Title Meetin Date November
_
' Agenda 1, 2004
Resolution Awarding a Construction Contract for 2004 Re -Roof ®3:00 PM
Time
Corporation Yard Buildings l VIeetin
C•100205
❑ 7:00 PM
Category (check one) Consent Calendar ❑ Pu He Hearing . ❑New Business
❑ Unfinished Business ❑ Presentation
Department
Director
Contact- Person
Phone Number
Public Facilities & Services
Ri ` . < dzien
Susan Lackie
778 -4303
Cost of Proposal $ 24,266.00
Account : Number 3800 54151
C 100205
Amount Budgeted $ 36;000 "
Name of Fund: General Fund
Contribution
Attachments to Agenda Packet Item
1, Location Map (Exhibit A)
2. Resolution
Summary Statement
The City received two (2) bids for the Re- Roofing Corporation Yard 'Buildings Project ranging from
$24,266.00 to $27,0:10.00. In, general, the work includes „ removing. and disposing of the existing built -up
bituminous membrane down to wood-sheathing, furnishing and installing a new built -up bituminous roof
membrane, and doing other work specified in the !special provision and as shown on the plans.
Recommended City Council Action /Su�2 sted, Motion
Adopt the resolution awarding the construction contract to the low' bid submitted by Henris Supply Inc.,
d/b /a Henris ;Roofing„ Company, P.O. Box 138, Petaluma, CA. 94953, in the amount of $24,266.00, and
authorize the City `Manager to execute the construction contract.
ReVijmmd by Aha nce Director:,
Reviewed by City Attorney
App roy b Cit: 1VIana er:
D t -�
Z® Date:
Date:
Toda - a e:
Revision # and Date Revised:
File ode:
#
October 1, 2004
SAStaffFolder \slackie\re -roof corp yard bldgs
\cc agenda
N 01,
CITY OF PETALUMA, CALIFORNIA
NOVEMBER 1, 2004
AGENDA REPORT
FOR
RESOLUTION AWARDING A CONSTRUCTION CONTRACT FOR
2004 RE -R'O6F CORPORATION YARD BUILDINGS PROJECT
PROJECT No., C100205
1. EXECUTIVE. SUMMARY
The City received two (2) bids for the Re- Roofing Corporation Yard Buildings Project
ranging from $24,266:00 to $27,0,10.00. 'In general, the work includes removing and
disposing of the existing built7up bituminous membrane down to wood sheathing,
. furnishin g and installing a new bui
It -up bituminous, roof membrane, and doing other
.
work specified in the;special provision and as shown on the plans.
2. BACKGROUND
The City Corporation yard was built in approximately 193 "6. Although the break/lunch
room has been remodel led' within the last 5 years, theiroofs on the remaining buildings
were last replaced in 1970.
3. ALTERNATIVES:
a. Award contract.
b. Reject the bids and re- advertise.
C. Do not'perforrn the work.
4. FINANCIAL IMPACTS
The Engineers estimate. was $29;9.00. The following is the summary of bids.
Name of Bidder Bid Amount
Hehr"i's' Supply Inc., d/b /a Henris
Roofin' &Company, Petaluma
$24,266.00
South West Construction & Property
Management, _San'Francisco $27,010.00
The exact auantityof d'amaged.sheathing to be replaced can only be determined after the
existing roof, is removed. The contingency will be used to replace existing sheathing„ as
necessary, that1was not estimated in the original bid'item. As funds allow, the re -roof of
the street shop building may be included.
e
r
Revenue So.uree(s): General Fund Contribution •
Amount
Budgeted
Estimated Costs PF &S
General. Fund Overhead $1,00;0:00
Administration $0.00
Design- . $1
Construction Management $0.00
Construction ;$24,266:00
Contingency $,10,734':00
TOTAL '$36;000
�5. CONCLUSION
The 'City received two (2) ,good bids and is recommending .award of the construction
contract to Henris Supply Inc:, d/b /a Henris Roofing Company, 'R ,OI .Bbx 138,' Petaluina,
CA 94953,, for a total of $24,266
6. OUTCOMES, OR PERFORMANCE MEASUREMENTS TI3AT WILL IDENTIFY 'S:UCCESS OR, .
COMPI ETION:
Following jhe award, the contractor wilt enter into an agreement with the City and submit
the °required. contract documents;' bonds and insurance. The , contractor.has five days after
the.Notce to,•Proceed to st C,
art work Construction.is anticipated "to start.` the °middle of.
November and be completed in December 20.04. -There are 10 working days, specified 'iii
this construction contract.
7. RE COMMENDATION :
Adopt- lo g
Henris Su rl s Incd/b /a Henris Roof` struction contract to the; low bid submitted by'
pp y g Company„ P':0. Box 138,'Petaluma,•..CA 94953,
in the amount of'$24-,266.00; and.authorize the -City Manager to execute''the construction,
contract.
AWARDING A CONSTRUCTION CONTRACT FOR
2004 RE - =ROOF CORPORATION YARD BUILDINGS
PROJECT NO. 000205
•
F
WHEREAS, the plans and specifications for the 2004 Re- Roof Corporation
Yard Buildings' Project 0100205 have been prepared, and bids solicited by the Public
Facilities and Services Department for removing and disposing the existing built -up
bituminous�membran e down -to wood. sheathing- and f irn shing and: installing a new
built -u bituminous roof, ; an`
p d.
WHEREAS, two (2) bidszwereLreceived on Ocfober 20' .2004 with the'low bid
being submitted by`Henrs Supply Inc., d/b /a Heriris Roofing Company; P.O. Box 138,
Petaluma, CA 94953, im the amount;:of "$24,266.00. .
NOW THEREFORE BE. IT RE SOLVE D that the City Council of the City of
Petaluma awards the eon structi oncoiitraet to Henris Supply Inc., d/b /a Henris Roofing
Company; P.O. Box 13'8
n a, JCA 94953 in the:. amount of $24,266:00, and
authorizes the_ City'Man; g er to execute the contract ;_subject to review and - approval of all
a
contract documents .insurance .certificates "and' bonds by-the City Attorney.