SUBJECT: PCDC Resolution Accepting Completion of the. Construction Contract for the
Caulfield Lane Ektesioii.At -Grade Railroad Crossing
It is recommended that the PCDC adopt the attached 'PCDC resolution accepting completion of
the construction contract for the Caulfield Lane'Extension At -Grade Railroad Crossing Project.
The Public Works Department prepared plans and specifications for this project. Bids were
opened on March 24, 2010, and on May'17, 2010, the PCDC awarded the construction contract
to North iBay Construction, Inc. ( "Contractor "), who'.has satisfactorily completed the
construction contract for $336,173.70. The estimated total cost ofthe'project, including
{
construction contract construction managementand inspection, design, administration and
overhead, is $440,000.
This project extends Caulfield Lane Extension, from: its currentterminus to Hopper Street, and
includes; a new at -grade railroad.crossing, along" with1he closure of 'Hopper Street
connecti,on/access to Lakeville .-Street.
Per contract requirements, retention will be released, within sixty days after Council acceptance
of this project.
i
DISCUSSION
Staff rec. nimerids accepting completion of the construction contract, ,since North Bay
Construction Inc. has'filfilled all contract requirements. Approval of this resolution will assure
release of retention to the Contractor.
b .
f
Agenda Review:
City Attor ney:
-
i
Finance Director City Manager ` `
f
FINANCIAL IMPACTS
The estimated total cost of the project, including construction contract, construction management
and inspiection, design, administration, sand overhead, is $440,000.. A total project budget of
$458,644.50 from PCDC funds was authorized by PCDC Resolution -07' on May 17, 2010.
The unused budget will be returned" to PCDC funds for future use.
ATTACHMENTS
1. Resolution
2. i ovation I map
ATT '1
f RESOLUTION ACCEPTING COMPLETION OF THE'
CONSTRUCTION CONTRACT FOR THE CAULFIE'LD LANE, EXTENSION AT
i GRAD"
RADE RAILROAD.CROSSING PROJECT NO. C01200104 '
WHEREAS, in S
accordance with.ection'68 of Article'X of the City of Petaluma Charter-,
Section, 20162 .of ,the California Public Contract Co& and ,other applicable law the City of
Petaluma.solicited bids for the Caulfield Lane Extension At- Grade Railroad°Cross- Project
( "Project "), and.
3EREAS; bid's for the Proj Oct were opened on March' 24, 201,0 in accordance with
Public Cont Code Section_ 4104.5 and,otheT applicable. law; and
:WHEREAS, the apparent low bid for the Project was Elie :bid of•North Bay Construction,
n,
in the amount of x$302,894.50;; and
'WHEREAS by PCDC Resolution No ,20,10 =07, adopted on M'ay 17, 2,010,, the PCDC
found the bid of- $302';894.50,for the Project to be the�.lowestresponsive bid and °awarded the
Project to North Bay Construction, lnc,:in the amount- of $302,894.50, conditioned on North Bay
Construction's time executing the Project contract.and submitting all required. documents,'and
authorized and. directed the, Executive Director'to. `sign the .Project, contract on behalf of the
PCDC, upon such timely submission, Ahdio execute on behalf of the PCDC any change orders
and other amendments to the Project contract that were necessary to effectively complete the
project p , realize the Project and /or cost benefits for the PCDC, so long as,such change.
o rderso amendments did not.result in an increase in,excess.of•$7�5,000 and
WHEREAS; the following contract change orders (CCO) affecting, the Project; amount
have been approved;
Change! Order
Number Description Amount
CC0 ' -Add barbed wire to chain linlc.fence $2,745,75
CCO #,2 Place stabilization fabric and coring utility vault $3,,407.73
CC0� #3 Saw cut median island:tg provide clearance to
railroad tracks, per PUC requirements $4,02:56
:Demo,:and reconstruef'S /W corner of Hopper Streetl
Caulfield Lane as required by SMART'
C06#5 Construct,ADA:access ramps per SMART, tree
removal°per;PUC;'lower electrical vault to,grade,
�. and relocate •d'owri spout $12,908.77
CC? % : Install one `Private Road -Keep Out" sign $305._00
CCO #7 Extra,fence work $1,601;:25 .
CCO #8 Install two changeable message signs
CC6#9 Install one additional sign & median delineators
CCO. #10 Change the width of new gutter to match existing
Total change orders:
Sum of over -runs:
; and
$800.00
$1,104.00
$250.00
$33,156.39
$122.81
, the final contract amount, as amended, including all change orders, is
$336,1,73.70; and
IHEREAS, PCDC staffhave inspected the Project and determined that it has been
I in accordance with'the contract requirements, subject to the Contractor's continuing
and other obligations pursuant to the contract; and
WHEREAS, based on - the foregoing, staff recommends acceptance of the Project on
behalf of the City;
OW, 'THEREFORE, BE I`I' RESOLVED by the PCDC as follows:
1. The contract entitled Caulfield Lane Extension At -Grade Railroad Crossing, Project
No. C01200104, with the final contract amount of $336,173.70, is accepted as
complete, subject to the Contractor's continuing warranty and other obligations
pursuant to the contract.
2. The City Clerk/Recording Secretary is hereby authorized and directed to file a Notice
of Completion concerning the Project.with the Sonoma County Clerk's Office within
ten (10) days of the date of this Resolution.
Staff are hereby- authorized and directed to release. all undisputed retention not subject
to pending change orders within sixty (60) days of the date of this Resolution and in
accordance with the terms of the Project contract; California Public Contract Code
Section 7,107 and applicable law.