Loading...
HomeMy WebLinkAboutStaff Report 4.G 04/16/2018DATE: April 16, 2018 TO: Honorable Mayor and Members of the City Council through City Manager FROM: Dan t. CE — Director, Public Works & Utilities Jeff Stutsman, P.E. — Senior Civil Engineer SUBJECT: Resolution Authorizing the Award of Contract for the Community Center Parking Lot Rehabilitation Project to Pat Nelson Construction, Inc. RECOMMENDATION It is recommended that the City Council approve the Resolution Authorizing the Award of Contract for the Community Center Parking Lot Rehabilitation Project to Pat Nelson Construction, Inc. BACKGROUND The Community Center's main parking lot was rehabilitated in 1988, which included a combination of pavement reconstruction and slurry seals of the existing pavement and the installation of new concrete flat work for the construction of the new Community Center. The parking lot has seen minimal improvements over the past 30 years and the pavement is beyond its useful life. Portions of the pavement have been severely uplifted by the pine trees, the pavement has extensive alligator cracking with localized pavement failures, and the median retaining curbs have been broken / uplifted by tree roots. Over the years, the Community Center parking lot has become highly utilized by programs, classes and facility rentals at the Community Center, the Petaluma's East Side Farmers Market and soon the future use of the Miracle Fields, which should be completed in the summer of 2018. DISCUSSION The project includes the reconstruction of the portion of the pavement that has been uplifted by the pine tree roots, asphalt dig outs followed by a 2" grind and overlay over the entire main parking lot. New landscape retaining curbs will be constructed to replace the ones that have been uplifted by tree roots. The concrete walkways will be modified to meet current ADA standards. The north parking lot at the Community Center was constructed in 1998 and is in relatively good condition. A new accessible drop off area will be constructed and will support handicapped accessibility to the park and Miracle Field. A high volume slurry seal will be used to extend the pavement life and provide an opportunity to restripe the parking lot to create five additional ADA parking stalls. The high volume slurry seal will be performed with the Pavement Restoration 17/18 project as it has a larger scope and more cost effective pricing. The project was originally advertised January 18, 2018 and bids were opened on February 8, 2018. The original design incorporated a new fiber reinforced asphalt product as compared to conventional asphalt. The award of the contract was based off the base bid plus fiber reinforced asphalt as long as the price was $150 a ton or less; otherwise it would have been awarded to the base bid plus conventional asphalt. After opening bids, it was apparent that the award of the contract was not clear and was interpreted several different ways. In order to provide a fair opportunity for all Contractors, all of the bids were rejected and the project was rebid. The construction plans and specifications were prepared by engineering staff and a Notice Inviting Bids was advertised on February 22, 2018. Three (3) bids were received as follows: Name of Bidder Base Bid Pat Nelson Construction, Inc. $ 287,125.00 Coastside Concrete $ 297,300.00 Team Ghilotti, Inc. $ 299,849.00 The lowest responsible and responsive bidder, Pat Nelson Construction Inc. has performed similar projects throughout the Bay Area and possesses a valid Class A California Contractor's License, #601031, which qualifies Pat Nelson Construction Inc. to perform the work. It is recommended that Council adopt the resolution awarding the contract to Pat Nelson Construction Inc., the lowest and responsive bidder, in the amount of $287,125. Construction is scheduled to begin in June 2018 and to be completed by August 2018. Construction management and inspection services will be conducted by City staff with assistance by an outside consultant for material testing. FINANCIAL IMPACTS The total project budget for the Community Center Parking Lot Rehabilitation Project (C11501910) as approved in the current budget is $400,000 and is,funded the through transient occupancy tax. The following is a breakdown of the budget for the project: Uses Total Project Budget Revised Total Project Cost Planning and Environmental $ 1,000 $ 1,000 Design (City Staff) $ 10,000 $ 7,500 Legal Services $ 1,000 $ 0 Administration $ 1,000 $ 0 Construction Contract (low bid) $ 345,000 $ 287,125 Construction Management & Inspection $ 10,000 $ 20,000 2 Contract Contingency $ 25,000 $ 82,375 CIP Overheads $ 7,000 $ 2,000 Total $ 400,000 $ 400,000 ATTACHMENTS 1. Resolution 2. Location Map Attachment 1 RESOLUTION AUTHORIZING THE AWARD OF CONTRACT FOR THE COMMUNITY CENTER PARKING LOT REHABILITATION PROJECT TO PAT NELSON CONSTRUCTION, INC. WHEREAS, in accordance with the City of Petaluma Charter and Municipal Code, California Public Contract Code Section 20162 and other applicable law, City staff prepared construction bid documents and solicited bids for the Project; and WHEREAS, the project was bid on January 18, 2018, and seven (7) bids were received and opened on February 8, 2018 in accordance with applicable law; and WHEREAS, all the bids were rejected based on unclear language on how the bid alternate was to be awarded; and WHEREAS, the project was rebid on February 22, 2018, and three (3) bids were received and opened on March 15, 2018 in accordance with applicable law; and WHEREAS, the lowest responsible bid for the Project was submitted by Pat Nelson Construction Inc., Inc. from Petaluma, CA for $287,125; and WHEREAS, staff has determined that the Pat Nelson Construction Inc., bid satisfies the bidding requirements for the Project; and WHEREAS, staff has verified that Pat Nelson Construction, Inc. possesses a valid California Contractor's License, Class A, #750905, that allows Pat Nelson Construction Inc. to perform the Project; and WHEREAS, the Project is categorically exempt pursuant to California Environmental Quality Act ("CEQA") and Title 14, the California Code of Regulations ("CEQA Guidelines"), Section 15301, because the project consists of repair and maintenance to an existing public street. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Petaluma hereby: In accordance with the City of Petaluma Charter and Municipal Code, California Public Contract Code Section 20162 and other applicable law, waives any and all non- conformance in the bid of Pat Nelson Construction, Inc. for the Cormnunity Center Rehabilitation, Project No. Cl 1501910, finds the bid of $287,125 to be the lowest, responsive bid and further finds that American Asphalt Repair and Resurfacing Company, Inc. is the lowest responsible bidder. 11 2. Awards the contract for the Community Center Parking Lot Rehabilitation, Project No. C11501910 to Pat Nelson Construction, Inc. in the amount of $287,125, the amount of the lowest responsive bid, conditioned on Pat Nelson Construction Inc., timely executing the project contract and submitting all required documents, including but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the project bid documents. 3. Directs staff to issue a notice of award Pat Nelson Construction, Inc. 4. Authorizes and directs the City Manager to execute the project contract on behalf of the City of Petaluma upon timely submission by Pat Nelson Construction Inc., of the signed project contract and all other required document, including but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the project bid documents. 5. Approves a construction contract contingency of $82,375. COMMUNITY CENTER PARKING LOT 320N. McDOWELL BLVD PETALUMA, CA 94954 LOCATION MAP —:45�1 Attachment 2 s Date :April 17, 2017 N p,is U City of Petaluma PRoJECT SITE W E Public Works and Utilities , S Department Igra