Loading...
HomeMy WebLinkAboutStaff Report 4.C 05/07/2018Agenda Item #4.0 DATE: May 7, 2018 TO: Honorable Mayor and Members of the City Council through City Manager FROM: Dari S,� John, F ASCE — Director, Public Works & Utilities Jeff Stutsrr`fan, P.E. — Senior Civil Engineer SUBJECT: Resolution Authorizing Award of Contract for the Sewer Main Replacement 2017-2018 Project to Coastside Concrete and Construction Inc. RECOMMENDATION It is recommended that the City Council approve a Resolution Authorizing the Award of Contract for the Sewer Main Replacement 2017-2018 Project to Coastside Concrete and Construction Inc. BACKGROUND To maintain and improve the condition of the City's water and wastewater systems, the Public Works and Utilities Department annually replaces or rehabilitates deteriorating water and sanitary sewer mains throughout the City. A 5 -year priority list of water and sewer line replacements has been created. These projects are cross-referenced with the City's street maintenance program, development projects, and proposed PG&E work to endeavor to assure that new or nearly new pavement will not be impacted. The Sewer Main Replacement 2017-2018 Project includes the replacement of the sewer main and manholes on Belleview Avenue, Hill Drive, and Hayes Lane and the installation of a new sewer main on Orchard Lane. The sewer main will be rerouted down Orchard Lane to eliminate a section of sewer main in private backyards with limited access for maintenance and repairs. These are also areas of identified occasional sanitary sewer overflow. The installation and replacement of the sewer main requires deep excavation through hard rock, which will increase the overall construction time and costs. This project will improve service, reduce maintenance costs, and significantly reduce inflow and infiltration. The project location is shown on Attachment 2. The proposed action meets Council Goal: "Plan for and implement priority capital projects as funding permits." DISCUSSION The project was designed and contract documents compiled in-house by City staff. A Notice Inviting Bids was advertised on March 15, 2018 and five (5) bids were received as follows: Name of Bidder Bid Total Coastside Concrete and Construction Inc. $ 869,675 Lowest Responsible Bidder Team Ghilotti Inc. $ 912,937 W.R. Forde $ 1,041,859 Northern Pacific Corp. $ 1,082,950 Argonaut Construction $ 1,215,307 Engineer's Estimate $ 1,060,000 The lowest responsible and responsive bidder, Coastside Concrete and Construction Inc., has performed similar sewer projects throughout the Bay Area. Staff verified that Coastside Concrete and Construction Inc. possess a valid Class A California Contractor's License, number 995338, which qualifies Coastside Concrete and Construction Inc. to perform the work. Construction is scheduled to begin in June 2018 and to be completed by August 2018. Construction management and inspection services will be conducted by City staff with assistance by an outside consultant for geotechnical and material testing. FINANCIAL IMPACTS The approved project budget for the Sewer Main Replacement 2017-2018 Project (C66401822) is $1,384,000. The following shows a revised breakdown of project costs based on the bid amount: Project Budget in Uses CIP Planning and Environmental $ Land and Easements $ 2,000 Design (City Staff) $ Legal Services $ 1,000 Administration $ 20,000 Construction Contract (low bid) $ 1,100,000 Construction Management & Inspection $ 80,000 Contract Contingency $ 156,000 CIP Overheads $ 25,000 Total $ 1,384,000 Funding Source Revised Project Budget $ 1,000 $ 2,000 $ 35,000 $ 1,000 $ 5,000 $ 869,675 $ 100,000 $ 217,419 $ 5,000 $1,236,094 Waste Water Capital $ 1,384,000 $1,236,094 Total $ 1,384,000 $1,236,094 It is not anticipated that the contingency will be entirely spent and the remaining contingency funds will be proportionally returned to their funding source. 2 ATTACHMENTS 1. Resolution 2. Location Map Attachment 1 RESOLUTION AUTHORIZING THE AWARD OF CONTRACT FOR THE SEWER MAIN REPLACEMENT 2017-2018 PROJECT TO COASTSIDE CONCRETE AND CONSTRUCTION INC. WHEREAS, in accordance with the City of Petaluma Charter and Municipal Code, California Public Contract Code Section 20162 and other applicable law, City staff prepared construction bid documents and solicited bids for the Project; and WHEREAS, the project was bid on March 15, 2018, and five (5) bids were received and opened on April 5, 2018 in accordance with applicable law; and WHEREAS, the lowest responsible bid for the Project was submitted by Coastside Concrete and Construction Inc., from Santa Rosa, CA for $869,675; and WHEREAS, staff has verified that Coastside Concrete and Construction Inc., possesses a valid California Contractor's License, Class A, number 995338 that qualifies Coastside Concrete and Construction Inc. to perform the Project; and WHEREAS, the Project is categorically exempt pursuant to California Environmental Quality Act ("CEQA") and Title 14, the California Code of Regulations ("CEQA Guidelines"), Section 15301, because the project consists of repair and maintenance to an existing public street. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Petaluma hereby: 1. In accordance with the City of Petaluma Charter and Municipal Code, California Public Contract Code Section 20162 and other applicable law, waives any and all non- conformance in the bid of Coastside Concrete and Construction Inc. for the Sewer Main Replacement 2017-2018, Project No. C66401822, finds the bid of $869,675 to be the lowest, responsive bid and further finds that Coastside Concrete and Construction Inc., is the lowest responsible bidder. 3. Awards the contract for the Sewer Main Replacement 2017-2018, Project No. C66401822 to Coastside Concrete and Construction Inc., in the amount of $869,675, the amount of the lowest responsive bid, conditioned on Coastside Concrete and Construction Inc.'s timely executing the project contract and submitting all required documents, including but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the project bid documents. 4. Directs staff to issue a notice of award to Coastside Concrete and Construction Inc. 5. Authorizes and directs the City Manager to execute the project contract on behalf of the City of Petaluma upon timely submission by Coastside Concrete and Construction Inc., of the signed project contract and all other required document, including but not limited to, executed bonds, certificates of insurance, and endorsements, in accordance with the project bid documents. M Attachment 2 SEWER MAIN REPLACEMENT 2017-2018 BELLEVIEW AVENUE, ORCHARD LANE, HILL BOULEVARD, HAYES LANE AND NOB HILL TERRACE LOCATION MAP / OP�P S,S�C • � ST ��� Oo 2 5� 0 90�q%- PROJECT SITE PROJECT SITE N W-*E S Date :MAY 7, 2018 City of Petaluma Public Works and Utilities Department 5