It is recommended that the City Council approve the Resolution Authorizing Award of Contract
for the Petaluma Boulevard South Sewer Trunk Main Replacement Project.
BACKGROUND
The subject Project was identified as a priority in the last Sewer Master Plan completed over a
decade ago and has been in the City's CIP for several years. The project was delayed recently to
allow Pacific Gas & Electric to replace the gas transmission main and allow the City to complete
a more critical sewer improvement on Weller and D Streets. During one of the large storms of
December 2014, the City experienced a high number of sanitary sewer overflows (SSOs) along
Petaluma Boulevard South and some adjacent streets, due to the lack of capacity within the
existing sanitary sewer system along with infiltration and inflow problems. This section of sewer
is older and numerous pipe defects were identified through a routine video inspection of the pipe
interior. To address this issue, a project was proposed to remove or abandon the existing sewer
mains along Petaluma Boulevard South between Mountain View Avenue and H Street, and
replace them with larger sewer mains that are capable of handling higher flows as shown in the
Attachment 2.
The Petaluma Boulevard South Sewer Trunk Main Replacement Project includes the
abandonment of an existing 12 -inch sewer, and the removal of roughly 2,000 linear feet of both
6 -inch pipe and 18 -inch pipe and replacing them with 8 -inch and 21 -inch pipes, respectively. The
sewer manholes along the new mains will be rehabilitated. All of the existing laterals, up to the
back of the curb, will be replaced. Ancillary work includes replacement of sidewalk, curb and
gutter, driveways, and curb ramps; removal of several trees; and replacement of traffic loops at
the signalized intersections. This project will improve reliability, increase capacity, and reduce
maintenance, inflow, and infiltration.
The proposed action meets Council Goal: "Plan for and implement priority capital projects as
funding permits."
DISCUSSION
A Notice Inviting Bids was advertised on February 9, 2017 and the bid opening was on March 2,
2017. Six (6) bids were received as follows:
Name of Bidder
Base Bid
Bid Alt 1
Bid Alt 2
Team Ghilotti, Inc.
$1,828,510
$378,475
$379,975
Argonaut Constructors
$2,334,319
$369,525
$477,700
Terra Con Constructors Inc.
$2,373,216
$357,710
$347,587
W.R. Forde Associates
$2,397,854
$358,175
$347,375
Michael Paul Company, Inc.
$2,409,300
$617,500
$709,750
Cratus, Inc.
$2,503,990
$713,750
$470,750
Engineer's Estimate
$1,910,200
$384,500
$301,500
The award of the contract was based on the lowest combination of Base Bid plus Bid Alternate
#1 or Base Bid plus Bid Alternate #2. Bid Alternate #1 included removing a 6 -inch pipe and
installing a new 8 -inch pipe by trenching and excavating. Bid Alternate #2 includes the use of
pipe bursting in places to replace the 6 -inch pipe with the 8 -inch pipe.
The lowest apparent responsible and responsive bidder was Team Ghilotti, Inc., with a combined
Base Bid and Bid Alternate #1 of $2,206,985. Team Ghilotti, Inc. has performed similar sewer
projects throughout the area, including many in Petaluma. Team Ghilotti, Inc. possesses a valid
Class "A" California Contractor's License, number 895384, which meets the contracting
requirements to perform the work.
A bid protest letter dated March 8, 2017 was received from Argonaut Constructors alleging that
the apparent low bidder did not list subcontractor's license numbers in the "List of
Subcontractors" form. Team Ghilotti, Inc. provided the Department of Industrial Relations (DIR)
registration number for the subcontractors under the "Public Works Contractor Registration
Number" column. The DIR registration number can only be obtained by a contractor holding a
valid contractor's license number and are acceptable as a "Public Works Contractor Registration
Number ". Therefore, it is recommended that the bid protest be rejected, as it has no merit.
Construction management and inspection services will be conducted by City staff with assistance
by an outside consultant for geotechnical and material testing. Construction is scheduled to begin
in May 2017 and to be completed by late summer 2017.
FINANCIAL IMPACTS
The total projects budget for the Petaluma Boulevard South Sewer Trunk Main Replacement
Project (C66401314) is $3,113,000. The following is a breakdown of the budget:
N
Any unspent contingency funds will be returned to the wastewater fluid.
ATTACHMENTS
1. Resolution
2. Location Map
3
ota
ReYisedProject
.:, IIses
'Bud
udet`:
Planning/Environmental
$ 10,000
$
100
Design
$ 180,000
$
132,500
Legal Services
$ 2,000
$
2,000
Administration
$ 4,000
$
4,000
Construction Contracts
$ 2,000,000
$
2,206,985
Construction Management
$ 254,000
$
254,000
CIP Overhead
$ 70,000
$
70,000
Project Contingency
$ 593,000
$
443,415
TOTAL
$ 3,113,000
$
3,113,000
Funding Sources
Waste Water Capital
$ 3,113,000 1
$
3,113,000
TOTALI
$ 3,113,000 1
$
3,113,000
Any unspent contingency funds will be returned to the wastewater fluid.
ATTACHMENTS
1. Resolution
2. Location Map
3
Attachment 1
RESOLUTION AUTHORIZING THE AWARD OF CONTRACT
FOR THE PETALUMA BOULEVARD SOUTH SEWER TRUNK MAIN
REPLACEMENT PROJECT
WHEREAS, in accordance with the City of Petaluma Charter and Municipal Code,
California Public Contract Code Section 20162 and other applicable law, City staff prepared
construction bid documents and solicited bids for the Project; and
WHEREAS, the project was advertised on February 9, 2017, and six (6) bids were
received and opened on February 22, 2017 in accordance with applicable law; and
WHEREAS, the lowest responsible bid for the Project was submitted by Team Ghilotti,
Inc., from Petaluma, CA for $2,206,985; and
WHEREAS, the bid protest submitted by Argonaut Constructors on March 8, 2017 is
rejected; and
WHEREAS, staff has determined that the Contractor's bid satisfies the bidding
requirements for the Project; and
WHEREAS, staff has verified that Team Ghilotti, Inc. possesses a valid California
Contractor's License, Class A, number 895384 that qualifies Team Ghilotti, Inc. to perform the
Project; and
WHEREAS, the Project is categorically exempt pursuant to California Environmental
Quality Act ( "CEQA ") and Title 14, the California Code of Regulations ( "CEQA Guidelines "),
Section 15302, because the project consists of replacement or reconstruction of existing utility
systems and /or facilities involving negligible expansion of capacity.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Petaluma
hereby:
1. In accordance with the City of Petaluma Charter and Municipal Code, California
Public Contract Code Section 20162 and other applicable law, waives any and all
non - conformance in the bid of Team Ghilotti, Inc. for the Petaluma Boulevard South
Sewer Trunk Main Replacement Project No. C66401314, finds the bid of $2,206,985
to be the lowest, responsive bid and further finds that Team Ghilotti, Inc. is the lowest
responsible bidder.
2. The bid protest by Argonaut Constructors is rejected. Team Ghilotti, Inc. complied
with the bid procedures by listing the Department of Industrial Relations number
rather than the contractors' license numbers.
3. Awards the contract for the Petaluma Boulevard South Sewer Trunk Main
Replacement, Project No. C664013.14 to Team Ghilotti, Inc., in the amount of
$2,206,985, the amount of the lowest responsive bid, conditioned on Team Ghilotti's
rd
timely executing the project contract and submitting all required documents,
including but not limited to, executed bonds, certificates of insurance, and
endorsements, in accordance with the project bid documents.
4. Approves a construction contract contingency of $443,415.00
5. Directs staff to issue a notice of award to Team Ghilotti, Inc.
6. Authorizes and directs the City Manager to execute the project contract on behalf of
the City of Petaluma upon timely submission by Team Ghilotti, Inc. of the signed
project contract and all other required documents, including but not limited to,
executed bonds, certificates of insurance, and endorsements, in accordance with the
project bid documents.
Attachment 2
PETALUMA BLVD SOUTH SEWER TRUNK MAIN
REPLACEMENT
PROJECT NO. C66401314
LOCATION MAP
i!
rl
la6✓ N
t \
N, I
0
- \� LAKEVILLE ST.
�.\ .
PROD CT S LAKEVILLE HIGHWAY
�\ \ \v \,\
�� =l N
41,1
f � ^ ✓� I -L-CITY LIMIT f
Date : April 3, 2017
N
L
City of Petaluma
®PROJECT SITE w E Public Works and Utilities J
s Department
r85a
el