Loading...
HomeMy WebLinkAboutMinutes 07/28/1969287 MINUTES OF MEETING OF CITY COUNCIL PETALUMA,. CALIFORNIA July'28,, 1969 Counci.l. Meeting Special meeting of the Council- of the City Payran Street and Con- of . Petaluma, called to. order by. Mayor struction of Caul field: at .the hour of. 7:30 o'clock p.m.. Attendance Present:.. Councilmen-.Battaglia, Brainerd, Brunner' Cavanagh, Jr., Joerger, Mattei and Mayor Putnam. _ Absent: ° - None.. Notice of the Notice of the Speci,al-meeting called for ,Cal1 July -' 28,,y 1969, the, certificate of the City Clerk - :of the delivery of said notice; and, the consent •of. the members - of the Council of the' holding ,of said meeting, submitted and filed. `. Purpose of . the The: meeting w,as • called for the purpose of Meeting reviewing the report and plans entitled, "Widening of Washington Street, Widening of Pay- Street -and Construction of Caulfield Launching Facility - Lane';.,.- to .consider award of contract for the Petaluma River launching. ,facility - and access road and to Res. #5282 - N.C.S. ,adjou.rn,'to, an .Executive Session to consider Res. #5283 N.C.S. personnel _matters . Widening of Washington Mr.'Ben Albritton of the,firm Whitlow, Hoff- Street; Widening of man. & Albritton,_ Consulting Engineers - who Payran Street and Con- prepared- and submitted the subject report struction of Caul field: and- plans;: appeared :before the- Council to Lane explain the. assignment of -the work involved and the scope of .the studies performed. He presented a ..totah- of -nine drawings of the _ complete :-study an .discussed each plan in detail by defining the proposed street widths ,'rights- of- .way'to be acquired, the number.of parcels involved, the buildings involved,. an the. proposed on- street park- ingtto be provided.- Upon conclusion o.f the presentation, Mayor Putnam thanked Mr. Albritton and asked that he return when the Council is ready to consider- the subject matter- - at- study sessions,.. Launching Facility - Copy of , letter.,'dated July 24, -1969, from Petaluma River B. L. Curry, Assistant Civil Engineer, Res. #5282 - N.C.S. State Department of Harbors and Watercraft, Res. #5283 N.C.S. to Director of Public Works David A. Young _ granting approval to award contract for the boat launching facility to H.F. Cleverdon Company, on, the basis that all construction costs over the-grant amount be by the City of'Petaluma in accordance with Paragraph 7 of the Construction and ration Agreement, submitted and filed. Director of Public Works David Young reported ,that .a meeting was held last week with representatives of-the State Department-of Harbors and Watercraft, Engi- neers Dames Moore,, the who sub - mitted the _low bid for the subject project, and members of the•staff to arrange modifica- tions to the bid bring the project cost 1 , July 28., 1969 Launching Facility Petaluma River Res.,. #52'82 N.C. - S. Res. #5283 N.C.S. ( continued) down to $121,0,00 (State grant $1.36,000, less $15,°00 ,fo.r.engineering costs - balance for construction cost $12: 000) 'and that an agree- merit -was reached to reduce the construction amount. to $i21,336Iby the following, deletions and substitutions: Bi-d .Item .6 - ' Delete. Type B asphalt concrete, ® and repi•ace with double seal coat on the. park- ing area.. Bid Item . 10 -.Delete sheet pile cutoff wa11 and - replace with improved rock foundation un -, der launching, ramp. Mr. Young poiri.ted . =out that- $10.i336 'is -required for the 'project to cover. $336 in excess of the grant .and . $10, 00.0 for .a contingency fund. Following a brief discuss.- ion;,, Resolution No..,; 52,82 N.-C.S. i. awarding contract to H. F.. Cle- e v Company to construct thte boat. launch- ing - facility -. (not including the ,access road) in accordance, with the • plans and .specifications entitled,, "Launch° ng .-Fac ,iity, .Project .PR 1 -59" was introduced.by Councilman Joerger -- ,'seconded by Councilman Mattei,;, and adopted by 7'' �affir- mative: -votes.._ Resolution No. 5',2?8� N.C;, , award -ing .contract to W. J Kubo 5218;',3 any -for the - construction .of ani,access - road to the boat launching ramp facility, , in accordance with the plans and specifications prepared by Dames- & Moore, was ,introduced by Councilman ,Mattei, seconded by Councilman Battaglia, and adopted by. 7 af= fi.rmative votes.- City .Manager Robert Meyer stated _that the amount needed.. in excess of the. State Grant, will be' paid from. - Capital _Outlay Project • 3-6-9, Capital.Continge:ncy (29,6 Adjournment, There being - no. further.busine,ss to come before the Counc .1, •t'he meeting was ad- journed at 9 :25 o'clock p. -m. to an Execu= tive I sessi,on to consider person_ nel matters. Mayor. Attest ., City Clerk