Loading...
HomeMy WebLinkAboutAgenda Bill 4.A 07/12/2004M FJ CITY OF PETALUMA, CALIFORNIA AGENDA BILL Agenda Title Resolution awarding the contract, to dredge the Meeting Date: July 12, 2004 Petaluma Marina to Eagle North America of Evans, Georgia for the' bid amount of $276,935:89, and :appropriate an additional $45;000 from Flood 1VLitigation.' Fees to cover contingencies program management and inspections. Meeting Tiffie ' Z 3:00 PM ❑ 7:00 PM Category kcheckf onel Z Consent Calendar ❑ Public Rearing ❑ New Business ❑ Unfinished 'Business ❑ Presentation Devartment Director Contact Person - Phone Number Parks and Recreation m Jim Carr (707) 778 -4380 Cost of Proposal $27 93 .89 ,.(Low Bid) Proposed project cost , Account.Number 63'00 -7199 including contingencies ogram management' and inspection is $315,000. Name of fund: Flood Mitigation Impact Fee Amount Budgeted $273,000, Attachments to Agenda. Packet Item A. Bid Results B. Resolution awarding the bid Summary 'Statement The Petaluma Marina is badly in. need, of dredging. The last dredging project took place in 1997 and only covered a portion of the Marina. All appropriate permits have been. secured and the project put out to bid. Six firms bid on the project, with Eagle North America of Evans, Georgia, the low bidder at $276,935.89. Recommended City Council'Action7Su2gested Motion Recommend that the City Council: award the bid to dredge the Petaluma. Marina to Eagle North America of Evans, Georgia for the: bid price of $276,935.89, and authorize the appropriation of an additional $42 from Flood Mitigation Impact Fees to assist with project management, inspection and contingencies. Reviewid by Panan ce Director: Review At orne ., t ° . mo ved V itv Manager: Date: Date:. Toda . s Wte: Revision. # and Date'Revised: File: Code: -o l 2 C ITY OF PETALUMA CALIFORNIA 3 JUL t2, 2004 .0 AGENDA REPORT 6 FOR 7 RESOLUTION TO AWARD 'THE PROJECT TO DREDGE THE P 8 MARI TO EAGLE NORTH AMERICA 9 10 1. ExwuTm SummARY 11 The Petaluma Marina is currently in need of dredging. The project dredge the Marina has 12 been put out to bid, with six° firms responding. Eagle North America came in with the low bid of 13 $276935.89. Staff is recommending that Eagle North °Americabe awarded the contract to dredge 14 the Marina based on their low bid (and the strong recommendations staff has received from past 15 clients. 16 17 18 2. BACKmoum 19 The ''Petaluma Marina was constructed in 1989 ;and has had only a partial, dredgingg in 1997. 20 Currently the Marina has heavy sediment buildup under all docks and At the mouth of the 21 Marina. At most low tides, sail's boats cannot enter or leave the Marina. This also pertains to 22 larger, power , craft. 23 Thep 'ectwas' originally,put out to <bid in the fall of 1993, with one firm responding. Dutra 24 Dredging provided" a.bid of $ T,198 882.00. At their meeting of October 27, 2003 the City 25 Council rejected the bid at the request of staff.' 'Staffchecked:withe number of firms who 0 indicated that due to the window of opportunity established by'Fish and Game and'Fish and Wildlife, there was not enough time to coordinate and' implement a dredging project. 28 Staff re -bid the dredging. project this spring and had six;�firms respond. Bids receivedwere as 29 follows: 30 31 Eagle North America- Evens Georgia $276,935.89 32 AIS Corporation — Carpenteria, Ca $485,612.50 33 Underwater Earth Movers, Inc.- Vancouver, Wa $580,612.50 34 California Company - Walnut Creek, Ca $591,294.00 35 Carmenzind Dredging —Palo Alto, Ca $649,537.00 36 Dutra Dredging- San Rafael, Ca $1,198,882.00 37 38 Staff checked references tand received good reports about Eagle North America., 7a nation wide 39 firm. They are currently involved with a.dredgingproject;in the Los Angeles area. They will 40 schedule the Petaluma project, either after they conclude or after a phase of the Los Angeles 41 project. 42 As is the practice; 'dredging'firms handle a number of projects on the .west coast, often scheduling 43 multiple projects: based. on their locations .and the proximity of their equipment. 44 The prime reason,Eagle North America is able to bid so low is due to the fact that they have a 45 smaller dredge than most companies. With the smaller dredge, Eagle North America is better 46. able to dredge .smaller marinas (i.e. under docks and in tight .confined spaces) such. as found in 47 Petaluma. Most dredging companies bring in two; dredges, a smaller one to work underthe. docks, and ,.a larger unit'to work open water areas and to pump the spoils to the'Shollenberger Disposal Site; thus `increasing their overhead. 50 Perthe permit with the Army Corps of Engineers, dredging may commence July I",.and must be 51 concluded by- October. 15*. 2 3. ALTERNATIVES 3 a. Award the bid ,as - recommended 4 b. Direct staff to delay the project until some future date. 5 c. Not award the project at this time. 6 7 8 4. F NANCIAL'IwACTs 9 The low bid for the Marina Project was $276 ; 935.89. Currentlythere 1'S.$273,000 budgeted for 10 the.Marina Dredge Project. Staff recommends appropriating an additional $42,000 to cover 11 contingencies, inspections and project management. Total recommended project amount is 12 $315,000. 13 14 Due to the nature of the dredging project; uncertainties will crop up as the work proceeds. Heavy 15. rip-rap from the bank could.adverselv'impact dredging operations, or additional amounts of'silt 16 may need: to be removed. Additionally, required Army Corps of Engineers reports must be filed 17 as the project progresses, as well as reports'with other regulatory agencies.'This phase, of the 18 work will be handled by a project inspectorwho is also an engineer familiar with. the, project. 19 This same engineer "handled the last marina dredging, project. 20 21 22 5. CONCLUSION 23 The need to dredge the, Petaluma Manna Lis critical, since a number of boats are marooned during 24 low tides &responsible low bidder has provided a competitive price and is ready and able to go 25 to work.: 26 Without dredging, the marina, customers will be forced to go elsewhere, and in some cases 27 already have._ 28 29 6.. OUTCOMES. OR PERFO MEASUREMENTS THAT WILL IDENTIFY `SUCCESS OR 30 COMPLETION: 31 Marina dredging will be scheduled and' started as soon as convenient for both the City and the 32 contractor. The City will have a project inspector on hand to ensure that the project meets all 33 Army Corps of Engineer criteria, and that the project is completed within the fish window of 34 July 1 to October'15, 2004. 35 36 37 7. RECOMMENDATION' 38 Staff recommends that the project to dredge the Petaluma. Marina be awarded to Eagle North. 3.9 America..of Evans,,, Georgia, and that an additional, $42,000 be allocated,from Flood Mitigation 40 Impact Fees to, cover contingencies, project management and inspection. 41 42 43 44 gAorms /2003 agenda bill 45 46 47 48 49 50 51 52 53 d M i� 0 City of Petaluma, California Office &4166 City'C-'16rk 11 English Street, Petaluma, CA 94952 Tel. 767.778.4360 Fax: 707.778.4554 E-Mail, cityclerk @ci.petaluma.ca.us Bid Results 2004 Petaluma Marina Dredging Project 223.0-71 Thursday, June 1 , 7, 2004 —q 11A0 a.m. Company Amount of Bid Eagle North America — EVaq-s, GA $276,935.89 AIS Construction — Carpenteria, CA $485,612.50 Underwater Earth Movers, Inc. — Vancouver, WA $580,612.50 California Dredging Company — Walnut Creek, CA $591,294.00 Carmenzind Dredging — Palo"Alto, CA $649,537.00 Dutra Dredging — San Rafael CA $1,198,882.00 49 2 3 4 7 RESOLUTION A THE BID TO DREDGE THE s PETALUMA MARINA T'O EAGLE NORTH AMERI OF EVANTS, 9 GEORGIA, FOIE THE RID AM UNT OF $276 10 11 " 12 13 14 WH ERE A S, the City of Petaluma owns the Petaluma Marina, located on the 15 Petaluma River, and 16 17 WHEREUS, the Petaluma Marina is badly in need of maintenance dredging 18 of the harbor due to the buildup of silt which hampers the ability of 19 boaters to operate and. moor their craft, and 20 21 VM EREA S, the City of Petaluma has. advertised, and bid the project to dredge the Petaluma Marina, and has received a responsive bid from the firm of Eagle North America of Evans Geor is in the amount of g 24 $276,935:89, and 25 26 " the budget for the Marina- Dredging Project is currently 27 $273,000, anadditional $42,000 in Flood &I'itigation'Fees is 28 recommended to cover project management, inspections and 29 contingencies, and 30 31 EREAS, references regarding the quality of work provided by Eagle 32 North America have been satisfactory. 33 34 IOW, THERE FO BE IT RESO that- the Petaluma City Council 35 does hereby award the project to dredge the Petaluma Marina to the firm of 3.6 E agle North America. of Evans, Georgia, for an amount of $276,935.89, 37 authorizes an - additionall appropriation from Flood Mitigation Fees in the 38 amount off$42�000. for the project, and authorize - the City Manager to execute 0 the construction contract, subject to review and approval of all required 4o documents, insurance certificates and bonds by the Ci Attorney.