposal of FAA Building
20,512.00
FO 31
Executed
125
Conduit addition Boiler
126
O&M Bldg: Exhaust power supply & controls
34,440.00
RFQ 69
Executed
127
Addition of Disconnect Switches @ Headworks
25,143.00
RFQ 56
Executed
128
Level Transmitter addition @ Headworks
23,058.00
RFQ 52
Executed
129
Contract Time extension Weather Days 01-02/07
7
Executed
130
Subgrade Improve & Pipe Encasement @ W Access Rd.
12,128.00
FO 35
Executed
131
Additional Conduit for Fuel Leak Detection
2,714.00
RFI 586
Executed
132
HVAC Enclosure Modifications @ Ops Bldg.
8,014.00
RFQ 72
Executed
133
Wiring of Spare I/Os
45,713.00
RFQ 57
Executed
134
PLC Enclosure Size for PLC 5
7,823.00
RFQ 106
Executed
135
Partial Payment for PLC Enclosures
0.00
Executed
136
Trench Backfill with Native Material
(72,000.00)
RFQ 53
Executed
137
UV Bldg Top Slab Modifications
14,000.00
RFQ 104
Executed
138
Ops Bldg: HVAC Electrical & Mechanical Modifications
2,854.00
RFQ 102.1
Executed
139
24" Pumped Storm Drain Line Coverage
30,000.00
RFQ 109
Executed
140
Metal Siding @ Main Electrical Bldg.
5,071.00
CL 124
Executed
141
Contract Time Extension for Weather Days April 2007
1
Executed
142
Ops: Relocate HVAC duct transition @ Locker Rm Ceiling
878.00
FO 78
Executed
143
Use of Native Material for backfill @ North & Middle Cluster
(77,690.00)
Executed
144
Recycled Water Storage Basin Size Increase
220,867.00
RFQ 89.01
Executed
145
Outlet conduit replacement @ Existing CCB
1,260.00
FO 56
Executed
146
Modify Rebar Expansion Joints @ Thickener Bldg
1,610.00
FO 40.001
Executed
147
Modify Grating Seat @ Headworks Beam B-13
1,737.00
RFQ 125
Executed
148
Added Space Heater for PLC 8 - RIO 1
1,803.00
RFQ 137
Executed
149
Additional G2 Light Fixture @ Ops Bldg Lobby
2,013.00
RFI 756
Executed
150
Connection Grounding Bldg rebar @ MCC HW Bldg.
974.00
FO 80
Executed
151
Relocate supply line fire riser @ maintenance Bldg.
3,027.00
FO 36
Executed
152
Pipe material for 36" mixed liquor line @ 2ndary Clarifiers
14,271.00
RFQ 8
Executed
[L1
153
Modifications HVAC Pads
9,562.00
RFQ 42
Executed I
154
Mod per PG&E Requiremnts to Main Power Supply
19,886.00
FO 18
Executed
155
Addition of Wall Sleeves at Thickener Building
847.00
CL 126
Executed
156
Reduce Deck b Openings Wetlands Pump Station
782.00
RFl 10
Executed
157
Wall Supports for ptL Pony Wall aLaboratory
2 162.00
RFQ100
Executed
158
Concrete Encase HCS pipeline @ Headworks Structure
2,393.00
RFQ 129
Executed
159
Convert Conference Rm into 2 Offices @ Ops Bldg.
8,351.00
RFQ 84
Executed
160
Concrete Backfill around Screw Press Equipment Trench
1,588.00
FO 71
Executed
161
Expansion Joint Rebar @ Headworks Grid Line 10
1,151.00
FO 64
Executed
162
Standby Generator Connection @ Wetlands PS
13,527.00
RFQ 135
Executed
163
Deletion of Rotameters @ Tertiary Filters
(1,074.00)
RFQ 118
Executed
164
Blockouts for Ox Ditch Aerator Anchorage
1,022.00
FO 67
Executed
165
Concrete Encase SO pipe under HWE pipeline @ HW
1,657.00
RFQ 126
Executed
166
Temporary Power for Transformer @ Aerated Lagoon
28,343.00
FO 34
Executed
167
Rebar @ Headworks Manual Bar Screen Embed
756.00
FO 57
Executed
168
Subgrade Improvement for Wetlands PS Apron Slab
11,799.00
FO 62
Executed
169
Screw Press Bldg Skylight Size Change
3,465.00
RFQ 140
Executed
170
ditional r Panel to PLC -9
2,887.00
CL 69
Executed
171
p@ eom xist g CCB duringower
Standby pump work @ Pond 10
44,000.00
F022
Executed
Executed
172
Billing for Potable Water Usage on site through 4/4/07
1,552.00
173
Upgrade starters for Ox Ditch Aerator Motors
78,373.00
RFQ 88
Executed
174
Blind flanges for future effluent line @ Aerated Lagoon
11,709.00
RFQ 24
Executed
175
Remove rebar @ Ox Ditch Aerator Motor Block-outs
3,000.00
FO 66
Executed
176
Modification of controls for Tertiary Effluent Bypass Valves
(3,075.00)
RFQ 29
Executed
177
Communication between PLC -8 & Thickener PLC
2,032.00
P RFI 37
Executed
178
Automated 1W Valve @ Recycled Water Storage Basin
46,267.00
RFQ 30
Executed
180
Relocate Fire Pump Can @ RWPS
4,613.00
FO 70
Executed
181
Add Effluent Conductivity Probe @ JB No. 2
9,680.00
RFQ 133
Executed
182
Revise DB Routing @ Ferrous Chloride Area
2,463.00
CL 54
Executed
183
Ventilation Alarms @ Boiler Bldg & Thickener Bldg
20,526.00
RFQ 127
Executed
184
Anti Graffiti Coating @ O&M Bldg and Sound Wall
28,736.00
RFQ 109
Executed
185
Deletion of Louvers @ HW Bar Screen Enclosures
(1,374.00)
RFQ 117
Executed
186
Deletion of Combination Smoke Fire Dampers
(18,005.00)
RFQ 83
Executed
187
Fire Rating Janitor Closet Door @ Ops
1,841.00
RFQ 138
Executed
188
Brush clearing @ Farm House fire season 2007
3,186.00
FO 90
Executed
189
Ops: alignment & wall cap (cD_ HVAC f e
8 26.00
FO 6 9.1
Executed
190
Ops: addition aco sti al ceiling @ electrical cal rm #1
3,125.00
RFQ 145
Executed
191
Ops: framing details for Lobby
2,163.00
FO 84
Executed
192
RWPS: modified floor drainage
15,107.00
RFQ 41.1
Executed
17
193
Ops: beam seats in CMU wall pockets
10,067.00
FO 46
Executed
194
Recycled Water Storage Basin Berm Modifications
(2,595.00)
RFQ 147
Executed
195
Double Containment System Modifications
90,172.00
RFQ 37
Executed
196
Site Security Lighting Estimation Cost
10,364.00
RFQ 145
Executed
197
Grading @ Mitigation Wetlands & RWSB
27,012.00
RFQ 161
Executed
198
PG&E power connection @ W Access Rd.
55,335.00
FO 37
Executed
199
UV Disinfection Light Pole Mounting Detail
7,027.00
RFQ 124
Executed
200
Ox Ditch Light Pole Mounting Detail
8,852.00
RFQ 134
Executed
202
Screw Press grating @ Flocculation Tank Opening
1,969.00
RFQ 94
Executed
203
Anchorage of Diffuser Pipe Ponds 9 & 10
32,659.00
FO 58
Executed
204
Acid Digester changed detail wall penetrations
4,286.00
RFI 645
Executed
205
Existing LPN panel in chemical bldg.
2,576.00
RFI 1031
Executed
206
Revised Details @ RWSB
20,881.00
RFQ 152
Executed
207
Ops: Deletion of Closet in Control Room
(932.00)
RFQ 150
Executed
208
Ultrasonic level sensor mount @ Headworks
1,208.00
CL 194
Executed
209
Mitigation Wetlands Drain — Permanent Installation
75,048.00
RFQ 153
Executed
210
Ops Bldg: Plumbing Dwgs
29,571.00
302
Executed
213
Ops: Furring Men's Restroom Urinal Wall
740.00
FO 102
Executed
214
Informational Kiosks: Addition of 2" PVC 40 Pipe Sleeve
2,560.00
FO 95
Executed
216
Below Grading Coatings
72,507.00
RFQ 61
Executed
217
Aerated Lagoon: Unknow utility @ 20" URW Alignment
5,225.00
FO 98
Executed
219
Silt Fence Repair
1,209.00
Executed
221
Ops Bldg: Modifying Welding Studs to 1/8" Tubing
5,293.00
CL 151/152
Executed
222
Pond 10 Apron Slab: Over Ex, Fabric, and Rock
3,870.00
FO 118
Executed
223
Addition of Solenoid Valve @ Recycled Water Surge Tank
5,095.00
RFQ 34
Executed
225
Relocate Receptacles @ Biofilter Mechanical Pad
3,286.00
RFI 874
Executed
226
Equipment Pad Modifications @ Screw Press
5,130.00
RFQ 130
Executed
227
Footing Elevation @ Filter Support Bldg. Tank Farm
2,098.00
FO 75
Executed
228
Relocation of Cell D Transfer Structure
5,162.00
RFI 1068
Executed
230
Farm House: Plywood Cover @ Back Entry
756.00
FO 72
Executed
231
Methane Digester construction joint location & piping
1,057.00
RFI 875
Executed
CHANGE ORDER TOTAL:
2,121,311.00 67
Contract Amount:
110,329,000.00 1278
Percent Change Orders:
1.92%
Totals:
112,450,311.00 1345
Total Additive Change Orders
2,916,539.00
Percentage of Contract Amount
2.64%
18
Total Credit Change Orders
Percentage of Contract Amount
(795,228.00)
0.72%
Contract Substantial Completion Date 4/9/09
Current Substantial Completion Date 6/15/09
19
\.
(
[
)}
�
\�
\|
no
n
ILI2 2
\) �
\ \
\
|
{
2
]
t \
]/ }j�
15
!.
_�!
|
ILI2 2
\) �
�}
4:
!°O±V
,
��
t \
]/ }j�
ILI2 2
15
!.
■» E»
/
}
;
5
§/
!
!iB
/ ,
.# !
4«!
t
>./i!
n
e
N
0
R
n