Loading...
HomeMy WebLinkAboutAgenda Bill 3.B-Memo 09/13/2004i CITY 'OF PETALUMA CALIFORNIA 1V�hMORANDUVI SEP 13 2004 CITY MAN G L, R�, Department oy WaterResoi&ces ai:d'Conservation, 11,EnglishyStreet, Petglum,a, CA 94952 11 (7.07) 778 -4304 Fax (707) 776=3635 E= mail:mban@ci.petaluma:ca us DATE: September 13',.2004 TO: Michael Bierman - Ciii Manager' FROM: Michael Ban, -P.E. SUBJECT: Cavanaugh Demonstration Garden Item 3:B of today's consent calendar agenda is a resolution awarding the contract for construction of the Cavanaugh Center Demonstration 'Garden. With,a bid of $24 North Bay Landscape Management's,bi'd was lower, than the next bid by over $18,000. The project includes the following components: Removal of over 1,500 square' feet of turf Installation of: o 390 perennials in 4" pots o 50 shrubs - 0 9 vines o 6 trees o 79 linear, feet of 2"x 6" recycled resin Header o 6 bike bollards o 3 plazabenches o Water efficient irrigation 'system. including connection to water system and pressure testing o Over 1,200 square feet of decomposed granite The design of the landscape and selection of materials was. in. accordance with the .Parks Department's requirements. The decomposed granite: will be installed adjacent to the existing sidewalk; as shown on, the attached. plan The use of decomposed > granite for this application is preferred by the Parks.Department: If the area for the decomposed granite were'to be used as the primary pedestrian path and for ADA compliance, the Parks. Department would `have likely selected quarry fines, as they •recently did for a new path, , adj acent to the river. Decomposed granite is the preferred`product for the Cavanaugh Center project; CAVANAGH CENTER NOTES: 1. ALL PLANTS TO BE SELECTED BY LANDSCAPE ARCHITECT OF PLANTING. 2. IRRIGATION SYSTEM TO BE RE FOR EACH, PLANT TYPE. SEI PLANT CALL -OUTS. SEE IRR 3. COVER ALL PERENNIAL PLANTII IRRIGATION STANDARDS MANLIF. MODEL DESCRIPTION GPM Hunter PCN -50 Bubbler .5 CPH ' p& Shrub 2 per Tree - See Detal Rainbird- Quick Coupler w/ Round. Concrete Box & Metal Lid Rainbird GB SERIES Bross Remote :Control - Valve w /two extra wires ® each site, w/` ball valve and two unions, before & after remote control valve locate in _Concrete Boxe wAocking "Metal Lid Irritrol MC PLUS Exterior Controller: w/LeMuer Enclosure Station Qty. cis required Schedule .40 2" Main Line Schedule 40 i" Lateral Line Toro 'Super Funny Pipe' 1/2" Lateral Line for Planter Pots Schedule 40 Sleeve - size to twice diameter of lateral(s) 2 "• OF MULCH, .SHRUB_ARE NOTES: 1. Minimum Design Pressure is assumed at 55. 2. Maximum System GPM is 50. 3. Backflow Prevention Device - see Engineer's Drawings. 4. Location of Main & Lateral Lines ore shown diagramatically on drawings - lines are intended. to run behind curb. 5. See Sheet this sheet for Irrigation Details. A� •4 L-dscspeAsditeaMbm 145ICe11er Sava Pefihkii - 3 - Celifim - 'k 94952 (707) 778 -7642 FAX M 779-7669 ,�;pNaSCgA NO '.2923 7p or _, " DRAWN BY: SR PLOT DATE: 5 -20 -04 CHECKED BY: DO APPROVED FOR THE OWNER BY:. APPROVED FOR THE ARCHITECT eY: awe 66wmox p er; =&E: 1"=30' PROJECT NUNBER ' LANDSCAPE PLAN L -1