Loading...
HomeMy WebLinkAboutResolution 2019-048 N.C.S. 04/15/2019Resolution No. 2019-048 N.C.S. of the City of Petaluma, California RESOLUTION TO APPROVE THE PROPOSED PROJECT LIST FOR FISCAL YEAR 19/20 PER THE REQUIREMENTS OF SENATE BILL 1 TO OBTAIN ROAD MAINTENANCE AND REHABILITATION ACCOUNT FUNDS WHEREAS, on April 28, 2017, the Governor signed Senate Bill 1 (S131), which is known as the Road Repair and Accountability Act of 2017 to address basic road maintenance, rehabilitation, and critical safety needs on both the state highway and local streets and road system; and WHEREAS, in accordance with Streets and Highway Code, section 2034, the City shall submit to the California Transportation Commission (Commission) a list of projects proposed to be funded with these funds pursuant to an adopted City budget. All projects proposed to receive funding shall be included in a City budget that is adopted by the City Council at a regular public meeting; and WHEREAS, a proposed project list consisting of reconstructing Maria Drive and pavement restoration on various streets to be submitted to the Commission has been compiled for the use of $1,849,120 made available by SB 1 and supplemented by Street Maintenance Fund for the current fiscal year and due on May 1, 2019; and WHEREAS, the RMRA funds will be combined with the current Capital Improvement budget for the Pavement Restoration 19/20 project in the FY 19/20 CIP budget. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Petaluma hereby; 1. Approves the proposed project list for use of RMRA funding for FY 19/20 2. Directs the City Manager to submit the proposed project list to the California Transportation Commission Under the power and authority conferred upon this Council by the Charter of said City, REFERENCE: I hereby certify the foregoing Resolution was introduced and adopted by the Apr d as to Council of the City of Petaluma at a Regular meeting on the 151" day of April 2019, fm: by the following vote:C-7-- Cityttorney AYES: Mayor Barrett; Fischer; Healy; Kearney; King; Vice Mayor McDonnell; Miller y NOES: None ABSENT: None ABSTAIN: None f ATTEST: City Clerk Mayor Resolution No. 2019-048 N.C.S. Page 1 Exhibit A - Project List City of Petaluma, Department of Public Works and Utilities 202 N.McDowell Blvd, Petaluma, CA 94954 Department Contact: Jeff Stutsman City Project Number: C16101823 Legislative District: 2" d Avg. Network PC[: 2019: PCI = 44 Fiscal Year: 18/19(update) and 19/20 Pavement Restoration 18/19 Project (Update) Proposed Street List Pavement Restoration 18/19 includes the design and construction of Sonoma Mountain Parkway from Corona Road to Campus Circle South. The work includes the reconstruction of Sonoma Mountain Parkwav which soecificallv includes full depth reclamation with cement, curb ramps and the installation of vehicle detection cameras. Estimated RMRA Construction FY Street Name Begin End Description Priority Completion useful Life (years) 18/19 SONOMA MOUNTAIN PARKWAY" CORONA ROAD CAMPUS CIRCLE SOUTH Full Depth Reclamation - Cement Yes 2019 20 * Project utilizes full depth reclamaintion with cement. The existing asphalt will be recycled offsite and turned into new asphalt. FDR_C and recycling will dramatically reduce trucking which will reduce greenhouse gas emissions. Pavement Restoration 19/20 Project Proposed Street List Pavement Restoration 19/20 includes the design and construction of various streets in the City of Petaluma. The work continues with the City's preventative maintenance program with high volume slurry seals. and crack seals as well as oavement reconstruction. FY Street Name Begin End Description RMRA Priority Construction Completion Estimated useful Life ears 19/20 MARIA DRIVE SONOMA MOUNTIAN PKWY RAINIER AVE Full Depth Reclamation - Cement Yes 2020 20 19/20 B STREET FIFTH STREET WEBSTER STREET High Volume Slurry Seal Yes 2020 7 19/20 B STREET WEBSTER STREET EL ROSE DRIVE High Volume Slurry Seal Yes 2020 7 19/20 CAULFIELD LANE LAKEVILLE STREET N.W.P. RAILROAD TRACKS High Volume Slurry Seal Yes 2020 7 19/20 CRINELLA DRIVE WEAVERLY DRIVE BAYWOOD DRIVE High Volume Slurry Seal Yes 2020 7 19/20 CRINELLA DRIVE BAYWOOD DRIVE BUNGALOW LN High Volume Slurry Seal Yes 2020 7 19/20 CRINELLA DRIVE ALTA DRIVE WEAVERLY DRIVE High Volume Slurry Seal Yes 2020 7 19/20 CRINELLA DRIVE MCGREGOR AVENUE ALTA DRIVE High Volume Slurry Seal Yes 2020 7 19/20 EAST MADISON MCDOWELL BLVD NORTH MARIA DRIVE SEAL CRACKS Yes 2020 3 19/20 MAGNOLIAAVENUE PETALUMA BLVD NORTH MADRONE LANE SEAL CRACKS Yes 2020 3 19/20 MAGNOLAAVENUE MADRONE LANE KEOKUK STREET SEAL CRACKS Yes 2020 3 19/20 MAGNOLIA AVENUE KEOKUK STREET 190' W/0 ANTONE WAY/COP SEAL CRACKS Yes 2020 3 19/20 MAGNOLIA AVENUE 190' W/O ANTONE WAY/COP SAMUEL DRIVE SEAL CRACKS Yes 2020 3 19/20 WASHINGTON STREET HOWARD STREET PETALUMA RIVER SEAL CRACKS Yes 2020 3 19/20 CAULFIELD LANE MCDOWELL BLVD SOUTH SAINT FRANCIS DRIVE SEAL CRACKS Yes 2020 3 7 bb Ca cl