Loading...
HomeMy WebLinkAboutMinutes 04/23/1996Planning Co mmissi on Minutes - April 23, 1996 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 CI'T'Y OF PETALUMA PLANNING COMMISSION MINUTES REGULAR MEETING CITY COUNCIL CHAMBERS CITY HALL - PETALUMA, CA APRIL 23, 1996 7:00 PM Comm 'issioners:Present: Feibusch, Rahman *, Read, Thompson, Torliatt, vonRaesfeld, Wick Staff. Pamela Tuft, Planning Director James McCann, Principal Planner Teryl Phillips, Associate Planner • Chairman PLEDGE OF ALLEGIANCE. APPROVAL OF MINUTES: Minutes of April 9, 1996 were approved as printed. PUBLIC COMMENT: Jack Metallinos - 1702 Creekview Court (owner - Jack's Produce) - responded to previous discussion by Commissioners regarding Jack's Produce at Lakeville and East "D" Streets; understands seasonal approval, Specific Plan underway in this area; understands that his business is temporary and that improvements made to the site are at his expense and entirely voluntary; offered to answer questions. DIRECTOR'S REPORT: Preliminary Goals from City Manager's Office; draft Planning Dept. Budget document including Department goals. COMMISSIONER'S REPORT: Commissioner Torliatt - firm date for discussion of Economic Plan? Planning Director Tuft - Will be on June 11 agenda. CORRESPONDENCE: Letter from Capri Creek Homeowner's Association regarding Woodside Village; letter from staff to Jack Metallinos (Jack's Produce); information on Marin- Sonoma Land Use and Conference; letter from Mogel Engineering regarding West View Estates. APPEAL STATEMENT: Was read. LEGAL RECOURSE STATEMENT: Was noted on the agenda. 1 Planning Commission Minutes - April 23, 1996 OLD BUSINESS L WEST VIEW ESTATES SUBDIVISION; NORTHBAY CONSTRUCTION; BODEGA AVENUE BETWEEN NORTH WEBSTER STREET AND RUTH COURT; AP NO'S 006 -470 -010, 006 - 480 -003, 005, 011, 012, 016, AND 031. 8 Continued consideration of a revised proposal for a 43 -lot detached single - family 9 home development on 21.63 acres of hillside property in west Petaluma. The 10 project includes requests for approval of 1) a Mitigated Negative Declaration; 2) 11 Rezoning of the site to PUD; 3) Tentative Subdivision Map to create 42 parcels 12 and future development potential of one additional lot. 13 14. (Continued from December 5, 1995, February 27, and March 12, 1996.) 15 16 Associate Planner Phillips presented the staff report - Applicant agrees with staff report 17 (except 18.1 d). 18 19 (The public hearing was closed at the Planning Commission meeting of March 12, 1996.) 20 21 COMMISSION DISCUSSION: 22 23 Commissioner Torliatt - Questions regarding maximum footprint allowed for homes. 24 Commissioner Read - Reviewed tapes/minutes of previous meetings - concerns with. 25 nuisance created by pathways - need to add a notice on titles; concerns with proposed 26 Design Guidelines. 27 Planning Director Tuft - Excellent idea - will add recorded easement requirement. 28 Principal Planner McCann - Guidelines will be fine -tuned by SPARC with the direction 29 provided through the conditions of approval. 30 Commissioner Read - Where will lot (recommended by staff) be removed (in vicinity of 31 Joan Court?) - Yes 32 Commissioner Wick - Questions regarding traffic distribution. 33 Commissioner vonRaesfeld - Question regarding the pedestrian connection to Joan Court; 34 Will this be further reviewed by SPARC /Staff? 35 Planning Director Tuft - Yes. 36 Commissioner vonRaesfeld - Has staff received very much neighborhood response since 37 the previous meeting? 38 Associate Planner Phillips - No written correspondence, spoken with 2 neighbors. 39 City Engineer Hargis - Respond to traffic question; calculated to add one vehicle per 40 minute. 41 Commissioner Wick - Thanked staff for excellent staff report; concerned that the project 42 does not provide an acceptable transition to the more rural lands to the west; apparent 43 density is very uniform lotting, not less dense toward top of hill; comparing this project 44 with adjacent projects (sq.footage) pattern set in surrounding areas (denser lower on 45 hillsides); makes suggestion - remove about 13 units from project site; shift density 46 downward, eliminate lots 24,25,26,27; suggests overall density of 1.51 units per acre (32 47 lots). 48 Commissioner Torliatt - Found visual assessment disturbing (massing); should not always 49 approve densities at high end of range. 50 Commissioner Read - This is an in -fill project, complies with density in General Plan; 51 Commissioner Wick's ideas only being introduced tonight ?; this project is part of puzzle of 2 Planning Co mmissi on Minutes - April 23, 1996 i westside of Petaluma; lived on Webster for 20 years; no more dense than any other project 2 in this area; should be voted on by this commission. 3 Commissioner Wick - Has also lived on N. Webster - concerns regarding traffic; number 4 of AM peak hour trips very important - needs to be made safer in front of Valley Vista 5 School; need sidewalks in front of schools; Park Fees should be spent in this area, park 6 should be expanded, perhaps at Valley Vista School (school facilities function as a park). 7 Commissioner Read - Bodega Avenue improvements in CIP for 3 years from now? 8 City Engineer Hargis - Discussed anticipated projects in area - cumulative 9 traffic/improvements required with projects. 10 Commissioner Torliatt - Does not want to allow higher density in this area - creates lower 11 quality of living; lives in Kingsfield Subdivision - major traffic coming down N. 12 Webster/Bodega; was all traffic to come from Cherry Valley area coming through this 13 subdivision considered? 14 Planning Director Tuft - Yes - all traffic that would use N. Webster as an alternative route 15 was considered. 16 Commissioner Torliatt - Will be a short-cut from downtown, believes more traffic will be 17 generated than traffic study indicates. 18 Commissioner Rahman - Any thoughts on Commissioner Wick's suggestions regarding 19 density? 20 Commissioner Thompson - Willing to discuss density reduction; makes sense to match 21 existing densities and lotting pattern in area. 22 Commissioner vonRaesfeld - Density versus design/massing - not really a problem with 23 number of lots - what will finished project look like ?; have to assume that this project will 24 be pretty much the same as other hillside developments in Petaluma; look at keeping 25 proposed density, rearrange lots; look at introducing some faster - growing trees at lot 26 lines; proposed walkway good feature; Landscape Assessment District ?; agrees with 27 Commissioner Wick - not ideal subdivision layout - is most logical way to get a road 28 through; move some of the lots down off of hill - still allow proposed density. 29 Comrrvssioner Torliatt - PUD Guidelines not very stringent; going down Bodega - existing 30 homes have lots of character; Bodega View Estates - very large homes without character 31 of Petaluma; would like mixture of house sizes; lot of thought in staff report - very good. 32 Commissioner Feibusch - General Plan addresses issues on ridgelines; SPARC takes this 33 issue very seriously and will really address these issues; ridgeline is No. 1 concern - can be 34 adequately addressed by SPARC. 35 Commissioner Rahman - Has looked at density; would like to recommend moving some 36 lots down from ridgeline. 37 Commissioner Feibusch - (for SPARC benefit) - Requests copies of all Minutes regarding 38 this meeting be forwarded to SPARC during their review. 39 Commissioner Torliatt - Make sure SPARC understands all Planning Commission 40 comments/concerns. 41 Planning Director Tuft - Staff also struggled with lot sizes - took into account topography; 42 concerned with massing; concerns with higher density on Rebecca; trying to minimize 43 grading throughout entire subdivision; described lot sizes, density in relationship to 44 topography; staff has already recommended additional provisions in the Design Guidelines 45 consistent with Commissioner Torliatt's comments; condition could be added requiring a 46 greater transition of lot size from the rural lands to the west. 47 Commissioner vonRaesfeld - Issues - traffic, drainage, aesthetics - heard all concerns; 48 would like to see "tree corridor" on Rebecca; one upper lot should be eliminated or 1 -2 49 moved down lower on hill; Traffic Impact Fees should be used in this area including to 50 address continuing problems on N. Webster at the Valley Vista School. 51 Commissioner Thompson - Mild readjustment of lot sizes from east to west. 52 Commissioner Rahman - Concerns with views of rear of homes; focus on upgrades around 53 Valley Vista School (safety, traffic); concerns regarding traffic and drainage - believes 54 proposal will adequately address these issues. Planning Commission Minutes - April 23, 1996 Commissioner Torliatt - Carry through to SPARC - make sure westside character is carried through; regarding parking along streets (Rebecca) parking should be allowed on Rebecca - would cause traffic to slow down. 5 A motion was made by Commissioner Thompson and seconded by Commissioner 6 Feibusch to recommend to the City Council adoption of a N Etigated Negative Declaration 7 and approval of the proposed Rezone to PUD, Development Plan and Standards, and 8 Tentative Subdivision Map for creation of the 43 -lot residential project known as West 9 View Estates, based on the findings and subject to the mitigations and conditions listed in 10 the staff report as amended by Commission. 11 12 Commissioner Read: Yes 13 Commissioner Feibusch: Yes 14 Commissioner Thompson: Yes 15 Commissioner Torliatt: Yes 16 Commissioner vonRaesfeld: Yes 17 Commissioner Wick: No 18 Chairperson Rahman: Yes 19 20 Findings for Mitigated Negative Declaration 21 22 1. An Initial Study has been prepared for the West View Estates project, and proper 23 notice provided in accordance with CEQA and local guidelines. 24 25 2. Based upon the Initial Study and comments received, potential impacts could be 26 avoided or reduced to a level of insignificance by mitigation measures attached as 27 conditions of approval. There is no substantial evidence that the West View 28 Estates project, as conditioned, would have a significant effect on the environment. 29 30 3. A monitoring program has been included to ensure compliance with the adopted 31 mitigation measures for the West View Estates project. 32 33 4. The West View Estates project does not have potential to affect wildlife resources 34 as defined in the Fish and Game code, either individually or cumulatively. 35 36 5. The West View Estates project is not located on a site listed on any Hazardous 37 Waste Site List compiled by the State pursuant to Section 65962.5 of the 38 Government Code. 39 4o 6. The Planning Commission reviewed the Initial Study/Negative Declaration and 41 considered the comments before making a decision on the project. 42 43 7. The record of proceedings of the decision on the project is available for public 44 review at the City of Petaluma, Planning Department, City Hall, 11 English Street, 45 Petaluma, California. 46 47 8. Potential circulation impacts resulting from development of the West View Estates 48 project as conditioned, will be adequately mitigated through improvement of the 49 Bodega Avenue arterial across the frontage of the project site and adjacent offsite 50 properties as necessary to provide safe and reasonable pedestrian, bicycle and 51 vehicular movement; implementation of a planned local residential collector loop 4 Planning Commission Minutes - April 23, 1996 1 system (Rebecca Drive and N. Webster Street) within the boundaries of the project 2 site; and provision of a secondary means of public access (Larch Drive) via 3 connection to West Street. Further, the design of the proposed interior street and 4 bicycle/pedestrian systems, as conditioned, will not jeopardize the public safety and 5 will provide adequate parking facilities to serve residents of the development. 6 7 9. Potential grading and drainage impacts resulting from development of the West 8 View Estates project, as conditioned, will be adequately mitigated by use of 9 narrower public street designs, including omission of sidewalk and on -street 10 parking improvements, and use of hammerheads in lieu of cul de sacs where 11 possible to reduce the amount of required grading; establishment of grading 12 standards for application to lot- specific development proposals; and installation of 13 grading and drainage improvements designed to City and Sonoma Co. Water 14 Agency standards, in order to eliminate lot to lot surface drainage within the 15 project boundaries and improve current drainage conditions affecting downhill 16 properties. 17 18 10. Potential aesthetic impacts resulting from development of the West View Estates 19 project, as conditioned, will be adequately mitigated by establishment of 20 architectural design standards for application to lot- specific development proposals 21 and administrative SPARC review of design plans for all lots; implementation of a 22 visual mitigation landscape plan and installation of public area landscaping, 23 including large- canopied street trees. 24 25 Mitigation Measures 26 27 All mitigation measures as specified in the Initial Study (filing date January 16, 1996) for 28 West View Estates are herein incorporated as follows: 29 30 EAR'T'H Mitigations 31 32 1. Prior to SPARC review of the PUD Development Plan and Tentative Map, 33 the written PUD Standards shall be amended to incorporate detailed provisions 34 pertaining to permitted grading limits. These provisions shall limit excavation, fill 35 and significant grading and paving for lot- specific development to within the 36 approved building envelopes, except for necessary driveway and pedestrian access 37 and required utilities. Graded slopes in excess of 3:1 shall not be permitted for all 38 proposed private landscape areas, except where 2:1 slopes have been approved for 39 public street grading transitions. The height of exposed retaining walls and 40 underfloor areas for buildings shall be limited to a maximum of 6', and use of 41 retaining walls within private yard areas shall be limited to a maximum of 42 ". Lot 42 "padding" shall be prohibited. Cut and fill areas for private lot improvements shall 43 be limited to a maximum depth.of 5. Driveway slopes shall not exceed 18 %. All 44 measurements for development of individual lots shall be based upon the grading 45 conditions established with the Final Map and Public Improvement Plans for the 46 Subdivision. 47 5 Planning Commission Minutes - April 23, 1996 1 2. An erosion control plan shall be prepared for all subdivision improvements, 2 in conformance with City Ordinance requirements, and submitted for staff review 3 and approval in conjunction with application for Final Map approval. 4 5 3. All lots shall be subject to administrative SPARC approval of grading 6 plans, for review of compliance with the SPARC - adopted PUD standards. Plan 7 submitted for approval of building permits shall include detailed grading plans in 8 conformance with the SPARC - approved plans and project conditions. 9 10 4. All recommendations detailed in the geotechnical report for the subdivision 11 dated August 29, 1994, prepared by John H_ Dailey, Consulting Geotechnical 12 Engineer, shall be incorporated into the grading and drainage plans submitted for 13 administrative approval of the Final Map and Public Improvement Plans. Plans 14 submitted for approval of individual lot development permits shall also reflect 15 compliance with the report recommendations as it relates to the specific site and 16 structural improvements proposed. 17 18 5. The following requirements of the City Engineer shall be met, and reflected 19 on plans submitted for Final Map approval: 20 21 Grading 22 23 a. Grading shall conform to the soils investigation report for this 24 subdivision. The geotechnical engineer shall make a 25 recommendation as to the construction and protection of graded 26 swales on steep slopes. Graded swales with a slope steeper than 27 5% shall be protected with a permanent method other than planting. 28 29 b. An Erosion Control Plan shall be prepared. 30 31 C. Drainage from sideyard swales shall be collected in a conduit and 32 directed through the curb face or to a storm drain system. 33 34 d. Any existing structures above or below ground that are abandoned 35 or not needed shall be removed. Structures shall include, but not be 36 limited to, fences, retaining walls, pipes, debris, etc. 37 38 Mom_toring: 39 40 1. Plans submitted for approval of the Final Map. and Public Improvements shall be 41 reviewed for compliance with the adopted mitigations and project conditions of 42 approval prior to recordation of the Final Map. 43 44 2. All public improvements shall be subject to inspection by City staff for compliance 45 with the approved Public Improvement Plans, construction permits and project 46 mitigation measures/conditions of approval, prior to City acceptance. 47 48 3. Plans submitted for approval of grading/building permits for lot- specific 49 development shall be subject to staff review for conformance with the SPARC- 50 adopted grading standards for the subdivision. All private lot construction shall be 51 subject to staff inspection for compliance with the approved plans and project 52 mitigations/conditions prior to issuance of a Certificate of Occupancy for each new 53 unit. 54 6 Planning Commission Minutes - April 23, 1996 2. ABR 3 Mitigations 4 5 1. Motorized equipment operated during construction activities shall be 6 properly maintained and mufflered to minimize smoke and other air emissions. 7 Equipment shall be turned off when not in use. The project site shall be routinely 8 sprinklered as necessary to prevent dust generation during grading and 9 construction activity. Tarps shall be utilized to contain soil and debris materials in 10 open trucks during transport to and from the site. 11 12 2. Prior to issuance of building permits, all homes designed with fireplace 13 units shall meet City specifications for reduction of emissions, as specified under 14 City Ordinance 1881 N.C.S. 15 16 Monitorine 17 18 1. Plans submitted for development permit approval shall contain 19 specifications meeting City Ordinance requirements. 20 21 2. All homes proposed shall be subject to inspection by City staff for 22 compliance with approved construction plans prior to issuance of a Certificate of 23 Occupancy. 24 25 3. Construction activities shall be monitored by Public Works (for project 26 public improvements) and Building Division (for private lot improvements) staff 27 during the course of required inspections, to ensure compliance with Mitigation 28 Measure 2.1. above. 29 30 3. WATER 31 32 Miti ations 33 34 1. Plans submitted at time of application for Final Map approval shall include 35 provisions for storm water runoff management, in conformance with City 36 Ordinance provisions and Engineering Department specifications as identified in 37 the project conditions of approval. No lot to lot surface drainage across property 38 lines shall be permitted. The submitted drainage plans shall include provisions for 39 installation of permanent signs at drop inlets to the public storm drain system, 40 which prohibit the deposit of hazardous materials into the system. 41 42 2. The project proponents shall be responsible for compliance with all 43 applicable requirements of the California Water Quality Control Board within the 44 time frames specified by that agency. 45 46 3. All hydrologic, hydraulic and storm drain system design shall be subject to 47 review and approval of the Sonoma County Water Agency (SCWA) within the 48 time frames specified by SCWA, and prior to City approval of the Final Map. 49 50 4. Grading plans submitted for SPARC approval of the Tentative Map and 51 PUD Development Plan shall reflect all proposed graded swales, in conformance 52 with the construction recommendations of a geotechnical engineer, particularly 53 where proposed slopes exceed 4 to 1 gradients. Plans shall also reflect all Planning Commission Minutes - April 23, 1996 1 necessary improvements to prevent drainage across property lines and private 2 roads/shared driveways. 3 4 5. The project shall be subject to payment of Storm Drainage Impact Fees as 5 specified by City Resolution prior to occupancy of each new unit constructed. 6 7 6. The following requirements shall be reflected on plans submitted for City 8 approval of the Final Map and Improvement Plans for all applicable phases of the 9 subdivision, subject to approval of the City Engineer: 10 11 a. Construct storm drain system from Webster Street to Lot 9 per 12 Sonoma County Water Agency Master Plan as part of the Bodega 13 Avenue frontage improvements for the project. 14 15 b. Provide necessary drainage improvements to prevent lot -to -lot 16 drainage. 17 18 C. Provide 100 -year overflow containment channels where public 19 storm drains cross private property. 20 21 d. The catch basin at Lot 6 shall drain via a storm drain pipe in 22 Hannah Lane to the end of the cul -de -sac. The catch basin in front 23 of Lot 5 shall be eliminated. An all weather access road shall be 24 provided over the proposed public storm drain system between the 25 end of Hannah Lane to the drop inlet on Lot 3 and between Fowler 26 Court and Hannah Lane. The access roads shall be ten feet wide. 27 Ten foot wide gates shall be provided between Lots 2, 3, 4, 5, and 28 8. 29 30 7. Prior to City approval of the Final Map and Public Improvement Plans for 31 the first phase of the project, additional study of project site subsurface drainage 32 conditions shall be conducted by a qualified geotechnical engineer, to determine 33 any potential impacts of proposed cut slopes to downhill properties, including 34 assessment of conditions that may be created by installation of residential irrigation 35 systems and excavation/fill for home construction. Based upon the results of the 36 study, a determination shall be made by City Engineering staff regarding the need 37 for additional measures to be incorporated into the project Public Improvement 38 Plans, and implemented by the project proponents. Costs of the study shall be 39 borne by the project proponents, with selection of consultant to staff approval. 40 41 8. A qualified geotechnical engineer shall be present on -site during grading 42 and excavation work conducted for the public improvements, as determined by 43 Engineering staff. Costs associated with staff - authorized consultant work shall be 44 borne by the project proponents. 45 46 Monl� 47 48 1. All required drainage improvements shall be reflected on plans submitted 49 for City approval of the Final Map and Public Improvement Plans for the 50 subdivision. 51 52 2. Plans submitted for approval of development permits shall be reviewed for 53 compliance with the approved Public Improvement Plans and all applicable 54 mitigations/conditions of project approval. Planning Commission Minutes - April 23, 1996 1 2 3. Prior to recordation of the first Final Map, public improvement plans shall 3 be subject to review and approval by Engineering and Planning staff for 4 compliance with all required mitigation measures, including any resulting from 5 study of the project site subsurface drainage conditions. 6 7 4. All public improvements shall be subject to inspection by City staff for 8 compliance with the approved Public Improvement Plans, construction permits and 9 project mitigations/conditions of approval, prior to City acceptance. Grading and 10 excavation work for the public improvements shall also be subject to inspection by 11 a qualified geotechnical engineer during construction, as determined by the City 12 Engineer. 13 14 5. Storm Drainage Impact Fees shall be calculated prior to Final Map 15 approval by the City Council, and paid prior to issuance of a Certificate of 16 Occupancy for each new dwelling unit constructed. 17 18 PLANTLIFE 19 20 Mitigations, if any 21 22 1. Existing mature native oak trees located within the project site along the 23 northerly boundary of proposed Lots 32, 33 and 35 and trees numbered 55 and 56 24 (as identified in the Horticultural Associates Tree Preservation and Mitigation 25 Report dated November 1, 1995) shall be presented for nomination as Heritage or 26 Landmark trees by the Historic and Cultural Preservation Committee in 27 conjunction with application for SPARC approval of the project Tentative Map 28 and PUD Development Plan. 29 30 2. Plans submitted at time of application for SPARC approval of the Tentative 31 Map and PUD Development Plan shall incorporate a non - development easement 32 to contain the trees proposed for Heritage/Landmark designation within a 33 minimum 30' wide continuous mitigation area, measured from the northerly 34 property lines of proposed Lots 32 ,33 and 35. No structures, underground 35 utilities, grading, trenching or other construction activity shall be permitted within 36 the easement/mitigation area. For Lots 8 and 9 (affecting trees #55 and #56), 37 proposed site improvements and building envelopes shall be modified if necessary 38 to maintain a minimum setback of 5' outside the existing driplines of the trees. 39 40 3. The consulting arborist's recommendations for tree protection (e.g., mulch, 41 irrigation, setback, pruning etc.), as specified in the Horticultural Associates report 42 dated November 1, 1995, shall be implemented prior to issuance of a grading 43 permit for the subdivision, for all trees granted Heritage(Landmark designation. 44 Work shall be conducted under the supervision of an ISA Certified arborist or tree 45 worker, with selection of consultant subject to the mutual consent of staff and the 46 developer. All costs associated with implementation of the recommended tree 47 protection measures shall be the responsibility of the subdivider. 48 49 4. All specific recommendations contained in the Horticultural Associates 50 report for trees other than those granted Heritage/Landmark status, shall be 51 implemented as specified by the consulting arborist. Required pruning and 52 mulching activities shall be completed prior to City acceptance of the public area 53 improvements or occupancy of the affected lots, whichever occurs first. Work Planning Commission Minutes - April 23, 1996 1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 5 shall be conducted under the supervision of a staff - approved arborist, with costs to be borne by the subdivider. 5. Landscape plans for the subdivision right -of -way areas shall reflect use of water conserving and native plant materials (including native oaks and other species with high habitat value) and compatible irrigation system design. Plans shall be included in the submittal for SPARC approval of the Tentative Map and PUD Plan, and shall conform to City standards for street tree installation. All public area landscaping shall be installed prior to acceptance of the public improvements for each phase of construction or bonded for 100% of the cost of materials and installation, with implementation to occur on a lot by lot basis. A 10% maintenance bond shall be retained by the City for a minimum of one year following installation of the required landscape improvements, as maintenance security during the establishment period. 7. Grading and landscape plans submitted for City approval of the Final Map and Public Improvement Plans shall identify the location of existing trees to be preserved, as well as incorporate a reference to mitigation measures applicable to the trees. 6. The written Development Standards shall identify all proposed lots containing existing trees to be preserved (including those granted Heritage/Landmark status) and shall reference the mitigation measures contained in the Horticultural Associates report dated November 1, 1995. Monitoring 1. Plans submitted for SPARC approval of the Tentative Map and PUD Development Plan shall be reviewed by Planning and Engineering staff for conformance with Mitigation Measures 4.1. - 4.7. Public Improvement Plans submitted for Final Map approval shall be reviewed for conformance with the adopted SPARC conditions of approval. All public area improvements shall be subject to inspection by City staff for compliance with the adopted conditions and mitigation measures, prior to City acceptance. 2. Plans submitted for administrative SPARC/building permit approval of individual lot development shall be reviewed by Planning and Engineering staff for conformance with Mitigation Measures 4.1. - 4.7. and the adopted SPARC conditions for the subdivision. All construction improvements shall be subject to inspection by City staff for conformance with the adopted conditions and mitigation measures prior to issuance of a Certificate of Occupancy for each new unit constructed. 3. City staff shall be notified by the project proponents prior to commencement of any work proposed closer than 5' outside the driplines of trees recommended for preservation (as identified in the Horticultural Associates report). All such activity, including excavation, pruning and root work shall be conducted under the supervision of the consulting arborist authorized by staff. ANIMAL LIFE: Mitigations, if any See Mitigation Measures under item 4 (Plant Life) above. 10 Planning Commission Minutes - April 23, 1996 2 Monitoring 3 4 1. See Monitoring Measures under item 4 (Plant Life) above. 5 6 6. NOISE 7 8 Mitigations 9 10 1. See Mitigation Measure 1 under item 2 (Air). 11 12 .2. All City - authorized grading and construction activity shall be limited to the 13 hours between 7:00 AM and 7:00 PM Monday through Friday, except that indoor 14 work may be conducted on Saturdays provided noise levels generated are 15 acceptable to nearby residents. No construction work shall be permitted on City 16 recognized holidays, and Sundays. The developer shall designate a construction 17 management person responsible for responding to any complaints generated 18 regarding excessive noise during construction. A telephone number for contacting 19 the designated individual shall be conspicuously posted at the construction site. 20 The responsible authority shall determine the cause of noise complaints received 21 and implement reasonable measures to resolve the issues. City staff shall monitor 22 complaints received and take reasonable steps to resolve issues in a timely manner 23 as they arise, including enforcement of abatement procedures to bring violations 24 into conformance with City General Plan and Zoning Ordinance Performance 25 standards. 26 27 3. A noise study shall be conducted prior to application for SPARC approval 28 of the Tentative Map and PUD Development Plan, to quantify the potential noise 29 impacts to any future units proposed along the Bodega Avenue frontage (Lots 1, 30 2, 9). The analysis shall be conducted by a qualified acoustical engineer under City 31 staff direction, with all costs associated with the study to be borne by the project 32 proponents. Recommendations for specific mitigation measures, if any, shall be 33 incorporated into project plans submitted for SPARC approval, and shall be 34 implemented as directed by SPARC. 35 36 Monitoring 37 38 1. Plans submitted for SPARC approval shall be reviewed for conformance 39 with Mitigation Measure 6.3. Construction plans submitted for development 40 permit approval shall be reviewed for conformance with SPARC adopted 41 mitigation measures if any, and conditions of approval. All new construction shall 42 be subject to inspection by City staff for compliance with all adopted mitigation 43 measures and project conditions of approval, prior to acceptance of public area 44 improvements and issuance of Certificates of Occupancy for all new units 45 constructed. 46 47 2. Construction activities shall be monitored by Public Works and Building 48 staff to ensure compliance with all mitigation measures under item 6. 49 50 7. LIGHT AND GLARE 51 52 Miti ations 53 11 Planning Commission Minutes - April 23, 1996 1 1. Plans submitted for SPARC approval of the Tentative Map and PUD 2 Development Plan shall incorporate lighting plans, which reflect the location and 3 design of all proposed street lights, and any other exterior subdivision lighting 4 proposed. Lighting shall be designed to prevent the intrusion of direct glare onto 5 adjacent residential properties. Standard City street light fixtures shall be utilized 6 unless otherwise approved by SPARC and City staff. 7 8 2. Plans submitted for administrative approval of individual lot development 9 shall include provisions to avoid vehicular lighting impacts to bedroom areas and 10 other light- sensitive living areas of proposed homes. Development plans for lots 11 proposed at street intersections or in other potentially light - sensitive locations shall 12 incorporate architectural or landscape design features to screen interior living 13 space from headlight glare. 14 15 Monitorinp, 16 17 1. Plans submitted for approval of the Final Map and construction permits 18 shall be reviewed for conformance with SPARC conditions of approval. All 19 construction shall be subject to staff inspection for conformance with the approved 20 construction plans prior to City acceptance of public improvements and issuance of 21 a Certificate of Occupancy for each new unit constructed. 22 23 8. LAND USE 24 25 Mitigations None required. 26 27 9. NATURAL RESOURCES 28 29 Mitigations None required. 30 31 10. RISK OF UPSET 32 33 Mitigation , s : None required. 34 35 11. POPULATION 36 37 Mitigations � 38 39 1. All lots shall comply with the minimum lot area standard of 11,426.38 sq. 40 ft., established for the site under the Hillside Residential Combining District 41 regulations of the Zoning Ordinance. Plans submitted for SPARC approval of the 42 PUD Development Plan and Tentative Map shall reflect this requirement. Further, 43 the PUD Development Standards for the subdivision shall specify a minimum lot 44 area consistent with this standard, and that future development potential for the 45 entire subdivision shall be limited to the future division of Lot 2, for a maximum 46 yield of one additional lot for the West View Estates project site. 47 48 Monitoring 49 50 1. Plans submitted for SPARC approval of the PUD Development Plan and 51 Tentative Map shall be reviewed for compliance with mitigations under item 11. 52 Plans submitted for Final Map and Public Improvement Plan approval shall reflect 53 all SPARC- imposed conditions of project approval, as well as the previously 54 adopted mitigation measures. Any future proposal for subdivision of Lot 2 shall be 12 Planning Commission Minutes - April 23, 1996 reviewed for conformance with the minimum lot area provisions established for the subdivision. 4 12. HOUSING 5 6 Mitigations None required. 7 8 13. TRANSPORTATION /CIRCULATION 9 10 Mitigations, if any 11 12 1. A 1' non - access easement shall be dedicated across the Bodega Avenue 13 frontage of the project site, except where existing driveways serve homes on 14 proposed Lots 1 and 2. The Final Map and Improvement Plans submitted for 15 Council approval shall reflect the non - access easement. Access to the proposed 16 future lot created by division of Lot 2 shall be provided from interior public streets. 17 18 2. Plans submitted for SPARC approval of the Tentative Map and PUD 19 Development Plan shall include provisions for the improvement of Bodega Avenue 20 along the frontage of the project site. Improvements to be installed shall include 21 right -of -way dedication as necessary to accommodate half - street improvements 22 within an ultimate 86' right -of -way, curb, gutter, sidewalk, storm drains, sanitary 23 sewer, water mains, street lights, striping, traffic signs, and fire hydrants. Street 24 tree planter strips shall be provided with a minimum 6' -8' planter width, 25 (consistent with street standards presently under consideration for adoption by the 26 City). Plans shall also include provisions for transitioning of the frontage 27 improvements within the existing right -of -way, across those off -site properties 28 located between N. Webster Street and the proposed Lot 9, which contain 29 frontage on the north side of Bodega Avenue. All improvements to Bodega 30 Avenue shall be completed in conjunction with phase 2 improvements. 31 32 3. Rebecca Drive, Larch Drive, Hannah Lane, and Fowler Court shall be 33 modified to include additional right -of -way as necessary to provide for minimum 6' 34 public street tree planter areas on both sides of the street. Sidewalks may be 35 omitted from Hannah Lane, Fowler Court and Joan Court in order to reduce 36 grading impacts. Sidewalk shall be provided on the south side of Rebecca Drive 37 and along the east side of Larch Drive. These revisions shall be reflected on plans 38 submitted for SPARC approval. 39 40 4. The project sponsor shall be responsible for payment of all applicable 41 special development fees, including Traffic Mitigation fees. Fees shall be 42 calculated and paid as specified by City Resolution. 43 44 5. The private road access for Lots 3941 shall be modified to reflect a 45 standard private driveway approach, and shall be reflected on plans submitted for 46 SPARC approval. 47 48 6. To reduce grading and visual impacts, Joan Court shall be reconfigured as 49 a 28' public street terminating in a hammerhead turnaround. The street shall be 50 situated within a minimum 48' right -of -way, to permit public area street tree 51 plantings. No sidewalk shall be required. The street shall be situated at least 10' 52 from the common property line with the existing homesite to the north (identified 53 as AP No. 006 -543 -029) on Amber Way. If no lots are proposed along the north 54 side of the street, all area situated between the street and the existing home shall 13 Planning Commission Minutes - April 23, 1996 1 2 4 6 7 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 be dedicated for public area landscaping. Lots 18-21 and 23 -28 shall be reconfigured to create an open space band at least 40' an width connecting Larch Drive and Joan Court The open space area shall be dedicated for public use, and shall contain a pedestrianlbike path and tree plantings for visual mitigation.. No vehicular access connection shall be permitted, except for emergency service vehicles, as determined by Fire and Police staff. Lots 14-21 and 23 -28 shall be reconfigured as necessary to best accommodate the modified street improvements, in order to minimiz required grading and maximize the visual effectiveness of mitigation plantings. A master landscape plan shall be prepared, to reflect planting of large- canopied trees within the public landscape areas, with trees planted in a natural pattern where feasible, a maximum of 40' apart. Plans submitted for SPARC approval of the Tentative Map and PUD Plan shall reflect these requirements. Installation of the bike/pedestrian path and mitigation plantings shall occur in conjunction with public improvements for Joan Court. The Final Map shall include a description of the public path/mitigation area which shall identify pedestrian access and landscaping as the primary permitted uses, and prohibit location of structures within its boundaries. 7. The following circulation - related requirements shall be reflected on plans submitted for City approval of the Final Map and Improvement Plans for each applicable phase of the subdivision, and shall be subject to approval of the City Engineer: a. Frontage improvements for Bodega Avenue shall include, but not be limited to, half street reconstruction, curb, gutter, sidewalk, storm drains, sanitary sewer, water mains, street lights, striping, traffic signs, fire hydrants, and landscaping. Street width shall be 48 feet with 86 foot right - of -way. Improvements shall include frontage along AP No. 006 -221 -076 and 077, 006 - 048 -004, 008 and 013. These five lots are not a part of this subdivision, therefore, the developer may apply to enter into a reimbursement agreement. No parking shall be allowed along Bodega Avenue. b. Parking along Rebecca Drive shall be created within parking bays, located beyond the 28' curb -to -curb pavement width. Parking on Joan Court shall be staggered by driveway placement, to ensure continuous 20' vehicular travelway clearance. No parking shall be allowed at the end of Hannah Lane. Lots 7,8,9 and 10 shall be accessed only from the end of Hannah Lane. Curbs shall be painted red and "No Parking" signs installed along designated no parking areas. Larch Drive shall be 32' wide from curb to curb with parking allowed on both sides of the street. Sidewalk shall be provided on one side of the street, as proposed. C. Streets, signs and striping shall conform to City Standards. d. Right -of -way shall be wide enough to accommodate streets, parking bays, planter strips, street lights, fire hydrants, catch basins, water meters, traffic signs, sidewalks, etc. e. To reduce the amount of hillside grading, the Engineering Department supports either a separated sidewalk on one side of the street or a contiguous sidewalk on both sides of the street. Sidewalks are required on both sides of the street (P.M.C. 20.32.220), however, the Planning 14 Planning Commission Minutes - April 23, 1996 i Commission, at their discretion, may omit sidewalks per P.M.C. Chapter 2 20.32.230. 3 4 f. Connect existing private road serving Lot 38 to Larch Drive. Install a fire 5 access gate on the property line of Lot 38 at the private road. 6 7 g. The transition around the oak tree at Larch Drive shall be continuous curb 8 and gutter. The existing improvements on Larch Drive shall be modified to 9 create the transition. 10 11 8. A minimum of four (4) on- street parking spaces shall be provided within 12 parking bays along Rebecca Drive, between the easterly boundary of the 13 project site and Larch Drive. Plans submitted for SPARC review of the 14 Tentative Map and PUD Plan shall reflect this requirement. 15 16 Monitoring X17 ..:.__......,_.. 18 1. Plans submitted for approval of the Final Map and public improvement 19 plans shall reflect all adopted project conditions of approval and Mitigation 20 Measures. 21 22 2. All site improvements shall be subject to inspection by City staff for 23 compliance with the approved improvement plans and all adopted mitigation 24 measures and conditions of approval prior to City acceptance of the public area 25 improvements. 26 27 3. All private lot improvements shall be subject to inspection by City staff for 28 compliance with the approved building permits and all adopted mitigation 29 measures and conditions of approval, prior to issuance of a Certificate of 30 Occupancy for all lots with new home construction. 31 32 4. Traffic Mitigation fees shall be paid prior to issuance of a Certificate of 33 Occupancy for each new unit constructed. 34 35 PUBLIC SERVICE 36 37 Miti ations 38 39 1. The project sponsor shall be responsible for payment of all applicable 40 special development fees, including Community Facilities Development fees, Park 41 and Recreation Land Improvements fees, and School Facilities fees. Fees shall be 42 calculated and paid as specified by City Resolution. 43 44 2. All requirements of the Fire Marshal, including specifications for 45 emergency access, hydrant location and fire flow pressure, and unit construction 46 shall be reflected on plans submitted for approval of the Final Map and 47 development permits, including the following specific requirements: 48 49 a. Post address at or near main entry door - minimum four (4) inch 50 letters on contrasting background. '51 52 b. Address locator required to be posted at or near the driveway 53 entrance. Reflectorized numbers are acceptable. Location and 54 design to be approved by the Fire Marshal's Office. 15 Planning Commission Minutes - April 23, 1996 2 3 4 5 6 7 9 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 C. Residential buildings constructed outside the four minute response area are required to have a residential fire sprinkler system designed and installed in accordance with N.F.P.A 13 -D, in all areas including attic, garage, bathrooms with combustible fixtures, bathrooms over 55 square feet and closets over 24 square feet or over 3 feet deep. This may apply to all lots beyond #5 and #16. d. Minimum fire flow required for this project is 1,500 gallons per minute at 20 pounds per square inch (psi). For buildings not exceeding 3,600 square feet in area, a minimum fare flow pressure of 1, 000 gpm is acceptable. e. Residential buildings constructed at or above one hundred -sixty feet in elevation are required to have a residential fire sprinkler system. f. Fire hydrants shall be spaced at a maximum of 300 feet apart. Location and type of fire hydrants are to be approved by the Fire Marshal's Office. No house should be further than 150 feet from a fire hydrant. Attention is directed to Lots 3941. g. Add as a general note to plans: No combustible construction is permitted above the foundation unless an approved all- weather hard surface road is provided to within one hundred -fifty (150') of the farthest point of a building or structure. All fire hydrants for the project must be tested, flushed, and in service prior to the commencement of combustible construction on the site. h. All required fire lanes in which no parking is allowed shall be designated by painting curbs red. Where no curbs exist, signs approved by the Fire Marshal shall be installed. This applies to any private drive or roadway 20 feet or less in width. All roofing material shall be rated Class `B" or better, treated in accordance with the Uniform building Code Standard 32.7 and City of Petaluma Ordinance 1744. All roofing material applied as exterior wall covering shall have a fire rating of Class `B" or better treated in accordance with Uniform Building Code Standard 32.7 and City of Petaluma Ordinance 1744. k. The maximum roadway grade is 12% which may be increased to 15% with special permission from the City Engineer and the Fire Marshal. Special attention should be given to driveways of individual lots. 1. For those lots situated along Larch Drive generally above the 190' elevation, there is the potential that the standard fire flow pressure requirement cannot be met. Prior to Final Map approval by the 16 Planning Commission Minutes - April 23, 1996 1 City Council, the project engineer shall submit plans reflecting 2 either 1) conformance with the standard fire flow pressure 3 requirement and hydrant locations, or 2) a combination of alternate 4 means and methods of providing adequate fire protection for homes 5 in this vicinity, in conformance with the Uniform Fire Code and ,kY 6 4 ' subject to Fire and Engineering staff approval. 7 °3 8 3. To ensure public safety within the public path/mitigation area situated 9 between Larch Drive and Joan Court, the development of all lots abutting this 10 open space area shall be designed to facilitate visual surveillance of the path by 11 Police staff and residents. The PUD Development Standards shall be modified to 12 specify that SPARC review of all lots directly abutting the mitigation area shall 13 emphasize visual orientation of units (windows, doors) and use of open fencing 14 and landscape treatments within the private lot areas. Private yard areas enclosed 15 with solid fencing shall be discouraged directly abutting the mitigation area. In 16 ` addition, landscape plans presented for SPARC approval of the mitigation area, 17 shall be designed to avoid use of shrub materials which achieve heights exceeding .,, 18 36" at maturity. Trees to be planted within the area shall be selected for high 19 branching habits, or pruned to maintain a minimum 8' vertical canopy clearance. 20 21 4. Landscape plans submitted for SPARC approval of the Tentative Map and _ 22 PUD Plan shall incorporate the use of plant materials and/or design strategies to 23 minimize maintenance requirements and fire risk for all right -of -way landscape 24 areas. Language encouraging use of fire resistant landscaping for private lot 25 development shall be incorporated into the PUD Development Standards subject 26 to SPARC approval. 27 ,f 28 5. All street trees, perimeter fencing/walls, and other improvements within the 29 public right -of -way on Bodega Avenue and interior public streets, as well as 3v 30 landscaping located within the public access/mitigation area shall be maintained by =; 31 a Landscape Assessment District (LAD) through contract services subject to 32 approval of the City Council in conjunction with the Final Map. Landscaping 33 within these areas shall be designed and installed to City standards acceptable to 34 City of Petaluma Planning, Engineering, Public Works and Parks staff. Irrigation ?' 35 to serve all landscaping in street tree planter strips adjacent to private residences 36 shall be designed to connect with the private lot irrigation systems of the adjoining 37 lots. Separate irrigation systems shall be established for street frontage landscape 38 areas located between the street curb and any subdivision perimeter walls, 39 landscape islands, and the public mitigation area, as determined by staff during 4o review of the public improvement plans . Costs of formation of the required LAD 41 shall be borne by the project proponents at time of Final Map application. 42 43 Monitoring 44 45 1. Plans submitted for approval of the Final Map and development permits 46 shall be subject to Fire Marshal, Public Works, Parks, and Police Department 47 review, for incorporation of all City safety and maintenance standards, adopted 48 project conditions of approval, and Mitigation Measures. .49 a� 50 2. All construction shall be subject to inspection by City staff for conformance x' 51 h with the approved plans and adopted mitigation measures and conditions of project 52 approval, nor to City acceptance of public area improvements and issuance of a im PP , P� Y P p P 53 Certificate of Occupancy for each new unit constructed. } 54 , .. sw: 17 Planning Commission Minutes - April 23, 1996 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 15. 16. ENERGY Miti ons None required. UTELXTTES Mitigations 1. The proposed project shall be subject to imposition of all applicable special development fees, including Sewer and Water Connection fees, and Storm Drainage Impact fees. Fees shall be calculated and paid as specified by City Resolution. 2. Plans submitted for approval of the Final Map and Public Improvement Plans shall reflect the following, subject to approval of Engineering staff: a. Replace the existing 6 inch sanitary sewer main with an 8 inch main between Webster Street and the manhole in front of AP No. 006- 480 -026. (The maximum permitted number of units on a 6" sanitary sewer line is 40). b. Underground all overhead utilities that traverse or run along the frontage of this subdivision. C. Bodega Avenue frontage improvements shall be constructed with Phase 2 improvements. d. The proposed water main system shall be capable of delivering a continuous 1500 gpm fire flow with a residual pressure of 20 psi. Any improvements necessary to provide the required capacity and pressure shall be the responsibility of the subdivider. Necessary facilities, improvements and supporting calculations shall be provided as a part of the improvement plans for review and approval by the City Engineer prior to the approval of the Final Map. e. Private sanitary sewer serving Lots 3,4,5,7,10, 11, 24, 25, 32, 33, 40 and 41 shall be privately maintained. f. Connect existing water main serving Lot 35 to proposed water main in Larch Drive. g. Move existing fire hydrant at Lot 38 to Larch Drive. h. Provide water and sanitary sewer services to future subdivision of Lot 2. i. All houses constructed above elevation 160 feet may require a water pressure system installed for each unit to maintain adequate house pressure. j. Show all existing or proposed easements that are within the boundary of this subdivision. 18 Planning Commission Minutes - April 23, 1996 1 k. Provide documentation of any existing off -site easements (public or 2 private) that are to be used by this subdivision. 3 4 1. Provide the necessary easements for public or private water, 5 sanitary sewer and storm drain facilities. 6 7 M. Each individual phase shall be designed to provide the required 8 utility service and street system independent of any other phase. 9 .10 n. Paved access shall be provided over public sanitary sewer and water 11 main easements. 12 13 0. Prepare the necessary private roadway, sanitary sewer, water line 14 and storm drain maintenance agreements for recordation with the 15 Final Map. 16 17 Monitoring: 18 19 1. All required mitigation measures shall be reflected in plans submitted for 20 City approval of the Final Map and Public Improvement Plans, and shall be subject 21 to the review and approval of Engineering and Planning staff. 22 23 2. All construction shall be subject to inspection by City staff for compliance 24 with the approved Public Improvement Plans prior to City acceptance of public 25 facilities. 26 27 17. HUMAN HEALTH 28 29 Mitigations None required. 30 31 18. AESTHETICS 32 33 Mitigations 34 35 1. Plans submitted for SPARC approval of the Tentative Map and PUD 36 Development Plan shall reflect the following amendments to address potential 37 visual impacts: 38 39 a. See mitigation 1 under item 11 (Population). 40 41 b. See mitigation 6 under item 13 (Transportation/Circulation). 42 43 c. Plans submitted for SPARC approval of the Tentative Map and 44 PUD Development Plan shall reflect incorporation of a non - 45 development easement not less than 40' in depth, between the rear 46 portion of Lots 14 -17 (north of Rebecca Dr.) and Lots 24 -26 47 (south of Joan Ct.). The easement shall be designed to permit 48 planting of large - canopied trees and other vegetation to a natural " 49 pattern to screen uphill development and enhance views from 50 Bodega Avenue, N. Webster Street and Bantam Way. No utilities 51 or structures shall be placed within the easement boundaries. Open 52 fencing may be permitted within the easement to enclose private 53 yard areas, but any solid fencing proposed shall be located outside 54 the easement boundaries. Location of the easement and design of 19 Planning Commission Minutes - April 23, 1996 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 the conceptual planting plan shall be subject to SPARC approval. The minimum planting density for the easement corridor shall reflect an average of 3 large- canopied trees (15 gallon size) per affected lot, with an average spacing of 40' between trees. Implementation of the planting plan shall occur on a lot -by -lot basis, with design of private yard landscaping and irrigation plans for each affected lot subject to administrative SPARC approval for compliance with the intent of the masterplan. Trees consistent with these provisions shall also be installed (and reflected on the SPARC plans) in the southeasterly portion of Lots 3, 4, 5 and 7. d. The total number of lots situated along the primary ridgeline in the vicinity of Lots 14 -21 and 23 -28 shall be reduced by at least one lot, to reduce the apparent density of development visible from the primary public viewsheds, as identified in the visual analysis for this project. The remaining lots in this area shall be reconfigured to maximize the visual effectiveness of mitigation/street tree plantings, and open space between homes. e. The PUD Development Plan shall be amended to modify the building envelopes proposed to incorporate greater variation in minimum setback from public streets. Minimum street frontage setbacks shall be reduced to 1.0' on at least 10 lots to encourage use of a variety of garage solutions throughout the subdivision. Minimum building setbacks shall respect the required non- development easement and common property lines with the required public access/mitigation area on applicable lots. All proposed lot - specific setbacks shall be subject to SPARC approval in conjunction with Tentative Map and PUD Plan approval. &hag be f To better achieve a more appropriate transition from the rural Properties to the west, lots within the subdivision shall be reconfigured as necessary to reflect a gradual transition to larger lot sizes in the westerly portion of the subdivision. The project proponents' Exhibit BB submitted May 14, 1996, is generally consistent with the intent of this requirement. 2. The PUD Development Standards shall be amended prior to SPARC approval of the Tentative Map and PUD Development Plan to incorporate more detailed provisions pertaining to the following: a. Maximum permitted building height for primary structures shall be limited to 25', except that where roof pitches of 8:12 or steeper are utilized, the maximum building height may be increased, subject to SPARC approval, including a determination that no significant visual impacts will be created. Building height shall be measured parallel to the existing grade as defined on the Final Map and Public Improvement Plans to the highest point of the roof. Maximum permitted building height for accessory 20 Planning Commission Minutes - April 23, 1996 21 1 structures shall be limited to 15', except as permitted for approved 2 accessory dwellings. 3 4 b. Architectural design standards shall be expanded to further define 5 elements that emphasize the "rural flavor" proposed, and to require that 6 individual building designs respect the natural grade by stepping 7 foundations. The design standards shall address building and roof 8 orientation, landscaping, decking, building projections, etc. Incorporation 9 of architectural forms, details, siding and window treatments found on 10 historic west -side buildings, use of detached garages, large porches, steep 11 roofs, garden gates, and other components characteristic of older rural 12 residences shall be encouraged. The rear elevations of homes oriented 13 toward Bodega Avenue shall have increased architectural interest and 14 detail. 15 16 C. Underfloor areas and building "skirts" shall be enclosed and 17 screened by use of landscape plantings. L 18 19 d. Setbacks for the primary structure and all accessory structures in 20 excess of 6' in height shall be as defined by the SPARC- approved building 21 envelopes for each lot. 22 23 e. Language shall be incorporated which references the visual 24 mitigation planting plan within the non - development easement for Lots 14- 25 17 and 24 -26, as well as a requirement for installation of at least two 15 26 gallon sized trees within the private yard areas of all subdivision lots where 27 new home construction is proposed. Plans submitted for administrative 28 SPARC/building permit approval for individual lot development plans shall 29 reflect this requirement, and installation shall occur on a lot by lot basis. 30 All required mitigation plantings shall be installed prior to issuance of a 31 Certificate of Occupancy for each new unit. 32 33 3. All lots proposed for new home construction shall be subject to . 34 administrative SPARC review for assessment of the sensitivity of the individual lot 35 development proposals, particularly as they relate to the following: 1) 36 preservation of visible open space along ridgelines, including conformance with the 37 intent of the dedicated public access/mitigation area and non - development 38 easements, 2) responsiveness to potential privacy issues where lots abut existing 39 development, 3) minimization of drainage and grading impacts, particularly as they 40 relate to downhill development and public views, and 4) avoidance of potential .41 grading and irrigation impacts to existing trees (particularly native oaks) required .42 to be preserved. Additional lot- specific analysis may be conducted and/or more 43 restrictive grading, height, floor area, lot coverage, exterior design, landscaping or 44 other standards may be imposed through the SPARC process as necessary to 45 ensure appropriate architectural and site design for the individual setting under 46 consideration. 47 48 Monitoring 49 50 1. Plans submitted for approval of the Final Map and development permits 51 shall be reviewed for compliance with all adopted mitigation measures and ' 52 conditions of project approval. 53 21 Planning Commission Minutes - April 23, 1996 1 2. All construction shall be subject to City staff inspection for compliance 2 with adopted mitigation measures and conditions of project approval, the approved 3 Public Improvement Plans and approved development permits, prior to City 4 acceptance of public area improvements and issuance of a Certificate of 5 Occupancy for each new unit constructed. 6 7 19. REC'REAT'ION 8 9 Mitt ations 10 11 1. Refer to Mitigation Measure 1 under item 14 (Public Service). 12 13 Monitoring 14 15 1. Refer to Monitoring Measures under item 14 (Public Service). 16 17 20. ARCHEOLOGICAL/HIS'I'ORICAL 18 19 Mitigations 20 21 1. All existing potentially historic buildings identified in the archaeological 22 study for the project received August 11, 1995 shall be preserved within the 23 project site. No significant alteration to the building exteriors or interiors shall be 24 permitted without further evaluation by a qualified architectural historian, selected 25 by City staff with developer concurrence. All costs associated with any required 26 further evaluation of these buildings shall be bome by the project proponents. 27 These requirements shall not preclude lawful demolition of the barns and chicken 28 houses situated on the property located at 648 Bodega Avenue, which have 29 already been documented by a qualified historian, and as a result of this study, have 30 not been recommended for preservation 31 32 2. Prior to grading activity, the project proponent shall advise all contractors 33 conducting soil disturbing activities of the potential for encountering buried 34 archaeological resources. If concentrations of historic or prehistoric materials 35 (e.g., adobe foundations or walls, structural remains with square nails, backfilled 36 privies, wells or other refuse deposits) are encountered during grading or other 37 ground - disturbing activities, work in the immediate area of the finds shall be halted 38 and City staff notified. A qualified historic archaeologist shall then be consulted 39 for further evaluation of the situation, and any subsequent recommendations 40 implemented. 41 42 Monitoring 43 44 1. All construction activities shall be routinely monitored by City Public 45 Works and Building staff during the course of required inspections. 46 Planning staff shall be notified of any findings of potential archaeological 47 significance for further referral. 48 49 )Findings for Rezoning to PUD 50 51 1. The proposed Amendment to Zoning Ordinance No. 1072 N.C.S., to reclassify 52 and rezone Assessor's Parcel Nos. 006 -470 -101; 006480 -003, 005, 011, 012, 22 Planning Commission Minutes - April 23, 1996 1 016, and 031, known as the West View Estates Subdivision, to Planned Unit 2 Development (PUD) is in general conformity with the Petaluma General Plan. 3 4 2. The public necessity, convenience and general welfare clearly permit and will be 5 furthered by the proposed Amendment to the Zoning Ordinance, reclassifying and 6 rezoning the West View Estates Subdivision to PUD. 7 8 3. The requirements of the California Environmental Quality Act (CEQA) have been 9 satisfied through preparation of an Initial Study/Mitigated Negative Declaration to 10 avoid or reduce to a level of insignificance, potential impacts generated by the 11 proposed West View Estates PUD. 12 13 Findings for Approval of the PUD Development Plan and Standards 14 15 1. The proposed West View Estates PUD District is proposed on property which has 16 a suitable relationship to one or more thoroughfares (Bodega Avenue, West 17 Street), and that said thoroughfares, with the improvements herein required, are 18 adequate to carry any additional traffic generated by the development. 19 20 2. The plan for the proposed West View Estates development presents a unified and 21 organized arrangement of buildings and service facilities which are appropriate in ;'. 22 relation to adjacent or nearby properties , and adequate landscaping and screening 23 is included to ensure compatibility with surrounding uses. 24 25 3. The natural and scenic qualities (hillside topography, significant public ridgeline 26 views) of the site are protected, with adequate available public and private spaces 27 designated on the PUD Development Plan. 28 29 4. The development of the subject West View Estates property in the manner . 30 proposed by the applicant, and as conditioned, will not be detrimental to the public 31 welfare, will be in the best interests of the City, and will be in keeping with the 32 general intent and spirit of the zoning regulations of the City of Petaluma, with the 33 Petaluma General Plan, and with other applicable plans adopted by the City. 34 35 Conditions for PUD Approval 36 37 1. All mitigation measures adopted in conjunction with approval of the Mitigated 38 Negative Declaration (Resolution No. N.C.S.) for the West View 39 Estates Subdivision are incorporated herein by reference as conditions of project 40 approval. 41 42 2. Prior to application for SPARC approval of the PUD Development Plan, the 43 written PUD Standards shall be amended to reflect the following: 44 23 Planning Commission Minutes - April 23, 1996 1 a. The minimum lot size shall be established consistent with mitigation 2 measures and the minimum lot area established under Hillside Residential District 3 provisions of the Zoning Ordinance, or 11,426.38 sq. ft. as determined for this 4 subdivision. 5 6 b. Maximum permitted building height shall be measured from the existing 7 grade as established for the City - approved Final Map and Public Improvement 8 Plans. 9 10 C. Written standards pertaining to grading and architectural design shall be 11 amended to conform to applicable mitigation measures adopted for the 12 subdivision. Language shall be incorporated which specifies that repetition of floor 13 plans and elevations within the subdivision shall not be permitted without City 14 approval of an application for Amendment to the PUD Development Plan and 15 Standards. 16 17 d. Landscape provisions shall be amended to specify that street frontage 18 landscaping (other than public area street trees) and irrigation systems serving 19 right -of -way landscaping shall be maintained by the adjacent lot owner. Private lot 20 landscaping and irrigation systems shall be compatible with the site - specific grade 21 conditions, and any adjacent landscaping, including required visual mitigation 22 plantings. Reference - shall be made to replacement provisions contained in the 23 arborist's report for the subdivision for any damage to protected trees. 24 25 e. Language pertaining to minimum setback standards for primary structures 26 shall be amended to reference the SPARC - approved building envelopes for each 27 currently undeveloped lot. All setbacks shall be measured from property lines. 28 Language shall be further amended to establish minimum standards consistent with 29 the R -1 20,000 Zoning District for any future development on Lots 1, 2, 8, 35, and 30 42, which contain existing residences, and for which building envelopes shall not 31 be shown on the PUD Plan. iii) 33 f. Language pertaining to regulation of accessory structures shall be modified 34 to specify that accessory structures shall not be permitted in designated front yard 35 areas. 36 37 g. The maximum lot coverage for building footprints including all buildings, 38 accessory structures, covered decks, and open decks above the ground floor shall 39 not exceed 40% of the total lot area, to a maximum of 6,000 sq. ft. 40 41 h. The Fxceptions section of the written standards shall be deleted. 42 Provisions shall be added to the written standards specifying that where the 43 development standards do not specifically address a use or condition, applicable 44 provisions of the Petaluma Zoning Ordinance shall prevail for enforcement 45 purposes. In addition, a statement shall be added specifying that proposed 24 Planning Commission Minutes - April 23, 1996 1 modifications to the PUD standards must be approved by the City of Petaluma in 2 accordance with Zoning Ordinance provisions applicable to the PUD Zoning 3 District. 4 5 i. Provisions shall be added specifying all lots are subject to administrative 6 SPARC review as defined in the , adopted mitigation measures for the project, and 7 referencing all mitigation measures applicable to specific lot development. 8 9 j. The written standards shall be reformatted to provide a table of contents, 10 and enumerated sections for reference. The title shall be modified to identify the 11 document as the West View Estates Subdivision PUD Development Standards. 12 13 3. Prior to application for SPARC approval, the PUD Development Plan shall be 14 amended to reflect the following: 15 16 a. Property lines shall be modified as necessary to reflect minimum lot area 17 and street design specifications contained in the adopted mitigation measures for 18 the project. 19 20 b. All conditions of the Tentative Map applicable to the Development Plan 21 shall be consistently reflected. 22 23 C. Building setback envelopes shall be modified to reflect shallower front 24 setbacks for some lots, particularly along Rebecca Drive, where grading impacts 25 may be reduced by bringing buildings closer to the public street. In accordance 26 with the adopted mitigation measures, minimum front setbacks shall be reduced to 27 10' for at least 10 lots within the subdivision. SPARC review of development 28 plans shall be utilized to ensure that sufficient variation in building setback and 29 reduction in required grading is achieved. 30 31 d. The boundaries of the public pedestrian path/mitigation area proposed for 32 dedication to the City and the 40' non - development easement (vicinity of Lots 14- 33 17) shall be reflected on the PUD Plan as specified in the adopted mitigation 34 measures. 35 36 4. The subdivider shall be responsible for installation of property line fencing around 37 all perimeters of the subdivision, with plans subject to SPARC approval in 38 conjunction with review of the PUD Development Plan. SPARC review of fencing 39 plans shall stress preservation of privacy for downhill neighbors, protection of 40 existing trees, compatibility with the existing setting including topographical 41 elements, and visual impact from the primary public view corridors. Fencing shall 42 not be required along the Bodega Avenue frontage of the project. Any future 43 proposal for fencing along Bodega Avenue shall be subject to Administrative 44 SPARC review for visual and safety analysis. Fencing design, materials, height I Planning Commission Minutes - April 23, 1996 1 and setback from Bodega Avenue shall be determined on a lot by lot basis, to City 2 staff approval- 3 4 5. Landscape plans shall be amended to incorporate street frontage landscaping for all 5 right -of -way areas, all landscape treatment proposed within the public pedestrian 6 pat/mitigation area (linking Larch Drive and Joan Court), and other mitigation 7 plantings required, in conformance with adopted mitigation measures. Plans shall 8 be subject to SPARC approval in conjunction with review of the PUD 9 Development Plan. 10 11 Findings for Tentative Mau 12 13 1. The proposed West View Estates Tentative Subdivision Map, as conditioned, is in 14 general conformity with the Suburban land use category and other applicable 15 provisions of the General Plan. 16 17 2. The proposed West View Estates Tentative Subdivision Map, as conditioned, is in 18 general conformity with the standards and intent of the Hillside Residential 19 Combining District, PUD Zoning District, and other applicable provisions of the 20 Petaluma Zoning Ordinance. 21 22 3. The proposed West View Estates Tentative Subdivision Map, as conditioned, is in 23 general conformance with the Petaluma Subdivision Ordinance and other 24 applicable provisions of the Petaluma Municipal Code (PMC). In accordance with 25 the provisions of PMC Section 20.32.230, the public safety is not jeopardized by 26 the omission of sidewalks on Hannah Lane and Joan Court, and omission on one 27 side of Fowler Court, Larch Drive and Rebecca Drive . Further, the use of 28 reduced street standards pursuant to PMC Section 20.32.270 will result in the best 29 possible utilization of the land to be subdivided given consideration to the 30 topography and natural cover of the land and the general character of the proposed 31 subdivision. 32 33 4. Pursuant to Ordinance 1994 N.C.S., regulating access for lots to public streets, the 34 most logical development of the land requires that proposed Lots 39 through 41, 35 and the proposed future division of Lot 2 be served by private driveway access 36 easements, in order to minimize the grading impacts to the land, and establish 37 lotting patterns for the West View Estates Subdivision which are consistent with 38 neighboring development. 39 40 5. The requirements of the California Environmental Quality Act have been met 41 through preparation of an Initial Study and adoption of a Mitigated Negative 42 Declaration, to avoid or reduce to a level of insignificance, potential impacts of the 43 West View Estates Subdivision. 44 26. Planning Commission Minutes - April 23, 1996 1 6. The West View Estates Subdivision has met all requirements of the City of 2 Petaluma Residential Growth Management System, as specified under Chapter 3 17.26 of the Municipal Code. 4 5 Tentative lean Conditions 6 7 1. The following requirements of the City Engineer shall be met prior to City 8 approval of the Final Map: 9 10 A. Frontage Improvements (Bodega Avenue) 11 12 a. Frontage improvements shall include, but not be limited to, half street 13 reconstruction, curb, gutter, sidewalk, storm drains, sanitary sewer, water 14 mains, street lights, striping, traffic signs, fire hydrants, and landscaping. 15 Street width shall be 48 feet with 86 foot right -of -way. Improvements 16 shall include frontage along A.P.N. 006 - 221 -076 and 077, 006- 048 -004, 17 008 and 013. These five lots are not a part of this subdivision, therefore, 18 the developer may apply to enter into a reimbursement agreement. No 19 parking shall be allowed along Bodega Avenue. 20 21 b. Construct storm drain system from Webster Street to lot 9 per Sonoma 22 County Water Agency Master Plan. 23 24 C. Replace the existing 6 inch sanitary sewer main with an 8 inch main 25 between Webster Street and the manhole in front of A.P.N. 006480 -026. 26 (The maximum number of units on a 6" sanitary sewer line is 40.) 27 28 d. Underground overhead utilities that traverse or run along the frontage of 29 this subdivision. 30 31 e. Frontage improvements shall be constructed with Phase 2 improvements. 32 33 B. Grading 34 35 a. Grading shall conform to the soils investigation report for this subdivision. 36 The geotechnical engineer shall make a recommendation as to the 37 construction and protection of graded swales on steep slopes. Graded 38 swales with a slope steeper than 5% shall be protected with permanent 39 method other than planting. 40 41 b. An erosion control plan shall be prepared. 42 43 C. Sideyard swales shall be collected in a conduit and directed through the 44 curb face or to a storm drain system. 45 46 d. Any existing structures above or below ground that are abandoned or not 47 needed shall be removed. Structures shall include, but be limited to, 48 fences, retaining walls, pipes, debris, etc. 49 50 C. Streets 27 Planning Co mmissi on Minutes - April 23, 1996 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 a. There shall be no parking along Rebecca Drive. Parking shall be created along this street with parking bays. No parking shall be allowed at the end of Hannah Lane. Lots 7, 8, 9 and 10 shall be accessed only from the end of Hannah Lane. Red curbs shall be painted and "No Parking" signs installed along designated no parking areas. Larch Drive shall be 32 feet wide from curb to curb with parking allowed on both sides of the street. b. Streets, signs and striping shall conform to City standards. C. Right -of -way shall be wide enough to accommodate streets, parking bays, planter strips, street lights, fire hydrants, catch basins, water meters, traffic signs, sidewalks, etc. - d. Sidewalks are required on both sides of the street (P.M.C. 20.32.220), however, the Planning Commission, at their discretion, may omit sidewalks per P.M.C. Chapter 20.32.230. To reduce the amount of hillside grading, the Engineering Department supports either a separated sidewalk on one side of the street or a contiguous sidewalk on both sides of the street. e. Connect existing private road serving Lot 38 to Larch Drive. Install a fire access gate on the property line of Lot 38 at the private road. f. The transition around the oak tree at Larch Drive shall be continuous curb and gutter. The existing improvements on Larch Drive shall be modified to create the transition. D. Site Drainage and Storm Drains a. Provide necessary drainage improvements to prevent lot - to-lot drainage. b. Provide 100 -year overflow containment channels where public storm drains cross private property. C. The catch basin at Lot 6 shall drain via a storm drain pipe in Hannah Lane to the end of the cul -de -sac. The catch basin in front of Lot 5 shall be eliminated. An all weather access road shall be provided over the proposed public storm drain system between the end of Hannah Lane to the D.I. on Lot 3 and between Fowler Court and Hannah Lane. The access roads shall be ten feet wide. Ten foot wide gates shall be provided between Lots, 2, 3, 4,5 and 8. E. Site Sanitary Sewer and Water Systems a. Private sanitary sewer serving Lots 3, 4, 5, 7, 10, 11, 24, 25, 32, 33, 40 and 41 shall be privately maintained. b. Connect existing water main serving Lot 35 to proposed water main in Larch Drive. C. Move existing fire hydrant at Lot 38 over to Larch Drive. 28 29 Planning Commission Minutes - April 23, 1996 1 2 d. Provide water and sanitary sewer services to fixture subdivision of Lot 2. 3 4 e. All houses constructed above elevation 160 feet may require a water 5 pressure system installed for each unit to maintain adequate house pressure. 6 7 f. The proposed water main system shall be capable of delivering a 8 continuous 1500 gpm fire flow with a residual pressure of 20 psi. Any 9 improvements necessary to provide the required capacity and pressure shall _ 10 be the responsibility of the subdivider. 11 12 F. Final Map 13 14 a. Show all existing or proposed easements that are within the boundary of 15 this subdivision. 16 '17 b. Provide documentation of any existing off site easements (public or 18 private) that are to be used by this subdivision. 19 20 C. The centerline offset in Bodega Avenue, as indicated on the tentative map, 21 shall be resolved prior to final map approval. 22 23 d. Show a one foot non - access easement across the Bodega frontage of Lot 24 8. 25 26 e. Provide the necessary easements for pubic or private water, sanitary sewer 27 and storm drain facilities. 28 29 f. Provide the necessary easements for private or public access. 30 M G. All hydrologic, hydraulic and storm drain system design shall be subject to review 32 and approval of the Sonoma County Water Agency. 33 34 H. The improvement plans and final map shall be prepared per the latest City policies, 35 standards, codes, resolutions and ordinances. 36 37 I. The applicant shall be advised that there are two reimbursement agreements for a 38 traffic signal and storm drain currently on file that affect this subdivision 39 (Resolution No. 92 -22 and 92 -87). There also is an intent to enter into a 40 reimbursement agreement on file that affects this subdivision (Resolution No. 94- 41 33). 42 43 1 Each individual phase shall be designed to provide the required utility service and ` 44 street system independent of any other phase. ° 45 46 K. Paved access shall be provided over public sanitary sewer and water main 47 easements. 48 49 L. Prepare the necessary private roadway, sanitary sewer, water line and storm drain 50 maintenance agreements for recordation with the final map. 29 Planning Commission Minutes - April 23, 1996 1 2 M. The developer shall keep the existing public streets clean that are used for access 3 to this site during construction. 4 5 2. The following requirements of the Fire Marshal shall be met: 6 7 a. Post address at or near main entry door - minimum four (4) inch letters on 8 contrasting background. 9 10 b. Address locator required to be posted at or near the driveway entrance. 11 Reflectorized numbers are acceptable. Location and design to be approved by the 12 Fire Marshal's office. 13 14 C. Residential buildings constructed outside the four minute response area are 15 required to have a residential fire sprinkler system designed and installed in 16 accordance with N.F.P.A. 13 -D, in all areas including attic, garage, bathrooms 17 with combustible fixtures, bathrooms over 55 square feet and closets over 24 18 square feet or over 3 feet deep. This may apply to all lots beyond #5 and #16. 19 20 d. Minimum fire flow required for this project is 1,500 gallons per minute at 21 20 pounds per square inch (psi). 22 23 e. Residential buildings constructed at or above one hundred -sixth feet in 24 elevation are required to have a residential fire sprinkler system. 25 26 f. Fire hydrants shall be spaced at a maximum of 300 feet apart. Location 27 and type of fire hydrants are to be approved by the Fire Marshal's office. No 28 house should be firrther than 150 feet from a hire hydrant. Attention is directed to 29 lots 39-41. 30 31 g. Add as a general note to plans: 32 33 No combustible construction is permitted above the foundation unless an 34 approved all- weather hard surface road is provided to within one hundred - 35 fifty (150') of the farthest point of a building or structure. 36 37 All fire hydrants for the project must be tested, flushed, and in service prior 38 to the commencement of combustible construction on the site. 39 40 h. All required fire lanes in which no parking is allowed, shall be designated 41 by painting curbs red. Where no curbs exist, signs approved by the Fire Marshal 42 shall be installed. This applies to any private drive or roadway 20 feet or less in 43 width. 44 30 Planning Commission Minutes - April 23, 1996 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 i. All roofing material shall be rated Class `B" or better, treated in accordance with the Uniform Building Code Standard 32.7 and City of Petaluma Ordinance 1744. j. All roofing material applied as exterior wall covering shall have a fire rating of Class `B" or better treated in accordance with Uniform Building code Standard 32.7 and City of Petaluma Ordinance 1744. k. The maximum roadway grade is 12% which may be increased to 15% with special permission from the City Engineer and the Fire Marshal. Special attention should be given to driveways of individual lots. 3. The following requirements of the Chief Building Official shall be met: a. Grading must be certified when completed to indicate compliance with approved plans and will be required for occupancy. b. Certify finished floor elevation before occupancy. C. Any holding tank required for elevations above 160 feet must meet Engineering Department design requirements. d. Where ground slopes greater than 1 on 10, foundation shall be stepped per Uniform Building Code 1806.2. e. Soils with expansion index greater than 20 requires special design foundation per Uniform Building Code 1803.2. f. All roofing shall be "B" rated or better per Ordinance No. 1744/1988. g. Driveway gradient shall comply with Ordinance No. 1533/1982. h. Responsible party to sign plans. i. Submit soils report to verify foundation design. j. Plans must show compliance to 1994 UBC, UPC, UMC, and 1993 NEC. Plans must also show compliance to current Title 24 Energy Code. k. Provide structural calculations for all non - conventional design items. 1. Demolition permit required to remove any structure. m. Abandonment of water well or septic system must be done under permit from County of Sonoma Public Health Department. 4. All mitigation measures adopted in conjunction with approval of the Mitigated Negative Declaration (Resolution N.C.S.) for the West View Estates Subdivision are incorporated herein by reference as conditions of project approval. 31 Planning Commission Minutes - April 23, 1996 1 5. Prior to application for SPARC approval, the following modifications shall be 2 incorporated into the Tentative Map: 3 4 a. All adopted mitigation measures applicable to the Tentative Map shall be 5 reflected. 6 7 b. The Tentative Map shall reflect consistency with the PUD Development 8 Plan as conditionally approved. 9 10 C. The private driveway access to Lots 39-41 shall be designed as a standard 11 driveway approach. 12 13 d. All lots shall be reconfigured as necessary to meet the minimum net lot area 14 requirement of 11, 426.38 sq. ft., as established for the site under Hillside 15 Combining District provisions. 16 17 e. The common property line between Lot 2 and Lots 5 and 6 shall be 18 relocated to the north, to place the 10' public storm drain easement and 19 proposed driveway access for the future lot within the boundaries of Lot 2. 20 21 f. The proposed turnaround for the private road serving Lot 38 shall be 22 omitted, and a paved emergency access connection (with gate or bollards 23 to preclude public access) made to Larch Drive, in accordance with 24 Engineering and Fire Marshal specifications. The driveway access for Lot 25 38 shall be established from the required private road connection to Larch_ 26 Drive. 27 28 6. The applicants/developers shall defend, indemnify, and hold harmless the City or 29 any of its boards, commission, agents, officers, and employees from any claim, 30 action or proceeding against the City, its boards, commission, agents, officers, or 31 employees to attack, set aside, void, or annul, the approval of the project when 32 such claim or action is brought within the time period provided for in applicable 33 State and/or local statutes. The City shall promptly notify the 34 applicants/developers of any such claim, action, or proceeding. The City shall 35 coordinate in the defense. Nothing contained in this condition shall prohibit the 36 City from participating in a defense of any claim, action, or proceeding if the City 37 bears its own attorney's fees and costs, and the City defends the action in good 38 faith. 39 40 7. Prior to City approval of the Final Map, the project proponents shall enter into an 41 agreement with the City for payment of an In -Lieu Contribution, to meet 42 affordable housing requirements for the West View Estates project, as specified 43 under Program 11 (iii) of the Petaluma General Plan Housing Element. 44 45 8 The location of all proposed electrical transformers, or other utility structures shall 46 be identified on plans submitted for Final Map and Improvement Plan approval, 47 and located underground in accordance with adopted City policy. 32 Planning Commission Minutes - April 23, 1996 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 4 5 6 10. 7 8 Following acceptance of public area landscape improvements, the subdivider shall post a maintenance bond to cover 100% of the cost of materials and labor for a period of 5 years, to ensure survival of all required mitigation plantings. A disclosure notice shall be added to the Final Map for all lots abutting the 40' public access/mitigation area connecting Joan Court and Larch Drive, speciffing that the lots . abutting the public access route may be exposed to disturbances associated with pedestrian and bicycle traffic such as noise, visual intrusion, trespass, litter, landscape damage, and/or private lot security impacts COMMISSION )BUSINESS II. QUARTERLY GOALS Planning Director Tuft listed Planning Department goals - hope to do Zoning Ordinance re -write this year. Commissioner Rahman - Where is City regarding computer hardware and software? Commissioner Read - Address issues through (Warner Study) budget. Commissioner vonRaesfeld - Supports all goals - especially goal 2; in -fill project in San Luis Obispo - definitely worth looking into for railroad area. Commissioner Read - Agrees with Commissioner vonRaesfeld. Commissioner Rahman - Referenced a parking garage in Los Gatos - lower than street level; must do something very creative in railroad area; corner of Washington and Ely - northeast corner had a turn lane (paved over) - very ugly corner - needs landscaping. Planning Director Tuft - Will share Commission concerns with Engineering. Commissioner Read - Idea was to get signalization fast - needed to look at signalization; maybe we could look at Church of Christ property. Commissioner Wick - Look at refining PUD Standards for hillside development. Planning Director Tuft - Would like to work on Hillside Standards. Commissioner Torliatt - Would like to see Economic Development Plan as a goal - put something together in detail. Commissioner Rahman - Would like Engineering Department to advise Commission when meetings concerning transportation are upcoming; transportation not given necessary importance. Commissioner Read - Sonoma County Transportation Authority - meets monthly (Mary Stompe attends for Petaluma). Commissioner Rahman - South Petaluma Specific Plan - more emphasis on transportation. 41 42 III. PROJECT STATUS: 43 44 1. Colombard Extension - Met with Waugh School District representative - 45 will meet May 29 - will notice neighborhood, all interested, etc.; will 46 discuss options. 47 2. Nessco CUP - SPARC approval letter expected end of this week - 60 days 48 from March 26. 49 3. Jack's Produce - Commissioner Rahman - felt badly that Mr. Mettalinos 50 was upset - not coming from Commission; Conunissioner Torliatt - spoke 51 with Mr. Mettalinos; Commissioner Thompson - does have a concern with 33 Planning Commission Minutes - April 23, 1996 1 traffic into this lot; Commissioner Rahman - delighted with efforts on this 2 lot. 3 4. Industrial Activity (Lakeville Business Park, Cader, Oakmead Northbay, N. 4 McDowell) - City has seen upsurge in business park activity recently - 5 rundown on planned buildings. 6 5. Marina Plaza Shopping Center - Meeting last week with 8 -10 consultants 7 regarding environmental document - EIR will commence shortly thereafter. 8 6. Elwood Opportunity Center - SPARC application will be forwarded - 9 working with Bonne Gaebler. 10 11 12 Discussion: 13 14 Commissioner Rahman - Regarding Payran Bridge project - would like brief staff report 15 regarding better understanding of traffic study /requirements. 16 Planning Director Tuft - Payran Street Bridge issue appealed to City Council; Petaluma 17 Queen has received County approval to allow cardroom on Petaluma Queen; River Inn / 18 Petaluma Queen requesting cardroom; working with applicant regarding removal of 19 floating commissary. 20 21 22 ADJOURNMENT: 9:05 PM 23 min0423 i plan69 34