HomeMy WebLinkAboutAgenda Bill 2.A 04/19/2004•
a
A P
CITY OF PETALUMA, CALIFORNIA
Petaluma Community Development Commission
AGENDA -BILL'
Agenda Title:
Meeting Dat e: April 19, 2004
Discussion and Action, Concerning a Mid-Term Review of the
"Five-Year Implementation Plan" and Related PCDC Goals,
Meeting Time: X 3:00 PM
Programs, Projects and Estimated Expenditures
❑ 1 7:00 PM
CateLyory (check, one): ❑ Consent Calendar Z Public Hearing ❑ New Business
Department:
Director:
Contact Person,
Phone Number:
ED& Redevelo pment
-Paul Marangella
Paul Marangella
778*-4581
Cost of Proposal: $117.Wilfiom(kevised Forecast)
Account Numbers: Various
Name of Funds:
Amount Budgeted: $74.6 Million (Original Forecast)
P Funds 3300, 5510, 3400,
5520,2130,4510,4610,4620,4630,
4650
Attachments- to Agenda Packet Item:
1. Resolution Accepting the Mid-Tenn Review of the PCDC "Five-Year Implementation Plan"
2. Mid-Term Review of the " Five -Year Implementation Plan"
Summary Statement:
State Law requires that each agency.'adopt a five-year Implementation Plan, which provides documentation
for the link between the efirhinatioft.of Blight and the proposed actions of the redevelopment agency. The
Law requires each redevelopment - agency to adopt, after a public ,hearing an Implementation Plan on or
before December 3 1, 1994. Thereafter-, this' Implementation Plan s hall be revised and adopted every five
years.* In addition, at least once during the five-year period, a public hearing on the Implementation Plan is
required to be held.
In accordance with Section 33490 of the California Communit y Redevelopment Law (CRL the Petaluma
Community Development Commission (PCDC) adopted a Five-Year Implementation Plan for the Central
Business District Project Area (CBD), the Petaluma Community Development Project Area (PCD) and the
Low & Moderate Income Housing i Fund on April 16, 2001. The purpose of the Implementation Plan was
to set forth the specific goals, programs or projects, and estimated expenditures for the Redevelopment
Project Areas and Housing Fund for the five-year period from fiscal year 2004-02 through fiscal year
2006-07.
Therefore,. the- purpose of this agenda item is to hold, a public. hearing on the PCDC "Five-Year
Implementation Plah drid related goals, programs, projects and estimated expenditures to evaluate the
progress to date.
Recommended City .Council' Action/SuL-t!ested.Motion:
Adopt the attached resolution C cppting the Mid -Tenn Review ofthe PCDC "Five-Year Implementation
Plan" and related adjustments. A A
Reviewed by Finance Director:
Reviewed by City Attorney:
Date:
Appro City Mana2er:
Date:
]Date•
Today's Date:.
Revision # and Date Revised:
File Co e:
#
April - 1,, ` 20,04
AgendaBflf5Yearlmplementation Plan0419041
Page I
CITY OF.P.ETALUMA9 CALIFORNIA
Petaluma Community Development Commissi ®n
April 19, 2004
AGENDA REPORT
FOR
DISCUSSION AND ACTION CONCERNING A MID =TERM REVIEW OF THE
"FIVE -YEAR - IMPLEMENTATION' PLAN" AND RELATED PCDC GOALS,
PROGRAMS,: PROJECTS AND ESTIMATED EXPENDITURES
EXECUTIVE SUMMARY
State Law requires that each ,agency adopt a five-year Implementation Plan, which provides
documentation for the link between the elimination of blight and the .proposed actions of the
redevelopment agency. The Law .requires each redevelopment agency to adopt, after a public hearing,
an Implementation Plan on or before December 31 1994. Thereafter-, this Implementation Plan shall be
revised and adopted every five; years. In addition, at least once during the five -year period, a public
hearing on the Implementation. Plan. is required to be held.
In accordance with Section 33490 of the California ' Community Redevelopment Law (CRL), the
Petaluma Community Development Commission (PCD(),adopted a Five -Year Implementation Plan for
the Central Business. District Project Area. (CBD), the Petaluma, Community Development Project Area
• (PCD) and the Low & Moderate Income Housing Fund on April. 16, 2001. The purpose of the
Implementation Plan was, to set forth the specific goals, programs or projects, and estimated
expenditures for the Redevelopment .Proiect Areas and Housing Fund for the five -year period from fiscal
year 2001 -02 through fiscal year 2006-07.
Therefore, the purpose of this agenda item is to hold a public_ hearing on the PCDC "Five -Year
Implementation Plan" and related goals, programs, projects and estimated expenditures to evaluate the
progress to date.
2. BACKGROUND
The Petaluma Community Development Commission (PCDC) was activated on December 1, 1975 by
the City of Petaluma Ordinance No 1201 N.C.S. The Commission exercises all. of the powers
authorized under the. Constitution and Health and Safety Code of the rState of California (Section 33000,
et seg.). These powers include, but are not limited to the authority to acquire, administer, develop, lease
or sell bonds or other forms of taxable or non- taxable securities.
All powers of the PCDC are vested in its seven members, which under the provisions of the ordinance
are the members of the City Council. The Mayor serves as the Chair and the Vice Mayor as Vice Chair.
Staffing of the PCDC is, provided by members of the City staff.
The administers two project areas within the City of Petaluma:
• _Central Business District Project Area, and
• Petaluma Community Development Project Area.
Page 2
State Law (CRL) requires the Commission to set aside in a separate segregated Low and Moderate
project areas for the, u pose increasin improving and reservin the co i revenue generated from it�.
Income Housing Fund. (the Housing Fund) 20 percent.of
p g, p g preserving community's supply of low and
moderate income housing. Both project areas deposit 20 percent of their tax increment revenue to the
Housing Set -Aside Fund. _
According to Health & Safety Code Section 33490(a) the Implementation Plan must describe specific
goals, and objectives for the project,areas, the specific: programs, ,including potential projects to be
carried out in the project areas, the estimated expenditures to be made during the period covered by the.
plan and an explanation of how the goals objectives programs, and expenditures will assist in the
alleviation of blight. The Implementation Plan must also describe how the agency will implement its
obligations to replace; increase, improve, preserve and maintain low and moderate - income housing.
Attached for your. review is the Mid -Term Review of the " Five -Year Implementation Plan." The review
outlines the priorities' for PCDC expenditures and preserits financial data on "the status of the proposed
expenditures. Several amendments are included in order to bring the plan current.
3. ALTERNATIVES .
None are provided under State Law
4.. FINANCIAL. IMPACTS
Original 5 -Year- Forecast of.Expenditures: $ 74.6 Million
Current 5 -Year Forecast of Expenditures: $117.8 Million
Difference in Forecasts: +$ 43.2 Million ( +58 %)
5. CONCLUSION
State Law requires the PCDC to perform a Mid -Term Review of the "Five -Year Implementation Plan."
The PCDC will hold a duly noticed public - hearing,'to consider `testimony and review the "Five -Year .
Implementation Plan" and related goals, programs, projects and estimated expenditures to evaluate the
progress to date.
6. OUTCOMES.OR PERFORMANCE MEASUREMENTS'THAT WILL IDENTIFY SUCCESS OR
COMPLETION
The, PCDC will complete its Mid -Term Review of the PCDC "Five -Year. Implementation Plai
as required under State Law.
7. RECOMMENDATION
Adopt the'attached.resolution accepting the Mid -Term Review of the PCDC "Five -Year Implementation
Plan and.related:adjustments.
Page 3'
Attachment I
[►a • 11a ; �r -r
Petaluma Community Development, Commission
Accepting the laid -'Term Review of the PCDC
"Five -Year Implementation Plan"
Page 4
RESOLUTION #
PETALUMA COMMUNITY DEVELOPMENT COMMISSION
ACCEPTING THE MID -TERM REVIEW OF THE PCDC
"FIVE-YEAR IMPLEMENTATION PLAN"
WHEREAS, the Petaluma Community Development Commission (PCDC) was activated
on December 1, 1.975 'by the City of Petaluma Ordinance No 1201 N.C.S.; and
WHEREAS, The PCDC administers two redevelopment project areas within the City of
Petaluma:
• The Central Business; District Project Area; and
• The Petaluma Community Development Project Area; and
WHEREAS, State :Law requires that each agency adopt a five -year Implementation Plan,
which provides documentation for the link between the elimination of blight and the
proposed actions of the redevelopment agency; and
WHEREAS, the PCDC' adopted a Five -Year Implementation Plan for the Central
Business District Project Area (CBD), the Petaluma Community Development Project
Area (PCD and. the Low ,& Moderate Income Housing Fund on April 16, 2001; and
WHEREAS; State Law requires every redevelopment agency, at least once within the
five -year term of the Implementation Plan, to conduct a public hearing and hear
testimony of all interested parties for the purpose of reviewing the ,redevelopment plan
and the corresponding, implementation plan for each redevelopment project within the
jurisdiction and evaluating progress of the redevelopment project; and
WHEREAS: the; PCDC has'held a duly noticed public hearing to review the "Five -Year
Implementation Plan."
NOW, 'THEREFORE, BE IT RESOLVED that the Petaluma Community
Development Commission hereby accepts the Mid -Term Review of the PCDC "Five -
Year .Implementation Plan, "' and related adjustments attached hereto as Exhibit A and
referred l as Attachment II in the staff report.
Adopted this .19th day of April, 2004 by the following vote:
'Page 5
Commissioner Aye No Absent
Glass
Harris
Healy
Moynihan
O'Brien
Thompson
Torliatt
David Glass, Chairperson
ATTEST:
Recording Secretary
•
0.-
Page 6
Attachment 11
Mld-Term Review of the PCDC
IlFive-Y- ear lmplem�ntatiou,, Plan"
•
Page 7
PEI'AL,UMA COMMUNITY DEVELOPMENT
COMMISSION
MID=TERM REVIEW OF THE PCDC
"FIVE -YEAR IMPLEMENTATION PLAN"
.(FY 2001 -02 through FY 2006 -07)
April 19, 2004
1
PETALUMA COMMUNITY DEVELOPMENT COMMISSION
MID-TERM i2EVIEWOF THE PCDC "FIVE-YEAR IMPLEMENTATION
PLAN" FOR THE CENTRAL BUSINESS DISTRICT (CBD) PROJECT AREA
ANDPETALUMA COMMUNI-TY DEVELOPMENT (PCD) PROJECT AREA
A. Introduction
In accordance with Section 33490 of the California Community Redevelopment Law
(CRL), the Petaluma Community Development 'Commission (PCDC) adopted 'a Five -
Year Implementation Plan for the Central Business District (CBD) and Petaluma
Community Development, (PCD) Project Areas (Implementation Plan) on April 16, 2001.
The purpose of 'the Iiriplementation Plan was to set forth the specific goals, programs or
projects, and estimated expenditures for the CBD and PCD Project Areas for the five -
year period from fiscal year 2001 -02 through fiscal year 2006 -07. Section 33490 also
states that:
"...every agency, at least once within the five year _term of the
(implementation) plan, (the agency) shall conduct q public hearing
and hear testimony of all interested partiesfo"r the purpose of
reviewing the redevelopment plan and the. corresponding
implementation plan for each redevelopment project within the
jurisdiction and evaluating progress of the � redevelopment
project. "
The CRL requires that the hearing take place no earlier than. two years and no later than
three years after the adoption of the implementation plan. The purpose of this report is to
provide asreview of the current, status of the goals, programs, and projects and estimated
expenditures set forth in the Implementation Plan in order to evaluate the progress to
date.
B. Background of Project Areas
The PCDC administers two redevelopment project areas asi follows:
L Central $usiness'District Project Area
The Central Business District Project Area (the "CBD" project) was established in
September 1976 (Ordinance No. 1221 N.C.S.). The CBD District Project Area
originally consisted of approximately 98 .acres and encompasses the majority of
the historic .downtown core from D. Street to Washington Street and from
Lakeville Street to Liberty and 5 Streets. The area is bisected by the Petaluma
River and by Petaluma,Boulevard. The Petaluma River" Turning Basin is the most
prominent geographic 'feature.
2
The original project area contains an impressive collection of turn =of the- century
commercial buildings devoted primarily to retail and office uses. Approximately
,seventy of these buildings are listed as in need of seismic "strengthening-. There is
relatively little vacant property in the project area, however, considerable under
utilized land in the vicinity of the railroad depot has potential for significant
development. In Aug_ ust 2003, .the. !PCDC approved the creation, of a Theater
District, including a large ,mixed -use project. The project area's economic
activity focuses on its, retail, restaurant, and visitor serving uses, but includes two
contemporary neighborhood shopping centers.
In 2001, through a Plan Amendment, the PCDC added 127 acres to the project
area The western portion :of the Added Area is generally bounded by Union
Street, Western Avenue, Howard Street and Liberty Street. The eastern portion. of.
the added area' is generally bounded by]) Street,. McNear Avenue, the Northwest
Pacific Railroad and Petaluma Boulevard.. The total area of the expanded project
area is 2 acres.
Sum mary of CBD Redevelopment Plan Limits
Back round Information
P1an.Limts
Acres
225
Date of Original Plan Adoption
•9/27/1976 - Ordinance 1221
Plan Amendments
11/21/1994 - Ordinance 1`973
7/21/1999 - Ordinance 2092
6/18/2001 - Ordinance 2116
Base Year
1976 -77 (Added Area 2000 -0i)
Base�Assessed Value
Existing Area: $18,832,170,
Added Area: $48,701,865
Time Limits Under At 1296
Incurring.Debt
Existing Area: 2011
Added Area: 2021
Termination Date for Use of
Eminent.;Domain on Non-
Residential Properties
2012 .
Plan Effectiveness
(Project Activities)
Existing Area: 2016
Added Area: 203,1
Tax Increment Collection/.
Repayment; of Debt
Existing Area: 2026
Added Area: 2046
Financial Limits' '
Tax Increment; Cap
No Limit
Bond.Principal Indebtedness Limit
$'5000,000
2. Petaluma Community Development Project Area
Established in July 1988 through the adoption of Ordinance No. 1725 N.C.S., the
Petaluma Community Development Project Area includes approximately 2,265
acres generally along both , sides of U.S. Highway 141 from Old .Redwood
Highway to Washington Street, the Southwest side of U.S Highway 101 from
Washington Street to Lakeville Street, and both sides of'U.S. Highway 101 from
Lakeville .Street to Petaluma Boulevard South and East of U.S. Highway 101 to
the "Haystack Landing" area. The Proj ect. Area also includes approximately five
miles of the Petaluma River and Willow .Brook Creek of which, a majority
parallels U.S. Highway 104. Portions of major traffic. arteries including Petaluma
Boulevard ,North. and South, North McDowell, Old Redwood Highway, East
Washington Street 'Lakeville Street and Lakeville Highway are also situated in
the Project Area.
Also included in thef Project Area are, several major business parks and industrial
uses as well as five :major retail centers: Washington Square, "Petaluma Plaza
North and South, the Petaluma- Premium Factory. Outlets, and the Petaluma Auto
Plaza. The area includes many public, and institutional uses. There is a
significant amount of vacant and/or underutilized land within the Project Area
that provides development potential.
Suiiim of PCD Redevelopment Plan Limits
1
Back round,Information _
Plani Limits
Acres
2, 740
Date o£ Original Plan Adoption
7/18/1988 — Ordinance 1725
Plan Amendments
11/21/1994 _ Ordinance 1972
4/3/200.0 - Ordinance
Base Year
1987_ -88
Base Assessed Value
$33:1;539,332
Time Limits Under.,A>B 1290
Incurring Debt
August 17, 2008
Termination Date for Use of
Eminent Domain on, Non-
Residential Properties
No Longer. Applicable After 7/18/2000
Plan Effectiveness
(Proj ect'Activites)
July 18; 2028
Tax 'Increment Collection%
Repayment ofDebt
July 18, 2038
Financial Limits,
Tax Increment Cap,
$800,000,000
Bond Principal Indebtedness Limit
$ 80,000,000
0
C. Blighting Conditions
The tphysibal and economic blighting conditions, as defined under the CRL, in the
CBD and PCD Project Areas documented at the tinieof each Plan adoption included:
unfit and unsafe, buildings, adjacent incompatible uses, lots of irregular form and
shape, depreciated. values and impaired investments and inadequate public
improvements, including utilities, circulation and public facilities.
D. Goals and Objectives of the Project Area Redevelopment Plans
1., CBD Redevelopment Plan: Project Area Goals & Objectives
• Eliminate, adverse. physical and economic conditions in the 'Existing and
Added Areas.
• Provide an environment conducive to social and economic growth.
• Implement the Ceniral Petaluma Specific Plan.
® Promote economic vitality in Petalurna's Central Business District; by
attracting new jobs that will employ Petalumans encouraging new
development and mixed, uses,, and enhancing the downtown.
• Encourage development, public access and recreational opportunities
along the river, and help to integrate the river orientation by. rehabilitating
older. shopping centers.
• Provide a mixturel of industrial, office, retail and compatible residential
�.
development.
• Provide sufficient parking to serve new businesses and residents while
supporting the use of alternative modes of transportation and facilities
prirriarily for pedestrian uses.
• Construct and repair public infrastructure, including streets, sidewalks,
curbs and gutters, and water and aewensystems.
• : Reinforce the role of the Central 'Business District as .the `center for transit
and non - vehicular modes of travel.
• Provide a street system in undeveloped ,areas that strengthens the existing
roadway network, serves new development, and balances the need for
through movement'with livability and pedestrian/bicycle orientation.
• Enhance streetscape improvements, including street trees; landscaping,
sidewalks, and strengthen linkages to and along the river through a system
of urban open spaces. .
1k Ensure a choice of housing types and locations to all persons regardless, of
income, sex, cultural origin, marital status or physical disabilities.
2. PCD Redevelopment Plan: Pr oject Area Goals & Obiectives
Eliminate the conditions of blight existing in the area included within the
redevelopment project area boundaries of the Project Area.,.
• Ensure to the greatest " possible extent that the causes of blighting
conditions in the areas included with the Project Area will be either
eliminated or protected against.
5
® Provide ,participation opportunities for owner And business 'tenants in the
area& included in the Troj'pet Area to the overall redevelopment objectives
of the Redevelopment Plan.
® Encourage and ensure the redevelopment of the areas in the Project Area.
® Encourage and foster the economic revitalization of the areas included in
the Project Area.
® Finance and construct the public improvements described in the
Redevelopment Plan.
e Implement the goals and objectives of the General 'Plan of the City of
Petaluma.
E. Summary of "Five -Year Implementation Plan" Goals and Objectives
The Petaluma Community Development Commission's goals and objectives for
redevelopment of the Project Areas over the five years covered by this
Implementation Plan are as follows:
1. The elimination of blighting influences and correction of environmental
deficiencies in the Project Areas, in particular structural deterioration,
underutilized commercial land, unmanageable parcelization patterns, and
inadequate and deteriorated public improvements and facilities including
curbs, gutters, ,paving,. sidewalks, drainage lighting and landscaping.
2. Improved pedestrian, bicycle, and. vehicular circulation in the Project
Areas;
3. The provision of an environment conducive to social and economic
growth; and.
4. The expansion and /or improvement. of the community's supply of housing
for low and moderate-income persons.
F. Summary -of 'PCDC Activities and Resources
This section will summarize the planned and actual activities of the Petaluma
Community Development. Commission over the first three years of the five -year
planning period. The actual expenditures and projected estimates, and the actual
revenues and' projections at the end of FY 2003 -04 are included in Exhibit 1.
0,
PCD Redeveloument Project Area
I. Capital Improvement Projects (CIP)
a.. Street Reconstruction, Traffic Circulation &
Parking Improvements: $5.460 Million
Project Description; The project will widen intersections and
bridges, reconstruct roads and make parking improvements,
increasing the safety and capacity of intersections, improving
vehicular, pedestrian, and bicycle' circulation in the Project Area.
Status of Expenditure Plan:
Original
5-Year Budget
Expenditures
To Date;
Unexpended
Balance
Revised
5 -Year Budget
$11,300;000
$1,300,000
$10;000,000
$5 ; 460,000
Project Status: Approximately $5.5 million in road improvements
are planned annually over the next three years. after which ,all streets
in the PCD project area will.have, a Pavement Condition Index of 70
or better. Large street improvement expenditures are also planned in
the CBD Project Area.
b. "Mainstreet" Improvements: $4.303 Million
Project Description: The, proj ect will address the :impacts on public
infrastructure impacted by the implementation of the following future
development:
• Central Petaluma Specific Plan,
• The Hub/Fairgrounds
• Bicycle Plan, and
• Related Transportation Improvements.
The project will make infrastructure :improvements, inside the project
area to eliminate deteriorated public 'improvements and facilities
including curbs; gutters, paving, sidewalks, drainage, lighting and
landscaping.
Status of Expenditure Plan:
Original.
— 5-Year Budget
Expenditures
To Date
Unexpended
Balance
Revised
5 -Year Bud` et
$9,00.0.,000
$50,000
$8,950,000
$4,3;03,000
7
Project Status: Focus, of Mainstreet -type improvements has been on
be Downtown Central Business District. Recommend reducing
proposed expenditures to -$4.3 million with the primary emphasis on
the implementation of improvements to Lakeville Highway and
related underground utility engineering studies.
c. River Enhancement Plan Improvements: $2.355 Million
Project Description: Pedestrian/Bicycle trails along the Petaluma
River will provide residents and visitors easy access to downtown
shopping and social - activities, creating an environment conducive to
social and economic growth. The project includes construction of a
paved. „path along the river from the Lynch Creek to the East
Washngton'Bridge.
Status, of Expenditure Plan:
Project Status: Additional funding has been budgeted for the
construction of a pedestrian/bike path along; the river. The current
budget is approximately $2.355 million. Engineering design for the
entire corridor is complete. The . first phase of construction from
Washington ,Creek to Edith Street is planned to begin in June 2004.
The second phase of construction from Edith Street to Washington
Street is planned for construction in 2005. The project has grown to
include streetscape improvements on Poultry Street to coincide with
and take advantage of private development occurring in the area.
d. Gateway Capital Improvements: $1.3`16 Million
Project Description: The project will .beautify various gateway
entrances to the City through a combination of landscape and
hardscape; capital .improvements, as cited in the General Plan in order
to provide an environment conducive to social and economic growth.
Status of Expenditure Plan:
Original
5 -Year Budget
Original
5- Year-Bud et
Expenditures
To Date
Unexpended
)Balance
Revised
5 -Year Budget
$1,500,000
$149,536
$3,350,464
$2,355,000
Project Status: Additional funding has been budgeted for the
construction of a pedestrian/bike path along; the river. The current
budget is approximately $2.355 million. Engineering design for the
entire corridor is complete. The . first phase of construction from
Washington ,Creek to Edith Street is planned to begin in June 2004.
The second phase of construction from Edith Street to Washington
Street is planned for construction in 2005. The project has grown to
include streetscape improvements on Poultry Street to coincide with
and take advantage of private development occurring in the area.
d. Gateway Capital Improvements: $1.3`16 Million
Project Description: The project will .beautify various gateway
entrances to the City through a combination of landscape and
hardscape; capital .improvements, as cited in the General Plan in order
to provide an environment conducive to social and economic growth.
Status of Expenditure Plan:
Original
5 -Year Budget
Expenditures
To Date
Unexpended
Balance
Revised
5 -Year Bud et
$1,000,000
sp
$1,000,000
$1,316,000
Project Status: Engineering and landscape design for gateway
improvements is currently, underway for the southern gateway by the
old,Rinehart's truck` stop. The first phase of construction is scheduled
for June 2004 with 'tree planting. A second phase of the south
gateway improvements will occur in August /September 2004_.
Landscape design is_ also underway for the Northern Gateway at the
intersection of Stony Point and Petaluma Blvd., for construction in
2005.
e. Turning Basin Dredging- $ 0.300.Million
Project .Description: The project will dredge the turning basin in
between the years when the US Army Corps of Engineers dredges the
turning basin downtown and the Petaluma. River. Without.the support
of the Agency, the turning basin would reduce the viability of river -
related industry and tourisin%boating.
Status.of'Expenditure Plan;
Original
5 -Year Budget
Expenditures
To Date
Unexpended
Balance
Revised
5- YearBu_ d et
$200,000
$54,000
$146,000
$3:00,000
Project Status: Funds were obtained from the Federal Government
for the dredging of the Turning Basin. Therefore, no PCDC
expenditures were required for`.this purpose. It is recommended that
funding be transferred to Marina Fund for Dredging Improvements
where $246,000 is to be expended from PCDC funding in FY 2003-
04.
11. Redevelopment '
f. Unreinforced Masonry Program: $0.005 Million
Project Description: � The project will restore many of Petaluma's
unreinforced masonry buildings thereby preserving'the stock of older
buildings which gives the, City its unique character. The . project
corrects structural. deficiencies in aging buildings thereby eliminating
blighting influences.
Status of Expenditure Plan:
Original
5-Year Budget
Expenditures
To pate
Unexpended.
Balance
Revised
5 -Year Budget
$330,000
$110
$329,890',
$5
I
P.ro'ect Status: Reduce project budget to $5 000 to account for fewer
J, P j. g ,
than antic' ipated seismic retrofits in.the project area:
g. 'Tree Planting & Establishment: $0.397
Project Description: The project will involve the planting of street
trees within the PCD Project Area, 'providing an environment
conducive to social and economic growth. .
Status of Expenditure Plan
Original
5 -year ud B et
Expenditures
T_ o Date
Unexpended
Balance'
Revised
5 -Year Bud et
$350,000
$157;201
$192,799.
$397,000
Project Status: On Track — Includes initial three -year period of
establishment /watering.
h. Economic Development Promotion :, $1.012 Million
Project Description: The project will promote tourism to the City by
supporting the- Petaluma Visitor's Bureau marketing efforts -- $1.8
million; establishing a business attraction & retention program by
providing economic data and related information to the business
community -- $600,000; and completing studies for the
implementation of the Central Petaluma, Specific Plan -- $180,000.
These programs are being implemented in order to provide an
environment conducive to social and. economic growth.
Status of.Expenditure Plan;
Original
5 -Year Bud' et
Expenditures
To Date
Unexpended
B'alanee
Revised
5 -Year Budget
52,580,000
$603,698
$1
$1,012,000
Project Status:, This project was substantially revised with the
deletion of funding for the Visitor's Bureau as per the limitations
imposed by Redevelopment Law. However with the
implementation of the Retail Strategy -and improvements to the
Industrial Avenue site, a total revised budget of $1.012 million is
recommended, as follows:
10`
• Industrial Avenue Site Prep: $204,000
• Retail Strategy & Implementation: $175,000
• Economic Studies/Promotion $ 20,0:00
• LOK Hotel OPA: $ 13;000
• Tourism Program (Discontinued): $600,000
i. LOK Petaluma Marina Hotel OPA: - $ 2.750 (Loan)
Project Description: - The Agency entered into. an . Owner
Participation Agreement for a 183 room full - service Sheraton Hotel in
the Marina. Assistance to the project includes a loan for
offsite public improvements. to be repaid. to the PCDC through a
deferred participation payment. Without financial assistance, the
economically .viable. use of the marina site was substantially hindered
due to limited access !and parking. ,Additionally, the vacant site was
difficult to develop for urban use and without redevelopment
assistance constituted a serious physical and economic burden on the
community that 'could "not be reversed or alleviated by private
enterprise or governmental action, or both, without redevelopment.
Status of Expenditure Plan:
Parking Lot Construction Loan
Original
5 -Year Budget
Expenditures
To Date
Unexpended.
Balance
Revised
5- Year,Bud et
$750,000
$75;0,000
$0
$750,000
Property Tax Increment Loan
Original
5- Year..Bud et .
Expenditures
To Date
'Unexpended
Balance
Revised
5-Year Bud et
$0
$200;000
41;800,000
$2,000,000
Pro f ect Status: Parking ,Lot Construction Loan is provided in full
An additional $2:0 million loan which was not anticipated in the Plan
is recommended in order to keep the Plan current. The total for this
item is $2.750 million.
j. Assessmem Credits: $0.148 Million
'11
Project Description: This project provides funding for assessment
credits for the Gow property. These credits were not included in the
original Plan are now included.
Status of Expenditure Plan:
Original.
5 -Year Budget
Expenditures
To Date
Unexpended,
Balance
Revised
5 -Year Budget
$0
$47,757
$77,243
$148,000
Project Status: On Track
III. Debt Service
k. Debt Service: $18.004 Million
J,
Project Description: The project _pays the debt service on the
following debt, allowing the Agency to undertake its projects:
• 2000A TAB: $6,655,350
0 2001 TAB: $2,383,100
0 2004A TAB (New Debt to Be Incurred):. $4
0 Assessment District 19 & Benson Note: $4,627,250
0 Assessment District 17 Subsidies: $ 147,800
Subtotal PCD Debt: $18,004,450
Status of Expenditure Plan:
Original
— 5-Year-Budget
Expenditures I
To Date
Unexpended
t Balance
Revised
5 -Year Budget
$18,004,000
$7,221,712
$10 9 782 9 288
$18,004,000
Project Status: On Track
IV. Administration
1. Project Administration & Overhead: $7.621 Million
Project Description: The project provides administrative ,support to
the PCDC and provides for the planning, oversight, and
implementation of all - agency projects and programs. The
administration of the Agency insures ' that .the goals and objectives of
the Agency are met.
12
Status of Expenditure Plan:
Original
5- Year.Bud et
Expenditures
To Date
Unexpended
Balance
Revised
5- Year„Bud et
$2,4.45,000
$1,747,659
$697,341
$7,621,000
Project Status; Administrative expenditures originally budgeted did
not include: ERAF .shift, ($2,322,000), TAB Cost; of Issuance
($788000), Intergovernmental Charges ($1,02000), SB2557
Collection Fees ($939,000,) or General Plan Consultants ($405,000).
In addition, administrative expenditures to date are overstated due to
the misallocation of construction staffing costs, general overhead and
engineering charges' to administration instead. of capital projects.
Approximately •$350;00'0 annually is actually expended for basic
administration. Accounting changes have made to correct these
charges so that' administrative' costs will be accurately accounted for
in the future. Additional funds; are 'programmed, for a PCDC Plan
Amendment to "merge the project areas ($210,000).
Subtotal Original PCD Project Area Proj,ect,Cost Estimate $47.740! Million,
Subtotal.N' w PCD Project Area Project CostEstimate: $66.771 Million
Difference: + $19.034 Million
eitral Business 'District Proi ect. Area
I. Capital Improvement Projects (CIP)
a. Parking Garage, Capital Improvements: $1.150 Million
Project Description: The project will begin in FY 200.1 -02 with
construction to improve the security of the Keller St. parking structure
($325;000). Additional funds are set aside for public participation in
new parking facilities ($2.0 million).
Status of Expenditure Plan:
Original
5 -Year. Budget
Expenditures
To Date.
Unexpended
Balance
Revised.
5 -Year Bud et
$2,325;000
$1,149,948
$1,175,052
$1;150,000
•
13
Project Status: Improvements to the Keller Street Garage are
complete.. hi FY 2003 -04, a Owner Participation Agreement (OPA)
with Basin-Street Properties provided for the addition of a new
parking facility with approximately 530 spaces, of which 216 are
public.. Therefore, having met the plan to provide additional public
parking in the CBD Project Area though the. OPA, no further
participation in publicly financed facilities is required through FY
2006 -07.
b. "MainstreeO /Streetscape Improvements: $10.3 Million
•
Project Description: The project.wll: improve public infrastructure
in the downtown core of the project area. The improvements will
eliminate deteriorated public 'improvements and facilities including
curbs, gutters, paving, sidewalks, drainage, lighting and landscaping
as follows:
• Sidewalks
• Streetlights
• Street Overlays;
• Curb & Gutter
• Misc & Supervision
Subtotal
$2,400;000
$ 800;000
$1
$ 35.0,000
$ 450,000
$5,000,000
Status of Expenditure Plan:
Original
5 -Year Budget
Expenditures
To Date
Unexpended
Balance.
Revised
5 -Year Budget
$5,000
$1,539,514,
$3,466,4%1
$10,300,000
Project Status: A -CBD Downtown Streetscape Master Plan was
approved by SPARC and provides a comprehensive guide to the
redevelopment of the downtown. Construction is' currently underway
to ,complete the first phase of the streetscape improvements, budgeted
at $6' million. This includes improvements on Kentucky/Fourth
Streets and Petaluma Blvd. from Washington to B Street. A second
phase will complete the remaining downtown streets, including
Washington Street from Petaluma Blvd. to Howard Street at
approximately $4 million. Additional engineering .is also budgeted
for improvements to Copeland/Baylis Streets north of Washington
($325,000).
14
c. Implementation of Central Petaluma Specific Plan $9.400 Million
Project Description: The implementation :of the Central Petaluma
Specific Plan will provide an environment conducive to social and
economic growth. Specifically, the implementation will involve
numerous public capital improvements such as street. paving,
sidewalks, curbs, gutters, storm drainage, lighting, water and, sewer
lines. The implementation of the Specific Plan improves pedestrian,
bicycle, and vehicular circulati.on °and access to the Project Area,
The plan also envisions high density housing linked to public
transportation. The project .may also include the renovation of an
aging railroad -trestle and the construction of a floating walkway used
for pedestrian access at Water Street.
Status of Expenditure Plan:
Ori g final
. 5-Year Budget,
Expenditures
To, Date
Unexpended.
Balance.
Revised
5-Year Bud` et
$8,600
$683 5 , 0.43
$7,91.6,957
$9,400
Project Status: The PCDC entered into a Owner . Participation
Agreement (OPA) with Basin "Street Properties °for the Theater District
Project, agreeing to provide $4.8 million in infrastructure
improvements; In addition, the PCDC _ added approximately $3.0'
million for 'improvements to` public rights =of- -way adjacent to the
project. The,project will be completed by 2006.
d. River Enhancement Plan Improvements: $7.125 Million
Project Description.; Pedestrian/Bicycle trails along the - Petaluma
River. will provide residents and visitors easy access to downtown
shopping and social activities,, creating an environment conducive `to
social and economic growth. , The project includes construction of a
paved path along the river in two segments from the East Washington
to the D Street Bridge and from D Street to the end of Foundry Warf
as follows:
Downtown Segment: $3,868
Warehouse Segment: $2,000;000
Subtotal $5,868,000
15
Status of Expenditure'Plan:
Original
5-Year Budget
Expenditures
'To Date
Unexpended
Balance
Revised
5 -Year Budget
.55;868;000
$580,599
$5;287,401
$7,125
Project Status: The downtown segment of the River Enhancement
Improvements will be completed as part ,of the Water Street /Turning
Basin Improvement Project. The first phase of the project, involving
undergrounding the utilities is currently under way. The above
ground streetscap.e improvements will begin late 'in the summer of
2004. Funding also includes river access ' improvements around the
Turning Basin,, for a total of $6.6 million.
In addition $525;900 .is included .in the revised budget to engineer a
replacement'to the Railroad Trestle and remove the defunct trestle.
Funding: for the Warehouse distri ct improvements has been provided
through the OPA between the PCDC and Basin Street for Theater
District 'Project improvements along First Street. Basin Street will be
making top of bank improvements along their development on First
Street. As further development occurs on First Street, the developer
will be required to make river access improvements.
11. PCDC Added CIP
e. Petaluma'Railroad Restoration:, $2.423 Million
Project Description; The `PCDC entered into a lease agreement with
the NWPRA for 25 years and '
greed to restore the depot within five
years. Exterior improvements to the buildings have been completed.
The second phase of the project will begin during the Summer of.
2004 and involves the undergrounding of utilities and
landscape /parking lot improvements. The final phase, involving
improvements to the interiors of the building, are planned for FY
2004 -05. These improvements were originally contemplated as part
of the implementation of the Central Petaluma Specific Plan, and have
been broken apart as a separate project.
Status of Expenditure Plan:
Original
5 -Year Budget
Expenditures
To Date
Unexpended
Balance
Revised ,
5- Year°Bud et
$0
$1,429,300
$0
$2,423-,000
16
Project Status: Project was started * in 'FY 2003 -04 and will be
completed in FY 2004 -05. - The project is central to starting the
redevelopment of the adjacent railroad parcel.
f. Road & Streetscape Improvements $8.477 Million
Project Description: Funds are allocated for additional road and
streetscape improvements °i ; n the CBD Project-Area, m_ ainly focused
on,Petaluma Blvd South to the 'beyond City Limits, including the
Dutra quarry site. Developer funding to offset-. possible future
'improvements is also reflected.
Status of Expenditure Plan:
Project Status: The Central Petaluma Specific Plan contemplates
improvements to Petaluma'Blvd. South. Making these improvements
in conjunction with improvements to the northern end of Petaluma
Blvd. will provide significant `improvements to circulation and to the
character of this important arterial and gateway:
Engineering /Architectural design will begin in FY 2004 -,05, with
construction "in FY 2005 =06.
g. Poultry Street Extension: $2.415 Million
Project Description; Funds are provided to make improvements to
Poultry Street in 6rder for development. Funding is completely offset
by the developer:
Status of Expenditure Plan:
Original
5- YearBud et
Original
5 -Year Budget
'Expenditures
To Date
Unexpended
Balance
Revised
5- Year_Bud et
$0
$0
$100,000
$0
$8,477;000_
Project Status: The Central Petaluma Specific Plan contemplates
improvements to Petaluma'Blvd. South. Making these improvements
in conjunction with improvements to the northern end of Petaluma
Blvd. will provide significant `improvements to circulation and to the
character of this important arterial and gateway:
Engineering /Architectural design will begin in FY 2004 -,05, with
construction "in FY 2005 =06.
g. Poultry Street Extension: $2.415 Million
Project Description; Funds are provided to make improvements to
Poultry Street in 6rder for development. Funding is completely offset
by the developer:
Status of Expenditure Plan:
Original
5- YearBud et
Expenditures
To Date
Unexpended
Balance
Revised
5 -Year Budget
$0
$0
$0
$2,415,000
Project Status: Project is fully funded by developer and subject to
City review. Improvements could include improving Poultry Street
and providing accesses to Lakeville Street.
17
111. Redevelopment Programs
h. Unreinforced Masonry Program: $0.400 Million
Project Description: The project will restore many of Petaluma's
unreinforced masonry buildings thereby preserving the stock of older
buildings which give the City its unique character. The proj ect
corrects structural deficiencies in aging buildings thereby eliminating
blighting influences.
Status of Expenditure Plan:
Original
S -Year Bud et.
Expenditures
To Date
Unexpended
Balance
Revised
5 -Year Budget
$355,000
$210,244
$144,756
$400,000
Project Status: An analysis of the remaining properties requiring
seismic retrofits `by 2007 reveals that an additional $45,000 is required
to subsidies to complete the 2007 URM requirements.
i. PDA Downtown Economic Development: $0.440 Million
Project Description: The project funds the work plan of the Petaluma
Downtown Association that under takes.. economic development
through business retention and enhancement programs. These
programs are being implemented in order "to provide an environment
conducive to social and economic growth.
Status of `Expenditure Plan:
original
5- Year;Bud et
Expenditures
To Date
Unexpended
-Balance.
Revised
5 -Year Budget
$420,000
$290;000.
$130,000
$440
Project Status: PDA funding was initially provided at a rate of
$70;000 annually but was`inereased to $110,000 annually in FY 2002-
03. Due to the impact of ERAF, recommend maintaining $50,000
Annual' expenditures while assisting the BID in increasing its
collections.
j. Special Projects: $0.109 Million
Project Description: The project was originally' to provide funding
for aiY enhanced downtown foot patrol provided by a private security
firm giving people shopping in the area an added sense of security
during holidays ($90,000). Another provides for the continual
rehabilitation and renewal of downtown sidewalks ($62,000). A third i
project provides employment to youth during the summers related to
business development and enhancement ($3,000). As these were non -
capital project expenses, they were not eligible for redevelopment
funding and were deleted: A fourth project provided a credit to
business property owners who provided off- street parking during the
life of Assessment District l4 ($115,500), which was completed at the
,beginning of FY 2003 -04.
Status of Expenditure Plait:
Original
5 -Year Budget
Expenditures
To'.Date
Unexpended
Balance
Revised
5 -Year Budget
$155000
$199;000
$46,000
$109,000
Project Status: Non = Capital Improvement Projects were deleted as
per state law regarding Redevelopment. The assessment credit project
is °complete.
L Keller St. Parking Garage, Security & ,Rehab: $ Million
Project Description:. The project provides, funding for monthly
facility rehabilitation and 'contract security personnel to patrol the
.Keller St. parking garage. Rehabilitation and parking security would
initially be only partially offset by parking fees. Parking revenue is
estimated to fully offset. the cost of securing and rehabilitating the
structure by FY 2006 -07.
Status of Expenditure Plan:
Original
5 -Year B et
ud
Expenditures
To Date
Unexpended
Balance
Revised
t
5 =Year Budget
$870;000
$171,626
$698,374
$280,000
Project Status: Efforts to make the maintenance and security of the
garage self- sustaining ,have :failed so far. At the request of the. PDA,
the PCDC made extensive garage ,improvements with the proviso that
users would pay to -park, thereby offsetting the ongoing General Fund
cost. Efforts to introduce pay - parking have been unsuccessful so far.
A Property Related Fee was opposed by property - owners in February
2004. A new assessment is being proposed by the PDA and will be
presented to the City Council for consideration 'in June.. If this
approach fails,. an alternative of instituting .downtown parking meters
may be proposed. A revised. budget of $280,000' is recommended,
taking current program through the end of FY,2003 -04, after which
time the" garage will become financially self-sustaining,
19
1. .Putnam Plaza Restroom OPA: $0.002 Million
Project Description: According to an agreement for use of private
property with the owners of 125 Petaluma Boulevard signed by the
Agency in 199.6; the Agency agreed to pay for the ongoing use of
public restrooms on private property.' This was in lieu of constructing
costly public restrooms downtown where space was limited. The
project was undertaken in order to eliminate blighting influences and
correct a deficiency in public improvements.
Status of Expenditure Plan:
Original
5 =Year Bud et
Expenditures
To Date
Unexpended
Balance
Revised
5 -Year Budget
$50;000
$2,491
547;509
$2,491
Project Status_; This project has been deleted as per State
Redevelopment 'Law pertaining to the use of Tax Increment and
Capital Proj Oct Funding.
m. Storefront Improvement Loan Program: $ 0.400 Million
Project. Description: The project. provides low- interest loans to
owners of properties located downtown. The 'loans are for exterior
repair :rehabilitation and painting. The intention of the program is to
eliminate blighting influences.
Status Of Expenditure Plan;
Original
5 -Year Budget
Expenditures
To Date
Unexpended
Balance
Revised
5 -Year Budget
WON
'$0
$600,000
$400,000
Project Status; Downtown property owners have not shown interest
in low - interest loans. It is recommended that the project be
reconfigured to include the possibility of providing matching grants
for storefront improvements to' buildings older than 1,00 years. For
example, some agencies provide a.50% match up to a capped amount
and agree to forgive the match if thel owner maintains the building for
10 years:
•
20
n. Downtown Foot'Patrol Security: $ 0.025 Million
Project Description: The project provides funding for an enhanced
downtown `.foot patrol provided by the Police Department giving
.people shopping in the area, an. added sense of security during weekly
shopping ($90,000).
Status of Expenditure Plan:
Original
5 -Year Budget
Expenditures
To Date
Unexpended
Balance
Revised
5 -Year. Bud et
$150,000
$25,000
$125;000'
$25,000
Project Status: This project has been deleted as per State
Redevelopment Law pertaining to the use of Tax Increment and
Capital Project Funding.
IV. PCDC Added Programs
o. Tree Planting & Establishment: $0.315
Project Description: The project will involve the'• planting and
establishment of street trees within the CBD Project Area, completing
the downtown ,urban foresfry program and providing an environment
conducive to socialjand economic growth.
Status of Expenditure Plan:
Original
5 -Year Budget
Expenditures
To Date
Unexpended,
Balance
Revised
5- Year Budget
$0
$15,000
$0
$315
Project Status: Includes initial three -year period of
establishment /watering.
2 1'
a
V. ; ebt 'Service
p. Debt Service: $1.243 Million
Project Description: The project pays the debt .service on the
following debt, allowing -the Agency to undertake its projects:
• 2000B TAB: $727,000
• 2005A TAB (New Debt to. Be Incurred); $400,000
• Assessment District'14 Credits_: $ 116,000
Subtotal. CBD Debt: $1,243,000
Status of Expenditure Plan:
Original
5-Year Bud' et
Expenditures
To Date
Unexpended
balance
Revised
5 -Year Budget
$1,643,000
$176,500
$1,466,500
$1,243,000
- Project Status; Estimated debt service on a future 2005 TAB has
been reduced thereby requiring a reduced appropriation.
VI. Administration
q. Project Administration & Overhead: $.2.531 Million
Project Description: The project provides administrative support to
the PCDC and provides for the planning, oversight, and
implementation of all agency projects and programs. The
administration of the Agency insures that the goals and objectives of
the Agency are met.
Status of Expenditure Plan:
Project Status: Administrative expenditures originally budgeted did
not 'include: Intergovernmental Charges ($170,000), SB2557
Collection Fees ($71,000), or General Plan Consultants ($307,000).
Administrative expenditures to date are overstated due to the
misallocation of staffing costs, general overhead and engineering
charges to administration instead of capital projects. Approximately
$250,000 annually is actually expended for administration.
22
Original
5 -Year ,Bud et
Expenditures
To Date
Unexpended
Balance
Revised
5 =Year Bud et
$825,000
$787,047
$37,953
$2,531,000
Project Status: Administrative expenditures originally budgeted did
not 'include: Intergovernmental Charges ($170,000), SB2557
Collection Fees ($71,000), or General Plan Consultants ($307,000).
Administrative expenditures to date are overstated due to the
misallocation of staffing costs, general overhead and engineering
charges to administration instead of capital projects. Approximately
$250,000 annually is actually expended for administration.
22
Accounting changes, have, been made to correct these charges so that
administrative costs will be accurately accounted for in the future.
• Administratior`/Staffing:, $1,936,000
• Other /General,Plan/Fees: $ 595,000
Subtotal Orginal,CBD Project Area Project Cost Estimate :'$26.861 Million
Subtotal New CBD Project Area Project Cost Estimate: $51.046 Million
Difference: +$24.185 Million
Grand Revised Total Five -Year Project .Costs
(Both Project'Areas)
Difference:
$1,17.811 Million
+$43216 Million
23
Mid -Term Review Of The
Progress on Proposed Housing Activities and. Annual Production Goals
California Redevelopment Law requires the Commission to set aside in a separate,
segregated Low and Moderate Income Housing Fund at least 20 percent of all tax
increment revenue generated from its project areas for the purpose of increasing,
improving and preserving the community's supply of low and moderate income housing.
In its. Implementation Plan, the Commission stated its goal to target its
Housing Fund to provide for the changing needs of the community.
The Plan stated that "Low -Mod set -aside funds will be utilized' in conjunction with
other funding sources to serve'very -low and low- income Petalumans based on its fair
share of regional housing , needs as determined by the Association of Bay Area
Governments and the Commission's determination and prioritization of the community's
housing needs."
The annual goals for the Commission's housing program follows, with estimates of the
number of new, rehabilitated and price- restricted housing units to be assisted with
expenditures from the Housing Fund over each of the next five years and estimates of
low- income households served by affordable housing -programs. Following each project
and program goal is a status update through the mid -term review:
FY 2000 -2001
• Housing Strategy: "The Commission will adopt a 2001 -2006 Implementation
Plan which will include an affordable housing strategy to meet its affordable
housing production and replacement housing obligations. Commission staff has
begun to identify more suitable sites for development of affordable housing. Staff
will continue`to work with nonprofit developers regarding the most feasible ways
to develop affordable housing, leveraging Commission funds to the greatest
extent possible.
Project Status: Plan Approved.
• Consolidated Plan: The City adopted its 2000 -2005 Consolidated Plan
StrateLyy as required by HUD. Staff has begun coordinating with other
entitlement jurisdictions in the. County and working, with service providers to
update the housing and community services needs assessment.
Project Status: Plan Approved
• Low - Income Senior Housing Units: The Vintage Chateau opened in February
2000 providing 240 units of low- income senior housing.
Project Status: Complete
• Housing Rehab: 15 homes will be rehabilitated for low - income senior
homeowners.
Project Status: Complete
24
• Rental Mediation: 200 households will rental mediation assistance.
Program- Status: Complete
• Shelter & Support Services: 130 homeless people will receive shelter and
support services.
Program Status: Complete
• Transitional housing: 25 households will receive transitional housing and
services.
Program Status: Complete
• Mary Isaak: Center: Phase I environmental work will be completed on new
homeless multi- services facility.
Program'Status: Complete
• Phase II, 01d.East Neighborhood Revitalization: Project on Hold
Project, Status.: On Hold, Pending Funding
•
Homeowner Programs: Two new homeowner programs will be researched for
possible implementation.
Project Status: Pending, To Be;Revisited in`FY 2004 -05
2001-2002
• housing Element :. The City will adopt its 2001 -2006 Housing Element as
required by the California Department 'of Housing and Community Development.
Project 'Status; Complete (Housing Element Was certified by California Dept.
of Housing and,CornmunityDevelopment and adopted by the City Council.)
• Edith Street Senior. Apartments: The project will be completed in 2004, adding
23 units of housing for very -low income seniors.
Project Status: In. Progress, To Be Completed"in 2004
• Downtown River Apartments: Eden Housing will complete site acquisition on
,downtown housing /81 units of any -age rental apartments.
Project Status: Site Acquisition. Complete
• Old Elm Village Predevelopment: Work icompleted on Old Elm Village /87
units of .any -age rental apartments.
Project Status: Complete
• Housing Rehab: 15 homes will be rehabilitated for low- income senior
homeowners.
Project Status: Complete. •
25
®' Rental Mediation: .20-0, households will receive rental mediation assistance.
Program Status: Complete
• Shelter & Support Services: 130 homeless people will receive shelter and
support services
Program Status Complete
• Transitional Mousing; 25 households will - receive transitional housing and
services.
Program. Status: Complete
• Mary Issac Pred'evelopment: Work will be completed on new homeless multi -
services center
Project Status: Complete
• Phase 11I, Old'East Neighborhood Revitalization: On hold.
Project Status: On Hold, Pending Funding
• 'Lieb Senior Apartments: Site acquisition for inMl senior housing 22/23 -unit
project will be completed
Project Status: Complete
2002 -2003
• Old Elm Village: Construction Will be completed for 87 units of work force
housing.
Project Status: Complete
• Downtown River Apartments Predevelopment: Eden Housing will complete
predevelopment for 81.units of work force housing
Project Status: Complete
• Housing Rehab;; 15 homes will be rehabilitated for low- income homeowners.
Project Status: Complete
Rental Mediation: 200 households will receive rental mediation assistance.
Program Status Complete
• Shelter. & Support Services: 130 homeless people will receive shelter and
support. services.
Program. Status: Complete
® Transitional Housing: 25 households will receive transitional housing and
services
Program Status: Complete
26
o Mary ,Issac Center Construction: Construction will begin on new homeless
multi- services facility
Project Status: Construction Start Delayed
Phase IV, Old East Neighborhood Revitalization: On hold.
Project Status: On Hold, Pending Funding
Lieb Senior Apartments Predevelopment: Predevelopmenf -for - 22/23 new
'senior housing units .undertaken.
Project Status Complete
2003 - 2004,.
• Future Housing-Development: Site acquisition for new multi - family rental
project /downtown area/size unknown
Project Status: On Track, Site Search In Progress
a Lieb 'Senior Apartments: Construction begins on, senior - housing site
Project Status: On Track, Construction Began February 2004
• Housing Rehab: 15 homes will be rehabilitated for 'low- income senior
homeowners
Project Status: On Track, To Be Completed in April 2004
• Mediation Assistance: 200 ,households will receive rental' mediation assistance.
Project Status: On Track, To Be Completed' by June 30, 2004
Shelter & Support Services: 130 homeless people will receive shelter and
support services.
Program Status: On Track To Be Completed by June 30, 2004
• Transitional Housing: 25 households will, receive transitional housing and
services.
Program Status: On Track To Be Completed by June 30,20W
• Mary ISacc Center: Construction "Will begin on Mary Isaak Center.
Project Status: On Track; Construction to be completed by December 2004.
s Phase IV, Old East NeigbborhoodRevitalization:
Project' Status: On Track, Implementation in Summer 2004.
27'
® Lieb S.euior Apartments Construction: Construction for infill senior housing
22/23' -unit project will be completed
Project Status: On Track for Completion in November 2004
• Housing Rehab: 15 homes will be rehabilitated for low- income senior
homeowners.
Project Status: To,Be Completed in April 2005
• Rental Mediation: 200 households will receive rental mediation assistance.
Program Status: To Be Completed during FY 2005
• Shelter & Support Services: 130 homeless people will receive shelter and
support services.
Program Status: To Be Completed during FY 2005
• Transitional Housing: 25 households will receive transitional housing and
services.
Program Status: Tu Be Completed during FY 2005
•
Mary Isaak Center Construction:
Project.Status: To Be Completed, December 2004
• Phase V, Old East-Neighborhood Revitalization:
Project Status: To Be Completed in FY 2005
The 2000 -2006 goals reflected the best projections that the Commission could make, at
the time, of projects that may develop in this time period. 'If these projects are developed
as foreseen, then the majority of affordable units developed will, address very -low and
low- income housing needs.
Summary of Remaining Regional Housing ,Need (August�2002)
•
go
Very Low
Low
Moderate
Above -Mod.
Income
Income.
Income
Income
A. Total
Units Constructed Since 1999
163
185
100
681
1,129
Units Under Construction
187
138
325
Subtotal
163
185
287
819
1,454
Reg. Housing, Need Allocation
206
124
312
502
1,144
Remaining Need Subtotal
43
(61)
25
(317)
(310)
Approved Units
87
16
48
125
276
Remaimn ,Housing Need
(44)
(77)
(23)
(442)
(586)
go
10�
•
29
MID -TERM REVIEW
SUMMARY,OF
HOUSING ACTIVITIES
2001 -2006
(All Funds) .
Senior Housing
Goal_
361
Mid -term completion
263
Family Housing
Goal
218
Mid -term completion
87
Rehabilitation
Goal
100
Mid - term completion
45
Rental Assistance
Goal
1200
Mid -term completion
600
Shelter Beds
Goal
840
Mid -term completion
390
Transitional Housing
Goal
210
:Mid -term completion
75
Neighborhood Revitalization
Goal
Phase 2
Mid- term completion
Phase 1
10�
•
29
Exhibit 1
Summary ®f Appropriations & Revenues
"Five -Fear Implementation Plan"
30-
FUNDS 5510,
REVENUES AND EXPENDITURES BY PROJECT AREA
CENTRAL BUSINESS .DISTRICT PROJECT AR
REVENUES & EXPENDITURES
IMPLEMENTATION PLAN
FIVE -YEAR FORECAST
FY,01 -02 FY 02 -03 FY 03 -04 FY 04 -05 FY 05 -06 FY 06 -07
Actual Actual Midyear Proposed Projected Projected
Adjusted
CENTRAL BUSINESS DISTRICT PROJECT AREA
BEGINNING CASH „REVENUES, TRANSFERS IN AND INTERFUND LOAF
1 •
2 Beginning Cash,Balance
3 Property Tax Increment Revenue
4 Other Revenues
5 Property Owner Contributions
6 Transfers In -- _
7 Bond Proceeds
8 Interfund Loan from PCDC:902
9 TOTAL CASH, REVENUES;,TRANSFERS' IN, rLOAN
16
11 EXPENDITURESAND TRANSFERSOUT
12 Administration {
13 Program Expenditures
1'4 Loans
15 Interest
16 Pass - Through Payments
17 Capital Improvement Projects
18 Transfer out to Housing Fund
19 Transfer out to Debt Service Fund
20 Transfer out to General Fund for Security Patrol
21 Reserves. for Future Projects
22 TOTAL EXPENDITURES, TRANSFERS OUT
23 CHANGE IN ASSETS /LIABILITIES
24
25 ENDING CASH BALANCE
32
.531,536
16,935
0
0
0
481,950
173,866
191,463
0
0
0
608;339
106784
48,600
25,000
0
1,154,052
(607,696)
FY 2061 =02 to
,� FY- 2006.07 _
484,297
498;794
481,950
481,950
48195032'
638;207
579;731
616,759
700
794,524 3 880;779`
15,424
27,000
168,500
170,000
170 568 359;;
29,649
0
2,415,000
1,8
0 4 321;149';
0
280,000
0
0
0 ° 280,000;
0
0
0
0
4740000 '- 000::
1,810,050
15,453,899.
: 14992,727
6,421,268
(67 -' -`37 092561
2,977;627
16;839;424
16,674;936
9,649;739
6;119642 =:50 ;862 ;8W.
425,182
741,900'
395,341
390,166
404-523 ;' 2 530 978
340;617
530,500
394,000
350;000
351,000, - - 2 157 560��
0
100,000
200
100
12,376
80,220
621,106
1,075,852
1,300 596 03 090'151
14
32,554
34,600
39,271
44 573 165 668"
1485,135
14,733,300
14,408;938
7;076,500
3,000000 'x'41312;212 - ;
127,642
0
0
0
0 - 234
129;900
139,000
139,000
136:000
537 ''1 129500
0
0
0
0
0 25,000`:
0
0
0
0
0 0£
2,535;522
16,357,474
16,192,986
9;167,789
5,637 692 -51 045 515-
(56;689)
t;, (664,585)
498,794
481,950
481.950
481.950
481 950 aa1"4s0=
City of Petaluma;.Califomia - Petaluma Community Development Commission
•
4/13/2004 12:32 PM PCDCF5YearlmplementationPlanAnalysis041104 PCDC detail 1
10 Interest 2,498' 5,268 5,000 1,500 3,000 3;500 20 76¢=
6 48010 Miscellaneous Revenue 1,079 0 0 0 0 0 '1
7 42420 Parking Lot Revenue 13,358 10,156.- 22;000 167 167,000 167 000 �J 546,514:'
8 48010 Property Owner Contributions 0 29;649 0 2,415,000 1 0 - - 1
4 321 W'
9 TOTAL REVENUES = 548,471 683,280 606,731. 3,200,259 2;746;521 965024 _.8750 =287.:
11 TRANSFERS.IN -
12 Transfer in Net Bond Proceeds 2006. TABS 0 .0 0 0 0 4,740 000
13 Transfer In 0 0 280;000 0 0 0 280 OOQ
14 INTERFRUND LOAN.FROM FUND 902 481,950 1,810;050 15,453;899 12 6,421,268 -67 332 37 092 561
15 TOTAL CASH, REVENUES'AND TRANSFERS IN 1,030,453 2,977;627 16,839,424 16;674,936 9,649,739 6,119 642
. 16 - -
1,7 EXPENDITURES
' 19 __
20 P20;1000 Project A rati
dministon 78,798 242;366 570,700 337;821 .347,956 358 394 -'
21 C200203 Basset/Howard %Street Remodel 0 15,000 0 20,000. 0 0 - 35 s '
22 P201000 CBD.Plan Amendment (Seifel #1) 4,021 8;853 0 0 0 0 - 12,8746
23 P201000 'SB -2557 Co: Collection Fee 6,647 9,213 11,800 12,520 14210 16 70,719:"
24 .Iritragovernmental 25,200 40;350 21,000 25;000, 28;000 30.0 -' 1169
.25' General PlanAdministration '59;000 109 ; 138,400 0 0 0 -* 3061800`"
26 Subtotal Administration 173 425;182 741_,900 395,341 390,166 404,523 42;530 '
i2T ? u
28 program Expenc>£ilies z
29 Central'Petaluma.Specifiic Plan 0 215 0 0 0 0 A 215;
30 P201070 URMProject .30,663 109,689 215,000. 45,000 0 0 400;352
31 P201020 Petaluma Downtown Assoc. 70;000 110,000 110,000 50,000 50;000 50,000 440 000
32 P201040 Street Tree Establishment 0 14,548 0 100,000 100,000 100 314;5W.-
33 Special: Projects
34 - Downtown Security - - 0 0 0 -- 0 0 0 = Ot
_35 Sidewalk Maintenance. 10,000 0 0 0. 0 0 _ 10 000
36- Depot Rents 0 0 0 32;000 33,0,00 34i()06 99 000`
barage Maint/Security 40 69,516 167,000
37 P201050 Parking,
.167,000 167,000 167 000 77 721 •?
38 P201010 CBD Loans & Assessment Credits 38;531 36;222 38;¢00 '0 0 0 '177;721:_-
113,253,` -'
P201060 Plaza'Restroom Maintenance 2;064 '427 0 10 0 0 - 2 491 - - " .
40 Subtotal P.rogram,Expenditures 191,463 340,617 - 530,500 394,000 350,000 351 =2 1573606
4/1312004 12: 3i*CDCF5YearlmplementalionPlanAnalysis041I b4 PCDC detail 2 �-
Funds 5510, -3300 C
FY 01 -02 F
CENTRAL BUSINESS DISTRICT PROJECT AREA
REVENUES& EXPENDITURES -
-_
CENTRAL BUSINESS DISTRICT PROJECT AREA
1 B
BEGINNINGCASH BALANCE 3
32 4
484,297 4
498 4
481,950 4
481,950 4
481 32
2
B R
REVENUES
10, - . Property Tax increment_ 5
531,536 6
638,207 5
579;731 6
616,759 7
700,021 7
794,524
5 4
434
4/1312004 12: 3i*CDCF5YearlmplementalionPlanAnalysis041I b4 PCDC detail 2 �-
0
Funds 5510, 3300
REVENUES AND EXPENDITURES BY PROJECT AREA
CENTRAL BUSINESS DISTRICT, PROJECT AREA
41
Loans
42
P201010 Storefront Improvement; Loan,Program
0
100,000
200,000
10000
0
44
Inteieslt
45
P201010 Interest .on Interfund'Loan
0
12,376
80,220
621;106
1,075,852
1,300,596
46
47
Pass Throughayments�� z - M
48
P201000 PasMfirough.Payme6ts io Ottiers
_ 0
14,670
32,554
. ,34,600
39,271
44,573
A9
50�
_C p tat_improv ment Projects
51
C200104 Caulfield Extension ' _ -
0
0
0
0
0
0
57
Downtown Parking Structure
Oi
0
0
0
0
0
X53
Was ingto,mStreet Improvements
0
0
1 25,000.
0
0.
oi .
54
North Copland /Baylis Street. Improvements
0
0
0
0
300;000
0
55
Pouliry'Street Extension
0
6
- 0
2,415;000
0
0
56
P202400 Underground Tank Monitor
0
•1 0
0
0
0
b '•
57
C200102 Parking Garage Improvements
291,391
'858;557
0:
0
0
0
58
C200603 Downtown Improvements Phases I.& 2
13;225
228,233
5;755,000
1;979,414
2,000 -
0 =.
59
C200304 Road /Streetscapelmprov
0
0
100,000
1,000,000
4,376,500,
3,000,000
60
C200703 Cent. Pet :Specific Plan District
0
173;580
4,717,000
4;529;816
0
0'
61
C200804 Trestle Engineering
0
0"
125,000
0
400,000
0
62
C200303 Petaluma Railroad Depot Restoration
0
55
1,429,300
938,000
0
0
63
C200503 Water StreetfTurning Basin Improvments
303,723
168,775
2,582,000
3,546,708
0
0 -'
64
Subtotal Capital Improvements Projects
608,339
1,485,135
14,733,300
14,408,938
7,076,500
3,000,000
�
65,
-
'66
TOTAL EXPENDITURES
973,668
2,277,980
16;218,474
16,053
9;031,789
5,100,692
67
=68,
TRANSFERS OUT
_
69;
Transfers�ouPto Low /Mod Housing Fund 903
106,784:
127,642
0
0'
-
0
0 -i
70
Transfers out to Gen Fund' for Foot Patrol Services
f
'25 000
- , '0
0
0.,
0
0 ;.
71
Transfers out to Debt Service: 1984 TAB
0
'0
0
'0
0
. .0` 2.
72.
Transfers out to Debt Service: 2006A TAB
0
0
0
0
0
400,000
73
Transfers out to Debt Service: 2000B TAB
-
48,600
129,900
139,000
139,000'
136,000
137,000
74
Subtotal Transfers Out
180,384.
257,542 ""
139,000
139,000!
,136,000
537;000 =s
75
76 TOTAL EXPENDITURES & OUT
`1,154,052'
2
16,357,474
16,192,986
9,167;789
5,637,692
77 CHANGE; IN ASSETS /LIABILITIES
(607,896)
(56,689)
0
-
78
79 ENDING
CASH BALANCE
484,297
498,794
.481,950
481,950
481,950
481,950
80
.
81 CUMMULATIVEINTERFUND LOAN FROM PCD PROJECT AREA (9 481;950 2;292:000 17,745,899 30,738;626 37;159;894 37,092;561
•
4/13/2004 12:32 PM PCDCF5YearlmplemenlationPlanAnalysis041104 PCDC detail 3
FUNDS 3400, 5520 PETALUMA COMMUNITY DEVELOPMENT PROJECT AREA
REVENUES & EXPENDITURES
IMPLEMENTATION PLAN
FIVE -YEAR FORECAST
REVENUES,AND EXPENDITURES BY PROJECT AREA FYa01 -02 FY 02 -03 FY, 03 =04 FY 04 -05 FY 05-08 FY 06 -07
Actual. Actual' Midyear Proposed Projected Projected
Forecast ,
COMMUNITY DEVELOPMENT' PROJECT AREA
BEGINNING CASH, REVENUES AND TRANSFERS IN
1 Beginning, Cash Balance
2 Cash with Fiscal Agent (Bond. Proceeds)
3 Property Tax Increm ent'Re_ve_nue.
4 Other Revenues
5 Transfers1n: 2004A Tax. Allocation Bon&Proceeds
6 Transfers In: 2000ATaxAlloc_a_tion Bond Proceeds
`7 Other. Transfers In
8 TOTAL CASH, AND TRANSFERS IN
9
10 EXPENDITURES: AND TRANSFERS OUT
11
12 Administration
13 Program Expenditures
14 'Pass- Through Payments
15 Capital lmprovement' Projects
16 Transfers 0 itto''Other - Funds
17 Transfers Out to Housing Fund 903
18 Transfers Out to'Debl Service Fund 904
19 Transfers Out to TOT. Fund
20 Transfers Out lo.Traffic Fund
21 Transfers Out to SlormlDrain Fund210
22 Transfers.0utto Marina Fund 607
23 TOTAL EXPENDITURES, TRANSFERS OUT
24
25 CHANGE IN ASSETS /LIABILITIES
26 CURRENT, INTERFUND:L'OANTO PCDC901
27
28 ENDING CASH BALANCE '
1,828,322
2;738,487
6;550;885
6,624;691
5,897,795
1,589;806
106.378
11,751
'_9;702,065
13,951,765
-
66000 -_ 961f102'
9
10;450;315
8!91.1;450
.9,357,023
9;824:874
10,316:117
487,336
1 3,863,391
1,200;220
1, 84,1, 282
1,282;275
1,356.239
0
0
23;630,0000
0
0
12,000.000
0
0
0
0
0
0
0
0
0
0
0
0
2;102;734
28,804,180
49,994;620
31,774,761
17,004,943
25,262,163
662;207
1,085;452;
2,133,129,
1,365,207'
1;179;968
1,195467 7621,430`
106.378
103,724
341,000'
236,000
106;000
66000 -_ 961f102'
3;085;929
3;318;511
3,565
3,793,425
3,983,096
4;182251 21928;863 - -
133,219
250,221
4,647;000
4;560,601
785;000"
3;300 000
1,873;685
1;990,651
0
0
'0;
0 336'
2,346;800
2;140;000
3,031,486'
..2,929,005
2, 939
_
'3j 132 = 16�519201r;
300,000
300,000
0.
0
0
0 600 000;:;
0.
1,300,000
0
0
0
0 1300`000;:`
0
:54
246,000
0
A
0' 300;000'.
8,510,218
10,542;559
13;964,265
12,884;238
8,993,870
11,875 823 Z66 770 973-:
372,079
198.821
0
0
0
0 = 570;70C
481,950
1,810;050
15,453,699
12,992727
6
- (67 , 332) #37;092;561 _
2,738,487
16;252;950
20,576
5,897,795
1.589.806
13.453 6721 3 453 6711,
4/1312004 12: 0CDCF5YearlmplementationP lanAnalysis041104 PCDC detail 4 ,�'
Funds, 5520,3400 0'
REVENUES AND EXPENDITURES BY PROJECT AREA
COMMUNITY DEVELOPMENT PROJECT AREA
1 BEGINNING CASH BALANCE
2 CASH WITH FISCAL AGENT (BOND PROCEEDS)
3 REVENUES
4 41110 Property Tax, Increment
5 43410 Interest Earnings
6 43410 lnterestEarnings from Inlerfund Loan
7 44310 Intergovernmental
8 48010 .Miscellaneous Revenues'
9 48010 ; Property Owners'Contribulio_ns -
10 TOTAL REVENUES
11
12. BOND PROCEEDS
1 3 49810 Gross 2000 Bond Proceeds -
'14 49810 , Gross Bond Proceeds
15 Proceeds of 1992; Bond Reserve
16
17 TOTAL BOND PROCEEDS
18
19 TOTAL CASH, REVENUES AND BOND PROCEEDS
20
21 EXPEN
22 Admmfstraton ^
23 P201000 Project Administration
24 C260203. Bassett Street Remodel
25 P201000 Cost'. of Issuance for 2000 TABS,
26 P201000 PCD Plan Amendment & EIR(Seifel)
27 P201000 PCD TAB Fiscal Svcs
28 P201000 SB- 2557 County Collection Fee
29.. P201000 Kenilworth Appraisal'
30 P201660 .Marina Hotel Study.
31 P20,1000 P.rojtAFea Alternatives Analysis (Seifet #2)
32 P201000 General Plan,Update
33 P201000. AB 1768 (ERAF) Sliift to State of California
34 P201000, RealProperty 'Purchase (27 Howard)
35 'Intragovemmental'Charge '
36 Subtotal Administration
37
38 Prog Expenditures gg. - =
39 P201070 URM Project - -
40 P201040 Landscape.lmprbvements
41 P201090 Economic Development Promotion
PETALUMA COMMUNITY DEVELOPMENT PROJEEA
REVENUES & EXPENDITURES
IMPLEMENTATION PLAN
FIVE-YEAR FORECAST
FY 01 -02 FY 02 -03 FY 03 -04 FY 04 -05 FY 05 -06
Actual Actual Midyear Proposed Projected
Forecast
1,828,322
2,738,487
6,550,685
6,624,691
5,897,795
1,589,806
11,751,987
9,702,065
13;951,765
0
0::'';1],751;987
9,787,076
10,450,315
8,91
9,357,023
9,824,674
10,316 117 - '158 646 854 -:
474,285
368,809
820,000
720,176
206,423
_
55,643 - 2 645,336::
0
12,376
80
621,106
1,075,852
1,300 596 ,'- 3 090j151`
0
3,482,118
300,000
500;000
0
0 - <: 4 282; 11,118
13,051
88;
0
0
00-
°13739;
10;274,412
14;313,706
10,111,670
11,198;305
11,107,148
19,672357 - ::
0
0
0
0
0
0
0
23,630,000
0
0
12,000 000 n_35 630 o00a„
0
0
�0
0
0
0
0
23,630,000
0
0
12,000 %''35 630;000,,
12,102,734
28,804,180
49,994,620
31
17,004,943
25,262163 .:117887907,:
164,894
277,669
406;800
350
350,000
350,000 , -:`- _
0
10
0
0
0
0 10 490'i
0
0
788,138
0
0
0 = -. f.- ,288;738
0
0
10,000
200,000
0
0 , 210 000'..
0
0
0
0
0
0 ',� 0,
121,563
145,650
155,950
163,748
171,935
180,532
0
0
25,000
0
0
0
0
0
0:
0
0
O :0
0
0
0
0
0
0 0?
186;000
109,400
109;400
_ 0
0
0
0
250,173
512,641
520,000
.520,000,
520,000
0
1;250
0
0
0
0
189,750
290,800
125,200
131,460
138,033
144.935 -1 020,178 -:
662,207
1;085,452
2,133,129
1,365,207
1,179,968
1,195467 7;621;430'
0
77
1,000
1,000,
1,000
1 4 07T -•
83,335
73,866
100;000
80,000
50,000
10,000 .` - -- 397i20
0
0
5,000
5,000
5,000
5,000 ,,.,., ...20,000,`
•
4/13/2004 12:32 PM PCDCF5YearlmplementationPlanAnalysis041104 PCDC detail 5
Funds 5520, 3400 PETALUMA COMMUNITY. DEVELOPMENT PROJECT AREA
REVENUES& EXPENDITURES
IMPLEMENTATION, PLAN
FIVE- YEAR'FORECAST
REVENUES AND EXPENDITURES,BY PROJECT AREA FY 01 -02- ' FY 02 -03'. FY 03-04 FY 04 705 FY 05 -06 FY 06 -07
Actual Actual Midyear Proposed . Projected Projected
Forecast
42Progra�Expendltures
(Goatlaued) „'
43
P201090 Retail;Study (Leakage). -
�LOK!.Petaluma
0
0
'. 100;000
25,000
25;000
2
44
;P201010 Manna Hotel OPA
1.130
2,239
10,000
0
0
0
45
P201030 Auto;P.laza ProjecUlndustriaLAve. Site Prep
0.
3,698
100,000
100!000
'0
0
46
P201010 Assessment Credits
23,913
23,844
25;000.
25,000
25,000
25,000
47
Subtotal. Program Expenditures
108,378
103,724
341;000
236;000
106,000
66,000
48
49
50 _
P201000 Passthrough.PaymentstoOthers
3
3;318;51
3;565,650
3,793;425
3,983,096
4,182251
51
52
CapiEalmp %vementPha�ects
1 Central
53
Petaluma'Specific'Plan
79,583
154,321
0
0
0
0
54
Corona Road Highway Improvements
0
0
0
0
0
0
55
Brownfield'§ EPA Studies
0
0
5,000
0
0
0
56
Kenilworth /Fairgrounds °Circulation Improvements
0
0
0
0'
0
0
57
C200304 Road /Streetscapelmprovements
0
0
3,000,000
2,460
0
0
58
Lakeville Highway (Washington to Caulfield)
0
0
0
;853,000"
0
3,000;000
59
C200503 River Trail Enhancement
53;636
95;900
1;379;000
826,601
0
0
60
C200904 Ulility:Undergoundin9�Studies & Projects
0
0
'50;000
0
400,000
0
61
C200204 Gateway Landscaping & Capital Improvements
0
0
210,000
421;000
385
300,000
62
C200104. Caufield Extension
0
0-
3,000
0
0
0
63
Subtotal Capltal-lmprovement Projects
133,219
250,221
4,647,000
4;560;601
785,000
3;300,000
64
65
66 TOTAL EXPENDITURES 3;969,733 4,757,908 10,686,779 9,955;233 6,054,065 8,743,718
4/13/2004 12 : 3 10�CDCF5YearlmplementationPlanAnalysis041104 PCDC detail 6
•
Funds ,5520,,3400 :�
PETALUMA COMMUNITY DEVELOPMENT PROJ EA
REVENUES &EXPENDITURES
IMPLEMENTATION PLAN
FIVE -YEAR FORECAST
=
REVENUES AND EXPENDITURES BY PROJECT AREA
FY 01 -02
FY 02 -03
FY 03-04
FY 04 -05
FY 05 -06
FY 06 -07
FY 2001 02:
•Actual
Actual
Midyear
Proposed
Projected
Projected
-,FY2006 -07 - - ,
Forecast
TRANSFERS OUT
67 Transfers to Low /Mod Housing Fund 903
:1',873,685
1,990,651
0
0
0
0
68 Transfers out to Debt Fund .904
69 Tax Allocation Bonds (1992A)
0
0
0
0
0
0
01 .. -
70 Surety for 1992A TABs.(in lieu: of Reserve)
0
0
0
0
0
0
-
71 Tax Allocation Bonds (2001 A)
•�,
433,700
406,500
403,900
404,800
400,400
405,500
72 Tax Allocation Bo 2007 nds ),
0
_ 0
0
0
0
0
_0"
73 Tax Allocation bonds (2004)
0
0
5441936
1,072;005
1;072;005
1,502 005
4,190,957 .,
74 Tax AllocationBonds'(2000)
1,112;200
1;118,120
1
1,104,200
1;107,900
1,101200
6654020.
75 Agreement Obligations(AD19 &Be6son)
800;900
615;380
972,250
348;000
3
123;400
3 219A30'
76 Transfers Out to Transient Occupancy Tax Fund
Z7 Economic Development/Tourism Promotion via PVB
300,000
300;00
0
0
0
0
600 000
78 Transfers Out,to Traffic Furid.
79 McDowell /E. Washington Widening
0
1,300
0
0 :
0
0
= 1 300000
80I Transfers Outto Marina Fund 607
_-
81 Operations /Debt 'Service Shortfall
0
0
0
0
0
0
82 _ Manna` Dredging '
0
54,006
246;000
0
0
0
= 300000'
83 Transfers Out to Storm Drain Mitigation Fund 210
84 Payran Reach Flood Management Project
0
0
0
0
0
0
0,
85 Turning Basin Dredging
0
'0:
0
- 0
0
0
- '.0
86 Transfers Out to CDB Fund 901
0
0
0
0
0
0
87 Subtotal Transfers Out
4,520;465
5,784
3,277,486
2,929,005
2,939;805
3,132 105
' <22 583 537, =,
88 CHANGE IN ASSETS /LIABILITIES
372,079
198,621
0
0
0
0
570 700
89 CURRENT INTERFUND LOAN TO FUND 907
481,950
1,810,050
15,453;899
12,992,727
6,421,268
(67
X 37 092 56'1
91 TOTAL EXPENDITURES, TRANSFERS OUT, CHARGES
92 AND INTERFUND LOAN
9,364,247
12,551,230
29,418,164
25,876;965
15,415,137
11,808491
.104,434,234. -
9 3
94 ENDING CASH BALANCE
2,738,487
16,252,950
20,576;456
5
1,589,806
13,453 672
= 13 453
95
-
96
�
97 CUMULATIVE MTERFUND LOAN TO,CBD FUND 901
481,950
2,292,000
17,745,899
30,738,626
37,159;894
37;092 561
_37 092,567 ;
4/1312004 12:32 PM PCDCF5YearlmplemenlationPlanAnalysis041104PCDC detail 7
FUND 2130 LOW &MODERATE INCOME HOUSING FUND -
REVENUES & EXPENDITURES
IMPLEMENTATION PLAN -
FIVE -YEAR FORECAST
REVENUES AND EXPENDITURES BY PROJECT AREA FY 01-02 FY 02 -03 FY 03 -04 FY 04 -05 FY 05 -06 FY 06-07 FY 2001 -02ao:
Actual Actual Midyear Proposed Projected Projected FY20060
Forecast . - -..
LOW /MODERATE INCOME HOUSING FUND
.BEGINNING CASH, REVENUES & TRANSFERS IN
1 Beginning Cash Balance
2 Tax, Increment Revenue
3 Other Revenues
4 Transfers In from. Other Funds
5 TOTAL CASH, REVENUES`& TRANSFERS IN
6
`7 EXPENDITURES & TRANSFERS OUT
8
9 Project'Adminislralion
10 Projects
11 Homelessness .(Prevention, Shelter, Services)
12 Transitional,Housing
13 Family :Renlal Projects
14 SeniorProlects /Programs
15 Homeownership /Rehabilitation =Programs
16 CommunityiRevitalizalion Programs
17 TOTAL EXPENDITURES'
18 LOAN TO CITY HOUSING FUND
19 CHANGES INASSET &.LIABILITIES
20 ENDING CASH BALANCE'
21
22
23
24
25 ESTIMATED AVAILABLE CASH. BALANCE IN
26 HOUSING IN -LIEU FUND:
1;247,711
1,275;593
475399
1,049,462
538;83,1
2;601375 = 1247711
0
0
2,343,728
2,473;805
2,61,1;102
2,756018 ' 101846_5:
148-145
121,180
18
64;250
43!231
126 '- 687 503
1,980,459
2,1;18;293
0
0
0
0 "' 4 098 762
3,376,325
3,515;066
3;003;427
3,587,518
3,193;164
5 x':116;218;629
188;326
313,727
403,065
365,287
382,389
400,260 `' - 2;6 ;65 4
663,599
0
0
0
0
0 ZZ; 663,599
.74,349
0
67,500
72,500
67,500
67 3419:349_ t
440,974
857;187
29;400
29,400
29,400
29,400 ; - 1 415 761
319,799
465,237
1,053,000
'1977,000
8,000
8000 .;; 3631036.=
290,671.
19,555
101;000
602i50o
102;500
102500 _ 1218726:'
59 „177
;3;250
300,000
2000
.2,000
2 000 368 427 -`
2,036,895
1,658,956
1,953,965
3,048;687
591,789
609 -:= %899;952a
0
1,511
0
0
0
0_ 1511200._
63,837
6130.4891
0
n.
n
r ,
5,486,886 2,725;298 1,485,500 1,500,000 1,850,000 2,200,000 ;I
4 /: 13 / 2004 3 9CDCF5YearlmplementationP lanAnalysis041404 PCDC detail 6 �i
Fund 2130
REVENUES AND EXPENDITURES BY PROJECT AREA
LOW /MODERATE INCOME HOUSING
1 BEGINNING CASH BALANCE
2
3 REVENUES
4 Tak Increment Revenue
5 I nvestment l nterest
6 Mobile Home Rent Control Ad_min
7 Charges'foi Services
e Intergovernmental f Revenue
.9 Other Revenue,
10 TOTAL REVENUES.,.
1 . 1 G .
12' TRANSFERSdN /LOANS
=13. From ;PCDCProjeclAreas
-14 _ From City Housing in- Lieu'Fund
15 TOTAL TRANSFERS,IN
16
17 TOTAL CASH, REVENUES & TRANSFERS IN
18 EXPENDITURES
19 Homelessness (Prevehhon �S�heBer`Servtces)
20 P202305 Rental Assistance Program (PPSC)
21 P202306 Mediation Assistance. Program (PPSC)
22 P202101 Family ShelterPrograrn/Mainl (COTS)
23 P202103 Homeless Shelter /Opportunity Center
24 P202102 Armory Facility Set Aside
25: Subtotal Homelessness
26
•27 �Transitwnaf Hotystn �"� �
28 P202070 Transitional Housing FPath {SARMY)
129 P202100 .Emmaus House (COTS)
30. ..P202106 Supportive Shared Housing (COTS) _
31 Subtotal Transltionallkousin_g
32
33 tFarftity',t2en(�I
34 Old Elm Village (BH)
35 P202030 Boys& Girls Club.
36 P201010 Low /Mod Existing Housing Support
37 P202200 CPSP.Area Housing (EDEN)
38 Subtotal Family Rentals
LOW & MODERATE INCOME HOUSING Fl.�
REVENUES & EXPENDITURES - - -
IMPLEMENTATION PLAN
FIVE -YEAR FORECAST
FY'01 -02 FY 02 -03 FY 03 -04 FY 04 -05 FY 05 -06 FY 06 -07 FY 2001 -02 to
Actual Actual Midyear Proposed Projected Projected : :TY. 006;07 7
Forecast
1
1,275,593
475;399
1,049,462
538,831
2,601,375
0
.0
'2,343,728
2,473.805
2
2,756,018
117:725
73;472
15,000
41,900
20;881
104,046
2;805
5,370
1950
5,000
5;000
5,000
12,37
12,375
12,350
12,350;
12,350
12,350
11,417
_ 29,963
150,000 '
0
0
0
3,823
0
U66
5,000
5;000
5;000
148,145
121;180
2
2,538,056
2;654;333 '
2;682;414
1,980,469
2,118,293
'0
.0
_ 0
6
'0.
0'
'0.
0
0.
.0
1:980,469
2,118,293
= 0
0
0
0
3,376,325 3,515,066 3,003,427 3,587,518 3;193;164 5
21,333
95,000
228,374
291,216
27,676
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 n
663,599
66,949
0
40
100,000
28,122
312,812
440,974
0
0
0
0
0
60,000
65,000
60,000
0
0
0
0
0
7,500
7,500
7;500
0
67,500
72,500
67,500
0
0
0
0
0
0
0
0
28,764
29
29,400
29,400
828,423
0
0
0
857,167
29,400
29,400
29,400
0.'
0
0
0
0,
0
60,000
0
7,500
67,500
0
0
29
0
29,400
7,711'::
4113/2004 12:32 PM PCDCF5YearlmplementationPlanAnalysis041104 PCDC detail 9
Fund 2130
REVENUES AND EXPENDITURE&BY PROJECT AREA
E Semor/ S�pecta�Ne�roieeJ�Pragg�s� !�.�_. __:�:
40 P202300 Casa Grande.(PEPj
41 P202010 Mobile Home Rent Control
42 P202040 The Boulevard(Buckelew Programs)
43 P202303 Senior Housing Rehab /Prop Acquisition (PEP)
44 P202303 Senior Housing Rehab /Prop Acquisition (PEP) Wood
45 P202303 Senior Housing Rehab /Prop Acquisition (PEP) South
46 P202302 Lieb Dougl s: Street SeniorProject'(PEP)
47 Subtotal Senior'. Projects
48
49 ¢tloeownershipehabilitatlon *Programs''_
50 P202011' Mortgage Certificat Program
51 P202002 Facility Maintenance & Rehab
52 Below Market Rate'Adrnlw
53 P202080 Vietnam.Vetraris oi,CA: Rocca Drive Rehab
54 P2027 ? ? Work Force Housing
55 P202060 "Rebuilding Together" Housing Rehab _
56 Subtotal Homeownership /Rehabilitation
57
58 C m ty Revi l izatiorograms
59 P202400 Ellwood Opportunity Center: - UST Monitor
60 P2020_20 Neighborhood Revitaliza Lion /Oid!EaslPetaluma NA _
61; , Subtotal :Community Revitalization
62
69 Adt tt l t " t1 ttOC�IPro�"ra • tttS 7q M' , `;'
64 P202000 Intragovemmental .Charge
65 P202000 SB 255T County .Collection Fee
66 P202000 General Plan Administration
67 P202000 Housing Projects, Management
68 Subtotal' Administration
69
70 TOTAL EXPENDITURES '
71
72 TRANSFERS OUT/ LOAN TO CITY HOUSING FUND
73 CHANGES IN ASSETS & LIABILITIES
74 -
.75 TOTAL EXPENDITURES, TRANSFERS & OTHER
76 -
77 ENDING CASH; BALANCE
78 -
79
80
81 Estimated Available Cash in Housing In -Lieu Fund.
1;275
LOW & MODERATE INCOME HOUSING FUND
1;049;462
538,831
2,601,375,
REVENUES &,EXPENDITURES
--'
IMPLEMENTATION. PLAN
5,486,886
2,725,298
FIVE
-YEAR, FORECAST
1,850
2,200,000
FY 01-02
FY 02-03
FY 03 -04
FY 04 -05
FY 05 -06
FY 06 -07 FY 2001 -024 o
Actual
Actual
Midyear,
Proposed
Projected
Projected °FY 2006 -07 4
Forecast
0
7,028
395000
975,000
0
0 ;377;028,
10;823
7,630
8,000
2;000
8;000
8 _ 44 453
0
250.000
0
0
0 " 250 000=
0
300
100,000
0
0
0 400 6Z6
•.0
- 0
'0
900;000
0
0 900000[
0
0
0
100
0
0 100
308,976
149,903
300,000
0
0
0 - 758 879=
319,799
465;237
1,053,000
1,977,000
8,000
8,000 .: 3 631 036 -:
0
0
1,000
2,500
2,500
2,500 ,. 8 500
226,208
15,798
100,000
100
100,000
100,000 "'7 642 006
16
0.
0
0
0
0 •- 16 967;e
0
3;757
0
0
0
0
0
0
0
500;000
0
0= 500,000 _'
47,496
0
'0
0 _
0
0 47 496'
290;671'
19,555
101,000
602,500
102,500
.102 500 i; 1 218 726'
59,087
0.
150,000•
2;000
2,000
2,000 - 215'0870
90
3,250
150;000
0
0
0 _ 153 340
59,177
3,256
300
?2;000
2
2,000
' 34,000
63
65,500
68;000.
70,000
72.000 = 372 850 i:
0
38;716
41,015
43,292
45,694
48,236
6
54,700
54,650
0
0
0 116,100??
147,576
156
241,900
253,995
266,695
280 7 56"
188,326
313,727
403,065
365,287,
382,389
400,260 _. 2 053`054
2;036;895
1,658
1,953,965
3,048,687
591,769
609,660 9 899 952"
01
1,511
0
0
0
0 >1511200ii
63;837
(130,489).
0
0
2,100
3,039;667
1;953,965
3;048,687
591789
609660 1:11344 ° snn, -
1;275
475,399
1;049;462
538,831
2,601,375,
4
5,486,886
2,725,298
:1,485,500
1,500;000
1,850
2,200,000
4/13/2004 12 : CDCF5Yearlmplemen tationPlanAnalysis041104 PCDC detail 10
FUNDS 4510,4620,4630,4640,4650
REVENUES AND`EXPENDITURES'BY` PROJECT AREA
DEBT SERVICE FUND
REVENUES &EXPENDITURES
IMPLEMENTATION PLAN
FIVE -YEAR FORECAST
FY 01'-02 FY 02 -03 - FY 03 -04 FY 04 -05 FY 05 >06 FY 06 -07
Actual Actual Midyear Proposed Projected Projected
Forecast
DEBT SERVICE FUNDS
BEGINNING CASH, REVENUES: AND TRANSFERS IN
1 Beginning Cash Balance
.
2 Other Revenues
3 Transfers in from Other Funds
4
5' TOTAL'CASH . „REVENUES AND TRANSFERS IN
6'
7 . 'EXPENDITURES, TRANSFERS OUT - &RESERVES
. 8
. 9 Debt- Service Payments
10 Transfers Out to'OlherFunds
11 Defense 1984 TAB,
12 TOTAL EXPENDITURES, TRANFERS OUT & RESERVES
13
14 CHANGES IN ASSETS & LIABILITIES
15
16 ENDING CASH BALANCE
1,449,034
860;765
163,619
,164;722
165;841
166987
- _ 14490347
30,027
.21,647
4103
4118'
,4;146
4,175
_
68,21
2,395,400
2,269,900.
3;170
3,068,005
3,075;805
3,669 105
w 17 648 701
3,874,461
3.1 72,332.
3,338,208
- 3.236
3,245,792
3,840 266
;' 19 165 95]f
2,993,676
.3,008,541
3,173,486
3
3,076;805
3,670 705
18 996 218 "''
0
0
0
0
0,
0
' 0
0
0
0
0
2,993;676
3,008,541
3,173,486
3,071,005
3
3,670 705
';18,996,218
0
172
0
0
0
0
174`
680,785
163,619
164,722
165;841
166,987
169,561
169'561
4/13/2004 12:32 PM PCDCF5YearlmplementationP lanAnalysis041104 PCDC detail 11
FUNDS 4510,4610,4620;4630,4640,4650
REVENUES AND EXPENDITURES BY PROJECT AREA
DEBT SERVICE
17 BEGINNING` CASH BALANCE
18
19 REVENUES. AND TRANSFERS IN
2b InteresGEarnings
21 Other, Revenue
22 `New
:2000B TAB Proceeds
23 'New 20038 TAB Proceeds
24 TOTAL REVENUES
25
26 TRANSFERSIN
27
28 TOTAL CASH, REVENUES AND TRANSFERS IN
29
30 ' EXPENDITURES + AND - TRANSFER&OUT
31
32 P201000 Audit ?Fee §,
33 1992A Taz-AllocationBonds
34 4620 2001A,Tax Allocation Bonds
35 4650 AD #,19 :Auto Plaza,(Publi0rnp.)
36 4646 Auto'Plaza Note (Benson Land Repay)
37 4610 2000A'Tax Allocation Bonds (PCD)
38 4510 20006 Tax Allocation Bonds (CBD)
.39 .4630 2004A`Tax Allocation Bonds.(PCD)
46 - 2007 A Tax AllocationBonds,(PCD)
41 0000 2006A
42 New TAB'Costof Issuance
43 TOTAL. EXPENDITURES
44
45 TRANSFERS OUT
46
47
48 TOTAL EXPENDITURES AND TRANSFERS OUT
49
50 Changes In Assets '8, Liablitttes
51
'52`. ENDING CASH BALANCE -
0 172 0 0 0
5 163,619 164;722 - 165;841 166;987
0
DEBT SERVICE FUND
REVENUES & EXPENDITURES
IMPLEMENTATION PLAN
FIVE -YEAR. FORECAST
FY 01. -62
FY 02 703
FY 03 -04
FY 04 -05
FY 05 -06
FY 06 -07
Actual
Actual
Midyear
Proposed
Projected
Projected
Forecast
1;449
880;785
163;619
164;722
165,841
166,987
30,027
27;647
4,103
4,118
4,146
4,175
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
30,027
21,647
4,103
4,118
4,146
4,175
2,395,400-
2,269,900
3,170,486
3,068,005
3.075,805
3,669,105
3,874,461
3
3,338,208
3,236,646
3,245,792
3 640 266
0
0
3,000
3,000
3,000
3,000
0
0
0
0
0
0
361,975
406;488
403,900
404;800
'400,400
405,500
121,337
1,14, 0 7 9
120,000
123,000
122,000
122,000
1;350;223
1,239;866
852:250
24000
237,500
0
1,113;518
1, L18;121
1,110,400
1,104,200
. 1,107
1,101,200
46;623
129,987 -
,139,000
-139,000
136,000
137,000
0
0
544'936
1,072,005
1,072,005
1,502,005
0
0
0
0
0
0
0
'0
0
0
0
400,000.
0
0
'.0
0
0
0
2,993,676
3,008,541
3,173,486
8,07.1;005
3,078,805
3,670,705 ".
0
0
0
0.
0
n
0 172 0 0 0
5 163,619 164;722 - 165;841 166;987