Loading...
HomeMy WebLinkAboutStaff Report 3.B 09/16/2019DATE: September 16, 2019 TO: Honorable Mayor and Members of the City Council through City Manager f ) FROM: Dan St. John, F.ASCE — Director, Public Works & Utilities Jeff Stutsman, P.E. — Senior Civil Engineer SUBJECT: Resolution Accepting Completion of the Sewer Main Replacement 2017-2018 by . Coastside Concrete and Construction, Inc. RECOMMENDATION It is recommended that the City Council approve the Resolution Accepting Completion of Sewer Main Replacement 2017-2018 by Coastside Concrete and Construction, Inc. BACKGROUND To maintain and improve the condition of the City's water and wastewater systems, the Public Works and Utilities Department annually replaces or rehabilitates deteriorating water and sanitary sewer mains throughout the City. A 5 -year priority list of water and sewer line replacements has been created. These projects are cross-referenced with the City's street maintenance program, development projects, and proposed PG&E work to endeavor to assure that new or nearly new pavement will not be impacted. The Sewer Main Replacement 2017-2018 Project included the replacement of the sewer main and manholes on Belleview Avenue, Hill Drive, and Hayes Lane and the installation of a new sewer main on Orchard Lane. The sewer main was rerouted down Orchard Lane to eliminate a section of sewer main in private backyards and under houses with limited access for maintenance and repairs. The project also identified areas of occasional sanitary sewer overflows during high flow events. The original sewer system was constructed in the early 1930's when the Linda Vista Subdivision was created. The sewer lines were not constructed to today's standards by installing them thru private properties without proper easements. By rerouting the lines into the road and upsizing the lines nearly eliminates the sewer overflows during high flow events and allow for more routine maintenance that was previously not possible. The proposed action supports the City Council Objective — "Preserve and Protect Petaluma's environment with smart and efficient use of resources," item 55; making our utility system more resilient by repairing and replacing pipes. DISCUSSION The final construction contract for the Sewer Main project with Coastside Concrete and Construction, Inc. is $948,564.87, which includes 2 change orders for $141,680.87 for various unforeseen items including the repair to two storm -drain crossings and paving within the project limits. Additionally, estimated unit quantities of supplies added up to a decrease of $62,791.00 based on the quantities that were used. The installation and replacement of the sewer main required deep excavation through hard rock, which required larger equipment which damaged the street road much more than anticipated. Because of this, it was decided to increase paving for the street fiom paving over the planned trench to grinding and paving over the width of the street. There are no disputed claims and the project was completed satisfactorily without any significant incidents. PUBLIC OUTREACH Public outreach included presenting the project at City Council during the authorization for award of the construction contract, which was approved on May 7, 2018 with Resolution 2018- 063 N.C.S., mailing notifications to properties within 500 feet of the project site, posting project information on the City's website, providing social media posts on the project, and placing door hangers on affected properties 48 -hours in advance of the work. FINANCIAL IMPACTS The Sewer Main Replacement 2017-2018 Project, CIP C66401822, had a revised budget of $1,236,094, approved on May 7, 2018, as part of the resolution to award the construction contract. The funding source was the Waste Water Capital. The following table compares the approved budget estimated cost with the actual cost of the proj ect. 2 Sewer Main Replacement 2017-2018 C66401822 Revised, Approved Project Budget Final Project Budget Uses Planning and Environmental $1,000 $1,000 Land and Easements $2,000 $0 Design (City Staff $35,000 $35,000 Legal Services $1,000 $1,000 Administration $5,000 $500 Construction Contract $869,675 $948,565 Construction Management & Inspection $100,000 $100,000 Contract Contingency $217,419 $147,529 CIP Overheads $5,000 $2,500 Total Uses $1,236,094 $1,236,094 Sources Waste Water Capital $1,236,094 $1,236,094 Unused funds will be returned to the Waste Water operating accounts for use on future maintenance and operations of the City's waste water collection system. ATTACHMENTS 1. Resolution 2. Location Map Attachment 1 RESOLUTION ACCEPTING COMPLETION OF THE SEWER MAIN REPLACEMENT 2017-2018 BY COASTSIDE CONCRETE AND CONSTRUCTION, INC. WHEREAS, in accordance with Section 68 of Article X of the City of Petaluma Charter, Section 20162 of the California Public Contract Code and other applicable law, the City of Petaluma solicited bids for the Sewer Main Replacement 2017-2018 to replace sewer main and laterals ("the project"); and WHEREAS, bids for the Project were opened on April 18, 2018, in accordance with California Public Contract Code Section 4104.5 and other applicable law; and WHEREAS, the lowest responsible bid for the Project was submitted by Coastside Concrete and Construction, Inc. (Coastside) of Rohnert Park, CA for $869,675; and WHEREAS, by Resolution No. 2018-063 N.C.S., adopted on May 7, 2018, the City Council found the bid of $869,675 for the project to be the lowest responsive bid, awarded the Project to Coastside Concrete and Construction Inc., conditioned on Coastside's timely executing the project contract and submitting all required documents and authorized and directed the City Manager to sign the project contract on behalf of the City; and WHEREAS, the following contract change orders (CCO) for replacing two storm drains and paving within the project limits affecting the Project amount have been approved: Water Services Project(C67501713) Change Order #1 Change Order #2 Decrease in quantities Total Change Orders and decrease in quantities Cost $ 30,882.87 $110,798.00 -$ 62,791.00 $ 78,889.87; and WHEREAS, the final contract amount, as amended, including all change orders, overruns, and underruns, is $948,564.87 and is within the approved project budget and; WHEREAS, based on the foregoing, staff recommends acceptance of the project on behalf of the City. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Petaluma hereby: The contract titled Sewer Main Replacement 2017-2018, project no. C66401822, with the final contract amount of $948,564.87, is accepted as complete, subject to the Contractor's continuing warranty and other obligations pursuant to the contract. L 2. The City Clerk is hereby authorized and directed to file a Notice of Completion concerning the project with the Sonoma County Clerk's Office within ten (t 0) days of the date of this Resolution. 3. Staff are hereby authorized and directed to release all undisputed retention not subject to pending change orders within sixty (60) days of the date of this Resolution and in accordance with the terms of the project contract, California Public Contract Code Section 7107, and applicable law. Attachment 2 REPLACEMENTSEWER MAIN 2017-2018 BELLEVIEW AVENUE, ORCHARD LANE, HILL • . - ..• TERRACE LOCATION MAP �P S�. S> S'ORiNG Q/- tiiNM qN ST WF9s ST 5P T���pFgRCF �\ gLq�FS Date :August 22, 2019 L N City of Petaluma awe PROJECT SITE w E Public Works and Utilities S Department : rs�a