HomeMy WebLinkAboutResolution 2019-048 N.C.S. 04/15/2019Resolution No. 2019-048 N.C.S.
of the City of Petaluma, California
RESOLUTION TO APPROVE THE PROPOSED PROJECT LIST
FOR FISCAL YEAR 19/20 PER THE REQUIREMENTS OF SENATE BILL 1
TO OBTAIN ROAD MAINTENANCE AND REHABILITATION ACCOUNT FUNDS
WHEREAS, on April 28, 2017, the Governor signed Senate Bill 1 (S131), which is
known as the Road Repair and Accountability Act of 2017 to address basic road maintenance,
rehabilitation, and critical safety needs on both the state highway and local streets and road
system; and
WHEREAS, in accordance with Streets and Highway Code, section 2034, the City shall
submit to the California Transportation Commission (Commission) a list of projects proposed to
be funded with these funds pursuant to an adopted City budget. All projects proposed to receive
funding shall be included in a City budget that is adopted by the City Council at a regular public
meeting; and
WHEREAS, a proposed project list consisting of reconstructing Maria Drive and
pavement restoration on various streets to be submitted to the Commission has been compiled for
the use of $1,849,120 made available by SB 1 and supplemented by Street Maintenance Fund for
the current fiscal year and due on May 1, 2019; and
WHEREAS, the RMRA funds will be combined with the current Capital Improvement
budget for the Pavement Restoration 19/20 project in the FY 19/20 CIP budget.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
Petaluma hereby;
1. Approves the proposed project list for use of RMRA funding for FY 19/20
2. Directs the City Manager to submit the proposed project list to the California
Transportation Commission
Under the power and authority conferred upon this Council by the Charter of said City,
REFERENCE: I hereby certify the foregoing Resolution was introduced and adopted by the Apr d as to
Council of the City of Petaluma at a Regular meeting on the 151" day of April 2019, fm:
by the following vote:C-7--
Cityttorney
AYES: Mayor Barrett; Fischer; Healy; Kearney; King; Vice Mayor McDonnell; Miller y
NOES: None
ABSENT: None
ABSTAIN: None
f
ATTEST:
City Clerk Mayor
Resolution No. 2019-048 N.C.S. Page 1
Exhibit A - Project List
City of Petaluma, Department of Public Works and Utilities
202 N.McDowell Blvd, Petaluma, CA 94954
Department Contact:
Jeff Stutsman
City Project Number:
C16101823
Legislative District:
2" d
Avg. Network PC[:
2019: PCI = 44
Fiscal Year:
18/19(update) and 19/20
Pavement Restoration 18/19 Project (Update)
Proposed Street List
Pavement Restoration 18/19 includes the design and construction of Sonoma Mountain Parkway from Corona Road to Campus Circle South. The work includes the reconstruction of Sonoma
Mountain Parkwav which soecificallv includes full depth reclamation with cement, curb ramps and the installation of vehicle detection cameras.
Estimated
RMRA
Construction
FY
Street Name
Begin
End
Description
Priority
Completion
useful Life
(years)
18/19
SONOMA MOUNTAIN PARKWAY"
CORONA ROAD
CAMPUS CIRCLE SOUTH
Full Depth Reclamation - Cement
Yes
2019
20
* Project utilizes full depth reclamaintion with cement. The existing asphalt will be recycled offsite and turned into new asphalt. FDR_C and recycling will dramatically reduce trucking which will
reduce greenhouse gas emissions.
Pavement Restoration 19/20 Project
Proposed Street List
Pavement Restoration 19/20 includes the design and construction of various streets in the City of Petaluma. The work continues with the City's preventative maintenance program with high volume
slurry seals. and crack seals as well as oavement reconstruction.
FY
Street Name
Begin
End
Description
RMRA
Priority
Construction
Completion
Estimated
useful Life
ears
19/20
MARIA DRIVE
SONOMA MOUNTIAN PKWY
RAINIER AVE
Full Depth Reclamation - Cement
Yes
2020
20
19/20
B STREET
FIFTH STREET
WEBSTER STREET
High Volume Slurry Seal
Yes
2020
7
19/20
B STREET
WEBSTER STREET
EL ROSE DRIVE
High Volume Slurry Seal
Yes
2020
7
19/20
CAULFIELD LANE
LAKEVILLE STREET
N.W.P. RAILROAD TRACKS
High Volume Slurry Seal
Yes
2020
7
19/20
CRINELLA DRIVE
WEAVERLY DRIVE
BAYWOOD DRIVE
High Volume Slurry Seal
Yes
2020
7
19/20
CRINELLA DRIVE
BAYWOOD DRIVE
BUNGALOW LN
High Volume Slurry Seal
Yes
2020
7
19/20
CRINELLA DRIVE
ALTA DRIVE
WEAVERLY DRIVE
High Volume Slurry Seal
Yes
2020
7
19/20
CRINELLA DRIVE
MCGREGOR AVENUE
ALTA DRIVE
High Volume Slurry Seal
Yes
2020
7
19/20
EAST MADISON
MCDOWELL BLVD NORTH
MARIA DRIVE
SEAL CRACKS
Yes
2020
3
19/20
MAGNOLIAAVENUE
PETALUMA BLVD NORTH
MADRONE LANE
SEAL CRACKS
Yes
2020
3
19/20
MAGNOLAAVENUE
MADRONE LANE
KEOKUK STREET
SEAL CRACKS
Yes
2020
3
19/20
MAGNOLIA AVENUE
KEOKUK STREET
190' W/0 ANTONE WAY/COP
SEAL CRACKS
Yes
2020
3
19/20
MAGNOLIA AVENUE
190' W/O ANTONE WAY/COP
SAMUEL DRIVE
SEAL CRACKS
Yes
2020
3
19/20
WASHINGTON STREET
HOWARD STREET
PETALUMA RIVER
SEAL CRACKS
Yes
2020
3
19/20
CAULFIELD LANE
MCDOWELL BLVD SOUTH
SAINT FRANCIS DRIVE
SEAL CRACKS
Yes
2020
3
7
bb
Ca
cl