HomeMy WebLinkAboutStaff Report 3.F 09/11/2017DATE: September 11, 2017 Agenda Item #3.F TO: Honorable Ma or and Members of the City Council through City Manager FROM: Da 4' St. CE — Director, Public Works & Utilities Department Larry immer, P.E. — Deputy Director, Public Works & Utilities Department SUBJECT: Resolution Accepting Completion of the D'Arcy & Harty Construction Inc. Contract for the Sewer Main Replacement 2016 -2017 Project RECOMMENDATION It is recommended that the City Council adopt the attached Resolution Accepting Completion of the D'Arcy & Harty Construction Inc. Contract for the Sewer Main Replacement 2016 -2017 Project. BACKGROUND To maintain and improve the condition of the City's water and wastewater systems, the Public Works and Utilities Department annually replaces or rehabilitates deteriorating water and sanitary sewer mains throughout the City. City staff has developed a 5 -year priority list of water and sewer lines needing replacement. These projects are cross - referenced with the City's street maintenance program, development projects, and proposed PG &E work to endeavor to assure that new or nearly new pavement will not be impacted. The sewer replacement projects included backyard pipe bursting at La Cresta Drive, Belleview Drive, Haven Drive, Pierce Street, Hill Drive, and Scenic Way. Pipe bursting is a process requiring less excavation where a new pipe is threaded through an old pipe, bursting the old pipe as it goes so the new pipe can be the same diameter as the old pipe. The project included approximately 3,000 linear feet of a pipe bursting method of main replacement. The private sewer laterals were reconnected at the mains and sewer manholes were rehabilitated. Approximately 400 linear feet of sewer main in portions of 7th Street and 8th Streets were replaced using standard removal and replacement methods. The project also included the removal and replacement of sewer manholes along the entire length of the project. Bids were opened on February 22, 2017. On March 20, 2017, the City Council authorized the award of the construction contract for Sewer Main Replacement 2016 -2017 Project to D'Arcy & Harty Construction of San Francisco in the amount of $630,612.00. Construction began in May 2017 and was completed in July 2017, within the allowable contract time. DISCUSSION The streets that were selected for this project were evaluated based on the condition of the pipe, the maintenance history, the inflow and infiltration (I &I) into the City's sewer system, and the projects construction budget. The construction bid by D'Arcy & Harty came in lower than estimated which allowed for a larger construction contingency. The contingency was used to fund a change order to replace the deteriorated sewer main on Oak Lane and Webster Street, which were selected because they are a maintenance priority and are within the same area of the original contract scope. The project was designed, managed, and inspected by Public Works and Utilities engineering staff. The contractor performed satisfactorily and there are no outstanding claims or issues. The final contract amount is $755,346.60, which includes all overruns, underruns and six change orders totaling $124, 734.60. Change orders were approved for $44, 490 for pipe bursting of Oak Lane, $8,775 for open trench driveway at 155 Belleview Drive, a deduction of $27,610.00 for scope change on Scenic Way, $6,500 to replace the concrete driveway on Manor Way, $82,275.00 for open trenching Webster Street and $10,400.60 for various force account work. All overruns and underruns added up for a deduction of $96.00 for the quantities that were actually used. The proposed action meets Council Goal: "Plan for and implement priority capital projects as funding permits." FINANCIAL IMPACTS The total cost for the project is summarized below: uses Approved Budget Actual Project Costs Design $ 52,000 $ 52,000 Legal $ 0 $ 0 Planning/Environmental $ 0 $ 0 Construction Contract $630,612 $755,346.60 Construction Management $ 52,000 $ 52,000 Project Contingency $125,000 $ 0 Administration $ 4,000 $ 4,000.00 CIP Overhead $ 3,000 $ 3,000.00 TOTAL $866,612 $866,346.60 Funding Sources Waste Water Capital $866,612 $866,346.60 TOTAL $866,612 $866,346.60 Note: City staff salary and benefits costs are included in appropriate project phases Unused funds will be returned to the enterprise fund reserve account for use on future projects. The proposed action will not cause any unanticipated fiscal impacts to the City's budget. 2 ATTACHMENTS 1. Resolution 2. Location Map Attachment 1 RESOLUTION ACCEPTING COMPLETION OF THE WARCY & HARTY CONSTRUCTION INC. CONTRACT FOR THE SEWER MAIN REPLACEMENT 2016 -2017 PROJECT WHEREAS, in accordance with Section 68 of Article X of the City of Petaluma Charter, Section 20162 of the California Public Contract Code and other applicable law, the City of Petaluma solicited bids for the Petaluma Complete Streets project ( "Project "); and WHEREAS, bids for the Project were opened on February 22, 2017, in accordance with California Public Contract Code Section 4104.5 and other applicable law; and WHEREAS, the apparent low bid for the Project was the bid of D'Arcy & Harty Construction Inc.; and WHEREAS, by Resolution No. 2017 -047 N.C.S. adopted March 20, 2017, the City Council of the City of Petaluma found the bid of $630,612 for the Project to be the lowest responsive bid and awarded the construction contract to D'Arcy & Harty Construction Inc. conditioned on their timely executing the Project contract and submitting all required documents, and authorized and directed the City Manager to sign the Project contract on behalf of the City; and WHEREAS, the following change orders affecting the Project amount have been approved: Change Description Amount Order # #1 Oak Lane $ 44,490.00 #2 Open Cut Driveway on Belleview Drive $ 8,775.00 #3 Scope Change Scenic Way <$27,610.00> 44 Manor Way Driveway $ 6,500.00 #5 Webster St $ 82,275.00 #6 Force Account $ 10,400.60 Total Change Orders $124,830.60; and WHEREAS, the contractor performed satisfactorily with no outstanding claims or performance issues, and final construction contract amount as amended including all change orders, overruns, underruns is $755,346.60; and WHEREAS, City staff have inspected the Project and determined that it has been completed in substantial accordance with the contract requirements subject to the Contractor's continuing warranty and other obligations pursuant to the contract; and WHEREAS, based on the foregoing, staff recommends acceptance of the Project on behalf of the City. 11 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Petaluma as follows: The contract entitled Sewer Main Replacement 2016 -2017, Project No. C66401626 with a final construction contract amount of $755,346.60 is accepted as complete subject to the Contractor's continuing warranty and other obligations pursuant to the contract. 2. The City Clerk is hereby authorized and directed to file a Notice of Completion concerning the Project with the Sonoma County Clerk's Office within ten (10) days of the date of this Resolution. 3. Staff is hereby authorized and directed to release all undisputed retention not subject to pending change orders within sixty (60) days of the date of this Resolution and in accordance with the terms of the Project contract, the Petaluma City Charter, California Public Contract Code Section 7107 and applicable law. 5 FAPROJECT SITE SEWER MAIN REPLACEMENT 2016 -2017 PROJECT NO. C66401626 LOCATION MAP �� \U v n �s c r0i Attachment 2 Date: MARCH 20, 2017 City of Petaluma Public Works and Utilities Department j �co Q J� 0