CONSTRUCTION MANAGEMENT
PROGRESS REPORT No. 38
li f ii TIM4111F6
PRESENTATION
January 5, 2009
The
Covello
Group
PARTICIPANTS
Owner: City of Petaluma Mike Ban
11 English Street Director
Petaluma, CA 94952 (707) 778-4487
Margaret Orr
Engineering Manager
(707)778-4589
Contractor: Kiewit Pacific Co. Clint Cole
5000 Marsh Drive Project Manager
Concord, CA 94520 (925) 516-4600
Design Engineer: Carollo Engineers Tom Patten
2700 Ygnacio Valley Rd, Suite 300 Principal
Walnut Creek, CA 94598 (925) 932-1710
Doug Wing
Design Engineer
(925)299-6733
Environmental ESA Jim O'Toole
Management: 8950 Cal Center Drive, Bldg 3, Suite 300 Project Engineer
Sacramento, CA 95826 (707) 795-0900
Jennifer Garrison
Enviromnental Manager
(916) 564-4500
Programmer: AreSine engineering Doug McHaney
970 Executive Way Project Manager
Redding, CA 96002 (530) 222-7204
Steve Stewart
Lead Programmer
(530)222-7204
Construction The Covello Group Bruce Presser
Manager: 1660 Olympic Blvd, Suite 300 Principal
Walnut Creek, CA 94596 (925) 933-2300
Ken Sinclair
Construction Manager
(925)260-2943
Ed O'Brien
Field Engineer
(925)382-1246
2
• Contractor: KIEWIT PACIFIC CONSTRUCTION
Base Contract Amount (Total Project) .................................... $ 110,329,000.00
Change Orders Executed .................................................. $ 3.989,347.00
Total Contract Cost ......................................................... $ 114,318,347.00
Contract Amount Earned ................................................... $ 110.839,120.00
Progress Payment for November 2008 (excludes retention).....,..... $ 781,591.00
Previous Progress Payments (excludes retention).. . ....... ........... $ 98,974,260.00
Estimated Percent Complete............................................................. 97 %
• Design Engineer: Carollo Engineers
Authorized Budget (Total Project).... ...... .... $ 4,354,075.00
Billings to Date-- . ............. ...... ....... ...... $ 4,178,348.69
• Environmental Manager: ESA
Authorized Budget (Total Project). ............ - $ 1,434,830.00
Billings to Date...............................................................$ 1,062,233.56
ArcSine engineering
Authorized Budget (Total Project)... ... ..................... .......... $ 2,340,951.00
Billings to Date.... ............. -- .... ................ .............. $ 2,014,087.02
• Construction Manager: The COVELLO GROUP, Inc.
Authorized Budget (Total Project) ....................................... $ 10,231,509.00
Billings to Date...............................................................$ 8,047,404.73
3
Schedule
Notice to Proceed ........................
Base Contract Duration ...............
Original Completion Date...........
Time Extension Authorized ........
Revised Duration
...... .... ............... I ... I.................. October 10.2005
........I .............................. 1278 consecutive days
................................................... April 9, 2009
............................................................ 67 days
Revised Completion Date .........................
......................... 1345 consecutive days
...................................... June 15, 2009
Weather Days (included in base duration)..........................................................40 days
Weather Days Expended (included in time expended).......................................82 days
TimeExpended.............................................................................................. 1147 Days
Percent Time Expended........................................................................................... 85°X0
4
Construction Manager's Summary
1. Schedule
The project remains on schedule for completion by June 2004.
2. Work Progress
Oxidation Ditches
The performance testing on the mixed liquor return pumps at both oxidation ditches was
completed.
Secondary Clarifiers
The performance testing of scum pumps at the secondary clarifiers was started in
November.
Main Electrical Building
Loadshed testing was performed on the generator. This testing demonstrated that the
generator would be protected if the electrical demand exceeds the capacity of the
generator.
Headworks Facility
The strategy field testing was completed on the bar screens, washer/compactors, the grit
cyclone and classifier and grit pumps to confinn that the SCADA programming properly
operated the headworks equipment. The strategy field testing was also completed for the
septage receiving facility.
The gratings for the openings in the headworks deck were installed.
Screw Press Building
Work continued on pulling, terminating and testing of the wiring in the building.
Installation of the 3 water, polymer and digested sludge piping was completed.
Methane Digester
Testing of the 3 water, digested sludge and sample lines was completed. Coating of the
piping and equipment continued through the month at the methane digester equipment
pad.
Acid Digester
No work was completed at this facility during the month.
Boiler Building
Pulling, terminating and testing of wire for the equipment in the building continued.
Installation of small diameter piping continued through much of November.
Thickener Building
Pulling, terminating and testing of wire continued throughout the month. The waste
activated sludge, 1, 2 and 3 water and the seal water piping was completed.
Biofilter
The biofilter media was removed so that the required smoke testing could be completed
on the underlying rock and gravel layers. This testing will confirm that the air is properly
distributed throughout the biofilter.
Operations and Maintenance Building
Completion of punch -list activities continued.
Filter Support
Preliminary testing of the fire protection system was completed.
Tertiary Filters
Grout was placed around the filter cones. The mixer supports and mixer were installed in
the influent well. Exposed electrical conduits were installed on the top deck of the
facility. Pulling, terminating and testing of the wire were started.
UV Disinfection
The baffle plates were installed. The UV equipment vendor was on-site to supervise the
installation of the equipment at the facility.
Recycled Water Pump Station
This facility has been put into operation.
Wetlands Planting
During the summer, cattails have grown in the mitigated wetland. These plants are
considered invasive and were cut down in cell D of the polishing wetlands and in the
mitigated wetland. Planting of the wetland plants in Pond 10 was started. The planting
will continue into December.
As needed, water was pumped from Pond 9, through the Wetlands Pump Station to the
Polishing Wetlands to maintain necessary water levels in those ponds for plant growth.
Site Landscaping
Soil amendments were added around the operations building and in the area of the
demonstration garden. The plants were delivered, placed and the planting was started for
the demonstration garden. This garden is located around the recycled water storage pond.
Rock and gravel used in the material storage yard was removed and the area returned to
farmland. This yard was located in the northeast corner of the site. The temporary access
road from the west access road to the south cluster was also removed. Final grading was
started in the area south of the IN structure.
Polishing Wetlands
Replacement of header boards and aggregate material continued for the trails around the
4 polishing wetland cells.
Connection of Existing Pipeline
The hot tap of the existing pipeline between the Hopper Street Plant and the existing
ponds was completed. This connection will allow flow from the PIPS facility to be
directed to the new Ellis Creek Facility. The pipe between the hot tap and the headworks
was completed and backfilled.
Flood Control Berm
A flood control berm was constructed along the east side of the plant using surplus dirt.
This berm will provide additional protection to the treatment plant when Ellis Creek
leaves its banks, which is anticipated to happen with the 10 -year flood event based on
data that is being used for the flood study for creeks in Sonoma County, which indicates
more runoff in smaller storm events (URS, Ellis Creek Flood Study November 13, 3008).
Existing Chlorine Contact Basin
A weather monitoring station was installed. The roads around the existing ponds were
graded and aggregate base material was added as necessary to provide an all weather
road.
3. Contract Changes
No change orders were processed in November. Three hundred fifty five change orders
have been executed to date with a combined value of $3,989,347.00
4. Field Orders
Ten new
field orders were prepared this month. Two -hundred thirty five field orders have
been prepared for the project. Of those, one hundred four remain active with a total
estimated value of $852,666.00. Active field orders for general changes greater than
$10,000
are as follows:
FO
No.
Description
Amount
76
Concrete Hand Holes at Light Bases
$15,456.00
88
RWPS: Truck Fill Station
$11,354.00
96
Headworks, Relocation of Local Control Stations and JBs
$46,510.00
106
CCB: Addition of Drain Vault Float and Clarification on Heat Trace Controller
$15,000.00
110
Handrail at Oxidation Ditch 1 and 2 North Bull nose
$10,000.00
111
Handrail Post Pockets at Headworks
$25,000.00
113
HVAC Modifications at Filter Support, Thickener & Screw Press
$10,000.00
117
Modify Solids Handling Slab
$22,000.00
134
CCB Wash down System
$50,000.00
142
Housekeeping Pads for Pump LCP's at Filter Support
$12,615.00
145
Existing CCB Piping Modifications
$30,000.00
173
Ops Bldg: Canopy Hood Single Speed Motors
$10,000.00
175
Water Meter Box Modifications — Locations and Valves
$11,641.00
177
Level Switches at RWPS Cans
$15,000.00
182
Additional Grading at RWSB— Build Up Petals
$20,000.00
183
Waste Gas Flare Modifications
$15,000.00
200
CCB Paving/Grading Modifications
$40,000.00
201
West Access Road Sidewalk Demolition
$10,000.00
202
RWPS 3W Supply Modifications
$10,000.00
204
Entry Road Sidewalks
$40,000.00
207
West Access Road — Entrance Conduit Protection
$12,000.00
216
Life Ring Cabinets
$10,000.00
221
Motor Operated Gates in Fences
$10,000.00
225
East Flood Protection Berm
$75,000.00
233
Headworks Barscreen Enclosure Gas Monitoring
$20,000.00
Total Active Field Orders a $10,000
$306,090.00
5, Testing
Pipe was pressure tested as required throughout the month.
Testing of the controls systems as noted in items above were completed this month.
6. Anticipated Work for Next Month
Mass Electric will continue pulling wire and completing terminations at many facilities
throughout the site including the methane digester, acid digester, boiler building,
thickener building, digested sludge tank and the waste gas flare area.
Strategy field-testing to confirm the operation of the control programming is scheduled to
be completed on the equipment at the stone water pump station
Installation and testing of piping will continue at most of the structures in the solids
handling area of the plant.
At the screwpress building, a structure will be installed to support the sludge load -out
piping.
Testing of equipment will continue throughout the site. Equipment that will be tested
includes chemical metering pumps, the storn water pumps, polymer systems in the filter
support building and the UV system.
During December, the Operational Testing of the liquids process should be completed.
In this test, recycled water will be pumped in a circle between the headworks, the
oxidation ditches and the secondary clarifiers and the necessary splitter boxes to simulate
conditions when flow is routed through the plant. This will allow for the testing of the
controls system on a complete system rather than on a specific facility. It will also allow
for operators to manipulate the system to determine if proper controls exist to operate the
system to treat influent to meet permit requirements. Once this five day test is
successfully completed, the liquids process portion of the plant can receive raw sewage.
SUBMITTAL STATUS
FIELD ORDERS
Total Cost of
Total November Active Active Orders
Field Orders Issued 235 10 104 $781.288.00
Total November
Value of Change Orders Executed in November 0 $0.00
Value of Change Orders Executed to Date 355 $1989,347.00
Percent to Date of Original Contract 3.62%
WEATHER RELATED DELAYS
Days
Base Contract Allowance 40
Weather Related Days in November 0
Weather Related Days to Date 82
9
Received
To Date
November
Returned
Pending
First Time Shop Drawing Submittals
903
7
897
6
Request for Information
1524
13
1522
2
C. M. Request for information
259
4
258
1
FIELD ORDERS
Total Cost of
Total November Active Active Orders
Field Orders Issued 235 10 104 $781.288.00
Total November
Value of Change Orders Executed in November 0 $0.00
Value of Change Orders Executed to Date 355 $1989,347.00
Percent to Date of Original Contract 3.62%
WEATHER RELATED DELAYS
Days
Base Contract Allowance 40
Weather Related Days in November 0
Weather Related Days to Date 82
9
Kiewit Laborers and a Castle Concrete Pumping Operator placed grout around the Sand
Filter Cones and Equipment at the Tertiary Filter Building. m,
10
Mass Electricians worked on the wire terminations at the Air Handling Local Control Panels for the
* Backwash Upflow, Sand Filters at the Tertiary Filter Building
II
Redwood Painting started the coating of the Ferrous Chloride Piping.
TD Williams and Kiewit performed the Hot Tap on the existing 36 inch Sanitary Sewer
Main.
12
Ellis Creek Water Recycling Facility
CONTRACT CHANGE ORDER TRACKING SHEET
cco #
Description
Amount
(Days)
1
Time extension for additional soil sampling
0.00
8
2
Lime treatment at Ox Ditch & Secondary Clarifiers
125,000.00
3
Board up Farmhouse
3,385.00
4
Hay Stacker Relocation
493.00
5
Terrorism Insurance and Increased Earthwork
0.00
6
Meter in Temporary Recycled Water Pipeline
3,023.00
7
Temporary Power for Pond 1 Aerators
1,270.00
8
Pavement Repair on Cypress and McDowell
419,681.00
9
Conduit Encasement Coloring Agent
J47,0n(j ui))
10
Delayed Caltrans Encroachment Permit
16,723.00
11
Trench Cut -Off Walls
18,bs)0,1)t.il
12
Horizontal Aerators Extended Warranty Testing
0.00
13
Deletion of Prime Coat under AC Pavement
(;'0, t00 00)
14
Replace PVC Sched. 40 with EB 20 Conduit in DB
t2 1774 area
15
Delete Lakeville Highway Access
40,000.00
16
Contract Time Extension for Weather Days 03-04106
0.00
38
17
Change Valve Types
0.00
18
Replace EMT conduits by MC cable @ O&M Bldg
1,1 ro (m)
19
Inverter Duty Motors at Oxidation Ditch Aerators
16,466.00
20
Aerated Lagoon and Pond 1 Modifications Milestone
0.00
21
Additional Striping and Loops on McDowell
13,747.00
22
Catch Basins Invert Changes
(9,917 00
23
Oxidation Ditch Sump Modifications
( 7 750,00)
24
Change Buried Conduits PVC GRS to PVC Sch. 40
(213,038 00)
25
Temporary Power to Existing Aerators 4 and 7
7,956.00
26
O&M Bldg: Ceiling & Wall Heights Rms
4,287.00
27
Provide Portable Generator Pads at Ponds
2,554.00
28
FS Bldg: Extend Conduit Stub -ups Beyond Ductbank
9,190.00
29
Headworks: Handrail Extension to Complete Deck
1,254.00
30
Pond 4 Aerator Temp Power
883.00
31
Aerated Lagoon: Reconnecting of Aerator No. 2
537.00
32
Unknown Utility at Pond 1 North Side
855.00
33
Ductbank Encasement with Reinforcing
24,884.00
34
Gun Safe for Storage of Bid Documents
2,410.00
35
S&C Pad Mounted Switch Additions
75,200.00
36
Permanent Power Supply for Pond 1 Aerators
98,000.00
37
Temporary Fire Hose
851.00
38
Change material for Temporary Debris Collector
(3k3,150,1)0y
39
Chemical Tank Pads @ Filter Support Bldg
4,425.00
40
Disconnect Aerator No. 2 & reconnect Pond 4 Aerators
607.00
41
Delete Steel Steps in Manholes
i 11,01'2. 00)
42
Add 4" Butterfly Valve in Acid Digester
1,189.00
43
Delete Pre -Action Fire System 0 Main Elect. Bldg
(19,242 00)
13
cco #
Description
Amount
44
Headworks Influent Box Modifications
3,000.00
45
Transformer Pad at Restroom
9,498.00
46
Addition of Construction Joint at Oxidation Ditch Slabs
23,505.00
47
Change Conduits from PVC Rigid Steel to PVC Sch. 40
(F'.CP! ? o(f)
48
Reader Board & Geogrid placement @ Cypress/McDowell
6,000.00
49
Plant Control System PLC Architecture
i 1 18 nU l
50
Grit Pump Room Sump Pump Modification
1,326.00
51
PLC Enclosure Size for PLCs 2, 3 and 8
5,446.00
52
Additional Time Switches at O&M Bldg.
2,722.00
53
Extension for Pond 1 Aerators Milestone Date
0.00
54
Levee Repair at Berm Existing Ponds 8 & 9
289,279.00
55
Operations Bldg. Maintenance Window
1,022.00
56
In -Plant Pump Station Wall Penetration Details
2,807.00
57
Alignment of 42" RSG line to Headworks
4,208.00
58
Revision of Structural Joints at Headworks Facility
5,628.00
59
Pond 9 & 10 Levee Pothole
1,400.00
60
Add pipe for Future Pump Can @ RWPS
6,316.00
61
Home Inspection of Farm House
746.00
62
Alignment of 42" PWE line to Cell D Transfer Structure
8,171.00
63
Delete Locks on Motor Operated Overhead Coiling Doors
183 001
64
Dewatering of Pond 8 and Mitigated Wetland
3,488.00
65
UV System Programming
2,777.00
66
Septic Tank Removal at Farm House
739.00
67
Changes to Slide and Sluice Gates
11,177.00
68
PLC System Material for C Street Pump Station
14,915.00
69
PLC - 10 Analog Input Module
1,873.00
70
Change Storm Drain Pipe from RCP to CHDPE
11233is on)
71
Deletion of CMU Coating on non -occupied structures
2 `)38 00)
72
Existing Utilities at West Access Road Entrance
8,543.00
73
Change Handrail for Polishing Wetlands Structures
6,965.00
74
Change SDR for HDPE Pipe Lines
(52 s 15 Of))
75
Addition of waterstop in wall @ Filter Support Bldg,
1,330.00
76
Delete waterstop & starter walls @ HW, RAS PS, UV
1,AX3 00)
77
Re -Power Pond Aerators, Reconnect Aerated Lagoon
3,718.00
78
Contract Time extension for Weather Days 10/2006
0.00
79
Deletion of waterstop and starter walls at Tertiary Filters
1,334 00f
80
Add waterstop at Grit Pump Area of Headworks Structure
6,167.00
81
Fuel Tank Removal at Farmhouse
2,972.00
82
Revised Anchorage for Oxidation Ditch Aerators
40,941.00
83
Deletion of Integrated System Shop Testing (ISST)
0.00
84
Additional Dowels at Maintenance Bldg.
914.00
85
Replace Fuses at MCC 3A after PG&E power spike
1,706.00
86
Remove and replace disconnect switch @ Aerated Lagoon
2,919.00
87
Lower Invert Elevation for 42" RSG Line
18,726.00
88
Addition of Roof Hatch @ Main Electrical Bldg.
3,195.00
89
Filter Support Bldg: NG Connections and Valving
1,361.00
90
Chain Link Fence addition @ Farmhouse
725.00
91
Repair Irrigation Lines @ Kaiser
1,186.00
14
(Days)
1
CCO #
Description
Amount
92
Demo of Spillway at Pond 10
12,109.00
93
Curb and Grading @ Filter Support Bldg
0.00
94
Irrigation System: Concrete Valve Boxes
2,393.00
95
Contract time extension for Weather Days 11/06
0.00
96
Mitigation Wetlands Drain
4,370.00
97
Additional vinyl sheets for Levee Repair @ berm Pond 8 & 9
5,498.00
98
Shoring @ Naval Trail
21,271.00
99
Extra excavation @ W Access Rd. for 12" 1W line
8,008.00
100
Replace SBS line @ Chlorine Contact Basin
5,936.00
101
Brush clearing @ Farm House
5,209.00
A 102
Relocate standby Generator @ CCB
2,005.00
103
Drywall Furring @ Elect Rm #2 in O&M Bldg.
1,630.00
104
Equipment for MCC -3 retrofit
25,360.00
105
Perimeter lighting switching @ Main Elec. Bldg.
1,795.00
106
Wiring for Time -Off Relay @ Wetlands Elec Bldg.
2,282.00
107
Changes to SCADA interface Boiler & PLC 3
3,549.00
108
Disposal of existing MCC 3 transformer
2,141.00
109
Contract time extension for Weather Days 12/06
0.00
110
Tree removal @ W Access Rd.
1,419.00
111
Deepening Pull Boxes @ Ox Ditch MCC Bldg.
11,540.00
112
Rebar modification @ Wetlands Pump St Deck Beam
2,187.00
113
Electrical Equipment Pads
9,018.00
114
Delete Catch Basins at W Access Rd.
1,746.00
115
Naval Bldg Lookout Area
3,000.00
116
Changes to TWE and PWE lines
0.00
117
Polishing Wetlands FSS: Add Hand Switch
3,444.00
118
Engineering of Anchorage @ Oxidation Ditch Aerators
(20 (189 OM
119
Replace Oxygen Probes @ Aerated Lagoon/Pond 1
13,411.00
120
Change Piping Material for Deionized Water Service
0.00
121
Filter Support Bldg: Relocation of 1 W Line
4,568.00
122
Security Lighting at Farmhouse
1,200.00
123
Disposal of Asbestos Containing Pipe
2,087.00
124
Investigation and Disposal of FAA Building
20,512.00
125
Conduit addition @ Boiler Bldg.
15,780.00
126
O&M Bldg: Exhaust fans power supply & controls
34,440.00
127
Addition of Disconnect Switches @ Headworks
25,143.00
128
Level Transmitter addition @ Headworks
23,058.00
129
Contract Time extension Weather Days 01-02/07
0 130
Subgrade Improve & Pipe Encasement @ W Access Rd.
12,128.00
131
Additional Conduit for Fuel Leak Detection
2,714.00
132
HVAC Enclosure Modifications @ Ops Bldg.
8,014.00
133
Wiring of Spare I/Os
45,713.00
134
PLC Enclosure Size for PLC 5
7,823.00
135
Partial Payment for PLC Enclosures
0.00
136
Trench Backfill with Native Material
('12,000.00)
137
UV Bldg Top Slab Modifications
14,000.00
138
Ops Bldg: HVAC Electrical & Mechanical Modifications
2,854.00
139
24" Pumped Storm Drain Line Coverage
30,000.00
15
(Days)
5
7
7
ccO #
Description
Amount
140
Metal Siding @ Main Electrical Bldg.
5,071.00
141
Contract Time Extension for Weather Days April 2007
142
Ops: Relocate HVAC duct transition @ Locker Rm Ceiling
878.00
143
Use of Native Material for backfill @ North & Middle Cluster
(Pin,o o O{r1
144
Recycled Water Storage Basin Size Increase
220,867.00
145
Outlet conduit replacement @ Existing CCB
1,260.00
146
Modify Rebar Expansion Joints @ Thickener Bldg
1,610.00
147
Modify Grating Seat @ Headworks Beam B-13
1,737.00
148
Added Space Heater for PLC 8 - RIO 1
1,803.00
149
Additional G2 Light Fixture @ Ops Bldg Lobby
2,013.00
150
Connection Grounding Bldg rebar @ MCC HW Bldg.
974.00
151
Relocate supply line fire riser @ maintenance Bldg.
3,027.00
152
Pipe material for 36" mixed liquor line @ 2ndary Clarifiers
14,271.00
153
Modifications HVAC Pads
9,562.00
154
Mod per PG&E Requiremnts to Main Power Supply
19,886.00
155
Addition of Wall Sleeves at Thickener Building
847.00
156
Reduce Deck Slab Openings @ Wetlands Pump Station
782.00
157
Wall Supports for Pony Wall at Laboratory
2,162.00
158
Concrete Encase HCS pipeline @ Headworks Structure
2,393.00
159
Convert Conference Rm into 2 Offices @ Ops Bldg.
8,351.00
160
Concrete Backfill around Screw Press Equipment Trench
1,588.00
161
Expansion Joint Rebar @ Headworks Grid Line 10
1,151.00
162
Standby Generator Connection @ Wetlands PS
13,527.00
163
Deletion of Rotameters @ Tertiary Filters
1,014 001
164
Blockouts for Ox Ditch Aerator Anchorage
1,022.00
165
Concrete Encase SD pipe under HWE pipeline @ HW
1,657.00
166
Temporary Power for Transformer @ Aerated Lagoon
28,343.00
167
Rebar @ Headworks Manual Bar Screen Embed
756.00
168
Subgrade Improvement for Wetlands PS Apron Slab
11,799.00
169
Screw Press Bldg Skylight Size Change
3,465.00
170
Additional 1/0 from Power Panel to PLC -9
2,887.00
171
Standby pump @ existing CCB during work @ Pond 10
44,000.00
172
Billing for Potable Water Usage on site through 4/4/07
1,552.00
173
Upgrade starters for Ox Ditch Aerator Motors
78,373.00
174
Blind flanges for future effluent line @ Aerated Lagoon
11,709.00
175
Remove rebar @ Ox Ditch Aerator Motor Block-outs
3,000.00
176
Modification of controls for Tertiary Effluent Bypass Valves
(.t 075,{)0)
177
Communication between PLC -8 & Thickener PLC
2,032.00
178
Automated 1W Valve @ Recycled Water Storage Basin
46,267.00
179
Modification to HW Bar Screen Channels
6,130.00
180
Relocate Fire Pump Can @ RWPS
4,613.00
181
Add Effluent Conductivity Probe @ JB No. 2
9,680.00
182
Revise DB Routing @ Ferrous Chloride Area
2,463.00
183
Ventilation Alarms @ Boiler Bldg & Thickener Bldg
20,526.00
184
Anti Graffiti Coating @ O&M Bldg and Sound Wall
28,736.00
185
Deletion of Louvers @ HW Bar Screen Enclosures
(1,37400)
186
Deletion of Combination Smoke Fire Dampers
18 005 001
187
Fire Rating Janitor Closet Door @ Ops
1,841.00
16
(Days)
1
CCO #
Description
Amount (Days)
188
Brush clearing @ Farm House fire season 2007
3,186.00
189
Ops: CMU alignment & wall cap @ HVAC enclosure
1,826.00
190
Ops: addition acoustical ceiling @ electrical rm #1
3,125.00
191
Ops: framing details for Lobby
2,163.00
192
RWPS: modified floor drainage
15,107.00
193
Ops: beam seats in CMU wall pockets
10,067.00
194
Recycled Water Storage Basin Berm Modifications
{2,595,00
195
Double Containment System Modifications
90,172.00
196
Site Security Lighting Estimation Cost
10,364.00
197
Grading @ Mitigation Wetlands & RWSB
27,012.00
198
PG&E power connection @ W Access Rd.
55,335.00
199
UV Disinfection Light Pole Mounting Detail
7,027.00
200
Ox Ditch Light Pole Mounting Detail
8,852.00
201
Existing GCB: power to New Chemical Metering Pump
8,588.00
202
Screw Press grating @ Flocculation Tank Opening
1,969.00
203
Anchorage of Diffuser Pipe Ponds 9 & 10
32,659.00
204
Acid Digester changed detail wall penetrations
4,286.00
205
Existing LPN panel in chemical bldg.
2,576.00
206
Revised Details @ RWSB
20,881.00
207
Ops: Deletion of Closet in Control Room
(93 011)
208
Ultrasonic level sensor mount @ Headworks
1,208.00
209
Mitigation Wetlands Drain - Permanent Installation
75,048.00
210
Ops Bldg: Plumbing Dwgs
29,571.00
211
Ops: Deletion of decking @ Mechanical Chases
1,719.00
212
Headworks: channel floor rebar modification
1,696.00
213
Ops: Furring Men's Restroom Urinal Wall
740.00
214
Informational Kiosks: Addition of 2" PVC 40 Pipe Sleeve
2,560.00
215
Screw Press: Modifications to Underslab Piping
2,607.00
216
Below Grading Coatings
72,507.00
217
Aerated Lagoon: Unknow utility @ 20" URW Alignment
5,225.00
218
Ops Bldg: Additional Window Clips
3,194.00
219
Silt Fence Repair
1,209.00
220
Ops Bldg: control rm. Backing & wood blocking
2,185.00
221
Ops Bldg: Modifying Welding Studs to 118" Tubing
5,293.00
222
Pond 10 Apron Slab: Over Ex, Fabric, and Rock
3,870.00
223
Addition of Solenoid Valve @ Recycled Water Surge Tank
5,095.00
224
Thickening Walls @ Ox Ditch Aerator Shafts
11,286.00
225
Relocate Receptacles @ Biofilter Mechanical Pad
3,286.00
226
Equipment Pad Modifications @ Screw Press
5,130.00
227
Footing Elevation @ Filter Support Bldg. Tank Farm
2,098.00
228
Relocation of Cell D Transfer Structure
5,162.00
229
Pipe Elevations & Drainage Swale @ Polishing Wetlands
1,938.00
230
Farm House: Plywood Cover @ Back Entry
756.00
231
Methane Digester construction joint location & piping
1,057.00
232
Ops Bldg: Icemaker Legs
893.00
233
Acid Digester: Overflow Piping Modifications
1,727.00
234
West Cluster: Sitework & Grading Change
277.00
235
Ops Bldg: Future access control conduit stub -outs
1,720.00
17
CCD #
Description
Amount
236
Ops Bldg: Interior lights & furring strips
2,292.00
237
Potholinq & Excavation existing utilities @ CCB
42,606.00
238
Replace Farmhouse Roof
34,194.00
239
SCADA: TWAS sump level set points
1,682.00
240
CCB: Relocation of Ammonia Tank
17,176.00
241
Add wire way in PLC 6 @ Existing Chemical Storage Bldg.
1,775.00
242
Replace Landscaping on Kaiser Property
2,690.00
243
Electrical Modifications @ UV Bldg.
47,188.00
244
Headworks: Rebar Detail @ Channel Wall Ends
1,625.00
245
Rebar @ Screw Press Bldg. Slab Extension
1,625.00
246
Tertiary Filter: 12 Inch Inlet Line
17,248.00
247
Ops: Modifications to Fume Hoods
(490,001
248
Ops: Addition of Compressed Air @ Laboratory
22,641.00
249
Ops: Training Room Modifications
8,494.00
250
Emergency Repair Kit Deletion
(557 00)
251
Increase Cover Over 14 inch Foul Air Line
1,972.00
252
Headworks: Epoxy Coat Rebar @ Block-outs
20,579.00
253
Relocation of Mezzanine Column @ Screw Press
3,225.00
254
Additional Rebar @ Oxidation Ditch
1,348.00
255
Pipe Class Acid Gas & Methane Gas Pipe
6.089 o(1)
256
Modifications to the Potable Water System
105,856.00
257
Thickening Bldg piping modifications
764.00
258
Catch Basin grating modification Co_) W Access Rd. culvert
4,950.00
259
Headworks FRP grating support @ Gate location
2,219.00
260
Digested Sludge Storage Tank: Piping Modifications
4,828.00
261
Modifications to Analyzer Enclosures
9,315.00
262
Additional Conduits & Wires Miscellaneous Areas
41,620.00
263
Planting modification @ West Access Rd.
2,328.00
264
Install Clapper Rail Trail Gate
2,687.00
265
Amphitheater seating next to Polishing Wetland Cell D
29,577.00
266
Ferrous Chloride- revised electrical & pump pad
24,552.00
267
Chip Down Top of Wall @ Filter Support
3,411.00
268
Conduits for Future Mixer @ CCB
11,320.00
269
Modifications for Interfacing between PLC 6 and PLC 11
5,800.00
270
Headworks Deck Slab Falsework
26,026.00
271
Dewatering of Pond 8
20,157.00
272
Pressure Gauges @ Wetlands Pump Station
4,110.00
273
Irrigation Changes @ Point of Connection
24,050.00
274
Filter Support: 4" chemical drain elevation
872.00
275
Unknown Utilities @ Site Entrance
4,205.00
276
Mitigated Wetland Planting
('1,30900)
277
Changes & Additions to 3W System @ Ox Ditches
34,716.00
278
Garbage Bin Structure
25,644.00
279
Relocate Veolia Materials @ CCB
788.00
280
Wetlands PS Portable Eyewash Station
5,217.00
281
Temporary Irrigation Connection to Schollenberger
2,255.00
282
Partial Deletion of Planting @ Polishing Wetlands
(18,900,00)
283
Change NEMA Rating for Pull Boxes @ Ox Ditches
(10, 726.0W
19
(Days)
cco #
Description
Amount (Days)
284
Delete Trail Material W Polishing Wetland Cell D
� 7 1t,5 Ufy
285
Equipment Pad Modifications @ CCB Bldg.
26,412.00
286
Parapet Detail @ Ops Bldg Lobby
18,746.00
287
Relocate Potable Water Riser @ 1 W Pump Station
3,299.00
288
Dewatering Pond 7 for TW IS
14,419.00
289
Additional work for Farmhouse Roof Replacement
41,819.00
290
Material for Clay Liner in RWSB
13,820.00
291
Ops Bldg 1 hr Fire Rating
40,885.00
292
Maintenance Bldg: 2hr Fire Rating
1,282.00
293
Relocate Tie -In to Potable Water Sys @ Cypress Dr.
8,042.00
294
Changes to Gates & Operators @ W Access Rd.
18 38,1 00t
295
Ellis Creek Clean Up
8,395.00
296
Analog Input Module for PLC 11
2,766.00
297
Addition of the Polishing Wetlands Pump Station
415,000.00
298
Natural Gas Connection & Metering Pad
18,435.00
299
Additional Digital Input Points PLC 9
2,335.00
300
Weather Monitoring Station
24,976.00
301
Modifications for future Polishing Wetlands Pump Station
16,899.00
302
Addition of Geofabric @ East Access Rd. Ponds
8,740.00
303
Outlet Cutouts in Backsplash @ Ops Laboratory
1,908.00
304
Ops Bldg: Exhaust Fan Drainlines
7,662.00
305
PVC pipe for Plant Drain Piping
0,36, 001
306
Drainage Swale @ W Access Rd.
t 500 (10)
307
UV Stair Grating Changes
(3,1 i'I 001
308
UV Channel Blockouts for Wireways
0; 849 00
309
CCB: Welding of 42' Pipe Connections
27,142.00
310
Trail Connection @ Schollenberger Park
13,167.00
311
Waste Gas Flare Pedestal
2,366.00
312
Relocation of cabinets in Ops Bldg.
753.00
313
Support for folding Partition in Ops Bldg.
830.00
314
Deepen Fuel Sump @ Generator
3,855.00
315
Operation Bldg: Fire Sprinkler Riser
25,728.00
316
Glass Lined Ductile Iron Pipe
97,613.00
317
Wetlands PS Mixer Mounting Bracket
1,798.00
318
Uninterruptible Power Supply @ Ops Bldg.
24,754.00
319
Clarifier 1 & 2 Light Post Mounting
3,060.00
320
Transformer Relocation @ Existing CCB
6,187.00
321
Ops Bldg: Mudroom Skylight Framing
5,192.00
322
Wetlands Pump Station Interim Milestone
0.00
323
Analyzer Enclosure @ Outfall Structure
11,080.00
324
Additional Grating @ Biofilter Damper Boxes
2,747.00
325
Additional Valves for Hydronic System
762.00
326
Modifications @ Flow Control Structure C-2
(2,1591 00 )
327
Change Manhole & Catch Basin Elevation @ South Cluster
1,923.00
328
Modifications to the Existing Outfall Structure
12,254.00
329
Anti Graffiti Coating @ Garbage Bin Structure
2,389.00
330
Instrumentation and Control Modifications @ Existing Plant
58,658.00
19
CCO #
Description
Amount (Days)
331
Miscellaneous Extra Work @ Junction Box No. 2
49,264.00
332
Miscellaneous Extra Work @ Existing CCB
12,655.00
333
Paint Flashings and install Spark Arrestor @ Farmhouse
2,860.00
334
Temperature Detection for Recycled Water Pumps
19,598.00
335
Raise Top of Electrical Pull Box @ Headworks
3,391.00
336
Modifications to Biosolids Load -out @ Screw Press Bldg.
266,077.00
339
Reverse Service Generator Plug
4,699.00
340
Submersible Sump Pump Control Panels
2,445.00
341
Flow Meter Transmitters @ WPS
1,597.00
342
Additional Fence & Gate @ Existing Farmhouse
5,299.00
343
Install pressure gauge @ Tertiary Filter Hypochlorite panel
1,684.00
344
Widen Sidewalk @ Filter Support Bldg.
821.00
345
Anti Graffiti Coating @ W Access Rd. Public Restroom
3,920.00
346
Screw Press Parapet Wall Height
2,658.00
347
Handrail Installation @ Ox Ditch Weir Gates
7,798.00
348
Bond and Insurance Over -Billing
(66,172 00)
349
Drains for AC Unit & Backflow Preventers @ Ops Bldg
2,185.00
350
Delete wires @ Headworks & add wires @ PW FSS
0.00
351
Added Sample & Drain Lines @ JB 2
4,127.00
352
Additional Blackout Shades @ Ops Bldg.
885.00
353
Relocation of Drain Lines @ Biosolids Load -out Slab
10,201.00
354
Deletetion of Vinyl Coating- chemical pump pad @ CCB
0.481 Opt
355
Ferrous Chloride Line Encasement under Equip Pad
2,608.00
356
Power Supply to Current Tranducers @ Ox Ditches
3,999.00
357
Level Switches @ RWPS
5,081.00
CHANGE ORDER TOTAL: 3,989,347.00 87
Contract Amount: 110,329,000.00 1278
Percent Change Orders: 3.62%
Totals: 114,318,347.00 1345
Total Additive Change Orders 4.978,076.00
Percentage of Contract Amount 4,51%
Total Credit Change Orders (988,729.00)
Percentage of Contract Amount 0.90%
Contract Substantial Completion Date 4/9/09
Current Substantial Completion Date 6/15/09
20
I
0
75
co
CD
0
E
0
z
I
Pi
ry
5 A z
Pl.
I
0
75
co
CD
0
E
0
z
I
Pi
ry
} \ } > \
§\i\
43,22
�
((\§
§\
■�«``2!
■t!:
(\(®\\§\
} \ } > \
§\i\
((\§
§\
■�«``2!
■t!:
�Q
g
w
c.
4h
P
8
�
A
�
� 1
� 1
V"
3.
q
w
s
o
y
g�
«Ig
C'
Iwo
lio
M O,
4
U
9
v
Y
Y i
Q
4184
}i Y �� llA cl fiyW�
a
N ;j _
w fn a
v
ME
D
+ci's 3 A
t6
i'
z z
414 3:
c.