CITY OF PETALUMA, CALIFORNIA
AGENDA BILL
enda Title: Resolution Awarding the Contract for the
Meeting Date October 18, 2004
anagement of Biosolids Stored on Wastewater Oxidation Pond
Levees
Meeting Time ® 3:00 PM
❑ 7:00 PM
Category (check one) ❑ Consent Calendar ❑ Public Hearing ® New Business
❑ Unfinished Business ® Presentation
Department
Director
Contact Person
Phone Number
Water Resources &
Michael J. Ban,
Margaret P. Orr,
(707) 778 -4589
Conservation
P. E.
P.E. pi&
Cost of Proposal $305,003.80 for Phase 1
Account Number C501104
Amount Budgeted Total FY 03 -04 Budget for Phase 1
Name of Fund Wastewater
(management of biosolids on Pond 4 levees) and Phase 2
(management of biosolids in oxidation ponds) is $1,281,000
Attachments to Agenda Packet Item
Location Map (Attachment A)
Pictures (Attachment B)
Summary Statement
The City received bids on October 5, 2004 for the management of biosolids currently stored on the north
and south levees adjacent to Pond 4. The project involves clearing vegetation from the piles of biosolids to
the pond water lines, management of 2,550 tons of biosolids, grading the levee once the solids are
removed, and finally applying a layer of base rock on the levee road where the biosolids were stored.
Recommended City Council Action /Suggested Motion City Management recommends the City Council
approve the resolution awarding the contract for management of the biosolids to Synagro West, Inc.
Rev' wed by Finance Direc
Reviewe t e
?
Approv by City Manager:
Date:
I ate•
�v
To 's te: October 6, 2004
Revision # and Date Revised
File Code S /WR &C/WW/6210/60 —
#
Biosolids/ City Council /October 18,
2004 /Agenda Bill Final.doc
• CITY OF PETALUMA, CALIFORNIA
OCTOBER 18, 2004
AGENDA REPORT
FOR
RESOLUTION AWARDING THE CONTRACT FOR THE MANAGEMENT OF BIOSOLIDS
STORED ON WASTEWATER OXIDATION POND LEVEES
EXECUTIVE SUMMARY
The City received bids on October 5, 2004 for the management of biosolids currently stored on the north
and south levees adjacent to Pond 4. The project involves clearing vegetation from the piles of biosolids
to the pond water lines, management of 2,550 tons of biosolids, grading the levee once the solids are
removed, and finally applying a layer of base rock on the levee road where the biosolids were stored.
City Management recommends the City Council approve the resolution awarding the contract for
management of the biosolids to Synagro West, Inc.
2. BACKGROUND
• In support of a digester cleaning project in the early 1990's, Veolia Water (formerly E.O.S. and formerly
U. S. Filter) removed biosolids from the digester at the Hopper Street wastewater treatment plant and
placed them in Pond 4 at the oxidation pond site on Lakeville Highway. In 1995, Veolia Water removed
the biosolids from Pond 4 and distributed them along the north and south levees of Pond 4. The location
is shown on Attachment A. The U.S. EPA allows on -site storage of biosolids for 90 days.
These biosolids need to be removed to protect the City from potential regulatory issues, to facilitate
removal of biosolids from Pond 1 (this work will begin early Summer 2005), and to prepare the site for
construction of the new water recycling facility project. In support of this project, the biosolids on the
levee have been extensively quantified and subjected to laboratory testing for land application or for use
as landfill cover or for disposal at the landfill. Land application is the use of wastewater biosolids to
augment farm land for natural nutrient addition to crops for growth. Sonoma County has approved sites
along Lakeville Highway for land application of biosolids.
This project involves the clearing of vegetation from the piles of biosolids to the pond water lines,
removal and management of approximately 2,550 tons of biosolids, grading the levee once the solids
are removed, and finally applying a layer of base rock (about 370 tons) on the levee road where the
biosolids were stored. Solids removal is scheduled to commence on October 19, 2004 and should be
finished by November 30, 2004. The project location is illustrated on Attachment A. Photos of the
stored biosolids are presented in Attachment B.
Once the biosolids were laboratory tested and quantified, the department prepared the technical
specifications and plans for this project. The Notice Inviting Bids was issued on September 22, 2004.
Bids were received and opened on October 5, 2004. The following is a summary of the bids:
NAME OF BIDDER BID AMOUNT
Synagro West, Inc., El Dorado Hills, CA $193,003.80
Fleet Environmental Services, Newport Beach, CA $338,623.20
With a bid of $193,003.80, the apparent low bidder is Synagro West, Inc., 4993 Golden Foothill
Parkway, El Dorado Hil1S, CA 95762. The engineer's construction cost estimate is $175,000. Staff
verified that Synagro West, Inc. possess a valid class A California Contractor's license, license number
817636, expiration date February 28, 2005, that qualifies Synagro to perform the work. Synagro has
provided similar work for Windsor, Napa, and Richmond. These agencies provided positive feedback
regarding Synagro.
3. ALTERNATIVES
1. Approve the resolution and award the contract to the low bidder.
2. Take no action. This will result in the continued violation of regulatory statues by the City
having knowledge such a situation exists. Regulatory penalties up to the maximum extent
allowed by law. This could reach back to the initial application period in 1995.
3. Reject all bids and re- advertise. i
4. FINANCIAL IMPACTS
The following is the breakdown of the estimated costs:
CONSTRUCTION CONTRACT $193,003.80
ENGINEERING 30,000.00
ADMIlVISTRATION /INSPECTION /TESTING 30,000.00
PROJECT CONTINGENCY 39,000.00
GENERAL FUND 13,000.00
ESTIMATED TOTAL PROJECT COST $305.003.80
5. CONCLUSION
Management of the biosolids currently stored on the north and south levees of Pond 4 will minimize
potential liability associated with the biosolids and will facilitate further removal of biosolids in Pond 1
and construction of the water recycling facility next Summer.
6. OUTCOMES OR PERFORMANCE MEASUREMENTS THAT WILL IDENTIFY SUCCESS OR
COMPLETION
The action will end any future regulatory liability for the situation and minimize any current exposure.
2
• 7. RECOMMENDATION
City Management recommends that the City Council approve the resolution awarding the contract to
Synagro West, Inc., the low bidder for the removal and proper disposal of the accumulated biosolids.
F - I
LJ
•
3
3 AWARDING THE CONTRACT FOR THE BIOSOLIDS REMOVAL FROM THE
4 OXIDATION POND LEVIES PROJECT
5
6 WHEREAS, in accordance with the City of Petaluma Charter and Municipal Code, California
7 Public Contract Code Section 20162 and other applicable law, the City of Petaluma solicited bids
8 for the Project; and
9
10 WHERAS, the engineer's estimate for the Project is $175,000; and
11
12 WHEREAS, two (2) bids for the Project were received on October 5, 2004, and opened in
13 accordance with California Public Contract Code Section 4105.5 and other applicable law; and
14
15 WHEREAS, the apparent low bid for the Project was submitted by Synagro West, Inc.; and
16
0 7 WHEREAS, the City staff has verified that Synagro West, Inc. possesses a valid California
�8 Contractor's license Class A license s number 817636, expiration date February 28, 2005, that
19 qualifies Synagro west, Inc. to perform the Project; and
20
21 BE IT RESOLVED by the Petaluma City Council that:
22 1. The low bid is accepted.
23 2. The contract is hereby awarded to Synagro West, Inc., 4993 Golden Foothill Parkway,
24 Suite 2, El Dorado Hills, CA 95762, the low bidder.
25 3. This resolution shall become effective immediately.
26 4. All portions of this resolution are severable. Should any individual component of this
27 resolution be adjudged to be invalid and unenforceable by a body of competent
28 jurisdiction, then the remaining resolution portions shall be and continue in full force and
29 effect, except as to those resolution portions that have been adjudge invalid. The City
30 Council of the City of Petaluma hereby declares that it would have adopted this
31 resolution and each section, subsection, clause, sentence, phrase and other portion
0
1 thereof, irrespective of the fact that one or more section subsection, clause sentence, •
Z phrase or other portion may be held invalid or unconstitutional.
3
4 BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the
5 contract with Synagro West, Inc. subject to the review and approval of all contract documents,
6 insurance certificates and bonds by the City Attorney.
7
8
U
is
•
ATTACHMENT A
LOCATION MAP
0
•
•
W
Z
� � 5
o z N
�z o
N ter; �d0 C
v ag Nau~i m
') AH 3'nI 9ll a5
Ln
O
i
o� o
H ~
z 3anou
Z I
W
i
a I I
3 f
® I Z
� 2 3anou Q � I
v
to
LO OLO
Owe_
_ I amaN a
"w
I
� I
ZZ
< W 00 i
N
I Ma°
j 0) p
I � i
0
I
z
I o z o W I
I zz
� ? W
Li
` W Um �O
o ? � I
a
0
In
a
•
ATTACHMENT B
PICTURES
•
•
Pond levee access blocked
i
W
"
I
J
r
ok
�
I
t
t
{
C
1
}
0 0 0