HomeMy WebLinkAbout3FCitywideBridgeRehabilitationCITY OF PLTALUMA, CALIFORNIA
AGENDA BILL
3.F
February 25, 2008
Agenda Title: Resolution Approving the Project Budget and Authorizing Meeting Date:
Award of Contract for the Citywide Bridge Rehabilitation Project No. February 25, 2008
C501404 to Bay Line Concrete Cutting Coring & Drilling Inc.
Meeting Time: ® 3:00 PM
❑ 7:00 PM
Category: ❑ Presentation M Consent Calendar ❑ Public Hearing ❑ Unfinished Business ❑ New Business
Department:
Public Works
Cost of Proposal:
Director:
Vin�engo
$238,000
Contact Person:
Larry Zimmer, P.E.
Amount Budgeted: $742,000 (budget for two separate construction
projects)
Attachments to Agenda Packet Item:
Resolution Awarding the Construction Contract
Location Map
Summary Statement:
Phone Number:
776-3674
Account Number:
3800-C501404
Name of Fund:
Traffic Mitigation Impact Fees
On January 31, 2008, the City received three (3) bids for the Citywide Bridge Rehabilitation Project, ranging
from $120,000.00 to $201,496.20. The project involves treating four concrete bridge decks with methacrylate to
protect the concrete.
Recommended Citv Council Action/Suggested Motion:
City staff recommends the City Council adopt the resolution awarding the contract to the low bidder, Bay Line
Concrete Cutting Coring & Drilling Inc. The work is anticipated to begin in May and is expected to be completed
in June 2008.
Reviewed by Admin. Svcs. Dir: Reviewed by City Attornev: Approved
(by�Citv. Manager:
\V
Date: U 1 Date: V Date: 2,-12- 0e
Rev. # Date Last Revised: File: S:\CIP Division\Projects\Bridge Rehab C501404\Citywide
Bridge Rehab C501404\1)esign\330 PCDC-City Council\CC Award
of Contract (2-4-05).doe
5:\CIP DivisionTrojects\Bridge Rehab C501404\Citywide Bridge Rehab C501404\pesign\330 PCDC-City Council\CC Award of Contract (24-06).doc
CITY OF PETALUMA, CALIFORNIA
FEBRUARY 25, 2008
AGENDA REPORT
FOR
RESOLUTION APPROVING THE PROJECT BUDGET AND AUTHORIZING AWARD OF
CONTRACT FOR THE CITYWIDE BRIDGE REHABILITATION
PROJECT NO. C501404 TO BAY LINE CONCRETE CUTTING CORING & DRILLING INC.
EXECUTIVE SUMMARY:
On January 31, 2008, the City received three (3) bids for the Citywide Bridge Rehabilitation
Project, ranging from $120,000.00 to $201,496.20. The project involves treating four concrete
bridge decks with methacrylate to protect the concrete.
2. BACKGROUND:
Caltrans Department of Structures periodically inspects all bridges in the State of California.
During the last inspection, they recommended the concrete decks of Lakeville Street Bridge,
Payran Street Bridge, Satori Street Bridge and Washington Street Bridge be treated with
methacrylate to protect the concrete.
Department of Public Works staff prepared the plans and specifications for this project. The
Notice Inviting Bids was issued on December 3, 2007. Bids were received and opened on
January 31, 2008, as follows:
NAME OF BIDDER
BID AMOUNT
Bay Line Concrete Cutting Coring & Drilling Inc., Oakland, CA $120,000.00
Truesdell Corporation, Tempe, AZ $174,174.00
Granite Construction Company, Healdsburg, CA $201,496.20
The engineer's estimate for construction is
$198,000.00
With a bid of $120,000, the apparent low bidder is Bay Line Concrete Cutting Coring & Drilling
Inc. Bay Line has satisfactorily performed similar projects for Caltrans. Staff verified that Bay
Line possesses a valid Class A California contractor's license, number 809660, expiring on June
30, 2008, which qualifies Bay Line to perform the work.
ALTERNATIVES:
1. Award the contract to the low bidder.
2. Reject all bids and re -advertise.
3. Take no action.
S:\CIP Division\Projeets\Bridge Rehab C501401\Citywide Bridge Rehab C501404\Design\330 PCDC-City Council\CC Award of
Contract (2-4-08).doc
[a
5
:9
FINANCIAL IMPACTS:
The following is a breakdown of the estimated costs:
Construction Contract (Low Bid) $120,000
Engineering Design 68,500
Administration/Inspection 20,000
Const. Contingency 18,000
CIP Overhead 11,500
Estimated Total Cost 238 000
The estimated total cost, including planning, design, construction, administration, inspection,
testing and project contingency, is $238,000. The CIP project C501104 was funded by Traffic
Mitigation Impact Fees in the amount of $742,000. This project originally included repairing a
spall on the East Washington Street Bridge over the Petaluma River. Due to the very different
type of work and required schedules, this deck treatment project was separated from the spall
repair project, which will be advertised for construction in June or July 2008.
CONCLUSION:
Following the award, the contractor will enter into agreement with the City and submit the
required contract documents, bonds and insurance.
OUTCOMES OR PERFORMANCE MEASUREMENTS THAT WILL IDENTIFY SUCCESS OR
COMPLETION:
Completion of construction.
RECOMMENDATION:
City staff recommends City Council adopt the resolution awarding the contract to the low bidder,
Bay Line Concrete Cutting Coring & Drilling Inc. The work is scheduled to begin in May and is
expected to be completed in June 2008.
S:\CIP Division\Projecis\Bridge Rehab C501404\Citywide Bridge Rehab C501404\Design\330 PCDC-City Council\C'C Award of
Contract (2-4-03).doc
ATTACHMENT?
RESOLUTION APPROVING THE PROJECT BUDGET AND AUTHORIZING
AWARD OF CONTRACT FOR THE CITYWIDE BRIDGE REHABILITATION
PROJECT NO. C501404
TO BAY LINE CONCRETE CUTTING CORING & DRILLING INC.
WHEREAS, City staff has worked diligently to prepare construction bid documents and
advertise for construction of this Project; and
WHEREAS, in accordance with the City of Petaluma Charter and Municipal Code, California
Public Contract Code Section 20162 and other applicable law, City staff solicited bids for the Project;
and
WHEREAS, the project was bid on January 31, 2008, and three (3) bids were received and
opened in accordance with applicable law; and
WHEREAS, the lowest bid for the Project was from Bay Line Concrete Cutting Coring &
Drilling Inc. for $120,000; and
WHEREAS, staff has determined that Bay Line's bid satisfies the bidding requirements for the
Project; and
WHEREAS, staff has verified that Bay Line possesses a valid California Contractor's License,
Class A, number 809660 that qualifies Bay Line to perform the Project; and
NOW, THEREFORE, BE IT RESOLVED that the Petaluma City Council hereby:
1. Approves the Project Budget in the amount of $238,000.
In accordance with the City of Petaluma Charter and Municipal Code, California Public Contact
Code Section 20162 and other applicable law, waives any and all non-conformance in the bid of
Bay Line Concrete Cutting Coring & Drilling Inc.for the Citywide Bridge Rehabilitation Project,
finds the bid of $120,000 to be the lowest, responsive bid and further finds that Bay Line
Concrete Cutting Coring & Drilling Inc. is the lowest responsible bidder.
Awards the contract for the Citywide Bridge Rehabilitation Project to Bay Line Cutting Coring
& Drilling Inc., in the amount of $120,000, the amount of the lowest responsive bid, conditioned
on Bay Line's timely executing the project contract and submitting all required documents,
including but not limited to, executed bonds, certificates of insurance, and endorsements, in
accordance with the project bid documents.
4. Directs staff to issue a notice of award to Bay Line Concrete Cutting Coring & Drilling Inc.
5. Authorizes and directs the City Manager to execute the project contract on behalf of the City of
Petaluma upon timely submission by Bay Line Concrete Cutting Coring & Drilling Inc, of the
signed project contract and all other required documents, including but not limited to, executed
bonds, certificates of insurance, and endorsements, in accordance with the project bid
documents.
5:\CIP DivisionTrojects\Bridge Rehab C501404\Citywide Bridge Rehab C501404\Design\330 PCDC-City Council\CC Award of 4
Contract (2-4-08).doc
ATTACHMENT d
MT I x®y ; /x �j / ! t
■i'--�_%(� Sm� / . ','a.; _ W:EYIItE \ �,v f j 'y
y pa44E ! zt t\} ayY l Illi` `M1. ` /
lar
EFy
I.
C4T/ f A9ly4t /(�t"-IUN,
EUNOR
CpitAr
flOLCq
PAYRAN STREET LAKEVILLE STREET
VAtiE ' II t „NpJ.yCtiOnEtitiO
SARTORI DRIVE
Z \M I I Yy
s �i Sam i IG �Tr'rtR 1
9r II a �psM�
p � IPIS
ttir�vi6a n rt` a si%-.ems
r r� Tr` Wit\
WASHINGTON STREET
LOCATION MAPS
SCALL N.T.1
SACIP Division\Projects\Bridge Rehab C501404\Citywide Bridge Rebab CS01404\Design\330 PCDC-City Council\CC Award of j
Contract (2-4-03).doc