Loading...
HomeMy WebLinkAboutAgenda 6.C 06/21/20044 CITY OF PETALUMA, CALIFORNIA•. AGENDA. ! ILL Agenda Title Resolution Awarding a Construction. Contract foi Meeting Date: June 21, 2004 FY 2003 -2004 Redevelopment Area — Local /Residential "Street Rehabilitation Pro';ect No. 03-C201 (formerly 03-.C501604 =1) Meetinz Time E 3:00 PM ❑ 7:00 PM Category (check one) ❑Consent Calendar ❑ Public FIearng New Business ❑ Unfinished Business ❑ Presentation DeOar"tment Director :. Contact-Person Phone'Nuniber Public Facilities & Rick''Sldadzien Steve Castaldo 778' -4303 Services Cost of Proposal $2,894,980.74 Account.Number ($2,431,536 Street Reconstruction and, $4:63,445 Water Resources) 3400mCMI 104 -54151 Name. of Fund: Amount Budeeted $3,493,000.00 2540 Street Reconstruction 6520 Water Resources Attachments to Agrenda Packet Item Location Maps (Exh'ib'it A & B) Letter from Ghilotti Bros. -(3 pages) (Exhibit C) Resolution Summary Statement The work to be performed under this contract consists, of repairing failed, sections of road, through cold milling and. placing asphalt patches, replacing existing water services placing a 1 %" asphalt concrete overlay with pavement fabric, lowering and raising manholes and valves, installing an 8" water main, installing detector loops -and striping on 57 residential street segments throughout the `City's Redevelopment area. The City received three (3) bids on 'May 26 2004, for this project, with the low bid 'being submitted by Ghilotti Bros. of San Rafael, CA. in the: amount of $2,567 This bid has been withdrawn due to a math error at the .request of Ghilotti .Bros. (see Exhibit Q. Staff is recommending that the seconid low bidder, North Bay Construction, be awarded the contract. " Recommended City Council Action /Suggested Motion City Council to, adopt the resolution awarding the construction contract to the second low bid submitted by North Bay Constructiondh the amount of $2 and authorize the City Manager to execute the construction contract. , RW'ie ed by Finance Director: Re viewed by City Attorney Date: -_ alter A rove Ci Man Date: Date: f To ' Date: Revision # and Date Revised: File Code: e CITY OF PETALUMA, CALIFORNIA JUNE 21, 2004 AGENDA REPORT' FOR RESOLUTION AWARDING A'CONSTRUCTION CONTRACT FOR FY1003- 2004. REDEVELOPMENT AREA - LOCAbIZESIDENTIAL'STREET REHABILITATION PROJECENO 03- C2011044 (FORMERLY 03- C5016.04 -1) EXECUTIVE SUMMARY The work to be performe1urider this contract consists of repairing failed: sections of- toad, 'through cold milling and p'lacing';asphalt patches,.replacing existing, water services, placing a 1 '/2 asphalt concrete overlay with pavement fabric, lowering; and raising•manhales and valves, installing an 8" water main, installing detector loops and striping on 57Tesidential' °street segments throughout the City's Redevelopment area. The City received three (3) bids on May - 26,.2,004, for this project, with the low bid being submitted by G1lilotti. of Sala Rafael, CA in the amount of $2,567, This bid has b „een -withdrawn due to a math error at`the request of Ghilotti -Bros (see Exhibit C): Staff is recommending that the second low bidder, North Bay Construction, be awarded the contract. 2. BACKGROUND Council directed staff to solicited bids to improve residential streets within the Redeve'loprnent area following along the recommendations of the Citizens Advisory Committee. This area is 'bordered by, Petaluma Blvd. to the west and McDowell Blvd. to the ,east. There are 57 streets that will be overlayed with asphalt-, and 10 streets that wi11 'be slurry sealed. The work covered will include repair of approximately 2,000;000 square feet of road. Paving; .iii ,general, brings streets up to a pavement condition index '(PO) of 1`00. At the completion of this contract, the.citywide:PCi :average will have risen to 60. This contract will also include replacement of existing water services and' nstallation of anew 8” water maim on four streets, to be amended in tl rough.a change order; once the water in design is complete. The work is anticipated to take several months;, followed by North Bay .Constructioinpaving. the streets to complete°the project. The ,Engi zeer s Estimate for the paving and water work was $2.40 million .and $250,00.0 respectively, 1. which was_ developed :from ,the bid unit prices from contract 9846 -�1., 9846-2, and 9732 - (bid n feb. 2004). The actual bid cost of the paving and water work is $2 3 431,536 and $"46 ,445 respectively: The apparent` low bidder has decided to withdraw his bid due to a math error. The Director of PF &S`an'd Project.Manager withdrawal of the-low bid submitted by Ghilotti Bros. and award of the, contract to North, Bay Construction. The City Manager concurs with awarding the contract to the second low bidder, and a memo was sent, to Assistant `City Attorney advising of out decision. ALTERNATIVES . , a. Award contract: b. Rejectthebids and re- advertise. c. Do not perform the work. 4.., • FINANCIAL IMPACTS Engineers Estimate, for the bid was $2.65 niillion: The following i& the summary of bids. '0 Name of Bidder Ghilotti Bros. NorthBay Construction Ghilotti Construction' Revenue Souree('s): `Funds 2640 and 6520 Bid Amount $2,567,899,95 $2;894;980.74 $3,1.25 Amouni Budgeted Estimated. Costs TF &S General Fund Overhead. $145,000.00 Administration $58,000.00 Design $.00 Construction Management $1,00,000.00 Construction $2;900,000.0.0. Contingency $290,000.00 TOTAL 5 Q 7 CONCLUSION 3;493,000.00 The _City received three (3) bids on May 26, 2004, for this project, with the low bid being submitted by Ghilotti Bros. of San „Rafael, CA in the amount of $2,567,899:95. This bid has subsequently been withdrawn due to a math error. City Manager approves allowing Ghilotti .Bros. to withdraw their bid. Staff is recommending that the second low bidder, North Bay Construction, be awarded the contract. OUTCOMEs OR.P,ERFORMANCE MEASUREMENTS THAT WILL,IDENTIFY SUCCESS OR COMPLETION° Fol lowing. the award, the contractor will enter into an agreement with the City and submit the required contract documents, bonds and- insurance. The contractor has five days after the Notice to Proceed to start o day spetruct on is anticipated to start in July and be completed 'in October 2004. There are 70 working in this construction contract. RECOMMENDATION City Council to adopt the resolution awarding the construction contract to the second low bid, submitted he c T oirtstr Ba ,Cbristr a c c t on, in the amount of $2,894,980.74, and authorize the City Manager to execute Y Y y • EXE[MIT A /J 1 I, I I I I I Ij II MAP I'B'I DECIMAL CONVERSION '1116" D:D052' 1 D:DS' PFULUMA 3132" 0.0078' 2" D.16' 1/87 0.0104' 3" = E 3/:16' 0.0156' 4" = 0.33' 114 = 0.0208' 5" 0.41' '51167 MIMI' 6" 0:50' 3/8° D 0318' 7 = 0.513 1/2" 0 0417 8 = D 66' LIMITS OF OVERLAY'S i a 3/4 0.0625' 10 `= D.83'' 0.0728' .. .. SIaNEO eY - _. 2003 - 2004' BIT DATE. C I T Y O F F E T A L U M A, Steve Castaido. Ap�i1;29iti,2oo4 seEe 3 jTY Street'Rehabilitation Project CNECKEU6Y:. SCALE, Redevelo . menf Area.' Department of Public Facilities and Services.. OF P R1ck As Shown; A� 555 McDowellBlvd North - P.etaluma ,.CA • 94954 S:/CM . :Lceah /Fesiden�sl Street. 707.778.4303 EE NO c 4e'i: Project Numbers o3 - 5olso4a Butch Smith Au q`/CFi' P /03`- 5D1604 -1 �" j EIIBTT B 17 Q � �— � ; III J�IIII i, U • -c. � -�# ^'�— �'_J ' 1 I I H111H 11,1 I •'�� � � �V o � I .� LAI•: !- - A�t�`�„`, MAP "C" MAP "D" DECIMAL CONVERSION 1/16" - 0.0052' 1" = 0.08' 'rneuun 3/32" - 1/8" - 0.0078' 2" - 0.0104' 3" = 0.16' 0.25' 1'I 3/16" 0.0156' 4" . 0.33' e,men,. U.", 1 114" = 0,0208' 5" 0.41' 5116" 0.0260' 6" 0.50' LIMITS OF OVERLAY :IM 5/8' �oP` 318 = 112' = 314' = 0.0318' 7' = 0.0417' 8' 0.0521' 9' 0.0625' 10" = 0.58' 0.66' 05' 0.e3' 7/8" = 0.0729' 11' = 0.91' SHEET - OF ^ ITY AD' 2003 = 2004 Street RehabllitatlDn,Project RedevelD rnent P P rLncal /ABBldentlal Slreeh Died Numbers 03 501604•1 " - - Area CITY O F P E T A L U M A Department o1 Public Facilities end Services �, 555 McDowell Blvd North . Petaluma - CA - 94954 707.778:4303 OEfi1GNED BV: Steve Castaldo; DATE:' April 29th 2004 4 CHECMED BY: Rick Skladzien, SCALE: As Shown 501604 -1 / ORAWHBY: Butch Smith ` AIfrOCAD FlLE NO. S: /CMPl03- EXHIBIT C rr rp - F GHILOA 11 BROS, INC. 525 Ucoby,gtreet, Salp. Rafael,, CA,94901 Telephone: 415/4'54e-70,11 Fax: 415/45443761 License 0.32129 June 1 „2004 City' of Petaluma iUN I 2001 Po Box 61 Petaluma, CA 94953 . I J eUdLw r Attn:, Steve astaldo AND RR Proj6ct'No. 03.C5.01.6.04-1 gtreetReh&6ation Project Redevelopment Area Local/Resideritial Streets DeaT'Steve; As per Section 2-1.095, Refief'of . Bid of the Standard Specifications, Ghilotti-Bros., Int.xecruests ow bid submitted f6r tlie#ove project on 5/226/04. When�we cal6ulated pr ice;for item ,5, W' ,.Cold' ling ,, on this project, we inchi&d costsitbmiill the existing pavement and haul and placethe asphalt concrete , requited to replace the existihgFpayeni nt that we hadrnilled. When wescalculaied the topurchase•the concrete to replace the 'illed pavement, however, We did a,quatitity for thepurchawofthe asphalt. t ,concrete and, subsequently, c did not in $195 of cost that we should have4hpluded in -item We:made this rhath error bytiot inputting aquantity of 4599 -tons ofasplialt that we need to 16 cbmPjete.thi§'iiem of wo rk: . A's a result of this rnistdice. our bid proposal I .di&n ot include K85,356.88.6f costslh4shoutd'haVe been included and we requestthat our bid proposal be<withdrawn. Enclo . sed are our:computer work sheets for this item of, work., We have lhighlighttd yellow the Buy AC item where we madeithe mistake dfnoVenterin the - quautity of 4598 tons of as p halt concrete If you questions or need any additional information.. 1)16ase call me at (415) 454-701 Franklin D Vice President of Estiiiiating & Constructiolimana''gement I Cc: Mike Ghilorti Kevin Dert Encl. I I 0 BROTHERS. INC. 5R0410 &ALUMASTREETREDEVELI ®- - -- Code Description Quantity UM U T Labor Equipmnt Rentals Material Supply Subcon Other Tax Unit Extended ' Nat'Assigned - 125N - COLD MILLING - ITEM :5 --- -- 120.00 - 0,33 - -- - 98 33,850 24,675 36,585 1,600.00 1.785.33 303,069 SF - -Detailed Account NONE QGroup QLabell QLabel2 QLabel3 100.00 %DBE Allow 22.0 Days 13775.86 SF /Da 0,0001 D a/SF 4482:57 CosUDa - - Net Assigned 125N 1 ,.. _ -. _ GRINDIHAUL - 4598 TN _ .. 303,069 SF _ __ 11,106 10,146 14,985 589,41 0.12: 36,830 Detailed -'- _. _:... 012048 Account 'NONE QGroup _ QLabell _. QLabe12 QLabe13 100,00 °'oDBE Allow 6 : 0 Days 50511:50 SF /Da 0.0000 Da/SF 6138.28 Cost/Da CREW Cost Detail - - ,_. 0.5 OPU PICKUP /FOREMAN --. _... 27.00 HR U __. 63.69 __ 15;00 3.41 82,10 420.46 ? 217 11,352 0 5: OGRINDERCAT GRINDER & 27:00 FIR U 115:52 298.90 6.04 82.13 2,21,8 0;s 0L310 310/210 RT LOADER 27;00 HR U 57:76 21.35 3,02 105:00 2,835 0 5 RS WEEP RENTAL SWEEPER 27.00 HR = U 105.00 4,9 "03 2;0' . LLAB, LABORER . - 1 HR . U 43:61 2.34 Z8,1 12:8]. l 692 1.6 ETFB ... FLATBED 54;00 HR U 12.81 7147 403 1.0 ECOMP COMPRESSER 54.00 HR S EM1 U 7.47 75.00 3:0 RTSBD BOTTQM DUMP 162:00 HR U 75.00 - 12150 -Not Assigned - 125N 2 _ 120.00 - 1244 - 61,787 14,528 21,600 1,600,00 1,195.92 -..... _ REPLACE.AG ... 4 1 598.00 TN' _. ,_ 22,742 -- -Detailed 1 Account NONE QGroup. QLabell QLabe12 QLabel3 100.00! OBE Allow 16.0 Days 287.3750 TNIDa 0,0035 DalTN 3861.68 Cost/Da -Not Assigned -- 12514 2 1 BUY•AC 4;598.00 TN - - Detailed 300301.Account NONE QGroup QLabell QLabe12 QLabel3 100.00 %DBE Allow IJS7 Cost Detail 1.0 MAC01 BUY 112 - 3/4 AC 0'.00 TN U - - -- -Not Assigned 125N 2 800.00 GL 1;600:00 120X0 - 2,15 1,720 2 BUY TACK - Detailed 300396 Account NONE QGrou p QLabell QLabel2 QLabel3 100,00%DBE Allow ..-.- LIST Costpetait 2.00 0.15 2.15 1,720 1.0 M01602 BUY SSIH OIL 800:00 GL U Not Assigned 125N 2 1;195.92 - ..- ._._.- 1306 -- 60067 - 22,742 14,528 - 21,600 -- 3 PAVE (ALL) 4,598.00 TN - Delalled ... _ i Account NONE QGroup: QLabell _. _ _... QLabe12 QLabel3 100.0i)'/.DBE Allow .37 16.0 Days 28750 TN /Da 0.0035 Da7TN 3754 18 CI SUDa ..- ..- .... -_.; .- . - hletAssigned -,, 125N 2 . - ..,. _.. 3 1 PAVE BACK ,.. 4,596.00 TO _. _. 22;742 14,528 __ 1,195.92 8.37 38;467 - - Detailed 005304 Account NONE QGroup QLabell QLabel2 QLabel3 I00.00 Allow 8.0 Days 574.7500 TN /Da 0.0017 DaITN 4808.36 Cost/Da CREW Cost Detail 0.5 OPU PICISUPIFOREMAN 36.00 HR U 63.69 15,00 3.41 82.'10 269.17 2,956 9,690 0;5 OP1055 OPERATED PAVER 1055 36:00 HR U 113.80 .149.45 5:92 12'81 822 1.0 ETFB FLATBED 72.00 IiR U 12.81 3.02 '103.48 3,725 0:5 OCR534 534 AC- ROLLER 36.00 HR U 57.76 42.70 3.02 103.48 3,725 0.5 OCRC21 CG2211434 AC ROLLER 36.00 HR U 57.76 4230 76.79 2,764 0;5 0CRC16 C -160 017220 ROLLER 36.00 HR U 57.76 16.01 3.02 82.13 2,957 0.5 OL310 3101210 RT LOADER 36.06 HR U 57.76 21.35 3.02 45.95 6,617 10 LLAB LABORER 144.00 HR U 43.61 2.34 2.45 120.58 4 0.5 OSWEEP SWEEPER 36.00 HR U 46.74 69.39 1068 769 1.0 ETACKAN TACKCART 72.00 HR U 10.68 Jun 01, 2004 A 12:22PPJI V2002M (e) Copyright 1988 to 2004 HaM DOW Corpore0on WI Rights Res-d Page t 01' msE'cnI Code Description 44ot Assigned 125N 2 3 -2 HAUL Detailed 005302 Account NONE QGroup ,&Opays 574.7500 T_ N/Da CREW Cost Detail 4.0 RTSEIVII RENTAL SEMI END-DUMP Gl' HLOTTI BROTHERS, INC.. SFZ04169 (PEYALUMA STREET REDEVEL) Quantity UM T Labor Equipmnt Rentals Material Supply Subcon Other. Tax Unit Extended 4;598.06 TN 21 600 4 21,600 QLabell QLabe12 QLati @I3 100.00%OBIE Allow 0.0017 DafTN 2700.00;CosVDa 288.00 HR U 75:00 75.00 21.600 Jun 01,:2004 -at 12;22PNI V2002.00 .(c) Copyright,1998 to 2 Dollar Corpolmflon All Rights #Zesenvd Page 2 of 2 .iE cn AWARDING A CONSTRUCTION CONTRACT FOR FY 2003- 2004 REDEVELOPMENT AREA LOCAURESI:DENTIAL STREET REHABILITATION PROTECT NO. 03- C20.1104 y (FORMERLY 03- 0501604 -1') WHEREAS, the plans and specifications for the Redevelopment: Street Rehabilitation,program' have been prepared, and bids solicited by the Public Facilities and Services Department for placing an, asphalt overlay on 57 residential streets in the Red_ evelopment area. WHEREAS, three (3) bid's were :received on May 26, 2004 with the: low `bid being submitted by Ghi'lotti Bros. of San Rafael,'CA, in the amount ofS2,567,899.95: WHEREAS, Ghil'otti Bros has requested to have their bid withdrawn due to a math error. Staff 'has. reviewed their request for withdrawing their bid and find it acceptable.. WHEREAS, North Bay Construction of Petaluma, CA submitted the second low bid, and staff recommends awarding the contract to North Bay Construction in the amount of`$2,894,980.74 NOW THEREFORE BE IT RESOLVED that` the City Council of the City of Petaluma awards the construction contract to North Bay Construction of Petaluma CA, in the amount of $2 ; 894,980.74 ; and authorizes the: City .Manager to execute the :contract subject to review and approval of all contract documents, insurance cert ificates and bonds by the City Attorney. •