HomeMy WebLinkAboutAgenda 5.A 04/04/2011DATE:
TO:
FROM:
e
April 4, 2011
Honorable Mayor and Members of the City Council through City Manager
Larry Zimmer, PW Engineering Manager
SUBJECT: Presentation Regarding the Potential Aesthetic and Gateway Features of the Old
Redwood Highway and Petaluma Blvd. South Interchanges, Resolution
Approving'Installation of Gateway Features for Old Redwood Highway
Interchange Project No. C53101002, and Direction to Staff Regarding
Implementation of Similar Features for the Petaluma Boulevard South Project
RECOMMENDATION
It is recommended that the City_ Council consider the presentation regarding the potential
aesthetic and gateway features of the Old Redwood Highway and Petaluma Boulevard South
Interchanges, adopt the attached resolution approving installation of gateway features for Old
Redwood Highway Interchange Project No. C53101002, and provide direction to staff regarding
implementation of similar features for the Petaluma Boulevard South project.
BACKGROUND
This project will upgrade the Old Redwood Highway/1.01 Interchange in Petaluma to meet
current design standards and traffic requirements to improve safety and provide congestion
relief. The proposed interchange modification includes ramp widening and reconfiguration,
traffic operations system improvements, the over-crossing,structure replacement to four lanes
that will include bicycle lanes and a pedestrian sidewalk, and enhanced signalization
improvements at the adjacent intersections.
The,Old'Redwood Highway/101 Interchange Project is being completed in coordination with the
Caltrans Highway 1'01 HOV Project. The City's need to replace the overcrossing and Caltrans'
widening of Highway 101 creates potential inefficiencies for both projects. In.order.to avoid'
such wastedeffort and- cost, several cooperative agreements were created between SCTA,
Caltrans, and the City to define roles and funding, so that the City's interchange project is
completely compatible with the Hwy 101 Project. In 2009, Council approved two separate
cooperative -agreements, one with Caltrans and one with SCTA.
Agenda Review:
City Attorney Finance Director City Manager
Following is the project schedule:
Start preparation of Project Study Report (PSR) 03/2007
Approve PSR 04/2008
Project Approval ' & Environmental Document .(PA&ED) 06/2009
Right=of-way (R/W); certification 12./2011
Plans, Specification, & Estimate (PS&E) 95% 07/2011
Construction 2012
The total cost for the City portion of the Project is estimated at $30,885,000, with $5,500,000
from Traffic Mitigation Impact.Fees (a portion of this will be loaned from PCDC), $10,000,000
Measure M, $10,000;000 PCDC Fund 5400,1$743000 Assessment. District 21, $3`,000,000 State
Local Partnership Program (SLPP), and $2,31 I,000 Developer Contributions. SCTA's
contribution will be $11,530,060 and pays for right of way,,
environmental process and a portion
of construction. The project will be constructed with Caltrans as the lead agency and the City in
an oversight role. The estimated total project construction cost is estimated to be $41,590,000,
and at this point, is fully funded.
On April 5, 2010, the Councill listened to an information presentation regarding the sound wall
installation proposed along Leisure Lake Mobile Home Park, which is to be installed as part of
the Highway 101 Central B Improvement Project (from Pepper Road to South of Old Redwood
H-ighway). This is not a City project; it however, within City limits, and therefore, Council
input was requested regarding the sound wall design. Per Council direction, staffs from the City,
SCTA and Caltrans worked with the Petaluma Art"Committee on design of the sound walls. The
Old Redwood. Highway/101 Interchange Project will alsoinclude some sound walls which will
match that design.
The attached resolution is specifically related to the aesthetic features on the bridge structures ,
not to design of the sound wall itself. Caltrans requires a resolution from Council committing to
the features, which include a concrete "monument" at the four corners of the bridge bearing the
City of Petaluma seal, a wave pattern on the concrete bridge barrier, upgraded fencing on top of
the bridge barrier, and fractured rib texture on the slope paving. The decision before Council is
whetheror not to accept the additional costs and maintenance responsibilities in order to provide
additional aesthetic features to the City's "gateways".
DISCUSSION
Over the, past several months, City, ;Sonoma County Transportation Authority (SCTA), County
of Sonoma and :Cal'trans .staffs have been working together on aesthetic features for the bridge
structure of O,ld Redwood Highway and Petaluma Blvd. South. Interchanges. Since both
interchanges are being reconstructed and both are essentially gateways into and out of Petaluma,
there is an opportunity°to install gateway and community identifiers with similar aesthetic
features at both locations '(see Exhibit A to Resolution).
In accordance with. the requirements stated in the Caltrans Project Development Procedures
Manual, Chapter 29, the City is required to adopt a resolution that describes:
W
I . the local agency's jurisdiction in the vicinity of the project site;
2. the date of public consideration and comment of, the, proposed art;
3. the local agency's approval of the artwork content;
4. the project's projected life span;
5. the local agency's commitment to ensure maintenance of the artwork, including timely
graffiti removal/repair, and removal (or restoration) of the artwork at the end of its life
span; and
6. a schedule for commencing and completing project installation.
The above requirements have been met and are incorporated into the attached resolution
approving the installation of aesthetic features for the Old Redwood Highway/101 Interchange.
Approving the resolution will provide direction to the project team to continue designing the
gateway features for Old Redwood Highway. As well, the cornrnitment to proceed with these
features;`includes a City commitment to maintain the improvements throughout the useful life of
the project. The financial impact section of the staff report includes projected maintenance costs,
although it should be noted that these assume customary maintenance activities, and do not
account° for unforeseen damage or vandalism.
In addition to recommending the resolution approving gateway features for the Old Redwood
Highway Interchange Project, staff is seeking direction from Council whether similar aesthetic
features should be installed on the Petaluma Blvd. South .Interchange. Since the proposed
aesthetic features to the Petaluma Blvd. South Interchange would be placed on County property,
City and SCTA staffs have also discussed this proposal with Sonoma County staff. The County
is receptive to the idea, but advised the City and SCTA-that a maintenance agreement would be
required between them and the City to cover the .future cost of maintenance. The agreement
would include graffiti removal, street light fixture/pole replacement; as needed, fence
repair/replacement, as,needed,.and maintenance of the corbels. If the City Council expresses the
desire to pursue such ,features, the City, SCTA and County staffs will work together to prepare a
maintenance agreement that wouldbe brought back to the City Council for review and approval.
FINANCIAL IMPACTS
Installation of aesthetic features for Old Redwood Highway is.paid for by the City as a project
cost. Installation of any aesthetic features for Petaluma Blvd. South Interchange would be paid
for'thro.ugh.that project's construction funding (101 Measure,M and State funds), not by the :City -
of Petalur
The fealures.for Old Redwood Highway include:
Corbels-- a concrete monument with Petaluma City seal (4)
Concrete bridge barrier treatment (wave pattern) on.outside of bridge railing (1385 feet)
Upg-raded fencing on top_ of concrete rail (1,3`85 feet)
Abutment `slope paving, wave pattern in concrete (80 cubic yards)
Retaining wa11; fractured rib texture (21,665 square feet)
Street lighting (25 historic -styled mast arm lights)
The: eatures' for Petaluma: Blvd. South include:
3
Corbels, (4)
Bridge fencing (444 lineal feet)
Concrete barrier (100 lineal feet)
Abutment slope paving (80 cubic yards)
Street lighting (4 historic tear drop lights)
The estimated increase -in the installation costs of the aesthetic features over standard features for
Old Redwood Highway and. Petaluma Blvd. South, respectively, is $680,000and $260,000. The
difference in cost is dueto the length .of each interchange improvement. Old Redwood Highway
is approximately three times the length of Petaluma Blvd. 'South. The estimated maintenance
cost per, year for the Old Redwood Highway/101 Interchange and the. Petaluma Blvd. South
Interchange, respectively, is $3,730 and $1,000, which includes the estimated cost for power,
light replacement, and minor painting to cover graffiti, and does not include repair caused by
vandalism or vehicle impacts, which is difficult to quantify:. The additional cost will be paid out
of the street maintenance operating budget. (See Attachment 2, Approved FY 2011 Old
Redwood Interchange CIP budget)
ATTACHMENTS
1. Resolution, including Exhibit A, List and Drawings of the Aesthetic Features
2. Approved FY 2011 Old Redwood Highway Interchange CIP Budget
M
ATTACHMENT 1
RESOLUTION
APPROVING INSTALLA'T`ION OF GATEWAY FEATURES FOR OLD REDWOOD
HIGHWAY INTERCHANGE PROJECT NO. C53101002
WHEREAS, the Old Redwood Highway Interchange is located within the City of
Petaluma city limits; and
WHEREAS, on March 7, 2011,`' City Council and the .public heard a presentation and
offered comments on. the aesthetic features proposed at the Old Redwood Highway Interchange
and Petaluma Boulevard South Interchanges; and
WHEREAS, the projected life span of the aesthetic improvements is 50 years; and
WHEREAS,"the City of Petaluma will perform future maintenance of the aesthetic
features, including timely graffiti removal/repair, and removal (or restoration) of the aesthetic
features at the end of their life span; and
WHEREAS, construction is expected to start,January, 2013, with completion of all
improvements by December 2015..
.NOW THEREFORE, BE IT RESOLVED, that the Petaluma City Council:
Approves installation of the aesthetic features ori Old Redwood Highway
Interchange Project C53.101.002 substantially as described in Exhibit A to the Resolution;
incorporated herein by reference; and
2. 'Commits to .the City's maintaining the. aesthetic features for their anticipated life
span, including timely removal of graffiti and removal or repair of the aesthetic features at the
end of'their life span,
1592436.1
EXHIBIT A TO RESOLUTION
Rl
�� �-.-__ =ice-� � L = --•_ -_ =_�
ME ^^"
__-�
ATTACHMENT 2
City of Petaluma, California
Fiscal Year 2011 Budget
Project Title: Old Redwood Highway Interchange C00501304
PROJECT PURPOSE'AND.DESCRIPTION
This project provides for Widening the existing; Old Redwood Highway at Highway 101. Interchange
improvements are also included to provide better traffic flowon'and off'Highway 101.
'PROJECT PARAMETERS
Environmental: Revalid6tion of Central B EIR Olds supplemental environmental documents.
Public Info: Neighborhood notification.
Schedule Expeqted,qdmpl6tion Summer 201.3. Project, cost,estimate'$30.9m.
Permits: Caltrans encroachment; "US Army Cdtpsof.Enqineers.P6r-mit,(40'4), Dept. of Fish and
Game 1600, Waste Dis6harge (NPDES);'R,eg_ion'aI Water Quality Control Board 401.
Reference: PCDC:Implementation Plan-, Genera I iPlam 2025
FINANCIAL OVERVIEW,
CDO501304
--- - ----- ------------
USES (dollarsin $000)
,Plan ing/Environ menial
Land & Fase.eras
Design
legal Services
Ad.i.M.0-
Construction Yontracts
C..51rucliu. Mgml
Contingency
CIP 0—head,
TOTAL
SOURCES (dollars in $000)
Traffic,MitigailDn ImpxI fees
Measure, M
PCOC Fund 54DD
Assrraru Di.16.1 21
SLPP .
010peicontribuilws
Und.tewijned
TOTAL
T,alS MuigMionlmpcl Fees
Wciasurv'M,
PCC1_ F -d 5400
A.t.-me.1 Distna 21
SLpp
Daval.p,C-1 ria.lions
TOTALFUNDS
Do -
to Date thm
Estimate
Euditet' P�;
�P000 v
-R.
Di2�5
USES(dollars in $DOD
?7'7.
FY 09110
15�F.IDI
rFY 11-12
1s.-
FY 1314
24,606
Estimate
22.900
:394-133'
-33,195.
X2;3301
30,885
T,alS MuigMionlmpcl Fees
Wciasurv'M,
PCC1_ F -d 5400
A.t.-me.1 Distna 21
SLpp
Daval.p,C-1 ria.lions
TOTALFUNDS
Do -
to Date thm
Estimate
Euditet' P�;
�P000 v
-R.
Di2�5
USES(dollars in $DOD
?7'7.
FY 09110
.74
rFY 11-12
�3;000
FY 1314
FY 14-15
Estimate
7,311
:394-133'
-33,195.
X2;3301
30,885
T,alS MuigMionlmpcl Fees
Wciasurv'M,
PCC1_ F -d 5400
A.t.-me.1 Distna 21
SLpp
Daval.p,C-1 ria.lions
TOTALFUNDS
Do -
to Date thm
Estimate
Euditet' P�;
13,171
Total
USES(dollars in $DOD
6130)09
FY 09110
::FY 1417,„
rFY 11-12
FY 12-13
FY 1314
FY 14-15
Estimate
PlanningiEnvirortmemal
:394-133'
-----
---10t
--
1,093
Land & Easements
�7
714.
..
Design
-
760
�55
�739
Legal 5—i—
5
5
'ia
30
Administration
15
15
Construction contracts
.........
......... . .
. . ........ .__..—
22,000
CDr,51rUCti0. W-gement�
-
2310
•..............
2 BID
Satan WBenelils
GO
s7*i
'7z"
276
8
:i44
1,IQ
YIP Nerhe ads
34
23
690
30,885
TOTALUSESr�_-G'
5DU CES(d.11— in $000)
T,alS MuigMionlmpcl Fees
Wciasurv'M,
PCC1_ F -d 5400
A.t.-me.1 Distna 21
SLpp
Daval.p,C-1 ria.lions
TOTALFUNDS
Do -
13,171
COD
R")74
J
-----
---10t
--
�7
714.
..
. ..... ...
-
3,000
2,311
4,885
30,885
•'kdCfunds will be used to C.— any shortages in TI-IficMitig-tion impact Fees through — Wte,fynd loop.
CIP-'28
E