CONSTRUCTION MANAGEMENT
PROGRESS REPORT No. 41
February 2009
April 6, 2009
PARTICIPANTS
Owner: City of Petaluma
Mike Ban
11 English Street
Director
Petaluma, CA 94952
(707) 778-4487
Margaret Orr
Engineering Manager
(707)778-4589
Contractor: Kiewit Pacific Co.
Clint Cole
5000 Marsh Drive
Project Manager
Concord, CA 94520
(925) 516-4600
Design Engineer: Carollo Engineers
Tom Patten
2700 Ygnacio Valley Rd, Suite 300
Principal
Walnut Creek, CA 94598
(925) 932-1710
Doug Wing
Design Engineer
(925)299-6733
Environmental ESA Jim O'Toole
Management: 8950 Cal Center Drive, Bldg 3, Suite 300 Project Engineer
Sacramento, CA 95826 (707) 795-0900
Jennifer Garrison
Environmental Manager
(916)564-4500
Programmer: AreSine engineering Doug McHaney
970 Executive Way Project Manager
Redding, CA 96002 (530) 222-7204
Steve Stewart
Lead Programmer
(530)2.22-7204
Construction The Covello Group Bruce Presser
Manager: 1660 Olympic Blvd, Suite 300 Principal
Walnut Creek, CA 94596 (925) 933-2300
Ken Sinclair
Construction Manager
(925)260-2943
Ed O'Brien
Field Engineer
(925) 382-1246
[- -,- SUMMARY OF CONSTRUCTION STATUS
• Contractor: KIEW1[T PACIFIC CONSTRUCTION
Base Contract Amount (Total Project).. ......... ---S 110,329,000,00
Change Orders Executed ........ ........... ............ -- ... —.- $ 4,160,826.00
Total Contract Cost ..................... ........ ......... .... . $ 114,489,826.00
Contract Amount Earned ................................................... $ 112,712.355.00
Progress Payment for February 2009 (excludes retention) ........... $ 300,383,00
Previous Progress Payments (excludes retention)...................... $ 101,441,119.00
Estimated Percent Complete... . . ...... ....... _ .... __ ........ ..... 98.4%
• Design Engineer: Carollo Engineers
Authorized Budget (Total Project) ..... ............ ........ $ 4,354,075.00
Billings to Date.... .... ....... — ... ...... ...... ......... ... — $ 4,249,724.62
• Environmental Manager: ESA
Authorized Budget (Total Project).. ...... ---- ...... -- .......... $
Billingsto Date ......................................... .... — ... ....... --$
0 ArcSine engineering
Authorized Budget (Total Project) .................. $
Billings to Date, .... ............... — ................. .......... ..... $
• Construction Manager: The COVELLO GROUP, Inc.
1,434,830.00
1,142,152.16
2,340,951.00
2,119,833.80
Authorized Budget (Total Project) ............... ...... ................ $ 10,231,509.00
Billings to Date .......... .............. ............... ................... —$ 8,581,427.38
3
Schedule
Notice to Proceed ............................... ................................ ...... October 10, 2005
Base Contract Duration. .............. — ...... -- ............. 1278 consecutive days
Original Completion Date ....... —,- ..... ...... - ............................................... April 9, 2009
Time Extension Authorized ....... -- ... -- ............. ...... ........... .......... ....... ... 67 days
Revised Duration ......... -- ............... --- .... ........... .... . ..... -- 1345 consecutive days
Revised Completion Date... .............. ....................... .............. ..... June 15, 2009
Weather Days (included in base duration) ..........................................................40 days
Weather Days Expended (included in time expended)....................................... 82 days
TimeExpended ..... ......................................... ................... 1237 Days
Percent Time Expended ........... ......... ................................... ........................... . 92%
4
Construction Manager's Summary
1. Schedule
The project remains on schedule for completion in June 2009.
2. Work Progress
Oxidation Ditches
The facility is in operation. The process test continued throughout the month.
Secondary Clarifiers
The facility is in operation. The process test continued throughout the month.
Main Electrical Building
No work was completed at this facility.
Headworks Facility
The facility is in operation. The process test continued throughout the month.
Screw Press Building
Work continued on pulling, terminating and testing of the wiring in the building.
Methane Digester
The digester was filled with water in preparation for testing of the facility. Insulation was
installed on the exposed piping.
Acid Digester
Installation of the insulation on the piping and equipment at the acid digester equipment
pad was completed. The acid digester was filled with water in preparation for testing of
the facility
Boiler Building
Preliminary start-up activities and check out of the installed equipment was completed
during the month
Thickener Building
The factory technician for the gravity belt thickener completed initial start up activities
on the equipment. The vendor for the thickened waste activated sludge pumps started up
those pumps.
Biofilter
The biofilters are in operation.
Operations and Maintenance Building
Completion of punch -list activities continued.
Filter Support
Testing continued in this structure in preparation for start up of the filters. The
operational test was performed during the month.
Tertiary Filters
Sand was added to the filters in February. Atler the sand was installed and washed, the
operational test for this facility was completed.
UV Disinfection
The operational test was completed during February.
Recycled Water Pump Station
This facility has been put into operation.
Wetlands Planting
This area has been planted with seeds from wetland plants. This spring, these plants
should begin to grow.
Site Landscaping
The installation of the plants in the area south of the headworks and thickener building
area continued though out the month as weather allowed.
Planting of trees was continued along the west entry road.
Polishing Wetlands
Punchlist activities were completed in the polishing wetlands as weather allowed. Clean
up work on the levee roads and trails continued throughout the month.
Existing Chlorine Contact Basin
The weather station installed on the building at the chlorine contact basin was put into
service. The rain gauge is not correctly functioning but the other components of the
station are operational
3. Contract Changes
Five change orders were processed in February with a total value of $5,038,00. Three
hundred seventy change orders have been executed to date with a combined value of
$4,160,826.00, No change orders greater than $10,000 were executed this month.
The Contractor continues to negotiate change order pricing however, they have asked that
all change orders be issued unilaterally.
4. Field Orders
Seven new field orders were prepared in February. Two -hundred fifty eight field orders
have been prepared for the project. Of those, one hundred nineteen remain active with a
total estimated value of $939,656.00. Active field orders for general changes greater than
$10,000 areas follows:
FO
No. Description Amount
76 Concrete Hand Holes at Light Bases
$15,456.00 l
88 RWPS: Truck Fill Station
$11,354.00
106 CCB: Addition of Drain Vault Float and Clarification on Heat Trace Controller (
$15,000.00
110 Handrail at Oxidation Ditch 1 and 2 North Bull nose
$10,000.00
111 Handrail Post Pockets at Headwork$ i
$25,000.00
113 HVAC Modifications at Filter Support, Thickener & Screw Press
$10.000.00 1
117
Modify Solids Handling Slab
! $22,000.00
134
CCB Wash down System
$50,000.00
142
Housekeeping Pads for Pump LCP's at Filter Support
{ $12,615.00
145
Existing CCB Piping Modifications
$301000.00
173
) Ops Bldg: Canopy Hood Single Speed Motors
$101000.00
175
Water Meter Box Modifications — Locations and Valves
$11,641.00
177
Level Switches at RWPS Cans
$15,000.00
182
Additional Grading at RWSB — Build Up Petals
$20,000.00
183
Waste Gas Flare Modifications
( $15,000.00
200
CCB Pavinq/Gradinq Modifications
$40,000.00
201
{ West Access Road Sidewalk Demolition
$10,000.00
202
RWPS 3W Supply Modifications
$10,000.00
204
1 Entry Road Sidewalks
$40,000.00
207
West Access Road — Entrance Conduit Protection
$12,000.00
216
( Life Ring Cabinets
$10,000.00
221
Motor Operated Gates in Fences
$10,000.00
225
East Flood Protection Berm
$75,000.00
233
Headworks Barscreen Enclosure Gas Monitoring
$20,000.00
237
1 W/2W Pump Station Air Gap Tank Coating
$10,000.00
239
Light Pole and Enclosure Grounding
$20,000.00
240
Motor Control Wiring Modifications
$20,000.00
242
Screw Press: Power Supply for LCP-17SPR001
$2,500.00
248
Replacement of Rotometers damaged due to freezing
$14,000.00
Total Active Field Orders a $10,000
$328,090.00
5. 'Testing
Testing of the filters, filter support building and the UV facility was started during the
month.
6. Anticipated Work for Next Month
Strategy field-testing to confirm the operation of the control programming is scheduled to
be started in the solids handling area, Functional testing of some facilities in this portion
of the plant will begin in March.
The boiler will be started and the hot water system used to heat the methane digester will
be tested. If the system testing is successful, the methane digester will be heated to the
operational range.
At the screwpress building, the piping for the load out facility will continue. Much of the
remaining work is electrical.
Landscaping work will continue throughout the site.
SUBMITTAL STATUS
FIELD ORDERS
Total Cost of
Total February Active Active Orders
Field Orders Issued 258 7 119 $939,650.00
CHANGE ORDER SUMMARY
Total February
Value of Change Orders Executed in February 5 $5,038.00
Value of Change Orders Executed to Date 370 $4,160,826,00
Percent to Date of Original Contract 3.77%
Days
Base Contract Allowance 40
Weather Related Days in January 0
Weather Related Days to Date R2
8
Received
To Date
February
Returned
Pending
First Time Shop Drawing Submittals
908
2
907
1
Request for Information
1555
5
1552
3
C. M. Request for Information
270
4
267
3
FIELD ORDERS
Total Cost of
Total February Active Active Orders
Field Orders Issued 258 7 119 $939,650.00
CHANGE ORDER SUMMARY
Total February
Value of Change Orders Executed in February 5 $5,038.00
Value of Change Orders Executed to Date 370 $4,160,826,00
Percent to Date of Original Contract 3.77%
Days
Base Contract Allowance 40
Weather Related Days in January 0
Weather Related Days to Date R2
8
..t, * mducb m5mationneson
Sludge Storage
0
Mass Electricians work on the pulling of wire to the equipment panels and
instrumentation a# t�b,. �.
_ . ,, u W W,, 4 w M.
10
Ellis Creek Water Recycling Facility
CONTRACT CHANGE ORDER TRACKING SHEET
1 CCO # Description
1 Time extension for additional soil sampling
2 Lime treatment at Ox Ditch & Secondary Clarifiers
3 Board up Farmhouse
4 Hay Stacker Relocation
5 Terrorism Insurance and Increased Earthwork
6 Meter in Temporary Recycled Water Pipeline
7 Temporary Power for Pond 1 Aerators
8 Pavement Repair on Cypress and McDowell
9 Conduit Encasement Coloring Agent
10 Delayed Caltrans Encroachment Permit
11 Trench Cut -Off Walls
12 Horizontal Aerators Extended Warranty Testing
13 Deletion of Prime Coat under AC Pavement
14 Replace PVC Schad. 40 with EB 20 Conduit in DB
15 Delete Lakeville Highway Access
16 Contract Time Extension for Weather Days 03-04/06
17 Change Valve Types
18 Replace EMT conduits by MC cable @ O&M Bldg
19 Inverter Duty Motors at Oxidation Ditch Aerators
20 Aerated Lagoon and Pond 1 Modifications Milestone
21 Additional Striping and Loops on McDowell
22 Catch Basins Invert Changes
23 Oxidation Ditch Sump Modifications
24 Change Buried Conduits PVC GRS to PVC Sch. 40
25 Temporary Power to Existing Aerators 4 and 7
26 O&M Bldg: Ceiling & Wall Heights Rms
27 Provide Portable Generator Pads at Ponds
28 FS Bldg: Extend Conduit Stub -ups Beyond Ductbank
29 Headworks: Handrail Extension to Complete Deck
30 Pond 4 Aerator Temp Power
31 Aerated Lagoon: Reconnecting of Aerator No. 2
32 Unknown Utility at Pond 1 North Side
33 Ductbank Encasement with Reinforcing
34 Gun Safe for Storage of Bid Documents
35 S&C Pad Mounted Switch Additions
36 Permanent Power Supply for Pond 1 Aerators
37 Temporary Fire Hose
11
Amount
OAO
125,OOQ.00
3,385.00
493.00
0.00
3,023.00
1,270.00
419,681.00
(47,000.00)
16.723.00
(18.600.00)
0.00
(29,700.00)
(21,774.00)
40,000.00
0.00
0.00
(14,777.00)
16,466.00
0.00
13,747.00
(9,9947.00)
(7.750.00)
(213,038.00)
7,956.00
4,287.00
2,554.00
9,190.00
1,254.00
883.00
537.00
855.00
24,884.00
2,410.00
75,200.00
98,000.00
851,00
Time
(Days)
8
m
CCO # ffI Description
38 Change material for Temporary Debris Collector
39 Chemical Tank Pads @a Filter Support Bldg
40 Disconnect Aerator No. 2 & reconnect Pond 4 Aerators
41 ( Delete Steel Steps in Manholes
42 Add 4" Butterfly Valve in Acid Digester
43 Delete Pre -Action Fire System P Main Elect, Bldg
44 Headworks Influent Box Modifications
45 Transformer Pad at Restroom
46 Addition of Construction Joint at Oxidation Ditch Slabs
47 Change Conduits from PVC Rigid Steel to PVC Sch. 40
48 Reader Board & Geogrid placement (a) Cypress/McDowell
49 Plant Control System PLC Architecture
50 Grit Pump Room Sump Pump Modification
51 PLC Enclosure Size for PLCs 2, 3 and 8
52 Additional Time Switches at O&M Bldg.
53 Extension for Pond 1 Aerators Milestone Date
54 Levee Repair at Berm Existing Ponds 8 & 9
55 Operations Bldg. Maintenance Window
56 In -Plant Pump Station Wall Penetration Details
57 Aliqnment of 42" RSG tine to Headworks
58 Revision of Structural Joints at Headworks Facility
59 Pond 9 & 10 Levee Pothole
60 ( Add pipe for Future Pump Can (a) RWPS
61 Home Inspection of Farm House
62 Alignment of 42" PWE line to Gell D Transfer Structure
63 Delete Locks on Motor Operated Overhead Coiling Doors
64 Dewatering of Pond 8 and Mitigated Wetland
65 UV System Proaramminq
66 Septic Tank Removal at Farm House
67 Changes to Slide and Sluice Gates
68 PLC System Material for C Street Pump Station
69 PLC - 10 Analog Input Module
70 Change Storm Drain Pipe from RCP to CHDPE
71 Deletion of CMU Coating on non -occupied structures
72 Existing Utilities at West Access Road Entrance
73 Change Handrail for Polishing Wetlands Structures
74 Change SDR for HDPE Pipe Lines
75 Addition of waterstop in wall ( Filter Support Bldg.
76 Delete waterstop & starter walls @ HW, RAS PS, UV
77 Re -Power Pond Aerators, Reconnect Aerated Lagoon
78 Contract Time extension for Weather Days 10/2006
12
Time
Amount (Days)
(36,150.00}
4,425.00
607.00
(19.092.00)
1,189.00
(19,24Z00)
3,000.00
9,498.00
23,505.00
(21,912.00)
6,000.00
(6.118.00)
1,326.00
5,446.00
2,722.00
0.00
289,279.00
1,022.00
2,807.00
4,208.00
5,628.00
1,400.00
6,316.00
746.00
8,171.00
(383.00)
3,488.00
2,777.00
739.00
11,177.00
14,915.00 }
1,873.00
(72,:39&00)
(2,538.00)
8,543.00
6,965.00
(52,415,00)
1,330.00
(4,206.00)
3,718.00
0.00 1
CCO # ( Description
79 Deletion of waterstop and starter walls at Tertiary Filters
80 Add waterstop at Grit Pump Area of Headworks Structure
81 Fuel Tank Removal at Farmhouse
82 Revised Anchorage for Oxidation Ditch Aerators
83 ( Deletion of Integrated System Shop Testing (ISST)
84 Additional Dowels at Maintenance Bldg.
85 Replace Fuses at MCC 3A after PG&E power spike
86 Remove and replace disconnect switch (? Aerated Lagoon
87 Lower Invert Elevation for 42" RSG Line
88 ( Addition of Roof Hatch (a? Main Electrical Bldg.
89 Filter Support Bldg: NG Connections and Valvinq
90 Chain Link Fence addition A Farmhouse
91 Repair Irrigation Lines @ Kaiser
92 Demo of Spillway at Pond 10
93 Curb and Grading (ci) Filter Support Bldg
94 Irrigation System: Concrete Valve Boxes
95 Contract time extension for Weather Days 11106
96 I Mitigation Wetlands Drain
97 Additional vinyl sheets for Levee Repair (a? berm Pond 8 & 9
98 Shoring @ Naval Trail
99 Extra excavation a(), W Access Rd. for 12" 1W line
100 Replace SBS line (cD Chlorine Contact Basin
101 Brush clearing at Farm House
102 Relocate standby Generator (o) CCB
103 Drywall Furring () Elect Rm #2 in O&M Bldg.
104 Equipment for MCC -3 retrofit
105 ( Perimeter lighting switching (a) Main Elec. Bldg.
106 Wiring for Time -Off Relay () Wetlands Elec Bldg.
107 Changes to SCADA interface Boiler & PLC 3
108 Disposal of existing MCC 3 transformer
109 Contract time extension for Weather Days 12106
110 Tree removal (a,) W Access Rd.
111 Deepening Pull Boxes (@ Ox Ditch MCC Bldg.
112 Rebar modification (a) Wetlands Pump St Deck Beam
113 Electrical Equipment Pads
114 Delete Catch Basins at W Access Rd.
115 Naval Bldg Lookout Area
116 I Changes to TWE and PWE lines
117 Polishing Wetlands FSS: Add Hand Switch
118 Engineering of Anchorage (a) Oxidation Ditch Aerators
119 Replace Oxygen Probes (a) Aerated Lagoon/Pond 1
13
Amount
(1,384.00)
6,167.00
2,972.00
40,941.00
0.00
914.00
1,706.00
2,919.00
18,726.00
3,195.00
1,361.00
725.00
1,186.00
12,109.00
0.00
2,393.00
0.00
4,370.00
5,498.00
21,271.00
8,008.00
5,936.00
5,209.00
2,005.00
1,630.00
25,360.00
1,795.00
2,282.00
3,549.00
2,141.00 0.00
1,41.00
11,540.00
2,187.00
9,018.00
1,746.00
3,000.00
0.00
3,444.00
(20,089.00)
13,411.00
Time
(Days)
5
7
14
Time j
CCO #
Description
Amount
(Days) !
120
Change Piping Material for Deionized Water Service
0.00 I
121
Filter Support Bldg: Relocation of 1W Line
4,568.00
122
Security Lighting at Farmhouse
1,200.00
123
Disposal of Asbestos Containing Pipe
2,087.00
124
tt
I Investigation and Disposal of FAA Building
20,512.00
125
Conduit addition @ Boiler Bldg.
15,780.00
126
O&M Bldg: Exhaust fans power supply & controls
34,440.00
127
Addition of Disconnect Switches @ Headworks
25,143.00
128
{
1 Level Transmitter (Headworks
addition
23,058.00
129
Contract Time extension Weather Days 01-02/07
7
130
Subgrade Improve & Pipe Encasement @ W Access Rd.
12,128.00
131
Additional Conduit for Fuel Leak Detection
2,714.00
f
132
HVAC Enclosure Modifications @ Ops Bldg,
8,014.00
133
Wiring of Spare I/Os
45,713.00
134
PLC Enclosure Size for PLC 5
7,823.00
135
Partial Payment for PLC Enclosures
0.00
136
Trench Backfill with Native Material
(72,000,00)
137
UV Blda Top Slab Modifications
14,000.00
I
138
Ops Bldg: HVAC Electrical & Mechanical Modifications
2,854.00
139
24" Pumped Storm Drain Line Coverage
30,000.00
j
140
Metal Siding (a') Main Electrical Bldg. (
5,071.00
141
Contract Time Extension for Weather Days April 2007 (
1
142
Ops: Relocate HVAC duct transition (a) Locker Rm Ceiling
878.00
143
Use of Native Material for backfill @ North & Middle Cluster (
{80,000.00)
144
{{
i Recycled Water Storage Basin Size Increase I
220,867.00
145
Outlet conduit replacement P Existing CCB
1,260.00
146
Modify Rebar Expansion Joints (a) Thickener Bldg
1,610.00
147
Modify Grating Seat (a) Headworks Beam B-13
1,737.00
,
148
( Added Space Heater for PLC 8 RIO 1
-
1,803.00
149
( Additional G2 Light Fixture @ Ops Bldg Lobby
2,013.00
150
Connection Grounding Bldg rebar (a) MCC HW Bldg.
974.00
151
Relocate supply line fire riser @ maintenance Bldg.
3,027.00
152
Pipe material for 36" mixed liquor line A 2ndary Clarifiers
14,271.00
153
Modifications HVAC Pads
9,562.00
154
Mod per PG&E Requiremnts to Main Power Supply
19,886.00
155
Addition of Wali Sleeves at Thickener Building I
847.00
156
Reduce Deck Slab Openings @ Wetlands Pump Station
782.00
157
Wali Supports for Pony Wall at Laboratory
2,162.00
158
Concrete Encase HCS pipeline @ Headworks Structure
2,393.00
159
Convert Conference Rm into 2 Offices @ Dos Bldg.
8,351.00
160
Concrete Backfill around Screw Press Equipment Trench E
1,588.00
14
Time
CCO #
Description
AmountiDays)
I 161
Expansion Joint Rebar (a) Headworks Grid Line 10
1,151.00
162
Standby Generator Connection @ Wetlands PS
13,527.00
163
Deletion of Rotameters @ Tertiary Filters
(1,0"74.00) j
164
Blockouts for Ox Ditch Aerator Anchorage
1,022.00
j 165
Concrete Encase SD pipe under HWE pipeline @ HW
1,657.00
166
Temporary Power for Transformer (a) Aerated Lagoon
28,343.00
167
Rebar @ Headworks Manual Bar Screen Embed
756.00
168
Subgrade Improvement for Wetlands PS Apron Slab
11,799.00
169
Screw Press Bldg Skylight Size Change
3,465.00
170
Additional 1/0 from Power Panel to PLC -9
2,887.00
171
I Standby pump (a) existing CCB during work @ Pond 10
44,000.00 j
I 172
Billing for Potable Water Usage on site through 414107
1,552.00
173
Upgrade starters for Ox Ditch Aerator Motors
78,373.00
174
ii
I Blind flanges for future effluent line @ Aerated Lagoon
11,709.00
I 175
Remove rebar @ Ox Ditch Aerator Motor Block-outs
3,000.00
176
Modification of controls for Tertiary Effluent Bypass Valves
(3,075.00)
177
I Communication between PLC & Thickener PLC
-8
2,032.00
178
Automated 1W Valve @ Recycled Water Storage Basin
46,267.00
179
Modification to HW Bar Screen Channels
6,130.00
180
Relocate Fire Pump Can @ RWPS
4,613.00
181
Add Effluent Conductivity Probe (a? JB No. 2
1 9,680.00
182
Revise DB Routing @ Ferrous Chloride Area
Ij 2,463.00
183
Ventilation Alarms @ Boiler Bldg & Thickener Bldg
j 20,526.00 1
184
Anti Graffiti Coating @ O&M Bldg and Sound Wall
I 28,736.00
185
Deletion of Louvers @ HW Bar Screen Enclosures
( (1.374.00)
186
Deletion of Combination Smoke Fire Dampers
(18,005,00) I
187
Fire Rating Janitor Closet Door @ Ops
1,841.00
188
Brush clearing @ Farm House fire season 2007
3,186.00 I
189
( Ops: CMU alignment & wall cap @ HVAC enclosure
1,826.00 1
190
Ops: addition acoustical ceiling @ electrical rm #1
3,125.00
191
Ops: framing details for Lobby
2,163.00
192
RWPS: modified floor drainage
15,107.00 1
193
Ops: beam seats in CMU wall pockets
10,067.00
194
I
C Recycled Water Storage Basin Berm Modifications
195
Double Containment System Modifications
(2.595.00)
90,172.00 1
I 196
Site Security Lighting Estimation Cost
10,364.00
{ 197
Grading aa) Mitigation Wetlands & RWSB
27,012.00 1
198
PG&E power connection @ W Access Rd.
55,335.00
199
UV Disinfection Light Pole Mounting Detail
7,027.00
200
Ox Ditch Light Pole Mounting Detail
8,852.00 I
201
Existing CCB: power to New Chemical Metering Pump
8,588.00 1
15
9
Times
CCO #
Description
Amount (Day
202
Screw Press grating @ Flocculation Tank Opening
1,969.00
203
Anchorage of Diffuser Pipe Ponds 9 & 10
32,659.00
204
Acid Digester changed detail wail penetrations
4,286.00
I 205
Existing LPN panel in chemical bldg.
2,576.00
206
Revised Details @ RWSB
20,881 A0
207
( Ops: Deletion of Closet in Control Room
(932.00)
208
Ultrasonic level sensor mount @ Headworks
1,208.00
209
Mitigation Wetlands Drain — Permanent installation
75,048.00 ,
210
Ops Bldg: Plumbing Dwas
29,571.00
211
Ops: Deletion of decking @ Mechanical Chases
1,719.00 ,
1,696.00
212
Headworks: channel floor rebar modification
213
Ops: Furring Men's Restroom Urinal Wall
740.00
214
informational Kiosks: Addition of 2" FVC 40 Pipe Sleeve
2,560.00
215
Screw Press: Modifications to Understab Piping
2,607.00
216
Below Grading Coatings
72,507.00
217
Aerated Lagoon: Unknow utility @ 20" URW Alignment
5,225.00
218
Ops Bldg: Additional Window Clips
3,194.00
219
Silt Fence Repair
1,209.00
220
Ops Bldg: control rm. Backing & wood blocking
2,185.00
221
Ops Bldg: Modifying Welding Studs to 118" Tubing
5,293.00
222
Pond 10 Apron Slab: Over Ex, Fabric, and Rock
3,870.00
223
Addition of Solenoid Valve @ Recycled Water Surge Tank
5,095.00 ,
224
Thickening Walls @ Ox Ditch Aerator Shafts
11,286.00
225
Relocate Receptacles @ Biofilter Mechanical Pad
3,286.00
226
Equipment Pad Modifications @ Screw Press
5,130.00 ,
227
Footing Elevation @ Filter Support Bldg. Tank Farm
2,098.00
228
Relocation of Cell D Transfer Structure
5,162.00
229
Pipe Elevations & Drainage Swale @ Polishing Wetlands
1,938.00
230
Farm House: Plywood Cover @ Back Entry
756.00
231
Methane Digester construction ioint location & piping
1,057.00
232
Ops Bldg: Icemaker Legs
893.00
j 233
1 Acid Digester. Overflow Piping Modifications
1,727.00
234
West Cluster: Sitework & Grading Change
277.00
235
Ops Bldg: Future access control conduit stub -outs
1,720.00
236
Ops Bldg: Interior lights & furring strips
2,292.00 ,
237
Potholing & Excavation existing utilities @ CCB
42,606.00
1 238
Replace Farmhouse Roof
34,194.00
239
SCADA: TWAS sump level set points
1,682.00
240
CCB: Relocation of Ammonia Tank
17,176.00 ,
241
Add wire way in PLC 6 @ Existing Chemical Storage Bldg.
1,775.00 !
2,690.00
( 242
Replace Landscaping on Kaiser Property
16
9
17
Time
CCQ#
Description
/ Annamek (Days)
243
Electrical &«nd/fiva§nno@UVBldg.
47.188.00
244
Heodwurku: Reber Detail QChannel Wall Ends
1.626.00
245
Reber @ Screw Press Bldg. Slab Extension
1,625'00
240
Tertiary Fi|tvc12Inch Inlet Line
17,248.00
247
Ops: Modifications 10Fume Hoods
(490,00)
248
Ops: Addition ofCompressed Air @Laboratory
22.84100
249
Ops: Training Room Modifications
8,494.00
250
Emergency Repair Kit Deletion
|
| (_567,00)
251
Increase Cover Over 14inch Foul Air Line
1.872,00
252
Headworka:Epoxy Coat Rebar @ Block-outs
20,578.00
253
Relocation ofMezzanine Column P Screw Press
3,225.00
254
Additional Reber 0Oxidation Ditch
1,348.00
255
Pipe Class Acid Gas & Methane Gas Pipe
�'6,089.08)
256
Modifications b)the Potable Water System
105,858.00
257
Thickening Bldg piping modifications
764.00
258
Catch Basin grating modification @VVAccess Rd. culvert
4.950.00
258
HemdvmorkoFRP grating support @ Gate location
2,21880
260
Digested Sludge Storage Tank: Piping Modifications
4,828.00
201
Modifications tuAnalyzer Enclosures
9,315.00
262
Additional Conduits & Wires Miscellaneous Areas
41'820.00
283
Planting modification @ West Access Rd.
�
| 2,328.00
� 284
Install Clapper Rail Trail Gate
2,687.08
205
Amphitheater seating next toPolishing Wetland Cell D
29,577�00
�
� 266
Ferrous Chloride- revised electrical & pump pad
24,552.00
207
Chip Down Top ofWall @ Filter Support
3.411.00
268
Conduits for Future Mixer @CCB
11,320.00
| 289
0Wodifinotionnfor Interfacing between PLC 6and PLC 1i
6,800.00
|
| 270
8oadwvrknDeck Slab Falsewmrk
| / 28,026.80
|
| 271
Oevmab*hnqofPond 8
20157l0
|
| 272
Pressure Gauges @ Wetlands Pump Station
4`110.00
|
| 273
Irrigation Changes (d) Point of Connection
/
/ 24,050I0
|
\ 274
Filter Support: 4" chemical drain elevation
02.00
|
| 275
Unknown Utilities (a)Site Entrance
4,205J00
| 270
Mitigated Wetland Planting
(3130900)
277
Changes & Additions toJVVSystem (a)OxDitches
34,716.00
| 278
Garbage Bin Structure
23^64480
|
| 279
Relocate Voo|imMaterials (a) CCB
788.00
|
| 280
Wetlands PSPortable Eyewash Station
5,217.80
281
TemPoraryIrrigation Connection 1u5cho||enbarqer
| 2.255.00
|
| 282
Partial Deletion ofPlanting (a)Polishing Wetlands
|
| (18,808.00)
|
| 283
Change NEMA Rating for Pull Boxes @OxDitches
�
| (18726.00)
17
CCO #
Description
Amount
284
Delete Trail Materia€ W Polishing Wetland Cell D
(27.165.00)
285
Equipment Pad Modifications @ CCB Bldg.
26,412.00
286
Parapet Detail @ Ops Bldg Lobby
18,746.00
287
Relocate Potable Water Riser @ 1W Pump Station
3,299.00
288
Dewatering Pond 7 for TWIS
14,419.00
289
Additional work for Farmhouse Roof Replacement
41,819.00
290
Material for Clay Liner in RWSB
13,820.00
291
Ops Bldg ihr Fire Rating
40,885.00
292
Maintenance Bldg: 2hr Fire Rating
1,282.00
293
ff
i Relocate Tie -€n to Potable Water Sys @ Cypress Dr.
8,042.00
294
Changes to Gates & Operators (@ W Access Rd.
(8,884.00)
295
Ellis Creek Clean Up
8,395.00
296
Analog Input Module for PLC 11
2,766.00
297
Addition of the Polishing Wetlands Pump Station
415,000.00
298
Natural Gas Connection & Metering Pad
18,435.00
299
Additional Digital Input Points PLC 9
2,335.00
300
Weather Monitoring Station
24,976.00
301
Modifications for future Polishing Wetlands Pump Station
16,899.00
302
Addition of Geofabric (p) Access Rd. Ponds
8,740.00
303
Outlet Cutouts in Backspiash @ Ops Laboratory
1,908.00
304
Ops Bldg: Exhaust Fan Drainlines
7,662.00
305
PVC pipe for Plant Drain Piping
(4,357.00)
306
Drainage Swale @ W Access Rd.
(1,500.00)
307
( UV Stair Grating Changes
(3,111.00)
308
UV Channel Biockouts for Wireways
(6,849.00)
309
CCB: Welding of 42" Pipe Connections
27,142.00
310
Trail Connection @ Schollenberger Park
13,167.00
311
ii
Waste Gas Flare Pedestal
2,366.00
312
I Relocation of cabinets in Ops Bldg.
753.00
313
Support for folding Partition in Ops Bldg.
830.00
314
Deepen Fuel Sump @ Generator
3,855.00
315
Operation Bldg: Fire Sprinkler Riser
25,728.00
316
Glass Lined Ductile Iron Pipe
97,613,00
317
Wetlands PS Mixer Mounting Bracket
1,798.00
318
Uninterruptible Power Supply @ Ops Bldg.
24,754.00
319
Clarifier 1 & 2 Light Post Mounting
3,060.00
320
Transformer Relocation {a) Existing CCB
6,187.00
321
Ops Bldg: Mudroom Skylight Framing
5,192.00
322
Wetlands Pump Station interim Milestone
0.00
323
Analyzer Enclosure (a} Outfall Structure
11,080.00
324
Additional Grating (5) Biofi€ter Damper Boxes
2,747.00
18
Time
(Days)
Time
CCO #
Description
Amount (Days)
325
Additional Valves for Hydronic System
(
762.00
326
Modifications @ Flow Control Structure C-2
(2,591.00)
327
Change Manhole & Catch Basin Elevation @ South Cluster
1,923.00
328
Modifications to the Existing Outfall Structure
12,254,00
329
Anti Graffiti Coating @ Garbage Bin Structure
2,389.00
330
Instrumentation and Control Modifications @ Existing Plant
58,658,00 ,
331
Miscellaneous Extra Work @ Junction Box No. 2
49,264.00 I {1
332
Miscellaneous Extra Work @ Existing CCB
12,655.00 , 1
333
Paint Flashings and install Spark Arrestor (a) Farmhouse
2,860.00 G
334
Temperature Detection for Recycled Water Pumps
19,598.00
335
Raise Top of Electrical Pull Box @ Headworks
3,351.00
f 336
Modifications to Biosolids Load -out @ Screw Press Bldg.
266,077.00
337
Rerouting of Electrical Conduits @ Headworks Deck
46,510.00
338
Miscellaneous Instrumentation Modifications
5,366.00
339
Reverse Service Generator Plug
4,699,00 ,
340
Submersible Sump Pump Control Panels
2,445.00
341
Flow Meter Transmitters @ WPS
1,597.00
342
Additional Fence & Gate @ Existing Farmhouse
5.289.00
1 343
Install pressure gauge @ Tertiary Filter Hypochlorite panel
1,684.00
344
Widen Sidewalk @ Filter Support Bldg.
821.00
345
Anti Graffiti Coating @ W Access Rd. Public Restroom
3,920.00
346
Screw Press Parapet Wall Height
2,658.00
347
Handrail installation @ Ox Ditch Weir Gates
7,798,00
348
Bond and Insurance Over -Billing
(66,172.001 .
349
Drains for AC Unit & Backflow Preventers @ Ops Bldg
2,185.00
350
Delete wires @ Headworks & add wires @ PW FSS
0,00
351
Added Sample & Drain Lines @ JB 2
4,12700
352
Additional Blackout Shades @ Ops Bldg.
885.00
353
Relocation of Drain Lines @ Biosolids Load -out Slab
10,201.00
354
Deletetion of Vinyl Coating- chemical pump pad @ GCB
(3,481.00)
355
Ferrous Chloride Line Encasement under Equip Pad
2,608.00 ,
356
Power Supply to Current Tranducers @ Ox Ditches
3.999.00
357
Level Switches @ RWPS
5,081.00
358
Contract Milestones O&M Bldg Occupancy 1 SCADA Readiness
0.00
359
22" Foul Air Pipe Encasement
11,291.00 ,
360
Shoring @ JB 2
48,500.00
361
Dewatering @ JB 2
28,000.00
362
Analyzer Changes & Minor Changes to Instrument Index
23,495.00
363
Sprinkler Repair at West Entrance Road
1,585.00
364
Modification of Light Pole Bases @ Tertiary Filters
693.00
365
Stair Landing @ Tertiary Pump Station
( 1,001.00 ,
19
20
I
Time
CCO #
Description
Amount
(Days)
366
Acid Equipment Pad: Ferroud Chloride Line
1,207.00
367
RWPS Hydropneumaflc Tank Mechanical
1,543.00
i
2,448.00
368
Change Diffuser Ph)e Supports @ UV
369
Fire Alram System Modifications
(2,905.00)
370
Site Keying of Permanent Cores
2,745,00
CHANGE ORDER TOTAL:
4,160,826,00
67
Contract Amount:
110,329,000.00
1278
Percent Change Orders:
3.77%
Totals:
114,489,826.00
1345
Total Additive Change Orders
5,152,460 00
Percentage of Contract Amount
4.67%
Total Credit Change Orders
(990.634.00)
Percentage of Contract Amount
0.90%
Contract Substantial Completion Date
4/9109
Current Substantial Completion Date
6/15/09
20
0
CK
Ng
Gt
O
Ct
O
Ni
LL
fly
I Elm a tor a
II
Ny
2r
2
0
z
16
It
K4
Wk
iu
4�j
O
ur
nz
CS
CS
w u1
4�j